This Report has been submitted to ADB by the Haryana State Road & Bridges Development Corporation and the National Capital Region Planning Board and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB.
External Monitoring Report
Project Number: 41598 December 2014
IND: National Capital Region Urban Infrastructure Financing Facility – Project 1 - Bahadurgarh-Badli and Gurgaon-Badli Roads Prepared by: Market-Info Services For Haryana State Roads & Bridges Development Corporation Limited and National Capital Region Planning Board
External Monitoring Report on Implementation of Resettlement Plan of Upgradation of Bahadurgarh-Badli-Chandu-Gurgaon Road
December 2014
Prepared by
Market-Info Services SCF-34, Sector-6, Bahadurgarh Haryana
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page i
Table of Contents
Abbreviations ............................................................................................................................................... ii
Glossary ....................................................................................................................................................... iii
Structure of the Report................................................................................................................................................. v
Chapter 1 – Introduction and Methodology .............................................................................................. 1
1.1 Project description ......................................................................................................................................... 1
1.2 Objectives and Scope of the Study ................................................................................................................ 1
1.3 Institutional Arrangements for implementation of Resettlement Plan (RP) .............................................. 2
1.4 Grievance Redressal Mechanism ................................................................................................................... 2
1.5 Approach and Methodology .......................................................................................................................... 3
Chapter 2 – Status & Impact of implementation of RP ............................................................................. 5
2.1 Introduction ................................................................................................................................................... 5
2.2 Resettlement ................................................................................................................................................... 5
Chapter 3 – Findings from Community Interactions .............................................................................. 15
3.1 Introduction ................................................................................................................................................. 15
3.2 Consultations with Affected Households .................................................................................................... 15
3.3 Consultations with Affected Households .................................................................................................... 17
Chapter 4 – Conclusions ............................................................................................................................ 20
4.1 Introduction ................................................................................................................................................. 20
4.2 Key Findings ................................................................................................................................................. 20
Entitlement Framework of ESMS, NCRPB for Stretch-1 & 2 ................................................................. 29
Annexures
1 – Entitlement Framework of ESMS, NCRPBP
2 – Photographs of Interactions with Stakeholders – APs and Officials
3 – New infrastructure along project roads
4 – Compliance on ADB comments on 1st EMA Report
5 – Other supportive documents of HSRDC
6 – Details of compensation for land & structures
7– Format for Identity Cards for R&R Assistance
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page ii
Abbreviations
ADB Asian Development Bank
AH Affected Households
AP Affected Persons
BPL Below Poverty Line
DGM Deputy General Manager
DP Displaced Person
DSB Design Service Volume
EA Executing Agency
EE Executive Engineer
EF Entitlement Framework
ESMC Environment and Social Management Cell
FI Financial Intermediary
GOI Government of India
GRC Grievance Redressal Cell
HSRDC Haryana State Roads and Bridges Development Corporation
HUDA Haryana Urban Development Authority
IA Implementing Agency
IP Indigenous Peoples
IR Involuntary Resettlement
LA Land Acquisition
MARLA/ KANAL Unit of Land
MFF Multi-trance Financing Facility
NA Not Applicable
NCR National Capital Region
NCRPB National Capital Region Planning Board
NGO Non-Government Organization
NH National Highway
NRRP National Rehabilitation and Resettlement Policy 2007
OCR Ordinary Capital Resources
PWD Public Works Department
PCU Passenger Car Unit
ROW Right of Way
RP Resettlement Plan
SH State Highway
SRP Short Resettlement Plan
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page iii
Glossary
Affected Household - is defined as those who stand to lose, as a consequence of the project, all or part of their
physical and non-physical assets, including homes, communities, and productive lands, resources such as
forests, range lands, fishing areas, or important cultural sites, commercial properties, tenancy, income-earning
opportunities, social and cultural networks and activities. Such impacts may be permanent or temporary.
BPL Family - for the project means, those families who possess the BPL Card.
Compensation - Means payment in cash or in kind of the replacement value of the acquired property.
Cut-off date - For titleholders, issuance of Land Acquisition Notification will be treated as cut off date.
Economic Displacement- Means loss of land, assets, access to assets, income sources, or means of livelihoods as a
result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally
designated parks and protected areas.
Entitlement - Means range of measures comprising compensation, income restoration, transfer assistance,
income substitution, and relocation which are due to the Affected Persons, depending on the nature of their
losses, to restore their economic and social base to pre-project situation.
Encroacher - Is used to denote illegal extension into public property by a person who is a legal titleholder of his
property. The person is an encroacher on the portion of the property occupied to which the person does not
hold legal title.
Family - means project affected family consisting of such persons, his or her spouse, minor sons, unmarried
daughters, minor brothers or unmarried sister, father, mother and other members residing with him/her and
dependent on him/her for their livelihood.
Grievances Redressal Committee - Means the committee established under the subproject to resolve the local
grievances.
Involuntary Resettlement - Addresses social and economic impacts that are permanent or temporary and are (i)
caused by acquisition of land and other fixed assets, (ii) by change in the use of land, or (3) restrictions
Kanal - Is a traditional unit of land area in northern states of India - Haryana, Punjab, Himachal Pradesh &
Jammu & Kashmir; and also in Pakistan; equal to 20 marlas. Under British rule the marla and kanal were
standardized, the kanal equals exactly to 5440 square feet or 505.392 square meters
Khasra number - A Khasra or index register to the revenue map. It is the list showing, by number, all the fields
and their area, measurement, who owns what cultivators he employs, what crops, what sort of soil, what trees,
are on the land.
Land Acquisition - Means acquiring of land for some public purpose by government/government agency, as
authorised by the law, from the individual landowner(s) after paying government fixed compensation in lieu of
losses incurred by land owner(s) due to surrendering of his/their land to the concerned government agency.
Replacement Cost - Means the method of valuing assets to replace the loss at market value before the project or
dispossession, or its nearest equivalent, plus any transaction costs such as administrative charges, taxes,
registration, and titling costs. Replacement cost is based on market value before the project or dispossession
whichever is higher
Resettlement - Means all the measures taken to mitigate all or any adverse impacts of the project on the DPs
property and/or livelihoods including compensation, relocation (where relevant), and rehabilitation.
Resettlement effects - Loss of physical and non-physical assets, including homes, communities, productive land,
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page iv
income-earning assets and sources, subsistence, resources, cultural sites, social structures, networks and ties,
cultural identity and mutual help mechanisms.
Relocation - Rebuilding housing, assets, including productive land, and public infrastructure in another
location.
Resettlement Plan: - A time-bound action plan with budget setting out resettlement strategy, objectives,
entitlement, actions, responsibilities, monitoring and evaluation
Rehabilitation - Means the measures provided under the resettlement plan other than payment of the
compensation of acquired property.
Stakeholders - Mean any individuals, groups, organisations, and institutions interested in and potentially
affected by a project or having the ability to influence a project.
Squatters - Are those that are landless or without title to land and occupy public land for shelter and/or for
carrying out their livelihoods.
Shajra - A shajra or Village Map is a detailed map of the village that is used for legal (land ownership) and
administrative purposes in India and Pakistan. A shajra maps out the village lands into land parcels and gives
each parcel a unique number.
Vulnerable groups - The groups of population are considered socially ‘vulnerable’comprise of - (a) those who
are below the poverty line (BPL); (b) those who belong to scheduled castes (SC), scheduled tribes (ST); (c)
female-headed households (FHH); (e) disabled headed households.
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page v
Background
HSRDC with NCRPBs financial assistance is implementing the work of widening & up-gradation of Gurgaon-
Chandu-Badli Bahadurgarh Road. For bidding purposes, the work has been divided under two separate
packages, i) Gurgaon Badli road and ii) Bahadurgarh Badli road. In accordance with Environmental & Social
Management System (ESMS) of NCRPB; social safeguard documents, called Resettlement Plan (RP) were
prepared and implemented. These Plans identified the broad scope of the project that results in IR, outlined the
policy and procedures for acquisition of land, compensation and other assistance measures for affected persons
and institutional requirements for the implementation of the mitigatory measures.
Objectives and scope of the M&E assignment
As the ESMS of NCRPB provided for monitoring and evaluation of the implementation of projects falling under
S-1 category (significant impact) by an external monitoring agency, the HSRDC, which is the implementing
agency for this project, engaged M/s Market-Info Services, Bahadurgarh as External Monitoring Consultant
(EMC) to undertake the Monitoring and Evaluation of RP implementation. The overall objective was to assess
whether objectives, particularly livelihoods and living standards of the Affected Persons (APs) have been
restored or enhanced. The scope of M&E included: to review and verify the progress in implementation as
outlined in the RP; to monitor the effectiveness and efficiency of agencies involved i.e. NCRPB, IA and NGO (if
any) in RP implementation; review results of internal monitoring and verify claims through random checking
at the field level to assess whether the objectives of RP have been generally met. Further it involved assessment
of efficiency, effectiveness, impact and sustainability of RP implementation, drawing both on policies and
practices and to suggest any corrective measures, if necessary. Further it requires that on project completion
confirm no deviation from social safeguards and provide completion document as per NCRPBs requirements.
Structure of the Report
The structure of the report is given below:
Structure of the report
Chapters Title of Chapter Details
1 Introduction and
Methodology
Shall include project context and a brief of the scope of the study.
Methodology of the study shall be presented in the chapter including
details on the households covered
2
Status and impact on
implementation of RP
Shall present the status of the R&R measures proposed and administered
till date and their utilization
3 Findings from
Community
Interactions
Details of the interactions with affected households are presented
4 Conclusion and
Recommendations
Conclusions drawn based on observations on the implementation
thus far followed by recommendations
Annexures
1 – Entitlement Framework of ESMS, NCRPB
2 – Photographs of Interactions with Stakeholders – APs and Officials
3 – New infrastructure along project roads
4 – Compliance on ADB comments on 1st EMA Report
5 – Other supportive documents of HSRDC
6 – Details of compensation for land & structures
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 1
Chapter 1 – Introduction and Methodology
1.1 Project description
1. Upgradation of Bahadurgarh-Badli-Gurgaon Road in Jhajjar and Gurgaon districts (Km +0.000 to Km
+39.000)” aims at removing all existing deficiencies and upgrading the project road to required State Highway
standards for speed, safe and comfortable travel. The proposed subproject aims to provide better connectivity
to different areas in these districts. These subprojects were implemented in two different sections, as follows:
Stretch 1: Upgradation of Bahadurgarh- Badli Road (Km +0.000 to Km. +18.100) in Jhajjar District including
the construction of Nayagaon (Bir-Barkhtabad) Bye Pass Road.
Stretch 2: Upgradation of Badli-Gurgaon Road in Jhajjar/ Gurgaon District (Km. +18.100 to Km. +39.000)
totalling a length of 20.900 kms.
2. The starting and ending points in km and length of project road from Bahadurgarh to Badli to Gurgaon each
stretch is provided in the table no 1.1 below.
Table No.- 1.1 Chainage of each stretch
District Stretch No From (km) To (km) Length (in km)
Jhajjar Stretch 1 Bahadurgarh (+0.000) Badli (+18.100) 18.100
Jhajjar & Gurgaon Stretch 2 Badli (+18.100) Gurgaon (+39.000) 20.900
Total length in Km 39.000
3. The Haryana State Roads Development Corporation (HSRDC) is the executing agency of the project. The
Project Implementation Unit (PIU) is situated at Jhajjar for stretch-1, District Head Quarter of Jhajjar and for
stretch-2 at Gurgaon, District Head Quarter of Gurgaon. One project manager is designated for each stretch
to oversee the progress of project construction work. However, responsibility of monitoring the resettlement
and rehabilitation activities for Stretch-1 lies with Deputy General Manager posted at Jhajjar and for stretch-2
lies with Deputy General Manager posted at Gurgaon.
4. As per the Asian Development Bank’s (ADB) Safeguard Policy Statement, a Resettlement Plan (RP) has been
prepared by HSRDC for this project to address adverse social impacts such as losses of land, resources, and
means of livelihood or social support systems for achieving development benefits.
1.2 Objectives and Scope of the Study
5. The ESMS of NCRPB has made provision for monitoring and evaluation of the implementation of projects
falling under S-1 category (significant impact) by an external monitoring agency. Therefore, the NCRPB,
which is the funding agency for this project, requires services of a reputed agency/ individual for monitoring
and evaluation of RP and/or IPP implementation.
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 2
6. The scope of work is as follows:
• To review and verify the progress in implementation as outlined in the RP/IPP;
• To develop specific monitoring indicators for undertaking monitoring for Involuntary Resettlement,
Indigenous Peoples Plan and the Community Participation Strategy;
• To monitor the effectiveness and efficiency of NCRPB, IA and NGO (if any) in RP/IPP implementation;
• Review results of internal monitoring and verify claims through random checking at the field level to assess
whether the objectives of RP/IPP have been generally met. Involve the affected people and community
groups in assessing the IR and impact to IP for monitoring and evaluation purposes.
• To assess whether objectives, particularly livelihoods and living standards of the Affected Persons (APs)
have been restored or enhanced;
• To assess the efforts of IA & NGO (if any) in implementation of the ‘Community Participation strategy’
with particular attention on participation of vulnerable groups namely (a) those who are below the poverty
line (BPL); (b) those who belong to indigenous peoples, scheduled castes (SC) and scheduled tribes (ST)
and; (c) female-headed households (FHH); (d) elderly and (e) disabled persons.
• To assess efficiency, effectiveness, impact and sustainability of RP/IPP implementation, drawing both on
policies and practices and to suggest any corrective measures, if necessary.
• To review the project impacts on Indigenous People and groups and assess the effectiveness of the
mitigative actions taken;
1.3 Institutional Arrangements for implementation of Resettlement Plan (RP)
7. The National Capital Region Planning Board (NCRPB) is the executing agency (EA) of the Project. The
Haryana State Roads & Bridges Development Corporation Limited, led by the Managing Director [who is also
Chief Engineer of PWD (B&R)] will be responsible for overall project implementation, monitoring,
supervision and preparation of all documentation needed for decision making, contracting, supervision of
work and providing progress monitoring information to NCRPB. The Managing Director, HSRDC will be
supported by DGM, HSRDC (the jurisdiction DGM of HSRDC). The institutional roles and responsibilities for
RP implementation are given in Table-1.2
Table No.- 1.2 The institutional roles and responsibilities for RP implementation
SI Activities Responsible
1 Implementation of proposed rehabilitation measures HSRDC (DGM)
2 Payment of compensation for acquired land LAO/ LAC
3 Consultation with AHs during rehabilitation activities HSRDC (DGM)
4 Grievance Redressal HSRDC
5 Internal Monitoring HSRDC (DGM)
6 Independent Audit commissioned by NCRPB External Agency
1.4 Grievance Redressal Mechanism
8. The HSRDC to constitute a three members Grievance Redressal Committee (GRC) comprising of the
concerned DGM, HSRDC, (Jurisdictionanl DGM), the elected member of the projected area and one member
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 3
from the public who is known to be person of integrity, judgement and commands respect among the
community. Any aggrieved villager can approach GRC, chaired by DGM, HSRDC and if any grievance of the
villagers is not addressed, the aggrieved person will be directed to approach the District Collector. The
aggrieved person will have to approach the court of law, if he/ she is still unsatisfied with the decisions taken
by the GRC and the Collector.
Grievance Redressal Mechanism
1.5 Approach and Methodology
Details on the approach and methodology i.e. the sequence of tasks for the assessment study adopted are presented
below:
Task 1 – Meeting with HSRDC: Site visit for stretch 1 was undertaken during 16/10/2014 to 30/10/2014.
The entire stretch was visited during the above mentioned period. Meetings and discussions were held with
HSRDC (Project Implementation Authority) personnel for RP implementation update. The purpose was to
collect data, monthly reports and other relevant documents.
Task 2 – Study Design: The survey was conducted using structured questionnaires, specifically designed for
this project. The aim was to measure the impact of implementation and interventions on income. Broadly,
GRC Grievance Redressal Cell
Civil Court
HSRDC DGM-1/ SDO
Not Redressed
Land Acquisition Collector
Redressed
Land Acquisition
Grievances
EPs (Affected Persons)
Resettlement & Rehabilitation
Redressed
Redressed
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 4
the study design followed activities – a) Socio-Economic Survey of the available and affected households for
Quantitative Data; b) Opinion Survey; c) Qualitative Data Collection and d) Review of RP implementation
in context of above mentioned aspects from a-c.
Task 3 – Site visit: To supplement the understanding gained from the desk review of the above mentioned
documents and reports, preliminary consultations with key stakeholders, sites in the both road stretches
were visited along with HSRDC personnel to ascertain the overall progress in respect of RP implementation
on the ground. It provided the opportunity to photograph and thereby record development along the road
stretches (See Annexure 3 for photos).
Task 4 – Meeting with APs: Interactions were held with APs to ascertain both qualitative and quantitative
information on their receipt of compensation and other assistances as stated in the RP. (See Annexure 2
for photographs of interactions with APs).
Task 5 – Visit to the construction sites: The purpose was to assess the overall facilities available to the
workers.
Task 6 – Data Processing and Interim Data Report: Data obtained through reviews of available documents,
socio-economic quantitative survey and qualitative data collection was processed to measure the impact
with respect to different parameters. For direct impacts, indicators would include per capita income, assets
in the households, change in occupation pattern, etc.
Task 7 – Preparation and Submission of Draft Report: In the light of the empirical analysis of both
quantitative and qualitative information collected during the study, the draft Report presents the
achievements made in different parameters considered under this study with appropriate data and
inferences drawn from its analysis. .
Task 8 – Report Finalization and Submission: The Final Assessment Report will be submitted along with an
executive summary to the client.
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 5
Chapter 2 – Status & Impact of implementation of RP
2.1 Introduction
9. Periodic updating of activities for long term projects is very important as it helps to ascertain whether
activities are progressing as per the scheduled plan or not. It provides specific information about the progress
of the project and if the activities are not progressing as per plan, suitable measures may be adopted by the
project managers to keep the programmers on schedule.
10. Progress of RP implementation is described in following sections. This report covers the progress of
resettlement plan implementation upto 30th November, 2014.
2.2 Resettlement
11. Verification of APs, Assets/ Properties: Affected persons were informed about the proposed alignment as part
of information dissemination process by the PIU to make them aware of the likely impacts on their land,
structures and assets. Physical verification of affected households, families and structures has been completed
for stretch 1 & 2. PIU/ IA Official verified and measured each structure/asset likely to be affected by the
project in presence of the entitled person or his/her family member.
12. Distribution of Entitlement cum Identity Card: Entitlement cum identity card format is to be prepared to
include name and address, photograph of APs (encroachers & squatters), socio-economic status, etc. This
exercise is in progress. However, for entitlement of each title-holder APs Land Acquisition Officer (LAO)
prepares this in the form of table showing all details of losses to each household including, land, trees,
structures with the total costs and given to them. They are keeping all the records (i.e. Copy of Identity proof
such as Voter ID, Ration card, Adhaar Card, a passport size photograph, Nambardar as a prominent person
from village signature as a witness etc.) of each affected title holder before handing over compensation
amount cheque.
13. Resettlement component of the project has been classified into following sections:
• Compensation for Land acquired
• Compensation for affected structures & others assets
• Rehabilitation Grant/ Additional assistance
• Additional benefits to vulnerable AHs
Compensation for Land acquired
14. For Stretch-1 a total of 11.731 Acres of land acquisition was estimated as per the RP. The land acquired from
two villages (i.e. village Balour 2.181 Acres and village Bir-Barkhtabad 9.550 Acres) for Bypass in village
Nayagaon/ Bir-Barkhtabad (+2.500 Kms to +4.000 Kms). The 2.181 acres of land in Balour village belongs to
Haryana Urban Development Authority (HUDA), Haryana State Govt. The compensation against this land is
to be transferred to HUDA (See letter attached). The 9.550 acres of acquired land of Bir-Barkhtabad village is
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 6
private land used for agriculture by title holders. No other land is required for improvement and upgradation
of this road upto Badli. Awards have been declared in these villages on 25th Sept, 2013. For Stretch-2 a total
of 25.825 acres of land acquisition were estimated, out of which 22.29 acres of land is private land from eight
villages (i.e. three villages in Jhajjar district & five villages in Gurgaon district). 2.838 acres of land belong to
panchayat and remaining 0.694 acres belong to Government land as per the RP. Award for private land in
Gurgaon district (i.e. 10.52 acres) was declared on 11th Dec, 2013. Land acquisition in Jhajjar district (i.e. 11.77
acres) is pending because of the process of fixing rates for land & procedures by the State Government under
the New Land Acquisition Act 2013 i.e. “The Right to Fair & Transparency in Land Acquisition, R&R Act,
2013”. Status of progress of land acquisition is provided in Table 2.1
Table 2.1 – Status of Land Acquisition and Disbursement of Compensation for Land
SI Village
Acquired land as
per notification
and award
declared (acre)
Date of
Award
declared
Amount of
compensation
for private
land (INR)
(%)
(Nos. of APs)
Compensation
disbursed for
private land
(INR)
(%)
(Nos. of APs)
Land Saved
(no
acquisition
) (INR)
(%)
(Nos. of
APs)
Unpaid amount
for
disbursement
(INR)
(%)
(Nos. of APs)
Stre
tch
-1
Bir-
Barkhtabad 9.550
25 Sept
2013
68530801
100.0%
121
61339677
89.5%
93
0
7191124
10.5%
28
Total of
stretch-1 9.550
68530801
100.0%
121
61339677
89.5%
93
0
7191124
10.5%
28
Stre
tch
-2
Daryapur 4.98
Award
pending
- - - -
Lagarpur 3.54 - - - -
Devarkhana 3.26 - - - -
Jhanjhraula 0.93
11th Nov,
2013
5630226
100.0%
68
3091141
54.9%
6
0
2539085
45.1%
62
Iqbalpur 2.24
14101245
100.0%
217
8160345
57.9%
102
0
5940900
42.1%
115
Kaliawas 1.86
11381995
100.0%
180
8452324
74.3%
105
0
2929671
25.7%
75
Makraula 0.35
3142243
100.0%
6
0 0
3142243
100.0%
6
Budhera 5.14
49546431
100.0%
119
40184510
81.1%
79
672028
1.4%
3
8689893
17.5%
37
Total of
stretch-2 22.29
83802140
100.0%
590
59888320 71.5%
292
672028
0.8%
3
23241792
27.7%
295
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 7
15. For Stretch-1 the unpaid compensation for land till 30th Nov, 2014 was Rs. 7191124/- of 28 title holders. Out
of the total unpaid amount 85.4% payments are held due to court case/ stay order or dispute/ unmatched
names of title holders. Similarly for Stretch-2 a total of Rs. 23241792/- is unpaid amount of 295 title holders
till 30th Nov, 2014. Out of total unpaid amount 39.6% payment stopped due to court case/ stay order or
dispute/ unmatched parts of title holders. Village-wise details provided in Table 2.2
Table 2.2 – Detailed status of Unpaid Compensation for Land
Stret
ch
Village Acquired
land as per
notification
and award
declared acre
Details of unpaid compensation for Land acquired till 30th Nov,
2014
Remarks
Total unpaid
compensation
Payment stopped
due to court case/
dispute
Pending compensation
for disbursement
without any dispute
Stre
tch
-1
Bir-
Barkhtabad 9.550
7191124
100.0%
28
6144450
85.4%
3
1046674
14.6%
25
85.4% payment
stopped of 3
title holders
due to dispute/
court case
Total 9.550
7191124
100.0%
28
6144450
85.4%
3
1046674
14.6%
25
Stre
tch
-2
Daryapur 4.98 - - -
Award pending Lagarpur 3.54 - - -
Devarkhana 3.26 - - -
Jhanjhraula 0.93
2539085
100.0%
62
442721
17.4%
3
2096364
82.6%
59
Iqbalpur 2.24
5940900
100.0%
115
2403758
40.5%
9
3537142
59.5%
106
Kaliawas 1.86
2929671
100.0%
75
1247219
42.6%
19
1682452
57.4%
56
Makraula 0.35
3142243
100.0%
6
3142243
100.0%
6
0 Court stay order
Budhera 5.14
8689893
100.0%
37
1962207
22.6%
10
6727686
77.4%
27
Total 22.29
23241792
100.0%
295
9198148
39.6%
47
14043644
60.4%
248
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 8
Compensation for affected structures & others assets
Similarly, for stretch-1 as per RP there was no impact on structures residential, commercial or CPR due to
improvement and upgradation of the road. After verification it was found that except few tube-wells, tube-well
room, trees and one old dug well, no other structures were affected. For stretch-2, impact on a total of 163
structures and associated fixed assets has been recorded (See list of structures & other assets attached in table-2.4).
The project will affect 14 common property resources (CPRs) and 14 Govt. property resources. Table-2.3 provides
the details of compensation of structures and other assets paid till 30th Nov, 2014.
Amount in INR
Table 2.3 – Detailed status of Compensation for affected structures & others assets
Stretch Village Unpaid compensation
for private structure
Compensation
paid Govt. Structure Structure Saved Grand Total
Stre
tch
-1 Bir-
Barkhtabad
279254
40.0%
10
419309
60.0%
4
- -
698563
100.0%
14
Total
279254
40.0%
10
419309
60.0%
4
- -
698563
100.0%
14
Stre
tch
-2
Dariyapur - -
Award pending Devarkhana - -
Lagarpur - -
Budhera
982177
8.9%
10
1624880
14.7%
9
3360299
30.5%
2
5051288
45.8%
2
11018644
100.0%
23
Iqbalpur
187868
10.2%
3
1652549
89.8%
7
- -
1840417
100.0%
10
Kaliawas
4894
0.2%
1
2390333
76.9%
12
-
714647
23.0%
3
3109874
100.0%
16
Makraula
1029963
100%
1
- - -
1029963
100%
1
Total
2204902
13.0%
15
5667762
33.3%
28
3360299
19.8%
2
5765935
33.9%
5
16998898
100.0%
50
Table 2.4 – Structures and Fixed Assets to be Impacted & Compensation Status Amount in Rs
Type of Structure Actual nos. of structures/ assets to be affected
Estimated amount to
be disbursed
Amount Disbursed
up to 20-10-2014
Gurgaon District Jhajjar District Total Gurgaon District Gurgaon District
Boundary-Wall 22 11 33 346089 54940
Cattle Shed 2 2 Structure saved 0
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 9
Commercial 27 11 38 4853550 3861394
Dharamshala 1 1 - 0
Entry Gate 2 2 39000 0
Grill, Misc 3 1 4 16250 16250
Handpump 2 3 5 13000 0
Kiosk 1 1 2 6500 0
Pyau 1 1 9750 9750
Residence 2 2 Structure saved 0
Room (Vacant) 12 3 15 3692685 920529
School Bldg 2 2 2024776 0
Security/ Guard Room 2 2 160816 0
Shed 11 1 12 530024 231402
Smadhi 2 3 5 13000 13000
Store/ Kitchen Room 1 1 Structure saved 0
Submersible Pump 4 4 84500 0
Temple 1 1 195000 195000
Toilet 3 1 4 85347 33347
Tube-Well 9 9 18 260000 227500
Tube-well Room 5 1 6 527707 104650
Water Tank 3 3 425750 0
Grand Total 117 46 163 10478963 5667762
Note: due to non-declaration of land acquisition award in three villages in Jhajjar district no structure impacted and no payment made.
54.08% amount disbursed in Gurgaon district
16. For Stretch-1 the unpaid compensation for private structures and other assets till 30th Nov, 2014 was Rs
279254/- of 10 title holders. Out of the total unpaid amount 90.7% payments of 5 titleholders held due to
court case/ stay order or dispute/ unmatched names of title holders. Similarly for Stretch-2 the unpaid
compensation for private structures was Rs. 2204902/- of 15 title holders till 30th Nov, 2014. Out of total
unpaid amount, for 72.6% payment was stopped due to court case/ stay order or dispute/ unmatched names of
3 title holders. Village-wise details provided in Table 2.5
Table 2.5: Detailed status of unpaid compensation for affected structures & others assets
Stretch Village
Unpaid compensation for private structures/ other assets
Remarks
Unpaid Payment Stopped Unpaid Total
Stre
tch
-1 Bir-Barkhtabad
25916
9.3%
5
253338
90.7%
5
279254
100.0%
10
Total
25916
9.3%
5
253338
90.7%
5
279254
100.0%
5
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 10
Stre
tch
-2
Dariyapur - - -
Award pending Devarkhana - - -
Lagarpur - - -
Budhera
411804
41.9%
8
570373
58.1%
2
982177
100.0%
10
Iqbalpur
187868
100.0%
3
-
187868
100.0%
3
Kaliawas
4894
100.0%
1
-
4894
100.0%
1
Makraula -
1029963
100.0%
1
1029963
100.0%
1
Total
604566
27.4%
12
1600336
72.6%
3
2204902
100.0%
15
Rehabilitation Assistance & benefits to vulnerable AHs
As per RP for stretch-1 the total nos. of significantly impacted household reported as 3 nos. and 11 in
vulnerable categories i.e. 9-WHH, 1-SC, 1-100% land loser. All 14 severely impacted & vulnerable AHs were
visited. The details of all AHs are provided in List No-1. The R&R Assistance amount is yet to be received by
DGM, HSRDC Jhajjar office. The disbursement activities therefore have not yet started. Similarly for the
stretch-2 as per RP all severely impacted & vulnerable AHs were visited in five villages of Gurgaon district
where award has been declared. The details are provided in list no 2 & 3. R&R Fund has been received by
DGM, HSRDC, Gurgaon office in last week of November. The disbursement of assistance is yet to start. The
severely impacted AHs identification is in progress. The disbursement will start in December 2014. Expected
date of completion is on or before 31 Jan, 2015. Details provided in the given Table 2.6
Table 2.6: Status of disbursement of compensation, R&R Assistance
Stretch Particulars As per
RP
As per
verification
upto 30th
Nov, 2014
(See List-1 to
4)
Progress of disbursement of R & R Assistance as on 30th Nov,
2014
Total amount
for R&R
Assistance
Disburse
ment of
R&R
Assistan
ce
Remark
Stre
tch
-1
Significant Land looser AHs 3 1 170250 0
R&R Fund not received by
DGM, Jhajjar, office from Head
office
Impact on vulnerable AHs
100% land lose 1 0 0 0
WHH 9 5 150000 0
SC/ST 1 2 60000 0
BPL 0 0 0 0
Handicapped 0 0 0 0
Grand Total 380250 0
Stre
tc
h-2
Loss of residential structures
Provision of housing units in case
of displacement 2 0 0 0 Structure saved
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 11
One-time resettlement allowance 2 0 0 0
Subsistence grant for displaced
families for a period of one year 2 0 0 0
Transportation cost for displaced
families 2 0 0 0
Rental allowance to facilitate
taking another place on rent for 6
months @ Rs. 2000/- per month
2 0 0 0
Loss of commercial structures
Subsistence grant for displaced
families for a period of one year
38 19 19x3000x12
= 684000
0 Impacted 16 APs reconstructed
shops behind the impacted
structure or extended the left
out structure in their private
land after acquisition.
Rental allowance to facilitate
taking another place on rent for 6
months @ Rs. 2000/- per month
0 3 3x2000x6
= 36000
0 3 families (owner of
commercial structures)
displaced due to project
For displaced family
Transportation cost for displaced
families
0 3 3x50000
=150000
0 3 families (owner of
commercial structures)
displaced due to project
Impacts to tenants residential and commercial
Rental allowance to facilitate
taking another place on rent for 6
months @ Rs. 2000/- per month
42 0 0 0
Subsistence allowance based on
monthly minimum wages for loss
of livelihood
42 25 25x3000x12
=900000 0
Additional assistance to vulnerable group
Skill development training for
vulnerable persons 16 0 0 0
Assistance for purchase of income
generating asset 16 0 0 0
Subsistence allowance based on
monthly minimum wages for loss
of livelihood
16 6 6x3000x12
=216000 0
Cattle shed/ Petty shops Kiosk 4 0 0 0 Structure saved
Grand Total 1986000 0
For stretch-2 verification figure is of five villages of Gurgaon district where award declared till 30th Nov, 2014
List No-1: AHs for Significant Impacted & Vulnerable Category after verification for Stretch-1 as per RP
Village Name of payee Category Remarks
Balour
Kuldeep s/o Indraj Significant
Impacted Land belongs to HUDA
Mannkaur w/o Udayram WHH Land belongs to HUDA
Manohari w/o Sultan Singh WHH Land belongs to HUDA
Bir-
Barkhtabad Srilal s/o Kanshi Ram
100% land
losser &
Significant
Impacted
Expired few years back. His successors are having approx 3
acres of land each and they have invested compensation
money for purchase of agriculture land. The information
collected from Jai Singh s/o Srilal
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 12
Kamla Devi widow Shri Shriniwas SC/ Widow
Nirmla widow Shri Jagdish
Chander SC/ Widow
Smt Prem Kaur Aadi, Lakhmi s/o
Jhunda
Significant
Impacted/
Widow Expired long back, dispute between successors.
Smt Chandro Devi widow Shri Raj
Singh
Widow &
significant
impacted
Widow, elderly lonely person and lose her land approx.
70%
Bharpai widow Shri Surajbhan Widow
Krishana w/o Mahender Singh WHH No part of her land acquired in this project
Samouti widow Shri Lakhmi
Chand Widow
Shakuntla widow Shri Dharam
Chand Widow Expired 10 months back.
Shanti widow Shri Ramkala Widow
Smt Chandro Devi widow Shri Raj
Singh Widow
List No-2: List of Owners of Commercial Structure impacted in project after verification for Stretch-2 as per RP
Sr Village Usage Name of Owner Remarks
1 Budhera Factory Hemraj Vashisth s/o Vasudev Vashisth Structure Saved
2 Budhera Shop Harpal s/o Jagdish
3 Budhera Shop Amar Singh s/o Dalpat Singh
4 Budhera Shop Virpal s/o Dalpat Singh
5 Budhera Shop Nisha Kumari w/o Dharmprakash Bhardwaj Displaced
6 Budhera Shop Meena w/o Ashok Kumar
7 Budhera Shop Chandan Singh s/o Chhaju Ram
8 Makraula Shop Satyavan s/o Nafe Singh
9 Kaliyawas Shop Rajinder Singh s/o Pratap Singh
10 Kaliyawas Shop Ram Kumar s/o Ram Nath
11 Kaliyawas Shop Gaje Singh s/o Sheesh Ram Displaced
12 Kaliyawas Shop Balraj s/o Roshan Lal Structure Saved
13 Kaliyawas Shop Krishan s/o Ram Saroop
14 Kaliyawas Shop Jile Singh s/o Maha Singh
15 Kaliyawas Shop Anita w/o Beer Singh Sold her property and shifted
16 Kaliyawas Shop Atar Singh s/o Budh Ram
17 Kaliyawas Shop Sumitra w/o Ramesh Foji
18 Kaliyawas Shop Mukesh Devi w/o Prakash Dhama
19 Iqbalpur Hotel Sonu s/o Amar Singh
20 Iqbalpur Shop Jile Singh s/o Swarup Singh
21 Iqbalpur Hotel Bhanwar Singh s/o Nihal Singh
22 Iqbalpur Shop Sardar s/o Mangtu Ram
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 13
List No-3: List of Vulnerable Category for R & R Assistance after verification for Stretch-2 as per RP
SR Village Name of Owner Venerable
Category
Remark
1 Budhera Smt Satyawati widow Hukamchand Widow
2 Budhera Bhagwati Devi widow Ravidutt Widow No land acquisition of her part
3 Iqbalpur Smt Chandrapati widow Omprakash Widow Expired
4 Iqbalpur Smt Phulodevi widow Bhanwar Singh BPL/ Widow
5 Iqbalpur Premwati widow Amar Singh Widow
6 Jhanjraula Smt Rajesh widow Malkhan Widow Sold her property before acquisition took
place.
7 Kaliyawas Smt. Basanti widow Bahadur Singh Widow
8 Kaliyawas Darshna Devi widow Ramphal Widow
9 Kaliyawas Smt Pushpa w/o Krishan BPL/ WHH Saved her structure
10 Kaliyawas Balram s/o Roshan Lal BPL Saved his structure
11 Kaliyawas Ram Gopal s/o Ram Swarup BPL
List No-4: List of Tenant for R&R Assistance after verification for Stretch-2 as per RP
SR Village Name of tenant Name of Shop Owner Remarks
1 Budhera Mitrasen Nisha Kumari w/o Dharmprakash Bhardwaj Shifted else where
2 Budhera Rajinder Kumar Meena Devi w/o Ashok Kumar
3 Budhera Mangat Tea stall Chandan Singh s/o Chhaju Ram Shifted else where
4 Budhera SP Yadav Chandan Singh s/o Chhaju Ram Shifted else where
5 Budhera Kudeep sweet shop Chandan Singh s/o Chhaju Ram Shifted else where
6 Budhera Monu Chandan Singh s/o Chhaju Ram Shifted else where
7 Iqbalpur Imran Jile Singh s/o Swarup Singh
8 Iqbalpur Manoj Jile Singh s/o Swarup Singh
9 Iqbalpur Liyakat Sardar Singh s/o Mangtu Ram
10 Kaliyawas Avdesh Rajinder Singh s/o Pratap Singh
11 Kaliyawas Rajesh Rajinder Singh s/o Pratap Singh
12 Kaliyawas Lala Rajinder Singh s/o Pratap Singh
13 Kaliyawas Naresh Rajinder Singh s/o Pratap Singh
14 Kaliyawas Krishan Ram Kumar s/o Ram Nath
15 Kaliyawas Santosh Karambir Ram Kumar s/o Ram Nath
16 Kaliyawas Ajay Ram Kumar s/o Ram Nath
17 Kaliyawas Prashant Ram Kumar s/o Ram Nath
18 Kaliyawas Rohtas Ram Kumar s/o Ram Nath
19 Kaliyawas Jitendra Ram Kumar s/o Ram Nath
20 Kaliyawas Pintoo Ram Kumar s/o Ram Nath
21 Kaliyawas Rakesh Gaje Singh s/o Sheesh Ram Shifted else where
22 Kaliyawas Kamal Yadav Jai Kishan s/o Naval Yadav
23 Kaliyawas Karam Singh Balraj s/o Roshan Lal Structure Saved
24 Kaliyawas Mukesh Ram Gopal - Krishan s/o Ram Swarup
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 14
25 Kaliyawas Jit Singh Anita w/o Beer Singh Shifted else where
26 Kaliyawas Laddulal Anita w/o Beer Singh Shifted else where
27 Kaliyawas Gajraj Mukesh Kumari w/o Prakash Dhama
28 Makraula Shiv Charan Satyavan s/o Nafe Singh
29 Makraula Hiralal Satyavan s/o Nafe Singh
30 Makraula Tirath Satyavan s/o Nafe Singh
31 Makraula Govind Satyavan s/o Nafe Singh
32 Makraula Satbir-Naresh Satyavan s/o Nafe Singh
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 15
Chapter 3 – Findings from Community Interactions
3.1 Introduction
17. The chapter presents the details of the consultations carried out with affected households.
3.2 Consultations with Affected Households
For Stretch-1
18. Individual interviews were carried with several affected persons with regard to resettlement plan
implementation. Key issues are segregated under different heads such as utilization of compensation money,
benefits accrued from the project, etc. and summarized below.
No of individual interview with severely APs/ vulnerable APs for stretch-1
No of individual
interview
Outcomes Remarks
15 nos.
(3 in Balour
village & 12 in
Bir-Barkhtabad
village)
• The land acquired of Balour village belongs to HUDA,
• 12 APs interviewed from Bir-Barkhtabad village as per RP categorised as;
WHH/ significant land looser APs - 3 (Expired)
Vulnerable category WHH/SC - 6
Not loosing her part of land - 1
Land loser APs - 2
• All alive APs having Ration Cards and Voter ID.
• Smt. Chandro Devi widow Rajsingh (WHH) not taken compensation for
land despite of twice reminding me.
• Smt Prem Kaur widow Chhotu (expired) – case is disputed hence
payment stopped.
• Almost all are satisfied by the method of compensation disbursement.
• When asked about the opinion on compensation received – if closer to
the prevailing market rate, all said the compensation paid is less than
market rate.
• None was aware about the R&R Assistance provisions in ADB funded
projects and have not received any assistance so far
• 40% said consultation meetings held with APs before land acquisition,
but they were not present in that meeting & 60% says they read in
newspaper & after that received notice from HSRDC about land
acquisition due to project intervention.
• Award was declared, payment disbursement started and crop harvested
by them before possession of land by HSRDC.
• Utilization of compensation amount received by APs, interactions
provided the following the types of usage
1. Repayment of loan;
2. Reconstruction and strengthening i.e. improvement and enhancement
of existing structures;
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 16
3. Economically productive investments such as purchase of business
items, agricultural land etc;
4. Economically non-productive activities such as marriage, ornaments,
etc.
5. Saved for children education
6. Fixed deposit/ Term Deposit.
• When asked about “how did the project helped in improving services?”
1. Ease to go to city, hospital, education etc.
2. Development of the area
3. Few people apart from APs said the land rate beside bypass and
along the road side become double, few property dealers, business
houses are trying to purchase land along the road side/ bypass with
this objective in mind
• Has the environment changed due to construction?
1. No change as the bypass is out of village
2. problem faced to go to their field across road at the time of
construction
• No one has changed their job/ business due to land acquisition and no
major adverse impact on their income pre & post land acquisition.
19. Payment of compensation: The market rate of land has been finalized by the competent authority as per the
procedures. While majority of the APs accepted the rate declared but some of the APs considered that this is
below the market rate, though they have accepted the compensation. Regarding the process of land
acquisition and payment of compensation, all the APs who have taken compensation are satisfied with it, and
have confirmed that they received adequate information on time and the payments are made as per the
predetermined schedule.
20. Utilization of Compensation money received by APs: Interactions provided the following the types of usage:
� repayment of loan;
� reconstruction and strengthening i.e. improvement and enhancement of existing structures;
� economically productive investments such as purchase of business items, agricultural land etc;
� economically non-productive activities such as marriage, ornaments, etc.
� saving for their children education; and
� yet to decide for utilisation of money.
� Fixed deposited/ term deposited
21. Change in occupation: None of the APs interviewed have changed their profession/ occupation as a result of
project impact.
22. Impact on business: Daily turnover of business enterprises in village Nayagaon have decreased substantially
due to bypass but there is no major change in business increase or decrease along road side of the stretch. But
shopkeepers are hopeful of regaining their business will definitely increase in near future.
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 17
23. Receipt of other R&R assistances/Training: None of significant & vulnerable AHs received R&R assistance &
skill development training. Few AHs did not require Skill Development Training & assistance as a part of
R&R assistance as they are self-sufficient.
24. See Box 1 for Case study of an affected WHH of
Bir-Barkhtabad village.
25. Benefits or opportunities from Project
construction stage: Some APs indicated that due
to a better (project) road it has become easier to
visit city market, hospitals, school/ college and
Tehsil/ Block HQ. Some of the APs indicated
that they are not interested in road construction
work as they are gainfully employed in their
initial work.
26. Process related: No identity cards have been yet
issued by HSRDC. Further, there was no
sensitization meeting held on Health /
HIV/AIDS related issue – a serious issue
considering the in-migration of construction workers.
3.3 Consultations with Affected Households
For Stretch-2
No of individual interview with severely APs/ vulnerable APs for stretch-2
No of individual
interview
Outcomes Remarks
29 nos.
Village-wise
(5-Budhera)
(11- Kaliawas)
(9-Iqbalpur)
(1-Makraula)
(4-Jhanjhraula)
• 29 APs interviewed from 5 villages (i.e. Budhera, Kaliawas, Iqbalpur,
Jhanjhraula & Makraula) as per RP categorised as;
WHH (Expired) - 1
Vulnerable category WHH/SC - 4
BPL - 2
WHH not losing her part of land/ sold - 2
Land loser APs - 20
• All 26 APs whose land & structure impacted are having voter ID &
ration cards.
• Land impacted of 16 APs and land + structure impacted reported 10APs
• 25APs have received compensation for impacted land & structures. One
AP Mr. Satyawan r/o Makraula not taken compensation. He has filed a
case in court.
• 15 APs not satisfied with the method & time taken for compensation
Box 1 - Case Study of an affected WHH
Smt Chandro Devi w/o Lt Raj Singh of
Bir-Barkhtabad village is a vulnerable
AP as per RP. She is alone as her
husband died 10 years back and her
young son aged 21 years also died in an
accident few years back. She has three
daughters all married. Whatever
agriculture land was in her husband name was transferred to her
daughters and they sold their parts. She has very less part of land
remaining with her after acquisition. No alternative of earnings
and depend on widow pension received from Haryana Govt. She
is almost 60+ years of age. As per the circumstances she is
significant affected lady and need to be given R&R Assistance
accordingly. As single person in house skill development training
won’t solve the aim of rehabilitation. This may be treated as a
special case for significant affected household. There may be some
more exceptional cases like this which may demand similar
considerations.
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 18
disbursement; where as 10 APs are satisfied.
• When asked about the opinion on compensation received – whether
closer to the prevailing to the market rate 24 APs replied in negative and
said “No - what ever is paid is less as compared to the market rate”
• No one knows about the R&R Assistance provisions and not received any
R&R assistance yet.
• HSRDC maintained payment disbursement for land & structure and crop
harvested before possession of land by HSRDC.
• Utilization of Compensation money received by APs: Interactions
provided the following the types of usage
• Repayment of loan;
• Reconstruction and strengthening i.e. improvement and
enhancement of existing structures;
• Economically non-productive activities such as marriage, etc.
• Saved for children education
• Fixed deposited
• When asked about “how did the project helped in improving services?”
• Ease to go to city, hospital, education etc.
• Development of the area
• Business will increase, employment opportunity will increase
accordingly
• Few people apart from APs said the land rate has increased due to
project intervention
• Has the environment changed due to construction?
• Yes, flying dust/ sand made problem at the time construction of
road.
• problem faced to go to their field across road at the time of
construction
• No one changed their job/ business due to land acquisition and no major
adverse impact on their income pre & post land acquisition.
27. Payment of compensation: The market rate of land has been finalized by the competent authority out as per
the laid out procedures. While majority of the APs accepted the rate, some of the APs considered that this is
below the market rate, but have yet accepted the compensation. Regarding the process of land acquisition
and payment of compensation, all the APs who have taken compensation are satisfied with it, and have
confirmed that they received adequate information on time and the payments are made as per the
predetermined schedule.
28. Utilization of Compensation money received by APs: Interactions provided the following the types of usage:
• Repayment of loan;
• Reconstruction and strengthening i.e. improvement and enhancement of existing structures;
• Economically non-productive activities such as marriage, etc.
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 19
• Saved for children education
• Fixed deposit/ term deposit
29. Change in occupation: None of the APs interviewed have changed their profession/ occupation as a result of
project impact.
30. Impact on business: Daily turnover of business enterprises have decreased substantially due to road
construction, but shopkeepers are hopeful of regaining their business will definitely increase in near future.
New shops are under construction along the road side.
31. Receipt of other R&R assistances/Training: No significant AHs & vulnerable AHs received R&R assistance &
skill development training. Few AHs did not require Skill Development Training & assistance as a part of
R&R assistance as they are self-sufficient.
32. Benefits or opportunities from Project construction stage: APs indicated that due to a better project road it
has become easier to visit city market, hospitals, school/ college and Tehsil / Block HQ.
33. Process related: Dissatisfaction of getting compensation cheque from LAO because land owner have visited
on an average 7-8 times or more to collect the compensation cheque.
34. Further, there was no sensitization meeting held on Health/ HIV/AIDS related issue – a serious issue
considering the in-migration of construction workers.
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 20
Chapter 4 – Conclusions
4.1 Introduction
35. The chapter concludes with the key findings.
4.2 Key Findings
36. Based on the assessment actions taken based on RP, the following key findings segregated by different aspects
such as provision of compensation, delivery of entitlements as presented in Annexure-1 for stretch-1 & 2.
Compensation for Land
For stretch-1
� Compensation for acquired land 89.5% amount has been paid in village Bir-Barkhtabad. Details provided in
Table no 2.1
� Out of total unpaid compensation i.e. Rs 7191123/- almost 85.4% i.e. Rs 6144450/- payment is stopped due to
dispute among title holders/ court case/ court stay order details provided in table no 2.2. The reasons for
remaining unpaid amount 14.6% of 25 title holders i.e. Rs. 1046673/- are
� Not collected by title holders till now despite of receiving notice from L.A.O.
� Information not reached to the title holders for collection of payment because staying out
of village/ in different cities/ due to common mutation/ intkal
� Not willing to collect small amount cheques less than 5000/- or so as they feels that it will
be more expensive (fare, collection of revenue record, get certified all these document,
affidavits expenses etc.) to collect this amount.
For stretch-2
� Compensation for acquired land 71.5% amount has been paid (where award has been declared) to the affected
land owners. Village wise details provided in Table no 2.1
� Out of total unpaid compensation Rs 23895042/- almost 38.5% of 100 title holders i.e. Rs 9198148/- payment is
stopped due to dispute among title holders/ court case/ court stay order details provided in table no 2.2. The
reasons for remaining unpaid amount 61.5% of 247 title holders i.e. Rs. 14024866/- are
� Not collected by title holders till now despite of receiving notice
� Information not reached to the title holders for collection of payment staying out of
village/ in different cities, due to common mutation/ intkal
� Not willing to collect small amount cheques less than 5000/- or so as they feels that it will
be more expensive (fare, collection of revenue record, get attested all document, affidavits
expenses etc.) to collect this amount.
Compensation for Structure & Other Assets
For stretch-1
� 60% Compensation for private affected structures and other assets for stretch-1 has been paid upto 30th Nov,
2014. Details provided in Table no 2.3
� Out of total unpaid compensation i.e. Rs 279254/- for private structures & other assets almost 90.7% amount is
stopped due to dispute among title holders/ court case/ court stay order details provided in table no 2.4.
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 21
For stretch-2
� Total compensation for privately affected structures Rs. 7872664/- (other than Govt. structures & structures
saved amount) almost 72% compensation i.e. Rs. 5667762/- has been paid upto 30th Nov, 2014. Details provided
in Table no 2.3
� Out of total unpaid compensation for privately affected structures and other assets i.e. Rs 2204902/- almost
72.6% (Rs. 1600336/-) is stopped due to dispute among title holders/ court case/ court stay order details
provided in table no 2.4.
Rehabilitation Grant/ Additional Assistance/ benefits to vulnerable AHs
� No identity cards were issued for R&R Assistance to non-title holder APs for stretch-1 & 2, because as per RP
there is no non-title holder AHs for affected land & structures in stretch-1 and only two squatters were
reported in strech-2.
� A proper documentation has been done by Land Acquisition Office (LAO), Gurgaon & Rohtak of all title
holders whose land and structures impacted in project.
� R&R Assistance is not disbursed for stretch-1. DGM-4, HSRDC, Jhajjar raised demand for R&R fund to their
Head Office on 31.10.2014. Tentative date of disbursement of R&R Assistance given by DGM, HSRDC, Jhajjar
on or before 31-12-2014 but this may change if fund not received on time.
� R&R Assistance is yet to be disbursed for stretch-2. Fund already received by DGM-1, Gurgaon office on 4th
Dec, 2014. Tentative date of disbursement of R&R Assistance given by DGM-1, HSRDC, Gurgaon on or before
31-01-2015.
Compensation Disbursement Process related
� For disbursement of compensation a proper verification of Title-holder was done by Land Acquisition Officials
before handing over cheques
� With respect to timing, those APs who received compensation are quite satisfied with its disbursement on time
given by officials for stretch-1, where as the for stretch-2 title holders are quite dissatisfied for the time taken
for disbursement for compensation. The main concern of title holders was that they have visited on an average
6-7 times or more to LAO to collect their cheques. The reasons given for frequent visits to collect their cheques
were
� Improper guidance for required documents by patwari such as Jamabandi, Intkal
Mutation, Affidavit, ID Proof, witness etc.
� Some time concern official/ Patwari was on leave despite of time given to APs.
� Cheque was not ready
� Cheque not signed by Land Acquisition Collector on time.
� Un-necessary harassment by LAO (Patwari)
Grievance Redressal
� DGM-1, HSRDC Gurgaon has constituted three members Grievance Redressal Committee (GRC) for stretch-2
in the first week of Dec, 2014. GRC headed by DGM, HSRDC, Gurgaon, Sarpanch of village Budhera Mr.
Mahendra and Mr. Ishwar Singh Ex Sarpanch of village Iqbalpur. First meeting of this committee will be held
in second week of Dec, 2014.
� Till 30th Nov, 2014 a total of 10 complaints were received by DGM-1/ LAO, Gurgaon. The nature of complaint
were ;
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 22
Table No.- 4.1 Summary & nature of complaint for stretch-2
Sr Nature of Complaint Nos. of
Complaint
Remarks/ Redressed
1 Structure demolished and not
paid compensation
2 Structures were not there at the time of evaluation
under this project implementation. Demolished by
other department prior to start this project. Complaint
Redressed
2 Submersible pump compensation
not paid
1 It was abandoned and was hidden in earth and bricks
and was lying covered. Complaint Redressed
3 Compensation paid for tube-well
but not paid for pipeline/ drain
for water in fields
4 Tube-well only impacted other things not touched.
Complaint Redressed
4 Concrete area, hoarding and D
area for exist & entrance for
petrol pump
1 PWD take off only PWD land for road construction &
strengthening, not touched other things. Complaint
Redressed
5 Request for avoid factory 20-25
workers building.
1 Factory building avoided, only boundary wall affected.
Complaint Redressed
6 Acquired 7 marla of land and
paying for 5 marla
1 Actually acquired 6 marla of land and paying for the
same. Payment not yet collected by complainant.
Complaint Pending
� One complaint was received for stretch-1 for compensation of private trees & tube-well related, raised by Shri
Samay Singh s/o Sh. Lahri Singh village Bir-Barkhtabad. As stated by the register, his “complain resolved”. The
compensation amount Rs. 9797/- deposited to LAO for disbursement, but this payment was stopped due to
dispute/ court case.
Construction related
� Construction work on the project roads for stretch-1 is almost 100% completed.
� Construction work on the project roads for stretch-2 is almost 65-70% completed in five villages of Gurgaon
District where land acquisition award has been declared. 35% work is completed in Jhajjar district villages
where land acquisition is still pending.
� Some new commercial outlets have developed near Nayagaon Bypass & Bahadurgarh Bypass Junction.
� Safety requirements such as speed breakers near village habitation or education facilities are yet to be provided
� The passage of Traffic is now smoother on Bahadurgarh-Badli-Gurgaon Road.
� Though proper slopes have been provided towards Kutcha Rasta/ field way to facilitate movement of farmers
to their respective fields with their carts or tractors for stretch-1, but farmers of Bir-Barkhtabad asked for
smoother slope for three Kutcha Rasta/ field ways in the by-pass embankment area. They have identified and
shown all these routes and explained the type of problem they are facing due to sharp slope on these ways. I
also believe that technically they are correct as at two points its accident prone area due to sharp slope of
Kutcha Rasta and curve at the crossing of these two. This needs to be addressed.
General Observation
� Traffic moves smoothly on stretch 1 & 2. Proper signage given at construction site.
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 23
� It has been noticed that few workers not taking safety measure (not wearing helmets/ shoes and proper dress) at
construction site. Water sprinkling daily on sub-grade/ Earthwork.
� Overall a satisfactory construction work is in progress.
� 100% male workers deployed by contractor.
� No child labour was identified by the monitoring team during field investigation at working site
� HIV/ AIDS Awareness , Prevention Campaingns not initiated
� Social Monitoring for physical & financial progress of RP is provided in table 4.2
Table No.- 4.2 Social monitoring matrix for stretch- 1 & 2
Physical Progress of RP implementation for stretch 1 & 2
SR Monitoring indicator
for physical progress
Total no
of APs
Implementation Target as per RP Target for
the next
month
Remarks Target
for this
month
Progress
in this
month
Cumulative
progress
% against
target
1 Private Land owners
paid compensation
for land
711 NA 7 385 NA NA
2 Private Structure/
other assets owners
paid compensation
58 NA Nil 32 NA NA
3 APs paid
replacement cost for
structure
NA NA NA NA NA NA
4 APs provided with
livelihood with
assistance
42 Nil Nil Nil Nil 20
5 APs provided with
livelihood with
training
25 Nil Nil Nil Nil 20
6 Vulnerable APs
provided with
income generating
assets/ support
25 Nil Nil Nil Nil 20
7 APs provided
shifting assistance
42 Nil Nil Nil Nil 20
8 APs Resettled NA NA NA NA NA NA
9 Notice to harvest
standing crop issued
to farmers
NA NA NA NA NA NA Land acquisition
done post
harvesting
10 Removal of common
property resources
NA NA NA NA NA NA One temple was
impacted,
reconstruction
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 24
in progress by
society
11 Reconstruction of
common property
resource
NA NA NA NA NA NA
Financial Progress of RP implementation for stretch 1 & 2
SR Monitoring indicator
for financial progress
Total
amount as
per RP
(Lac Rs.)
Implementation Target (Lac Rs.) Target for
the next
month
(Lac Rs.)
Remarks Target
for this
month
Progress
in this
month
Cumulative
progress
% against
target
1 Land compensation
paid
1523.3 Nil 44.2 1212.3 Nil NA
2 Structure
compensation paid
176.9 Nil 0 60.9 Nil NA
3 Livelihood assistance
& other assistance
released
71.1 Nil 0 0 Nil 10.0
4 Training assistance
paid
2.7 Nil 0 0 Nil 0.5
5 Income generating
assets
8.1 Nil 0 0 Nil 2.0
6 Development of
resettlement site
NA NA NA NA NA NA
7 Shifting assistance
released
NA NA NA NA NA NA
8 Crop compensation
released
NA NA NA NA NA NA
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 25
Annexure 1
Entitlement Framework of ESMS, NCRPB for Stretch-1
Sr Impact Category / Entitlement Remarks Provisions applicable in stretch 1- of
this subproject
I. Loss of Private Property
a
1
2
3
4
Loss of Land agricultural or otherwise
Cash Compensation in accordance with
the provisions of Land Acquisition Act.
Rehabilitation grant based on minimum
wage rates1
Shifting assistance2 for households.
Additional compensation for vulnerable
households3 whose livelihood is impacted
by the project.
Safeguard Requirement-2 does not
apply if land is acquired through
private negotiations.
Compensation is determined based
on past sale statistics circle rates /
guideline value. However, if ESMC
finds the compensation so
determined is lower than the
replacement value of the land, the
IA will provide the difference as
assistance
Loss of land- Cash compensation in
accordance with the LA Act and the
R&R Policy of Haryana
Government. applicable to all the
title holders
i. Base price of land @ Rs.
5,200,000 has been determined
by a high level committee in a
meeting chaired by
commissioner- Rohtak Division
on 27 August 2013;
ii. 30% Solatium on base price of
land;
iii. 12 % additional interest on base
price of land;
iv. 20 % non Litigation Incentive on
base price of land;
v. Annuity Charges for 33 years @
Rs. 21000/per acre per annum,
with an increase of Rs. 750 every
year. This is in line with ‘social
security’ or ‘benefit scheme’
provided for ‘additional basis
sustenance’.
Rehabilitation Grant- The title
holders who are significantly
affected are considered. 750 days @
minimum wage rate i.e. Rs. 227/
day.
Shifting Assistance- Nil. Not
applicable.
Additional compensation for
vulnerable households- 10
vulnerable households identified.
1 NRRP 2007 provides for 750 days minimum agricultural wages
2 NRRP 2007 provides for a lump sum of INR 10,000 per AH
3 Vulnerable household comprise female-headed household, disabled-headed household, indigenous person-headed households and Below Poverty
Line households.
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 26
Sr Impact Category / Entitlement Remarks Provisions applicable in stretch 1- of
this subproject
The column Impact to vulnerable
APs in this matrix calls for annuity
scheme.
It is noteworthy that annuity will
be paid to all the titleholders
irrespective of their vulnerability
status as a part of R&R Policy of
Haryana Government and
accordingly budgeted in the SRP.
The impact on the vulnerable APs
except 01 AP is insignificant; still as
SPS 2009 of ADB calls for providing
benefits “to improve the standards
of living of the displaced poor and
other vulnerable Groups” extra
benefits in tune with EM of ESMS
have been provisioned. Moreover,
01 AP who would be losing 100%
land and is dependent on
agriculture as primary source of
income has been considered
potentially vulnerable after LA.
Thus benefits for total 11 AHs are
provisioned.
b
1
2
3
4
5
Loss of residential structure
Cash compensation at scheduled rates
without depreciation
Right to salvage affected materials
Shifting assistance for all those who loose
complete house;
Subsistence allowance based on monthly
minimum wages to all those who loose
complete house
A house site4, free of cost to the extent of
actual loss of area of the acquired house
but not more than two hundred and fifty
square meter of land in rural areas, or one
hundred and fifty square meter of land in
urban areas, as the case may be, for each
nuclear family.
Provided that, in urban areas, a house of
up to one hundred square meter carpet
area may be provided in lieu thereof. Such
a house, if necessary may be offered in a
multi-storied building complex.
a) If more than one third of
structure is affected, AP has
option to offer for acquisition
of entire structure
b) Resettlement sites will be
developed with basic amenities
if more than 40 families opt in
a project area, otherwise houses
will be built in the existing
villages
Not applicable in context of the
impacts noted for this subproject.
No impact on residential structures.
c
1
2
Loss of Commercial structure
Cash Compensation at scheduled rates
with our depreciation
Right to salvage affected materials
Shifting assistance for all those who loose
a) If more than one third of
structure is affected, AP has
option to offer for acquisition
of entire structure
Not applicable in context of the
impacts noted for this subproject.
4 In line with NRRP 2007
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 27
Sr Impact Category / Entitlement Remarks Provisions applicable in stretch 1- of
this subproject
3
4
5
complete structure
Subsistence allowance based on monthly
minimum wages to all those who loose
complete structure
An option of alternative constructed shop
or employment generation asset or
financial assistance5
d
1
2
3
Impacts to tenants residential and
commercial
Rental allowance to facilitate taking
another place for rental
Shifting assistance
In case of agricultural tenants advance
notice to harvest crops or compensation
for lost crop at market value of the yield
Not applicable in context of the
impacts noted for this subproject.
e
1
2
3
Impacts to standing crops and other
properties
Non-perennial crops:
Three months 90 days advance
notification for the harvesting of standing
crops or lump sum equal to the market
value of the yield of the standing crop lost
Compensation for trees based on timber
value at market price to be determined by
the Forest Department for timber trees
and for other trees perennial trees by the
Horticultural Department.
Loss of other properties such as irrigation
wells will be compensated at scheduled
rates.
Crops- Since LA proceedings are
underway affected families are
aware about the land acquisition.
However, the IA shall ensure that
work shall start after harvesting of
crops.
Trees- the valuation of 12 affected
trees will be done by the competent
authority i.e. Forest Department.
SRP budget contains lump-sum
amount
Loss of other Properties-
Nil
II. Impacts to squatters / Encroachers
a
1
2
3
4
5
Impacts to squatters
Loss of House: An alternative built house
in line with IAY standards for vulnerable
and compensation at scheduled rates
without depreciation for non vulnerable
with 2 months notice to demolish the
affected structure
Loss of shop: An alternative built shop
OR employment generation asset for
vulnerable and compensation at scheduled
rates without depreciation for non
vulnerable with 2 months notice to
demolish affected structure
Right to salvage the affected materials;
Shifting assistance
Cultivation: 2 months notice to harvest
standing crops or market value of
No impact on squatters is noted and
hence not applicable in context of
the impacts noted for this
subproject.
5 NRRP 2007 prescribes not less than Rs.25,000/-
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 28
Sr Impact Category / Entitlement Remarks Provisions applicable in stretch 1- of
this subproject
compensation for standing crops
b
1
2
Impacts to encroachers
2 months notice to harvest standing crops
or market value of compensation for
standing crops or demolish the
encroached structure;
Compensation at scheduled rates without
depreciation for the affected portion of
the structures
Not applicable in context of the
impacts noted for this subproject.
III. Loss of employment to agricultural and non-agricultural workers
Subsistence allowance based on monthly
minimum wages;
Economic rehabilitation assistance consisting of
training and preference in employment in the
project
This section deals with wage
earning employees. Only title
holders will be impacted thus this
section is not applicable in context
of the impacts noted for this
subproject.
iv. Impact to Vulnerable APs
Annuity policies will be arranged that will pay a
monthly pension of minimum Rs. 500 for life to
the vulnerable affected persons
Or
Training for skill development and assistance for
purchase of income generating asset for a
maximum of Rs. 30,000 per AH
a) If the livelihood of a
Vulnerable Person such as the
disabled, destitute, orphans,
widows, unmarried girls,
abandoned women, or persons
above fifty years of age, who
are not provided or cannot
immediately be provided with
alternative livelihood, and who
are not otherwise covered as
part of a family will be
provided pension for life.
b) Vulnerable Households who do
not qualify under a above and
if their livelihood is affected
then they will be entitled for
skill development and
assistance for income
generating asset.
Impact to Vulnerable APs- 10
vulnerable households identified.
The impact on the vulnerable APs
except 01 AP is insignificant; still as
SPS 2009 of ADB calls for providing
benefits “to improve the standards
of living of the displaced poor and
other vulnerable Groups” extra
benefits in tune with EM of ESMS
have been provisioned. Moreover,
01 AP who would be losing 100%
land and is dependent on
agriculture as primary source of
income has been considered
potentially vulnerable after LA.
Thus benefits for total 11 AHs are
provisioned.
V. Loss of Community assets
Relocation of community / cultural properties
impacted in consultation with the community
prior to demolition of impacted asset
Not applicable in context of the
impacts noted for this subproject.
No loss of community assets is
envisaged.
VI. Unidentified Impacts
Unforeseen impacts will be documented and
mitigated based on the provisions of the policy
applicable for the project
Contingency amount provisioned in
the budget table will take care of
such events.
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 29
Entitlement Framework of ESMS, NCRPB for Stretch-2
Sl.
No.
Compensation & R&R Assistance Entitlement Provision
I As per New Land Acquisition Act, 2013
A Component of compensation package in respect of land acquired under the Act
1 Market value of land To be determined as provided U/s 26 of the Act..
2 Factor by which the market value is to
be multiplied in the case of rural areas
1 to 2 based on the distance of the project from urban area, as
may be notified by the appropriate Government.
3 Value of assets attached to land or
building
To be determined as provided U/s 29 of the Act.
4 Solatium Equivalent to 100% of the market value of land against market
value of land mentioned against Sl. No. 1 of A multiplied by the
factor specified against 2 of A for rural areas plus value of assets
attached to the land or building against Sl. No. 3 of A.
5 Final award in rural areas Market value of land against market value of land mentioned
against Sl. No. 1 of A multiplied by the factor specified against 2
of A plus value of assets attached to the land or building against
Sl. No. 3 of A plus solatium mentioned against Sl. No. 4 of A.
B Elements of Rehabilitation and Resettlement Entitlements
1 Provision of housing units in case of
displacement
If a house is lost is rural areas, a constructed house shall be
provided as per the Indira Awas Yojana specifications.
Provided further that if any affected family in rural areas so
prefers, the equivalent cost of the house may be offered in lieu of
the constructed house.
Provided also that no family affected by the acquisition shall be
given more than one house under the provisions of this Act.
2 Choice of Annuity or Employment The R&R Policy of Haryana Government provides Annuity for
33 years @ Rs. 21000/per acre per annum, with an increase of Rs.
750 every year.
3 Subsistence grant for displaced families
for a period of one year
Each affected family which is displaced from the land acquired
shall be given a monthly subsistence allowance equivalent to Rs.
3000/- per month for a period of 1 year from the date of award.
4 Transportation cost for displaced families Each affected family which is displaced shall get a one-time
financial assistance of Rs. 50000/- as transportation cost for
shifting of the family, building materials, belongings and cattle.
5 Cattle shed/ petty shops Each affected family having cattle or having a petty shop shall
get one-time financial assistance of such amount as the
appropriate Government may, by notification, specify subject to
a minimum of Rs. 25000/- for construction of cattle shed or petty
shop as the case may be.
6 One-time Resettlement Allowance Each affected family shall be given a one-time Resettlement
Allowance of Rs. 50000/- only.
II As per ESMS of NCRPB
1 Loss of land agricultural or otherwise
a. Annuity Annuity will be paid to all the titleholders irrespective of their
vulnerability status as a part of R&R Policy of Haryana
Government and accordingly budgeted in the SRP.
b. Non-litigation Incentive @ 20 % on base price of land market value of land
2 Loss of residential structure
• If more than one third of structure is
• Compensation at scheduled rates without depreciation
• Right to salvage affected materials
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 30
affected, AP has option to offer for
acquisition of entire structure
• Resettlement site will be developed with
basic amenities if more than 40 families
opt in a project area, otherwise houses
will be built in the existing villages
• Transportation cost for displaced families
• Rental allowance to facilitate taking another place on rent for 6
months @ Rs. 2000/- per month
• Subsistence allowance based on monthly minimum wages to all
those who loose complete structure @ Rs. 3000/- per month for a
period of 1 year
3 Loss of Commercial structure
• If more than one third of structure is
affected, AP has option to offer for
acquisition of entire structure
• Compensation at scheduled rates without depreciation
• Right to salvage affected materials
• Transportation cost for displaced families
• Rental allowance to facilitate taking another place on rent for 6
months @ Rs. 2000/- per month
• Subsistence allowance based on monthly minimum wages to all
those who loose complete structure @ Rs. 3000/- per month for a
period of 1 year
• An option of alternative constructed shop or employment
generation asset or financial assistance6
4 Impacts to tenants residential and
commercial
• Rental allowance to facilitate taking another place on rent for 6
months @ Rs. 2000/- per month
• Subsistence allowance based on monthly minimum wages to all
those who loose complete structure @ Rs. 3000/- per month for a
period of 1 year
• Transportation cost for displaced families
• In case of agricultural tenants advance notice to harvest crops or
compensation for lost crop at market value of the yield.
5 Impacts to standing crops and other
properties
Non-perennial crops:
• 3 months advance notice for the
harvesting of standing crops or lump sum
equal to the market value of the yield of
the standing crop lost
• Compensation for trees based on timber
value at market price to be determined
by the Forest Department for timber
trees and for other trees perennial trees
by the Horticultural Department.
• Loss of other properties such as irrigation
wells, tube wells, hand pumps, etc will be
compensated at scheduled rates or
replacement value
Since LA proceedings are underway affected families are aware
about the land acquisition. However, the IA shall ensure that work
shall start after harvesting of crops.
6 Impacts to squatters
• Loss of House: An alternative built house in line with IAY
standards for vulnerable and compensation at scheduled rates
without depreciation for non- vulnerable with 2 months prior
notice to demolish the affected structure
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 31
• Loss of shop: An alternative built shop OR employment
generation asset for vulnerable and compensation at scheduled
rates without depreciation for non-vulnerable with 2 months
prior notice to demolish affected structure
• Right to salvage the affected materials;
• Transportation cost for displaced families
• Cultivation: Two 2 months’ prior notice to harvest standing crops
or market value for standing crops
7 Impacts to encroachers
• Two 2 months’ prior notice: i to harvest standing crops or market
value of compensation for standing crops, ii to demolish the
encroached structure.
• Compensation at scheduled rates without depreciation for the
affected portion of the structures.
8 Loss of employment to agricultural and
non-agricultural workers
• Subsistence allowance based on monthly minimum wages;
• Economic rehabilitation assistance consisting of training, and
• Preference in employment in the project
9 Impact to Vulnerable APs7
• If the livelihood of a vulnerable Person
such as the disabled, destitute, orphans,
widows, unmarried girls, abandoned
women, or persons above sixty two years
of age, who are not provided or cannot
immediately be provided with alternative
livelihood, and who are not otherwise
covered as part of a family will be
provided additional assistance.
• Vulnerable households who do not
qualify in the above criteria and if their
livelihood is affected then they will be
entitled for skill development and
assistance for income generating asset.
• Training for skill development @ Rs. 10000/- per AH
• Assistance for purchase of income generating asset for a
maximum of Rs. 30,000 per AH.
• Subsistence allowance based on monthly minimum wages to all
those who loose complete structure @ Rs. 3000/- per month for a
period of 1 year
10 Loss of Community assets
• In consultation with the community
prior to demolition of impacted asset
• Relocation/construction or rehabilitation of community / cultural
properties impacted at project cost.
• Lump sum amount has been earmarked for the compensation of
such properties.
11 Unidentified Impacts • Unforeseen impacts will be documented and mitigated based on
the provisions of the policy applicable for the project.
• Contingency amount provisioned in the budget will be utilized
for such unidentified impacts.
7Vulnerable household comprise female-headed household, disabled-headed household, indigenous person-headed
households and Below Poverty Line households.
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 32
Annexure 2
Photographs of interactions with Stakeholders – APs and Officials
Discussions – with villager in Soldha Village L and Nirmala w/o Sh Jagdish Chand s/o Sh Khushi Ram R
Interactions with Bharpai w/o Sh Surajbhan L and school staff in Budhera village R
DGM, SDO and Patwari, HSRDC (Left) and Account Officials of DGM-1, Gurgaon (Right)
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 33
Annexure 3
New infrastructure along project roads
New Petrol pump near road site - L and New commercial outlets -R
New Commercial Building constructioned on road - L and New temporary outlet R
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 34
Annexure 4
ADB Comments of 1st EMA Report of Gurgaon- Chandu-Badli-Bahadurgarh Subproject
1st stretch
SR Comments from ADB Compliance Remark
1 The quality of the first report is acceptable
and provided critical information of the
stretch 1 RP implementation.
-
2 Few issues identified and reported. They are: 2.1 Disagreement on the final rate of land
compensation came from some APs the
number is not specified in the report which
also caused of incomplete payment of land
compensation to the APs. All APs 3AP from
Balour village did not take the
compensation amount until today. The
reason is because the offered amount is less
than the market rate.
The 2.181 acres of land in
Balour village belongs to
Haryana Urban Development
Authority HUDA, Haryana
Govt. The compensation for
this land is to be transferred to
HUDA and not to any private
individual. The dispute is
between HUDA & 3APs and
HSRDC has no role in it.
Compiled in point no. 14 of
the report
2.2 Additional allowances to all APs as required
in the RP are yet to be provided. The report
indicated that the DGM HSRDC requested
the fund to their head office only on 31
October 2014 to be disbursed tentatively on
or before 31 December 2014.
Payment not received by 30th
Nov, 2014 from Head office.
Tentative date for
disbursement may be
extended marginally.
2.3 Only one complaint received and already
resolved.
Complaint was received for
compensation of private trees &
tube-well related issue, raised
by Shri Samay Singh s/o Sh.
Lahri Singh, village Bir-
Barkhtabad. As stated in the
complaint register, his
“complaint resolved”.
The compensation amount
Rs. 9797/- deposited to LAO
by HSRDC for disbursement;
however, this payment has
been stopped by LAO due to
dispute on this land.
Compiled in point no. 36
(Grievance Redressal)
2.4 Modification for livelihood rehabilitation
for AP experienced significant impacts is
required for affected family categorized
vulnerable family elderly and single
member HH as the offered mechanism to
provide training skill will not work. Thus
option to give monthly pension of a
minimum Rs 500 for life should be provided
as stated in the entitlement matrix of the
RP.
Re-verification exercise with
the APs/ Vulnerable family is
pending about their choice for
opting pension or one time
assistance. They are already
getting old age pension from
State Govt so preference for
one -time payment is indicated
This exercise will be
completed by 20th Dec, 2014
2.5 ID cards are not yet distributed to AHs by
HSRDC. This is important finding as
A proper documentation/
verification of each AP is being
This exercise will be
completed by 20th Dec, 2014
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 35
without proper ID card issued by HRSDC
how the AH can claim their additional
allowance/ entitlement as reserved in the
final RP to the IA?
done by LAO for disbursement
of compensation for Land/
structures. ID cards are needed
for non-title holders, or for
temporary impacted APs which
is nil on this stretch. All the
documents will be matched
with the documents submitted
to LAO for land compensation
before giving the R&R
assistance to APs.
3 Regular monitoring on the livelihood
condition of all vulnerable HH and HH who
are experience significant LAR impacts
needs to be done by the EMA and reported
to NCRPB/ ADB
Noted
4 Time-bound actions should be prepared based on the findings of the EMA. The topics include: 4.1 Submission for explanation and conflict
resolution plan from HSRDC to resolve the
compensation issue in Balour village.
The 2.181 acres of land in
Balour village is belongs to
Haryana Urban Development
Authority HUDA, Haryana
Govt.
Land to be transferred by
HUDA to HSRDC. Issue
resolved. Compiled in point
no. 14. Copy of letter no 4004
dated 03-12-14 from HSRDC
stating this land belongs to
HUDA attached. 4.2 Completion of payment for remaining
compensation on private structures affected
by the subproject.
Out of total, unpaid
compensation i.e. Rs 279254/-
against of 5 nos. AHs for
private structures and other
assets ; almost 90.7% is stopped
due to dispute among title
holders/ court case/ court stay
order details provided in table
no 2.5
Remaining amount is
expected to disbursed by 15-
01-2015
4.3 Issuance of ID cards by HSRDC to all APs to
claims their entitlements as per RP
All APs entitled for R&R
Assistance identified. List-1
attached
This exercise will be
completed by 20th Dec, 2014
4.4 Payment of additional R&R allowance as
detailed in the RP to all entitled APs
Payment not received by 30th
Nov, 2014 frrm Head office.
Tentative date for disbursement
may be marginally extended.
4.5 Adjustment of livelihood rehabilitation
measures for elderly and single member HH
from providing skills and job to a pension
allowance for life.
Re-verification with the APs/
Vulnerable family is pending
about their preference for
pension or one time monetary
assistance. They are getting old
age pension from State Govt.
This exercise will be
completed by 20th Dec, 2014
5 Next monitoring report should provide the following item: 5.1 Completion/ progress of the various Noted
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 36
activities as detailed in the CAP 5.2 Assessment of the livelihood condition of all
affected APs including the vulnerable APs
who are not assessed in the first report.
Noted
5.3 Grievance and redress cases if any and its
solution status.
No fresh complaint received in
last month
2nd stretch
The details of our comments on the submitted documents are specified below to be accommodated and responded
in the next EMR.
SR Comments from ADB Compliance Remark
1 Please revise the cover page of the report to be consistent
with the cover page of the EMR that is already disclosed on
ADB website. Please also include the monitoring period in
the title for easy reference.
Revised
2 Provide the comprehensive matrix of the summary
progress on the numbers of APs in each village that already
received compensation and/or R&R assistance/allowance
and the remaining APs to receive them and the progress of
civil works in the relevant village. The table 1 & 2 only
described the numbers of affected assets land and other
fixed assets but not on the number of APs as described in
the RPs. The table 4 is yet to be completed.
Required detail
provided in Table
No-2.1, 2.2, 2.3 &
2.5
3 Check again the numbers of the paid and unpaid
compensation amount as stated in the report against the
information provided in the supporting documents
attached and revised as necessary. We noted number errors
for Budhera and Makraula villages.
Corrected
4 Please prepare a matrix for the progress of RPs
implementation in both stretches and its policy compliance
status of the subproject especially on the payment of
compensation and allowances to the eligible APs prior to 1
acquisition of assets, and 2 starts of the civil works in the
affected areas. Provide explanation of the delayed of the
compensation and prepare time-bound actions for the
IA/EA to implement. Priority for implementation should
be given to the areas where civil works already started and
about to complete.
Details provided in
Social monitoring
matrix in the Report.
R&R assistance not
yet received by
HSRDC for stretch-
1 from head
quarter.
5 We noted from this report and the earlier report that no ID
cards were issued by HRSDC to the eligible APs. Why is
this happen and what is the plan to ensure that all the
eligible APs will be identified and receive their
Details of all title
holders are properly
documented by
L.A.O. hence
This exercise is
started and
expected date of
complete is 20th
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 37
allowances? Please discuss and include the result of
discussion in the next report.
additionally ID were
not issued initially.
All details will be
taken by L.A.O. and
matched with the
original documents.
for land
compensation before
giving the R&R
assistance to APs. I-
D cards are being
prepared as a
preparatory
arrangement before
disbursement of
R&R assistance.
Dec, 2014
6 What is the status of the GRM implementation, whether
any complaints received and resolution progress. Various
attachments are provided in the EMR, however these are
not referred anywhere in the report. Some of the attached
documents of the report seemed to relate with some
objections/complaints raised by the villagers. Please
provide explanation on these matters in the main text of
the report. EMA has to assess whether the issues are
treated fairly based on the government regulation and
ESMS requirements by meeting the complainants and the
responsible HSRDC responsible officer.
GRC constituted by
DGM, Gurgaon.
Details provided in
point no. 36 of the
report. (Grievance
Redressal)
Visit point. No 36
of the report.
7 The submitted report did not mention the numbers of APs
surveyed/ visited/ interview to monitor/ assess their
livelihood status post of the acquisition of their assets.
Please include this information in the next report. Be
reminded that based on the TOR the EMA should at least
sampling size of 20% of the total APs and 50% of the total
vulnerable groups in its monitoring tasks. APs that
experienced significant impacts loss more than 10% of
their land or income generating assets should be prioritized
in this monitoring exercise. This is important to ensure
that no APs have become worse off due to subproject
activity.
Required detail
provided in point
no- 18 and post
acquisition socio-
economic survey
and impact on
livelihood in
progress for both
stretches
8 Please confirm if the EMA have met the APs who are not
received/ refused to receive their compensation and to
understand their concerns. Also to assess whether their
concerns are valid. Please be reminded that EMA should be
independent and objectives in assessing the issues
identified in from the project sites and recommend
objective solutions that acceptable to ADB, Government
and APs.
One to one
interaction was
conducted to record
the status case by
case. Met with Mr.
Satyawan r/o
Makraula village
who filed case in
court. Requested for
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 38
a copy of the case
but Yet to receive
the copy of case filed
by him.
9 For effective review provide a summary matrix of
incompliance/ pending issues identified from the previous
and current monitoring report, differentiated by each
relevant stretch, and its action to be taken, with schedule,
to be monitored its progress in the subsequent report.
Thus, in each EMR the summary progress status of RP
implementation for both stretches has to be reported.
Noted
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 39
Annexure 5
Other supportive documents
1 Document for compensation disbursement upto 30th Nov, 2014 in Gurgaon district
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 40
2 Demand letter for R&R Assistance by DGM, Gurgaon for stretch-2
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 41
3 Demand letter for R&R Assistance by DGM, Jhajjar for stretch-1
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 42
4 Copy of letter from HSRDC stated the land of village-Balour is belong to HUDA on Stretch-1
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 43
Annexure 6
Details of compensation for land & structures
Compensation status of Land (List-5 to List-10)
List No-5: List of Title Holders for Acquired Land of Village - Budhera, District-Gurgaon on Stretch-2
SR
No
Name of the title holder Total
Compensation
amount
Compensation
disbursed as on
30-11-14
Unpaid
compensation as
on 30-11-14
Status Remarks
1 Naresh Kumar s/o Akshya Kumar 293027 293027 0 Paid
2 Ashok Kumar s/o Om Prakash 366283 366283 0 Paid
3 Anil Kumar s/o Om Prakash 366283 366283 0 Paid
4 Vijay Kumar s/o Suraj Prakash 366283 366283 0 Paid
5 Satish Kumar s/o Suraj Prakash 366284 366284 0 Paid
6 Vinod Kumar s/o Chander Prakash 879080 879080 0 Paid
7 Ridha Acharya Kaushik s/o Shiv Prasad 1178340 1178340 0 Paid
8 Suresh Kumar s/o Chanku Ram 118457 118457 0 Paid
9 Jitender Chopra s/o Diwan Singh Chopra 592288 0 592288 Unpaid
10 Manish Malik s/o Bahadur Chand 236915 0 236915 Unpaid
11 Smt Kaushlaya Devi w/o Hemraj 118457 118457 0 Paid
12 Smt Jyoti Dagar s/o Suresh Kumar 1458898 1458898 0 Paid
13 Om Shri Sai Nath Sanstha Ramesh Kumar Urf
Sai Baba s/o Dinaram
222393 222393 0 Paid
14 Ramesh Kumar s/o Data Ram 182362 182362 0 Paid
15 Smt Kamla Devi w/o Lakhiram 73390 73390 0 Paid
16 Smt Shanti Devi w/o Sube Singh 35583 0 35583 Unpaid
17 Jagwanti w/o Pratap Singh 48926 48926 0 Paid
18 Smt Mira Devi w/o Mahesh Gupta 35583 0 35583 Unpaid
19 Anand Prakash s/o Lal Chand 35583 35583 0 Paid
20 Smt Geeta Devi w/o Gyan Prakash 29652 0 29652 Unpaid
21 Sandeep Kataria s/o Mangli Ram 29652 29652 0 Paid
22 Smt Nisha Kumar w/o Dharm Prakash 64741 64741 0 Paid
23 Smt Meena Devi w/o Ashok Kumar 28911 28911 0 Paid
24 Smt Meena Devi w/o Rajbir 82285 82285 0 Paid
25 Ravinder Dagar s/o Mahabir Singh 30641 0 30641 Unpaid
26 Dharambir s/o Dayanand 52880 0 52880 Unpaid
27 Om Sai Mandir 179397 179397 0 Paid
28 Smt Pinki w/o Pankaj Kumar 32618 0 32618 Unpaid Payment stopped, dispute
29 Rajinder Singh s/o Himmat Singh 96865 0 96865 Unpaid Payment stopped, dispute
30 Smt Shano Devi w/o Jasram 29652 0 29652 Unpaid Payment stopped, dispute
31 Jain Sons Engineering Pvt Ltd 105513 105513 0 Paid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 44
32 Smt Kamla Devi w/o Nand Kishor 62271 62271 0 Paid
33 Rajinder Prasad s/o Sudama 303002 0 303002 Unpaid Court Case
34 Virender Kumar s/o Sudama 303002 0 303002 Unpaid Court Case
35 Smt Anjana w/o Surender Kumar 606004 0 606004 Unpaid Court Case
36 M/s Reliance SEZ Ltd 303001 0 303001 Unpaid Court Case
37 Mahabir Singh s/o Ratan Singh 925839 925839 0 Paid
38 Rajpal Singh s/o Ratan Singh 925839 925839 0 Paid
39 Govind Ram s/o Mahabir Singh 350696 350696 0 Paid
40 Sri Bhagwan s/o Mahabir Singh 350697 350697 0 Paid
41 Suresh s/o Mahabir Singh 350697 350697 0 Paid
42 Naresh Kumar s/o Mahabir Singh 350696 350696 0 Paid
43 Jitender Kumar s/o Mahender Singh 112223 112223 0 Paid
44 M/s Bharti Agritech Pvt Ltd (Vijay, Director),
Mahesh Kumar Modi s/o Madan Lal
1515009 1515009 0 Paid
45 Dashmesh Educational Charitable Trust Regd. 1290563 1290563 0 Paid
46 M/s Pragati Fabricator Pvt Ltd 572480 0 572480 Unpaid
47 M/s Cambridge Comodities Pvt Ltd Ka Marfat
Director Sudhakar Atmaram Gandrakar
156970 0 156970 Unpaid
48 M/s Pragati Fabricator Pvt Ltd 213224 0 213224 Unpaid
49 M/s Cambridge Comodities Pvt Ltd Ka Marfat
Director Sudhakar Atmaram Gandrakar
11222 0 11222 Unpaid
50 Jaipal Singh s/o Devi Singh 299262 299262 0 Paid
51 Satish Kumar s/o Devi Singh 299261 299261 0 Paid
52 Sailesh Kumar s/o Devi Singh 299261 299261 0 Paid
53 Vijay Yadav s/o Mahender Singh 1066118 1066118 0 Paid
54 Chandan Singh s/o Chhaju Ram 841673 841673 0 Paid
55 Kehar Singh s/o Hukam Singh 224446 224446 0 Paid
56 Kehar Singh s/o Hukam Singh 0 0 Unpaid Award pending
57 Smt Komal Gupta w/o Amit Gupta Patta
Dehinda Ankur Gupta s/o Adarsh Gupta
182362 0 182362 Unpaid
58 Smt Jyoti Gupta w/o Adarsh Gupta Patta
Dehinda Ankur Gupta s/o Adarsh Gupta
182362 0 182362 Unpaid
59 Dhanjit Singh s/o Ram Narayan Patta Dehinda
Ankur Gupta s/o Adarsh Gupta
182363 0 182363 Unpaid
60 Sudha w/o Dhanjit Singh Patta Dehinda
Ankur Gupta s/o Adarsh Gupta
182363 0 182363 Unpaid
61 Smt Komal Gupta w/o Amit Gupta patta
Dehinda Ankur Gupta s/o Adarsh Gupta
154307 0 154307 Unpaid
62 Smt Jyoti Gupta w/o Adarsh Gupta Patta
Dehinda Ankur Gupta s/o Adarsh Gupta
154307 0 154307 Unpaid
63 Dhanjit Singh s/o Ram Narayan 154307 0 154307 Unpaid
64 Sudha w/o Dhanjit Singh 154306 0 154306 Unpaid
65 Ram Kawar s/o Shiv Narayan 1515010 1515010 0 Paid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 45
66 Ramchander s/o Hari Ram 126251 0 126251 Unpaid
67 Ramkaran s/o Hari Ram 126251 0 126251 Unpaid Court Case
68 Rampal s/o Hari Ram 126251 0 126251 Unpaid
69 Dashmesh Educational Charitable Trust Regd. 126251 126251 0 Paid
70 Kehar Singh s/o Hukam Singh 0 0 Unpaid Award pending
71 Ratiram s/o Ganga Bishan s/o Harphul 112222 0 112222 Unpaid
72 Niraj Naman Shrivastav s/o K N Shrivastav
Bhag
56112 0 56112 Unpaid
73 Smt Ritu Shrivastav w/o Niraj Naman
Shrivastav
56112 0 56112 Unpaid
74 Smt Sattan Devi Widow Sawant Ram 70140 70140 0 Paid
75 Jitender s/o Sawant Ram 70140 70140 0 Paid
76 Dharmender s/o Sawant Ram 70139 70139 0 Paid
77 Geeta s/o Sawant Ram 70139 70139 0 Paid
78 Jitender Kumar s/o Mahender Singh 505004 505004 0 Paid
79 Smt Raju Hasija w/o Ramesh Kumar 412496 412496 0 Paid
80 Smt Laxmi Devi w/o Balwant Singh 80881 80881 0 Paid
81 Smt Nirmala Devi w/o Ashawini Kumar 80881 80881 0 Paid
82 Smt Meena Devi w/o Virender Singh 80882 80882 0 Paid
83 Smt Rajwanti Sharma w/o Rajbir Sharma 121322 121322 0 Paid
84 Smt Urmila Sharma w/o Surender Sharma 121322 121322 0 Paid
85 Naresh Kumar s/o Akshya Kumar 81050 81050 0 Paid
86 Ashok Kumar s/o Om Prakash 81050 81050 0 Paid
87 Anil Kumar s/o Om Prakash 81050 81050 0 Paid
88 Jaipraksah s/o Suraj Prakash 81050 81050 0 Paid
89 Vijay Kumar s/o Suraj Prakash 81050 81050 0 Paid
90 Satish Chander s/o Suraj Prakash 81050 81050 0 Paid
91 Vinod Kumar s/o Chander Prakash 243150 243150 0 Paid
92 Smt Satyawati w/o Hukam Chand 2188348 2188348 0 Paid
93 Devender Kumar s/o Hukam Chand 505004 505004 0 Paid
94 Harish Kumar s/o Hukam Chand 1795567 1795567 0 Paid
95 Kewal Krishan s/o Ravidatt 1262508 1262508 0 Paid
96 Pawan Kumar s/o Ravidatt 1262507 1262507 0 Paid
97 Jitender Kumar s/o Mahender Singh 280558 280558 0 Paid
98 Rajinder s/o Ram Singh 785561 0 785561 Unpaid
99 Vibhor Sharma s/o Jitender Kumar Sharma 1515010 1515010 0 Paid
100 Mahender Pal Pisar Mutbana Prabhu Dayal
s/o Ramji
392780 392780 0 Paid
101 M/s Guru Govind Singh Education Charitable 1346675 1346675 0 Paid
102 Surender Kumar s/o Yudhersitra 723413 723413 0 Paid
103 Tejbir Sharma s/o Ratan Lal 16555 16555 0 Paid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 46
104 Sudesh Oberai w/o H S Oberai 54918 54918 0 Paid
105 Smt Santosh Sharma w/o Shri Krishan Kumar 54918 54918 0 Paid
106 Vijay Kumar s/o Deep Chand 78592 78592 0 Paid
107 Sanjiv s/o Deep Chand 78592 78592 0 Paid
108 Ramesh Singh s/o Umed Singh 176028 176028 0 Paid
109 Sheela Devi w/o P R Chauhan 107547 107547 0 Paid
110 Adisal s/o Dalpat 364725 364725 0 Paid
111 Amar Singh s/o Dalpat 364725 364725 0 Paid
112 Virpal s/o Dalpat 364724 364724 0 Paid
113 Dharam Singh s/o Dalpat 364724 364724 0 Paid
114 Amar Singh s/o Nihal 2412793 2412793 0 Paid
115 Harpal Singh s/o Jagdish 47437 47437 0 Paid
116 Ramesh Chand s/o Jagdish 47437 47437 0 Paid
117 Smt Pushpa Devi w/o Gyan Chand 63250 0 63250 Unpaid
118 Balbir s/o Amar Singh Bhag 101199 101199 0 Paid
119 Hemraj Vashist s/o Vashudev Vashist 237186 0 0 Saved Structure saved
120 Smt Nirmala w/o Attar Singh 75900 75900 0 Paid
121 Satyavir s/o Jivan Singh 94874 94874 0 Paid
122 Smt Roshni Devi w/o Anil Kumar 63250 0 63250 Unpaid
123 Smt Jyoti Vashist w/o Hemraj Vashist 172356 0 0 Saved Structure saved
124 Smt Sushila Gupta w/o Moti Ram Gupta 86441 0 86441 Unpaid
125 Smt Bhagwati Devi w/o Vashudev Vashist 262486 0 0 Saved Structure saved
126 Ram Narayan s/o Chander Bhan 63250 0 63250 Unpaid
127 Smt Savitri Goyal w/o Chander Prakash Goyal 23192 0 23192 Unpaid
128 Satender Kumar Nayar s/o Narender Kumar
Nayar
90658 90658 0 Paid
129 Smt Poonam w/o Prem Prakash 106470 0 106470 Unpaid Court Case
130 Vikas Sattering Store Pvt Ltd Bajariye
Dayanand Saini
373173 373173 0 Paid
131 Smt Poonam w/o Sunil Kumar 55342 0 55342 Unpaid Court Case
132 Panchayat Deh (Rasta) 3759468 3759468 0 Paid
133 Panchayat Deh (Public Health Dept.) 1851679 0 1851679 Unpaid
Grand Total of Village-Budhera 49546431 40184510 8689893 Compensation for structure save is Rs.
672028
List No-6: List of Title Holders for Acquired Land of Village - Iqbalpur, District-Gurgaon on Stretch-2
SR
No
Name of the title holder Total
Compensation
amount
Compensation
disbursed as on
30-11-14
Unpaid
compensation
as on 30-11-14
Status Remarks
1 Mangal Singh s/o Badlu 16734 16734 0 Paid 1
2 Ram Singh s/o Badlu 16734 16734 0 Paid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 47
3 Ramkishan s/o Badlu 16734 16734 0 Paid
4 Ram Kumar s/o Badlu 16734 16734 0 Paid
5 Satbir s/o Badlu 16734 16734 0 Paid
6 Amichand s/o Chain Sukh 119527 119527 0 Paid
7 Amar Singh s/o Badlu 3984 0 3984 Unpaid
8 Jagdish s/o Badlu 3984 0 3984 Unpaid
9 Smt Dhanpati w/o Mahasingh 1328 1328 0 Paid
10 Naresh s/o Mahasingh 1328 1328 0 Paid
11 Mewa Singh s/o Mahasingh 1328 1328 0 Paid
12 Nisha w/o Dharampal 484086 0 484086 Unpaid
13 Lachchhe-Tarachand etc 738082 0 738082 Unpaid Matter under consideration-
Takseem
14 Lachchhe-Tarachand etc 621541 0 621541 Unpaid Matter under consideration-
Takseem
15 Bhopa-Gokul-Surajbhan & others 1010007 0 1010007 Unpaid Matter under consideration-
Takseem
16 Gaje Singh s/o Bhanwar Singh 32007 0 32007 Unpaid
17 Vinod Kumar s/o Bhanwar Singh 32007 0 32007 Unpaid
18 Fateh Singh s/o Shishan 12803 0 12803 Unpaid
19 Ravi Dutt s/o Shishan 12803 0 12803 Unpaid
20 Nahar Singh s/o Shishan 12803 0 12803 Unpaid
21 Suman d/o Shishan 12803 0 12803 Unpaid
22 Shyamo w/o Shishan 12803 0 12803 Unpaid
23 Kaptan s/o Nihal Singh 64015 0 64015 Unpaid
24 Ajit Singh s/o Munshi Ram 39407 0 39407 Unpaid
25 Kavita w/o Vikas 11968 0 11968 Unpaid
26 Pushpa w/o Virender Singh 24639 24639 0 Paid
27 Lalita w/o Anil Kumar 25343 25343 0 Paid
28 Jaidev s/o Mange Ram 19560 0 19560 Unpaid
29 Saroj Rana w/o Ashok Kumar 17147 0 17147 Unpaid
30 Sheela w/o Prakash Singh 17147 0 17147 Unpaid
31 Savita w/o Tejpal 4826 0 4826 Unpaid
32 Promela w/o Somveer 12955 0 12955 Unpaid
33 Jyoti w/o Krishan Kumar Yadav 15750 15750 0 Paid
34 Kavita w/o Pirthev Raj 29975 29975 0 Paid
35 Mamta Rani w/o Surender Singh 22992 0 22992 Unpaid
36 Ranjana Gupta w/o Raghav Gupta 10294 0 10294 Unpaid
37 Sandeep Kumar s/o Ram Kumar 20247 0 20247 Unpaid
38 Sashi Bala w/o Satbir Singh 5148 0 5148 Unpaid
39 Attar Singh s/o Smt Phoola 28451 28451 0 Paid
40 Kalpana w/o Bhagwan Singh 7113 0 7113 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 48
41 Umesh Yadav s/o Bharat Lal 1563 0 1563 Unpaid
42 Smt Mishro w/o Lalu Ram 3556 0 3556 Unpaid
43 Anita w/o Ravi Kumar 46233 0 46233 Unpaid
44 Smt Sanesh w/o Ramesh 35564 0 35564 Unpaid
45 Usha Rani w/o Krishan Pal 46233 46233 0 Paid
46 Raj Kumar s/o Jawahar Lal 168926 168926 0 Paid
47 Manoj Kumar Saini s/o Jawahar Lal 168926 168926 0 Paid
48 Smt Manorama w/o Sube Singh 34000 0 34000 Unpaid
49 Gaje Singh s/o Bhanwar Singh 9848 0 9848 Unpaid
50 Vinod Kumar s/o Bhanwar Singh 9848 0 9848 Unpaid
51 Fateh Singh s/o Shishan 3939 0 3939 Unpaid
52 Ravi Dutt s/o Shishan 3939 0 3939 Unpaid
53 Nahar Singh s/o Shishan 3939 0 3939 Unpaid
54 Suman d/o Shishan 3939 0 3939 Unpaid
55 Shyamo w/o Shishan 3939 0 3939 Unpaid
56 Kaptan s/o Nihal Singh 19697 0 19697 Unpaid
57 Ajit Singh s/o Munshi Ram 12125 0 12125 Unpaid
58 Kavita w/o Vikas 3682 0 3682 Unpaid
59 Pushpa w/o Virender Singh 7581 7581 0 Paid
60 Lalita w/o Anil Kumar 7798 7798 0 Paid
61 Jaidev s/o Mange Ram 6018 0 6018 Unpaid
62 Saroj Rana w/o Ashok Kumar 5276 0 5276 Unpaid
63 Sheela w/o Prakash Singh 5276 0 5276 Unpaid
64 Savita w/o Tejpal 1485 0 1485 Unpaid
65 Promela w/o Somveer 3986 0 3986 Unpaid
66 Jyoti w/o Krishan Kumar Yadav 4846 4846 0 Paid
67 Kavita w/o Pirthev Raj 9223 9223 0 Paid
68 Jagbir Singh s/o Munshi Ram 18057 0 18057 Unpaid
69 Attar Singh s/o Smt Phoola 8754 8754 0 Paid
70 Kalpana w/o Bhagwan Singh 2189 0 2189 Unpaid
71 Umesh Yadav s/o Bharat Lal 481 0 481 Unpaid
72 Smt Mishro w/o Lalu Ram 1094 0 1094 Unpaid
73 Anita w/o Ravi Kumar 14225 0 14225 Unpaid
74 Smt Sanesh w/o Ramesh 10943 0 10943 Unpaid
75 Usha Rani w/o Krishan Pal 14225 14225 0 Paid
76 Raj Kumar s/o Jawahar Lal 51978 51978 0 Paid
77 Manoj Kumar Saini s/o Jawahar Lal 51978 51978 0 Paid
78 Smt Manorama w/o Sube Singh 10463 0 10463 Unpaid
79 Phool Singh s/o Chhatar Singh 20 0 20 Unpaid
80 Girwar s/o Chhatar Singh 20 0 20 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 49
81 Krishan s/o Chhatar Singh 20 0 20 Unpaid
82 Mukesh s/o Chhatar Singh 20 0 20 Unpaid
83 Smt Sunehri d/o Chhatar Singh 20 0 20 Unpaid
84 Nirmla d/o Chhatar Singh 20 0 20 Unpaid
85 Kamlesh d/o Chhatar Singh 19 0 19 Unpaid
86 Mamkaur widow Chhatar Singh 19 0 19 Unpaid
87 Satish Kumar s/o Mahaveer 4 0 4 Unpaid
88 Sangita d/o Mahaveer 4 0 4 Unpaid
89 Satish Kumar s/o Mahaveer 4 0 4 Unpaid
90 Sushma d/o Mahabir 4 0 4 Unpaid
91 Smt Bhudei widow Mahaveer 4 0 4 Unpaid
92 Sakuntla w/o Jai Prakash 45231 0 45231 Unpaid
93 Smt Meena w/o Vinod Kumar 45231 0 45231 Unpaid
94 Sardar Singh s/o Mangtu Ram 7275 0 7275 Unpaid
95 Smt Anita w/o Ranglal 54652 54652 0 Paid
96 Smt Seema w/o Sumer 54652 54652 0 Paid
97 Smt Mamta w/o Ravinder Kumar 19385 0 19385 Unpaid
98 Smt Poonam w/o Gaj Raj 381 0 381 Unpaid
99 Smt Minaxi w/o Dilbag Singh 31991 0 31991 Unpaid
100 Gaje Singh s/o Bhanwar Singh 33768 0 33768 Unpaid
101 Vinod Kumar s/o Bhanwar Singh 33768 0 33768 Unpaid
102 Fateh Singh s/o Shishan 13507 0 13507 Unpaid
103 Ravi Dutt s/o Shishan 13507 0 13507 Unpaid
104 Nahar Singh s/o Shishan 13507 0 13507 Unpaid
105 Suman d/o Shishan 13508 0 13508 Unpaid
106 Shyamo w/o Shishan 13508 0 13508 Unpaid
107 Kaptan s/o Nihal Singh 203 0 203 Unpaid
108 Smt Vandana w/o Ajay Vats 40141 0 40141 Unpaid
109 Soneka Sharma 40141 0 40141 Unpaid
110 Ajit Singh s/o Munshi Ram 14737 0 14737 Unpaid
111 Kavita w/o Vikas 17754 0 17754 Unpaid
112 Indrawati w/o Nandkishor 7841 0 7841 Unpaid
113 Pushpa w/o Virender Singh 28710 0 28710 Unpaid
114 Lalita w/o Anil Kumar 37596 37596 0 Paid
115 Dheer Singh s/o Shankar (Munshi Ram) 442 442 0 Paid
116 Jaidev s/o Mange Ram 21180 0 21180 Unpaid
117 Saroj Rana w/o Ashok Kumar 18567 0 18567 Unpaid
118 Sheela w/o Prakash Singh 18567 0 18567 Unpaid
119 Savita w/o Tejpal 5226 0 5226 Unpaid
120 Mahinder Singh s/o Shankar (Munshi Ram) 443 0 443 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 50
121 Kavita w/o Pirthev Raj 32457 0 32457 Unpaid
122 Jyoti w/o Krishan Kumar Yadav 17054 0 17054 Unpaid
123 Promela w/o Somveer 14028 0 14028 Unpaid
124 Jagbir Singh s/o Shankar (Munshi Ram) 783 0 783 Unpaid
125 Mamta Rani w/o Surender Singh 24762 0 24762 Unpaid
126 Sandeep Kumar s/o Ram Kumar 21806 0 21806 Unpaid
127 Ranjana Gupta w/o Raghav Gupta 11088 0 11088 Unpaid
128 Shashibala w/o Satbir Singh 5544 0 5544 Unpaid
129 Dhanpat s/o Mohar Singh 85310 85310 0 Paid
130 Sanjay Kumar s/o Mohar Singh 85310 85310 0 Paid
131 Kalpana w/o Bhagwan Singh 5332 0 5332 Unpaid
132 Umesh Yadav s/o Bharat Lal 707 0 707 Unpaid
133 Smt Manorama w/o Sube Singh 36616 0 36616 Unpaid
134 Dharambir Singh s/o Bharat Singh 390 0 390 Unpaid
135 Smt Kanta Devi w/o Surender Singh 68925 68925 0 Paid
136 Smt Phoola d/o Kishan 31990 0 31990 Unpaid
137 Chhatar Singh s/o Mangtu 55550 0 55550 Unpaid
138 Sardar Singh s/o Mangtu Ram 90640 90640 0 Paid
139 Preet Singh s/o Zile Singh 30210 12947 17263 Paid Balance Rs. 17263/- to be
paid
140 Ravinder s/o Zile Singh 30214 30214 0 Paid
141 Naresh Kumar s/o Zile Singh 30214 30214 0 Paid
142 Bhawar Singh s/o Nihal Singh 68225 68225 0 Paid
143 Kaptan s/o Nihal Singh 68225 68225 0 Paid
144 Fateh Singh s/o Shishan 1075 0 1075 Unpaid
145 Ravi Dutt s/o Shishan 1076 1076 0 Paid
146 Nahar Singh s/o Shishan 1077 1077 0 Paid
147 Suman d/o Shishan 1077 1077 0 Paid
148 Shyamo w/o Shishan 1077 1077 0 Paid
149 Bijender s/o Jaipal 1825 1825 0 Paid
150 Kuldeep s/o Jaipal 1825 1825 0 Paid
151 Akash s/o Jaipal 1825 1825 0 Paid
152 Sahil s/o Jaipal 1825 1825 0 Paid
153 Smt Bharti d/o Jaipal 1825 1825 0 Paid
154 Smt Mukesh Devi widow Jaipal 1825 1825 0 Paid
155 Shishpal s/o Pooran 10954 10954 0 Paid
156 Sher Singh s/o Nihal Singh 1263 0 1263 Unpaid
157 Smt Savita Devi w/o Ranbir Singh 106935 106935 0 Paid
158 Balwan s/o Bharat Singh 17544 17544 0 Paid
159 Dharambir Singh s/o Bharat Singh 17544 17544 0 Paid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 51
160 Phool Singh s/o Chhatar Singh 11939 0 11939 Unpaid
161 Girwar s/o Chhatar Singh 11939 0 11939 Unpaid
162 Krishan s/o Chhatar Singh 11939 0 11939 Unpaid
163 Mukesh s/o Chhatar Singh 11939 0 11939 Unpaid
164 Smt Sunehri d/o Chhatar Singh 11939 0 11939 Unpaid
165 Nirmla d/o Chhatar Singh 11939 0 11939 Unpaid
166 Kamlesh d/o Chhatar Singh 11939 0 11939 Unpaid
167 Mamkaur widow Chhatar Singh 11939 0 11939 Unpaid
168 Satish Kumar s/o Mahaveer 2388 0 2388 Unpaid
169 Sangita d/o Mahaveer 2387 0 2387 Unpaid
170 Satish Kumar s/o Mahaveer 2387 0 2387 Unpaid
171 Sushma d/o Mahabir 2387 0 2387 Unpaid
172 Smt Bhudei widow Mahaveer 2387 0 2387 Unpaid
173 Sardar Singh s/o Mangtu Ram 82798 0 82798 Unpaid
174 Preet Singh s/o Zile Singh 26493 0 26493 Unpaid
175 Ravinder s/o Zile Singh 26493 0 26493 Unpaid
176 Naresh Kumar s/o Zile Singh 26493 0 26493 Unpaid
177 Smt Minaxi w/o Dilbag Singh 170810 0 170810 Unpaid
178 Gaje Singh s/o Bhanwar Singh 26862 0 26862 Unpaid
179 Vinod Kumar s/o Bhanwar Singh 26862 0 26862 Unpaid
180 Fateh Singh s/o Shishan 2608 0 2608 Unpaid
181 Ravi Dutt s/o Shishan 2608 0 2608 Unpaid
182 Nahar Singh s/o Shishan 2608 0 2608 Unpaid
183 Suman d/o Shishan 2608 0 2608 Unpaid
184 Shyamo w/o Shishan 2608 0 2608 Unpaid
185 Bijender s/o Jaipal 3390 0 3390 Unpaid
186 Kuldeep s/o Jaipal 3390 0 3390 Unpaid
187 Akash s/o Jaipal 3390 0 3390 Unpaid
188 Sahil s/o Jaipal 3390 0 3390 Unpaid
189 Smt Bharti d/o Jaipal 3390 0 3390 Unpaid
190 Smt Munesh Devi w/o Jaipal 3390 0 3390 Unpaid
191 Shishpal s/o Surat Singh 20343 0 20343 Unpaid
192 Sher Singh s/o Nihal Singh 71550 0 71550 Unpaid
193 Smt Savita Devi w/o Ranbir Singh 57387 57387 0 Paid
194 Kaptan s/o Nihal Singh 128937 0 128937 Unpaid
195 Smt Savita Devi w/o Ranbir Singh 64469 64469 0 Paid
196 Balwan s/o Bharat Singh 32234 0 32234 Unpaid
197 Dharambir Singh s/o Bharat Singh 32234 0 32234 Unpaid
198 Smt Savita Devi w/o Ranbir Singh 75214 75214 0 Paid
199 Chhatar Singh & Others 194232 0 194232 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 52
200 Ved Kaur widow Mohinder Singh 296645 296645 0 Paid
201 Naresh Kumar s/o Ram Kishan 3139 3037 102 Paid Balance Rs. 102/- to be paid
202 Satish Kumar s/o Dhanpat 4709 4709 0 Paid
203 Pawan Kumar s/o Dhanpat 4709 4709 0 Paid
204 Naresh Kumar s/o Dhanpat 4709 4709 0 Paid
205 Smt Savita Devi w/o Ranbir Singh 607417 606004 1413 Paid Balance Rs. 1413/- to be paid
206 Pratap Singh s/o Rohtas 3662 0 3662 Unpaid
207 Maan Singh s/o Rohtas 3662 0 3662 Unpaid
208 Dharambir Singh s/o Rohtas 3662 0 3662 Unpaid
209 Ashok Kumar s/o Hukam Chand 74663 74663 0 Paid
210 Rakesh Vijay s/o Hukam Chand 132465 132465 0 Paid
211 Promela Yadav w/o Atul Yadav 28902 0 28902 Unpaid
212 Sunita Yadav w/o Sunil Yadav 14451 0 14451 Unpaid
213 Mamta Yadav w/o Naveen Kumar 28902 0 28902 Unpaid
214 Kamlesh w/o Balraj 14451 0 14451 Unpaid
215 Murti Devi w/o Ranbir Singh 14451 0 14451 Unpaid
216 Smt Rajbala w/o Suresh Kumar 14451 0 14451 Unpaid
217 Roja Sharma w/o Rajesh Kumar 14451 0 14451 Unpaid
218 Poonam w/o Jasbir 38536 0 38536 Unpaid
219 Omwati w/o Ramanand 28902 0 28902 Unpaid
220 Karan Singh s/o Chimman 4817 0 4817 Unpaid
221 Naresh Kumar s/o Ram Kishan 4817 4817 0 Paid
222 Duli Chand s/o Chander 4817 0 4817 Unpaid
223 Pratap Singh s/o Rohtas 2408 0 2408 Unpaid
224 Man Singh s/o Rohtas 2408 0 2408 Unpaid
225 Smt Savita Devi w/o Ranbir Singh 780347 780347 0 Paid
226 Attar Singh s/o Banwari 4856 4856 0 Paid
227 Ved Prakash s/o Banwari 4856 4856 0 Paid
228 Harphool s/o Chimman 9712 9712 0 Paid
229 Pradip Kumar s/o Samay Singh 3237 3237 0 Paid
230 Gopi Chand s/o Samay Singh 3237 3237 0 Paid
231 Sanjay s/o Samay Singh 3237 3237 0 Paid
232 Dharampal s/o Sirju 8992 8992 0 Paid
233 Karambeer s/o Ram Prasad 3237 3237 0 Paid
234 Duli Chand s/o Chander 4532 4532 0 Paid
235 Pratap Singh s/o Rohtas 2374 0 2374 Unpaid
236 Maan Singh s/o Rohtas 2374 2374 0 Paid
237 Dharambir Singh s/o Rohtas 2374 2374 0 Paid
238 Smt Ratni widow Sirju 719 719 0 Paid
239 Shanti Devi widow Ram Prasad 6474 0 6474 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 53
240 Smt Santosh d/o Rohtas 1295 0 1295 Unpaid
241 Sumita d/o Rohtas 1295 0 1295 Unpaid
242 Sunita d/o Vidhya 1295 1295 0 Paid
243 Anaro d/o Chander 1295 0 1295 Unpaid
244 Chameli d/o Chander 1295 0 1295 Unpaid
245 Saraswati d/o Chander 1295 1295 0 Paid
246 Dharam Singh s/o Prithi Singh 658 0 658 Unpaid
247 Karan Singh s/o Chimman 9054 9054 0 Paid
248 Karan Singh s/o Chimman 4155 0 4155 Unpaid
249 Ashok Kumar s/o Hukam Chand 155787 155787 0 Paid
250 Rakesh Vijay s/o Hukam Chand 155785 155785 0 Paid
251 Maan Singh s/o Rohtas 447 447 0 Paid
252 Pratap Singh s/o Rohtas 447 0 447 Unpaid
253 Dharambir Singh s/o Rohtas 448 448 0 Paid
254 Smt Savita Devi w/o Ranbir Singh 604129 604129 0 Paid
255 Shanti Devi widow Ram Prasad 1340 0 1340 Unpaid
256 Dharam Singh s/o Prithi Singh 7901 0 7901 Unpaid
257 Smt Savita Devi w/o Ranbir Singh 1875 0 1875 Unpaid
258 Rohtash s/o Om Prakash 33090 33090 0 Paid
259 Umed Singh s/o Om Prakash 33090 33090 0 Paid
260 Jai Singh s/o Om Prakash 33090 33090 0 Paid
261 Inder Singh s/o Om Prakash 33090 33090 0 Paid
262 Jai Singh s/o Om Prakash 33090 33090 0 Paid
263 Inder Singh s/o Om Prakash 33090 33090 0 Paid
264 Phulo w/o Bhanwar Singh 7454 7454 0 Paid
265 Hukam Singh s/o Phoola Ram 1932 0 1932 Unpaid
266 Savita d/o Bhanwar Singh 9386 9386 0 Paid
267 Seema d/o Bhanwar Singh 9386 9386 0 Paid
268 Rekha d/o Bhanwar Singh 9386 9386 0 Paid
269 Kusum d/o Bhanwar Singh 9386 9386 0 Paid
270 Rajni d/o Bhanwar Singh 9386 9386 0 Paid
271 Bhateri d/o Bhanwar Singh 9386 9386 0 Paid
272 Lali d/o Bhanwar Singh 9386 9386 0 Paid
273 Ishwar Singh s/o Ram Saroop 1588 1588 0 Paid
274 Raj Kumar s/o Ram Saroop 1588 1588 0 Paid
275 Rajbir s/o Ram Saroop 1588 1588 0 Paid
276 Zile Singh s/o Ram Saroop 1588 1588 0 Paid
277 Balram s/o Bhanwar Singh 1588 1588 0 Paid
278 Reliance Haryana Sez Ltd. 262762 262762 0 Paid
279 Rajinder Singh s/o Kishan Singh 722 0 722 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 54
280 Joginder Singh s/o Kishan Singh 722 0 722 Unpaid
281 Narender Singh s/o Kishan Singh 722 0 722 Unpaid
282 Ishwar Singh s/o Ram Saroop 43170 0 43170 Unpaid
283 Surender Kumar s/o Chanderbhan 15559 0 15559 Unpaid
284 Jitender s/o Chanderveer 15559 0 15559 Unpaid
285 Mukesh Kumar Verma 31117 0 31117 Unpaid
286 Raj Kumar s/o Ram Saroop 105407 105407 0 Paid
287 Rajbir s/o Ram Saroop 105407 0 105407 Unpaid
288 Zile Singh s/o Ram Saroop 105407 0 105407 Unpaid
289 Balram s/o Bhanwar Singh 30323 0 30323 Unpaid
290 Karan Singh s/o Ram Chander 200705 200705 0 Paid
291 Premwati w/o Amar Singh 617 617 0 Paid
292 Sonu s/o Amar Singh 616 616 0 Paid
293 Vikas Urf Monu s/o Amar Singh 616 616 0 Paid
294 Suresh Devi d/o Amar Singh 616 616 0 Paid
295 Mamta d/o Amar Singh 616 616 0 Paid
296 Kamla d/o Amar Singh 615 615 0 Paid
297 Rita d/o Amar Singh 616 616 0 Paid
298 Rema d/o Amar Singh 615 615 0 Paid
299 Reliance Haryana Sez Ltd. 161 0 161 Unpaid Payment stopped, dispute
300 Karan Singh s/o Ram Chander 127031 127031 0 Paid
301 Akhil Bhartya Sisodiya Rajput Samaj 254061 254061 0 Paid
302 Phulo Devi widow Bhanwar Singh 7939 7939 0 Paid
303 Savita d/o Bhanwar Singh 9074 9074 0 Paid
304 Seema d/o Bhanwar Singh 9074 9074 0 Paid
305 Rekha d/o Bhanwar Singh 9074 9074 0 Paid
306 Kusum d/o Bhanwar Singh 9074 9074 0 Paid
307 Rajni d/o Bhanwar Singh 9074 9074 0 Paid
308 Bhateri d/o Bhanwar Singh 9074 9074 0 Paid
309 Lali d/o Bhanwar Singh 9074 9074 0 Paid
310 Balram s/o Bhanwar Singh 31758 31758 0 Paid
311 Raj Kumar s/o Ram Saroop 113798 113798 0 Paid
312 Rajbir s/o Ram Saroop 113798 113798 0 Paid
313 Zile Singh s/o Ram Saroop 113798 113798 0 Paid
314 Ishwar Singh s/o Ram Saroop 31758 31758 0 Paid
315 Hukam Singh s/o Phoola Ram 7939 0 7939 Unpaid Payment stopped, dispute
316 Rajinder Singh s/o Kishan Singh 2646 0 2646 Unpaid Payment stopped, dispute
317 Joginder Singh s/o Kishan Singh 2646 0 2646 Unpaid Payment stopped, dispute
318 Narender Singh s/o Kishan Singh 2646 0 2646 Unpaid Payment stopped, dispute
319 Rohtash s/o Om Prakash 35727 35727 0 Paid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 55
320 Umed Singh s/o Om Prakash 35727 35727 0 Paid
321 Jai Singh s/o Om Prakash 71455 71455 0 Paid
322 Inder Singh s/o Om Prakash 71454 71454 0 Paid
323 Seema d/o Bhanwar Singh 1532 1532 0 Paid
324 Rajni d/o Bhanwar Singh 1532 1532 0 Paid
325 Rekha d/o Bhanwar Singh 1532 1532 0 Paid
326 Savita d/o Bhanwar Singh 1533 1533 0 Paid
327 Kusum d/o Bhanwar Singh 1532 1532 0 Paid
328 Phulo Devi widow Bhanwar Singh 1221 1221 0 Paid
329 Hukam Singh s/o Phoola Ram 312 0 312 Unpaid
330 Bhateri d/o Bhanwar Singh 1532 1532 0 Paid
331 Lali d/o Bhanwar Singh 1532 1532 0 Paid
332 Ishwar Singh s/o Ram Saroop 19423 19423 0 Paid
333 Raj Kumar s/o Ram Saroop 19423 19423 0 Paid
334 Zile Singh s/o Ram Saroop 19423 19423 0 Paid
335 Rajbir s/o Ram Saroop 19423 19423 0 Paid
336 Balram s/o Bhanwar Singh 7480 7480 0 Paid
337 Jai Singh s/o Om Prakash 4656 4656 0 Paid
338 Inder Singh s/o Om Prakash 4656 4656 0 Paid
339 Rohtash s/o Om Prakash 2328 2328 0 Paid
340 Umed Singh s/o Om Prakash 2328 2328 0 Paid
341 Karan Singh s/o Ram Chander 32372 32372 0 Paid
342 Reliance Haryana Sez Ltd. 32372 32372 0 Paid
343 Smt Saroj w/o Budh Ram 9045 0 9045 Unpaid Payment stopped, dispute
344 Smt Shakuntla w/o Rattan Singh 9045 0 9045 Unpaid Payment stopped, dispute
345 Inder Singh s/o Rampat 103590 103590 0 Paid
346 Jagat Singh s/o Rampat 103590 103590 0 Paid
347 Ishwar Singh s/o Rampat 103590 103590 0 Paid
348 Suresh s/o Rampat 103590 103590 0 Paid
349 Ramphal s/o Patram 414362 414362 0 Paid
350 Hoshiyar s/o Patram 414363 414363 0 Paid
Grand Total of Village Iqbalpur 14101245 8160345 5940900
List No-7: List of Title Holders for Acquired Land of Village - Jhanjhraula, District-Gurgaon on Stretch-2
SR
No
Name of the title holder Total
Compensation
amount
Compensation
disbursed as on
30-11-14
Unpaid
compensation
as on 30-11-14
Status Remarks
1 Ram Dass s/o Ram Singh 376443 376443 0 Paid
2 Ravinder Singh s/o Ram Singh 376443 376443 0 Paid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 56
3 Bijender Singh s/o Ram Singh 376443 376443 0 Paid
4 Narender Singh s/o Ram Singh 517608 517608 0 Paid
5 Ram Kumar s/o Rajpal 122563 0 122563 Unpaid
6 Rajbir s/o Shri Chand 122563 0 122563 Unpaid
7 Samunder Singh s/o Sultan Singh 81708 0 81708 Unpaid
8 Devender Singh s/o Dalip Singh 81708 0 81708 Unpaid
9 Rajesh Kumar Yadav s/o Satyanarayan 27236 0 27236 Unpaid
10 Deepak Yadav s/o Ranveer Singh 27236 0 27236 Unpaid
11 Dinesh Sharma s/o J N Sharma 27236 0 27236 Unpaid
12 Smt Anju Rani w/o Rattan Singh 44895 0 44895 Unpaid
13 Smt Alka Tyagi w/o Sudhir Tyagi 44895 0 44895 Unpaid
14 Kamal Chand Singh s/o Rai Singh 89790 0 89790 Unpaid
15 Sher Singh s/o Ragbir Singh 147573 0 147573 Unpaid Dispute
16 Lal Singh s/o Ragbir Singh 147574 0 147574 Unpaid Dispute
17 Babu Lal s/o Ragbir Singh 147574 0 147574 Unpaid Dispute
18 Bijender Singh s/o Kundan Singh 74241 0 74241 Unpaid
19 Nandan Lal s/o Kundan Singh 74241 0 74241 Unpaid
20 Prithvi Singh s/o Manohar Singh 418 0 418 Unpaid
21 Vijay Kumar s/o Phool Singh 7167 0 7167 Unpaid
22 Jeet Ram s/o Ramsaran 9557 0 9557 Unpaid
23 Anil Kumar s/o Muthtir Singh 9557 0 9557 Unpaid
24 Pramod Kumar s/o Ragbir Singh 9557 0 9557 Unpaid
25 Smt Sunita Dahiya w/o Sahab Singh 26937 0 26937 Unpaid
26 Varun Kumar Shoukin s/o Jaipal Singh 26937 0 26937 Unpaid
27 Anand Singh s/o Gyan Chand 4290 0 4290 Unpaid
28 Smt Shakuntla Devi w/o Ishwar Singh 89790 0 89790 Unpaid
29 Sunil Kumar s/o Lal Chand 98769 0 98769 Unpaid
30 Smt Jaldhara w/o Manohar Singh 140 0 140 Unpaid
31 Narender Singh s/o Manohar Singh 140 0 140 Unpaid
32 Smt Bhagwati Gour w/o Mahender Prasad 8171 0 8171 Unpaid
33 Ram Kishan s/o Maha Singh 449396 449396 0 Paid
34 Anand- Jagvir- Jasbir s/o Ram Narayan 449396 449396 0 Paid
35 Ram Kumar s/o Rajpal 13322 0 13322 Unpaid
36 Rajbir s/o Shri Chand 13322 0 13322 Unpaid
37 Samunder Singh s/o Sultan Singh 8881 0 8881 Unpaid
38 Devender Singh s/o Dalip Singh 8881 0 8881 Unpaid
39 Rajbir s/o Shri Chand 8881 0 8881 Unpaid
40 Gajraj Singh s/o Nathan 13322 0 13322 Unpaid
41 Smt Anju Rani w/o Rattan Singh 26644 0 26644 Unpaid
42 Smt Alka Tyagi w/o Sudhir Tyagi 26644 0 26644 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 57
43 Ram Kishan s/o Maha Singh 46627 46627 0 Paid
44 Anand- Jagvir- Jasbir s/o Ram Narayan 46627 46627 0 Paid
45 Prithvi Singh s/o Manohar Singh 4441 0 4441 Unpaid
46 Vijay Kumar s/o Phool Singh 896 0 896 Unpaid
47 Jeet Ram s/o Ram Saran 1195 0 1195 Unpaid
48 Anil Kumar s/o Muthtir Singh 1195 0 1195 Unpaid
49 Pramod Kumar s/o Ragbir Singh 1195 0 1195 Unpaid
50 Sudhansu Sakhar s/o Raj Kumar 1045 0 1045 Unpaid
51 Jagmohan Baitha s/o Jagru 448 0 448 Unpaid
52 Reena Devi w/o Vinod Kumar 1120 0 1120 Unpaid
53 Smt Seema Verma w/o Ajesh Kumar 1120 0 1120 Unpaid
54 Lalan Baitha s/o Ramlal 896 0 896 Unpaid
55 Smt Saroj w/o Budhram 39966 0 39966 Unpaid
56 Anand Singh s/o Gyan Chand 4213 0 4213 Unpaid
57 Smt Shakuntla Devi w/o Ishwar Singh 13322 0 13322 Unpaid
58 Sunil Kumar s/o Lal Chand 22204 0 22204 Unpaid
59 Rajbir s/o Shri Chand 61488 0 61488 Unpaid
60 Ram Kumar s/o Rajpal 61489 0 61489 Unpaid
61 Samunder Singh s/o Sultan Singh 40992 0 40992 Unpaid
62 Devender Singh s/o Dalip Singh 40992 0 40992 Unpaid
63 Rajesh Kumar Yadav s/o Satyanarayan 13664 0 13664 Unpaid
64 Deepak Yadav s/o Ranveer Singh 13664 0 13664 Unpaid
65 Dinesh Sharma s/o J N Sharma 13664 0 13664 Unpaid
66 Smt Bhagwati Gour w/o Mahender Prasad 4969 0 4969 Unpaid
67 Ram Kishan s/o Maha Singh 226079 226079 0 Paid
68 Anand- Jagvir- Jasbir s/o Ram Narayan 226079 226079 0 Paid
69 Smt Shakuntla Devi w/o Ishwar Singh 40295 0 40295 Unpaid
70 Smt Jaldhara w/o Manohar Singh 204 0 204 Unpaid
71 Narender Singh s/o Manohar Singh 204 0 204 Unpaid
72 Sunil Kumar s/o Lal Chand 30198 0 30198 Unpaid
73 Smt Renu w/o Vinod Kumar 6716 0 6716 Unpaid
74 Vimla Devi w/o Mahabir 8395 0 8395 Unpaid
75 Monika w/o Raj Kumar 8395 0 8395 Unpaid
76 Smt Anju Rani w/o Rattan Singh 5037 0 5037 Unpaid
77 Smt Alka Tyagi w/o Sudhir Tyagi 5037 0 5037 Unpaid
78 Jai Prakash s/o Rattan Singh 10913 0 10913 Unpaid
79 Smt Saroj w/o Budhram 17629 0 17629 Unpaid
80 Sher Singh s/o Ragbir Singh 161 0 161 Unpaid
81 Lal Singh s/o Ragbir Singh 161 0 161 Unpaid
82 Babu Lal s/o Ragbir Singh 161 0 161 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 58
83 Virender Singh s/o Kundan Singh 81 0 81 Unpaid
84 Nandlal s/o Kundan Singh 81 0 81 Unpaid
85 Vijay Kumar s/o Phool Singh 3605 0 3605 Unpaid
86 Jeet Ram Notiyal s/o Ram Saran 4778 0 4778 Unpaid
87 Anil Kumar s/o Mukhtiyar Singh 4778 0 4778 Unpaid
88 Pramod Kumar s/o Ragbir Singh 4778 0 4778 Unpaid
89 Smt Poonam w/o Daulat Ram 45265 0 45265 Unpaid
90 Smt Nisha Ujjawal w/o Ravi Ujjawal 20891 0 20891 Unpaid
91 Harish Rana s/o Om Prakash 20891 0 20891 Unpaid
92 Sudhansu Sakhar s/o Raj Kumar 4181 0 4181 Unpaid
93 Jagmohan Baitha s/o Jagru 1792 0 1792 Unpaid
94 Smt Renu w/o Vinod Kumar 4480 0 4480 Unpaid
95 Smt Seema Verma w/o Ajesh Kumar 4480 0 4480 Unpaid
96 Lalan Baitha s/o Ramlal 3584 0 3584 Unpaid
97 Smt Krishna w/o Dilbag 3971 0 3971 Unpaid
98 Smt Santra w/o Dharambir 3971 0 3971 Unpaid
99 Anand s/o Gyan Chand 557 0 557 Unpaid
100 Smt Poonam w/o Daulat Ram 20891 0 20891 Unpaid
101 Smt Birlawati w/o Jagdish 10446 0 10446 Unpaid
102 Smt Sahasi w/o Om Prakash 10446 0 10446 Unpaid
103 Smt Bharti Devi w/o Harpal 20891 0 20891 Unpaid
104 Smt Babita w/o Sanjay Kumar 20891 0 20891 Unpaid
105 Vijay Pal s/o Ram Narayan 2060 0 2060 Unpaid
106 Rambir s/o Man Singh 20891 0 20891 Unpaid
107 Inderjeet s/o Ramjeevan 64735 0 64735 Unpaid
108 Budhram s/o Shri Chand 75705 0 75705 Unpaid
109 Greshi Chand s/o Mahanand Notiyal 9921 0 9921 Unpaid
Grand Total of Village - Jhanjhraula 5630226 3091141 2539085
List No-8: List of Title Holders for Acquired Land of Village - Kaliawas, District-Gurgaon on Stretch-2
SR Name of the title holder Total
Compensation
amount
Compensation
disbursed as on
30-11-14
Unpaid
compensation as
on 30-11-14
Status Remarks
1 Ram Kunwar s/o Bahadur Singh 263921 263921 0 Paid
2 Abhay Singh s/o Bahadur Singh 263921 0 263921 Unpaid Payment stopped
3 Jai Bhagwan s/o Bahadur Singh 263921 263921 0 Paid
4 Basanti w/o Bahadur Singh 148557 148557 0 Paid
5 Smt Seema Kataria w/o Rajesh Kataria 73350 0 73350 Unpaid
6 Rajesh Kataria s/o Sajjan Singh 73350 0 73350 Unpaid
7 Sonu s/o Ramlal Urf Ramphal 29305 29305 0 Paid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 59
8 Monu Singh s/o Ramlal Urf Ramphal 29305 29305 0 Paid
9 Gautam s/o Ramlal Urf Ramphal 29304 29304 0 Paid
10 Smt Darshna Devi w/o Ramlal Urf Ramphal 29304 29304 0 Paid
11 Smt Omwati d/o Nyaydar 233078 233078 0 Paid
12 Rajbir s/o Lakhmi Chand 227251 0 227251 Unpaid
13 Amar Singh s/o Shishram 1214 1214 0 Paid
14 Gaje Singh s/o Shishram 1214 1214 0 Paid
15 Norang Singh s/o Shishram 1214 1214 0 Paid
16 Daulat Singh s/o Shishram 1214 1214 0 Paid
17 Smt Saraswati w/o Shishram 971 971 0 Paid
18 Virender s/o Jailal 181283 181283 0 Paid
19 Rajender s/o Jailal 67981 67981 0 Paid
20 Smt Sarla Devi w/o Jai Kishan 113302 113302 0 Paid
21 Smt Reena Devi w/o Karambir 90642 0 90642 Unpaid Court stay order
22 Smt Sushila Yadav w/o Ajit Yadav 45321 0 45321 Unpaid Court stay order
23 Smt Reena Yadav w/o Manjit 45321 0 45321 Unpaid Court stay order
24 Devender s/o Ramanand 16636 0 16636 Unpaid
25 Mukesh s/o Ramanand 16636 0 16636 Unpaid
26 Seema Devi d/o Ramanand 16636 0 16636 Unpaid
27 Meena Devi d/o Ramanand 16636 0 16636 Unpaid
28 Resham Devi w/o Ramanand 16636 0 16636 Unpaid
29 Satpal s/o Daulatram 83178 83178 0 Paid
30 Smt Lakshmi Devi w/o Kishan Kumar Yadav 124439 124439 0 Paid
31 Sajjan s/o Prabhu 31001 31001 0 Paid
32 Braham Prakash s/o Prabhu 31000 31000 0 Paid
33 Suraj Prakash s/o Prabhu 31000 31000 0 Paid
34 Rakesh Kumar s/o Mangat Ram 56653 0 56653 Unpaid Court case
35 Virender Kumar s/o Patram 56653 0 56653 Unpaid Court case
36 Reliance Haryana SEZ Ltd 11134 11134 0 Paid
37 Satbir s/o Ram Kishan 16537 16537 0 Paid
38 Satprakash s/o Ram Kishan 16537 16537 0 Paid
39 Vikas s/o Satish 5512 5512 0 Paid
40 Sabina d/o Satish 5512 5512 0 Paid
41 Sushila w/o Satish 5513 5513 0 Paid
42 Vedprakash s/o Ram Kishan 16537 16537 0 Paid
43 Suman w/o Rajbir 5458 5458 0 Paid
44 Sanjit s/o Rajbir 5458 5458 0 Paid
45 Rakesh s/o Rajbir 5458 5458 0 Paid
46 Smt Ram Rati w/o Prabhu 30782 30782 0 Paid
47 Satpal s/o Daulatram 31077 0 31077 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 60
48 Ramesh s/o Sampat 46616 0 46616 Unpaid
49 Sajjan s/o Prabhu 11655 0 11655 Unpaid
50 Braham Prakash s/o Prabhu 11655 0 11655 Unpaid
51 Suraj Prakash s/o Prabhu 11654 0 11654 Unpaid
52 Smt Ram Rati w/o Prabhu 11654 0 11654 Unpaid
53 Raj Singh s/o Shishram 46616 0 46616 Unpaid
54 Satbir s/o Ram Kishan 6215 0 6215 Unpaid
55 Satprakash s/o Ram Kishan 6215 0 6215 Unpaid
56 Satish s/o Ram Kishan 6215 0 6215 Unpaid
57 Vedprakash s/o Ram Kishan 6215 0 6215 Unpaid
58 Suman w/o Rajbir 2072 0 2072 Unpaid
59 Sanjit s/o Rajbir 2072 0 2072 Unpaid
60 Rakesh s/o Rajbir 2072 0 2072 Unpaid
61 Devender s/o Ramanand 6215 0 6215 Unpaid
62 Mukesh s/o Ramanand 6215 0 6215 Unpaid
63 Seema Devi d/o Ramanand 6215 0 6215 Unpaid
64 Meena Devi d/o Ramanand 6215 0 6215 Unpaid
65 Resham Devi w/o Ramanand 6215 0 6215 Unpaid
66 Rajender Singh s/o Pratap Singh 1126546 1126546 0 Paid
67 Yadram s/o Harnarayan 23646 0 23646 Unpaid
68 Rajender Singh s/o Pratap Singh 520204 520204 0 Paid
69 Ram Kunwar s/o Ramnath 388464 388464 0 Paid
70 Hari Kishan s/o Roshan 323720 323720 0 Paid
71 Om Prakash s/o Kawal Singh 161860 161860 0 Paid
72 Satprakash s/o Kawal Singh 161860 161860 0 Paid
73 Baldev Singh s/o Sher Singh 64744 0 64744 Unpaid
74 Harpal s/o Sher Singh 64744 64744 0 Paid
75 Kawalsingh s/o Sher Singh 64744 64744 0 Paid
76 Satish Kumar s/o Sher Singh 64744 64744 0 Paid
77 Monu s/o Mahender Singh 64744 0 64744 Unpaid
78 Om Prakash s/o Kawal Singh 103590 103590 0 Paid
79 Satprakash s/o Kawal Singh 103590 103590 0 Paid
80 Ram Gopal s/o Ram Saroop 103590 103590 0 Paid
81 Krishan s/o Ram Saroop 103590 103590 0 Paid
82 Bule Singh s/o Sher Singh 41436 0 41436 Unpaid
83 Harpal s/o Sher Singh 41436 41436 0 Paid
84 Kawalsingh s/o Sher Singh 41436 0 41436 Unpaid
85 Satish Kumar s/o Sher Singh 41437 41437 0 Paid
86 Monu s/o Mahender Singh 41437 0 41437 Unpaid
87 Bule Singh s/o Sher Singh 12948 0 12948 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 61
88 Harpal s/o Sher Singh 12949 12949 0 Paid
89 Kawalsingh s/o Sher Singh 12949 0 12949 Unpaid
90 Satish Kumar s/o Sher Singh 12949 12949 0 Paid
91 Om Prakash s/o Kawal Singh 1029 1029 0 Paid
92 Satprakash s/o Kawal Singh 1029 1029 0 Paid
93 Smt Kamlesh s/o Sominder 25335 25335 0 Paid
94 Rambhagat s/o Jitram 37352 37352 0 Paid
95 Vedprakash s/o Ganga Ram 64744 64744 0 Paid
96 Monu s/o Mahender Singh 12948 0 12948 Unpaid
97 Smt Chameli w/o Banwari 224814 224814 0 Paid
98 Bule Singh s/o Sher Singh 5620 0 5620 Unpaid
99 Harpal s/o Sher Singh 5620 5620 0 Paid
100 Kawalsingh s/o Sher Singh 5620 0 5620 Unpaid
101 Satish Kumar s/o Sher Singh 5620 5620 0 Paid
102 Smt Mewa Devi w/o Hukam Singh 196711 196711 0 Paid
103 Babli Devi w/o Krishan Kumar 84305 84305 0 Paid
104 Monu s/o Mahender Singh 5620 0 5620 Unpaid
105 Rambhagat s/o Jitram 126458 126458 0 Paid
106 Gokal s/o Shriram 9469 9469 0 Paid
107 Gajraj s/o Sultan 1353 1353 0 Paid
108 Satpal s/o Sultan 1353 1353 0 Paid
109 Raju s/o Sultan 1353 1353 0 Paid
110 Jaipal s/o Sultan 1353 1353 0 Paid
111 Jaibhagwan s/o Sultan 1353 1353 0 Paid
112 Smt Meena d/o Sultan 1353 1353 0 Paid
113 Smt Premwati w/o Sultan 1353 1353 0 Paid
114 Manoharlal s/o Shyamlal 9469 0 9469 Unpaid
115 Smt Kaushalya w/o Shadiram 1184 1184 0 Paid
116 Mamta Devi d/o Shadiram 1184 1184 0 Paid
117 Madhu Devi d/o Shadiram 1184 1184 0 Paid
118 Manisha d/o Shadiram 1184 1184 0 Paid
119 Dayachand s/o Nanak 4734 4734 0 Paid
120 Ashok s/o Lakhiram 1335 1335 0 Paid
121 Dharmender s/o Lakhiram 1335 1335 0 Paid
122 Krishan s/o Lakhiram 1335 1335 0 Paid
123 Smt Kavita d/o Lakhiram 1335 1335 0 Paid
124 Savita d/o Lakhiram 1335 1335 0 Paid
125 Smt Shakuntla w/o Lakhiram 1335 1335 0 Paid
126 Smt Santosh Devi w/o Dharamvir 623 0 623 Unpaid
127 Smt Mamta w/o Rajesh Kumar 463 0 463 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 62
128 Madan s/o Pyarelal 1099 1099 0 Paid
129 Sanjay s/o Pyarelal 2185 2185 0 Paid
130 Smt Sunita d/o Pyarelal 2185 2185 0 Paid
131 Jailal s/o Gobinda 13111 13111 0 Paid
132 Chanderbhan s/o Pyarelal 728 728 0 Paid
133 Rajesh Kumar s/o Ramkishan 728 0 728 Unpaid
134 Balwan Singh s/o Kaliram 2549 2549 0 Paid
135 Vedprakash s/o Kaliram 2549 2549 0 Paid
136 Prem Singh s/o Kaliram 2549 2549 0 Paid
137 Braham Prakash s/o Kaliram 2549 2549 0 Paid
138 Smt Vidhya Devi w/o Pyarelal 728 728 0 Paid
139 Ram Niwas s/o Banshilal 2185 2185 0 Paid
140 Smt Mukesh w/o Prakash Dhama 8740 8740 0 Paid
141 Smt Shakuntla m/o Satender m/o 1457 0 1457 Unpaid
142 Smt Hemlata w/o Brij Mohan 1457 0 1457 Unpaid
143 Smt Suresh Devi w/o Ajit Singh 2913 0 2913 Unpaid
144 Lalita w/o Anil Kumar 546 546 0 Paid
145 Balbir s/o Bhopal 546 546 0 Paid
146 Mahabir s/o Bhopal 546 546 0 Paid
147 Anil Kumar s/o Raghbir Singh 91 91 0 Paid
148 Sher Singh s/o Raghbir Singh 91 91 0 Paid
149 Kuldeep s/o Raghbir Singh 91 0 91 Unpaid
150 Dharmender s/o Raghbir Singh 91 0 91 Unpaid
151 Smt Neetu d/o Raghbir Singh 46 46 0 Paid
152 Nisha d/o Raghbir Singh 46 46 0 Paid
153 Babita d/o Raghbir Singh 46 46 0 Paid
154 Roshni w/o Raghbir Singh 46 0 46 Unpaid
155 Smt Sarla Devi w/o Rajpal Singh 5099 5099 0 Paid
156 Reliance Haryana SEZ Ltd 2913 2913 0 Paid
157 Shushil Kumar s/o Pyarelal 1457 1457 0 Paid
158 Smt Mamkaur w/o Samay Singh 728 0 728 Unpaid
159 Satyawan s/o Rajo Devi 9469 9469 0 Paid
160 Gokal s/o Shriram 164214 164214 0 Paid
161 Gajraj s/o Sultan 23459 23459 0 Paid
162 Satpal s/o Sultan 23459 23459 0 Paid
163 Raju s/o Sultan 23459 23459 0 Paid
164 Jaipal s/o Sultan 23459 23459 0 Paid
165 Jaibhagwan s/o Sultan 23459 23459 0 Paid
166 Smt Meena d/o Sultan 23459 23459 0 Paid
167 Smt Premwati w/o Sultan 23459 23459 0 Paid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 63
168 Manoharlal s/o Shyamlal 165539 0 165539 Unpaid
169 Smt Kaushalya w/o Shadiram 20527 20527 0 Paid
170 Mamta Devi d/o Shadiram 20527 20527 0 Paid
171 Madhu Devi d/o Shadiram 20527 20527 0 Paid
172 Manisha d/o Shadiram 20527 20527 0 Paid
173 Dayachand s/o Nanak 82107 82107 0 Paid
174 Ashok s/o Lakhiram 23838 23838 0 Paid
175 Dharmender s/o Lakhiram 23838 23838 0 Paid
176 Krishan s/o Lakhiram 23838 23838 0 Paid
177 Smt Kavita d/o Lakhiram 23838 23838 0 Paid
178 Savita d/o Lakhiram 23838 23838 0 Paid
179 Smt Shakuntla w/o Lakhiram 23838 23838 0 Paid
180 Smt Santosh Devi w/o Dharamvir 10589 0 10589 Unpaid
181 Smt Mamta w/o Rajesh Kumar 7877 0 7877 Unpaid
182 Madan s/o Pyarelal 16211 16211 0 Paid
183 Smt Sunita d/o Pyarelal 34677 34677 0 Paid
184 Vedprakash s/o Ram Kishan 18540 0 18540 Unpaid
185 Jaswati w/o Paran Singh 33583 0 33583 Unpaid Payment stopped due to
unmatched shares
186 Puja Yadav w/o Dharmesh Yadav 33582 0 33582 Unpaid Payment stopped due to
unmatched shares
187 Smt Rajwati w/o Suberam 45027 45027 0 Paid
188 Balwan Singh s/o Kaliram 41337 41337 0 Paid
189 Vedprakash s/o Kaliram 41337 41337 0 Paid
190 Braham Prakash s/o Kaliram 41337 41337 0 Paid
191 Prem Singh s/o Kaliram 41337 41337 0 Paid
192 Smt Vidhya Devi d/o Kaliram 63 0 63 Unpaid
193 Naresh Kumari d/o Kaliram 63 0 63 Unpaid
194 Suresh Kumari d/o Kaliram 63 0 63 Unpaid
195 Smt Chameli Devi w/o Charan Singh 29135 29135 0 Paid
196 Balram s/o Roshanlal 18540 0 18540 Unpaid
197 Smt Subhash Kumari Sharma w/o Sri
Bhagwan Sharma
39322 39322 0 Paid
198 Smt Pushpa w/o Krishan Kumar 5705 0 5705 Unpaid
199 Smt Shakuntla m/o Satender m/o 21189 0 21189 Unpaid
200 Smt Mukesh w/o Prakash Dhama 152670 152670 0 Paid
201 Shushil Kumar s/o Pyarelal 27020 27020 0 Paid
202 Amar Singh s/o Shishram 662 662 0 Paid
203 Gaje Singh s/o Shishram 662 662 0 Paid
204 Norang Singh s/o Shishram 662 662 0 Paid
205 Daulat Singh s/o Shishram 662 662 0 Paid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 64
206 Smt Poonam w/o Neeraj Kumar 4807 4807 0 Paid
207 Lalita w/o Anil Kumar 27980 27980 0 Paid
208 Balbir s/o Bhopal 27981 27981 0 Paid
209 Mahabir s/o Bhopal 27981 27981 0 Paid
210 Anil Kumar s/o Raghbir Singh 4664 4664 0 Paid
211 Sher Singh s/o Raghbir Singh 4664 4664 0 Paid
212 Kuldeep s/o Raghbir Singh 4664 0 4664 Unpaid
213 Dharmender s/o Raghbir Singh 4664 0 4664 Unpaid
214 Smt Neetu d/o Raghbir Singh 2332 2332 0 Paid
215 Nisha d/o Raghbir Singh 2332 2332 0 Paid
216 Babita d/o Raghbir Singh 2332 2332 0 Paid
217 Roshni w/o Raghbir Singh 2332 0 2332 Unpaid
218 Reliance Haryana SEZ Ltd 54937 0 54937 Unpaid
219 Smt Mamkaur w/o Samay Singh 7412 0 7412 Unpaid
220 Satyawan s/o Rajo Devi 164214 164214 0 Paid
221 Smt Rajo Devi w/o Vijay Singh 45027 45027 0 Paid
222 Smt Rajbala w/o Omprakash 18540 18540 0 Paid
223 Sanjay s/o Pyarelal 31783 31783 0 Paid
224 Smt Premwati w/o Kaliram 1062 0 1062 Unpaid
225 Smt Sumitra Devi w/o Ramesh Chand 4236 4236 0 Paid
226 Smt Vidhya Devi w/o Pyarelal 17216 17216 0 Paid
227 Chanderbhan s/o Pyarelal 17216 17216 0 Paid
228 Ram Niwas s/o Banshilal 39729 39729 0 Paid
229 Gokal s/o Shriram 349618 0 349618 Unpaid Payment stopped due to
unmatched shares from Sr
229 to 287 of total khewat 230 Gajraj s/o Sultan 0 0 Unpaid
231 Satpal s/o Sultan 0 0 Unpaid
232 Jaipal s/o Sultan 0 0 Unpaid
233 Raju s/o Sultan 0 0 Unpaid
234 Jaibhagwan s/o Sultan 0 0 Unpaid
235 Smt Meena d/o Sultan 0 0 Unpaid
236 Smt Premwati w/o Sultan 0 0 Unpaid
237 Manoharlal s/o Shyamlal 0 0 Unpaid
238 Smt Kaushalya w/o Shadiram 0 0 Unpaid
239 Mamta Devi d/o Shadiram 0 0 Unpaid
240 Madhu Devi d/o Shadiram 0 0 Unpaid
241 Manisha d/o Shadiram 0 0 Unpaid
242 Dayachand s/o Nanak 0 0 Unpaid
243 Krishan s/o Lakhiram 0 0 Unpaid
244 Ashok s/o Lakhiram 0 0 Unpaid
245 Dharmender s/o Lakhiram 0 0 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 65
246 Smt Kavita d/o Lakhiram 0 0 Unpaid
247 Savita d/o Lakhiram 0 0 Unpaid
248 Smt Shakuntla w/o Lakhiram 0 0 Unpaid
249 Madan s/o Pyarelal 0 0 Unpaid
250 Smt Santosh Devi w/o Dharamvir 0 0 Unpaid
251 Smt Sunita d/o Pyarelal 0 0 Unpaid
252 Jailal s/o Gobinda 0 0 Unpaid
253 Balwan Singh s/o Kaliram 0 0 Unpaid
254 Vedprakash s/o Kaliram 0 0 Unpaid
255 Braham Prakash s/o Kaliram 0 0 Unpaid
256 Prem Singh s/o Kaliram 0 0 Unpaid
257 Smt Vidhya Devi d/o Kaliram 0 0 Unpaid
258 Naresh Kumari d/o Kaliram 0 0 Unpaid
259 Suresh Kumari d/o Kaliram 0 0 Unpaid
260 Smt Rajbala w/o Omprakash 0 0 Unpaid
261 Rakesh Kumar s/o Balbir 0 0 Unpaid
262 Kailash s/o Ram Chander Gumani 0 0 Unpaid
263 Sanjay s/o Pyarelal 0 0 Unpaid
264 Smt Premwati w/o Kaliram 0 0 Unpaid
265 Smt Sumitra Devi w/o Ramesh Chand 0 0 Unpaid
266 Smt Vidhya Devi w/o Pyarelal 0 0 Unpaid
267 Chanderbhan s/o Pyarelal 0 0 Unpaid
268 Ram Niwas s/o Banshilal 0 0 Unpaid
269 Jagdish s/o Gobinda 0 0 Unpaid
270 Smt Shakuntla m/o Satender m/o 0 0 Unpaid
271 Smt Hemlata w/o Brij Mohan 0 0 Unpaid
272 Shushil Kumar s/o Pyarelal 0 0 Unpaid
273 Smt Poonam w/o Neeraj Kumar 0 0 Unpaid
274 Randhir Singh s/o Bhopal 0 0 Unpaid
275 Balbir s/o Bhopal 0 0 Unpaid
276 Mahabir s/o Bhopal 0 0 Unpaid
277 Anil Kumar s/o Raghbir Singh 0 0 Unpaid
278 Sher Singh s/o Raghbir Singh 0 0 Unpaid
279 Kuldeep s/o Raghbir Singh 0 0 Unpaid
280 Dharmender s/o Randhir 0 0 Unpaid
281 Smt Neetu d/o Raghbir Singh 0 0 Unpaid
282 Nisha d/o Raghbir Singh 0 0 Unpaid
283 Babita d/o Raghbir Singh 0 0 Unpaid
284 Roshni w/o Raghbir Singh 0 0 Unpaid
285 Reliance Haryana SEZ Ltd 0 0 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 66
286 Smt Mamkaur w/o Samay Singh 0 0 Unpaid
287 Satyawan s/o Rajo Devi 0 0 Unpaid
288 Gokal s/o Shriram 271925 0 271925 Unpaid Payment stopped due to
unmatched shares from Sr
288 to 344 of total khewat 289 Gajraj s/o Sultan 0 0 Unpaid
290 Satpal s/o Sultan 0 0 Unpaid
291 Jaipal s/o Sultan 0 0 Unpaid
292 Raju s/o Sultan 0 0 Unpaid
293 Jaibhagwan s/o Sultan 0 0 Unpaid
294 Smt Meena d/o Sultan 0 0 Unpaid
295 Smt Premwati w/o Sultan 0 0 Unpaid
296 Manoharlal s/o Shyamlal 0 0 Unpaid
297 Smt Kaushalya w/o Shadiram 0 0 Unpaid
298 Mamta Devi d/o Shadiram 0 0 Unpaid
299 Madhu Devi d/o Shadiram 0 0 Unpaid
300 Manisha d/o Shadiram 0 0 Unpaid
301 Dayachand s/o Nanak 0 0 Unpaid
302 Krishan s/o Lakhiram 0 0 Unpaid
303 Ashok s/o Lakhiram 0 0 Unpaid
304 Dharmender s/o Lakhiram 0 0 Unpaid
305 Smt Kavita d/o Lakhiram 0 0 Unpaid
306 Savita d/o Lakhiram 0 0 Unpaid
307 Smt Shakuntla w/o Lakhiram 0 0 Unpaid
308 Shushil Kumar s/o Pyarelal 0 0 Unpaid
309 Sanjay s/o Pyarelal 0 0 Unpaid
310 Jailal s/o Gobinda 0 0 Unpaid
311 Balwan Singh s/o Kaliram 0 0 Unpaid
312 Vedprakash s/o Kaliram 0 0 Unpaid
313 Braham Prakash s/o Kaliram 0 0 Unpaid
314 Prem Singh s/o Kaliram 0 0 Unpaid
315 Chanderbhan s/o Pyarelal 0 0 Unpaid
316 Ram Niwas s/o Banshilal 0 0 Unpaid
317 Smt Mukesh w/o Prakash Dhama 0 0 Unpaid
318 Smt Shakuntla m/o Satender m/o 0 0 Unpaid
319 Smt Hemlata w/o Brij Mohan 0 0 Unpaid
320 Smt Suresh Devi w/o Ajit Singh 0 0 Unpaid
321 Reliance Haryana SEZ Ltd 0 0 Unpaid
322 Smt Santosh Devi w/o Dharamvir 0 0 Unpaid
323 Smt Mamta w/o Rajesh Kumar 0 0 Unpaid
324 Madan s/o Pyarelal 0 0 Unpaid
325 Smt Sunita d/o Pyarelal 0 0 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 67
326 Suresh s/o Samay Singh 0 0 Unpaid
327 Dharambir s/o Ramkaran 0 0 Unpaid
328 Smt Sarita Solanki w/o Vijender Solanki 0 0 Unpaid
329 Randhir Singh s/o Bhopal 0 0 Unpaid
330 Balbir s/o Bhopal 0 0 Unpaid
331 Mahabir s/o Bhopal 0 0 Unpaid
332 Smt Balesh d/o Bhopal 0 0 Unpaid
333 Santosh d/o Bhopal 0 0 Unpaid
334 Anil Kumar s/o Raghbir Singh 0 0 Unpaid
335 Sher Singh s/o Raghbir Singh 0 0 Unpaid
336 Kuldeep s/o Raghbir Singh 0 0 Unpaid
337 Dharmender s/o Raghbir Singh 0 0 Unpaid
338 Smt Neetu d/o Raghbir Singh 0 0 Unpaid
339 Nisha d/o Raghbir Singh 0 0 Unpaid
340 Babita d/o Raghbir Singh 0 0 Unpaid
341 Roshni w/o Raghbir Singh 0 0 Unpaid
342 Smt Kaushal Thakur w/o Tejbhan Singh 0 0 Unpaid
343 Smt Rajo Devi d/o Surajbhan 0 0 Unpaid
344 Jailal s/o Ramsroop 108269 0 108269 Unpaid
345 Ram Gopal s/o Ram Saroop 12030 12030 0 Paid
346 Krishan s/o Ram Saroop 12030 12030 0 Paid
347 Zile Singh s/o Mahasingh 48119 48119 0 Paid
348 Smt Pushpa Tyagi w/o Sanjiv Tyagi 24060 0 24060 Unpaid
349 Hari Singh s/o Maujiram 12030 12030 0 Paid
350 Smt Shiwani w/o Yudhister Kumar 24060 24060 0 Paid
351 Jagdish s/o Gobinda 6015 6015 0 Paid
352 Satpal s/o Sultan 9452 9452 0 Paid
353 Gajraj s/o Sultan 9452 9452 0 Paid
354 Raju s/o Sultan 9452 9452 0 Paid
355 Jaipal s/o Sultan 9452 9452 0 Paid
356 Jaibhagwan s/o Sultan 9452 9452 0 Paid
357 Smt Meena d/o Sultan 9452 9452 0 Paid
358 Smt Premwati w/o Sultan 9451 9451 0 Paid
359 Kamal Singh s/o Budhram 6015 0 6015 Unpaid
360 Rajbala w/o Ramesh 24060 24060 0 Paid
361 Smt Anita w/o Bir Singh 72179 72179 0 Paid
362 Surajbhan s/o Shriram 156388 156388 0 Paid
363 Smt Santosh Devi w/o Jagpal 24060 24060 0 Paid
364 Smt Vidhya Devi w/o Pyarelal 4010 0 4010 Unpaid
365 Chanderbhan s/o Pyarelal 4009 0 4009 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 68
366 Shushil Kumar s/o Pyarelal 4010 0 4010 Unpaid
367 Madan s/o Pyarelal 4010 0 4010 Unpaid
368 Smt Sunita d/o Pyarelal 4010 0 4010 Unpaid
369 Rakesh Kumar s/o Balbir 2673 0 2673 Unpaid
370 Kailash s/o Ram Chander 1337 0 1337 Unpaid
371 Balwan Singh s/o Kaliram 39097 39097 0 Paid
372 Vedprakash s/o Kaliram 39097 39097 0 Paid
373 Braham Prakash s/o Kaliram 39097 39097 0 Paid
374 Prem Singh s/o Kaliram 39097 39097 0 Paid
375 Smt Shakuntla w/o Lakhiram 48119 48119 0 Paid
376 Krishan s/o Lakhiram 21654 21654 0 Paid
377 Ashok s/o Lakhiram 21654 21654 0 Paid
378 Dharmender s/o Lakhiram 21654 21654 0 Paid
379 Savita d/o Lakhiram 21654 21654 0 Paid
380 Smt Kavita d/o Lakhiram 21654 21654 0 Paid
381 Civil Panchyat Deh 155387 0 155387 Unpaid
Grand Total of Village - Kaliawas 11381995 8452324 2929671
List No-9 : List of Title Holders for Acquired Land of Village – Makraula, District-Gurgaon on Stretch-2
SR
No
Name of the title holder Total
Compensation
amount
Compensation
disbursed as on
30-11-14
Unpaid
compensation as
on 30-11-14
Status Remarks
1 Satyawan s/o Nafe Singh 785561 0 785561 Unpaid Court case
2 Mahesh Kumar s/o Nafe Singh 785561 0 785561 Unpaid Court case
3 Vinod Kumar s/o Nafe Singh 785560 0 785560 Unpaid Court case
4 Mukesh Devi w/o Pramod Kumar 261854 0 261854 Unpaid Court case
5 Ekta d/o Pramod Kumar 261854 0 261854 Unpaid Court case
6 Mayank s/o Pramod Kumar 261853 0 261853 Unpaid Court case
Grand Total of Village - Makraula 3142243 0 3142243
List No-10 : List of Title Holders for Acquired Land of Village – Bir-Barkhtabad, District-Jhajjar on Stretch-1
SR
No
Name of the title holder Total
Compensation
amount
Compensation
disbursed as on
30-11-14
Unpaid
compensation as
on 30-11-14
Status Remarks
1 Smt Prem Kaur Aadi Lakhmi s/o Jhunda 1524900 0 1524900 Unpaid Dispute
2 Karan Singh Aadi, Sukhlal s/o Harnam 2511600 0 2511600 Unpaid Court case
3 Karan Singh s/o Ram Richhpal 27440 0 27440 Unpaid
4 Inder Singh s/o Ram Richhpal 27440 0 27440 Unpaid
5 Mahender Singh s/o Jai Narayan 58305 0 58305 Unpaid
6 Rajender Singh s/o Jai Narayan 58305 0 58305 Unpaid
7 Rajbala d/o Jai Narayan 58305 0 58305 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 69
8 Bhagwani widow Shri Devidas 82005 82005 0 Paid
9 Roopchand s/o Jhundaram 391270 391270 0 Paid
10 Samouti widow Shri Lakhmi Chand 48909 48909 0 Paid
11 Shri Krishan s/o Lakhmi Chand 48909 48909 0 Paid
12 Darshan s/o Lakhmi Chand 48910 48910 0 Paid
13 Sat Narayan s/o Lakhmi Chand 48909 48909 0 Paid
14 Joginder s/o Lakhmi Chand 48909 48909 0 Paid
15 Lilavati d/o Lakhmi Chand 48909 48909 0 Paid
16 Darshna d/o Lakhmi Chand 48909 48909 0 Paid
17 Rajeshwari d/o Lakhmi Chand 48908 48908 0 Paid
18 Narender Singh s/o Sardar Singh 843180 843180 0 Paid
19 Ashok s/o Surender Singh 401514 401514 0 Paid
20 Anil s/o Surender Singh 401514 401514 0 Paid
21 Swity d/o Surender Singh 40151 40151 0 Paid
22 Raj Singh s/o Lahri s/o Nihalu 1593670 1593670 0 Paid
23 Jaisingh s/o Lahri 1593670 1593670 0 Paid
24 Rajpal s/o Lahri 1593670 1593670 0 Paid
25 Dharampal s/o Lahri 1593670 1593670 0 Paid
26 Ajit Singh s/o Lahri 1593670 1593670 0 Paid
27 Smt Vijay Laxmi Sharma w/o Ashok Kumar 1794000 1794000 0 Paid
28 Smt Priyanka w/o Saurabh Gaur 1794000 1794000 0 Paid
29 Balbir s/o Surat Singh 666770 666770 0 Paid
30 Dalbir s/o Surat Singh 666770 666770 0 Paid
31 Savitri d/o Surat Singh 666770 666770 0 Paid
32 Nirmala d/o Surat Singh 666770 666770 0 Paid
33 Deepak s/o Randhir Singh 666770 666770 0 Paid
34 Smt Sushila Devi widow Shri Jasbir Singh 1345500 1345500 0 Paid
35 Smt Sunita d/o Raj Singh s/o Ransingh 1558537 1558537 0 Paid
36 Anupsingh s/o Raj Singh s/o Nyadar 158801 0 158801 Unpaid
37 Smt Sunita w/o Omvir 93872 0 93872 Unpaid
38 Smt Anju w/o Paramvir 25032 0 25032 Unpaid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 70
39 Smt Navima d/o Dalel Singh 25033 0 25033 Unpaid
40 Smt Chandro Devi widow Shri Raj Singh 33637 0 33637 Unpaid
41 Davender Singh s/o Sajjan Singh 33638 0 33638 Unpaid
42 Jagdish s/o Ran Singh 4395300 4395300 0 Paid
43 Jai Singh s/o Shrilal 986700 986700 0 Paid
44 Rajsingh s/o Shrilal 986700 986700 0 Paid
45 Same Singh s/o Lahri 777400 777400 0 Paid
46 Satbir Singh s/o Gordhan 259133 259133 0 Paid
47 Surajmal s/o Gordhan 259133 259133 0 Paid
48 Prabhu s/o Gordhan 259134 259134 0 Paid
49 Saradevi widow Shri Ratiram 86378 86378 0 Paid
50 Ramphal s/o Ratiram 201548 201548 0 Paid
51 Ramdhan s/o Ratiram 201548 201548 0 Paid
52 Rambir s/o Ratiram 287926 287926 0 Paid
53 Bharpai widow Shri Surajbhan 275382 275382 0 Paid
54 Ramesh s/o Surajbhan 275382 275382 0 Paid
55 Kamla d/o Surajbhan 275382 275382 0 Paid
56 Bimla d/o Surajbhan 275381 275381 0 Paid
57 Inder Singh s/o Risal Singh 109423 0 109423 Unpaid
58 Bijender Singh s/o Mahender Singh s/o Baljit 2422762 2377050 45712 Unpaid Calculation error, difference
amt 45712
59 Jaiprakash s/o Amna Kanwar s/o Baljit 2354194 2309775 44419 Unpaid Calculation error, difference
amt 44419
60 Satish s/o Amna Kanwar s/o Baljit 2354194 2309775 44419 Unpaid Calculation error, difference
amt 44419
61 Rajender Singh s/o Phool Singh 2242500 2242500 0 Paid
62 Jagdish s/o Phool Singh 2242500 2242500 0 Paid
63 Smt Pramila Devi w/o Jaideep 1928550 1928550 0 Paid
64 Sitaram Goyal s/o Gajanand 1053975 1053975 0 Paid
65 Indu w/o Dashrath 1053975 1053975 0 Paid
66 Smt Murti widow Shri Mangeram 227240 227240 0 Paid
67 Dinesh s/o Mangeram 227240 227240 0 Paid
68 Deepak s/o Mangeram 227240 227240 0 Paid
69 Smt Rekha widow Shri Uderaj 75747 75747 0 Paid
70 Sagar s/o Uderaj 75747 75747 0 Paid
71 Shivani s/o Uderaj 75746 75746 0 Paid
72 Smt Anju d/o Mangeram 227240 227240 0 Paid
73 Smt Bimla widow Shri Umed Singh 227240 227240 0 Paid
74 Naresh s/o Umed Singh 227240 227240 0 Paid
75 Sandip s/o Umed Singh 227240 227240 0 Paid
76 Manju d/o Umed Singh 227240 227240 0 Paid
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 71
77 Sangita d/o Umed Singh 227240 227240 0 Paid
78 Shakuntla widow Shri Dharam Chand 284050 284050 0 Paid
79 Sanjay Kumar s/o Dharam Chand 284050 284050 0 Paid
80 Ramesh Kumar s/o Dharam Chand 284050 284050 0 Paid
81 Varsha d/o Dharam Chand 284050 284050 0 Paid
82 Nirmla widow Shri Jagdish Chander 392438 392438 0 Paid
83 Sandipa d/o Jagdish Chander 392438 392438 0 Paid
84 Pradipa d/o Jagdish Chander 392437 392437 0 Paid
85 Deepak s/o Jagdish Chander 392437 392437 0 Paid
86 Sagar s/o Jagdish Chander 392438 392438 0 Paid
87 Kamla Devi widow Shri Shriniwas 490547 490547 0 Paid
88 Rakhi d/o Shriniwas 490547 490547 0 Paid
89 Ritu d/o Shriniwas 490546 490546 0 Paid
90 Sumit s/o Shriniwas 490547 490547 0 Paid
91 Tarachand s/o Dulichand 1308125 1308125 0 Paid
92 Ratan Singh s/o Dulichand 1308125 1308125 0 Paid
93 Krishan s/o Dulichand 1308125 1308125 0 Paid
94 Naresh Kumar s/o Mangeram 762450 762450 0 Paid
95 Mahesh s/o Nafesingh 34420 0 34420 Unpaid
96 Navin s/o Nafesingh 34420 0 34420 Unpaid
97 Deepak s/o Dilbag Singh 34420 0 34420 Unpaid
98 Dinesh s/o Dilbag Singh 34419 0 34419 Unpaid
99 Ritu w/o Arun 41721 0 41721 Unpaid
100 Shanti widow Shri Ramkala 1020997 1020997 0 Paid
101 Omprakash s/o Ramkala 1020997 1020997 0 Paid
102 Khajan Singh s/o Ramkala 1020997 1020997 0 Paid
103 Smt Santosh d/o Ramkala 435309 435309 0 Paid
104 Bijender Singh s/o Mahender, Ajay Mehra s/o
Ramgopal gair mousmi
2107950 0 2107950 Unpaid Dispute
105 Hari Singh s/o Khushi Ram 44850 44850 0 Paid
106 Hukumchand s/o Khushi Ram 44850 44850 0 Paid
107 Sumit s/o Jai Karan 14950 14950 0 Paid
108 Amit s/o Jai Karan 14950 14950 0 Paid
109 Nisha d/o Jai Karan 14950 0 14950 Unpaid
110 Dharambir Singh s/o Bhim Singh 6407 6407 0 Paid
111 Hoshyar Singh s/o Bhim Singh 6407 6407 0 Paid
112 Balwan Singh s/o Bhim Singh 6407 6407 0 Paid
113 Smt Sushila Devi widow Shri Jasbir Singh 6407 6407 0 Paid
114 Kuldeep s/o Jasbir Singh 1068 0 1068 Unpaid Cheque ready not collected
by owner
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 72
115 Rajesh s/o Jasbir Singh 1068 0 1068 Unpaid Cheque ready not collected
by owner
116 Vishal s/o Rajender Singh 4271 0 4271 Unpaid Cheque ready not collected
by owner
117 Darshna widow Shri Rajender Singh 2136 2136 0 Paid
118 Ritu d/o Rajender Singh 2136 0 2136 Unpaid Cheque ready not collected
by owner
119 Jaipal s/o Bhim Singh 8543 8543 0 Paid
Grand Total of Village – Bir Barkhtabad 68530801 61339677 7191124
Compensation status of Structures & Other Assets (List-11 to List-12)
List No-11 : List of Title Holders for Structure & other assets of Villages – Budhera, Iqbalpur, Kaliawas, Jhanjhraula and Makraula of District-Gurgaon on
Stretch-2
SR
No
Village Name of the title holder Total
Compensation
amount
Compensation
disbursed as on
30-11-14
Amount for
Structure
Saved
Unpaid
compensation as
on 30-11-14
Remarks
1 Budhera Amarsingh s/o Dalpat Singh 14497 14497
2 Budhera
Ashok Jain (Factory) s/o
Mahavir Prasad Jain 55047 55047
3 Budhera Chandan Singh s/o Chaju Ram 360912 360912
4 Budhera Deshmesh Educational Trust 34525 34525
5 Budhera Harpal s/o Jagdish 6500 6500
6 Budhera
Hemraj Vashisth s/o Vasudev
Vashisth 3000512 3000512 Structure Saved
7 Budhera Jagdish s/o Prabhu 13000 13000
8 Budhera
Jds Farm, Jyoti Dagar d/o
Suresh Kumar Dagar 32165 32165
9 Budhera
Maman Munna s/o Maman
Rasool 6500 6500
10 Budhera Meena Devi w/o Ashok Kumar 331500 331500
11 Budhera
Nisha Kumari w/o
Dharmprakash Bhardwaj 396500 396500
12 Budhera Panchayat 233958 233958 Dispute
13 Budhera Ram Kumar s/o Shiv Narayan 393500 393500
14 Budhera Ramesh s/o Jagdish 6500 6500
15 Budhera S K Chhabra 69875 69875
16 Budhera Sai Baba Mandir Trust 32500 32500
17 Budhera School
2136303 2050776 85527
Govt Structure (Building
part saved, boundary wall
dismentaled)
18 Budhera SGT Trust 141424 141424
19 Budhera Shiv Mandir, Hanuman Mandir 336415 336415 Dispute
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 73
20 Budhera Vikas (Not Sure) 58933 58933
21 Budhera Virpal s/o Dalpat Singh 82806 82806
22 Budhera Water-Works 3274772 3274772 Govt Structure
Village- Budhera Total 11018644 1624880 5051288 4342476
1 Iqbalpur Bhanwar Singh s/o Nihal Singh 321853 321853
2 Iqbalpur Dhanpat s/o Devi Singh 71404 71404
3 Iqbalpur Dharam Singh s/o Prithi Singh 65557 65557
4 Iqbalpur Girivar s/o Chhatar Singh 157668 157668
5 Iqbalpur Jile Singh s/o Swarup Singh 431198 431198
6 Iqbalpur Manoj Kumar Saini 8337 8337
7 Iqbalpur Sardar s/o Mangtu 251386 251386
8 Iqbalpur Shani Mandir 211355 211355
9 Iqbalpur Sonu- Monu s/o Amar Singh 207685 207685
10 Iqbalpur Unknown (Mukesh Verma,
Jitendra, Surendra) 113974 113974
Village-Iqbalpur Total 1840417 1652549 187868
1 Kaliawas Anita s/o Beer Singh 128605 128605
2 Kaliawas Atar Singh s/o Budh Ram 95013 95013
3 Kaliawas Balraj s/o Roshan Lal 451335 451335 Structure saved
4 Kaliawas Balram s/o Roshan Lal 230812 230812 Structure saved
5 Kaliawas Gaje Singh s/o Sheesh Ram 106259 106259
6 Kaliawas Jagdish s/o Govinda 32500 32500
7 Kaliawas Jile Singh s/o Maha Singh 265027 265027
8 Kaliawas Monu Singh s/o Ramphal
(Ramkumar s/o Bahadur Singh) 70927 70927
9 Kaliawas Mukesh Devi s/o Prakash
Dhama 179843 179843
10 Kaliawas Rajender s/o Pratap Singh 468000 468000
11 Kaliawas Ram Gopal - Krishan s/o Ram
Swarup 187482 187482
12 Kaliawas Ram Kumar s/o Ram Nath 503690 471190 32500 Structure impacted,
tubewell saved
13 Kaliawas Smt. Sarla Devi w/o Jai Kishan
s/o Naval Yadav 161236 161236
14 Kaliawas Sumitra Devi w/o Ramesh Foji 224251 224251
15 Kaliawas Unknown (Santosh w/o Tegpal) 4894 4894
Village - Kaliawas Total 3109874 2390333 714647 4894
1 Makraula Satyavan s/o Nafe Singh 1029963 1029963 Court case
Village- Makraula Total 1029963 0 0 1029963
Grand Total of Stretch-2 16998898 5667762 5765935 5565201
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 74
List No-12 : List of Title Holders for Structure & other assets of Village – Bir-Barkhtabad, District-Jhajjar on Stretch-1
SR
No
Name of the title holder Total
Compensation
amount
Compensation
disbursed as on
30-11-14
Amount
for
Structure
Saved
Unpaid
compensation
as on 30-11-14
Remarks
1 Bijender Singh s/o Mahender Singh 807 807
2 Jai Singh s/o Shrilal 14035 14035
3 Jaiprakash s/o Amna Kanwar 404 404
4 Karan Singh Aadi, Sukhlal s/o Harnam 56410 56410 Dispute
5 Naresh Kumar s/o Mangeram 29090 18823 10267
6 Raj Singh Aadi 2207 2207 Dispute
7 Raj Singh s/o Shrilal 14034 14034
8 Ramesh s/o Surajbhan 27399 27399
9 Same Singh Aadi 9797 9797 Dispute
10 Satish s/o Amna Kanwar 404 404
11 Smt Pramila Devi w/o Jaideep 359052 359052
12 Smt Prem Kaur Aadi Lakhmi s/o Jhunda 4375 4375 Dispute
13 Smt Sushila Devi Aadi 180549 180549 Dispute
Bir-Barkhtabad Total 698563 698563 0 419309
Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road
Haryana State Roads and Bridges Development Corporation Page 75
Photo
Annexure 7
(Format)
IDENTITY CARDS FOR R&R ASSISTANCE FOR HSRDC
(Project: Bahadurgarh-Badli-Chandu-Gurgaon Road)
Name of Affected Person : _________________________________
Sex : _________________________________
Address : __________________________________
House No : __________________________________
Village : __________________________________
Tehsil : __________________________________
District : __________________________________
Total no. of family members : __________________________________
Main occupation of household head : __________________________________
Type of loss : __________________________________
Entitlements : __________________________________
Signature/ Thumb impression : __________________________________
Name of IA In-charge : __________________________________
Signature of IA In-charge : __________________________________
Date of Issue : __________________________________
Office Seal