Social Monitoring Report This report has been submitted to ADB by the Public Works Department, Government of Chhattisgarh, PIU, Raipur and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Project Number: 44427-013 October 2016 Period: July 2015 December 2015 IND: Chhattisgarh State Road Sector Project Package: Group C Submitted by: Public Works Department, Government of Chhattisgarh, PIU, Raipur

Upload: lamminh

Post on 17-Mar-2018

243 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Social Monitoring Report

This report has been submitted to ADB by the Public Works Department, Government of Chhattisgarh, PIU, Raipur and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB.

This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Number: 44427-013 October 2016 Period: July 2015 – December 2015

IND: Chhattisgarh State Road Sector Project Package: Group C

Submitted by: Public Works Department, Government of Chhattisgarh, PIU, Raipur

Page 2: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the
Page 3: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Up gradation of Group C Roads (Contract Package 16 to 19)

Loan No. - 2981-IND

Social Monitoring Report Semi- Annual (July - December- 2015)

Intercontinental Consultant and

Technocrats Private Limited

In Joint Venture

Rodic Consultants Pvt. Ltd.

Government of Chhattisgarh PIU (ADB Projects); Raipur, Chhattisgarh, India

Public Works Department

Page 4: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 2

Contents

1. PROJECT BRIEFING AND PROJECT BACKGROUND ................................................................. 4

1.1 Project Background ...................................................................................................................... 4

1.2 Project Description ....................................................................................................................... 5

2. IMPLEMENTATION OF RESETTLEMENT PLAN: A COMPONENT OF THE PROJECT ......... 6

3. MONITORING AND REPORTING ................................................................................................... 7

3.1 Disclosure and Distribution of Public Information Brochure (PIB) and Entitlement Matrix ...... 8

3.2 Status of Impact and Losses during Reporting Period ............................................................... 10

3.3 Status of Temporary Land Acquisition in Reporting Period...................................................... 13

3.4 Status of Disbursement of Compensation and Allowances and Rehabilitation Measures (RP

Implementation) ..................................................................................................................................... 13

3.4.1 GAP Identified during Disbursement of Compensation: ................................................... 15

3.5 Consultation with Stakeholders, Grievances, Staffing and Capacity Building .......................... 16

3.5.1 Consultation with Entitled Persons ........................................................................................ 16

3.5.2 Grievance Redressal ........................................................................................................... 17

3.5.3 Staffing ............................................................................................................................... 18

3.5.4 Capacity Building Initiatives ............................................................................................. 18

3.6 Conclusion, Recommendation and Lesson Learned: ................................................................. 19

3.6.1 Conclusion and Recommendation...................................................................................... 19

3.6.2 Lesson Learned .................................................................................................................. 19

Social Monitoring Report

Semi- Annual (Up till December- 2015)

Page 5: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 3

ABBREVIATION

ADB --- Asian Development Bank

AF --- Affected Family

AP --- Affected Person

BPL --- Below Poverty Line

CGPWD --- Chhattisgarh Public Works Department

COI --- Corridor of Impact

CPRs --- Community Property Resources

CSRSP --- Chhattisgarh State Road Sector Project

DF --- Displaced Family

DP --- Displaced Person

EA --- Executing Agency

EM --- Entitlement Matrix

FGD --- Focused Group Discussion

GoCG --- Government of Chhattisgarh

GoI --- Government of India

GRC --- Grievance Redress Committee

HH --- Household

KII --- Key Informant Interview

MP --- Micro Plan

NGO --- Non-Government Organization

PH --- Physical Handicapped

PIU --- Project Implementation Unit

PMU --- Project Management Unit

R&R --- Resettlement and Rehabilitation

ROW --- Right of Way

RP --- Resettlement Plan

SC --- Schedule Caste

SDU --- Social Development Unit

SH --- State Highway

SHG --- Self Help Group

ST --- Schedule Tribe

ToR --- Terms of Reference

Page 6: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 4

SOCIAL MONITORING REPORT

1. PROJECT BRIEFING AND PROJECT BACKGROUND

1.1 Project Background

Government of Chhattisgarh has applied a loan through Government of India from the Asian

Development Bank (ADB) for the Chhattisgarh State Road Sector Development Project

(CSRSDP) for the improvement of about 916 kms state roads in Chhattisgarh. Public Works

Department, Government of Chhattisgarh (PWD GoCG) has been entrusted the implementation

of CSRSDP. The improvement work consists of rehabilitation, strengthening and / or widening

of the existing roads and cross drainage structures/ bridges under ADB assistance vide Loan No.

2981-IND.

The Project scope comprises of rehabilitation and upgrading of 4 roads in Group C under

Chhattisgarh State Road Sector Project which include (i) Sheorinarayan-Birra-Champa (SH-9) -

51.80Km; (ii) Ratanpur-Kota-Lormi (SH-10) - 50.20Km; (iii) Pandariya-Lormi-Mungeli (SH-

10/MDR) - 37.01Km; and (iv) Jairamnagar-Masturi-Malhar-Jondhara-Lawan (MDR) - 52.94Km

having a total length of 191.95km of all the sections as shown in Fig. 1.1 Index Map.

Fig. 1.1 Index Map

Page 7: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 5

1.2 Project Description

The project scope comprises of rehabilitation and upgrading of 4 roads in Group-C under

Chhattisgarh State Road Sector Project. The details of all 4 concerned sub-project roads

including contractors name and date of commencement of service are presented in Table-1:

Table-1: List of Sub-Project Roads and Length

Pkg.

No. Project Road District

Length

(Km.)

Contractors

Name and

Contract No.

Commencement

of Service

P-16 Sheorinarayan-

Birra-Champa (SH-

9)

Janjgir-

Champa

51.80 M/s GPL-

RKTCPL JV

No. 04/2014-15

dated 11.02.2015

20th April 2015

P-17 Ratanpur-Kota-

Lormi(SH-10)

Bilaspur &

Mungeli

50.20 Not Yet Not Yet

P-18 Pandariya-Lormi-

Mungeli(SH-

10/MDR)

Mungeli

&Kabirdham

37.01 Not Yet Not Yet

P-19 Jairamnagar-

Masturi-Malhar-

Jondhara-

Lawan(MDR)

Bilaspur

&Baloda

Bazar

52.94 M/s SEW

Infrastructure Ltd.

No. 14/2014-15

dated 10.03.2015

20th April 2015

Total 191.95

P-16: Sheorinarayan – Birra – Champa road (51.80 km)

The project road starts at the junction on SH-13 near Sethi Nagar (Sheorinarayan) and ends at

Gatoli chowk (Champa) and passes through towns and villages namely Sheorinarayan, Birra,

Taldveri, Bamhanideh, Champa etc.

P-17: Ratanpur-Kota-Lormi Road (50.20 km)

The project road starts from T-junction on SH-2 near Ratanpur and ends at Lormi and passes

through towns & villages namely Jogipur, Kota, Karka, Imlikapa, Onganpat & Lormi etc. The

project road is passing through plain and rolling terrain the project road traverses through

agricultural land and barren land.

P-18: Pandariya -Lormi- Mungeli Road (37.01km)

The project Road starts at junction of SH-7 in Mungeli and ends at Gandhi Chowk in Pandariya.

Project road from Mungeli to Lormi is a MDR of length 26km and from Lormi to Pandariya is

part of SH-10 of length 32km. In addition a Mungeli bypass of about 750m length is also

considered in the project length. The project road traverses through towns and villages namely

Surighat, Devri, Umariya, Bodhapara, Lormi, Sardha, Ghorbandha etc.

P-19: Jairamnagar-Masturi-Malhar-Jondhara-Lawan road (52.94 km)

Page 8: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 6

The project road starts near railway crossing at Jairamnagar and ends at Lawan at junction on

SH-9 and traverses through towns & villages namely Jairamnagar, Tikari, MasturiMalhar,

Jondhara, Lawan.

2. IMPLEMENTATION OF RESETTLEMENT PLAN: A COMPONENT OF THE

PROJECT

Monitoring the implementation of Resettlement Plan of the project is an important component of

the project implementation, there are several important activities of RP implementation, and the

progress of those activities has been briefed, here, in the table below:

Table-2: Status on Important Activities of RP Implementation

SL.

No.

Important

Activities

Role/

Responsibi

lities

Status Remarks

1

Appointment

and

Mobilization of

NGO

Executing

Agency

Help and Helps Samiti

Date of Contract

25th September 2014

(1292/904-0062/NGO/L-

2/2013-14)

Date of Commencement-

27th October 2014

Date of Mobilization-

11th November 2014

Address: Plot No. - 127,

H.No.-42/1293, Gowardhan

Chowk , Dr.Rajendra Nagar,

Civil Lines Ward, Raipur-

492001, Chhattisgarh.

Contact Persons-

Sumeet Rathore

Tel- +91-9303848916,

+91-9691342852

2

Identification

and

Verification of

Affected

Persons

NGO In Process

New households from NTH

and TH categories have been

identified in some places,

hence Identification and

Verification of Affected

Persons report will be updated

3

Identification

and

Verification of

Community

Properties

(CPRs)

NGO, CSC Completed

4

Disclosure and

Distribution of

Public

Information

Brochure (PIB)

and Entitlement

Matrix

Executing

Agency/

NGO

Completed

Disclosed between 11th Nov.

2014 to 8th Jan. 2015 ( Refer

Section -3.1, table no.-3 & 4

for details)

Page 9: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 7

SL.

No.

Important

Activities

Role/

Responsibi

lities

Status Remarks

5 Updating of RP CSC Updating of RP is under

progress

Due to change in Displaced

Persons (DPs) the RP need to

be updated. The CSC is

having close interaction with

the concerned NGO and

getting the updated

information.

6

Preparation of

Micro Plan of

Non-

titleholders

NGO In Process

In addition to approved Micro

Plan, new households have

been identified during

implementation of project, the

micro plan of which is to be

updated by the NGO.

7

Distribution of

Compensation

and Assistance

NGO/Exec

utive

Agency

Not Initiated To be Paid during next

Reporting Period

8

Proper Training

to Displaced

Persons (DPs)

as a part of

livelihood

support

NGO Not Initiated

NGO has been asked to

initiate the skill up gradation

training of eligible DPs

9

Constitution of

Grievance

Redressed

Committee

Executive

Agency Constituted

Total 18 GRC Received

(For Detail refer Table No.8)

10

Institutional

Arrangement

for

implementation

of Resettlement

Plan (RP)

Executing

Agency In place

3. MONITORING AND REPORTING

The main objective of monitoring of resettlement work is to provide an insight and guidelines to

the management for assessing the progress of resettlement. Its objective is to identify probable

difficulties and problem area, like a RADAR system providing an early warning system, which

need correction.

In order to ensure effective implementation of the RP and achievement of the set targets, internal

monitoring of R&R components of the project has been carried out by the EA with the help of

R&R cum Social Development Specialist of Supervision Consultant, to enable timely adjustment

of implementation set up and procedures. This first monitoring report outlines and discusses the

Page 10: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 8

status of RP implementation in terms of impacts and its progress during the reporting period

(July-December 2015).

3.1 Disclosure and Distribution of Public Information Brochure (PIB) and Entitlement

Matrix

Translation of the summary and entitlement matrix of RP in vernacular language and its disclosure

to the affected people was done by Executing Agency. This task is important because it discloses

the entitlement provision of compensation and assistance to the affected people of different

categories under Resettlement Framework. During field verification and consultation with

stakeholder’s, it was revealed that the NGO has distributed the translated version of RP to affected

people and other stakeholders and same was disclosed to affected people at various identified

locations to make them acquainted with the provision of compensation and assistance to affected

people. The dates of disclosure are given in Table-3.

Table-3: Details of RP Disclosure

Package

No.

Resettlement Plan Report

for Project Roads

Date of disclosure on

ADB website

Date of disclosure of

Original RP to the

Community

P-16 Sheorinarayan-Birra-

Champa (SH-9) November 2012 11-11-14 to 21-11-14

P-17 Ratanpur-Kota-Lormi November 2012 14-12-14 to 26-12-14

P- 18 Pandariya - Lormi

November 2012 14-12-14 to 26-12-14

Lormi - Mungeli 03-01-15 to 08-01-15

P- 19 Jairamnagar-Masturi-

Malhar-Jondhara November 2012 22-11-14 to 04-12-14

The applicable Entitlement Matrix, which lists various types of losses, eligibility and entitlements,

based on the specific sub-project impacts, has been disclosed to the DPs and is discussed here:

Table-4: Entitlement Matrix

Type of

Loss

Identification of

Affected

Households

Entitlement Details

A: LOSS OF LIVELIHOOD SOURCE

Page 11: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 9

1. Loss of

primary

source of

income

Non-titleholders

namely squatters

and encroachers

losing primary

source of income

Training Assistance

for income restoration

a) Training would be provided

for upgrade of skills/alternate

skills at Rs. 5,000 per eligible

person(s) to the affected

households belonging to

vulnerable groups and losing

their income or for those losing

significant income as a result of

the loss and becoming

vulnerable.

b) Transitional allowance for

three months based on local

minimum daily wage rate.

Wage earning

employees

indirectly affected

due to displacement

of commercial

structure

a) This is valid for persons

indirectly affected due to the

employer having being

displaced, on case-by-case,

based on local wage rates for

three months

B: LOSSES OF NON-TITLEHOLDERS

2 Structures

within

ROW

Encroachers

No compensation for

Land but

compensation for

assets to vulnerable

group

a) Encroachers will be notified a

time in which to remove their

assets to be affected.

b) Right to salvage material from

demolished structure at no cost.

c) Compensation for affected

structures at replacement cost to

the vulnerable households.

2 Structures

within

ROW

Squatters and

informal settlers

No compensation for

Land but

compensation for

assets to vulnerable

group

a) Squatters will be notified of a

time in which to remove their

assets that will be affected.

b) Right to salvage material from

demolished structure at no cost.

c) Compensation for loss of

structure at replacement cost to

be paid by the subproject.

d) A lump sum transfer grant of

an amount of Rs.2, 000 to Rs.5,

000 (based on type of structures)

for shifting households‟ assets and other belonging to the new

area.

D: LOSS OF COMMON PROPERTY RESOURCES

4.Loss of

common

property

resources

Affected

community/instituti

on responsible

Cash compensation/

reconstruction

a) Cash compensation at

replacement cost or

reconstruction of the community

structure in consultation with the

community

Page 12: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 10

E: REHABILITATION MEASURES

5.Additiona

l Assistance

to

vulnerable

groups

Households

categorized as

vulnerable

(BPLhouseholds,

female- headed

households,

SC/STs,

disabled/elderly)

Lump sum assistance

a) Additional lump sum

assistance of Rs.10,000 per

household to vulnerable groups

such as - female headed

households, households with

disabled family members,

households below poverty line,

scheduled tribe and scheduled

caste households, elderly persons

etc.

b) Provide priority to vulnerable

groups for employment as

construction workers under the

Subproject during the

construction period.

6. Any

unanticipat

ed adverse

impact due

to

subproject

intervention

Any unanticipated consequence of the subproject will be documented and

mitigated based on the spirit of the principles agreed upon in this policy

framework.

3.2 Status of Impact and Losses during Reporting Period

Up till December 2015 602 affected households have been identified as DPs and all the affected

households are non-titleholders. It is worth mention that at the very initial stage of the project

implementation, it has been decided by the Executing Agency that no land acquisition will be

done for implementation of the project. As per available records, PWD has ample land to meet

the design requirement of the project, however, during the field verification by the Supervision

consultant, it has been witnessed that there are several issues related to land acquisition,

especially in pkg.-19. The package wise status of affected households at this juncture is

presented in the Table: 5

Page 13: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Table-5: Updated list of Displaced Households & Impacts

Sl.

No.

Impact

Category

Pkg. 16 Pkg. 17 Pkg. 18 Pkg. 19

Remarks

No of displaced Households

As per I &

V Activity

Reporting

Period

(Up till

Dec-2015)

Cum.

Impacts

As per I &

V Activity

Reporting

Period

(Up till

Dec-2015)

Cum.

Impacts

As per I &

V Activity

Reporting

Period

(Up till

Dec-2015)

Cum.

Impacts

As per I &

V Activity

Reporting

Period

(Up till

Dec-2015)

Cum.

Impacts

1 Land and

Structures

(TH)

At the initial stage no land acquisition was proposed, however, during the reporting period, cases of land acquisition were identified in pkg-19. The identification and

verification of land acquisition cases are being carried out by the Executing agency with the help of NGO, however, the number of cases is not specified till date but it is

expected that it will be around 40.

New

displaced

persons

have been

identified

during

reporting

period.

Verification

of new

Displaced

Households

(THs/NTHs)

and their

losses will

be carried

out in next

reporting

period.

2 Structures

(NTH) 112 0 112 160 0 160 203 0 203 127 0 127

2.1 Residential 22 0 22 69 0 69 101 0 101 71 0 71

2.1.1 permanent 0 0 0 8 0 8 11 0 11 12 0 12

2.1.2

Semi-

permanent 10 0 10 19 3 22 26 1 27 25 0 25

2.1.3 temporary 12 0 12 42 2 44 64 0 64 34 0 34

2.2

Commercial/

Residential -

cum-

commercial

73 0 73 50 0 50 87 0 87 39 0 39

2.2.1 permanent 2 0 2 4 0 4 25 0 25 9 0 9

2.2.2

semi-

permanent 27 0 27 12 0 12 14 0 14 19 0 19

2.2.3 temporary 44 0 44 34 0 34 48 0 48 11 0 11

2.3 Other 17 0 17 41 0 41 15 0 15 11 0 11

3 Impact on

Livelihood

To be

assessed

To be

assessed

To be

assessed

To be

assessed

To be

assessed

To be

assessed

To be

assessed

To be

assessed

To be

assessed

To be

assessed

To be

assessed

To be

assessed

4 Vulnerability 100 0 100 150 0 150 166 0 166 112 0 112

5 Eligible for

transitional

allowance

As per

EM

As per

EM

As per

EM

As per

EM

As per

EM

As per

EM

As per

EM

As per

EM

As per

EM

As per

EM

As per

EM

As per

EM

Page 14: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads (Contract Package 16 To 19)

Social Monitoring Report Page 12

6 Total Nos. of

Displaced

Households 112 0 112 160 5 165 203 1 204 127 9 136

7 Total Nos. of

Displaced

Persons

801 0 801 862 0 876 1389 0 1393 905 0 932

8

Community

Property

Resources

(CPRs)*

33 0 33 29 0 29 36 0 36 43 0 43

Source- Approved Micro Plan and progress report, submitted by the NGO

Page 15: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 13

3.3 Status of Temporary Land Acquisition in Reporting Period

Cases of temporary land acquisition were also witnessed in Pkg-16 and Pkg-19 for use of various

purposes. Documentary evidences have been collected from Contractors, compiled. These

documentary evidences provide proof of temporary land acquisition for setting construction

camps by respective Civil Contractors following all statutory regulations required

All the Contractors have legal contracts with owners of these land parcels and there is no

remainder of temporary acquisition by Contractors. All temporary land parcels acquired by

Contractors for setting up camps are found complete in terms of legal contracting and

arrangement of paying compensation to respective owners. The sample copy of agreement with

land owner and contractor is attached as Annexure: 1 .The package wise detail of temporary

land acquisition is presented in Table: 6

Table- 6: Status of Temporary Land Acquisition for Setting Construction Camp by Civil

Contractor

Package

No.

Location / Chainage Purpose

Agreements Status with

Owner

P-16 16+300 RHS Batching Plant &

Camp

Mr. Teshram Dadsena

Agreement date 15.10.2015

P-19

Near Shiv Petrol

Bunk, Jairam Nagar

Road , Masturi,

Bilaspur (Dist)

Km 4+580

Camp & Plants

Owner Name:- Rajiv Gupta

Date of Agreement :-

01/07/2015 to 30/06/2017

Years of Agreement:- 2 Years

3.4 Status of Disbursement of Compensation and Allowances and Rehabilitation Measures (RP

Implementation)

Up till December 2015 due to late submission and approval of micro plan the compensation

payment of eligible DPs could not be taken place, however, the executive, NGO with support of

supervision Consultant is all set to make the compensation payment to all the eligible DPs before

next reporting period. The status report on compensation payment of all the packages is

delineated herewith.

Table-7: Disbursement of Compensation and Allowances

Sl.

No. Impact Category

DPs as of

December

2015

Applicable

Entitlements

Total

Amount

July-Dec 2015 Cumulative progress Remar

ks Paid Progress (%) Paid Progress (%)

DPs Amount DPs Amount DPs Amount DPs Amount

A Pkg. 16

1 Compensation for

Land None NA NA

No cases of land acquisition during the reporting period

2 Compensation for

Structures 112

Replacement

Cost 4,890316 0 0 0 0

0 0 0 0

3

Shifting Assistance

(INR) 10 2000 20,000 0 0 0 0

0 0 0 0

4 Compensation for

livelihood As per EM

0 0 0 0 0 0 0.00 0

4.1 A. Transitional

Assistance (INR)

As per EM 0 0 0 0 0 0 0.00 0

4.2 B. Training Assistance

(INR) 70 5000 3,50,000

Training

for skill

up

Page 16: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 14

Sl.

No. Impact Category

DPs as of

December

2015

Applicable

Entitlements

Total

Amount

July-Dec 2015 Cumulative progress Remar

ks Paid Progress (%) Paid Progress (%)

DPs Amount DPs Amount DPs Amount DPs Amount

gradatio

n is not

initiated

5 Special Assistance to

Vulnerable Aps (INR) 100 10000 1,000,000 0 0 0 0

0 0 0 0

6 Compensation for

CPRs 33

Replacement

Cost 2,913,399 0 0 0 0

0 0 0 0

B Pkg. 17

1 Compensation for

Land NO NA NA

No cases of land acquisition during the reporting period

2 Compensation for

Structures 160 Replacement Cost 7733917 0 0 0 0

0 0 0 0

3

Shifting Assistance

(INR) 8 2000 16000

0 0 0 0 0 0 0 0

4 Compensation for

livelihood As per EM

0 0 0 0 0 0 0.00 0.00

4.1

A. Transitional

Assistance (INR)

As per EM 0 0 0 0 0 0 0.00 0.00

4.2 B. Training Assistance

(INR) 53 5000 2,65,000 0 0 0 0 0 0 0.00 0.00

Training

for skill

up

gradation

is not

initiated

5 Special Assistance to

Vulnerable Aps (INR) 150 10000 1500000 0 0 0 0 0 0 0.00 0.00

6 Compensation for

CPRs 29 Replacement Cost 2,951,814 0 0 0 0 0 0 0.00 0.00

C Pkg. 18

1 Compensation for

Land NA NA NA

No cases of land acquisition was identified in the initial stage of

project implementation

2 Compensation for

Structures 203 Replacement Cost 9555573 0 0 0 0

0 0 0 0

3 Shifting Assistance

(INR) 22 2000 44000 0 0 0 0

0 0 0 0

4 Compensation for

livelihood As per EM

0 0 0 0 0 0 0.00 0.00

4.1 A. Transitional

Assistance (INR) As per EM

0 0 0 0 0 0 0.00 0.00

4.2 B. Training Assistance

(INR) 72 5000 3,60,000 0 0 0 0 0 0 0.00 0.00

Training

for skill

up

gradatio

n is not

initiated

5 Special Assistance to

Vulnerable Aps (INR) 169 10000 1690000 0 0 0 0 0 0 0 0

6 Compensation for

CPRs 36

Replacement

Cost 1,991,448 0 0 0 0 0 0 0 0

Page 17: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 15

Sl.

No. Impact Category

DPs as of

December

2015

Applicable

Entitlements

Total

Amount

July-Dec 2015 Cumulative progress Remar

ks Paid Progress (%) Paid Progress (%)

DPs Amount DPs Amount DPs Amount DPs Amount

D Pkg. 19

1 Compensation for

Land

Being

Assessed

AS per New Land

Acquisition Act

RFCTLARRA-2013

to be

Finalized

There were no cases of land acquisition in the initial stage of project

implementation; however, during the reporting period, the cases of land

acquisition was identified in pkg-19. The identification and verification of land

acquisition cases are being carried out by the Executing Agency, the number of

cases are not specified till date.

2 Compensation for

Structures 127 Replacement Cost 12167028 0 0 0 0

0 0 0 0

3 Shifting Assistance

(INR) 8 2000 16000 0 0 0 0

0 0 0 0

4 Compensation for

livelihood As per EM

0 0 0 0

0 0 0 0

4.1 A. Transitional

Assistance (INR) As per EM 0 0 0

0 0 0 0 0

4.2 B. Training Assistance

(INR) 32 5000 1,60,000 0 0 0 0

0 0 0 0 Training

for skill up

gradation

is not

initiated

5 Special Assistance to

Vulnerable DPs (INR) 111 10000 1110000 0 0 0 0

0 0 0 0

6 Compensation for

CPRs 43 Replacement Cost 5,289,828 0 0 0 0

0 0 0 0

3.4.1 GAP Identified during Disbursement of Compensation:

Compensation for Land and Structures to Non-titleholders/Titleholders (NTHs/THs):

The payment of eligible displaced households of NTH category remains unpaid in this reporting

period (Up till December 2015). The main reason for non-payment of compensation is late approval

of micro plan and insufficient time to prepare the cheques for disbursement thereafter during the

reporting period. However, the approved list of eligible displaced households, having all the details

(Name and Approved Amount) is attached, herewith as Annexure -2 for ready reference.

Shifting Assistance:

The payment of shifting assistance is clubbed with compensation payment of the lost property and

other Assistance however, the assessment of eligible DPs, who are entitled for assistance, need

updating.

Transitional Assistance:

Transitional allowances, as part of livelihood support, have not been verified up till date due to

variance over entitlements and remain unpaid.

Assistance to Vulnerable DPs:

Page 18: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 16

The payment of Vulnerable Assistance is clubbed with compensation payment of the lost property

whenever, the compensation of property will be paid to DPs the Vulnerable Assistance will be paid

simultaneously.

Training Assistance:

There is no action on providing training to eligible displaced persons. Training Assistance is to be

paid to training providers @ Rs.5000 /Trainee and it is expected that substantial progress will be seen

in next reporting period. The reporting on training program should come in following format, which

has already forwarded to the NGO.

Date Venue Training

Institution Participants Topics covered Comments

1

2

3

Compensation of CPRs:

The payment of CPRs remains unpaid in this reporting period (Up till December 2015). As reported

in the previous section, the main reason for non-payment of compensation is late approval of micro

plan and insufficient time to prepare the cheques for disbursement. The list of entitled and unpaid

CPRs is attached, herewith, as Annexure- 3.

3.5 Consultation with Stakeholders, Grievances, Staffing and Capacity Building

3.5.1 Consultation with Entitled Persons

During and after disclosure of Resettlement Plan in local language many meetings were organized

by the RO with Sub Engineers, R&R cum Social Development Specialist, NGO and successfully

convinced the APs about the importance of the project for their betterment.

The concerned NGO organized several meetings with affected families for hearing of any issues

regarding project implementation. In these meetings people were made aware about Resettlement

and compensation issues, redressal of grievances, if any, advantages of the project and

documented their suggestion regarding project.

The interactions and consultations with other stakeholders especially the village headman

(Mukhiya) have brought in an interesting dimension for the consideration of the project authorities

in terms of minimizing the further squatting and encroachment across the project stretch. Village

headman assured that they would assist in removing encroachments and suggested that notices

should be put along the highway to prevent further encroachments. The consultations with the

officials of district administration including land/ revenue officials conducted under the

Chairmanship of District Magistrate have helped in getting assurance from them in terms of all the

co-operation and support for the implementation of the project.

Page 19: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 17

Photo-10: Consultation with Affected Household/ Stakeholders at Panchpedi and Khaira village

The consultations were centered around formation of Self Help Groups (SHGs) and livelihood

options exploration as quite a large percentage of APs fall under the category of labours who

primarily work in the agricultural fields during the season and during other period, most of these

either remain unemployed or go to the nearby towns for other works of unskilled nature. The

detail of consultation meeting at different locations of the sub-projects with the number of

participants is briefed in Annexure-4.

3.5.2 Grievance Redressal

The grievance procedure need to be administered, in the first instance, at the local level to

facilitate access, flexibility and open to various proofs and leads to speedy, just and fair

resolution of their grievances. (Annexure-5).

In the course of RP implementation for this project, the Executing Agency facilitated with the

help of NGO for the constitution of Grievances Redressal Committee (GRC) at district level for

all the sub-project roads. The status of constitution of GRC at sub-project level is summarized in

the table below:

Table-8: The Status of Constitution of GRC at Sub-Project Level

Sl. No. Nature of Complaints

Numbers of

Grievances Received

and Addressed

(Up till Dec 2015) Comments Pkg. 16

Received Resolved

1

To be confirmed whether

the existing structure is

within 8 mts. from center

line or not/

13 13

Pending cases -NO

Grievance has been resolved by

Additional Collector, Champa in

association with local level

authority and PIU (The name of 5

APs have been added, while

claim of 13 people was rejected

as they were not affected

2

Requested for re-

measurement of the

structures for compensation

5 5

Total 18 18

Page 20: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 18

Moreover, five grievances received/ reported from the field which has been addressed by

Additional Collector, Champa in Package-16. During the field visit of R&R cum Social

Development Specialist no other grievances were received from any of the affected population.

When asked, most of the people told that they are not having any serious grievances against the

project, while few grievances demure in nature are settled by NGO and Executing Agency in the

beginning itself.

3.5.3 Staffing

The institutional arrangement of executive agency for RP implementation is in place, the status

of required and sanctioned staff in reporting, is as follows:

Table 9: Status of Staffing for Land Acquisition, Resettlement and Rehabilitation

Sl.

No.

Position Agency No.

Sanctioned

No. Actual

ADB-PIU, CGPWD Raipur Chhattisgarh

1 Project Director 1 1

SRU, PWD Chhattisgarh

1 Resettlement Officer 1 0

2 Support Staff 1 0

ADB-PIU ( Field), Bilaspur Chhattisgarh

1 Assistant Resettlement Officer 1 0

CSC ,ICT Pvt. Ltd.

1 Social Expert 1 1

2 Social Support Staff 0 1

NGO, Help & Helps Samiti

1 Team Leader

1 1

2 Key-professional-A(R & R

Expert)

1 1

3 Key-professional-B

(Livelihood/Social Development

Specialist)

1 1

4 Technical Support Professional 1 1

5 Technical Support Professional 2 2

6 Other Support Personnel 1 1

3.5.4 Capacity Building Initiatives

For the purpose of proper and smooth implementation of RP implementation and safeguards

compliance as per ADB requirement, the capacity building of all the stakeholders involved in

implementation work is very important.

The philosophy behind this initiative is to develop the better understanding of the problem and to

enhance the productivity and efficiency. The ADB and the CSC has been conducting training and

workshop at different interval of time for capacity building of the Consultant and RP

implementing Agency. The table below has elucidated the details of such capacity building

exercise by the CSC Expert:

Page 21: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 19

Table-10: Safeguard Capacity Building

Date Venue Participants Topics covered Comments

9/12/2015 PWD Bridge

Meeting Hall

Raipur

Officials of

Implementing

Agency(HO &

District

Office),Construction

Supervision

Consultants,

Contractors and

NGO

Environment

Management Plan and

Framework

ADB Environmental

Safeguard Requirements

Social Impact

Assessment Process

Resettlement Plan

Resettlement Framework

of CSRSP

3.6 Conclusion, Recommendation and Lesson Learned:

3.6.1 Conclusion and Recommendation

There was no major dispute and grievances, received from the affected persons, however, any

grievances and doubts of the APs was redressed by the Executing Agency with the consultation

of local community/ authorities and through awareness campaign etc. however, there is need to

work on fast track on other activities of RP implementation. Certain steps need to be taken for

smooth and timely implementation of RP:

1. Distribution of Compensation to the APs need be expedited on fast track.

2. Identification of training needs and training programme for NTHs,

3. The contract period of NGO is on the verse of need and extension of service as major

task of RP implementation is incomplete.

4. The NGOs is advised that they should facilitate and assist to Displaced Persons to

complete the documents in case of any deficiency in receiving the entitlements. If

Bank account is not opened, the NGO can help entitled persons to open a bank

account as now a day a special drive by Central Govt. is ongoing in which it is easy

to every household to open a Bank Account on their name for which least documents

are required.

5. NGO need to be required to submit monthly progress report and quarterly progress

report in the format provided by the Consultant.

3.6.2 Lesson Learned

The NGO in RP implementation must be engaged for full time and on continuous basis

until RP implementation is completed. Hence, the engagement of the NGO for 6 months

seems not feasible for proper implementation of RP, keeping in mind the volume and

nature of work.

A qualified and experienced Resettlement Officer at PIU level on regular basis is must

for proper implementation and monitoring of RP Implementation and safeguards issues.

For proper implementation of Resettlement Plan, the synchronization in mobilization of

RP implementing Agency (NGO) and CSC Social Expert is must.

Page 22: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Consultancy Services for Road Construction Supervision of Rehabilitation and Upgradation of Group C Roads

(Contract Package 16 To 19)

Social Monitoring Report Page 20

Appointment of an Experienced NGO and or proper training to working NGO by the

professional in the very beginning of the implementation work is a must for smooth and

timely implementation of RP.

A proper Identification and verification exercise of displaced persons and accurately

prepared Micro plan, which has provision of all the applicable entitlements in terms of

compensation and allowances, make the RP implementation easy and smooth.

Page 23: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure-1 Sample copy of Agreement with Land Owner for Temporary Land Acquisition

Page 24: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the
Page 25: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

Pay e t details of co pe satio a d Assista ce Package 16

S.No. Unique ID DP Name Village Block Amount Status

1 2001 Dinanath Yadav Sheorinarayan Navagharh 20860 Unpaid

2 2002 Santosh Shrivas Sheorinarayan Navagharh 17534 Unpaid

3 2003 Rajendra Yadav Sheorinarayan Navagharh 0 Unpaid

4 2004 Panchram Yadav Sheorinarayan Navagharh 17652 Unpaid

5 2005 Ramadhin sahu Sheorinarayan Navagharh 0 Unpaid

6 2006 Ravi kumar Aaditya Sheorinarayan Navagharh 21021 Unpaid

7 2007 Manharan Patel Tusma Navagharh 42671 Unpaid

8 2008 Amarlal Banjare Durpa Navagharh 15357 Unpaid

9 2009 Govind Kumar Banjare Durpa Navagharh 16964 Unpaid

10 2010 Raja Ram Yadav Durpa Navagharh 11339 Unpaid

11 2011 Purnima Das Durpa Navagharh 4729 Unpaid

12 2012 Purushottam Kevat Durpa Navagharh 38877 Unpaid

13 2013 Nand Kumar Kashyap Murpar Navagharh 12000 Unpaid

14 2014 Budharam Sahu Kanasda Navagharh 64493 Unpaid

15 2015 Dwarika Prasad Kashyap Kanasda Navagharh 27529

Unpaid

16 2016 Bhupendra Kumar Kanasda Navagharh 43650 Unpaid

17 2017 Ramlal Kashyap Kanasda Navagharh 12000 Unpaid

18 2018 Shivprasad Kahra Nagardih Navagharh 17094 Unpaid

19 2019 Ram Kumar Ghasiya Kera Navagharh 32778 Unpaid

20 2020 Santosh Kumar Kevat Kera Navagharh 19435 Unpaid

21 2021 Shankar Das Vaishnav Kera Navagharh 110448 Unpaid

22 2022 Laxmi Prasad Sahu Kera Navagharh 54574 Unpaid

Page 26: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

23 2023 Kaushal Prasad Karsha Kera Navagharh 26112

Unpaid

24 2024 Shyam Bai Devangan Kera Navagharh 42858 Unpaid

25 2025 Loknath Devangan Kera Navagharh 108187 Unpaid

26 2026 Dayanand Dhiwar Kera Navagharh 109115 Unpaid

27 2027 Laxmi Narayan Dhiwar Kera Navagharh 12000

Unpaid

28 2141 Pilaram Sahu Kera Navagharh 18608 Unpaid

29 2142 Hemlal Bharti Kera Navagharh 12000 Unpaid

30 2028 Abhimanyu Chauhan Mohtara Navagharh 12000 Unpaid

31 2029 Ram kishun Kewant Shiladehi Navagharh 119363 Unpaid

32 2030 Samaro Ram Katakvar Shiladehi Navagharh 22079 Unpaid

33 2031 Jagdish Prasad Dubey Shiladehi Navagharh 18175 Unpaid

34 2032 Rudra Narayan Upadhyaya Shiladehi Navagharh 46863

Unpaid

35 2033 Jagdish Prasad Dubey Shiladehi Navagharh 243268 Unpaid

36 2034 Khikhabai Sahu Shiladehi Navagharh 23120 Unpaid

37 2035 Rakesh Kumar Vaishnav Shiladehi Navagharh 69202

Unpaid

38 2143 Ramadhar Kevat Shiladehi Navagharh 25744 Unpaid

39 2036 Padmini Bai Birra Bamhanidih 39770 Unpaid

40 2037 Savitribai Kenvat Birra Bamhanidih 240681 Unpaid

41 2038 Timalu Ram Patel Birra Bamhanidih 37518 Unpaid

42 2039 Ekadasiya Patel Birra Bamhanidih 69351 Unpaid

43 2040 Paras Ram Patel Birra Bamhanidih 170215 Unpaid

44 2041 Ashok Karsh Birra Bamhanidih 18608 Unpaid

45 2042 Ramesh Patel Birra Bamhanidih 89598 Unpaid

Page 27: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

46 2043 Firatin Bai Patel Birra Bamhanidih 60860 Unpaid

47 2044 Ful Bai Karsh Birra Bamhanidih 62818 Unpaid

48 2045 Shanti Bai Kashyap Birra Bamhanidih 43345 Unpaid

49 2046 Shanti Bai Kashyap Birra Bamhanidih 31345 Unpaid

50 2047 Mitthu Lal Karsh Birra Bamhanidih 30866 Unpaid

51 2048 Ramavatar Agrawal Birra Bamhanidih 0 Unpaid

52 2049 Bhagawat Prasad Namdeo Birra Bamhanidih 27955

Unpaid

53 2050 Gangotri Kaiwartya Birra Bamhanidih 79509 Unpaid

54 2051 Jagdish Prasad Banjare Birra Bamhanidih 51623

Unpaid

55 2052 Kulkit Sahu Birra Bamhanidih 93749 Unpaid

56 2053 Ghanshyam Prasad Karsh Birra Bamhanidih 57345

Unpaid

57 2054 Suresh Kumar Chandra Birra Bamhanidih 129030

Unpaid

58 2055 Bisahin Birra Bamhanidih 70457 Unpaid

59 2056 Dhaniram Sahis Birra Bamhanidih 42899 Unpaid

60 2057 Jawarlal Lal Namdev Birra Bamhanidih 136502 Unpaid

61 2058 Khuda Baksh Birra Bamhanidih 34673 Unpaid

62 2059 Shiv Lal Karsh Birra Bamhanidih 33747 Unpaid

63 2060 Mohanlal Khote Birra Bamhanidih 43902 Unpaid

64 2061 Anandram Khunte Birra Bamhanidih 37832 Unpaid

65 2062 Saheb lal Tanjaya Birra Bamhanidih 112457 Unpaid

66 2063 Avadh Bihari Kashyap Birra Bamhanidih 23498 Unpaid

67 2064 Chita Bai Kashyap Birra Bamhanidih 29148 Unpaid

68 2065 Jagatran Shrivas Birra Bamhanidih 120179 Unpaid

69 2066 Ashok Kumar Birra Bamhanidih 75166 Unpaid

Page 28: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

Biswas

70 2067 Abbas Khan Birra Bamhanidih 23071 Unpaid

71 2068 Rakesh Kumar Gupta Birra Bamhanidih 0 Unpaid

72 2069 Haider Baksh Birra Bamhanidih 249192 Unpaid

73 2070 Harnarayan Dewangan Birra Bamhanidih 82197

Unpaid

74 2071 Pitamber Prasad Kashyap Birra Bamhanidih 0

Unpaid

75 2072 Anant Ram Kashyap Birra Bamhanidih 74287 Unpaid

76 2073 Chita Bai Kashyap Birra Bamhanidih 2000 Unpaid

77 2074 Tarun Kumar Kahar Birra Bamhanidih 37856 Unpaid

78 2075 Chottelal Kewat Birra Bamhanidih 36114 Unpaid

79 2076 Pawan Kumar Dewangan Birra Bamhanidih 17410

Unpaid

80 2077 Shravan Kumar Kashyap Birra Bamhanidih 41601

Unpaid

81 2078 Aarti Lal Kashyap Birra Bamhanidih 77175 Unpaid

82 2079 Ram Lal Devangan Birra Bamhanidih 65874 Unpaid

83 2080 Govindram Kewat Birra Bamhanidih 29684 Unpaid

84 2081 Nandlal Shriwas Birra Bamhanidih 50807 Unpaid

85 2082 Shankar Lal Kashyap Birra Bamhanidih 25468 Unpaid

86 2083 Rameshwar Prasad Sahu Birra Bamhanidih 22555 Unpaid

87 2084 Hetram Sahu Birra Bamhanidih 18772 Unpaid

88 2085 Ghanshyam Kevat Birra Bamhanidih 19140 Unpaid

89 2086 Narbadiya Kashyap Birra Bamhanidih 16629 Unpaid

90 2144 Deepak Vishvas Birra Bamhanidih 52704 Unpaid

91 2145 Phool Singh Karsh Birra Bamhanidih 29656 Unpaid

92 2087 Goswami Khote Taldevri Bamhanidih 140514 Unpaid

Page 29: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

93 2088 Shyamlal Sahu Taldevri Bamhanidih 12624 Unpaid

94 2089 Resham Lal Diwakar Taldevri Bamhanidih 24038 Unpaid

95 2090 Sudrika Prasad Patel Naktidiha Bamhanidih 79762 Unpaid

96 2091 Jhul Bai Naktidiha Bamhanidih 115487 Unpaid

97 2092 Bahartaram Yadav Karnod Bamhanidih 66791 Unpaid

98 2093 Chandrabhushan Dadsena Karnod Bamhanidih 30992

Unpaid

99 2094 Aditya Verma Sonadih Bamhanidih 98201 Unpaid

100 2095 Shyam Bai Mahant Sonadih Bamhanidih 37183 Unpaid

101 2096 Muniram Sahu Bamhanidih Bamhanidih 27193 Unpaid

102 2097 Chayatram Jaiswal Bamhanidih Bamhanidih 60431 Unpaid

103 2098 Ram Narayan Kevat Bamhanidih Bamhanidih 174798 Unpaid

104 2099 Kishorilal Kesharwani Bamhanidih Bamhanidih 30090 Unpaid

105 2100 Jaibuddin Mumin Khan Bamhanidih Bamhanidih 49551

Unpaid

106 2101 Makhan Shrivas Bamhanidih Bamhanidih 57085 Unpaid

107 2102 Biraspati Bai Mahant Bamhanidih Bamhanidih 62059 Unpaid

108 2103 Manbodh Kurre Bamhanidih Bamhanidih 68809 Unpaid

109 2104 Prakash Kumar Tiwari Bamhanidih Bamhanidih 45785 Unpaid

110 2105 Agloo Kanwar Pucheli Bamhanidih 91015 Unpaid

111 2106 Rajkumar Patel Pipardiha Bamhanidih 33603 Unpaid

112 2107 Kunjita Yadav Pipardiha Bamhanidih 27768 Unpaid

Package 17

Page 30: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

1 2401 Dipak Shrivas Ratanpur Kota 36368 Unpaid

2 2402 Raju Maravi Junna Sahar Kota 17371 Unpaid

3 2403 Narayan Singh Checham Mendrapara Kota 21103 Unpaid

4 2404 Bhansingh Gond Mendrapara Kota 30205 Unpaid

5 2405 Shankar Lal Yadav Mendrapara Kota 24694 Unpaid

6 2406 Chhatram Dhanuhar Mendrapara Kota 32547 Unpaid

7 2407 Panch Ram Dhurv Mendrapara Kota 65283 Unpaid

8 2408 Tirithram Arvind Kalhamar Kota 41777 Unpaid

9 2409 Sohan Lal Binjwar Kalhamar Kota 41081 Unpaid

10 2410 Om Prakash Jaiswal Bhaisajhar Kota 93749 Unpaid

11 2411 Binda Prasad Sahu Laripara Kota 44506 Unpaid

12 2412 Jay kumar Sahu Laripara Kota 33616 Unpaid

13 2413 Munshi Ram Sahu Laripara Kota 80752 Unpaid

14 2414 Nakul Sahu Laripara Kota 121994 Unpaid

15 2415 Bhagbali Sahu Jogipur Kota 34007 Unpaid

16 2416 Gendram Raj Jogipur Kota 35182 Unpaid

17 2417 Sadhu Ram Raj Jogipur Kota 64498 Unpaid

18 2418 Santram Maravi Jogipur Kota 46342 Unpaid

19 2419 Deman Pottam Jogipur Kota 29115 Unpaid

20 2420 Kalam Bai Gond Jogipur Kota 176216 Unpaid

21 2421 Sadhu Ram Raj Jogipur Kota 184392 Unpaid

22 2422 Dilharan Singh Jogipur Kota 120565 Unpaid

23 2423 Malikram Yadav Jogipur Kota 116677 Unpaid

24 2424 Komal Prasad Tiwari Jogipur Kota 129118 Unpaid

Page 31: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

25 2425 Bhulau Ram Sagar Jogipur Kota 27242 Unpaid

26 2426 Hemant Jain Jogipur Kota 21874 Unpaid

27 2427 Shulochna Jain Surajpur Kota 90986 Unpaid

28 2428 Devendra Kumar Jain Surajpur Kota 0 Unpaid

29 2429 Kanti Bai Gupta Bankighat Kota 56527 Unpaid

30 2430 Vyasnarayan Sahu Ramnagar Kota 93947 Unpaid

31 2431 Harivansh Diwedi Ramnagar Kota 53522 Unpaid

32 2432 Shishupal Nishad Ramnagar Kota 42717 Unpaid

33 2433 Dharmendra Kumar Shrivas Ramnagar Kota 58968 Unpaid

34 2434 Ashweeni Kumar Kesharwani Ramnagar Kota 272076 Unpaid

35 2435 Raju Gupta Ramnagar Kota 193422 Unpaid

36 2436 Ashweeni Kumar Kesharwani Ramnagar Kota 26339 Unpaid

37 2437 Rajdeep Goswami Ramnagar Kota 110565 Unpaid

38 2438 Rajkumar Kaiwart Ramnagar Kota 46412 Unpaid

39 2439 Subrat Ali Ramnagar Kota 58215 Unpaid

40 2440 Baisakhu Binjwar Ramnagar Kota 494323 Unpaid

41 2441 Bhagwat Prasad Binhjwar Ramnagar Kota 114809 Unpaid

42 2442 Shrawan Kumar Drivedi Gobripat Kota 66502 Unpaid

43 2443 Teklal Shahu Gobripat Kota 37737 Unpaid

44 2444 Vijay Kumar Kurre Gobripat Kota 19184 Unpaid

45 2445 Ram Kumar Mishra Gobripat Kota 37243 Unpaid

46 2446 Shyama Bai Satnami Gobripat Kota 67913 Unpaid

47 2447 Sukhmani Banjare Gobripat Kota 25613 Unpaid

48 2448 Ram Kumar Banjare Gobripat Kota 57763 Unpaid

Page 32: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

49 2449 Krishn Kumar Banjare Gobripat Kota 94128

Unpaid

50 2450 Chandrika Devi Banjare Gobripat Kota 110909 Unpaid

51 2451 Jambai Dhimar Litiya Kota 49227 Unpaid

52 2452 Suritram Yadav Litiya Kota 73454 Unpaid

53 2453 Mohan Lal Litiya Kota 32491 Unpaid

54 2454 Makhan Singh Shyam Litiya Kota 61244 Unpaid

55 2455 Ashok Singh Thakur Kargikhurd Kota 94029 Unpaid

56 2456 Rajkumar Barman Lokband Kota 27187 Unpaid

57 2457 Panchram Ratre Lokband Kota 91148 Unpaid

58 2458 Bhagwati Bai Satnami Lokband Kota 67450 Unpaid

59 2459 Kanti Bai Banjare KargiKala Kota 26006 Unpaid

60 2460 Janak Ram Satnami Lokband Kota 16560 Unpaid

61 2461 Ramu Baghel Lokband Kota 46089 Unpaid

62 2462 Sakha Ram Lokband Kota 27318 Unpaid

63 2463 Kashiram Dahariya Lokband Kota 217295 Unpaid

64 2464 Itwari Ram Dahariya Lokband Kota 31847 Unpaid

65 2465 Vijay Kumar Sahu Kargikala Kota 47884 Unpaid

66 2466 Jamuna Bai Kargikala Kota 124418 Unpaid

67 2467 Laxmikant Kewart Kargikala Kota 70144 Unpaid

68 2468 Devendra Singh Saluja Kargikala Kota 169461 Unpaid

69 2469 Manohar Yadav Kargikala Kota 28668 Unpaid

70 2470 Krishna Basor Lamkana Kota 25482 Unpaid

71 2471 Bhikham Basor Lamkana Kota 83542 Unpaid

72 2472 Mannu Ram Sahu Lamkana Kota 46047 Unpaid

Page 33: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

73 2473 Nand Ram Yadav Lamkana Kota 41750 Unpaid

74 2474 Giraja Kshatri Lamkana Kota 27056 Unpaid

75 2475 Salik Ram Lamkana Kota 21939 Unpaid

76 2476 Shyam Bai Goswami Lamkana Kota 43211

Unpaid

77 2477 Gajanand Giri Goswami Lamkana Kota 46545 Unpaid

78 2478 Chanda Bai Lamkana Kota 21939 Unpaid

79 2479 Radhe Shyam Anant Lamkana Kota 38329 Unpaid

80 2480 Dhaniram Sahu Lamkana Kota 12000 Unpaid

81 2481 Savan Bai Khandey Lamkana Kota 12000 Unpaid

82 2482 Jethuram Sahu Lamkana Kota 0 Unpaid

83 2483 Itwari Ram Jaiswal Lamkana Kota 88134 Unpaid

84 2484 Sahukar Tandan Lamkana Kota 45268 Unpaid

85 2485 Punni Lal Jaiswal Lamkana Kota 115405 Unpaid

86 2486 Anuj Ram Jaiswal Lamkana Kota 64139 Unpaid

87 2487 Urvsi Bai Shrivas Lamkana Kota 66613 Unpaid

88 2488 Shaukhi Lal Shekhar Shantipur Kota 14914 Unpaid

89 2489 Kumari Bai Shantipur Kota 53194 Unpaid

90 2490 Anjora Bai Khande Shantipur Kota 59082 Unpaid

91 2491 Mahanteen Bai Banjare Surajpur Kota 38208 Unpaid

92 2492 Gheesal Diwakar Shantipur Kota 50028 Unpaid

93 2493 Anandi Bhaskar Imlipara Kota 131080 Unpaid

94 2494 Titari Bai Miree Imlipara Kota 54545 Unpaid

95 2495 SahetraTondey Imlipara Kota 82973 Unpaid

96 2496 Vishnu Prasad Tondey Imlipara Kota 71818

Unpaid

Page 34: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

97 2497 Gendlal Navrang Imlipara Kota 47200 Unpaid

98 2498 Ajay Kumar Sonwani Imlipara Kota 55740

Unpaid

99 2499 Santram Banjare Imlipara Kota 31386 Unpaid

100 2500 Lakshaman Prasad Gendale Imlipara Kota 128860

Unpaid

101 2501 Chandrabhan Singh Gobaripat Kota 0 Unpaid

102 2502 Lacchhiram Kurre Tendua Kota 27187 Unpaid

103 2503 Santosh Kumar Khute Tendua Kota 28893

Unpaid

104 2504 Brihaspati Bai Dubey Tendua Kota 31898

Unpaid

105 2505 Chandra Kumar Kurre Tendua Kota 68937

Unpaid

106 2506 Anand Ram Tendua Kota 12000 Unpaid

107 2507 Anil Yadav Tendua Kota 29084 Unpaid

108 2508 Kamal Dhruv Tikrepara Kota 109296 Unpaid

109 2509 Basant Bai Manikpuri Tikrepara Kota 23120

Unpaid

110 2510 Gendram Ghirhi Tikrepara Kota 80263 Unpaid

111 2511 Ambika Kashyap Nangchui Kota 0 Unpaid

112 2512 Juthail Ram Rajak Nangchui Kota 45686 Unpaid

113 2513 Indraman Shrivas Nangchui Kota 27187 Unpaid

114 2514 Parmeshwar Yadav Nangchui Kota 65822 Unpaid

115 2515 Aghnu Ram Rajak Nangchui Kota 38501 Unpaid

116 2516 Santosh Kumar Rathaur Nangchui Kota 33747 Unpaid

117 2517 Badri Prasad Nangchui Kota 83402 Unpaid

118 2518 Janak Ram Rathaur Mudaghusari Kota 38864 Unpaid

119 2519 Dayaram Maravi Mudaghusari Kota 95407 Unpaid

Page 35: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

120 2520 Gahnu Ram Uraon Mudaghusari Kota 90178 Unpaid

121 2521 Niranjam Singh Khushro Khaparakhol Kota 39486 Unpaid

122 2522 Punitram Markam Khaparakhol Kota 34324 Unpaid

123 2523 Anita Bai Manikpuri Pali Takhatpur 81498 Unpaid

124 2524 Nandu Ram Yadav Pali Takhatpur 77037 Unpaid

125 2525 Sahdev Kaivart Pali Takhatpur 42943 Unpaid

126 2526 Kishore Kumar Yadav Pali Takhatpur 18456 Unpaid

127 2527 Munna Prajapati Pali Takhatpur 23641 Unpaid

128 2528 Charan Singh Jagat Pali Takhatpur 20168 Unpaid

129 2529 Urmila Bai Kenvat Pali Takhatpur 34928 Unpaid

130 2530 Ramraj Jaiswal Pali Takhatpur 31123 Unpaid

131 2531 Shyamu Shrivas Pali Takhatpur 28499 Unpaid

132 2532 Dhanesh Karmakar Bhanwara kacchar Takhatpur 12000 Unpaid

133 2533 Ramu Shrivas Bhanwara kacchar Takhatpur 70417 Unpaid

134 2534 Bahoran Rathore Bhanwarakacchar Takhatpur 39189 Unpaid

135 2535 Saroj Kumar Jaiswal Bhanwarakacchar Takhatpur 28368 Unpaid

136 2536 Santosh Singh Rajput

Bhanwarakacchar Takhatpur 25088 Unpaid

137 2537 Laxman Jaiswal Bandha Takhatpur 101670 Unpaid

138 2538 Daduram Keshar Bandha Takhatpur 16914 Unpaid

139 2539 Jamuna Sakat Bandha Takhatpur 51219 Unpaid

140 2540 Dashoda Bai Jaiswal Bhimpuri Takhatpur 34373 Unpaid

141 2541 Lakhan Lal Dhruv Bhimpuri Takhatpur 32113 Unpaid

142 2542 Sushil Kumar Agrawal Bhimpuri Takhatpur 12000

Unpaid

143 2543 Shravan Das Vaishnav Bhimpuri Takhatpur 100909 Unpaid

Page 36: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

144 2544 Fuliya Bai Bhimpuri Takhatpur 23251 Unpaid

145 2545 Deep Narayan Mishra Bhimpuri Takhatpur 19578 Unpaid

146 2546 Durpati Bai Sahu Bhimpuri Takhatpur 30252 Unpaid

147 2547 Santosh Dadsena Bhimpuri Takhatpur 40145 Unpaid

148 2548 Thakur Ram Dadsena Bhimpuri Takhatpur 19512 Unpaid

149 2549 Sanguram Sahu Bhimpuri Takhatpur 21414 Unpaid

150 2550 Jakla Sahu Bhimpuri Takhatpur 33882 Unpaid

151 2551 Dropati Sahu Bhimpuri Takhatpur 22925 Unpaid

152 2552 Devi Prasad Dixit Bhimpuri Takhatpur 95998 Unpaid

153 2553 Prahlad Singh Dhruv Bhimpuri Takhatpur 54465 Unpaid

154 2554 Bharat Lal Dhruv Bhimpuri Takhatpur 0 Unpaid

155 2555 Dujiya Bai Junapara Takhatpur 50098 Unpaid

156 2556 Laxmi Prasad Jaiswal Junapara Takhatpur 40869 Unpaid

157 2557 Chanchal Kumar Jaiswal Pendritalab Takhatpur 54426 Unpaid

158 2558 Vijay Kumar Sahu Lormi Lormi 12000 Unpaid

159 2559 Bihari Lal Rathore Lormi Lormi 0 Unpaid

160 2560 Balaji Gupta Lormi Lormi 24826 Unpaid

Package 18

S.No. Unique ID DP Name Village Block Amount Status

1 2701 Virendra Kumar Sahu Khamhi Lormi 12000 Unpaid

2 2702 Hetram Sahu Khamhi Lormi 25048 Unpaid

3 2703 Yogendra Singh Thakur Bortarakala Lormi 0 Unpaid

Page 37: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

4 2704 Sonam Chaturbedi Hardi-Khetra Lormi 41274 Unpaid

5 2705 Ishwar Prasad Satnami Khektara Lormi 57085 Unpaid

6 2706 Komal Prasad Anant Khektara Lormi 45265 Unpaid

7 2707 Uttam Das Khektara Lormi 49225 Unpaid

8 2708 Jagmohan Anant Hardi Khetra Lormi 81214 Unpaid

9 2709 Roshanlal Anant Hardi Khetra Lormi 105233 Unpaid

10 2710 Lakhan Lal Anant Hardi Khetra Lormi 65455 Unpaid

11 2711 Ganeshiya Anant Khektara Lormi 65897 Unpaid

12 2712 Santra Bai Gendle Hardi Khetra Lormi 98584 Unpaid

13 2713 Amrika Bai Anant Hardi Khetra Lormi 90491 Unpaid

14 2714 Puran Das Hardi Khetra Lormi 38305 Unpaid

15 2715 Tijan Ahire Hardi Khetra Lormi 27919 Unpaid

16 2716 Sant Kumar Ratre Khektra Lormi 14088 Unpaid

17 2717 Bhagwat Ratre Hardi Khetra Lormi 38354 Unpaid

18 2718 Sanjiv Ratre Khektra Lormi 0 Unpaid

19 2719 Guruprasad Yadav Khektra Lormi 36368 Unpaid

20 2720 Jhulan Bai Dahariya Hardi Khetra Lormi 57027 Unpaid

21 2721 Maan Singh Thakur Khektra Lormi 12000 Unpaid

22 2722 Pila Bai Sakat Khektra Lormi 38108 Unpaid

23 2723 Suman Kumar Chaturvedi Khirwar Khurd Lormi 15165 Unpaid

24 2724 Manistar Sahab Khirwar Khurd Lormi 89264 Unpaid

25 2725 Hemant Kumar Ratre Khirwar Khurd Lormi 68972 Unpaid

26 2726 Rajesh Bhaskar Chilphi Lormi 40375 Unpaid

27 2727 Nakul Sahu Chilphi Lormi 27813 Unpaid

Page 38: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

28 2728 Bansilal Kurre Chilphi Lormi 16026 Unpaid

29 2729 Bhatturam Patre Chilphi Lormi 28368 Unpaid

30 2730 Hari Ram Tandan Chilphi Lormi 0 Unpaid

31 2731 Uttam Chaturvedi Chilphi Lormi 12000 Unpaid

32 2732 Avatar Singh Kosariya Chilphi Lormi 12000 Unpaid

33 2733 Ramkumar Nishad Chilphi Lormi 26736 Unpaid

34 2734 Santosh Ahirwar Baghamuda Pandariya 12000 Unpaid

35 2735 Rama Chandrakar Baghamuda Pandariya 54570 Unpaid

36 2736 Pareshwar Chandrakar Baghamuda Pandariya 40300 Unpaid

37 2737 Girdhari Chandrakar Ramtala Pandariya 24791 Unpaid

38 2738 Lekha Ram Sahu Ramtala Pandariya 27692 Unpaid

39 2739 Hiraram Sahu Ramtala Pandariya 84964 Unpaid

40 2740 Siya Ram Sahu Ramtala Pandariya 63114 Unpaid

41 2741 Rekha Tiwari Ramtala Pandariya 18435 Unpaid

42 2742 Ramkumar Sahu Ramtala Pandariya 44128 Unpaid

43 2743 Narmada Sahu Ramtala Pandariya 56127 Unpaid

44 2744 Anil Tiwari Ramtala Pandariya 16777 Unpaid

45 2745 Ram Avatar Sahu Ramtala Pandariya 31727 Unpaid

46 2746 Tirath Ramtala Pandariya 68379 Unpaid

47 2747 Jodhan Ram Sahu Ramtala Pandariya 17216 Unpaid

48 2748 Juthelram Sahu Mohtara Khurd Pandariya 16671 Unpaid

49 2749 Komal Sahu Mohtara Khurd Pandariya 12000 Unpaid

50 2750 Prabhujeet Singh Chhabra Daupara Mungeli 96911 Unpaid

Page 39: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

51 2751 Shri Ram Vadhva Daupara Mungeli 0 Unpaid

52 2752 Mahesh Singh Daupara Mungeli 0 Unpaid

53 2753 Shail Tiwari Daupara Mungeli 0 Unpaid

54 2754 Shantosh Panjwani Daupara Mungeli 141573 Unpaid

55 2755 Suhaga Jaiswal Daupara Mungeli 60015 Unpaid

56 2756 Nishad Ganesh Ram Daupara Mungeli 44022 Unpaid

57 2757 Ashok Kumar Nandwani Daupara Mungeli 0 Unpaid

58 2758 Kanhaiya Lal Bairagi Daupara Mungeli 0 Unpaid

59 2759 Pratap Singh Thakur Daupara Mungeli 0 Unpaid

60 2760 Prabhujeet Singh Chhabra Daupara Mungeli 740183 Unpaid

61 2761 Shila Devi Panjvani Daupara Mungeli 1261537 Unpaid

62 2762 Jeevan Lal Banjara Surighat Mungeli 25350 Unpaid

63 2763 Hariprasad Patle Surighat Mungeli 25154 Unpaid

64 2764 Raj Kumar Tiwari Surighat Mungeli 0 Unpaid

65 2765 Janardhan Sahu Surighat Mungeli 0 Unpaid

66 2766 Rajo Bai Gandharv Deogaon Mungeli 49189 Unpaid

67 2767 Tijauva Ram Deogaon Mungeli 136728 Unpaid

68 2768 Vishram Patel Deogaon Mungeli 32369 Unpaid

69 2769 Sitaram Patel Deogaon Mungeli 82531 Unpaid

70 2770 Hridayashankar Patel Deogaon Mungeli 34201 Unpaid

71 2771 Shanti Vishvakarma Deogaon Mungeli 42693 Unpaid

72 2772 Dhanaji Patel Deogaon Mungeli 58943 Unpaid

73 2773 Sushila Devagan Sangawa kapa Mungeli 70142 Unpaid

74 2774 Rupa Goswami Sangawa kapa Mungeli 73043 Unpaid

Page 40: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

75 2775 Utti Ram Sangawa kapa Mungeli 33858 Unpaid

76 2776 Yashwant Kumar Jaiswal Sangawa kapa Mungeli 12000 Unpaid

77 2777 Shalikram Yadav Sangawa kapa Mungeli 57297 Unpaid

78 2778 Chhed Lal Sangawa kapa Mungeli 44398 Unpaid

79 2779 Son Say Sahu Sangawa kapa Mungeli 12000 Unpaid

80 2780 Gangotri Sahu Sangawa kapa Mungeli 49730 Unpaid

81 2781 Jeetram Dewangan Sangawa kapa Mungeli 114668 Unpaid

82 2782 Jaitaram Satnami Sangawa kapa Mungeli 62072 Unpaid

83 2783 Bagelaram Satnami Sangawa kapa Mungeli 42678 Unpaid

84 2784 Sharmila Garg Sangawa kapa Mungeli 37715 Unpaid

85 2785 Anjori Sahu Sangawa kapa Mungeli 69803 Unpaid

86 2786 Rambharosh Sahu Sangawa kapa Mungeli 49803 Unpaid

87 2787 Jaitram Sangawa kapa Mungeli 49803 Unpaid

88 2788 Bedram Koshle Sangawa kapa Mungeli 49116 Unpaid

89 2789 Chyawan Kumar Koshle Sangawa kapa Mungeli 142110 Unpaid

90 2790 Tahal Das Sangawa kapa Mungeli 66609 Unpaid

91 2791 Mahangu Sangawa kapa Mungeli 36536 Unpaid

92 2792 Anjor Bai Sahu Sangawa kapa Mungeli 40000 Unpaid

93 2793 Kali Ram Sangawa kapa Mungeli 31081 Unpaid

94 2794 Ajuram Sahu Sangawa kapa Mungeli 49926 Unpaid

95 2795 Santar Sahu Sangawa kapa Mungeli 61106 Unpaid

96 2796 Jai Jai Ram Sahu Sangawa kapa Mungeli 87396 Unpaid

97 2797 Sanhaguram Sahu Sangawa kapa Mungeli 39975 Unpaid

Page 41: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

98 2798 Rambharos Sahu Sangawa kapa Mungeli 34767 Unpaid

99 2799 Sahbeen Bai Sahu Sangawa kapa Mungeli 46167 Unpaid

100 2800 Hariram Sahu Sangawa kapa Mungeli 63551 Unpaid

101 2801 Geeta Prasad Sahu Sangawa kapa Mungeli 38567 Unpaid

102 2802 Manharan Sahu Sangawa kapa Mungeli 77420 Unpaid

103 2803 Parasram Sangawa kapa Mungeli 97273 Unpaid

104 2804 Joit Ram Sahu Sangawa kapa Mungeli 25941 Unpaid

105 2805 Urmila Sangawa kapa Mungeli 37076 Unpaid

106 2806 Rikhiram Gond Devari Mungeli 42878 Unpaid

107 2807 Rajjan Thakur Devari Mungeli 27150 Unpaid

108 2808 Manohar Devari Mungeli 69783 Unpaid

109 2809 Tulshi Ram Patel Devari Mungeli 39730 Unpaid

110 2810 Tularam patel Devari Mungeli 115726 Unpaid

111 2811 Sudesh Patel Devari Mungeli 86461 Unpaid

112 2812 Suresh Patel Devari Mungeli 0 Unpaid

113 2813 Suraj Kumar Patel Devari Mungeli 62332 Unpaid

114 2814 Kansram Patel Devari Mungeli 55269 Unpaid

115 2815 Raj Kumar Patel Devari Mungeli 0 Unpaid

116 2816 Kuldeep Singh Saluja Devari Mungeli 24563 Unpaid

117 2817 Vishram Ogre Devari Mungeli 36315 Unpaid

118 2818 Surooj Bai Devari Mungeli 140662 Unpaid

119 2819 Dushyant Devari Mungeli 182527 Unpaid

120 2820 Balram Koshle Devari Mungeli 74055 Unpaid

121 2821 Harish Kumar Divakar Devari Mungeli 98807 Unpaid

Page 42: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

122 2822 Gajendra Koshle Devari Mungeli 41523 Unpaid

123 2823 Sundar Lal Devari Mungeli 38139 Unpaid

124 2824 Shobha Kumar Devari Mungeli 0 Unpaid

125 2825 Ayodhya Devari Mungeli 101110 Unpaid

126 2826 Gyan Koshale Devari Mungeli 71179 Unpaid

127 2827 Bhikhari Diwakar Devari Mungeli 88452 Unpaid

128 2828 Mohitram Devari Mungeli 20627 Unpaid

129 2829 Rajesh Kurre Devari Mungeli 49312 Unpaid

130 2830 Dev Prasad Devari Mungeli 52457 Unpaid

131 2831 Ram Sevak yadav Jamkor Mungeli 12000 Unpaid

132 2832 Raghav Ram Shrivas Jamkor Mungeli 18608 Unpaid

133 2833 Lakhan Ram Yadav Jamkor Mungeli 48108 Unpaid

134 2834 Prabhuram Yadav Jamkor Mungeli 18143 Unpaid

135 2835 Mahaveer Prasad Pathari Jamkor Mungeli 35676 Unpaid

136 2836 Raghuvir Pathari Jamkor Mungeli 46560 Unpaid

137 2837 Urmila Bai Pathari Jamkor Mungeli 46708 Unpaid

138 2838 Gurudayal Yadav Umariya Mungeli 43882 Unpaid

139 2839 Vinda Prasad Umariya Mungeli 19196 Unpaid

140 2840 Rajesh Yadav Umariya Mungeli 0 Unpaid

141 2841 Hajarilal Kurre Kanteli Mungeli 51230

Unpaid

142 2842 Hajarilal Kurre Kanteli Mungeli Unpaid

143 2843 Kamta Tandan Kanteli Mungeli 66388 Unpaid

144 2844 Gulaba Yadav Kanteli Mungeli 42482 Unpaid

145 2845 J. S. Baghel Kanteli Mungeli 14914 Unpaid

Page 43: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

146 2846 Narayan Satnami Kanteli Mungeli 24565 Unpaid

147 2847 Vilas Thakre Kanteli Mungeli 14914 Unpaid

148 2848 Kapoor (Gullu) Kanteli Mungeli 12000 Unpaid

149 2849 Rajkumar Sahu Kanteli Mungeli 118158 Unpaid

150 2850 Arvind Jaiswal Kanteli Mungeli 118158 Unpaid

151 2851 Kamta Prasad Sharma Kanteli Mungeli 53395 Unpaid

152 2852 Manohar Kumar Jaiswal Kanteli Mungeli 536898 Unpaid

153 2853 Surendra Yadav Kanteli Mungeli 12000 Unpaid

154 2854 Vishnu Prasad Kanteli Mungeli 12000 Unpaid

155 2855 Kishun Ram Kanteli Mungeli 12000 Unpaid

156 2856 Maniram Yadav Kanteli Mungeli 12000 Unpaid

157 2857 Murarilal Devangan Kanteli Mungeli 18822 Unpaid

158 2858 Santosh Kumar Chaturgosthi Kanteli Mungeli 12000 Unpaid

159 2859 Devnath Chaturgosthi Kanteli Mungeli 142702 Unpaid

160 2860 Naresh Kumar Tiwari Kanteli Mungeli 37249 Unpaid

161 2861 Prem kumar Tiwari Kanteli Mungeli 23991 Unpaid

162 2862 Loknath Tiwari Kanteli Mungeli 35622 Unpaid

163 2863 Puran Prasad Sharma Kanteli Mungeli 123422 Unpaid

164 2864 Kodu Banjare Kanteli Mungeli 102138 Unpaid

165 2865 Amitesh Raj Kanteli Mungeli 34402 Unpaid

166 2866 Ajay Kanteli Mungeli 30590 Unpaid

167 2867 Sukutram Banjare Bodhapara Mungeli 46093 Unpaid

168 2868 Kaushilya Bai Bodhapara Mungeli 34403 Unpaid

169 2869 Bindiya Bai Bodhapara Mungeli 55012 Unpaid

Page 44: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

170 2870 Dhalal Prasad Bodhapara Mungeli 40909 Unpaid

171 2871 Santosh Bodhapara Mungeli 213717 Unpaid

172 2872 Hirmat Bai Barmat Bodhapara Mungeli 57297 Unpaid

173 2873 Dulara Bai Bandhiya Bodhapara Mungeli 48477 Unpaid

174 2874 Pyariya Chaturbedani Bodhapara Mungeli 37473 Unpaid

175 2875 Bhagirathi Devangan Bodhapara Mungeli 174865 Unpaid

176 2876 Siyaram Bodhapara Mungeli 66708 Unpaid

177 2877 Rikhi Ram Devangan Bodhapara Mungeli 0 Unpaid

178 2878 Madhur Singh Dhruv Bodhapara Mungeli 12000 Unpaid

179 2879 Hoshlal Bodhapara Mungeli 29656 Unpaid

180 2880 Raghunath Bodhapara Mungeli 83464 Unpaid

181 2881 Dhalal Prasad Bodhapara Mungeli 44615 Unpaid

182 2882 Yen Kumar Barman Bodhapara Mungeli 18397 Unpaid

183 2883 Kumari Bai Bodhapara Mungeli 39091 Unpaid

184 2884 Dhur Singh Sapre Bodhapara Mungeli 28206 Unpaid

185 2885 Jam Singh Dhruv Bodhapara Mungeli 36924 Unpaid

186 2886 Dilip Verma Bodhapara Mungeli 26853 Unpaid

187 2887 Ram Rakshit Thakur Bodhapara Mungeli 0 Unpaid

188 2888 Uttar Kumar Bodhapara Mungeli 12000 Unpaid

189 2889 Rajendra Kumar Patre Bodhapara Mungeli 20178 Unpaid

190 2890 Rajkumar Banjare Bodhapara Mungeli 48615 Unpaid

191 2891 Holiram Sapre Bodhapara Mungeli 27543 Unpaid

192 2892 Murichand Lehre Bodhapara Mungeli 0 Unpaid

Page 45: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S.No. Unique ID DP Name Village Block Amount Status

193 2893 Mortand Singh Parihar Jawahar Ward Mungeli 0 Unpaid

194 2894 Sanjay Vaisnav Jawahar Ward Mungeli 0 Unpaid

195 2895 Ram Kumar Yadav Jawahar Ward Mungeli 0 Unpaid

196 2896 Ram Kumar Yadav Jawahar Ward Mungeli 0 Unpaid

197 2897 Sarwan Singh Mungeli Mungeli 0 Unpaid

198 2898 Ram Kumar Singh Parihar Mungeli Mungeli 0 Unpaid

199 2899 Laxmi Prasad Chhedaiya Mungeli Mungeli 0 Unpaid

200 2900 Guruvendra Sahu Mungeli Mungeli 0 Unpaid

201 2901 Rajendra Devangan Mungeli Mungeli 14723 Unpaid

202 2902 Vashu Parihar Mungeli Mungeli 0 Unpaid

203 2903 Mohnish Worker Jawahar Ward Mungeli 42800 Unpaid

Package 19

S. No.

Unique ID DP Name Village Block Amount Status

1 2201 Muniram Sidar Khaira Masturi 100604 Unpaid

2 2202 Manglu Ram Sahu Khaira Masturi 120811 Unpaid

3 2203 Meghnath (Sahu) Khaira Masturi 96486 Unpaid

4 2204 Chhote Lal Sahu Khaira Masturi 171012 Unpaid

5 2205 Haribai sahu Khaira Masturi 50540 Unpaid

Page 46: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S. No.

Unique ID DP Name Village Block Amount Status

6 2206 Geeta Bai Sahu Khaira Masturi 19469 Unpaid

7 2207 Manharan Sahu Khaira Masturi 89588 Unpaid

8 2208 Videshi Ram Khaira Masturi 35504 Unpaid

9 2209 Samundilal Surakshit Khaira Masturi 12000

Unpaid

10 2210 Gorelal Kurre Masturi Masturi 30992 Unpaid

11 2211 DR. Mahesh Shrivastav Masturi Masturi 0

Unpaid

12 2212 Rajendra Kumar Madhukr Sargawa Masturi 45510

Unpaid

13 2213 Ajju Kumar Kesharwani Ved Parasada Masturi 39328

Unpaid

14 2214 Arun bai Sahu Tekari Masturi 45433 Unpaid

15 2215 Ganesh Sahu Tekari Masturi 18157 Unpaid

16 2216 Amaru Jangade Tekari Masturi 72780 Unpaid

17 2217 Amrit Lal Tekari Masturi 388564 Unpaid

18 2218 Amrit Lal Tekari Masturi Unpaid

19 2219 Dukhin Bai Tekari Masturi 28499 Unpaid

20 2220 Bhagbali Yadav Tekari Masturi 26330 Unpaid

21 2221 Budhwar Kaiwert Tekari Masturi 82951 Unpaid

22 2222 Madhuri Verma Tekari Masturi 50670 Unpaid

23 2223 Kapoor Chand Lahre Bakarkuda Masturi 122313

Unpaid

24 2224 Dhaniram Kurre Bakarkuda Masturi 39987 Unpaid

25 2225 Gangabai Mehar Burikhara Masturi 91450 Unpaid

26 2226 Dhanmat Bai Ramayan Kewat Burikhara Masturi 33320

Unpaid

27 2227 Kamlesh Chakarbedha Masturi 14003 Unpaid

Page 47: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S. No.

Unique ID DP Name Village Block Amount Status

28 2228 Bedram Chakarbedha Masturi 100691 Unpaid

29 2229 Sundarlal Tandan Chakarbedha Masturi 148249 Unpaid

30 2230 (Not Present) Malhar Masturi 0 Unpaid

31 2231 Nitesh Kumar Puran Gupta Malhar Masturi 220941

Unpaid

32 2232 Bholaram Yadav Malhar Masturi 152111 Unpaid

33 2233 Dharam Pandey Malhar Masturi 25514 Unpaid

34 2234 Sumer Singh Malhar Masturi 0 Unpaid

35 2235 Sumer Singh Malhar Masturi 0 Unpaid

36 2236 Ramesh Singh Kshatri Nevari Masturi 25219

Unpaid

37 2237 Ranjeet Singh Nevari Masturi 27122 Unpaid

38 2238 Santram Nevari Masturi 58599 Unpaid

39 2239 Dashrath Singh Nevari Masturi 12000 Unpaid

40 2240 Lakhan Singh Thakur Nevari Masturi 72432

Unpaid

41 2241 Rajakumari Binori Masturi 35039 Unpaid

42 2242 Dharmendra Kumar Banjare Binori Masturi 60793

Unpaid

43 2243 Sahun Bai Sonwani Binori Masturi 54488 Unpaid

44 2244 Chhedu Ram Durwakari Masturi 0 Unpaid

45 2245 Lateluram Ghritlahare Binori Masturi 450794

Unpaid

46 2246 Ram Singh Bhardwaj Durwakari Masturi 31582

Unpaid

47 2247 Agahan Lal Bhardwaj Durwakari Masturi 66221

Unpaid

48 2248 Rukhmani Bai Yadav Durwakari Masturi 33342

Unpaid

Page 48: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S. No.

Unique ID DP Name Village Block Amount Status

49 2249 Prakash Chand Durwakari Masturi 518225 Unpaid

50 2250 Shankarlal Kenwat Durwakari Masturi 197518 Unpaid

51 2251 Kanshiram Durwakari Masturi 70074 Unpaid

52 2252 Chini Kumar Durwakari Masturi 73113 Unpaid

53 2253 Ramnath Soni Durwakari Masturi 66165 Unpaid

54 2254 Mukund Singh Durwakari Masturi 449252 Unpaid

55 2255 Bhuvan Lal Durwakari Masturi 660880 Unpaid

56 2256 Sushil Prasad Tiwari Durwakari Masturi 181472 Unpaid

57 2257 Phiranta Patva Durwakari Masturi 40895 Unpaid

58 2258 Sukhvilash Gandharv Durwakari Masturi 51638

Unpaid

59 2259 Panchram Yadav Durwakari Masturi 125072

Unpaid

60 2260 Panchram Yadav Durwakari Masturi

61 2261 Bodhwa Pasi Durwakari Masturi 102306 Unpaid

62 2262 Guljar Singh Thakur Durwakari Masturi 159724 Unpaid

63 2263 Ram Dulari Bhardwaj Durwakari Masturi 37346

Unpaid

64 2264 Dharmendra Kumar Bhardwaj Durwakari Masturi 33813

Unpaid

65 2265 Hariram Mahilange Durwakari Masturi 89537 Unpaid

66 2266 Dhanesh Ram Bhardwaj Durwakari Masturi 113520/

105479 Unpaid

67 2267 Kailash Singh Bhardwaj Durwakari Masturi 118017

Unpaid

68 2268 Raja Ram Bhardwaj Durwakari Masturi 120172 Unpaid

Page 49: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S. No.

Unique ID DP Name Village Block Amount Status

69 2269 Hirasai Bhardwaj Durwakari Masturi 333249 Unpaid

70 2270 Asharam Bhardwaj Durwakari Masturi 95995 Unpaid

71 2271 Sujeet kumar Bhardwaj Durwakari Masturi 81600

Unpaid

72 2272 Anil kumar Bharadwaj Durwakari Masturi 107608

Unpaid

73 2273 Phoolchand Durwakari Masturi 41546 Unpaid

74 2274 Ravi Shankar Bhardwaj Durwakari Masturi 472589

Unpaid

75 2275 Sukhsagar Bharadwaj Durwakari Masturi 108585

Unpaid

76 2276 Teras Ram Bhardwaj Durwakari Masturi 55951

Unpaid

77 2277 Prakash Bhardwaj Durwakari Masturi 178531 Unpaid

78 2278 Raj Kapoor Bhardwaj Durwakari Masturi 57297

Unpaid

79 2279 Bhagirathi Bhardwaj Durwakari Masturi 69582 Unpaid

80 2280 Devchran Mahilange Durwakari Masturi 197652 Unpaid

81 2281 Krishna Kumar Bharadwaj Durwakari Masturi 37364

Unpaid

82 2282 Bisambhar Ghritlahre Durwakari Masturi 96252

Unpaid

83 2283 Basant Kumar Bharadvaj Durwakari Masturi 35535

Unpaid

84 2284 Rang Lal Khandel Durwakari Masturi 126457 Unpaid

85 2285 Kanhaiya Lal Durwakari Masturi 71416 Unpaid

86 2286 Parmeshwar Navrange Pachpedhi Masturi 196930

Unpaid

87 2287 Sharadhu Ram Bhardwaj Pachpedhi Masturi 716533

Unpaid

88 2288 Rajadas (Manikpuri) Chisda Masturi 0 Unpaid

Page 50: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S. No.

Unique ID DP Name Village Block Amount Status

89 2289 Bahor Singh Pachpedhi Masturi 24563 Unpaid

90 2290 Meghnath Paikara Chisda Masturi 31596 Unpaid

91 2291 Manohar Lal Sahis Chisda Masturi 32068 Unpaid

92 2292 Rajan Singh Chisda Masturi 35584 Unpaid

93 2293 Paltu Chisda Masturi 258317

Unpaid 94 2294 Paltu Chisda Masturi

95 2295 Umesh Kumar Thawait Jondhara Masturi 8914/

10000 Unpaid

96 2296 Shiv Kumar Thawait Jondhara Masturi 46603 Unpaid

97 2297 Mohar Patel Jondhara Masturi 45086 Unpaid

98 2298 Shyam Lal Patel Jondhara Masturi 33091 Unpaid

99 2299 Phirat Ram Shrivas Jondhara Masturi 66502 Unpaid

100 2300 Ramgopal Kaiwart Jondhara Masturi 125307 Unpaid

101 2301 Shivkumari Shriwas Jondhara Masturi 87690 Unpaid

102 2302 Gulab Bai Patel Jondhara Masturi 36342 Unpaid

103 2303 Akhat Ram Yadav (Afat Ram) Jondhara Masturi 52455

Unpaid

104 2304 Derha Yadav Jondhara Masturi 108460 Unpaid

105 2305 Chhatar Patel Jondhara Masturi 37212 Unpaid

106 2306 Baliram Kevarth Jondhara Masturi 126953 Unpaid

107 2307 Tilakram Kewat Jondhara Masturi 22948 Unpaid

108 2308 Gautariha Pandariya Baloda Bazar 174413 Unpaid

109 2309 Mitha Lal Pandariya Baloda Bazar 53695 Unpaid

110 2310 Jhalak Bai Pandariya Baloda Bazar 82829 Unpaid

111 2311 Ansu Kumar Sahu Chichirda Baloda Bazar 12000 Unpaid

Page 51: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure –02

S. No.

Unique ID DP Name Village Block Amount Status

112 2312 Phirtu Chichirda Baloda Bazar 12000 Unpaid

113 2313 Rama Koshale Ahilda Baloda Bazar 46393 Unpaid

114 2314 Ramnarayan Ahilda Baloda Bazar 135541 Unpaid

115 2315 Raghuram Verma Ahilda Baloda Bazar 0 Unpaid

116 2316 Ramau Ahilda Baloda Bazar 57914 Unpaid

117 2317 Atmaram Yadu Ahilda Baloda Bazar 174128 Unpaid

118 2318 Genduram Yadav Ahilda Baloda Bazar 198182 Unpaid

119 2319 Gulal Varma Ahilda Baloda Bazar 0 Unpaid

120 2320 Narayan Varma Ahilda Baloda Bazar 0 Unpaid

121 2321 Munna Lal Sahu Ahilda Baloda Bazar 561434 Unpaid

122 2322 Girdhar Sahu Ahilda Baloda Bazar 149017 Unpaid

123 2323 Ramprasad Sahu Ahilda Baloda Bazar 77076 Unpaid

124 2324 Nohar Lal Sahu Ahilda Baloda Bazar 391048 Unpaid

125 2325 Bhim Ram Sahu Ahilda Baloda Bazar 221945 Unpaid

126 2326 Yasoda Kumari Sahu Ahilda Baloda Bazar 139641

Unpaid

127 2327 Santosh Ahilda Baloda Bazar 57666 Unpaid

Page 52: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure - 03

Pay e t Details of CPRs

Package 16 Sheorinarayan-Birra-Champa Road

S.No. Village Structure Amount Grand Total Paid To Status

1 Sheorinarayan Temple 6424 6424 Rajendra Kumar Unpaid

2 Sheorinarayan Temple 27049 27049 Ishwari Prasad Kesherwani Unpaid

3 Sheorinarayan Temple 42671 42671 Manharan Patel Unpaid

4 Tushma Temple 16941 24771 SarpanchSachiv Gram

PanchayatTusma Unpaid

5 Tushma Temple 7830

6 Murpar Village Gate 258187 441945 SarpanchSachiv Gram

PanchayatMurpar Unpaid

7 Murpar Community Hall 183758

8 Murpar Temple 121362 121362 ChhabiLalDube Unpaid

9 Kanasda Community Hall 320419

646865 SarpanchSachiv Gram PanchayatKanasda

Unpaid 10 Kanasda Temple 255294 11 Kanasda Sitting Place 34123 12 Kanasda Sitting Place 27496 13 Kanasda Sitting Place 9533 14 Kera Village Gate 195866

281335 SarpanchSachiv Gram PanchayatKera

Unpaid 15 Kera AtalChowk 85469

16 Kera Temple Unpaid

17 Kera Boundary wall 14170 14170 Ram RatanBhishm Unpaid

Page 53: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure - 03

S.No. Village Structure Amount Grand Total Paid To Status

18 Shiladehi School Boundary wall 50315 50315 Sachiv/Koshadhyaksh,

ShalaPrabandhan& VSSPMS Siladehi

Unpaid

19 Shiladehi Temple Sitting Place 63606 63606 RamadharKenvat Unpaid

20 Bira Chowk 0 Unpaid

21 Bira Community Hall 62285

894300 SarpanchSachiv Gram PanchayatBirra

Unpaid

22 Bira Temple 54096 23 Bira Community Hall 160699 24 Bira Gramin Bank Boundary wall 14432 25 Bira Post office Boundary Wal 19680 26 Bira Market Sitting Place 228769 27 Bira Bus Waiting Hall 267090 28 Bira Village Gate 87249

29 Taldevri Sitting Place 16268 16268 SarpanchSachiv Gram PanchayatTaldevri

Unpaid

30 Naktidih Bus Waiting Hall 170403 170403 SarpanchSachiv Gram PanchayatNaktidih

Unpaid

31 Piperda Temple 92613 92613 SarpanchSachiv Gram PanchayatPiperda

Unpaid

32 Sothi Sitting Place 6329 61973 BhartiyaKushthaNivaranSangha Unpaid

33 Sothi Temple 55644

Page 54: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure - 03

Package 17 Ratanpur-Kota-Lormi Road

S.No. Village Structure Amount Grand Total Paid To Status

1 Mendra Para School Boundary 62845 62845 JanbhagidariVikasSamiti Unpaid

2 Laripara AtalChowk 54753 54753 SarpanchSachiv Gram PanchayatLaripara

Unpaid

3 Surajpur Sitting Place 30089 68104 SarpanchSachiv Gram

PanchayatJogipur Unpaid 4 Jogipur Sitting Place 12285

5 Jogipur Place of Worship 25730 6 Kota Place of Worship 146276

393157 Chairman Nagar Parishad Kota

Unpaid 7 Kota Place of Worship 35523 8 Kota Place of Worship 43091 9 Kota Place of Worship 168267

10 Kota Jai StambhChowk 0 0 Unpaid

11 Gobripat Bus Shelter 171294 171294 SarpanchSachiv Gram PanchayatGobripat

Unpaid

12 Lokbandh Community Hall 160254 274034 SarpanchSachiv Gram

PanchayatLokbandh Unpaid

13 Lokbandh Community Hall 113780

14 Kargikala Place of Worship 59027 226825 SarpanchSachiv Gram

PanchayatKargikala Unpaid

15 Kargikala Pump House 167798

16 Karka Place of Worship 156693 156693 SarpanchSachiv Gram PanchayatPali

Unpaid

Page 55: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure - 03

S.No. Village Structure Amount Grand Total Paid To Status

17 Lamkena Place of Worship 115294 115294 Dharmendra Kumar Unpaid

18 Lamkena Bus Shelter 135059 135059 SarpanchSachiv Gram PanchayatLamkena

Unpaid

19 Imlipara School Boundary 58909 58909 School Management Community

Unpaid

20 Imlipara Village Gate 157584 210290 SarpanchSachiv Gram

PanchayatImlipara Unpaid

21 Imlipara Place of Worship 52706 22 Tendua Place of Worship 65882

355141 SarpanchSachiv Gram PanchayatTendua

Unpaid 23 Tendua Bus Shelter 146900 24 Tendua Place of Worship 142359

25 Bandha Place of Worship 486104 486104 SarpanchSachiv Gram PanchayatBandha

Unpaid

26 Junapara Bus Shelter 59205 59205 SarpanchSachiv Gram PanchayatJunapara

Unpaid

27 ChorhaSinhganpuri Place of Worship 28668 28668 GayaramJaiswal Unpaid

28 Lormi Place of Worship 48432 48432 PatvariLormi Unpaid

29 Lormi Place of Worship 47008 47008 Chairman Lormi Unpaid

Page 56: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure - 03

Package 18 Mungeli-Lormi Road

S.No. Village Structure Amount Grand Total Paid To Status

1 Khamhi Place of Worship 54130 61341 SarpanchSachiv Gram

PanchayatKhamhi

Unpaid

2 Khamhi Place of Worship 7211 Unpaid

3 Khektara Sitting Place 0 0 Unpaid

4 Khektara Village Gate 122081 122081 SarpanchSachiv Gram

PanchayatHardiKhektara

Unpaid

5 HardiKhektara Sitting Place 69854 69854 Unpaid

6 Bortarakala Public Toilet 71224 150105 SarpanchSachiv Gram

PanchayatBortarakala

Unpaid

7 Bortarakala Place of Worship 78881 Unpaid

8 Khirwarkhurd Gate 65526 157672 SarpanchSachiv Gram

Panchayat,Khirwarkhurd

Unpaid

9 Khirwarkhurd Bus Shelter 92146 Unpaid

10 Baghamuda Place of Worship 17094 17094 Private Unpaid

11 Barrier Forest Check Naka 25061 25061 Forest Department Unpaid

12 Kishungarh Public Toilet 18077 18077 Unpaid

13 Kishungarh Village Gate 237977 237977 Unpaid

14 Kishungarh Bus Shelter 123485 123485 Unpaid

Page 57: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure - 03

S.No. Village Structure Amount Grand Total Paid To Status

15 Kishungarh Place of Worship 28490 28490 Unpaid

16 Ramtala Bus Shelter 97933 97933 SarpanchSachiv Gram PanchayatRamtala

Unpaid

17 Mungali Public Toilet 150995 150995 Unpaid

18 Mungali Shiv Temple 57870 57870 Unpaid

19 Daupara Place of Worship 78792 78792 Unpaid

20 Daupara Place of Worship 25641 25641 SantoshYadav Unpaid

21 Surighat Public Toilet 7862 7862 Unpaid

22 Surighat Mayadevi Temple 12820 12820 Unpaid

23 Surighat Shiv Temple 112000 112000 Unpaid

24 Devgaon Gate 81463 94141 SarpanchSachiv Gram

PanchayatDevgaon

Unpaid

25 Devgaon Public Toilet 12678 Unpaid

26 Surda Place of Worship 20032 20032 Unpaid

27 SangwaKapa Place of Worship 8013 8013 BlramDewangan Unpaid

28 SangwaKapa JayatKhamb 11364 11364 Neman Kumar Kashle Unpaid

29 SangwaKapa School Boundary wall 20861 20861 School Community Unpaid

30 Jamkor Kudariya Mata Temple 53418 53418 SarpanchSachiv Gram PanchayatUmariya

Unpaid

Page 58: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure - 03

S.No. Village Structure Amount Grand Total Paid To Status

31 Umariya Mahamaya Temple 30364 30364 SarpanchSachiv Gram PanchayatUmariya

Unpaid

32 Umariya Village Gate 120191 120191 SarpanchSachiv Gram PanchayatUmariya

Unpaid

33 Kanteli JayatKhamb 18108

65383 SarpanchSachiv Gram PanchayatKanteli

Unpaid

34 Kanteli Place of Worship 4986 Unpaid

35 Kanteli Panchyat Welcome Gate 42289 Unpaid

36 Bodhapara Place of Worship 12531 12531 SarpanchSachiv Gram PanchayatBodhapara

Unpaid

Page 59: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure - 03

Packsge 19 Jairamnagar-Masturi-Malhar-Joundhara-Lawan Road

S.No. Village Structure A ou t Gra d Total Paid To

Status

Khaira Te ple Ma glu Ra Unpaid

Masturi Village Gate Unpaid

VedParsada Te ple Arju Bareth Unpaid

VedParsada Te ple Unpaid

VedParsada Bus Shelter Sarpa hSa hi Gra Pa hayatVedParsada

Unpaid

Tikari

S hool Bou dary Wall

Sarpa hSa hi Gra Pa hayatTikari

Unpaid

Bus Shelter Unpaid

Te ple Unpaid

Bakarkuda Bus Shelter Sarpa hSa hi Gra Pa hayatBakarkuda

Unpaid

Bakarkuda Te ple Jait-Kha Kapoor Cha d Lahre Unpaid

Burikhar Sitti g Pla e Ma isha kar Si gh Thakur

Unpaid

Chakar edha S hool Sarpa hSa hi Gra Pa hayatChakar edha

Unpaid

Page 60: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure - 03

S.No. Village Structure A ou t Gra d Total Paid To

Status

Malhar Te ple Nitesh Ku ar Pura Gupta

Unpaid

Ne ari Te ple Sa tosh

Unpaid

Ne ari Te ple Unpaid

Bi auri Te ple PardesiYada Unpaid

Te ple Rajpa ditMahila ge Unpaid

Bi auri Co u ity Hall

Sarpa hSa hi Gra Pa hayatBi auri

Unpaid

Bi auri Te ple Unpaid

Bi auri Ra g Ma h Unpaid

Dhru akari Te ple Kailash Si gh Bhard aj Unpaid

Dhru akari Bus Shelter

Sarpa hSa hi Gra Pa hayatDhru akari

Unpaid

Dhru akari Co u ity Hall Unpaid

Dhru akari Co u ity Hall,Te ple Unpaid

Pa hpedhi Statue Unpaid

Pa hpedhi Sitti g Pla e Sarpa hSa hi Gra Pa hayatPa hpedhi

Unpaid

Page 61: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure - 03

S.No. Village Structure A ou t Gra d Total Paid To

Status

Lohara hor Te ple Sarpa hSa hi Gra Pa hayat,Sukulkari

Unpaid

Lohara hor Te ple Ma rakha Das Unpaid

Chilhati AtalCho k Unpaid

Chilhati Sitti g Pla e Sarpa hSa hi Gra Pa hayatChilhati

Unpaid

Chisda Te ple Raj Ku ar Patel Unpaid

Jo dhara Sitti g Pla e

Sarpa hSa hi Gra Pa hayatJo dhara

Unpaid

Jo dhara Pa hayat Buildi g Bou dary Wall Unpaid

Jo dhara AtalCho k Unpaid

Pa dariya Village Gate Sarpa hSa hi Gra Pa hayatPa dariya

Unpaid

Pa dhariya Te ple Malikra Unpaid

Ahilda Te ple Unpaid

Ahilda Co u ity hall Unpaid

Page 62: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure - 03

S.No. Village Structure A ou t Gra d Total Paid To

Status

DurgaPa dal Unpaid

Ahilda Te ple Sukh Ra Unpaid

Ahilda Te ple Ku ar Sahu Unpaid

Ahilda AtalCho k Sarpa hSa hi Gra

Pa hayatAhilda

Unpaid

Ahilda Te ple Unpaid

Page 63: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure-4

Details of Consultation Meetings

Sub No. Village/ Location of FGD & Individual Consultation Date Participation of Community

Male Female Total

P-16

Bamhanidih 2/03/2015 08 0 08 Shiladehi 10/03/2015 09 0 09 Pipardiha 16/04/2015 07 0 07 Sonadih 19/04/2015 05 0 05 Pucheli, 16/05/2015 05 07 12 Karnod 28/05/2015 07 0 07 Kanasda 09/06/2015 07 0 07 Birra 19/06/2015 04 0 04 Mudpar 15/07/2015 04 0 04 Naktidih 9/08/2015 04 0 04 Kera 11/09/2015 10 0 10 Taldevri 30/10/2015 07 0 07 Durpa 22/11/2015 14 0 14 Sheorinarayan 29/12/2015 06 0 06 Tusma 02/01/2016 07 0 07

P-17

Gobripat 23/02/2015 10 - 10 Bhimpuri 26/02/2015 06 - 06 Jogipur 30/03/2015 13 05 18 Kota 5/04/2015 07 - 07 Laripara 25/04/2015 04 05 09 Bhanrakachhar 22/05/2015 02 - 02 Lokband 4/06/2015 07 - 07 Kargikala 9/07/2015 07 - 07 Ramnagar 28/07/2015 04 01 05 Lamkena 24/08/2015 07 - 07 Bandha 1/09/2015 04 01 05 Nangchui 15/09/2015 07 - 07 Litiya 29/09/2015 10 03 13 Mendrapara 9/10/2015 11 - 11 Imlipara 12/10/2015 11 - 11 Tendua 27/10/2015 03 03 06 Pali 12/11/2015 14 - 14 Surajpur 15/12/2015 08 - 08 Litiya 22/12/2015 09 01 10

P-18

Devari 12/02/2015 09 0 9 Bodhapara 16/03/2015 09 0 09 SangwaKapa 3/05/2015 02 0 02 Umariya 24/06/2015 03 0 03 Kanteli 29/06/2015 10 0 10 Mohtara-Khurd 12/07/2015 07 01 08 Hardi-Khektra 30/07/2015 05 02 07 Devgaon 5/08/2015 06 0 06

Page 64: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Sub No. Village/ Location of FGD & Individual Consultation Date Participation of Community

Male Female Total Ramtala 07/09/2015 06 0 06 Jamkor 3/10/2015 17 0 17 Surighat 6/10/2015 08 0 08 Bortarakala, 1/11/2015 15 03 18 Chilphi 4/11/2015 15 0 15 Khamhi 26/11/2015 13 0 13 Khirwar-Khurd 30/11/2015 07 01 08

P-19

Binori 22/03/2015 06 0 06 Tikari 9/04/2015 10 0 10 Khaira 14/06/2015 09 0 09 Chisda 4/07/2015 07 0 07 Ahilda, 20/07/2015 12 0 12 Nevari 24/07/2015 08 0 08 Malhar 1/08/2015 07 0 07 Pachpedhi 13/08/2015 07 0 07 Durwakari, 18/08/2015 08 0 08 Jondhara 20/08/2015 07 0 07 Bakarkuda, 4/09/2015 08 0 08 Chichirda 7/11/2015 06 0 06 Chakarbedha 16/11/2015 06 0 06 Masturi 5/12/2015 07 0 07 Burikhara 9/12/2015 06 0 06

Source- Information provided by NGO

Page 65: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure- 05

Status of Grievances Received and Redressal Package-16

SR. No. Date Applicant Village Agenda Point NGO Action Status

/ / MittuKrash Birra Dou t that his stru ture is ith

t of e ter poi t. Measure e t do e, fou d after

t. Stru ture ot distru . Reje t

/ / Vija Agra al Birra Dou t that his stru ture is ith

t of e ter poi t.

E hro haer ut ot i ul era le group, so o

o pe satio . Reje t

/ / Deepak Vis as Birra Appl for Measure e t of his

stru ture

st Refuse to pro ide stru ture easure e t, he he fou d

others are getti g o pe satio the he Appl for Measure e t

of his stru ture.

Appro e

/ / Phool Si gh Krash Birra Appl for Measure e t of his

stru ture

st Refuse to pro ide stru ture easure e t, he he fou d

others are getti g o pe satio the he Appl for Measure e t

of his stru ture.

Appro e

/ / RafikBa Birra Dou t that his stru ture is ith

t of e ter poi t. Measure e t do e, fou d after

t. Stru ture ot distru . Reje t

/ / BholaKash ap Birra Dou t that his stru ture is ith

t of e ter poi t. Measure e t do e, fou d after

t. Stru ture ot distru . Reje t

/ / Bihari Hotel Birra Dou t that his stru ture is ith

t of e ter poi t. Measure e t do e, fou d after

t. Stru ture ot distru . Reje t

/ / Ma i Ra Kash ap Birra Dou t that his stru ture is ith

t of e ter poi t. Measure e t do e, fou d after

t. Stru ture ot distru . Reje t

/ / Gopi Ra Birra Dou t that his stru ture is ith

t of e ter poi t. Measure e t do e, fou d after

t. Stru ture ot distru . Reje t

/ / Gopi Cha d Krash Birra Dou t that his stru ture is ith

t of e ter poi t. Measure e t do e, fou d after

t. Stru ture ot distru . Reje t

/ / PardeshiShau Birra Dou t that his stru ture is ith

t of e ter poi t. Stru ture after ut off date. Reje t

Page 66: IND: Chhattisgarh State Road Sector Project · PDF fileGovernment of Chhattisgarh has applied a loan through Government of India from ... having a total length of 191.95km of all the

Annexure- 05

SR. No. Date Applicant Village Agenda Point NGO Action Status

/ / RupeshAgra al Birra Dou t that his stru ture is ith

t of e ter poi t. Measure e t do e, fou d after

t. Stru ture ot distru . Reje t

/ / Bahadur Birra Dou t that his stru ture is ith

t of e ter poi t.

Measure e t do e, fou d after t. Stru ture ot distru . He

as lai i g other propert o his a e. ut ot pro ided proof.

Reje t

/ / Ra dharKe at Siladehi Appl for Measure e t of his

stru ture

st Refuse to pro ide stru ture easure e t, he he fou d

others are getti g o pe satio the he Appl for Measure e t

of his stru ture.

Appro e

/ / Pila Ra sahu Kera Appl for Measure e t of his

stru ture

st Refuse to pro ide stru ture easure e t, he he fou d

others are getti g o pe satio the he Appl for Measure e t

of his stru ture.

Appro e

/ / He LalSat a i Kera Appl for Measure e t of his

stru ture

st Refuse to pro ide stru ture easure e t, he he fou d

others are getti g o pe satio the he Appl for Measure e t

of his stru ture.

Appro e

/ / Ga patiSahu Kera Dou t that his stru ture is ith

t of e ter poi t. Measure e t do e, fou d after

t. Stru ture ot distru . Reje t

/ /

Kesa Prasad Dadse a

Ba ha idih

Dou t that his stru ture is ith t of e ter poi t.

Measure e t do e, fou d after t. Stru ture ot distru . Reje t