Asian Development Bank This Report has been submitted to ADB by the Haryana State Road & Bridges Development Corporation and the National Capital Region Planning Board and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB. External Monitoring Report Project Number: 41598 December 2014 IND: National Capital Region Urban Infrastructure Financing Facility – Project 1 - Bahadurgarh-Badli and Gurgaon-Badli Roads Prepared by: Market-Info Services For Haryana State Roads & Bridges Development Corporation Limited and National Capital Region Planning Board

Upload: others

Post on 27-Jun-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Asian Development Bank

This Report has been submitted to ADB by the Haryana State Road & Bridges Development Corporation and the National Capital Region Planning Board and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB.

External Monitoring Report

Project Number: 41598 December 2014

IND: National Capital Region Urban Infrastructure Financing Facility – Project 1 - Bahadurgarh-Badli and Gurgaon-Badli Roads Prepared by: Market-Info Services For Haryana State Roads & Bridges Development Corporation Limited and National Capital Region Planning Board

Page 2: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

External Monitoring Report on Implementation of Resettlement Plan of Upgradation of Bahadurgarh-Badli-Chandu-Gurgaon Road

December 2014

Prepared by

Market-Info Services SCF-34, Sector-6, Bahadurgarh Haryana

Page 3: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page i

Table of Contents

Abbreviations ............................................................................................................................................... ii

Glossary ....................................................................................................................................................... iii

Structure of the Report................................................................................................................................................. v

Chapter 1 – Introduction and Methodology .............................................................................................. 1

1.1 Project description ......................................................................................................................................... 1

1.2 Objectives and Scope of the Study ................................................................................................................ 1

1.3 Institutional Arrangements for implementation of Resettlement Plan (RP) .............................................. 2

1.4 Grievance Redressal Mechanism ................................................................................................................... 2

1.5 Approach and Methodology .......................................................................................................................... 3

Chapter 2 – Status & Impact of implementation of RP ............................................................................. 5

2.1 Introduction ................................................................................................................................................... 5

2.2 Resettlement ................................................................................................................................................... 5

Chapter 3 – Findings from Community Interactions .............................................................................. 15

3.1 Introduction ................................................................................................................................................. 15

3.2 Consultations with Affected Households .................................................................................................... 15

3.3 Consultations with Affected Households .................................................................................................... 17

Chapter 4 – Conclusions ............................................................................................................................ 20

4.1 Introduction ................................................................................................................................................. 20

4.2 Key Findings ................................................................................................................................................. 20

Entitlement Framework of ESMS, NCRPB for Stretch-1 & 2 ................................................................. 29

Annexures

1 – Entitlement Framework of ESMS, NCRPBP

2 – Photographs of Interactions with Stakeholders – APs and Officials

3 – New infrastructure along project roads

4 – Compliance on ADB comments on 1st EMA Report

5 – Other supportive documents of HSRDC

6 – Details of compensation for land & structures

7– Format for Identity Cards for R&R Assistance

Page 4: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page ii

Abbreviations

ADB Asian Development Bank

AH Affected Households

AP Affected Persons

BPL Below Poverty Line

DGM Deputy General Manager

DP Displaced Person

DSB Design Service Volume

EA Executing Agency

EE Executive Engineer

EF Entitlement Framework

ESMC Environment and Social Management Cell

FI Financial Intermediary

GOI Government of India

GRC Grievance Redressal Cell

HSRDC Haryana State Roads and Bridges Development Corporation

HUDA Haryana Urban Development Authority

IA Implementing Agency

IP Indigenous Peoples

IR Involuntary Resettlement

LA Land Acquisition

MARLA/ KANAL Unit of Land

MFF Multi-trance Financing Facility

NA Not Applicable

NCR National Capital Region

NCRPB National Capital Region Planning Board

NGO Non-Government Organization

NH National Highway

NRRP National Rehabilitation and Resettlement Policy 2007

OCR Ordinary Capital Resources

PWD Public Works Department

PCU Passenger Car Unit

ROW Right of Way

RP Resettlement Plan

SH State Highway

SRP Short Resettlement Plan

Page 5: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page iii

Glossary

Affected Household - is defined as those who stand to lose, as a consequence of the project, all or part of their

physical and non-physical assets, including homes, communities, and productive lands, resources such as

forests, range lands, fishing areas, or important cultural sites, commercial properties, tenancy, income-earning

opportunities, social and cultural networks and activities. Such impacts may be permanent or temporary.

BPL Family - for the project means, those families who possess the BPL Card.

Compensation - Means payment in cash or in kind of the replacement value of the acquired property.

Cut-off date - For titleholders, issuance of Land Acquisition Notification will be treated as cut off date.

Economic Displacement- Means loss of land, assets, access to assets, income sources, or means of livelihoods as a

result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally

designated parks and protected areas.

Entitlement - Means range of measures comprising compensation, income restoration, transfer assistance,

income substitution, and relocation which are due to the Affected Persons, depending on the nature of their

losses, to restore their economic and social base to pre-project situation.

Encroacher - Is used to denote illegal extension into public property by a person who is a legal titleholder of his

property. The person is an encroacher on the portion of the property occupied to which the person does not

hold legal title.

Family - means project affected family consisting of such persons, his or her spouse, minor sons, unmarried

daughters, minor brothers or unmarried sister, father, mother and other members residing with him/her and

dependent on him/her for their livelihood.

Grievances Redressal Committee - Means the committee established under the subproject to resolve the local

grievances.

Involuntary Resettlement - Addresses social and economic impacts that are permanent or temporary and are (i)

caused by acquisition of land and other fixed assets, (ii) by change in the use of land, or (3) restrictions

Kanal - Is a traditional unit of land area in northern states of India - Haryana, Punjab, Himachal Pradesh &

Jammu & Kashmir; and also in Pakistan; equal to 20 marlas. Under British rule the marla and kanal were

standardized, the kanal equals exactly to 5440 square feet or 505.392 square meters

Khasra number - A Khasra or index register to the revenue map. It is the list showing, by number, all the fields

and their area, measurement, who owns what cultivators he employs, what crops, what sort of soil, what trees,

are on the land.

Land Acquisition - Means acquiring of land for some public purpose by government/government agency, as

authorised by the law, from the individual landowner(s) after paying government fixed compensation in lieu of

losses incurred by land owner(s) due to surrendering of his/their land to the concerned government agency.

Replacement Cost - Means the method of valuing assets to replace the loss at market value before the project or

dispossession, or its nearest equivalent, plus any transaction costs such as administrative charges, taxes,

registration, and titling costs. Replacement cost is based on market value before the project or dispossession

whichever is higher

Resettlement - Means all the measures taken to mitigate all or any adverse impacts of the project on the DPs

property and/or livelihoods including compensation, relocation (where relevant), and rehabilitation.

Resettlement effects - Loss of physical and non-physical assets, including homes, communities, productive land,

Page 6: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page iv

income-earning assets and sources, subsistence, resources, cultural sites, social structures, networks and ties,

cultural identity and mutual help mechanisms.

Relocation - Rebuilding housing, assets, including productive land, and public infrastructure in another

location.

Resettlement Plan: - A time-bound action plan with budget setting out resettlement strategy, objectives,

entitlement, actions, responsibilities, monitoring and evaluation

Rehabilitation - Means the measures provided under the resettlement plan other than payment of the

compensation of acquired property.

Stakeholders - Mean any individuals, groups, organisations, and institutions interested in and potentially

affected by a project or having the ability to influence a project.

Squatters - Are those that are landless or without title to land and occupy public land for shelter and/or for

carrying out their livelihoods.

Shajra - A shajra or Village Map is a detailed map of the village that is used for legal (land ownership) and

administrative purposes in India and Pakistan. A shajra maps out the village lands into land parcels and gives

each parcel a unique number.

Vulnerable groups - The groups of population are considered socially ‘vulnerable’comprise of - (a) those who

are below the poverty line (BPL); (b) those who belong to scheduled castes (SC), scheduled tribes (ST); (c)

female-headed households (FHH); (e) disabled headed households.

Page 7: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page v

Background

HSRDC with NCRPBs financial assistance is implementing the work of widening & up-gradation of Gurgaon-

Chandu-Badli Bahadurgarh Road. For bidding purposes, the work has been divided under two separate

packages, i) Gurgaon Badli road and ii) Bahadurgarh Badli road. In accordance with Environmental & Social

Management System (ESMS) of NCRPB; social safeguard documents, called Resettlement Plan (RP) were

prepared and implemented. These Plans identified the broad scope of the project that results in IR, outlined the

policy and procedures for acquisition of land, compensation and other assistance measures for affected persons

and institutional requirements for the implementation of the mitigatory measures.

Objectives and scope of the M&E assignment

As the ESMS of NCRPB provided for monitoring and evaluation of the implementation of projects falling under

S-1 category (significant impact) by an external monitoring agency, the HSRDC, which is the implementing

agency for this project, engaged M/s Market-Info Services, Bahadurgarh as External Monitoring Consultant

(EMC) to undertake the Monitoring and Evaluation of RP implementation. The overall objective was to assess

whether objectives, particularly livelihoods and living standards of the Affected Persons (APs) have been

restored or enhanced. The scope of M&E included: to review and verify the progress in implementation as

outlined in the RP; to monitor the effectiveness and efficiency of agencies involved i.e. NCRPB, IA and NGO (if

any) in RP implementation; review results of internal monitoring and verify claims through random checking

at the field level to assess whether the objectives of RP have been generally met. Further it involved assessment

of efficiency, effectiveness, impact and sustainability of RP implementation, drawing both on policies and

practices and to suggest any corrective measures, if necessary. Further it requires that on project completion

confirm no deviation from social safeguards and provide completion document as per NCRPBs requirements.

Structure of the Report

The structure of the report is given below:

Structure of the report

Chapters Title of Chapter Details

1 Introduction and

Methodology

Shall include project context and a brief of the scope of the study.

Methodology of the study shall be presented in the chapter including

details on the households covered

2

Status and impact on

implementation of RP

Shall present the status of the R&R measures proposed and administered

till date and their utilization

3 Findings from

Community

Interactions

Details of the interactions with affected households are presented

4 Conclusion and

Recommendations

Conclusions drawn based on observations on the implementation

thus far followed by recommendations

Annexures

1 – Entitlement Framework of ESMS, NCRPB

2 – Photographs of Interactions with Stakeholders – APs and Officials

3 – New infrastructure along project roads

4 – Compliance on ADB comments on 1st EMA Report

5 – Other supportive documents of HSRDC

6 – Details of compensation for land & structures

Page 8: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 1

Chapter 1 – Introduction and Methodology

1.1 Project description

1. Upgradation of Bahadurgarh-Badli-Gurgaon Road in Jhajjar and Gurgaon districts (Km +0.000 to Km

+39.000)” aims at removing all existing deficiencies and upgrading the project road to required State Highway

standards for speed, safe and comfortable travel. The proposed subproject aims to provide better connectivity

to different areas in these districts. These subprojects were implemented in two different sections, as follows:

Stretch 1: Upgradation of Bahadurgarh- Badli Road (Km +0.000 to Km. +18.100) in Jhajjar District including

the construction of Nayagaon (Bir-Barkhtabad) Bye Pass Road.

Stretch 2: Upgradation of Badli-Gurgaon Road in Jhajjar/ Gurgaon District (Km. +18.100 to Km. +39.000)

totalling a length of 20.900 kms.

2. The starting and ending points in km and length of project road from Bahadurgarh to Badli to Gurgaon each

stretch is provided in the table no 1.1 below.

Table No.- 1.1 Chainage of each stretch

District Stretch No From (km) To (km) Length (in km)

Jhajjar Stretch 1 Bahadurgarh (+0.000) Badli (+18.100) 18.100

Jhajjar & Gurgaon Stretch 2 Badli (+18.100) Gurgaon (+39.000) 20.900

Total length in Km 39.000

3. The Haryana State Roads Development Corporation (HSRDC) is the executing agency of the project. The

Project Implementation Unit (PIU) is situated at Jhajjar for stretch-1, District Head Quarter of Jhajjar and for

stretch-2 at Gurgaon, District Head Quarter of Gurgaon. One project manager is designated for each stretch

to oversee the progress of project construction work. However, responsibility of monitoring the resettlement

and rehabilitation activities for Stretch-1 lies with Deputy General Manager posted at Jhajjar and for stretch-2

lies with Deputy General Manager posted at Gurgaon.

4. As per the Asian Development Bank’s (ADB) Safeguard Policy Statement, a Resettlement Plan (RP) has been

prepared by HSRDC for this project to address adverse social impacts such as losses of land, resources, and

means of livelihood or social support systems for achieving development benefits.

1.2 Objectives and Scope of the Study

5. The ESMS of NCRPB has made provision for monitoring and evaluation of the implementation of projects

falling under S-1 category (significant impact) by an external monitoring agency. Therefore, the NCRPB,

which is the funding agency for this project, requires services of a reputed agency/ individual for monitoring

and evaluation of RP and/or IPP implementation.

Page 9: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 2

6. The scope of work is as follows:

• To review and verify the progress in implementation as outlined in the RP/IPP;

• To develop specific monitoring indicators for undertaking monitoring for Involuntary Resettlement,

Indigenous Peoples Plan and the Community Participation Strategy;

• To monitor the effectiveness and efficiency of NCRPB, IA and NGO (if any) in RP/IPP implementation;

• Review results of internal monitoring and verify claims through random checking at the field level to assess

whether the objectives of RP/IPP have been generally met. Involve the affected people and community

groups in assessing the IR and impact to IP for monitoring and evaluation purposes.

• To assess whether objectives, particularly livelihoods and living standards of the Affected Persons (APs)

have been restored or enhanced;

• To assess the efforts of IA & NGO (if any) in implementation of the ‘Community Participation strategy’

with particular attention on participation of vulnerable groups namely (a) those who are below the poverty

line (BPL); (b) those who belong to indigenous peoples, scheduled castes (SC) and scheduled tribes (ST)

and; (c) female-headed households (FHH); (d) elderly and (e) disabled persons.

• To assess efficiency, effectiveness, impact and sustainability of RP/IPP implementation, drawing both on

policies and practices and to suggest any corrective measures, if necessary.

• To review the project impacts on Indigenous People and groups and assess the effectiveness of the

mitigative actions taken;

1.3 Institutional Arrangements for implementation of Resettlement Plan (RP)

7. The National Capital Region Planning Board (NCRPB) is the executing agency (EA) of the Project. The

Haryana State Roads & Bridges Development Corporation Limited, led by the Managing Director [who is also

Chief Engineer of PWD (B&R)] will be responsible for overall project implementation, monitoring,

supervision and preparation of all documentation needed for decision making, contracting, supervision of

work and providing progress monitoring information to NCRPB. The Managing Director, HSRDC will be

supported by DGM, HSRDC (the jurisdiction DGM of HSRDC). The institutional roles and responsibilities for

RP implementation are given in Table-1.2

Table No.- 1.2 The institutional roles and responsibilities for RP implementation

SI Activities Responsible

1 Implementation of proposed rehabilitation measures HSRDC (DGM)

2 Payment of compensation for acquired land LAO/ LAC

3 Consultation with AHs during rehabilitation activities HSRDC (DGM)

4 Grievance Redressal HSRDC

5 Internal Monitoring HSRDC (DGM)

6 Independent Audit commissioned by NCRPB External Agency

1.4 Grievance Redressal Mechanism

8. The HSRDC to constitute a three members Grievance Redressal Committee (GRC) comprising of the

concerned DGM, HSRDC, (Jurisdictionanl DGM), the elected member of the projected area and one member

Page 10: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 3

from the public who is known to be person of integrity, judgement and commands respect among the

community. Any aggrieved villager can approach GRC, chaired by DGM, HSRDC and if any grievance of the

villagers is not addressed, the aggrieved person will be directed to approach the District Collector. The

aggrieved person will have to approach the court of law, if he/ she is still unsatisfied with the decisions taken

by the GRC and the Collector.

Grievance Redressal Mechanism

1.5 Approach and Methodology

Details on the approach and methodology i.e. the sequence of tasks for the assessment study adopted are presented

below:

Task 1 – Meeting with HSRDC: Site visit for stretch 1 was undertaken during 16/10/2014 to 30/10/2014.

The entire stretch was visited during the above mentioned period. Meetings and discussions were held with

HSRDC (Project Implementation Authority) personnel for RP implementation update. The purpose was to

collect data, monthly reports and other relevant documents.

Task 2 – Study Design: The survey was conducted using structured questionnaires, specifically designed for

this project. The aim was to measure the impact of implementation and interventions on income. Broadly,

GRC Grievance Redressal Cell

Civil Court

HSRDC DGM-1/ SDO

Not Redressed

Land Acquisition Collector

Redressed

Land Acquisition

Grievances

EPs (Affected Persons)

Resettlement & Rehabilitation

Redressed

Redressed

Page 11: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 4

the study design followed activities – a) Socio-Economic Survey of the available and affected households for

Quantitative Data; b) Opinion Survey; c) Qualitative Data Collection and d) Review of RP implementation

in context of above mentioned aspects from a-c.

Task 3 – Site visit: To supplement the understanding gained from the desk review of the above mentioned

documents and reports, preliminary consultations with key stakeholders, sites in the both road stretches

were visited along with HSRDC personnel to ascertain the overall progress in respect of RP implementation

on the ground. It provided the opportunity to photograph and thereby record development along the road

stretches (See Annexure 3 for photos).

Task 4 – Meeting with APs: Interactions were held with APs to ascertain both qualitative and quantitative

information on their receipt of compensation and other assistances as stated in the RP. (See Annexure 2

for photographs of interactions with APs).

Task 5 – Visit to the construction sites: The purpose was to assess the overall facilities available to the

workers.

Task 6 – Data Processing and Interim Data Report: Data obtained through reviews of available documents,

socio-economic quantitative survey and qualitative data collection was processed to measure the impact

with respect to different parameters. For direct impacts, indicators would include per capita income, assets

in the households, change in occupation pattern, etc.

Task 7 – Preparation and Submission of Draft Report: In the light of the empirical analysis of both

quantitative and qualitative information collected during the study, the draft Report presents the

achievements made in different parameters considered under this study with appropriate data and

inferences drawn from its analysis. .

Task 8 – Report Finalization and Submission: The Final Assessment Report will be submitted along with an

executive summary to the client.

Page 12: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 5

Chapter 2 – Status & Impact of implementation of RP

2.1 Introduction

9. Periodic updating of activities for long term projects is very important as it helps to ascertain whether

activities are progressing as per the scheduled plan or not. It provides specific information about the progress

of the project and if the activities are not progressing as per plan, suitable measures may be adopted by the

project managers to keep the programmers on schedule.

10. Progress of RP implementation is described in following sections. This report covers the progress of

resettlement plan implementation upto 30th November, 2014.

2.2 Resettlement

11. Verification of APs, Assets/ Properties: Affected persons were informed about the proposed alignment as part

of information dissemination process by the PIU to make them aware of the likely impacts on their land,

structures and assets. Physical verification of affected households, families and structures has been completed

for stretch 1 & 2. PIU/ IA Official verified and measured each structure/asset likely to be affected by the

project in presence of the entitled person or his/her family member.

12. Distribution of Entitlement cum Identity Card: Entitlement cum identity card format is to be prepared to

include name and address, photograph of APs (encroachers & squatters), socio-economic status, etc. This

exercise is in progress. However, for entitlement of each title-holder APs Land Acquisition Officer (LAO)

prepares this in the form of table showing all details of losses to each household including, land, trees,

structures with the total costs and given to them. They are keeping all the records (i.e. Copy of Identity proof

such as Voter ID, Ration card, Adhaar Card, a passport size photograph, Nambardar as a prominent person

from village signature as a witness etc.) of each affected title holder before handing over compensation

amount cheque.

13. Resettlement component of the project has been classified into following sections:

• Compensation for Land acquired

• Compensation for affected structures & others assets

• Rehabilitation Grant/ Additional assistance

• Additional benefits to vulnerable AHs

Compensation for Land acquired

14. For Stretch-1 a total of 11.731 Acres of land acquisition was estimated as per the RP. The land acquired from

two villages (i.e. village Balour 2.181 Acres and village Bir-Barkhtabad 9.550 Acres) for Bypass in village

Nayagaon/ Bir-Barkhtabad (+2.500 Kms to +4.000 Kms). The 2.181 acres of land in Balour village belongs to

Haryana Urban Development Authority (HUDA), Haryana State Govt. The compensation against this land is

to be transferred to HUDA (See letter attached). The 9.550 acres of acquired land of Bir-Barkhtabad village is

Page 13: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 6

private land used for agriculture by title holders. No other land is required for improvement and upgradation

of this road upto Badli. Awards have been declared in these villages on 25th Sept, 2013. For Stretch-2 a total

of 25.825 acres of land acquisition were estimated, out of which 22.29 acres of land is private land from eight

villages (i.e. three villages in Jhajjar district & five villages in Gurgaon district). 2.838 acres of land belong to

panchayat and remaining 0.694 acres belong to Government land as per the RP. Award for private land in

Gurgaon district (i.e. 10.52 acres) was declared on 11th Dec, 2013. Land acquisition in Jhajjar district (i.e. 11.77

acres) is pending because of the process of fixing rates for land & procedures by the State Government under

the New Land Acquisition Act 2013 i.e. “The Right to Fair & Transparency in Land Acquisition, R&R Act,

2013”. Status of progress of land acquisition is provided in Table 2.1

Table 2.1 – Status of Land Acquisition and Disbursement of Compensation for Land

SI Village

Acquired land as

per notification

and award

declared (acre)

Date of

Award

declared

Amount of

compensation

for private

land (INR)

(%)

(Nos. of APs)

Compensation

disbursed for

private land

(INR)

(%)

(Nos. of APs)

Land Saved

(no

acquisition

) (INR)

(%)

(Nos. of

APs)

Unpaid amount

for

disbursement

(INR)

(%)

(Nos. of APs)

Stre

tch

-1

Bir-

Barkhtabad 9.550

25 Sept

2013

68530801

100.0%

121

61339677

89.5%

93

0

7191124

10.5%

28

Total of

stretch-1 9.550

68530801

100.0%

121

61339677

89.5%

93

0

7191124

10.5%

28

Stre

tch

-2

Daryapur 4.98

Award

pending

- - - -

Lagarpur 3.54 - - - -

Devarkhana 3.26 - - - -

Jhanjhraula 0.93

11th Nov,

2013

5630226

100.0%

68

3091141

54.9%

6

0

2539085

45.1%

62

Iqbalpur 2.24

14101245

100.0%

217

8160345

57.9%

102

0

5940900

42.1%

115

Kaliawas 1.86

11381995

100.0%

180

8452324

74.3%

105

0

2929671

25.7%

75

Makraula 0.35

3142243

100.0%

6

0 0

3142243

100.0%

6

Budhera 5.14

49546431

100.0%

119

40184510

81.1%

79

672028

1.4%

3

8689893

17.5%

37

Total of

stretch-2 22.29

83802140

100.0%

590

59888320 71.5%

292

672028

0.8%

3

23241792

27.7%

295

Page 14: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 7

15. For Stretch-1 the unpaid compensation for land till 30th Nov, 2014 was Rs. 7191124/- of 28 title holders. Out

of the total unpaid amount 85.4% payments are held due to court case/ stay order or dispute/ unmatched

names of title holders. Similarly for Stretch-2 a total of Rs. 23241792/- is unpaid amount of 295 title holders

till 30th Nov, 2014. Out of total unpaid amount 39.6% payment stopped due to court case/ stay order or

dispute/ unmatched parts of title holders. Village-wise details provided in Table 2.2

Table 2.2 – Detailed status of Unpaid Compensation for Land

Stret

ch

Village Acquired

land as per

notification

and award

declared acre

Details of unpaid compensation for Land acquired till 30th Nov,

2014

Remarks

Total unpaid

compensation

Payment stopped

due to court case/

dispute

Pending compensation

for disbursement

without any dispute

Stre

tch

-1

Bir-

Barkhtabad 9.550

7191124

100.0%

28

6144450

85.4%

3

1046674

14.6%

25

85.4% payment

stopped of 3

title holders

due to dispute/

court case

Total 9.550

7191124

100.0%

28

6144450

85.4%

3

1046674

14.6%

25

Stre

tch

-2

Daryapur 4.98 - - -

Award pending Lagarpur 3.54 - - -

Devarkhana 3.26 - - -

Jhanjhraula 0.93

2539085

100.0%

62

442721

17.4%

3

2096364

82.6%

59

Iqbalpur 2.24

5940900

100.0%

115

2403758

40.5%

9

3537142

59.5%

106

Kaliawas 1.86

2929671

100.0%

75

1247219

42.6%

19

1682452

57.4%

56

Makraula 0.35

3142243

100.0%

6

3142243

100.0%

6

0 Court stay order

Budhera 5.14

8689893

100.0%

37

1962207

22.6%

10

6727686

77.4%

27

Total 22.29

23241792

100.0%

295

9198148

39.6%

47

14043644

60.4%

248

Page 15: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 8

Compensation for affected structures & others assets

Similarly, for stretch-1 as per RP there was no impact on structures residential, commercial or CPR due to

improvement and upgradation of the road. After verification it was found that except few tube-wells, tube-well

room, trees and one old dug well, no other structures were affected. For stretch-2, impact on a total of 163

structures and associated fixed assets has been recorded (See list of structures & other assets attached in table-2.4).

The project will affect 14 common property resources (CPRs) and 14 Govt. property resources. Table-2.3 provides

the details of compensation of structures and other assets paid till 30th Nov, 2014.

Amount in INR

Table 2.3 – Detailed status of Compensation for affected structures & others assets

Stretch Village Unpaid compensation

for private structure

Compensation

paid Govt. Structure Structure Saved Grand Total

Stre

tch

-1 Bir-

Barkhtabad

279254

40.0%

10

419309

60.0%

4

- -

698563

100.0%

14

Total

279254

40.0%

10

419309

60.0%

4

- -

698563

100.0%

14

Stre

tch

-2

Dariyapur - -

Award pending Devarkhana - -

Lagarpur - -

Budhera

982177

8.9%

10

1624880

14.7%

9

3360299

30.5%

2

5051288

45.8%

2

11018644

100.0%

23

Iqbalpur

187868

10.2%

3

1652549

89.8%

7

- -

1840417

100.0%

10

Kaliawas

4894

0.2%

1

2390333

76.9%

12

-

714647

23.0%

3

3109874

100.0%

16

Makraula

1029963

100%

1

- - -

1029963

100%

1

Total

2204902

13.0%

15

5667762

33.3%

28

3360299

19.8%

2

5765935

33.9%

5

16998898

100.0%

50

Table 2.4 – Structures and Fixed Assets to be Impacted & Compensation Status Amount in Rs

Type of Structure Actual nos. of structures/ assets to be affected

Estimated amount to

be disbursed

Amount Disbursed

up to 20-10-2014

Gurgaon District Jhajjar District Total Gurgaon District Gurgaon District

Boundary-Wall 22 11 33 346089 54940

Cattle Shed 2 2 Structure saved 0

Page 16: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 9

Commercial 27 11 38 4853550 3861394

Dharamshala 1 1 - 0

Entry Gate 2 2 39000 0

Grill, Misc 3 1 4 16250 16250

Handpump 2 3 5 13000 0

Kiosk 1 1 2 6500 0

Pyau 1 1 9750 9750

Residence 2 2 Structure saved 0

Room (Vacant) 12 3 15 3692685 920529

School Bldg 2 2 2024776 0

Security/ Guard Room 2 2 160816 0

Shed 11 1 12 530024 231402

Smadhi 2 3 5 13000 13000

Store/ Kitchen Room 1 1 Structure saved 0

Submersible Pump 4 4 84500 0

Temple 1 1 195000 195000

Toilet 3 1 4 85347 33347

Tube-Well 9 9 18 260000 227500

Tube-well Room 5 1 6 527707 104650

Water Tank 3 3 425750 0

Grand Total 117 46 163 10478963 5667762

Note: due to non-declaration of land acquisition award in three villages in Jhajjar district no structure impacted and no payment made.

54.08% amount disbursed in Gurgaon district

16. For Stretch-1 the unpaid compensation for private structures and other assets till 30th Nov, 2014 was Rs

279254/- of 10 title holders. Out of the total unpaid amount 90.7% payments of 5 titleholders held due to

court case/ stay order or dispute/ unmatched names of title holders. Similarly for Stretch-2 the unpaid

compensation for private structures was Rs. 2204902/- of 15 title holders till 30th Nov, 2014. Out of total

unpaid amount, for 72.6% payment was stopped due to court case/ stay order or dispute/ unmatched names of

3 title holders. Village-wise details provided in Table 2.5

Table 2.5: Detailed status of unpaid compensation for affected structures & others assets

Stretch Village

Unpaid compensation for private structures/ other assets

Remarks

Unpaid Payment Stopped Unpaid Total

Stre

tch

-1 Bir-Barkhtabad

25916

9.3%

5

253338

90.7%

5

279254

100.0%

10

Total

25916

9.3%

5

253338

90.7%

5

279254

100.0%

5

Page 17: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 10

Stre

tch

-2

Dariyapur - - -

Award pending Devarkhana - - -

Lagarpur - - -

Budhera

411804

41.9%

8

570373

58.1%

2

982177

100.0%

10

Iqbalpur

187868

100.0%

3

-

187868

100.0%

3

Kaliawas

4894

100.0%

1

-

4894

100.0%

1

Makraula -

1029963

100.0%

1

1029963

100.0%

1

Total

604566

27.4%

12

1600336

72.6%

3

2204902

100.0%

15

Rehabilitation Assistance & benefits to vulnerable AHs

As per RP for stretch-1 the total nos. of significantly impacted household reported as 3 nos. and 11 in

vulnerable categories i.e. 9-WHH, 1-SC, 1-100% land loser. All 14 severely impacted & vulnerable AHs were

visited. The details of all AHs are provided in List No-1. The R&R Assistance amount is yet to be received by

DGM, HSRDC Jhajjar office. The disbursement activities therefore have not yet started. Similarly for the

stretch-2 as per RP all severely impacted & vulnerable AHs were visited in five villages of Gurgaon district

where award has been declared. The details are provided in list no 2 & 3. R&R Fund has been received by

DGM, HSRDC, Gurgaon office in last week of November. The disbursement of assistance is yet to start. The

severely impacted AHs identification is in progress. The disbursement will start in December 2014. Expected

date of completion is on or before 31 Jan, 2015. Details provided in the given Table 2.6

Table 2.6: Status of disbursement of compensation, R&R Assistance

Stretch Particulars As per

RP

As per

verification

upto 30th

Nov, 2014

(See List-1 to

4)

Progress of disbursement of R & R Assistance as on 30th Nov,

2014

Total amount

for R&R

Assistance

Disburse

ment of

R&R

Assistan

ce

Remark

Stre

tch

-1

Significant Land looser AHs 3 1 170250 0

R&R Fund not received by

DGM, Jhajjar, office from Head

office

Impact on vulnerable AHs

100% land lose 1 0 0 0

WHH 9 5 150000 0

SC/ST 1 2 60000 0

BPL 0 0 0 0

Handicapped 0 0 0 0

Grand Total 380250 0

Stre

tc

h-2

Loss of residential structures

Provision of housing units in case

of displacement 2 0 0 0 Structure saved

Page 18: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 11

One-time resettlement allowance 2 0 0 0

Subsistence grant for displaced

families for a period of one year 2 0 0 0

Transportation cost for displaced

families 2 0 0 0

Rental allowance to facilitate

taking another place on rent for 6

months @ Rs. 2000/- per month

2 0 0 0

Loss of commercial structures

Subsistence grant for displaced

families for a period of one year

38 19 19x3000x12

= 684000

0 Impacted 16 APs reconstructed

shops behind the impacted

structure or extended the left

out structure in their private

land after acquisition.

Rental allowance to facilitate

taking another place on rent for 6

months @ Rs. 2000/- per month

0 3 3x2000x6

= 36000

0 3 families (owner of

commercial structures)

displaced due to project

For displaced family

Transportation cost for displaced

families

0 3 3x50000

=150000

0 3 families (owner of

commercial structures)

displaced due to project

Impacts to tenants residential and commercial

Rental allowance to facilitate

taking another place on rent for 6

months @ Rs. 2000/- per month

42 0 0 0

Subsistence allowance based on

monthly minimum wages for loss

of livelihood

42 25 25x3000x12

=900000 0

Additional assistance to vulnerable group

Skill development training for

vulnerable persons 16 0 0 0

Assistance for purchase of income

generating asset 16 0 0 0

Subsistence allowance based on

monthly minimum wages for loss

of livelihood

16 6 6x3000x12

=216000 0

Cattle shed/ Petty shops Kiosk 4 0 0 0 Structure saved

Grand Total 1986000 0

For stretch-2 verification figure is of five villages of Gurgaon district where award declared till 30th Nov, 2014

List No-1: AHs for Significant Impacted & Vulnerable Category after verification for Stretch-1 as per RP

Village Name of payee Category Remarks

Balour

Kuldeep s/o Indraj Significant

Impacted Land belongs to HUDA

Mannkaur w/o Udayram WHH Land belongs to HUDA

Manohari w/o Sultan Singh WHH Land belongs to HUDA

Bir-

Barkhtabad Srilal s/o Kanshi Ram

100% land

losser &

Significant

Impacted

Expired few years back. His successors are having approx 3

acres of land each and they have invested compensation

money for purchase of agriculture land. The information

collected from Jai Singh s/o Srilal

Page 19: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 12

Kamla Devi widow Shri Shriniwas SC/ Widow

Nirmla widow Shri Jagdish

Chander SC/ Widow

Smt Prem Kaur Aadi, Lakhmi s/o

Jhunda

Significant

Impacted/

Widow Expired long back, dispute between successors.

Smt Chandro Devi widow Shri Raj

Singh

Widow &

significant

impacted

Widow, elderly lonely person and lose her land approx.

70%

Bharpai widow Shri Surajbhan Widow

Krishana w/o Mahender Singh WHH No part of her land acquired in this project

Samouti widow Shri Lakhmi

Chand Widow

Shakuntla widow Shri Dharam

Chand Widow Expired 10 months back.

Shanti widow Shri Ramkala Widow

Smt Chandro Devi widow Shri Raj

Singh Widow

List No-2: List of Owners of Commercial Structure impacted in project after verification for Stretch-2 as per RP

Sr Village Usage Name of Owner Remarks

1 Budhera Factory Hemraj Vashisth s/o Vasudev Vashisth Structure Saved

2 Budhera Shop Harpal s/o Jagdish

3 Budhera Shop Amar Singh s/o Dalpat Singh

4 Budhera Shop Virpal s/o Dalpat Singh

5 Budhera Shop Nisha Kumari w/o Dharmprakash Bhardwaj Displaced

6 Budhera Shop Meena w/o Ashok Kumar

7 Budhera Shop Chandan Singh s/o Chhaju Ram

8 Makraula Shop Satyavan s/o Nafe Singh

9 Kaliyawas Shop Rajinder Singh s/o Pratap Singh

10 Kaliyawas Shop Ram Kumar s/o Ram Nath

11 Kaliyawas Shop Gaje Singh s/o Sheesh Ram Displaced

12 Kaliyawas Shop Balraj s/o Roshan Lal Structure Saved

13 Kaliyawas Shop Krishan s/o Ram Saroop

14 Kaliyawas Shop Jile Singh s/o Maha Singh

15 Kaliyawas Shop Anita w/o Beer Singh Sold her property and shifted

16 Kaliyawas Shop Atar Singh s/o Budh Ram

17 Kaliyawas Shop Sumitra w/o Ramesh Foji

18 Kaliyawas Shop Mukesh Devi w/o Prakash Dhama

19 Iqbalpur Hotel Sonu s/o Amar Singh

20 Iqbalpur Shop Jile Singh s/o Swarup Singh

21 Iqbalpur Hotel Bhanwar Singh s/o Nihal Singh

22 Iqbalpur Shop Sardar s/o Mangtu Ram

Page 20: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 13

List No-3: List of Vulnerable Category for R & R Assistance after verification for Stretch-2 as per RP

SR Village Name of Owner Venerable

Category

Remark

1 Budhera Smt Satyawati widow Hukamchand Widow

2 Budhera Bhagwati Devi widow Ravidutt Widow No land acquisition of her part

3 Iqbalpur Smt Chandrapati widow Omprakash Widow Expired

4 Iqbalpur Smt Phulodevi widow Bhanwar Singh BPL/ Widow

5 Iqbalpur Premwati widow Amar Singh Widow

6 Jhanjraula Smt Rajesh widow Malkhan Widow Sold her property before acquisition took

place.

7 Kaliyawas Smt. Basanti widow Bahadur Singh Widow

8 Kaliyawas Darshna Devi widow Ramphal Widow

9 Kaliyawas Smt Pushpa w/o Krishan BPL/ WHH Saved her structure

10 Kaliyawas Balram s/o Roshan Lal BPL Saved his structure

11 Kaliyawas Ram Gopal s/o Ram Swarup BPL

List No-4: List of Tenant for R&R Assistance after verification for Stretch-2 as per RP

SR Village Name of tenant Name of Shop Owner Remarks

1 Budhera Mitrasen Nisha Kumari w/o Dharmprakash Bhardwaj Shifted else where

2 Budhera Rajinder Kumar Meena Devi w/o Ashok Kumar

3 Budhera Mangat Tea stall Chandan Singh s/o Chhaju Ram Shifted else where

4 Budhera SP Yadav Chandan Singh s/o Chhaju Ram Shifted else where

5 Budhera Kudeep sweet shop Chandan Singh s/o Chhaju Ram Shifted else where

6 Budhera Monu Chandan Singh s/o Chhaju Ram Shifted else where

7 Iqbalpur Imran Jile Singh s/o Swarup Singh

8 Iqbalpur Manoj Jile Singh s/o Swarup Singh

9 Iqbalpur Liyakat Sardar Singh s/o Mangtu Ram

10 Kaliyawas Avdesh Rajinder Singh s/o Pratap Singh

11 Kaliyawas Rajesh Rajinder Singh s/o Pratap Singh

12 Kaliyawas Lala Rajinder Singh s/o Pratap Singh

13 Kaliyawas Naresh Rajinder Singh s/o Pratap Singh

14 Kaliyawas Krishan Ram Kumar s/o Ram Nath

15 Kaliyawas Santosh Karambir Ram Kumar s/o Ram Nath

16 Kaliyawas Ajay Ram Kumar s/o Ram Nath

17 Kaliyawas Prashant Ram Kumar s/o Ram Nath

18 Kaliyawas Rohtas Ram Kumar s/o Ram Nath

19 Kaliyawas Jitendra Ram Kumar s/o Ram Nath

20 Kaliyawas Pintoo Ram Kumar s/o Ram Nath

21 Kaliyawas Rakesh Gaje Singh s/o Sheesh Ram Shifted else where

22 Kaliyawas Kamal Yadav Jai Kishan s/o Naval Yadav

23 Kaliyawas Karam Singh Balraj s/o Roshan Lal Structure Saved

24 Kaliyawas Mukesh Ram Gopal - Krishan s/o Ram Swarup

Page 21: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 14

25 Kaliyawas Jit Singh Anita w/o Beer Singh Shifted else where

26 Kaliyawas Laddulal Anita w/o Beer Singh Shifted else where

27 Kaliyawas Gajraj Mukesh Kumari w/o Prakash Dhama

28 Makraula Shiv Charan Satyavan s/o Nafe Singh

29 Makraula Hiralal Satyavan s/o Nafe Singh

30 Makraula Tirath Satyavan s/o Nafe Singh

31 Makraula Govind Satyavan s/o Nafe Singh

32 Makraula Satbir-Naresh Satyavan s/o Nafe Singh

Page 22: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 15

Chapter 3 – Findings from Community Interactions

3.1 Introduction

17. The chapter presents the details of the consultations carried out with affected households.

3.2 Consultations with Affected Households

For Stretch-1

18. Individual interviews were carried with several affected persons with regard to resettlement plan

implementation. Key issues are segregated under different heads such as utilization of compensation money,

benefits accrued from the project, etc. and summarized below.

No of individual interview with severely APs/ vulnerable APs for stretch-1

No of individual

interview

Outcomes Remarks

15 nos.

(3 in Balour

village & 12 in

Bir-Barkhtabad

village)

• The land acquired of Balour village belongs to HUDA,

• 12 APs interviewed from Bir-Barkhtabad village as per RP categorised as;

WHH/ significant land looser APs - 3 (Expired)

Vulnerable category WHH/SC - 6

Not loosing her part of land - 1

Land loser APs - 2

• All alive APs having Ration Cards and Voter ID.

• Smt. Chandro Devi widow Rajsingh (WHH) not taken compensation for

land despite of twice reminding me.

• Smt Prem Kaur widow Chhotu (expired) – case is disputed hence

payment stopped.

• Almost all are satisfied by the method of compensation disbursement.

• When asked about the opinion on compensation received – if closer to

the prevailing market rate, all said the compensation paid is less than

market rate.

• None was aware about the R&R Assistance provisions in ADB funded

projects and have not received any assistance so far

• 40% said consultation meetings held with APs before land acquisition,

but they were not present in that meeting & 60% says they read in

newspaper & after that received notice from HSRDC about land

acquisition due to project intervention.

• Award was declared, payment disbursement started and crop harvested

by them before possession of land by HSRDC.

• Utilization of compensation amount received by APs, interactions

provided the following the types of usage

1. Repayment of loan;

2. Reconstruction and strengthening i.e. improvement and enhancement

of existing structures;

Page 23: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 16

3. Economically productive investments such as purchase of business

items, agricultural land etc;

4. Economically non-productive activities such as marriage, ornaments,

etc.

5. Saved for children education

6. Fixed deposit/ Term Deposit.

• When asked about “how did the project helped in improving services?”

1. Ease to go to city, hospital, education etc.

2. Development of the area

3. Few people apart from APs said the land rate beside bypass and

along the road side become double, few property dealers, business

houses are trying to purchase land along the road side/ bypass with

this objective in mind

• Has the environment changed due to construction?

1. No change as the bypass is out of village

2. problem faced to go to their field across road at the time of

construction

• No one has changed their job/ business due to land acquisition and no

major adverse impact on their income pre & post land acquisition.

19. Payment of compensation: The market rate of land has been finalized by the competent authority as per the

procedures. While majority of the APs accepted the rate declared but some of the APs considered that this is

below the market rate, though they have accepted the compensation. Regarding the process of land

acquisition and payment of compensation, all the APs who have taken compensation are satisfied with it, and

have confirmed that they received adequate information on time and the payments are made as per the

predetermined schedule.

20. Utilization of Compensation money received by APs: Interactions provided the following the types of usage:

� repayment of loan;

� reconstruction and strengthening i.e. improvement and enhancement of existing structures;

� economically productive investments such as purchase of business items, agricultural land etc;

� economically non-productive activities such as marriage, ornaments, etc.

� saving for their children education; and

� yet to decide for utilisation of money.

� Fixed deposited/ term deposited

21. Change in occupation: None of the APs interviewed have changed their profession/ occupation as a result of

project impact.

22. Impact on business: Daily turnover of business enterprises in village Nayagaon have decreased substantially

due to bypass but there is no major change in business increase or decrease along road side of the stretch. But

shopkeepers are hopeful of regaining their business will definitely increase in near future.

Page 24: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 17

23. Receipt of other R&R assistances/Training: None of significant & vulnerable AHs received R&R assistance &

skill development training. Few AHs did not require Skill Development Training & assistance as a part of

R&R assistance as they are self-sufficient.

24. See Box 1 for Case study of an affected WHH of

Bir-Barkhtabad village.

25. Benefits or opportunities from Project

construction stage: Some APs indicated that due

to a better (project) road it has become easier to

visit city market, hospitals, school/ college and

Tehsil/ Block HQ. Some of the APs indicated

that they are not interested in road construction

work as they are gainfully employed in their

initial work.

26. Process related: No identity cards have been yet

issued by HSRDC. Further, there was no

sensitization meeting held on Health /

HIV/AIDS related issue – a serious issue

considering the in-migration of construction workers.

3.3 Consultations with Affected Households

For Stretch-2

No of individual interview with severely APs/ vulnerable APs for stretch-2

No of individual

interview

Outcomes Remarks

29 nos.

Village-wise

(5-Budhera)

(11- Kaliawas)

(9-Iqbalpur)

(1-Makraula)

(4-Jhanjhraula)

• 29 APs interviewed from 5 villages (i.e. Budhera, Kaliawas, Iqbalpur,

Jhanjhraula & Makraula) as per RP categorised as;

WHH (Expired) - 1

Vulnerable category WHH/SC - 4

BPL - 2

WHH not losing her part of land/ sold - 2

Land loser APs - 20

• All 26 APs whose land & structure impacted are having voter ID &

ration cards.

• Land impacted of 16 APs and land + structure impacted reported 10APs

• 25APs have received compensation for impacted land & structures. One

AP Mr. Satyawan r/o Makraula not taken compensation. He has filed a

case in court.

• 15 APs not satisfied with the method & time taken for compensation

Box 1 - Case Study of an affected WHH

Smt Chandro Devi w/o Lt Raj Singh of

Bir-Barkhtabad village is a vulnerable

AP as per RP. She is alone as her

husband died 10 years back and her

young son aged 21 years also died in an

accident few years back. She has three

daughters all married. Whatever

agriculture land was in her husband name was transferred to her

daughters and they sold their parts. She has very less part of land

remaining with her after acquisition. No alternative of earnings

and depend on widow pension received from Haryana Govt. She

is almost 60+ years of age. As per the circumstances she is

significant affected lady and need to be given R&R Assistance

accordingly. As single person in house skill development training

won’t solve the aim of rehabilitation. This may be treated as a

special case for significant affected household. There may be some

more exceptional cases like this which may demand similar

considerations.

Page 25: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 18

disbursement; where as 10 APs are satisfied.

• When asked about the opinion on compensation received – whether

closer to the prevailing to the market rate 24 APs replied in negative and

said “No - what ever is paid is less as compared to the market rate”

• No one knows about the R&R Assistance provisions and not received any

R&R assistance yet.

• HSRDC maintained payment disbursement for land & structure and crop

harvested before possession of land by HSRDC.

• Utilization of Compensation money received by APs: Interactions

provided the following the types of usage

• Repayment of loan;

• Reconstruction and strengthening i.e. improvement and

enhancement of existing structures;

• Economically non-productive activities such as marriage, etc.

• Saved for children education

• Fixed deposited

• When asked about “how did the project helped in improving services?”

• Ease to go to city, hospital, education etc.

• Development of the area

• Business will increase, employment opportunity will increase

accordingly

• Few people apart from APs said the land rate has increased due to

project intervention

• Has the environment changed due to construction?

• Yes, flying dust/ sand made problem at the time construction of

road.

• problem faced to go to their field across road at the time of

construction

• No one changed their job/ business due to land acquisition and no major

adverse impact on their income pre & post land acquisition.

27. Payment of compensation: The market rate of land has been finalized by the competent authority out as per

the laid out procedures. While majority of the APs accepted the rate, some of the APs considered that this is

below the market rate, but have yet accepted the compensation. Regarding the process of land acquisition

and payment of compensation, all the APs who have taken compensation are satisfied with it, and have

confirmed that they received adequate information on time and the payments are made as per the

predetermined schedule.

28. Utilization of Compensation money received by APs: Interactions provided the following the types of usage:

• Repayment of loan;

• Reconstruction and strengthening i.e. improvement and enhancement of existing structures;

• Economically non-productive activities such as marriage, etc.

Page 26: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 19

• Saved for children education

• Fixed deposit/ term deposit

29. Change in occupation: None of the APs interviewed have changed their profession/ occupation as a result of

project impact.

30. Impact on business: Daily turnover of business enterprises have decreased substantially due to road

construction, but shopkeepers are hopeful of regaining their business will definitely increase in near future.

New shops are under construction along the road side.

31. Receipt of other R&R assistances/Training: No significant AHs & vulnerable AHs received R&R assistance &

skill development training. Few AHs did not require Skill Development Training & assistance as a part of

R&R assistance as they are self-sufficient.

32. Benefits or opportunities from Project construction stage: APs indicated that due to a better project road it

has become easier to visit city market, hospitals, school/ college and Tehsil / Block HQ.

33. Process related: Dissatisfaction of getting compensation cheque from LAO because land owner have visited

on an average 7-8 times or more to collect the compensation cheque.

34. Further, there was no sensitization meeting held on Health/ HIV/AIDS related issue – a serious issue

considering the in-migration of construction workers.

Page 27: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 20

Chapter 4 – Conclusions

4.1 Introduction

35. The chapter concludes with the key findings.

4.2 Key Findings

36. Based on the assessment actions taken based on RP, the following key findings segregated by different aspects

such as provision of compensation, delivery of entitlements as presented in Annexure-1 for stretch-1 & 2.

Compensation for Land

For stretch-1

� Compensation for acquired land 89.5% amount has been paid in village Bir-Barkhtabad. Details provided in

Table no 2.1

� Out of total unpaid compensation i.e. Rs 7191123/- almost 85.4% i.e. Rs 6144450/- payment is stopped due to

dispute among title holders/ court case/ court stay order details provided in table no 2.2. The reasons for

remaining unpaid amount 14.6% of 25 title holders i.e. Rs. 1046673/- are

� Not collected by title holders till now despite of receiving notice from L.A.O.

� Information not reached to the title holders for collection of payment because staying out

of village/ in different cities/ due to common mutation/ intkal

� Not willing to collect small amount cheques less than 5000/- or so as they feels that it will

be more expensive (fare, collection of revenue record, get certified all these document,

affidavits expenses etc.) to collect this amount.

For stretch-2

� Compensation for acquired land 71.5% amount has been paid (where award has been declared) to the affected

land owners. Village wise details provided in Table no 2.1

� Out of total unpaid compensation Rs 23895042/- almost 38.5% of 100 title holders i.e. Rs 9198148/- payment is

stopped due to dispute among title holders/ court case/ court stay order details provided in table no 2.2. The

reasons for remaining unpaid amount 61.5% of 247 title holders i.e. Rs. 14024866/- are

� Not collected by title holders till now despite of receiving notice

� Information not reached to the title holders for collection of payment staying out of

village/ in different cities, due to common mutation/ intkal

� Not willing to collect small amount cheques less than 5000/- or so as they feels that it will

be more expensive (fare, collection of revenue record, get attested all document, affidavits

expenses etc.) to collect this amount.

Compensation for Structure & Other Assets

For stretch-1

� 60% Compensation for private affected structures and other assets for stretch-1 has been paid upto 30th Nov,

2014. Details provided in Table no 2.3

� Out of total unpaid compensation i.e. Rs 279254/- for private structures & other assets almost 90.7% amount is

stopped due to dispute among title holders/ court case/ court stay order details provided in table no 2.4.

Page 28: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 21

For stretch-2

� Total compensation for privately affected structures Rs. 7872664/- (other than Govt. structures & structures

saved amount) almost 72% compensation i.e. Rs. 5667762/- has been paid upto 30th Nov, 2014. Details provided

in Table no 2.3

� Out of total unpaid compensation for privately affected structures and other assets i.e. Rs 2204902/- almost

72.6% (Rs. 1600336/-) is stopped due to dispute among title holders/ court case/ court stay order details

provided in table no 2.4.

Rehabilitation Grant/ Additional Assistance/ benefits to vulnerable AHs

� No identity cards were issued for R&R Assistance to non-title holder APs for stretch-1 & 2, because as per RP

there is no non-title holder AHs for affected land & structures in stretch-1 and only two squatters were

reported in strech-2.

� A proper documentation has been done by Land Acquisition Office (LAO), Gurgaon & Rohtak of all title

holders whose land and structures impacted in project.

� R&R Assistance is not disbursed for stretch-1. DGM-4, HSRDC, Jhajjar raised demand for R&R fund to their

Head Office on 31.10.2014. Tentative date of disbursement of R&R Assistance given by DGM, HSRDC, Jhajjar

on or before 31-12-2014 but this may change if fund not received on time.

� R&R Assistance is yet to be disbursed for stretch-2. Fund already received by DGM-1, Gurgaon office on 4th

Dec, 2014. Tentative date of disbursement of R&R Assistance given by DGM-1, HSRDC, Gurgaon on or before

31-01-2015.

Compensation Disbursement Process related

� For disbursement of compensation a proper verification of Title-holder was done by Land Acquisition Officials

before handing over cheques

� With respect to timing, those APs who received compensation are quite satisfied with its disbursement on time

given by officials for stretch-1, where as the for stretch-2 title holders are quite dissatisfied for the time taken

for disbursement for compensation. The main concern of title holders was that they have visited on an average

6-7 times or more to LAO to collect their cheques. The reasons given for frequent visits to collect their cheques

were

� Improper guidance for required documents by patwari such as Jamabandi, Intkal

Mutation, Affidavit, ID Proof, witness etc.

� Some time concern official/ Patwari was on leave despite of time given to APs.

� Cheque was not ready

� Cheque not signed by Land Acquisition Collector on time.

� Un-necessary harassment by LAO (Patwari)

Grievance Redressal

� DGM-1, HSRDC Gurgaon has constituted three members Grievance Redressal Committee (GRC) for stretch-2

in the first week of Dec, 2014. GRC headed by DGM, HSRDC, Gurgaon, Sarpanch of village Budhera Mr.

Mahendra and Mr. Ishwar Singh Ex Sarpanch of village Iqbalpur. First meeting of this committee will be held

in second week of Dec, 2014.

� Till 30th Nov, 2014 a total of 10 complaints were received by DGM-1/ LAO, Gurgaon. The nature of complaint

were ;

Page 29: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 22

Table No.- 4.1 Summary & nature of complaint for stretch-2

Sr Nature of Complaint Nos. of

Complaint

Remarks/ Redressed

1 Structure demolished and not

paid compensation

2 Structures were not there at the time of evaluation

under this project implementation. Demolished by

other department prior to start this project. Complaint

Redressed

2 Submersible pump compensation

not paid

1 It was abandoned and was hidden in earth and bricks

and was lying covered. Complaint Redressed

3 Compensation paid for tube-well

but not paid for pipeline/ drain

for water in fields

4 Tube-well only impacted other things not touched.

Complaint Redressed

4 Concrete area, hoarding and D

area for exist & entrance for

petrol pump

1 PWD take off only PWD land for road construction &

strengthening, not touched other things. Complaint

Redressed

5 Request for avoid factory 20-25

workers building.

1 Factory building avoided, only boundary wall affected.

Complaint Redressed

6 Acquired 7 marla of land and

paying for 5 marla

1 Actually acquired 6 marla of land and paying for the

same. Payment not yet collected by complainant.

Complaint Pending

� One complaint was received for stretch-1 for compensation of private trees & tube-well related, raised by Shri

Samay Singh s/o Sh. Lahri Singh village Bir-Barkhtabad. As stated by the register, his “complain resolved”. The

compensation amount Rs. 9797/- deposited to LAO for disbursement, but this payment was stopped due to

dispute/ court case.

Construction related

� Construction work on the project roads for stretch-1 is almost 100% completed.

� Construction work on the project roads for stretch-2 is almost 65-70% completed in five villages of Gurgaon

District where land acquisition award has been declared. 35% work is completed in Jhajjar district villages

where land acquisition is still pending.

� Some new commercial outlets have developed near Nayagaon Bypass & Bahadurgarh Bypass Junction.

� Safety requirements such as speed breakers near village habitation or education facilities are yet to be provided

� The passage of Traffic is now smoother on Bahadurgarh-Badli-Gurgaon Road.

� Though proper slopes have been provided towards Kutcha Rasta/ field way to facilitate movement of farmers

to their respective fields with their carts or tractors for stretch-1, but farmers of Bir-Barkhtabad asked for

smoother slope for three Kutcha Rasta/ field ways in the by-pass embankment area. They have identified and

shown all these routes and explained the type of problem they are facing due to sharp slope on these ways. I

also believe that technically they are correct as at two points its accident prone area due to sharp slope of

Kutcha Rasta and curve at the crossing of these two. This needs to be addressed.

General Observation

� Traffic moves smoothly on stretch 1 & 2. Proper signage given at construction site.

Page 30: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 23

� It has been noticed that few workers not taking safety measure (not wearing helmets/ shoes and proper dress) at

construction site. Water sprinkling daily on sub-grade/ Earthwork.

� Overall a satisfactory construction work is in progress.

� 100% male workers deployed by contractor.

� No child labour was identified by the monitoring team during field investigation at working site

� HIV/ AIDS Awareness , Prevention Campaingns not initiated

� Social Monitoring for physical & financial progress of RP is provided in table 4.2

Table No.- 4.2 Social monitoring matrix for stretch- 1 & 2

Physical Progress of RP implementation for stretch 1 & 2

SR Monitoring indicator

for physical progress

Total no

of APs

Implementation Target as per RP Target for

the next

month

Remarks Target

for this

month

Progress

in this

month

Cumulative

progress

% against

target

1 Private Land owners

paid compensation

for land

711 NA 7 385 NA NA

2 Private Structure/

other assets owners

paid compensation

58 NA Nil 32 NA NA

3 APs paid

replacement cost for

structure

NA NA NA NA NA NA

4 APs provided with

livelihood with

assistance

42 Nil Nil Nil Nil 20

5 APs provided with

livelihood with

training

25 Nil Nil Nil Nil 20

6 Vulnerable APs

provided with

income generating

assets/ support

25 Nil Nil Nil Nil 20

7 APs provided

shifting assistance

42 Nil Nil Nil Nil 20

8 APs Resettled NA NA NA NA NA NA

9 Notice to harvest

standing crop issued

to farmers

NA NA NA NA NA NA Land acquisition

done post

harvesting

10 Removal of common

property resources

NA NA NA NA NA NA One temple was

impacted,

reconstruction

Page 31: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 24

in progress by

society

11 Reconstruction of

common property

resource

NA NA NA NA NA NA

Financial Progress of RP implementation for stretch 1 & 2

SR Monitoring indicator

for financial progress

Total

amount as

per RP

(Lac Rs.)

Implementation Target (Lac Rs.) Target for

the next

month

(Lac Rs.)

Remarks Target

for this

month

Progress

in this

month

Cumulative

progress

% against

target

1 Land compensation

paid

1523.3 Nil 44.2 1212.3 Nil NA

2 Structure

compensation paid

176.9 Nil 0 60.9 Nil NA

3 Livelihood assistance

& other assistance

released

71.1 Nil 0 0 Nil 10.0

4 Training assistance

paid

2.7 Nil 0 0 Nil 0.5

5 Income generating

assets

8.1 Nil 0 0 Nil 2.0

6 Development of

resettlement site

NA NA NA NA NA NA

7 Shifting assistance

released

NA NA NA NA NA NA

8 Crop compensation

released

NA NA NA NA NA NA

Page 32: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 25

Annexure 1

Entitlement Framework of ESMS, NCRPB for Stretch-1

Sr Impact Category / Entitlement Remarks Provisions applicable in stretch 1- of

this subproject

I. Loss of Private Property

a

1

2

3

4

Loss of Land agricultural or otherwise

Cash Compensation in accordance with

the provisions of Land Acquisition Act.

Rehabilitation grant based on minimum

wage rates1

Shifting assistance2 for households.

Additional compensation for vulnerable

households3 whose livelihood is impacted

by the project.

Safeguard Requirement-2 does not

apply if land is acquired through

private negotiations.

Compensation is determined based

on past sale statistics circle rates /

guideline value. However, if ESMC

finds the compensation so

determined is lower than the

replacement value of the land, the

IA will provide the difference as

assistance

Loss of land- Cash compensation in

accordance with the LA Act and the

R&R Policy of Haryana

Government. applicable to all the

title holders

i. Base price of land @ Rs.

5,200,000 has been determined

by a high level committee in a

meeting chaired by

commissioner- Rohtak Division

on 27 August 2013;

ii. 30% Solatium on base price of

land;

iii. 12 % additional interest on base

price of land;

iv. 20 % non Litigation Incentive on

base price of land;

v. Annuity Charges for 33 years @

Rs. 21000/per acre per annum,

with an increase of Rs. 750 every

year. This is in line with ‘social

security’ or ‘benefit scheme’

provided for ‘additional basis

sustenance’.

Rehabilitation Grant- The title

holders who are significantly

affected are considered. 750 days @

minimum wage rate i.e. Rs. 227/

day.

Shifting Assistance- Nil. Not

applicable.

Additional compensation for

vulnerable households- 10

vulnerable households identified.

1 NRRP 2007 provides for 750 days minimum agricultural wages

2 NRRP 2007 provides for a lump sum of INR 10,000 per AH

3 Vulnerable household comprise female-headed household, disabled-headed household, indigenous person-headed households and Below Poverty

Line households.

Page 33: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 26

Sr Impact Category / Entitlement Remarks Provisions applicable in stretch 1- of

this subproject

The column Impact to vulnerable

APs in this matrix calls for annuity

scheme.

It is noteworthy that annuity will

be paid to all the titleholders

irrespective of their vulnerability

status as a part of R&R Policy of

Haryana Government and

accordingly budgeted in the SRP.

The impact on the vulnerable APs

except 01 AP is insignificant; still as

SPS 2009 of ADB calls for providing

benefits “to improve the standards

of living of the displaced poor and

other vulnerable Groups” extra

benefits in tune with EM of ESMS

have been provisioned. Moreover,

01 AP who would be losing 100%

land and is dependent on

agriculture as primary source of

income has been considered

potentially vulnerable after LA.

Thus benefits for total 11 AHs are

provisioned.

b

1

2

3

4

5

Loss of residential structure

Cash compensation at scheduled rates

without depreciation

Right to salvage affected materials

Shifting assistance for all those who loose

complete house;

Subsistence allowance based on monthly

minimum wages to all those who loose

complete house

A house site4, free of cost to the extent of

actual loss of area of the acquired house

but not more than two hundred and fifty

square meter of land in rural areas, or one

hundred and fifty square meter of land in

urban areas, as the case may be, for each

nuclear family.

Provided that, in urban areas, a house of

up to one hundred square meter carpet

area may be provided in lieu thereof. Such

a house, if necessary may be offered in a

multi-storied building complex.

a) If more than one third of

structure is affected, AP has

option to offer for acquisition

of entire structure

b) Resettlement sites will be

developed with basic amenities

if more than 40 families opt in

a project area, otherwise houses

will be built in the existing

villages

Not applicable in context of the

impacts noted for this subproject.

No impact on residential structures.

c

1

2

Loss of Commercial structure

Cash Compensation at scheduled rates

with our depreciation

Right to salvage affected materials

Shifting assistance for all those who loose

a) If more than one third of

structure is affected, AP has

option to offer for acquisition

of entire structure

Not applicable in context of the

impacts noted for this subproject.

4 In line with NRRP 2007

Page 34: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 27

Sr Impact Category / Entitlement Remarks Provisions applicable in stretch 1- of

this subproject

3

4

5

complete structure

Subsistence allowance based on monthly

minimum wages to all those who loose

complete structure

An option of alternative constructed shop

or employment generation asset or

financial assistance5

d

1

2

3

Impacts to tenants residential and

commercial

Rental allowance to facilitate taking

another place for rental

Shifting assistance

In case of agricultural tenants advance

notice to harvest crops or compensation

for lost crop at market value of the yield

Not applicable in context of the

impacts noted for this subproject.

e

1

2

3

Impacts to standing crops and other

properties

Non-perennial crops:

Three months 90 days advance

notification for the harvesting of standing

crops or lump sum equal to the market

value of the yield of the standing crop lost

Compensation for trees based on timber

value at market price to be determined by

the Forest Department for timber trees

and for other trees perennial trees by the

Horticultural Department.

Loss of other properties such as irrigation

wells will be compensated at scheduled

rates.

Crops- Since LA proceedings are

underway affected families are

aware about the land acquisition.

However, the IA shall ensure that

work shall start after harvesting of

crops.

Trees- the valuation of 12 affected

trees will be done by the competent

authority i.e. Forest Department.

SRP budget contains lump-sum

amount

Loss of other Properties-

Nil

II. Impacts to squatters / Encroachers

a

1

2

3

4

5

Impacts to squatters

Loss of House: An alternative built house

in line with IAY standards for vulnerable

and compensation at scheduled rates

without depreciation for non vulnerable

with 2 months notice to demolish the

affected structure

Loss of shop: An alternative built shop

OR employment generation asset for

vulnerable and compensation at scheduled

rates without depreciation for non

vulnerable with 2 months notice to

demolish affected structure

Right to salvage the affected materials;

Shifting assistance

Cultivation: 2 months notice to harvest

standing crops or market value of

No impact on squatters is noted and

hence not applicable in context of

the impacts noted for this

subproject.

5 NRRP 2007 prescribes not less than Rs.25,000/-

Page 35: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 28

Sr Impact Category / Entitlement Remarks Provisions applicable in stretch 1- of

this subproject

compensation for standing crops

b

1

2

Impacts to encroachers

2 months notice to harvest standing crops

or market value of compensation for

standing crops or demolish the

encroached structure;

Compensation at scheduled rates without

depreciation for the affected portion of

the structures

Not applicable in context of the

impacts noted for this subproject.

III. Loss of employment to agricultural and non-agricultural workers

Subsistence allowance based on monthly

minimum wages;

Economic rehabilitation assistance consisting of

training and preference in employment in the

project

This section deals with wage

earning employees. Only title

holders will be impacted thus this

section is not applicable in context

of the impacts noted for this

subproject.

iv. Impact to Vulnerable APs

Annuity policies will be arranged that will pay a

monthly pension of minimum Rs. 500 for life to

the vulnerable affected persons

Or

Training for skill development and assistance for

purchase of income generating asset for a

maximum of Rs. 30,000 per AH

a) If the livelihood of a

Vulnerable Person such as the

disabled, destitute, orphans,

widows, unmarried girls,

abandoned women, or persons

above fifty years of age, who

are not provided or cannot

immediately be provided with

alternative livelihood, and who

are not otherwise covered as

part of a family will be

provided pension for life.

b) Vulnerable Households who do

not qualify under a above and

if their livelihood is affected

then they will be entitled for

skill development and

assistance for income

generating asset.

Impact to Vulnerable APs- 10

vulnerable households identified.

The impact on the vulnerable APs

except 01 AP is insignificant; still as

SPS 2009 of ADB calls for providing

benefits “to improve the standards

of living of the displaced poor and

other vulnerable Groups” extra

benefits in tune with EM of ESMS

have been provisioned. Moreover,

01 AP who would be losing 100%

land and is dependent on

agriculture as primary source of

income has been considered

potentially vulnerable after LA.

Thus benefits for total 11 AHs are

provisioned.

V. Loss of Community assets

Relocation of community / cultural properties

impacted in consultation with the community

prior to demolition of impacted asset

Not applicable in context of the

impacts noted for this subproject.

No loss of community assets is

envisaged.

VI. Unidentified Impacts

Unforeseen impacts will be documented and

mitigated based on the provisions of the policy

applicable for the project

Contingency amount provisioned in

the budget table will take care of

such events.

Page 36: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 29

Entitlement Framework of ESMS, NCRPB for Stretch-2

Sl.

No.

Compensation & R&R Assistance Entitlement Provision

I As per New Land Acquisition Act, 2013

A Component of compensation package in respect of land acquired under the Act

1 Market value of land To be determined as provided U/s 26 of the Act..

2 Factor by which the market value is to

be multiplied in the case of rural areas

1 to 2 based on the distance of the project from urban area, as

may be notified by the appropriate Government.

3 Value of assets attached to land or

building

To be determined as provided U/s 29 of the Act.

4 Solatium Equivalent to 100% of the market value of land against market

value of land mentioned against Sl. No. 1 of A multiplied by the

factor specified against 2 of A for rural areas plus value of assets

attached to the land or building against Sl. No. 3 of A.

5 Final award in rural areas Market value of land against market value of land mentioned

against Sl. No. 1 of A multiplied by the factor specified against 2

of A plus value of assets attached to the land or building against

Sl. No. 3 of A plus solatium mentioned against Sl. No. 4 of A.

B Elements of Rehabilitation and Resettlement Entitlements

1 Provision of housing units in case of

displacement

If a house is lost is rural areas, a constructed house shall be

provided as per the Indira Awas Yojana specifications.

Provided further that if any affected family in rural areas so

prefers, the equivalent cost of the house may be offered in lieu of

the constructed house.

Provided also that no family affected by the acquisition shall be

given more than one house under the provisions of this Act.

2 Choice of Annuity or Employment The R&R Policy of Haryana Government provides Annuity for

33 years @ Rs. 21000/per acre per annum, with an increase of Rs.

750 every year.

3 Subsistence grant for displaced families

for a period of one year

Each affected family which is displaced from the land acquired

shall be given a monthly subsistence allowance equivalent to Rs.

3000/- per month for a period of 1 year from the date of award.

4 Transportation cost for displaced families Each affected family which is displaced shall get a one-time

financial assistance of Rs. 50000/- as transportation cost for

shifting of the family, building materials, belongings and cattle.

5 Cattle shed/ petty shops Each affected family having cattle or having a petty shop shall

get one-time financial assistance of such amount as the

appropriate Government may, by notification, specify subject to

a minimum of Rs. 25000/- for construction of cattle shed or petty

shop as the case may be.

6 One-time Resettlement Allowance Each affected family shall be given a one-time Resettlement

Allowance of Rs. 50000/- only.

II As per ESMS of NCRPB

1 Loss of land agricultural or otherwise

a. Annuity Annuity will be paid to all the titleholders irrespective of their

vulnerability status as a part of R&R Policy of Haryana

Government and accordingly budgeted in the SRP.

b. Non-litigation Incentive @ 20 % on base price of land market value of land

2 Loss of residential structure

• If more than one third of structure is

• Compensation at scheduled rates without depreciation

• Right to salvage affected materials

Page 37: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 30

affected, AP has option to offer for

acquisition of entire structure

• Resettlement site will be developed with

basic amenities if more than 40 families

opt in a project area, otherwise houses

will be built in the existing villages

• Transportation cost for displaced families

• Rental allowance to facilitate taking another place on rent for 6

months @ Rs. 2000/- per month

• Subsistence allowance based on monthly minimum wages to all

those who loose complete structure @ Rs. 3000/- per month for a

period of 1 year

3 Loss of Commercial structure

• If more than one third of structure is

affected, AP has option to offer for

acquisition of entire structure

• Compensation at scheduled rates without depreciation

• Right to salvage affected materials

• Transportation cost for displaced families

• Rental allowance to facilitate taking another place on rent for 6

months @ Rs. 2000/- per month

• Subsistence allowance based on monthly minimum wages to all

those who loose complete structure @ Rs. 3000/- per month for a

period of 1 year

• An option of alternative constructed shop or employment

generation asset or financial assistance6

4 Impacts to tenants residential and

commercial

• Rental allowance to facilitate taking another place on rent for 6

months @ Rs. 2000/- per month

• Subsistence allowance based on monthly minimum wages to all

those who loose complete structure @ Rs. 3000/- per month for a

period of 1 year

• Transportation cost for displaced families

• In case of agricultural tenants advance notice to harvest crops or

compensation for lost crop at market value of the yield.

5 Impacts to standing crops and other

properties

Non-perennial crops:

• 3 months advance notice for the

harvesting of standing crops or lump sum

equal to the market value of the yield of

the standing crop lost

• Compensation for trees based on timber

value at market price to be determined

by the Forest Department for timber

trees and for other trees perennial trees

by the Horticultural Department.

• Loss of other properties such as irrigation

wells, tube wells, hand pumps, etc will be

compensated at scheduled rates or

replacement value

Since LA proceedings are underway affected families are aware

about the land acquisition. However, the IA shall ensure that work

shall start after harvesting of crops.

6 Impacts to squatters

• Loss of House: An alternative built house in line with IAY

standards for vulnerable and compensation at scheduled rates

without depreciation for non- vulnerable with 2 months prior

notice to demolish the affected structure

Page 38: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 31

• Loss of shop: An alternative built shop OR employment

generation asset for vulnerable and compensation at scheduled

rates without depreciation for non-vulnerable with 2 months

prior notice to demolish affected structure

• Right to salvage the affected materials;

• Transportation cost for displaced families

• Cultivation: Two 2 months’ prior notice to harvest standing crops

or market value for standing crops

7 Impacts to encroachers

• Two 2 months’ prior notice: i to harvest standing crops or market

value of compensation for standing crops, ii to demolish the

encroached structure.

• Compensation at scheduled rates without depreciation for the

affected portion of the structures.

8 Loss of employment to agricultural and

non-agricultural workers

• Subsistence allowance based on monthly minimum wages;

• Economic rehabilitation assistance consisting of training, and

• Preference in employment in the project

9 Impact to Vulnerable APs7

• If the livelihood of a vulnerable Person

such as the disabled, destitute, orphans,

widows, unmarried girls, abandoned

women, or persons above sixty two years

of age, who are not provided or cannot

immediately be provided with alternative

livelihood, and who are not otherwise

covered as part of a family will be

provided additional assistance.

• Vulnerable households who do not

qualify in the above criteria and if their

livelihood is affected then they will be

entitled for skill development and

assistance for income generating asset.

• Training for skill development @ Rs. 10000/- per AH

• Assistance for purchase of income generating asset for a

maximum of Rs. 30,000 per AH.

• Subsistence allowance based on monthly minimum wages to all

those who loose complete structure @ Rs. 3000/- per month for a

period of 1 year

10 Loss of Community assets

• In consultation with the community

prior to demolition of impacted asset

• Relocation/construction or rehabilitation of community / cultural

properties impacted at project cost.

• Lump sum amount has been earmarked for the compensation of

such properties.

11 Unidentified Impacts • Unforeseen impacts will be documented and mitigated based on

the provisions of the policy applicable for the project.

• Contingency amount provisioned in the budget will be utilized

for such unidentified impacts.

7Vulnerable household comprise female-headed household, disabled-headed household, indigenous person-headed

households and Below Poverty Line households.

Page 39: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 32

Annexure 2

Photographs of interactions with Stakeholders – APs and Officials

Discussions – with villager in Soldha Village L and Nirmala w/o Sh Jagdish Chand s/o Sh Khushi Ram R

Interactions with Bharpai w/o Sh Surajbhan L and school staff in Budhera village R

DGM, SDO and Patwari, HSRDC (Left) and Account Officials of DGM-1, Gurgaon (Right)

Page 40: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 33

Annexure 3

New infrastructure along project roads

New Petrol pump near road site - L and New commercial outlets -R

New Commercial Building constructioned on road - L and New temporary outlet R

Page 41: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 34

Annexure 4

ADB Comments of 1st EMA Report of Gurgaon- Chandu-Badli-Bahadurgarh Subproject

1st stretch

SR Comments from ADB Compliance Remark

1 The quality of the first report is acceptable

and provided critical information of the

stretch 1 RP implementation.

-

2 Few issues identified and reported. They are: 2.1 Disagreement on the final rate of land

compensation came from some APs the

number is not specified in the report which

also caused of incomplete payment of land

compensation to the APs. All APs 3AP from

Balour village did not take the

compensation amount until today. The

reason is because the offered amount is less

than the market rate.

The 2.181 acres of land in

Balour village belongs to

Haryana Urban Development

Authority HUDA, Haryana

Govt. The compensation for

this land is to be transferred to

HUDA and not to any private

individual. The dispute is

between HUDA & 3APs and

HSRDC has no role in it.

Compiled in point no. 14 of

the report

2.2 Additional allowances to all APs as required

in the RP are yet to be provided. The report

indicated that the DGM HSRDC requested

the fund to their head office only on 31

October 2014 to be disbursed tentatively on

or before 31 December 2014.

Payment not received by 30th

Nov, 2014 from Head office.

Tentative date for

disbursement may be

extended marginally.

2.3 Only one complaint received and already

resolved.

Complaint was received for

compensation of private trees &

tube-well related issue, raised

by Shri Samay Singh s/o Sh.

Lahri Singh, village Bir-

Barkhtabad. As stated in the

complaint register, his

“complaint resolved”.

The compensation amount

Rs. 9797/- deposited to LAO

by HSRDC for disbursement;

however, this payment has

been stopped by LAO due to

dispute on this land.

Compiled in point no. 36

(Grievance Redressal)

2.4 Modification for livelihood rehabilitation

for AP experienced significant impacts is

required for affected family categorized

vulnerable family elderly and single

member HH as the offered mechanism to

provide training skill will not work. Thus

option to give monthly pension of a

minimum Rs 500 for life should be provided

as stated in the entitlement matrix of the

RP.

Re-verification exercise with

the APs/ Vulnerable family is

pending about their choice for

opting pension or one time

assistance. They are already

getting old age pension from

State Govt so preference for

one -time payment is indicated

This exercise will be

completed by 20th Dec, 2014

2.5 ID cards are not yet distributed to AHs by

HSRDC. This is important finding as

A proper documentation/

verification of each AP is being

This exercise will be

completed by 20th Dec, 2014

Page 42: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 35

without proper ID card issued by HRSDC

how the AH can claim their additional

allowance/ entitlement as reserved in the

final RP to the IA?

done by LAO for disbursement

of compensation for Land/

structures. ID cards are needed

for non-title holders, or for

temporary impacted APs which

is nil on this stretch. All the

documents will be matched

with the documents submitted

to LAO for land compensation

before giving the R&R

assistance to APs.

3 Regular monitoring on the livelihood

condition of all vulnerable HH and HH who

are experience significant LAR impacts

needs to be done by the EMA and reported

to NCRPB/ ADB

Noted

4 Time-bound actions should be prepared based on the findings of the EMA. The topics include: 4.1 Submission for explanation and conflict

resolution plan from HSRDC to resolve the

compensation issue in Balour village.

The 2.181 acres of land in

Balour village is belongs to

Haryana Urban Development

Authority HUDA, Haryana

Govt.

Land to be transferred by

HUDA to HSRDC. Issue

resolved. Compiled in point

no. 14. Copy of letter no 4004

dated 03-12-14 from HSRDC

stating this land belongs to

HUDA attached. 4.2 Completion of payment for remaining

compensation on private structures affected

by the subproject.

Out of total, unpaid

compensation i.e. Rs 279254/-

against of 5 nos. AHs for

private structures and other

assets ; almost 90.7% is stopped

due to dispute among title

holders/ court case/ court stay

order details provided in table

no 2.5

Remaining amount is

expected to disbursed by 15-

01-2015

4.3 Issuance of ID cards by HSRDC to all APs to

claims their entitlements as per RP

All APs entitled for R&R

Assistance identified. List-1

attached

This exercise will be

completed by 20th Dec, 2014

4.4 Payment of additional R&R allowance as

detailed in the RP to all entitled APs

Payment not received by 30th

Nov, 2014 frrm Head office.

Tentative date for disbursement

may be marginally extended.

4.5 Adjustment of livelihood rehabilitation

measures for elderly and single member HH

from providing skills and job to a pension

allowance for life.

Re-verification with the APs/

Vulnerable family is pending

about their preference for

pension or one time monetary

assistance. They are getting old

age pension from State Govt.

This exercise will be

completed by 20th Dec, 2014

5 Next monitoring report should provide the following item: 5.1 Completion/ progress of the various Noted

Page 43: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 36

activities as detailed in the CAP 5.2 Assessment of the livelihood condition of all

affected APs including the vulnerable APs

who are not assessed in the first report.

Noted

5.3 Grievance and redress cases if any and its

solution status.

No fresh complaint received in

last month

2nd stretch

The details of our comments on the submitted documents are specified below to be accommodated and responded

in the next EMR.

SR Comments from ADB Compliance Remark

1 Please revise the cover page of the report to be consistent

with the cover page of the EMR that is already disclosed on

ADB website. Please also include the monitoring period in

the title for easy reference.

Revised

2 Provide the comprehensive matrix of the summary

progress on the numbers of APs in each village that already

received compensation and/or R&R assistance/allowance

and the remaining APs to receive them and the progress of

civil works in the relevant village. The table 1 & 2 only

described the numbers of affected assets land and other

fixed assets but not on the number of APs as described in

the RPs. The table 4 is yet to be completed.

Required detail

provided in Table

No-2.1, 2.2, 2.3 &

2.5

3 Check again the numbers of the paid and unpaid

compensation amount as stated in the report against the

information provided in the supporting documents

attached and revised as necessary. We noted number errors

for Budhera and Makraula villages.

Corrected

4 Please prepare a matrix for the progress of RPs

implementation in both stretches and its policy compliance

status of the subproject especially on the payment of

compensation and allowances to the eligible APs prior to 1

acquisition of assets, and 2 starts of the civil works in the

affected areas. Provide explanation of the delayed of the

compensation and prepare time-bound actions for the

IA/EA to implement. Priority for implementation should

be given to the areas where civil works already started and

about to complete.

Details provided in

Social monitoring

matrix in the Report.

R&R assistance not

yet received by

HSRDC for stretch-

1 from head

quarter.

5 We noted from this report and the earlier report that no ID

cards were issued by HRSDC to the eligible APs. Why is

this happen and what is the plan to ensure that all the

eligible APs will be identified and receive their

Details of all title

holders are properly

documented by

L.A.O. hence

This exercise is

started and

expected date of

complete is 20th

Page 44: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 37

allowances? Please discuss and include the result of

discussion in the next report.

additionally ID were

not issued initially.

All details will be

taken by L.A.O. and

matched with the

original documents.

for land

compensation before

giving the R&R

assistance to APs. I-

D cards are being

prepared as a

preparatory

arrangement before

disbursement of

R&R assistance.

Dec, 2014

6 What is the status of the GRM implementation, whether

any complaints received and resolution progress. Various

attachments are provided in the EMR, however these are

not referred anywhere in the report. Some of the attached

documents of the report seemed to relate with some

objections/complaints raised by the villagers. Please

provide explanation on these matters in the main text of

the report. EMA has to assess whether the issues are

treated fairly based on the government regulation and

ESMS requirements by meeting the complainants and the

responsible HSRDC responsible officer.

GRC constituted by

DGM, Gurgaon.

Details provided in

point no. 36 of the

report. (Grievance

Redressal)

Visit point. No 36

of the report.

7 The submitted report did not mention the numbers of APs

surveyed/ visited/ interview to monitor/ assess their

livelihood status post of the acquisition of their assets.

Please include this information in the next report. Be

reminded that based on the TOR the EMA should at least

sampling size of 20% of the total APs and 50% of the total

vulnerable groups in its monitoring tasks. APs that

experienced significant impacts loss more than 10% of

their land or income generating assets should be prioritized

in this monitoring exercise. This is important to ensure

that no APs have become worse off due to subproject

activity.

Required detail

provided in point

no- 18 and post

acquisition socio-

economic survey

and impact on

livelihood in

progress for both

stretches

8 Please confirm if the EMA have met the APs who are not

received/ refused to receive their compensation and to

understand their concerns. Also to assess whether their

concerns are valid. Please be reminded that EMA should be

independent and objectives in assessing the issues

identified in from the project sites and recommend

objective solutions that acceptable to ADB, Government

and APs.

One to one

interaction was

conducted to record

the status case by

case. Met with Mr.

Satyawan r/o

Makraula village

who filed case in

court. Requested for

Page 45: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 38

a copy of the case

but Yet to receive

the copy of case filed

by him.

9 For effective review provide a summary matrix of

incompliance/ pending issues identified from the previous

and current monitoring report, differentiated by each

relevant stretch, and its action to be taken, with schedule,

to be monitored its progress in the subsequent report.

Thus, in each EMR the summary progress status of RP

implementation for both stretches has to be reported.

Noted

Page 46: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 39

Annexure 5

Other supportive documents

1 Document for compensation disbursement upto 30th Nov, 2014 in Gurgaon district

Page 47: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 40

2 Demand letter for R&R Assistance by DGM, Gurgaon for stretch-2

Page 48: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 41

3 Demand letter for R&R Assistance by DGM, Jhajjar for stretch-1

Page 49: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 42

4 Copy of letter from HSRDC stated the land of village-Balour is belong to HUDA on Stretch-1

Page 50: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 43

Annexure 6

Details of compensation for land & structures

Compensation status of Land (List-5 to List-10)

List No-5: List of Title Holders for Acquired Land of Village - Budhera, District-Gurgaon on Stretch-2

SR

No

Name of the title holder Total

Compensation

amount

Compensation

disbursed as on

30-11-14

Unpaid

compensation as

on 30-11-14

Status Remarks

1 Naresh Kumar s/o Akshya Kumar 293027 293027 0 Paid

2 Ashok Kumar s/o Om Prakash 366283 366283 0 Paid

3 Anil Kumar s/o Om Prakash 366283 366283 0 Paid

4 Vijay Kumar s/o Suraj Prakash 366283 366283 0 Paid

5 Satish Kumar s/o Suraj Prakash 366284 366284 0 Paid

6 Vinod Kumar s/o Chander Prakash 879080 879080 0 Paid

7 Ridha Acharya Kaushik s/o Shiv Prasad 1178340 1178340 0 Paid

8 Suresh Kumar s/o Chanku Ram 118457 118457 0 Paid

9 Jitender Chopra s/o Diwan Singh Chopra 592288 0 592288 Unpaid

10 Manish Malik s/o Bahadur Chand 236915 0 236915 Unpaid

11 Smt Kaushlaya Devi w/o Hemraj 118457 118457 0 Paid

12 Smt Jyoti Dagar s/o Suresh Kumar 1458898 1458898 0 Paid

13 Om Shri Sai Nath Sanstha Ramesh Kumar Urf

Sai Baba s/o Dinaram

222393 222393 0 Paid

14 Ramesh Kumar s/o Data Ram 182362 182362 0 Paid

15 Smt Kamla Devi w/o Lakhiram 73390 73390 0 Paid

16 Smt Shanti Devi w/o Sube Singh 35583 0 35583 Unpaid

17 Jagwanti w/o Pratap Singh 48926 48926 0 Paid

18 Smt Mira Devi w/o Mahesh Gupta 35583 0 35583 Unpaid

19 Anand Prakash s/o Lal Chand 35583 35583 0 Paid

20 Smt Geeta Devi w/o Gyan Prakash 29652 0 29652 Unpaid

21 Sandeep Kataria s/o Mangli Ram 29652 29652 0 Paid

22 Smt Nisha Kumar w/o Dharm Prakash 64741 64741 0 Paid

23 Smt Meena Devi w/o Ashok Kumar 28911 28911 0 Paid

24 Smt Meena Devi w/o Rajbir 82285 82285 0 Paid

25 Ravinder Dagar s/o Mahabir Singh 30641 0 30641 Unpaid

26 Dharambir s/o Dayanand 52880 0 52880 Unpaid

27 Om Sai Mandir 179397 179397 0 Paid

28 Smt Pinki w/o Pankaj Kumar 32618 0 32618 Unpaid Payment stopped, dispute

29 Rajinder Singh s/o Himmat Singh 96865 0 96865 Unpaid Payment stopped, dispute

30 Smt Shano Devi w/o Jasram 29652 0 29652 Unpaid Payment stopped, dispute

31 Jain Sons Engineering Pvt Ltd 105513 105513 0 Paid

Page 51: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 44

32 Smt Kamla Devi w/o Nand Kishor 62271 62271 0 Paid

33 Rajinder Prasad s/o Sudama 303002 0 303002 Unpaid Court Case

34 Virender Kumar s/o Sudama 303002 0 303002 Unpaid Court Case

35 Smt Anjana w/o Surender Kumar 606004 0 606004 Unpaid Court Case

36 M/s Reliance SEZ Ltd 303001 0 303001 Unpaid Court Case

37 Mahabir Singh s/o Ratan Singh 925839 925839 0 Paid

38 Rajpal Singh s/o Ratan Singh 925839 925839 0 Paid

39 Govind Ram s/o Mahabir Singh 350696 350696 0 Paid

40 Sri Bhagwan s/o Mahabir Singh 350697 350697 0 Paid

41 Suresh s/o Mahabir Singh 350697 350697 0 Paid

42 Naresh Kumar s/o Mahabir Singh 350696 350696 0 Paid

43 Jitender Kumar s/o Mahender Singh 112223 112223 0 Paid

44 M/s Bharti Agritech Pvt Ltd (Vijay, Director),

Mahesh Kumar Modi s/o Madan Lal

1515009 1515009 0 Paid

45 Dashmesh Educational Charitable Trust Regd. 1290563 1290563 0 Paid

46 M/s Pragati Fabricator Pvt Ltd 572480 0 572480 Unpaid

47 M/s Cambridge Comodities Pvt Ltd Ka Marfat

Director Sudhakar Atmaram Gandrakar

156970 0 156970 Unpaid

48 M/s Pragati Fabricator Pvt Ltd 213224 0 213224 Unpaid

49 M/s Cambridge Comodities Pvt Ltd Ka Marfat

Director Sudhakar Atmaram Gandrakar

11222 0 11222 Unpaid

50 Jaipal Singh s/o Devi Singh 299262 299262 0 Paid

51 Satish Kumar s/o Devi Singh 299261 299261 0 Paid

52 Sailesh Kumar s/o Devi Singh 299261 299261 0 Paid

53 Vijay Yadav s/o Mahender Singh 1066118 1066118 0 Paid

54 Chandan Singh s/o Chhaju Ram 841673 841673 0 Paid

55 Kehar Singh s/o Hukam Singh 224446 224446 0 Paid

56 Kehar Singh s/o Hukam Singh 0 0 Unpaid Award pending

57 Smt Komal Gupta w/o Amit Gupta Patta

Dehinda Ankur Gupta s/o Adarsh Gupta

182362 0 182362 Unpaid

58 Smt Jyoti Gupta w/o Adarsh Gupta Patta

Dehinda Ankur Gupta s/o Adarsh Gupta

182362 0 182362 Unpaid

59 Dhanjit Singh s/o Ram Narayan Patta Dehinda

Ankur Gupta s/o Adarsh Gupta

182363 0 182363 Unpaid

60 Sudha w/o Dhanjit Singh Patta Dehinda

Ankur Gupta s/o Adarsh Gupta

182363 0 182363 Unpaid

61 Smt Komal Gupta w/o Amit Gupta patta

Dehinda Ankur Gupta s/o Adarsh Gupta

154307 0 154307 Unpaid

62 Smt Jyoti Gupta w/o Adarsh Gupta Patta

Dehinda Ankur Gupta s/o Adarsh Gupta

154307 0 154307 Unpaid

63 Dhanjit Singh s/o Ram Narayan 154307 0 154307 Unpaid

64 Sudha w/o Dhanjit Singh 154306 0 154306 Unpaid

65 Ram Kawar s/o Shiv Narayan 1515010 1515010 0 Paid

Page 52: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 45

66 Ramchander s/o Hari Ram 126251 0 126251 Unpaid

67 Ramkaran s/o Hari Ram 126251 0 126251 Unpaid Court Case

68 Rampal s/o Hari Ram 126251 0 126251 Unpaid

69 Dashmesh Educational Charitable Trust Regd. 126251 126251 0 Paid

70 Kehar Singh s/o Hukam Singh 0 0 Unpaid Award pending

71 Ratiram s/o Ganga Bishan s/o Harphul 112222 0 112222 Unpaid

72 Niraj Naman Shrivastav s/o K N Shrivastav

Bhag

56112 0 56112 Unpaid

73 Smt Ritu Shrivastav w/o Niraj Naman

Shrivastav

56112 0 56112 Unpaid

74 Smt Sattan Devi Widow Sawant Ram 70140 70140 0 Paid

75 Jitender s/o Sawant Ram 70140 70140 0 Paid

76 Dharmender s/o Sawant Ram 70139 70139 0 Paid

77 Geeta s/o Sawant Ram 70139 70139 0 Paid

78 Jitender Kumar s/o Mahender Singh 505004 505004 0 Paid

79 Smt Raju Hasija w/o Ramesh Kumar 412496 412496 0 Paid

80 Smt Laxmi Devi w/o Balwant Singh 80881 80881 0 Paid

81 Smt Nirmala Devi w/o Ashawini Kumar 80881 80881 0 Paid

82 Smt Meena Devi w/o Virender Singh 80882 80882 0 Paid

83 Smt Rajwanti Sharma w/o Rajbir Sharma 121322 121322 0 Paid

84 Smt Urmila Sharma w/o Surender Sharma 121322 121322 0 Paid

85 Naresh Kumar s/o Akshya Kumar 81050 81050 0 Paid

86 Ashok Kumar s/o Om Prakash 81050 81050 0 Paid

87 Anil Kumar s/o Om Prakash 81050 81050 0 Paid

88 Jaipraksah s/o Suraj Prakash 81050 81050 0 Paid

89 Vijay Kumar s/o Suraj Prakash 81050 81050 0 Paid

90 Satish Chander s/o Suraj Prakash 81050 81050 0 Paid

91 Vinod Kumar s/o Chander Prakash 243150 243150 0 Paid

92 Smt Satyawati w/o Hukam Chand 2188348 2188348 0 Paid

93 Devender Kumar s/o Hukam Chand 505004 505004 0 Paid

94 Harish Kumar s/o Hukam Chand 1795567 1795567 0 Paid

95 Kewal Krishan s/o Ravidatt 1262508 1262508 0 Paid

96 Pawan Kumar s/o Ravidatt 1262507 1262507 0 Paid

97 Jitender Kumar s/o Mahender Singh 280558 280558 0 Paid

98 Rajinder s/o Ram Singh 785561 0 785561 Unpaid

99 Vibhor Sharma s/o Jitender Kumar Sharma 1515010 1515010 0 Paid

100 Mahender Pal Pisar Mutbana Prabhu Dayal

s/o Ramji

392780 392780 0 Paid

101 M/s Guru Govind Singh Education Charitable 1346675 1346675 0 Paid

102 Surender Kumar s/o Yudhersitra 723413 723413 0 Paid

103 Tejbir Sharma s/o Ratan Lal 16555 16555 0 Paid

Page 53: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 46

104 Sudesh Oberai w/o H S Oberai 54918 54918 0 Paid

105 Smt Santosh Sharma w/o Shri Krishan Kumar 54918 54918 0 Paid

106 Vijay Kumar s/o Deep Chand 78592 78592 0 Paid

107 Sanjiv s/o Deep Chand 78592 78592 0 Paid

108 Ramesh Singh s/o Umed Singh 176028 176028 0 Paid

109 Sheela Devi w/o P R Chauhan 107547 107547 0 Paid

110 Adisal s/o Dalpat 364725 364725 0 Paid

111 Amar Singh s/o Dalpat 364725 364725 0 Paid

112 Virpal s/o Dalpat 364724 364724 0 Paid

113 Dharam Singh s/o Dalpat 364724 364724 0 Paid

114 Amar Singh s/o Nihal 2412793 2412793 0 Paid

115 Harpal Singh s/o Jagdish 47437 47437 0 Paid

116 Ramesh Chand s/o Jagdish 47437 47437 0 Paid

117 Smt Pushpa Devi w/o Gyan Chand 63250 0 63250 Unpaid

118 Balbir s/o Amar Singh Bhag 101199 101199 0 Paid

119 Hemraj Vashist s/o Vashudev Vashist 237186 0 0 Saved Structure saved

120 Smt Nirmala w/o Attar Singh 75900 75900 0 Paid

121 Satyavir s/o Jivan Singh 94874 94874 0 Paid

122 Smt Roshni Devi w/o Anil Kumar 63250 0 63250 Unpaid

123 Smt Jyoti Vashist w/o Hemraj Vashist 172356 0 0 Saved Structure saved

124 Smt Sushila Gupta w/o Moti Ram Gupta 86441 0 86441 Unpaid

125 Smt Bhagwati Devi w/o Vashudev Vashist 262486 0 0 Saved Structure saved

126 Ram Narayan s/o Chander Bhan 63250 0 63250 Unpaid

127 Smt Savitri Goyal w/o Chander Prakash Goyal 23192 0 23192 Unpaid

128 Satender Kumar Nayar s/o Narender Kumar

Nayar

90658 90658 0 Paid

129 Smt Poonam w/o Prem Prakash 106470 0 106470 Unpaid Court Case

130 Vikas Sattering Store Pvt Ltd Bajariye

Dayanand Saini

373173 373173 0 Paid

131 Smt Poonam w/o Sunil Kumar 55342 0 55342 Unpaid Court Case

132 Panchayat Deh (Rasta) 3759468 3759468 0 Paid

133 Panchayat Deh (Public Health Dept.) 1851679 0 1851679 Unpaid

Grand Total of Village-Budhera 49546431 40184510 8689893 Compensation for structure save is Rs.

672028

List No-6: List of Title Holders for Acquired Land of Village - Iqbalpur, District-Gurgaon on Stretch-2

SR

No

Name of the title holder Total

Compensation

amount

Compensation

disbursed as on

30-11-14

Unpaid

compensation

as on 30-11-14

Status Remarks

1 Mangal Singh s/o Badlu 16734 16734 0 Paid 1

2 Ram Singh s/o Badlu 16734 16734 0 Paid

Page 54: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 47

3 Ramkishan s/o Badlu 16734 16734 0 Paid

4 Ram Kumar s/o Badlu 16734 16734 0 Paid

5 Satbir s/o Badlu 16734 16734 0 Paid

6 Amichand s/o Chain Sukh 119527 119527 0 Paid

7 Amar Singh s/o Badlu 3984 0 3984 Unpaid

8 Jagdish s/o Badlu 3984 0 3984 Unpaid

9 Smt Dhanpati w/o Mahasingh 1328 1328 0 Paid

10 Naresh s/o Mahasingh 1328 1328 0 Paid

11 Mewa Singh s/o Mahasingh 1328 1328 0 Paid

12 Nisha w/o Dharampal 484086 0 484086 Unpaid

13 Lachchhe-Tarachand etc 738082 0 738082 Unpaid Matter under consideration-

Takseem

14 Lachchhe-Tarachand etc 621541 0 621541 Unpaid Matter under consideration-

Takseem

15 Bhopa-Gokul-Surajbhan & others 1010007 0 1010007 Unpaid Matter under consideration-

Takseem

16 Gaje Singh s/o Bhanwar Singh 32007 0 32007 Unpaid

17 Vinod Kumar s/o Bhanwar Singh 32007 0 32007 Unpaid

18 Fateh Singh s/o Shishan 12803 0 12803 Unpaid

19 Ravi Dutt s/o Shishan 12803 0 12803 Unpaid

20 Nahar Singh s/o Shishan 12803 0 12803 Unpaid

21 Suman d/o Shishan 12803 0 12803 Unpaid

22 Shyamo w/o Shishan 12803 0 12803 Unpaid

23 Kaptan s/o Nihal Singh 64015 0 64015 Unpaid

24 Ajit Singh s/o Munshi Ram 39407 0 39407 Unpaid

25 Kavita w/o Vikas 11968 0 11968 Unpaid

26 Pushpa w/o Virender Singh 24639 24639 0 Paid

27 Lalita w/o Anil Kumar 25343 25343 0 Paid

28 Jaidev s/o Mange Ram 19560 0 19560 Unpaid

29 Saroj Rana w/o Ashok Kumar 17147 0 17147 Unpaid

30 Sheela w/o Prakash Singh 17147 0 17147 Unpaid

31 Savita w/o Tejpal 4826 0 4826 Unpaid

32 Promela w/o Somveer 12955 0 12955 Unpaid

33 Jyoti w/o Krishan Kumar Yadav 15750 15750 0 Paid

34 Kavita w/o Pirthev Raj 29975 29975 0 Paid

35 Mamta Rani w/o Surender Singh 22992 0 22992 Unpaid

36 Ranjana Gupta w/o Raghav Gupta 10294 0 10294 Unpaid

37 Sandeep Kumar s/o Ram Kumar 20247 0 20247 Unpaid

38 Sashi Bala w/o Satbir Singh 5148 0 5148 Unpaid

39 Attar Singh s/o Smt Phoola 28451 28451 0 Paid

40 Kalpana w/o Bhagwan Singh 7113 0 7113 Unpaid

Page 55: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 48

41 Umesh Yadav s/o Bharat Lal 1563 0 1563 Unpaid

42 Smt Mishro w/o Lalu Ram 3556 0 3556 Unpaid

43 Anita w/o Ravi Kumar 46233 0 46233 Unpaid

44 Smt Sanesh w/o Ramesh 35564 0 35564 Unpaid

45 Usha Rani w/o Krishan Pal 46233 46233 0 Paid

46 Raj Kumar s/o Jawahar Lal 168926 168926 0 Paid

47 Manoj Kumar Saini s/o Jawahar Lal 168926 168926 0 Paid

48 Smt Manorama w/o Sube Singh 34000 0 34000 Unpaid

49 Gaje Singh s/o Bhanwar Singh 9848 0 9848 Unpaid

50 Vinod Kumar s/o Bhanwar Singh 9848 0 9848 Unpaid

51 Fateh Singh s/o Shishan 3939 0 3939 Unpaid

52 Ravi Dutt s/o Shishan 3939 0 3939 Unpaid

53 Nahar Singh s/o Shishan 3939 0 3939 Unpaid

54 Suman d/o Shishan 3939 0 3939 Unpaid

55 Shyamo w/o Shishan 3939 0 3939 Unpaid

56 Kaptan s/o Nihal Singh 19697 0 19697 Unpaid

57 Ajit Singh s/o Munshi Ram 12125 0 12125 Unpaid

58 Kavita w/o Vikas 3682 0 3682 Unpaid

59 Pushpa w/o Virender Singh 7581 7581 0 Paid

60 Lalita w/o Anil Kumar 7798 7798 0 Paid

61 Jaidev s/o Mange Ram 6018 0 6018 Unpaid

62 Saroj Rana w/o Ashok Kumar 5276 0 5276 Unpaid

63 Sheela w/o Prakash Singh 5276 0 5276 Unpaid

64 Savita w/o Tejpal 1485 0 1485 Unpaid

65 Promela w/o Somveer 3986 0 3986 Unpaid

66 Jyoti w/o Krishan Kumar Yadav 4846 4846 0 Paid

67 Kavita w/o Pirthev Raj 9223 9223 0 Paid

68 Jagbir Singh s/o Munshi Ram 18057 0 18057 Unpaid

69 Attar Singh s/o Smt Phoola 8754 8754 0 Paid

70 Kalpana w/o Bhagwan Singh 2189 0 2189 Unpaid

71 Umesh Yadav s/o Bharat Lal 481 0 481 Unpaid

72 Smt Mishro w/o Lalu Ram 1094 0 1094 Unpaid

73 Anita w/o Ravi Kumar 14225 0 14225 Unpaid

74 Smt Sanesh w/o Ramesh 10943 0 10943 Unpaid

75 Usha Rani w/o Krishan Pal 14225 14225 0 Paid

76 Raj Kumar s/o Jawahar Lal 51978 51978 0 Paid

77 Manoj Kumar Saini s/o Jawahar Lal 51978 51978 0 Paid

78 Smt Manorama w/o Sube Singh 10463 0 10463 Unpaid

79 Phool Singh s/o Chhatar Singh 20 0 20 Unpaid

80 Girwar s/o Chhatar Singh 20 0 20 Unpaid

Page 56: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 49

81 Krishan s/o Chhatar Singh 20 0 20 Unpaid

82 Mukesh s/o Chhatar Singh 20 0 20 Unpaid

83 Smt Sunehri d/o Chhatar Singh 20 0 20 Unpaid

84 Nirmla d/o Chhatar Singh 20 0 20 Unpaid

85 Kamlesh d/o Chhatar Singh 19 0 19 Unpaid

86 Mamkaur widow Chhatar Singh 19 0 19 Unpaid

87 Satish Kumar s/o Mahaveer 4 0 4 Unpaid

88 Sangita d/o Mahaveer 4 0 4 Unpaid

89 Satish Kumar s/o Mahaveer 4 0 4 Unpaid

90 Sushma d/o Mahabir 4 0 4 Unpaid

91 Smt Bhudei widow Mahaveer 4 0 4 Unpaid

92 Sakuntla w/o Jai Prakash 45231 0 45231 Unpaid

93 Smt Meena w/o Vinod Kumar 45231 0 45231 Unpaid

94 Sardar Singh s/o Mangtu Ram 7275 0 7275 Unpaid

95 Smt Anita w/o Ranglal 54652 54652 0 Paid

96 Smt Seema w/o Sumer 54652 54652 0 Paid

97 Smt Mamta w/o Ravinder Kumar 19385 0 19385 Unpaid

98 Smt Poonam w/o Gaj Raj 381 0 381 Unpaid

99 Smt Minaxi w/o Dilbag Singh 31991 0 31991 Unpaid

100 Gaje Singh s/o Bhanwar Singh 33768 0 33768 Unpaid

101 Vinod Kumar s/o Bhanwar Singh 33768 0 33768 Unpaid

102 Fateh Singh s/o Shishan 13507 0 13507 Unpaid

103 Ravi Dutt s/o Shishan 13507 0 13507 Unpaid

104 Nahar Singh s/o Shishan 13507 0 13507 Unpaid

105 Suman d/o Shishan 13508 0 13508 Unpaid

106 Shyamo w/o Shishan 13508 0 13508 Unpaid

107 Kaptan s/o Nihal Singh 203 0 203 Unpaid

108 Smt Vandana w/o Ajay Vats 40141 0 40141 Unpaid

109 Soneka Sharma 40141 0 40141 Unpaid

110 Ajit Singh s/o Munshi Ram 14737 0 14737 Unpaid

111 Kavita w/o Vikas 17754 0 17754 Unpaid

112 Indrawati w/o Nandkishor 7841 0 7841 Unpaid

113 Pushpa w/o Virender Singh 28710 0 28710 Unpaid

114 Lalita w/o Anil Kumar 37596 37596 0 Paid

115 Dheer Singh s/o Shankar (Munshi Ram) 442 442 0 Paid

116 Jaidev s/o Mange Ram 21180 0 21180 Unpaid

117 Saroj Rana w/o Ashok Kumar 18567 0 18567 Unpaid

118 Sheela w/o Prakash Singh 18567 0 18567 Unpaid

119 Savita w/o Tejpal 5226 0 5226 Unpaid

120 Mahinder Singh s/o Shankar (Munshi Ram) 443 0 443 Unpaid

Page 57: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 50

121 Kavita w/o Pirthev Raj 32457 0 32457 Unpaid

122 Jyoti w/o Krishan Kumar Yadav 17054 0 17054 Unpaid

123 Promela w/o Somveer 14028 0 14028 Unpaid

124 Jagbir Singh s/o Shankar (Munshi Ram) 783 0 783 Unpaid

125 Mamta Rani w/o Surender Singh 24762 0 24762 Unpaid

126 Sandeep Kumar s/o Ram Kumar 21806 0 21806 Unpaid

127 Ranjana Gupta w/o Raghav Gupta 11088 0 11088 Unpaid

128 Shashibala w/o Satbir Singh 5544 0 5544 Unpaid

129 Dhanpat s/o Mohar Singh 85310 85310 0 Paid

130 Sanjay Kumar s/o Mohar Singh 85310 85310 0 Paid

131 Kalpana w/o Bhagwan Singh 5332 0 5332 Unpaid

132 Umesh Yadav s/o Bharat Lal 707 0 707 Unpaid

133 Smt Manorama w/o Sube Singh 36616 0 36616 Unpaid

134 Dharambir Singh s/o Bharat Singh 390 0 390 Unpaid

135 Smt Kanta Devi w/o Surender Singh 68925 68925 0 Paid

136 Smt Phoola d/o Kishan 31990 0 31990 Unpaid

137 Chhatar Singh s/o Mangtu 55550 0 55550 Unpaid

138 Sardar Singh s/o Mangtu Ram 90640 90640 0 Paid

139 Preet Singh s/o Zile Singh 30210 12947 17263 Paid Balance Rs. 17263/- to be

paid

140 Ravinder s/o Zile Singh 30214 30214 0 Paid

141 Naresh Kumar s/o Zile Singh 30214 30214 0 Paid

142 Bhawar Singh s/o Nihal Singh 68225 68225 0 Paid

143 Kaptan s/o Nihal Singh 68225 68225 0 Paid

144 Fateh Singh s/o Shishan 1075 0 1075 Unpaid

145 Ravi Dutt s/o Shishan 1076 1076 0 Paid

146 Nahar Singh s/o Shishan 1077 1077 0 Paid

147 Suman d/o Shishan 1077 1077 0 Paid

148 Shyamo w/o Shishan 1077 1077 0 Paid

149 Bijender s/o Jaipal 1825 1825 0 Paid

150 Kuldeep s/o Jaipal 1825 1825 0 Paid

151 Akash s/o Jaipal 1825 1825 0 Paid

152 Sahil s/o Jaipal 1825 1825 0 Paid

153 Smt Bharti d/o Jaipal 1825 1825 0 Paid

154 Smt Mukesh Devi widow Jaipal 1825 1825 0 Paid

155 Shishpal s/o Pooran 10954 10954 0 Paid

156 Sher Singh s/o Nihal Singh 1263 0 1263 Unpaid

157 Smt Savita Devi w/o Ranbir Singh 106935 106935 0 Paid

158 Balwan s/o Bharat Singh 17544 17544 0 Paid

159 Dharambir Singh s/o Bharat Singh 17544 17544 0 Paid

Page 58: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 51

160 Phool Singh s/o Chhatar Singh 11939 0 11939 Unpaid

161 Girwar s/o Chhatar Singh 11939 0 11939 Unpaid

162 Krishan s/o Chhatar Singh 11939 0 11939 Unpaid

163 Mukesh s/o Chhatar Singh 11939 0 11939 Unpaid

164 Smt Sunehri d/o Chhatar Singh 11939 0 11939 Unpaid

165 Nirmla d/o Chhatar Singh 11939 0 11939 Unpaid

166 Kamlesh d/o Chhatar Singh 11939 0 11939 Unpaid

167 Mamkaur widow Chhatar Singh 11939 0 11939 Unpaid

168 Satish Kumar s/o Mahaveer 2388 0 2388 Unpaid

169 Sangita d/o Mahaveer 2387 0 2387 Unpaid

170 Satish Kumar s/o Mahaveer 2387 0 2387 Unpaid

171 Sushma d/o Mahabir 2387 0 2387 Unpaid

172 Smt Bhudei widow Mahaveer 2387 0 2387 Unpaid

173 Sardar Singh s/o Mangtu Ram 82798 0 82798 Unpaid

174 Preet Singh s/o Zile Singh 26493 0 26493 Unpaid

175 Ravinder s/o Zile Singh 26493 0 26493 Unpaid

176 Naresh Kumar s/o Zile Singh 26493 0 26493 Unpaid

177 Smt Minaxi w/o Dilbag Singh 170810 0 170810 Unpaid

178 Gaje Singh s/o Bhanwar Singh 26862 0 26862 Unpaid

179 Vinod Kumar s/o Bhanwar Singh 26862 0 26862 Unpaid

180 Fateh Singh s/o Shishan 2608 0 2608 Unpaid

181 Ravi Dutt s/o Shishan 2608 0 2608 Unpaid

182 Nahar Singh s/o Shishan 2608 0 2608 Unpaid

183 Suman d/o Shishan 2608 0 2608 Unpaid

184 Shyamo w/o Shishan 2608 0 2608 Unpaid

185 Bijender s/o Jaipal 3390 0 3390 Unpaid

186 Kuldeep s/o Jaipal 3390 0 3390 Unpaid

187 Akash s/o Jaipal 3390 0 3390 Unpaid

188 Sahil s/o Jaipal 3390 0 3390 Unpaid

189 Smt Bharti d/o Jaipal 3390 0 3390 Unpaid

190 Smt Munesh Devi w/o Jaipal 3390 0 3390 Unpaid

191 Shishpal s/o Surat Singh 20343 0 20343 Unpaid

192 Sher Singh s/o Nihal Singh 71550 0 71550 Unpaid

193 Smt Savita Devi w/o Ranbir Singh 57387 57387 0 Paid

194 Kaptan s/o Nihal Singh 128937 0 128937 Unpaid

195 Smt Savita Devi w/o Ranbir Singh 64469 64469 0 Paid

196 Balwan s/o Bharat Singh 32234 0 32234 Unpaid

197 Dharambir Singh s/o Bharat Singh 32234 0 32234 Unpaid

198 Smt Savita Devi w/o Ranbir Singh 75214 75214 0 Paid

199 Chhatar Singh & Others 194232 0 194232 Unpaid

Page 59: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 52

200 Ved Kaur widow Mohinder Singh 296645 296645 0 Paid

201 Naresh Kumar s/o Ram Kishan 3139 3037 102 Paid Balance Rs. 102/- to be paid

202 Satish Kumar s/o Dhanpat 4709 4709 0 Paid

203 Pawan Kumar s/o Dhanpat 4709 4709 0 Paid

204 Naresh Kumar s/o Dhanpat 4709 4709 0 Paid

205 Smt Savita Devi w/o Ranbir Singh 607417 606004 1413 Paid Balance Rs. 1413/- to be paid

206 Pratap Singh s/o Rohtas 3662 0 3662 Unpaid

207 Maan Singh s/o Rohtas 3662 0 3662 Unpaid

208 Dharambir Singh s/o Rohtas 3662 0 3662 Unpaid

209 Ashok Kumar s/o Hukam Chand 74663 74663 0 Paid

210 Rakesh Vijay s/o Hukam Chand 132465 132465 0 Paid

211 Promela Yadav w/o Atul Yadav 28902 0 28902 Unpaid

212 Sunita Yadav w/o Sunil Yadav 14451 0 14451 Unpaid

213 Mamta Yadav w/o Naveen Kumar 28902 0 28902 Unpaid

214 Kamlesh w/o Balraj 14451 0 14451 Unpaid

215 Murti Devi w/o Ranbir Singh 14451 0 14451 Unpaid

216 Smt Rajbala w/o Suresh Kumar 14451 0 14451 Unpaid

217 Roja Sharma w/o Rajesh Kumar 14451 0 14451 Unpaid

218 Poonam w/o Jasbir 38536 0 38536 Unpaid

219 Omwati w/o Ramanand 28902 0 28902 Unpaid

220 Karan Singh s/o Chimman 4817 0 4817 Unpaid

221 Naresh Kumar s/o Ram Kishan 4817 4817 0 Paid

222 Duli Chand s/o Chander 4817 0 4817 Unpaid

223 Pratap Singh s/o Rohtas 2408 0 2408 Unpaid

224 Man Singh s/o Rohtas 2408 0 2408 Unpaid

225 Smt Savita Devi w/o Ranbir Singh 780347 780347 0 Paid

226 Attar Singh s/o Banwari 4856 4856 0 Paid

227 Ved Prakash s/o Banwari 4856 4856 0 Paid

228 Harphool s/o Chimman 9712 9712 0 Paid

229 Pradip Kumar s/o Samay Singh 3237 3237 0 Paid

230 Gopi Chand s/o Samay Singh 3237 3237 0 Paid

231 Sanjay s/o Samay Singh 3237 3237 0 Paid

232 Dharampal s/o Sirju 8992 8992 0 Paid

233 Karambeer s/o Ram Prasad 3237 3237 0 Paid

234 Duli Chand s/o Chander 4532 4532 0 Paid

235 Pratap Singh s/o Rohtas 2374 0 2374 Unpaid

236 Maan Singh s/o Rohtas 2374 2374 0 Paid

237 Dharambir Singh s/o Rohtas 2374 2374 0 Paid

238 Smt Ratni widow Sirju 719 719 0 Paid

239 Shanti Devi widow Ram Prasad 6474 0 6474 Unpaid

Page 60: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 53

240 Smt Santosh d/o Rohtas 1295 0 1295 Unpaid

241 Sumita d/o Rohtas 1295 0 1295 Unpaid

242 Sunita d/o Vidhya 1295 1295 0 Paid

243 Anaro d/o Chander 1295 0 1295 Unpaid

244 Chameli d/o Chander 1295 0 1295 Unpaid

245 Saraswati d/o Chander 1295 1295 0 Paid

246 Dharam Singh s/o Prithi Singh 658 0 658 Unpaid

247 Karan Singh s/o Chimman 9054 9054 0 Paid

248 Karan Singh s/o Chimman 4155 0 4155 Unpaid

249 Ashok Kumar s/o Hukam Chand 155787 155787 0 Paid

250 Rakesh Vijay s/o Hukam Chand 155785 155785 0 Paid

251 Maan Singh s/o Rohtas 447 447 0 Paid

252 Pratap Singh s/o Rohtas 447 0 447 Unpaid

253 Dharambir Singh s/o Rohtas 448 448 0 Paid

254 Smt Savita Devi w/o Ranbir Singh 604129 604129 0 Paid

255 Shanti Devi widow Ram Prasad 1340 0 1340 Unpaid

256 Dharam Singh s/o Prithi Singh 7901 0 7901 Unpaid

257 Smt Savita Devi w/o Ranbir Singh 1875 0 1875 Unpaid

258 Rohtash s/o Om Prakash 33090 33090 0 Paid

259 Umed Singh s/o Om Prakash 33090 33090 0 Paid

260 Jai Singh s/o Om Prakash 33090 33090 0 Paid

261 Inder Singh s/o Om Prakash 33090 33090 0 Paid

262 Jai Singh s/o Om Prakash 33090 33090 0 Paid

263 Inder Singh s/o Om Prakash 33090 33090 0 Paid

264 Phulo w/o Bhanwar Singh 7454 7454 0 Paid

265 Hukam Singh s/o Phoola Ram 1932 0 1932 Unpaid

266 Savita d/o Bhanwar Singh 9386 9386 0 Paid

267 Seema d/o Bhanwar Singh 9386 9386 0 Paid

268 Rekha d/o Bhanwar Singh 9386 9386 0 Paid

269 Kusum d/o Bhanwar Singh 9386 9386 0 Paid

270 Rajni d/o Bhanwar Singh 9386 9386 0 Paid

271 Bhateri d/o Bhanwar Singh 9386 9386 0 Paid

272 Lali d/o Bhanwar Singh 9386 9386 0 Paid

273 Ishwar Singh s/o Ram Saroop 1588 1588 0 Paid

274 Raj Kumar s/o Ram Saroop 1588 1588 0 Paid

275 Rajbir s/o Ram Saroop 1588 1588 0 Paid

276 Zile Singh s/o Ram Saroop 1588 1588 0 Paid

277 Balram s/o Bhanwar Singh 1588 1588 0 Paid

278 Reliance Haryana Sez Ltd. 262762 262762 0 Paid

279 Rajinder Singh s/o Kishan Singh 722 0 722 Unpaid

Page 61: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 54

280 Joginder Singh s/o Kishan Singh 722 0 722 Unpaid

281 Narender Singh s/o Kishan Singh 722 0 722 Unpaid

282 Ishwar Singh s/o Ram Saroop 43170 0 43170 Unpaid

283 Surender Kumar s/o Chanderbhan 15559 0 15559 Unpaid

284 Jitender s/o Chanderveer 15559 0 15559 Unpaid

285 Mukesh Kumar Verma 31117 0 31117 Unpaid

286 Raj Kumar s/o Ram Saroop 105407 105407 0 Paid

287 Rajbir s/o Ram Saroop 105407 0 105407 Unpaid

288 Zile Singh s/o Ram Saroop 105407 0 105407 Unpaid

289 Balram s/o Bhanwar Singh 30323 0 30323 Unpaid

290 Karan Singh s/o Ram Chander 200705 200705 0 Paid

291 Premwati w/o Amar Singh 617 617 0 Paid

292 Sonu s/o Amar Singh 616 616 0 Paid

293 Vikas Urf Monu s/o Amar Singh 616 616 0 Paid

294 Suresh Devi d/o Amar Singh 616 616 0 Paid

295 Mamta d/o Amar Singh 616 616 0 Paid

296 Kamla d/o Amar Singh 615 615 0 Paid

297 Rita d/o Amar Singh 616 616 0 Paid

298 Rema d/o Amar Singh 615 615 0 Paid

299 Reliance Haryana Sez Ltd. 161 0 161 Unpaid Payment stopped, dispute

300 Karan Singh s/o Ram Chander 127031 127031 0 Paid

301 Akhil Bhartya Sisodiya Rajput Samaj 254061 254061 0 Paid

302 Phulo Devi widow Bhanwar Singh 7939 7939 0 Paid

303 Savita d/o Bhanwar Singh 9074 9074 0 Paid

304 Seema d/o Bhanwar Singh 9074 9074 0 Paid

305 Rekha d/o Bhanwar Singh 9074 9074 0 Paid

306 Kusum d/o Bhanwar Singh 9074 9074 0 Paid

307 Rajni d/o Bhanwar Singh 9074 9074 0 Paid

308 Bhateri d/o Bhanwar Singh 9074 9074 0 Paid

309 Lali d/o Bhanwar Singh 9074 9074 0 Paid

310 Balram s/o Bhanwar Singh 31758 31758 0 Paid

311 Raj Kumar s/o Ram Saroop 113798 113798 0 Paid

312 Rajbir s/o Ram Saroop 113798 113798 0 Paid

313 Zile Singh s/o Ram Saroop 113798 113798 0 Paid

314 Ishwar Singh s/o Ram Saroop 31758 31758 0 Paid

315 Hukam Singh s/o Phoola Ram 7939 0 7939 Unpaid Payment stopped, dispute

316 Rajinder Singh s/o Kishan Singh 2646 0 2646 Unpaid Payment stopped, dispute

317 Joginder Singh s/o Kishan Singh 2646 0 2646 Unpaid Payment stopped, dispute

318 Narender Singh s/o Kishan Singh 2646 0 2646 Unpaid Payment stopped, dispute

319 Rohtash s/o Om Prakash 35727 35727 0 Paid

Page 62: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 55

320 Umed Singh s/o Om Prakash 35727 35727 0 Paid

321 Jai Singh s/o Om Prakash 71455 71455 0 Paid

322 Inder Singh s/o Om Prakash 71454 71454 0 Paid

323 Seema d/o Bhanwar Singh 1532 1532 0 Paid

324 Rajni d/o Bhanwar Singh 1532 1532 0 Paid

325 Rekha d/o Bhanwar Singh 1532 1532 0 Paid

326 Savita d/o Bhanwar Singh 1533 1533 0 Paid

327 Kusum d/o Bhanwar Singh 1532 1532 0 Paid

328 Phulo Devi widow Bhanwar Singh 1221 1221 0 Paid

329 Hukam Singh s/o Phoola Ram 312 0 312 Unpaid

330 Bhateri d/o Bhanwar Singh 1532 1532 0 Paid

331 Lali d/o Bhanwar Singh 1532 1532 0 Paid

332 Ishwar Singh s/o Ram Saroop 19423 19423 0 Paid

333 Raj Kumar s/o Ram Saroop 19423 19423 0 Paid

334 Zile Singh s/o Ram Saroop 19423 19423 0 Paid

335 Rajbir s/o Ram Saroop 19423 19423 0 Paid

336 Balram s/o Bhanwar Singh 7480 7480 0 Paid

337 Jai Singh s/o Om Prakash 4656 4656 0 Paid

338 Inder Singh s/o Om Prakash 4656 4656 0 Paid

339 Rohtash s/o Om Prakash 2328 2328 0 Paid

340 Umed Singh s/o Om Prakash 2328 2328 0 Paid

341 Karan Singh s/o Ram Chander 32372 32372 0 Paid

342 Reliance Haryana Sez Ltd. 32372 32372 0 Paid

343 Smt Saroj w/o Budh Ram 9045 0 9045 Unpaid Payment stopped, dispute

344 Smt Shakuntla w/o Rattan Singh 9045 0 9045 Unpaid Payment stopped, dispute

345 Inder Singh s/o Rampat 103590 103590 0 Paid

346 Jagat Singh s/o Rampat 103590 103590 0 Paid

347 Ishwar Singh s/o Rampat 103590 103590 0 Paid

348 Suresh s/o Rampat 103590 103590 0 Paid

349 Ramphal s/o Patram 414362 414362 0 Paid

350 Hoshiyar s/o Patram 414363 414363 0 Paid

Grand Total of Village Iqbalpur 14101245 8160345 5940900

List No-7: List of Title Holders for Acquired Land of Village - Jhanjhraula, District-Gurgaon on Stretch-2

SR

No

Name of the title holder Total

Compensation

amount

Compensation

disbursed as on

30-11-14

Unpaid

compensation

as on 30-11-14

Status Remarks

1 Ram Dass s/o Ram Singh 376443 376443 0 Paid

2 Ravinder Singh s/o Ram Singh 376443 376443 0 Paid

Page 63: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 56

3 Bijender Singh s/o Ram Singh 376443 376443 0 Paid

4 Narender Singh s/o Ram Singh 517608 517608 0 Paid

5 Ram Kumar s/o Rajpal 122563 0 122563 Unpaid

6 Rajbir s/o Shri Chand 122563 0 122563 Unpaid

7 Samunder Singh s/o Sultan Singh 81708 0 81708 Unpaid

8 Devender Singh s/o Dalip Singh 81708 0 81708 Unpaid

9 Rajesh Kumar Yadav s/o Satyanarayan 27236 0 27236 Unpaid

10 Deepak Yadav s/o Ranveer Singh 27236 0 27236 Unpaid

11 Dinesh Sharma s/o J N Sharma 27236 0 27236 Unpaid

12 Smt Anju Rani w/o Rattan Singh 44895 0 44895 Unpaid

13 Smt Alka Tyagi w/o Sudhir Tyagi 44895 0 44895 Unpaid

14 Kamal Chand Singh s/o Rai Singh 89790 0 89790 Unpaid

15 Sher Singh s/o Ragbir Singh 147573 0 147573 Unpaid Dispute

16 Lal Singh s/o Ragbir Singh 147574 0 147574 Unpaid Dispute

17 Babu Lal s/o Ragbir Singh 147574 0 147574 Unpaid Dispute

18 Bijender Singh s/o Kundan Singh 74241 0 74241 Unpaid

19 Nandan Lal s/o Kundan Singh 74241 0 74241 Unpaid

20 Prithvi Singh s/o Manohar Singh 418 0 418 Unpaid

21 Vijay Kumar s/o Phool Singh 7167 0 7167 Unpaid

22 Jeet Ram s/o Ramsaran 9557 0 9557 Unpaid

23 Anil Kumar s/o Muthtir Singh 9557 0 9557 Unpaid

24 Pramod Kumar s/o Ragbir Singh 9557 0 9557 Unpaid

25 Smt Sunita Dahiya w/o Sahab Singh 26937 0 26937 Unpaid

26 Varun Kumar Shoukin s/o Jaipal Singh 26937 0 26937 Unpaid

27 Anand Singh s/o Gyan Chand 4290 0 4290 Unpaid

28 Smt Shakuntla Devi w/o Ishwar Singh 89790 0 89790 Unpaid

29 Sunil Kumar s/o Lal Chand 98769 0 98769 Unpaid

30 Smt Jaldhara w/o Manohar Singh 140 0 140 Unpaid

31 Narender Singh s/o Manohar Singh 140 0 140 Unpaid

32 Smt Bhagwati Gour w/o Mahender Prasad 8171 0 8171 Unpaid

33 Ram Kishan s/o Maha Singh 449396 449396 0 Paid

34 Anand- Jagvir- Jasbir s/o Ram Narayan 449396 449396 0 Paid

35 Ram Kumar s/o Rajpal 13322 0 13322 Unpaid

36 Rajbir s/o Shri Chand 13322 0 13322 Unpaid

37 Samunder Singh s/o Sultan Singh 8881 0 8881 Unpaid

38 Devender Singh s/o Dalip Singh 8881 0 8881 Unpaid

39 Rajbir s/o Shri Chand 8881 0 8881 Unpaid

40 Gajraj Singh s/o Nathan 13322 0 13322 Unpaid

41 Smt Anju Rani w/o Rattan Singh 26644 0 26644 Unpaid

42 Smt Alka Tyagi w/o Sudhir Tyagi 26644 0 26644 Unpaid

Page 64: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 57

43 Ram Kishan s/o Maha Singh 46627 46627 0 Paid

44 Anand- Jagvir- Jasbir s/o Ram Narayan 46627 46627 0 Paid

45 Prithvi Singh s/o Manohar Singh 4441 0 4441 Unpaid

46 Vijay Kumar s/o Phool Singh 896 0 896 Unpaid

47 Jeet Ram s/o Ram Saran 1195 0 1195 Unpaid

48 Anil Kumar s/o Muthtir Singh 1195 0 1195 Unpaid

49 Pramod Kumar s/o Ragbir Singh 1195 0 1195 Unpaid

50 Sudhansu Sakhar s/o Raj Kumar 1045 0 1045 Unpaid

51 Jagmohan Baitha s/o Jagru 448 0 448 Unpaid

52 Reena Devi w/o Vinod Kumar 1120 0 1120 Unpaid

53 Smt Seema Verma w/o Ajesh Kumar 1120 0 1120 Unpaid

54 Lalan Baitha s/o Ramlal 896 0 896 Unpaid

55 Smt Saroj w/o Budhram 39966 0 39966 Unpaid

56 Anand Singh s/o Gyan Chand 4213 0 4213 Unpaid

57 Smt Shakuntla Devi w/o Ishwar Singh 13322 0 13322 Unpaid

58 Sunil Kumar s/o Lal Chand 22204 0 22204 Unpaid

59 Rajbir s/o Shri Chand 61488 0 61488 Unpaid

60 Ram Kumar s/o Rajpal 61489 0 61489 Unpaid

61 Samunder Singh s/o Sultan Singh 40992 0 40992 Unpaid

62 Devender Singh s/o Dalip Singh 40992 0 40992 Unpaid

63 Rajesh Kumar Yadav s/o Satyanarayan 13664 0 13664 Unpaid

64 Deepak Yadav s/o Ranveer Singh 13664 0 13664 Unpaid

65 Dinesh Sharma s/o J N Sharma 13664 0 13664 Unpaid

66 Smt Bhagwati Gour w/o Mahender Prasad 4969 0 4969 Unpaid

67 Ram Kishan s/o Maha Singh 226079 226079 0 Paid

68 Anand- Jagvir- Jasbir s/o Ram Narayan 226079 226079 0 Paid

69 Smt Shakuntla Devi w/o Ishwar Singh 40295 0 40295 Unpaid

70 Smt Jaldhara w/o Manohar Singh 204 0 204 Unpaid

71 Narender Singh s/o Manohar Singh 204 0 204 Unpaid

72 Sunil Kumar s/o Lal Chand 30198 0 30198 Unpaid

73 Smt Renu w/o Vinod Kumar 6716 0 6716 Unpaid

74 Vimla Devi w/o Mahabir 8395 0 8395 Unpaid

75 Monika w/o Raj Kumar 8395 0 8395 Unpaid

76 Smt Anju Rani w/o Rattan Singh 5037 0 5037 Unpaid

77 Smt Alka Tyagi w/o Sudhir Tyagi 5037 0 5037 Unpaid

78 Jai Prakash s/o Rattan Singh 10913 0 10913 Unpaid

79 Smt Saroj w/o Budhram 17629 0 17629 Unpaid

80 Sher Singh s/o Ragbir Singh 161 0 161 Unpaid

81 Lal Singh s/o Ragbir Singh 161 0 161 Unpaid

82 Babu Lal s/o Ragbir Singh 161 0 161 Unpaid

Page 65: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 58

83 Virender Singh s/o Kundan Singh 81 0 81 Unpaid

84 Nandlal s/o Kundan Singh 81 0 81 Unpaid

85 Vijay Kumar s/o Phool Singh 3605 0 3605 Unpaid

86 Jeet Ram Notiyal s/o Ram Saran 4778 0 4778 Unpaid

87 Anil Kumar s/o Mukhtiyar Singh 4778 0 4778 Unpaid

88 Pramod Kumar s/o Ragbir Singh 4778 0 4778 Unpaid

89 Smt Poonam w/o Daulat Ram 45265 0 45265 Unpaid

90 Smt Nisha Ujjawal w/o Ravi Ujjawal 20891 0 20891 Unpaid

91 Harish Rana s/o Om Prakash 20891 0 20891 Unpaid

92 Sudhansu Sakhar s/o Raj Kumar 4181 0 4181 Unpaid

93 Jagmohan Baitha s/o Jagru 1792 0 1792 Unpaid

94 Smt Renu w/o Vinod Kumar 4480 0 4480 Unpaid

95 Smt Seema Verma w/o Ajesh Kumar 4480 0 4480 Unpaid

96 Lalan Baitha s/o Ramlal 3584 0 3584 Unpaid

97 Smt Krishna w/o Dilbag 3971 0 3971 Unpaid

98 Smt Santra w/o Dharambir 3971 0 3971 Unpaid

99 Anand s/o Gyan Chand 557 0 557 Unpaid

100 Smt Poonam w/o Daulat Ram 20891 0 20891 Unpaid

101 Smt Birlawati w/o Jagdish 10446 0 10446 Unpaid

102 Smt Sahasi w/o Om Prakash 10446 0 10446 Unpaid

103 Smt Bharti Devi w/o Harpal 20891 0 20891 Unpaid

104 Smt Babita w/o Sanjay Kumar 20891 0 20891 Unpaid

105 Vijay Pal s/o Ram Narayan 2060 0 2060 Unpaid

106 Rambir s/o Man Singh 20891 0 20891 Unpaid

107 Inderjeet s/o Ramjeevan 64735 0 64735 Unpaid

108 Budhram s/o Shri Chand 75705 0 75705 Unpaid

109 Greshi Chand s/o Mahanand Notiyal 9921 0 9921 Unpaid

Grand Total of Village - Jhanjhraula 5630226 3091141 2539085

List No-8: List of Title Holders for Acquired Land of Village - Kaliawas, District-Gurgaon on Stretch-2

SR Name of the title holder Total

Compensation

amount

Compensation

disbursed as on

30-11-14

Unpaid

compensation as

on 30-11-14

Status Remarks

1 Ram Kunwar s/o Bahadur Singh 263921 263921 0 Paid

2 Abhay Singh s/o Bahadur Singh 263921 0 263921 Unpaid Payment stopped

3 Jai Bhagwan s/o Bahadur Singh 263921 263921 0 Paid

4 Basanti w/o Bahadur Singh 148557 148557 0 Paid

5 Smt Seema Kataria w/o Rajesh Kataria 73350 0 73350 Unpaid

6 Rajesh Kataria s/o Sajjan Singh 73350 0 73350 Unpaid

7 Sonu s/o Ramlal Urf Ramphal 29305 29305 0 Paid

Page 66: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 59

8 Monu Singh s/o Ramlal Urf Ramphal 29305 29305 0 Paid

9 Gautam s/o Ramlal Urf Ramphal 29304 29304 0 Paid

10 Smt Darshna Devi w/o Ramlal Urf Ramphal 29304 29304 0 Paid

11 Smt Omwati d/o Nyaydar 233078 233078 0 Paid

12 Rajbir s/o Lakhmi Chand 227251 0 227251 Unpaid

13 Amar Singh s/o Shishram 1214 1214 0 Paid

14 Gaje Singh s/o Shishram 1214 1214 0 Paid

15 Norang Singh s/o Shishram 1214 1214 0 Paid

16 Daulat Singh s/o Shishram 1214 1214 0 Paid

17 Smt Saraswati w/o Shishram 971 971 0 Paid

18 Virender s/o Jailal 181283 181283 0 Paid

19 Rajender s/o Jailal 67981 67981 0 Paid

20 Smt Sarla Devi w/o Jai Kishan 113302 113302 0 Paid

21 Smt Reena Devi w/o Karambir 90642 0 90642 Unpaid Court stay order

22 Smt Sushila Yadav w/o Ajit Yadav 45321 0 45321 Unpaid Court stay order

23 Smt Reena Yadav w/o Manjit 45321 0 45321 Unpaid Court stay order

24 Devender s/o Ramanand 16636 0 16636 Unpaid

25 Mukesh s/o Ramanand 16636 0 16636 Unpaid

26 Seema Devi d/o Ramanand 16636 0 16636 Unpaid

27 Meena Devi d/o Ramanand 16636 0 16636 Unpaid

28 Resham Devi w/o Ramanand 16636 0 16636 Unpaid

29 Satpal s/o Daulatram 83178 83178 0 Paid

30 Smt Lakshmi Devi w/o Kishan Kumar Yadav 124439 124439 0 Paid

31 Sajjan s/o Prabhu 31001 31001 0 Paid

32 Braham Prakash s/o Prabhu 31000 31000 0 Paid

33 Suraj Prakash s/o Prabhu 31000 31000 0 Paid

34 Rakesh Kumar s/o Mangat Ram 56653 0 56653 Unpaid Court case

35 Virender Kumar s/o Patram 56653 0 56653 Unpaid Court case

36 Reliance Haryana SEZ Ltd 11134 11134 0 Paid

37 Satbir s/o Ram Kishan 16537 16537 0 Paid

38 Satprakash s/o Ram Kishan 16537 16537 0 Paid

39 Vikas s/o Satish 5512 5512 0 Paid

40 Sabina d/o Satish 5512 5512 0 Paid

41 Sushila w/o Satish 5513 5513 0 Paid

42 Vedprakash s/o Ram Kishan 16537 16537 0 Paid

43 Suman w/o Rajbir 5458 5458 0 Paid

44 Sanjit s/o Rajbir 5458 5458 0 Paid

45 Rakesh s/o Rajbir 5458 5458 0 Paid

46 Smt Ram Rati w/o Prabhu 30782 30782 0 Paid

47 Satpal s/o Daulatram 31077 0 31077 Unpaid

Page 67: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 60

48 Ramesh s/o Sampat 46616 0 46616 Unpaid

49 Sajjan s/o Prabhu 11655 0 11655 Unpaid

50 Braham Prakash s/o Prabhu 11655 0 11655 Unpaid

51 Suraj Prakash s/o Prabhu 11654 0 11654 Unpaid

52 Smt Ram Rati w/o Prabhu 11654 0 11654 Unpaid

53 Raj Singh s/o Shishram 46616 0 46616 Unpaid

54 Satbir s/o Ram Kishan 6215 0 6215 Unpaid

55 Satprakash s/o Ram Kishan 6215 0 6215 Unpaid

56 Satish s/o Ram Kishan 6215 0 6215 Unpaid

57 Vedprakash s/o Ram Kishan 6215 0 6215 Unpaid

58 Suman w/o Rajbir 2072 0 2072 Unpaid

59 Sanjit s/o Rajbir 2072 0 2072 Unpaid

60 Rakesh s/o Rajbir 2072 0 2072 Unpaid

61 Devender s/o Ramanand 6215 0 6215 Unpaid

62 Mukesh s/o Ramanand 6215 0 6215 Unpaid

63 Seema Devi d/o Ramanand 6215 0 6215 Unpaid

64 Meena Devi d/o Ramanand 6215 0 6215 Unpaid

65 Resham Devi w/o Ramanand 6215 0 6215 Unpaid

66 Rajender Singh s/o Pratap Singh 1126546 1126546 0 Paid

67 Yadram s/o Harnarayan 23646 0 23646 Unpaid

68 Rajender Singh s/o Pratap Singh 520204 520204 0 Paid

69 Ram Kunwar s/o Ramnath 388464 388464 0 Paid

70 Hari Kishan s/o Roshan 323720 323720 0 Paid

71 Om Prakash s/o Kawal Singh 161860 161860 0 Paid

72 Satprakash s/o Kawal Singh 161860 161860 0 Paid

73 Baldev Singh s/o Sher Singh 64744 0 64744 Unpaid

74 Harpal s/o Sher Singh 64744 64744 0 Paid

75 Kawalsingh s/o Sher Singh 64744 64744 0 Paid

76 Satish Kumar s/o Sher Singh 64744 64744 0 Paid

77 Monu s/o Mahender Singh 64744 0 64744 Unpaid

78 Om Prakash s/o Kawal Singh 103590 103590 0 Paid

79 Satprakash s/o Kawal Singh 103590 103590 0 Paid

80 Ram Gopal s/o Ram Saroop 103590 103590 0 Paid

81 Krishan s/o Ram Saroop 103590 103590 0 Paid

82 Bule Singh s/o Sher Singh 41436 0 41436 Unpaid

83 Harpal s/o Sher Singh 41436 41436 0 Paid

84 Kawalsingh s/o Sher Singh 41436 0 41436 Unpaid

85 Satish Kumar s/o Sher Singh 41437 41437 0 Paid

86 Monu s/o Mahender Singh 41437 0 41437 Unpaid

87 Bule Singh s/o Sher Singh 12948 0 12948 Unpaid

Page 68: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 61

88 Harpal s/o Sher Singh 12949 12949 0 Paid

89 Kawalsingh s/o Sher Singh 12949 0 12949 Unpaid

90 Satish Kumar s/o Sher Singh 12949 12949 0 Paid

91 Om Prakash s/o Kawal Singh 1029 1029 0 Paid

92 Satprakash s/o Kawal Singh 1029 1029 0 Paid

93 Smt Kamlesh s/o Sominder 25335 25335 0 Paid

94 Rambhagat s/o Jitram 37352 37352 0 Paid

95 Vedprakash s/o Ganga Ram 64744 64744 0 Paid

96 Monu s/o Mahender Singh 12948 0 12948 Unpaid

97 Smt Chameli w/o Banwari 224814 224814 0 Paid

98 Bule Singh s/o Sher Singh 5620 0 5620 Unpaid

99 Harpal s/o Sher Singh 5620 5620 0 Paid

100 Kawalsingh s/o Sher Singh 5620 0 5620 Unpaid

101 Satish Kumar s/o Sher Singh 5620 5620 0 Paid

102 Smt Mewa Devi w/o Hukam Singh 196711 196711 0 Paid

103 Babli Devi w/o Krishan Kumar 84305 84305 0 Paid

104 Monu s/o Mahender Singh 5620 0 5620 Unpaid

105 Rambhagat s/o Jitram 126458 126458 0 Paid

106 Gokal s/o Shriram 9469 9469 0 Paid

107 Gajraj s/o Sultan 1353 1353 0 Paid

108 Satpal s/o Sultan 1353 1353 0 Paid

109 Raju s/o Sultan 1353 1353 0 Paid

110 Jaipal s/o Sultan 1353 1353 0 Paid

111 Jaibhagwan s/o Sultan 1353 1353 0 Paid

112 Smt Meena d/o Sultan 1353 1353 0 Paid

113 Smt Premwati w/o Sultan 1353 1353 0 Paid

114 Manoharlal s/o Shyamlal 9469 0 9469 Unpaid

115 Smt Kaushalya w/o Shadiram 1184 1184 0 Paid

116 Mamta Devi d/o Shadiram 1184 1184 0 Paid

117 Madhu Devi d/o Shadiram 1184 1184 0 Paid

118 Manisha d/o Shadiram 1184 1184 0 Paid

119 Dayachand s/o Nanak 4734 4734 0 Paid

120 Ashok s/o Lakhiram 1335 1335 0 Paid

121 Dharmender s/o Lakhiram 1335 1335 0 Paid

122 Krishan s/o Lakhiram 1335 1335 0 Paid

123 Smt Kavita d/o Lakhiram 1335 1335 0 Paid

124 Savita d/o Lakhiram 1335 1335 0 Paid

125 Smt Shakuntla w/o Lakhiram 1335 1335 0 Paid

126 Smt Santosh Devi w/o Dharamvir 623 0 623 Unpaid

127 Smt Mamta w/o Rajesh Kumar 463 0 463 Unpaid

Page 69: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 62

128 Madan s/o Pyarelal 1099 1099 0 Paid

129 Sanjay s/o Pyarelal 2185 2185 0 Paid

130 Smt Sunita d/o Pyarelal 2185 2185 0 Paid

131 Jailal s/o Gobinda 13111 13111 0 Paid

132 Chanderbhan s/o Pyarelal 728 728 0 Paid

133 Rajesh Kumar s/o Ramkishan 728 0 728 Unpaid

134 Balwan Singh s/o Kaliram 2549 2549 0 Paid

135 Vedprakash s/o Kaliram 2549 2549 0 Paid

136 Prem Singh s/o Kaliram 2549 2549 0 Paid

137 Braham Prakash s/o Kaliram 2549 2549 0 Paid

138 Smt Vidhya Devi w/o Pyarelal 728 728 0 Paid

139 Ram Niwas s/o Banshilal 2185 2185 0 Paid

140 Smt Mukesh w/o Prakash Dhama 8740 8740 0 Paid

141 Smt Shakuntla m/o Satender m/o 1457 0 1457 Unpaid

142 Smt Hemlata w/o Brij Mohan 1457 0 1457 Unpaid

143 Smt Suresh Devi w/o Ajit Singh 2913 0 2913 Unpaid

144 Lalita w/o Anil Kumar 546 546 0 Paid

145 Balbir s/o Bhopal 546 546 0 Paid

146 Mahabir s/o Bhopal 546 546 0 Paid

147 Anil Kumar s/o Raghbir Singh 91 91 0 Paid

148 Sher Singh s/o Raghbir Singh 91 91 0 Paid

149 Kuldeep s/o Raghbir Singh 91 0 91 Unpaid

150 Dharmender s/o Raghbir Singh 91 0 91 Unpaid

151 Smt Neetu d/o Raghbir Singh 46 46 0 Paid

152 Nisha d/o Raghbir Singh 46 46 0 Paid

153 Babita d/o Raghbir Singh 46 46 0 Paid

154 Roshni w/o Raghbir Singh 46 0 46 Unpaid

155 Smt Sarla Devi w/o Rajpal Singh 5099 5099 0 Paid

156 Reliance Haryana SEZ Ltd 2913 2913 0 Paid

157 Shushil Kumar s/o Pyarelal 1457 1457 0 Paid

158 Smt Mamkaur w/o Samay Singh 728 0 728 Unpaid

159 Satyawan s/o Rajo Devi 9469 9469 0 Paid

160 Gokal s/o Shriram 164214 164214 0 Paid

161 Gajraj s/o Sultan 23459 23459 0 Paid

162 Satpal s/o Sultan 23459 23459 0 Paid

163 Raju s/o Sultan 23459 23459 0 Paid

164 Jaipal s/o Sultan 23459 23459 0 Paid

165 Jaibhagwan s/o Sultan 23459 23459 0 Paid

166 Smt Meena d/o Sultan 23459 23459 0 Paid

167 Smt Premwati w/o Sultan 23459 23459 0 Paid

Page 70: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 63

168 Manoharlal s/o Shyamlal 165539 0 165539 Unpaid

169 Smt Kaushalya w/o Shadiram 20527 20527 0 Paid

170 Mamta Devi d/o Shadiram 20527 20527 0 Paid

171 Madhu Devi d/o Shadiram 20527 20527 0 Paid

172 Manisha d/o Shadiram 20527 20527 0 Paid

173 Dayachand s/o Nanak 82107 82107 0 Paid

174 Ashok s/o Lakhiram 23838 23838 0 Paid

175 Dharmender s/o Lakhiram 23838 23838 0 Paid

176 Krishan s/o Lakhiram 23838 23838 0 Paid

177 Smt Kavita d/o Lakhiram 23838 23838 0 Paid

178 Savita d/o Lakhiram 23838 23838 0 Paid

179 Smt Shakuntla w/o Lakhiram 23838 23838 0 Paid

180 Smt Santosh Devi w/o Dharamvir 10589 0 10589 Unpaid

181 Smt Mamta w/o Rajesh Kumar 7877 0 7877 Unpaid

182 Madan s/o Pyarelal 16211 16211 0 Paid

183 Smt Sunita d/o Pyarelal 34677 34677 0 Paid

184 Vedprakash s/o Ram Kishan 18540 0 18540 Unpaid

185 Jaswati w/o Paran Singh 33583 0 33583 Unpaid Payment stopped due to

unmatched shares

186 Puja Yadav w/o Dharmesh Yadav 33582 0 33582 Unpaid Payment stopped due to

unmatched shares

187 Smt Rajwati w/o Suberam 45027 45027 0 Paid

188 Balwan Singh s/o Kaliram 41337 41337 0 Paid

189 Vedprakash s/o Kaliram 41337 41337 0 Paid

190 Braham Prakash s/o Kaliram 41337 41337 0 Paid

191 Prem Singh s/o Kaliram 41337 41337 0 Paid

192 Smt Vidhya Devi d/o Kaliram 63 0 63 Unpaid

193 Naresh Kumari d/o Kaliram 63 0 63 Unpaid

194 Suresh Kumari d/o Kaliram 63 0 63 Unpaid

195 Smt Chameli Devi w/o Charan Singh 29135 29135 0 Paid

196 Balram s/o Roshanlal 18540 0 18540 Unpaid

197 Smt Subhash Kumari Sharma w/o Sri

Bhagwan Sharma

39322 39322 0 Paid

198 Smt Pushpa w/o Krishan Kumar 5705 0 5705 Unpaid

199 Smt Shakuntla m/o Satender m/o 21189 0 21189 Unpaid

200 Smt Mukesh w/o Prakash Dhama 152670 152670 0 Paid

201 Shushil Kumar s/o Pyarelal 27020 27020 0 Paid

202 Amar Singh s/o Shishram 662 662 0 Paid

203 Gaje Singh s/o Shishram 662 662 0 Paid

204 Norang Singh s/o Shishram 662 662 0 Paid

205 Daulat Singh s/o Shishram 662 662 0 Paid

Page 71: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 64

206 Smt Poonam w/o Neeraj Kumar 4807 4807 0 Paid

207 Lalita w/o Anil Kumar 27980 27980 0 Paid

208 Balbir s/o Bhopal 27981 27981 0 Paid

209 Mahabir s/o Bhopal 27981 27981 0 Paid

210 Anil Kumar s/o Raghbir Singh 4664 4664 0 Paid

211 Sher Singh s/o Raghbir Singh 4664 4664 0 Paid

212 Kuldeep s/o Raghbir Singh 4664 0 4664 Unpaid

213 Dharmender s/o Raghbir Singh 4664 0 4664 Unpaid

214 Smt Neetu d/o Raghbir Singh 2332 2332 0 Paid

215 Nisha d/o Raghbir Singh 2332 2332 0 Paid

216 Babita d/o Raghbir Singh 2332 2332 0 Paid

217 Roshni w/o Raghbir Singh 2332 0 2332 Unpaid

218 Reliance Haryana SEZ Ltd 54937 0 54937 Unpaid

219 Smt Mamkaur w/o Samay Singh 7412 0 7412 Unpaid

220 Satyawan s/o Rajo Devi 164214 164214 0 Paid

221 Smt Rajo Devi w/o Vijay Singh 45027 45027 0 Paid

222 Smt Rajbala w/o Omprakash 18540 18540 0 Paid

223 Sanjay s/o Pyarelal 31783 31783 0 Paid

224 Smt Premwati w/o Kaliram 1062 0 1062 Unpaid

225 Smt Sumitra Devi w/o Ramesh Chand 4236 4236 0 Paid

226 Smt Vidhya Devi w/o Pyarelal 17216 17216 0 Paid

227 Chanderbhan s/o Pyarelal 17216 17216 0 Paid

228 Ram Niwas s/o Banshilal 39729 39729 0 Paid

229 Gokal s/o Shriram 349618 0 349618 Unpaid Payment stopped due to

unmatched shares from Sr

229 to 287 of total khewat 230 Gajraj s/o Sultan 0 0 Unpaid

231 Satpal s/o Sultan 0 0 Unpaid

232 Jaipal s/o Sultan 0 0 Unpaid

233 Raju s/o Sultan 0 0 Unpaid

234 Jaibhagwan s/o Sultan 0 0 Unpaid

235 Smt Meena d/o Sultan 0 0 Unpaid

236 Smt Premwati w/o Sultan 0 0 Unpaid

237 Manoharlal s/o Shyamlal 0 0 Unpaid

238 Smt Kaushalya w/o Shadiram 0 0 Unpaid

239 Mamta Devi d/o Shadiram 0 0 Unpaid

240 Madhu Devi d/o Shadiram 0 0 Unpaid

241 Manisha d/o Shadiram 0 0 Unpaid

242 Dayachand s/o Nanak 0 0 Unpaid

243 Krishan s/o Lakhiram 0 0 Unpaid

244 Ashok s/o Lakhiram 0 0 Unpaid

245 Dharmender s/o Lakhiram 0 0 Unpaid

Page 72: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 65

246 Smt Kavita d/o Lakhiram 0 0 Unpaid

247 Savita d/o Lakhiram 0 0 Unpaid

248 Smt Shakuntla w/o Lakhiram 0 0 Unpaid

249 Madan s/o Pyarelal 0 0 Unpaid

250 Smt Santosh Devi w/o Dharamvir 0 0 Unpaid

251 Smt Sunita d/o Pyarelal 0 0 Unpaid

252 Jailal s/o Gobinda 0 0 Unpaid

253 Balwan Singh s/o Kaliram 0 0 Unpaid

254 Vedprakash s/o Kaliram 0 0 Unpaid

255 Braham Prakash s/o Kaliram 0 0 Unpaid

256 Prem Singh s/o Kaliram 0 0 Unpaid

257 Smt Vidhya Devi d/o Kaliram 0 0 Unpaid

258 Naresh Kumari d/o Kaliram 0 0 Unpaid

259 Suresh Kumari d/o Kaliram 0 0 Unpaid

260 Smt Rajbala w/o Omprakash 0 0 Unpaid

261 Rakesh Kumar s/o Balbir 0 0 Unpaid

262 Kailash s/o Ram Chander Gumani 0 0 Unpaid

263 Sanjay s/o Pyarelal 0 0 Unpaid

264 Smt Premwati w/o Kaliram 0 0 Unpaid

265 Smt Sumitra Devi w/o Ramesh Chand 0 0 Unpaid

266 Smt Vidhya Devi w/o Pyarelal 0 0 Unpaid

267 Chanderbhan s/o Pyarelal 0 0 Unpaid

268 Ram Niwas s/o Banshilal 0 0 Unpaid

269 Jagdish s/o Gobinda 0 0 Unpaid

270 Smt Shakuntla m/o Satender m/o 0 0 Unpaid

271 Smt Hemlata w/o Brij Mohan 0 0 Unpaid

272 Shushil Kumar s/o Pyarelal 0 0 Unpaid

273 Smt Poonam w/o Neeraj Kumar 0 0 Unpaid

274 Randhir Singh s/o Bhopal 0 0 Unpaid

275 Balbir s/o Bhopal 0 0 Unpaid

276 Mahabir s/o Bhopal 0 0 Unpaid

277 Anil Kumar s/o Raghbir Singh 0 0 Unpaid

278 Sher Singh s/o Raghbir Singh 0 0 Unpaid

279 Kuldeep s/o Raghbir Singh 0 0 Unpaid

280 Dharmender s/o Randhir 0 0 Unpaid

281 Smt Neetu d/o Raghbir Singh 0 0 Unpaid

282 Nisha d/o Raghbir Singh 0 0 Unpaid

283 Babita d/o Raghbir Singh 0 0 Unpaid

284 Roshni w/o Raghbir Singh 0 0 Unpaid

285 Reliance Haryana SEZ Ltd 0 0 Unpaid

Page 73: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 66

286 Smt Mamkaur w/o Samay Singh 0 0 Unpaid

287 Satyawan s/o Rajo Devi 0 0 Unpaid

288 Gokal s/o Shriram 271925 0 271925 Unpaid Payment stopped due to

unmatched shares from Sr

288 to 344 of total khewat 289 Gajraj s/o Sultan 0 0 Unpaid

290 Satpal s/o Sultan 0 0 Unpaid

291 Jaipal s/o Sultan 0 0 Unpaid

292 Raju s/o Sultan 0 0 Unpaid

293 Jaibhagwan s/o Sultan 0 0 Unpaid

294 Smt Meena d/o Sultan 0 0 Unpaid

295 Smt Premwati w/o Sultan 0 0 Unpaid

296 Manoharlal s/o Shyamlal 0 0 Unpaid

297 Smt Kaushalya w/o Shadiram 0 0 Unpaid

298 Mamta Devi d/o Shadiram 0 0 Unpaid

299 Madhu Devi d/o Shadiram 0 0 Unpaid

300 Manisha d/o Shadiram 0 0 Unpaid

301 Dayachand s/o Nanak 0 0 Unpaid

302 Krishan s/o Lakhiram 0 0 Unpaid

303 Ashok s/o Lakhiram 0 0 Unpaid

304 Dharmender s/o Lakhiram 0 0 Unpaid

305 Smt Kavita d/o Lakhiram 0 0 Unpaid

306 Savita d/o Lakhiram 0 0 Unpaid

307 Smt Shakuntla w/o Lakhiram 0 0 Unpaid

308 Shushil Kumar s/o Pyarelal 0 0 Unpaid

309 Sanjay s/o Pyarelal 0 0 Unpaid

310 Jailal s/o Gobinda 0 0 Unpaid

311 Balwan Singh s/o Kaliram 0 0 Unpaid

312 Vedprakash s/o Kaliram 0 0 Unpaid

313 Braham Prakash s/o Kaliram 0 0 Unpaid

314 Prem Singh s/o Kaliram 0 0 Unpaid

315 Chanderbhan s/o Pyarelal 0 0 Unpaid

316 Ram Niwas s/o Banshilal 0 0 Unpaid

317 Smt Mukesh w/o Prakash Dhama 0 0 Unpaid

318 Smt Shakuntla m/o Satender m/o 0 0 Unpaid

319 Smt Hemlata w/o Brij Mohan 0 0 Unpaid

320 Smt Suresh Devi w/o Ajit Singh 0 0 Unpaid

321 Reliance Haryana SEZ Ltd 0 0 Unpaid

322 Smt Santosh Devi w/o Dharamvir 0 0 Unpaid

323 Smt Mamta w/o Rajesh Kumar 0 0 Unpaid

324 Madan s/o Pyarelal 0 0 Unpaid

325 Smt Sunita d/o Pyarelal 0 0 Unpaid

Page 74: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 67

326 Suresh s/o Samay Singh 0 0 Unpaid

327 Dharambir s/o Ramkaran 0 0 Unpaid

328 Smt Sarita Solanki w/o Vijender Solanki 0 0 Unpaid

329 Randhir Singh s/o Bhopal 0 0 Unpaid

330 Balbir s/o Bhopal 0 0 Unpaid

331 Mahabir s/o Bhopal 0 0 Unpaid

332 Smt Balesh d/o Bhopal 0 0 Unpaid

333 Santosh d/o Bhopal 0 0 Unpaid

334 Anil Kumar s/o Raghbir Singh 0 0 Unpaid

335 Sher Singh s/o Raghbir Singh 0 0 Unpaid

336 Kuldeep s/o Raghbir Singh 0 0 Unpaid

337 Dharmender s/o Raghbir Singh 0 0 Unpaid

338 Smt Neetu d/o Raghbir Singh 0 0 Unpaid

339 Nisha d/o Raghbir Singh 0 0 Unpaid

340 Babita d/o Raghbir Singh 0 0 Unpaid

341 Roshni w/o Raghbir Singh 0 0 Unpaid

342 Smt Kaushal Thakur w/o Tejbhan Singh 0 0 Unpaid

343 Smt Rajo Devi d/o Surajbhan 0 0 Unpaid

344 Jailal s/o Ramsroop 108269 0 108269 Unpaid

345 Ram Gopal s/o Ram Saroop 12030 12030 0 Paid

346 Krishan s/o Ram Saroop 12030 12030 0 Paid

347 Zile Singh s/o Mahasingh 48119 48119 0 Paid

348 Smt Pushpa Tyagi w/o Sanjiv Tyagi 24060 0 24060 Unpaid

349 Hari Singh s/o Maujiram 12030 12030 0 Paid

350 Smt Shiwani w/o Yudhister Kumar 24060 24060 0 Paid

351 Jagdish s/o Gobinda 6015 6015 0 Paid

352 Satpal s/o Sultan 9452 9452 0 Paid

353 Gajraj s/o Sultan 9452 9452 0 Paid

354 Raju s/o Sultan 9452 9452 0 Paid

355 Jaipal s/o Sultan 9452 9452 0 Paid

356 Jaibhagwan s/o Sultan 9452 9452 0 Paid

357 Smt Meena d/o Sultan 9452 9452 0 Paid

358 Smt Premwati w/o Sultan 9451 9451 0 Paid

359 Kamal Singh s/o Budhram 6015 0 6015 Unpaid

360 Rajbala w/o Ramesh 24060 24060 0 Paid

361 Smt Anita w/o Bir Singh 72179 72179 0 Paid

362 Surajbhan s/o Shriram 156388 156388 0 Paid

363 Smt Santosh Devi w/o Jagpal 24060 24060 0 Paid

364 Smt Vidhya Devi w/o Pyarelal 4010 0 4010 Unpaid

365 Chanderbhan s/o Pyarelal 4009 0 4009 Unpaid

Page 75: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 68

366 Shushil Kumar s/o Pyarelal 4010 0 4010 Unpaid

367 Madan s/o Pyarelal 4010 0 4010 Unpaid

368 Smt Sunita d/o Pyarelal 4010 0 4010 Unpaid

369 Rakesh Kumar s/o Balbir 2673 0 2673 Unpaid

370 Kailash s/o Ram Chander 1337 0 1337 Unpaid

371 Balwan Singh s/o Kaliram 39097 39097 0 Paid

372 Vedprakash s/o Kaliram 39097 39097 0 Paid

373 Braham Prakash s/o Kaliram 39097 39097 0 Paid

374 Prem Singh s/o Kaliram 39097 39097 0 Paid

375 Smt Shakuntla w/o Lakhiram 48119 48119 0 Paid

376 Krishan s/o Lakhiram 21654 21654 0 Paid

377 Ashok s/o Lakhiram 21654 21654 0 Paid

378 Dharmender s/o Lakhiram 21654 21654 0 Paid

379 Savita d/o Lakhiram 21654 21654 0 Paid

380 Smt Kavita d/o Lakhiram 21654 21654 0 Paid

381 Civil Panchyat Deh 155387 0 155387 Unpaid

Grand Total of Village - Kaliawas 11381995 8452324 2929671

List No-9 : List of Title Holders for Acquired Land of Village – Makraula, District-Gurgaon on Stretch-2

SR

No

Name of the title holder Total

Compensation

amount

Compensation

disbursed as on

30-11-14

Unpaid

compensation as

on 30-11-14

Status Remarks

1 Satyawan s/o Nafe Singh 785561 0 785561 Unpaid Court case

2 Mahesh Kumar s/o Nafe Singh 785561 0 785561 Unpaid Court case

3 Vinod Kumar s/o Nafe Singh 785560 0 785560 Unpaid Court case

4 Mukesh Devi w/o Pramod Kumar 261854 0 261854 Unpaid Court case

5 Ekta d/o Pramod Kumar 261854 0 261854 Unpaid Court case

6 Mayank s/o Pramod Kumar 261853 0 261853 Unpaid Court case

Grand Total of Village - Makraula 3142243 0 3142243

List No-10 : List of Title Holders for Acquired Land of Village – Bir-Barkhtabad, District-Jhajjar on Stretch-1

SR

No

Name of the title holder Total

Compensation

amount

Compensation

disbursed as on

30-11-14

Unpaid

compensation as

on 30-11-14

Status Remarks

1 Smt Prem Kaur Aadi Lakhmi s/o Jhunda 1524900 0 1524900 Unpaid Dispute

2 Karan Singh Aadi, Sukhlal s/o Harnam 2511600 0 2511600 Unpaid Court case

3 Karan Singh s/o Ram Richhpal 27440 0 27440 Unpaid

4 Inder Singh s/o Ram Richhpal 27440 0 27440 Unpaid

5 Mahender Singh s/o Jai Narayan 58305 0 58305 Unpaid

6 Rajender Singh s/o Jai Narayan 58305 0 58305 Unpaid

7 Rajbala d/o Jai Narayan 58305 0 58305 Unpaid

Page 76: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 69

8 Bhagwani widow Shri Devidas 82005 82005 0 Paid

9 Roopchand s/o Jhundaram 391270 391270 0 Paid

10 Samouti widow Shri Lakhmi Chand 48909 48909 0 Paid

11 Shri Krishan s/o Lakhmi Chand 48909 48909 0 Paid

12 Darshan s/o Lakhmi Chand 48910 48910 0 Paid

13 Sat Narayan s/o Lakhmi Chand 48909 48909 0 Paid

14 Joginder s/o Lakhmi Chand 48909 48909 0 Paid

15 Lilavati d/o Lakhmi Chand 48909 48909 0 Paid

16 Darshna d/o Lakhmi Chand 48909 48909 0 Paid

17 Rajeshwari d/o Lakhmi Chand 48908 48908 0 Paid

18 Narender Singh s/o Sardar Singh 843180 843180 0 Paid

19 Ashok s/o Surender Singh 401514 401514 0 Paid

20 Anil s/o Surender Singh 401514 401514 0 Paid

21 Swity d/o Surender Singh 40151 40151 0 Paid

22 Raj Singh s/o Lahri s/o Nihalu 1593670 1593670 0 Paid

23 Jaisingh s/o Lahri 1593670 1593670 0 Paid

24 Rajpal s/o Lahri 1593670 1593670 0 Paid

25 Dharampal s/o Lahri 1593670 1593670 0 Paid

26 Ajit Singh s/o Lahri 1593670 1593670 0 Paid

27 Smt Vijay Laxmi Sharma w/o Ashok Kumar 1794000 1794000 0 Paid

28 Smt Priyanka w/o Saurabh Gaur 1794000 1794000 0 Paid

29 Balbir s/o Surat Singh 666770 666770 0 Paid

30 Dalbir s/o Surat Singh 666770 666770 0 Paid

31 Savitri d/o Surat Singh 666770 666770 0 Paid

32 Nirmala d/o Surat Singh 666770 666770 0 Paid

33 Deepak s/o Randhir Singh 666770 666770 0 Paid

34 Smt Sushila Devi widow Shri Jasbir Singh 1345500 1345500 0 Paid

35 Smt Sunita d/o Raj Singh s/o Ransingh 1558537 1558537 0 Paid

36 Anupsingh s/o Raj Singh s/o Nyadar 158801 0 158801 Unpaid

37 Smt Sunita w/o Omvir 93872 0 93872 Unpaid

38 Smt Anju w/o Paramvir 25032 0 25032 Unpaid

Page 77: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 70

39 Smt Navima d/o Dalel Singh 25033 0 25033 Unpaid

40 Smt Chandro Devi widow Shri Raj Singh 33637 0 33637 Unpaid

41 Davender Singh s/o Sajjan Singh 33638 0 33638 Unpaid

42 Jagdish s/o Ran Singh 4395300 4395300 0 Paid

43 Jai Singh s/o Shrilal 986700 986700 0 Paid

44 Rajsingh s/o Shrilal 986700 986700 0 Paid

45 Same Singh s/o Lahri 777400 777400 0 Paid

46 Satbir Singh s/o Gordhan 259133 259133 0 Paid

47 Surajmal s/o Gordhan 259133 259133 0 Paid

48 Prabhu s/o Gordhan 259134 259134 0 Paid

49 Saradevi widow Shri Ratiram 86378 86378 0 Paid

50 Ramphal s/o Ratiram 201548 201548 0 Paid

51 Ramdhan s/o Ratiram 201548 201548 0 Paid

52 Rambir s/o Ratiram 287926 287926 0 Paid

53 Bharpai widow Shri Surajbhan 275382 275382 0 Paid

54 Ramesh s/o Surajbhan 275382 275382 0 Paid

55 Kamla d/o Surajbhan 275382 275382 0 Paid

56 Bimla d/o Surajbhan 275381 275381 0 Paid

57 Inder Singh s/o Risal Singh 109423 0 109423 Unpaid

58 Bijender Singh s/o Mahender Singh s/o Baljit 2422762 2377050 45712 Unpaid Calculation error, difference

amt 45712

59 Jaiprakash s/o Amna Kanwar s/o Baljit 2354194 2309775 44419 Unpaid Calculation error, difference

amt 44419

60 Satish s/o Amna Kanwar s/o Baljit 2354194 2309775 44419 Unpaid Calculation error, difference

amt 44419

61 Rajender Singh s/o Phool Singh 2242500 2242500 0 Paid

62 Jagdish s/o Phool Singh 2242500 2242500 0 Paid

63 Smt Pramila Devi w/o Jaideep 1928550 1928550 0 Paid

64 Sitaram Goyal s/o Gajanand 1053975 1053975 0 Paid

65 Indu w/o Dashrath 1053975 1053975 0 Paid

66 Smt Murti widow Shri Mangeram 227240 227240 0 Paid

67 Dinesh s/o Mangeram 227240 227240 0 Paid

68 Deepak s/o Mangeram 227240 227240 0 Paid

69 Smt Rekha widow Shri Uderaj 75747 75747 0 Paid

70 Sagar s/o Uderaj 75747 75747 0 Paid

71 Shivani s/o Uderaj 75746 75746 0 Paid

72 Smt Anju d/o Mangeram 227240 227240 0 Paid

73 Smt Bimla widow Shri Umed Singh 227240 227240 0 Paid

74 Naresh s/o Umed Singh 227240 227240 0 Paid

75 Sandip s/o Umed Singh 227240 227240 0 Paid

76 Manju d/o Umed Singh 227240 227240 0 Paid

Page 78: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 71

77 Sangita d/o Umed Singh 227240 227240 0 Paid

78 Shakuntla widow Shri Dharam Chand 284050 284050 0 Paid

79 Sanjay Kumar s/o Dharam Chand 284050 284050 0 Paid

80 Ramesh Kumar s/o Dharam Chand 284050 284050 0 Paid

81 Varsha d/o Dharam Chand 284050 284050 0 Paid

82 Nirmla widow Shri Jagdish Chander 392438 392438 0 Paid

83 Sandipa d/o Jagdish Chander 392438 392438 0 Paid

84 Pradipa d/o Jagdish Chander 392437 392437 0 Paid

85 Deepak s/o Jagdish Chander 392437 392437 0 Paid

86 Sagar s/o Jagdish Chander 392438 392438 0 Paid

87 Kamla Devi widow Shri Shriniwas 490547 490547 0 Paid

88 Rakhi d/o Shriniwas 490547 490547 0 Paid

89 Ritu d/o Shriniwas 490546 490546 0 Paid

90 Sumit s/o Shriniwas 490547 490547 0 Paid

91 Tarachand s/o Dulichand 1308125 1308125 0 Paid

92 Ratan Singh s/o Dulichand 1308125 1308125 0 Paid

93 Krishan s/o Dulichand 1308125 1308125 0 Paid

94 Naresh Kumar s/o Mangeram 762450 762450 0 Paid

95 Mahesh s/o Nafesingh 34420 0 34420 Unpaid

96 Navin s/o Nafesingh 34420 0 34420 Unpaid

97 Deepak s/o Dilbag Singh 34420 0 34420 Unpaid

98 Dinesh s/o Dilbag Singh 34419 0 34419 Unpaid

99 Ritu w/o Arun 41721 0 41721 Unpaid

100 Shanti widow Shri Ramkala 1020997 1020997 0 Paid

101 Omprakash s/o Ramkala 1020997 1020997 0 Paid

102 Khajan Singh s/o Ramkala 1020997 1020997 0 Paid

103 Smt Santosh d/o Ramkala 435309 435309 0 Paid

104 Bijender Singh s/o Mahender, Ajay Mehra s/o

Ramgopal gair mousmi

2107950 0 2107950 Unpaid Dispute

105 Hari Singh s/o Khushi Ram 44850 44850 0 Paid

106 Hukumchand s/o Khushi Ram 44850 44850 0 Paid

107 Sumit s/o Jai Karan 14950 14950 0 Paid

108 Amit s/o Jai Karan 14950 14950 0 Paid

109 Nisha d/o Jai Karan 14950 0 14950 Unpaid

110 Dharambir Singh s/o Bhim Singh 6407 6407 0 Paid

111 Hoshyar Singh s/o Bhim Singh 6407 6407 0 Paid

112 Balwan Singh s/o Bhim Singh 6407 6407 0 Paid

113 Smt Sushila Devi widow Shri Jasbir Singh 6407 6407 0 Paid

114 Kuldeep s/o Jasbir Singh 1068 0 1068 Unpaid Cheque ready not collected

by owner

Page 79: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 72

115 Rajesh s/o Jasbir Singh 1068 0 1068 Unpaid Cheque ready not collected

by owner

116 Vishal s/o Rajender Singh 4271 0 4271 Unpaid Cheque ready not collected

by owner

117 Darshna widow Shri Rajender Singh 2136 2136 0 Paid

118 Ritu d/o Rajender Singh 2136 0 2136 Unpaid Cheque ready not collected

by owner

119 Jaipal s/o Bhim Singh 8543 8543 0 Paid

Grand Total of Village – Bir Barkhtabad 68530801 61339677 7191124

Compensation status of Structures & Other Assets (List-11 to List-12)

List No-11 : List of Title Holders for Structure & other assets of Villages – Budhera, Iqbalpur, Kaliawas, Jhanjhraula and Makraula of District-Gurgaon on

Stretch-2

SR

No

Village Name of the title holder Total

Compensation

amount

Compensation

disbursed as on

30-11-14

Amount for

Structure

Saved

Unpaid

compensation as

on 30-11-14

Remarks

1 Budhera Amarsingh s/o Dalpat Singh 14497 14497

2 Budhera

Ashok Jain (Factory) s/o

Mahavir Prasad Jain 55047 55047

3 Budhera Chandan Singh s/o Chaju Ram 360912 360912

4 Budhera Deshmesh Educational Trust 34525 34525

5 Budhera Harpal s/o Jagdish 6500 6500

6 Budhera

Hemraj Vashisth s/o Vasudev

Vashisth 3000512 3000512 Structure Saved

7 Budhera Jagdish s/o Prabhu 13000 13000

8 Budhera

Jds Farm, Jyoti Dagar d/o

Suresh Kumar Dagar 32165 32165

9 Budhera

Maman Munna s/o Maman

Rasool 6500 6500

10 Budhera Meena Devi w/o Ashok Kumar 331500 331500

11 Budhera

Nisha Kumari w/o

Dharmprakash Bhardwaj 396500 396500

12 Budhera Panchayat 233958 233958 Dispute

13 Budhera Ram Kumar s/o Shiv Narayan 393500 393500

14 Budhera Ramesh s/o Jagdish 6500 6500

15 Budhera S K Chhabra 69875 69875

16 Budhera Sai Baba Mandir Trust 32500 32500

17 Budhera School

2136303 2050776 85527

Govt Structure (Building

part saved, boundary wall

dismentaled)

18 Budhera SGT Trust 141424 141424

19 Budhera Shiv Mandir, Hanuman Mandir 336415 336415 Dispute

Page 80: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 73

20 Budhera Vikas (Not Sure) 58933 58933

21 Budhera Virpal s/o Dalpat Singh 82806 82806

22 Budhera Water-Works 3274772 3274772 Govt Structure

Village- Budhera Total 11018644 1624880 5051288 4342476

1 Iqbalpur Bhanwar Singh s/o Nihal Singh 321853 321853

2 Iqbalpur Dhanpat s/o Devi Singh 71404 71404

3 Iqbalpur Dharam Singh s/o Prithi Singh 65557 65557

4 Iqbalpur Girivar s/o Chhatar Singh 157668 157668

5 Iqbalpur Jile Singh s/o Swarup Singh 431198 431198

6 Iqbalpur Manoj Kumar Saini 8337 8337

7 Iqbalpur Sardar s/o Mangtu 251386 251386

8 Iqbalpur Shani Mandir 211355 211355

9 Iqbalpur Sonu- Monu s/o Amar Singh 207685 207685

10 Iqbalpur Unknown (Mukesh Verma,

Jitendra, Surendra) 113974 113974

Village-Iqbalpur Total 1840417 1652549 187868

1 Kaliawas Anita s/o Beer Singh 128605 128605

2 Kaliawas Atar Singh s/o Budh Ram 95013 95013

3 Kaliawas Balraj s/o Roshan Lal 451335 451335 Structure saved

4 Kaliawas Balram s/o Roshan Lal 230812 230812 Structure saved

5 Kaliawas Gaje Singh s/o Sheesh Ram 106259 106259

6 Kaliawas Jagdish s/o Govinda 32500 32500

7 Kaliawas Jile Singh s/o Maha Singh 265027 265027

8 Kaliawas Monu Singh s/o Ramphal

(Ramkumar s/o Bahadur Singh) 70927 70927

9 Kaliawas Mukesh Devi s/o Prakash

Dhama 179843 179843

10 Kaliawas Rajender s/o Pratap Singh 468000 468000

11 Kaliawas Ram Gopal - Krishan s/o Ram

Swarup 187482 187482

12 Kaliawas Ram Kumar s/o Ram Nath 503690 471190 32500 Structure impacted,

tubewell saved

13 Kaliawas Smt. Sarla Devi w/o Jai Kishan

s/o Naval Yadav 161236 161236

14 Kaliawas Sumitra Devi w/o Ramesh Foji 224251 224251

15 Kaliawas Unknown (Santosh w/o Tegpal) 4894 4894

Village - Kaliawas Total 3109874 2390333 714647 4894

1 Makraula Satyavan s/o Nafe Singh 1029963 1029963 Court case

Village- Makraula Total 1029963 0 0 1029963

Grand Total of Stretch-2 16998898 5667762 5765935 5565201

Page 81: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 74

List No-12 : List of Title Holders for Structure & other assets of Village – Bir-Barkhtabad, District-Jhajjar on Stretch-1

SR

No

Name of the title holder Total

Compensation

amount

Compensation

disbursed as on

30-11-14

Amount

for

Structure

Saved

Unpaid

compensation

as on 30-11-14

Remarks

1 Bijender Singh s/o Mahender Singh 807 807

2 Jai Singh s/o Shrilal 14035 14035

3 Jaiprakash s/o Amna Kanwar 404 404

4 Karan Singh Aadi, Sukhlal s/o Harnam 56410 56410 Dispute

5 Naresh Kumar s/o Mangeram 29090 18823 10267

6 Raj Singh Aadi 2207 2207 Dispute

7 Raj Singh s/o Shrilal 14034 14034

8 Ramesh s/o Surajbhan 27399 27399

9 Same Singh Aadi 9797 9797 Dispute

10 Satish s/o Amna Kanwar 404 404

11 Smt Pramila Devi w/o Jaideep 359052 359052

12 Smt Prem Kaur Aadi Lakhmi s/o Jhunda 4375 4375 Dispute

13 Smt Sushila Devi Aadi 180549 180549 Dispute

Bir-Barkhtabad Total 698563 698563 0 419309

Page 82: IND: National Capital Region Urban Infrastructure ...€¦ · designated parks and protected areas. Entitlement - Means range of measures comprising compensation, income restoration,

Monthly Report for November 2014 External Monitoring Report of Bahadurgarh-Badli-Gurgaon Road

Haryana State Roads and Bridges Development Corporation Page 75

Photo

Annexure 7

(Format)

IDENTITY CARDS FOR R&R ASSISTANCE FOR HSRDC

(Project: Bahadurgarh-Badli-Chandu-Gurgaon Road)

Name of Affected Person : _________________________________

Sex : _________________________________

Address : __________________________________

House No : __________________________________

Village : __________________________________

Tehsil : __________________________________

District : __________________________________

Total no. of family members : __________________________________

Main occupation of household head : __________________________________

Type of loss : __________________________________

Entitlements : __________________________________

Signature/ Thumb impression : __________________________________

Name of IA In-charge : __________________________________

Signature of IA In-charge : __________________________________

Date of Issue : __________________________________

Office Seal