IN THE MATTER OF AN ARBITRATION
UNDER THE RULES OF ARBITRATION OF THE INTERNATIONAL
CENTRE FOR THE SETTLEMENT OF INVESTMENT DISPUTES
ICSID CASE No. ARB/14/22
BETWEEN:
BSG RESOURCES LIMITED
Claimant
- v -
THE REPUBLIC OF GUINEA
Respondent
CLAIMANT'S MEMORIAL
Karel Daele
James Libson
Mishcon de Reya Solicitors
Summit House
12 Red Lion Square
WC1R 4QD
London
Tel: +44 (0) 20 7440 7060
Fax: +44 (0) 20 7831 3487
2
CONTENTS
I. INTRODUCTION ........................................................................................................................ 5
1.1 Preliminaries .................................................................................................................................. 5
1.2 Summary of BSGR's claims........................................................................................................... 5
1.3 The nature of the projects at issue in this case ............................................................................... 8
1.4 Related proceedings ....................................................................................................................... 9
1.5 The BSGR Group ......................................................................................................................... 10
II. BACKGROUND FACTS .......................................................................................................... 15
2.1 The geographical areas in question .............................................................................................. 16
2.2 The Guinean opportunity ............................................................................................................. 16
2.3 Prospecting permits over Simandou North and Simandou South ............................................... 18
2.4 The Memorandum of Understanding .......................................................................................... 21
2.5 BSGR group investment in Simandou North and Simandou South ............................................ 22
2.6 Application for and grant of Blocks 1 and 2 Permit ................................................................... 23
2.7 The Base Convention and the Zogota Mining Concession ......................................................... 27
2.8 Joint Venture with Vale .............................................................................................................. 32
2.9 Further investments in relation to Project Zogota and Blocks 1 and 2 ....................................... 34
2.10 Summary of Investments made in Guinea ................................................................................... 35
2.11 The election of Alpha Condé and the campaign against BSGR .................................................. 36
2.12 The Technical Committee "investigation" ................................................................................... 44
2.13 The end game .............................................................................................................................. 46
2.14 Expropriation of BSGR's investments ......................................................................................... 50
2.15 The Measures were politically motivated .................................................................................... 52
III. BSGR'S CLAIMS ...................................................................................................................... 55
3.1 Summary ...................................................................................................................................... 55
3.2 Mining Rights .............................................................................................................................. 56
3.2.1 The Mining Code .......................................................................................................... 56
3.2.2 The Base Convention ................................................................................................... 60
3.2.3 The new 2011 Mining Code ......................................................................................... 66
3.2.4 Conclusions .................................................................................................................. 68
3.3 Infrastructure Rights. ................................................................................................................... 69
3
3.3.1 The BOT Act. ............................................................................................................... 69
3.3.2 The Base Convention as a qualifying development infrastructure project ................... 71
3.4 Breaches of the Investment Code................................................................................................. 75
3.4.1 Breach of Article 5 of the Investment Code ................................................................. 75
a. "Investments carried out by… corporations" ..................................................... 75
b. Indirect expropriation of BSGR's investment in BSGR Guinea ........................ 78
c. The Measures constituted an involuntary taking of BSGR's investments .......... 80
d. The Measures constituted an illegal expropriation ............................................. 86
e. No compensation provided in respect of the expropriation................................ 86
3.4.2 Breach of Article 6 of the Investment Code ................................................................. 86
3.4.3 Breach of Article 30 of the Investment Code ............................................................... 87
3.5 Breaches of the Mining Code ...................................................................................................... 89
3.5.1 Breach of Article 21 of the Mining Code ..................................................................... 89
3.5.2 Breach of Article 22 of the Mining Code ..................................................................... 90
3.5.3 Breach of Article 11 of the Mining Code ..................................................................... 91
3.5.4 Breach of Article 26 of the Mining Code ..................................................................... 91
3.5.5 Breach of Article 41 of the Mining Code ..................................................................... 91
3.6 Breaches of the BOT Act….. ....................................................................................................... 92
3.6.1 Breach of Article 7.1 of the BOT Act .......................................................................... 92
3.6.2 Breach of Article 7.2.2 of the BOT Act ....................................................................... 92
3.6.3 Breach of Article 7.2.7 of the BOT Act ....................................................................... 93
3.6.2 Breach of Article 7.2.12 of the BOT Act ..................................................................... 93
3.7 Breaches of International Law ..................................................................................................... 94
3.8 Flaws in the process by which Guinea decided to implement the Measures ............................... 96
3.8.1 The review process was ultra vires ............................................................................... 97
3.8.2 The review process was unfair, partial and dependent ................................................. 98
a. Composition of the review committees .............................................................. 98
b. The process in which the Technical Committee engaged was unfair............... 100
c. The conclusion was pre-determined ................................................................. 104
3.9 No substance to the corruption allegations ................................................................................ 104
3.9.1 Preliminary observations ............................................................................................ 104
3.9.2 BSGR did not corrupt Guinean officials .................................................................... 107
4
a. The Simandou North Permits, the Simandou South Permits and the
Memorandum of Understanding ...................................................................... 107
b. Blocks 1 and 2 Permit ...................................................................................... 109
c. The Base Convention and the Zogota Mining Concession .............................. 111
3.9.3 No involvement of Ms. Mamadie Touré .................................................................... 113
3.9.4 No undue pressure by President Conté ....................................................................... 115
3.9.5 Conclusions ................................................................................................................ 118
IV. JURISDICTION ...................................................................................................................... 119
4.1 Article 25(1) of the ICSID Convention ...................................................................................... 119
4.2 The Dispute is a legal dispute .................................................................................................... 120
4.3 The Dispute arose directly out of an Investment ....................................................................... 120
4.4 The Dispute is between a Contracting State and a National of another Contracting State ....... 121
4.5 The Parties have consented in writing to ICSID Arbitration ..................................................... 122
4.5.1 The Investment Code .................................................................................................. 122
4.5.2 The Mining Code ........................................................................................................ 123
V. RELIEF SOUGHT ................................................................................................................... 128
5
I. INTRODUCTION
1.1 Preliminaries
1. This Statement of Claim is served on behalf of the Claimant (“BSGR”)
pursuant to Procedural Order No.1. Attached to this document are:
(i) Witness statements of Beny Steinmetz (CWS-1), Marc Struik (CWS-2),
Asher Avidan (CWS-3), Joseph Tchelet (CWS-4), Mahmoud Thiam
(CWS-5), Patrick Saada (CWS-6), Dag Cramer (CWS-7) and Saifee
Durbar (CWS-8);
(ii) Exhibits, marked [C-]; and
(iii) Legal authorities, marked [CL-]
1.2 Summary of BSGR’s Claims
2. In summary, BSGR and its investments have been treated in an unlawful,
unfair, inequitable and discriminatory manner by the Guinean state (including
by its agencies and/or instrumentalities) and in a manner which demonstrated a
blatant disregard and breach of both (a) the express undertakings the State itself
had provided directly to BSGR; and (b) applicable Guinean and international
law (which guaranteed protection to BSGR and its investments).
3. At the heart of this case is the withdrawal of certain vested rights comprised in
particular of the following:
(i) An iron ore mining concession granted on 19 March 2010 over an area
of 1,024 square kilometres on Mount Younon in Simandou South, near
the village of Zogota (the "Zogota Mining Concession").
(ii) A mining and infrastructure agreement dated 16 December 2009 with
the Republic of Guinea regarding largely (though not exclusively) the
6
rights and obligations arising from the Zogota Mining Concession (the
"Base Convention").
(iii) A prospecting permit over an area referred to as Simandou Blocks 1 and
2 (covering an area of 369 square kilometres in the prefecture of
Kérouané) granted on 9 December 2008, giving rise to (i) an exclusive
right to prospect for iron ore and (ii) once a feasibility study has
established the presence of economically viable deposits (which were
established), a right to develop and operate the area (by way of
operating permit or mining concession) (the "Blocks 1 and 2 Permit").
4. Those vested rights were expropriated by the Republic of Guinea by means of
three executive orders: (i) a Presidential Order dated 17 April 2014 terminating
the Zogota Mining Concession, (ii) a Ministerial Order dated 18 April 2014
terminating the Blocks 1 and 2 Permit and (iii) a Ministerial Order dated 23
April 2014 terminating the Base Convention.
5. The expropriation of those rights was without justification and BSGR is
entitled to be compensated (and to the other relief claimed herein) for the loss
of its investments.
6. The purported justification for this unlawful expropriation was given in a report
of a committee (the “Technical Committee”) dated 21 March 2014 (the
"Technical Committee Report"). The Technical Committee had been
established by the current President, Mr Alpha Condé, to investigate allegations
of corruption against the BSGR group. The Report recommended the
withdrawal of the vested rights identified above on the putative basis that those
rights had allegedly been obtained by corruption. In particular, the Report
incorrectly alleged that the BSGR group had obtained the rights enumerated
above by bribing the alleged fourth wife, Ms Mamadie Touré, of the former
President, General Lansana Conté. The latter was the President of Guinea from
5 April 1984 until his death on 22 December 2008. However, as explained
below, the process adopted by the Technical Committee when investigating the
allegations made against the BSGR group and in producing its report was
7
fundamentally flawed and involved a violation of both Guinean and
international standards of due process. Further, and in any event, the allegations
made by the Technical Committee and its putative “recommendations” were
and are demonstrably false and provided no basis whatsoever for the
expropriation that took place in April 2014.
7. What is more, at the time of the entry into the Base Convention on 16
December 2009 and the granting of the Zogota Mining Concession on 19
March 2010, President Conté had been dead for over a year and Ms Touré (who
was not in any case his fourth wife) was living in Sierra Leone, having fled
following a military coup by Captain Moussa Dadis Camara.. Ms Touré had no
possible influence at that (or any other) time.
8. As regards the Blocks 1 and 2 Permit, there was similarly no credible evidence
put forward by the Technical Committee to support its allegation that this was
obtained by corruption, and it is demonstrably untrue.
9. Even if one goes further back in time (as the Technical Committee purported to
do in its Report) to the granting of earlier mining rights to BSGR (known as the
Simandou North Permits and the Simandou South Permits), there is no
substance at all to the Technical Committee’s allegations.
10. The truth of the matter is that not only do BSGR's own witnesses testify that it
did not obtain its expropriated rights by corruption, but also the ministers and
officials in the Guinean administration that were directly involved in their
granting do so. Indeed, first in a criminal investigation conducted by the
Guinean Public Prosecutor, Mr Ousmane Coumbassa, and then in a criminal
investigation conducted by the Swiss Public Prosecutor, Mr Claudio Mascotto,
nine former Guinean Ministers and senior officials made statements under oath
to that effect.
11. Guinea’s conduct resulted in the expropriation, without compensation, of
BSGR’s very substantial and valuable investments in Guinea in or around April
2014.
8
12. BSGR therefore has brought this arbitration in order to obtain protection from
and compensation for Guinea’s unlawful conduct, and in particular for the
violation of its duties and obligations under (a) the Guinean Investment Code,
(b) the Guinean Mining Code, (c) the Guinean BOT legislation and (d)
international law. BSGR has suffered and continues to suffer very significant
losses as a result of Guinea’s unlawful conduct. In these proceedings, BSGR
therefore seeks all available relief in respect of that unlawful conduct.
1.3 The nature of the projects at issue in this case
13. Mining is a speculative business. Often, at the beginning of a project,
significant investment is made and work carried out without any guarantee of a
return (that is, without any guarantee of finding a deposit of an economically
significant size). To succeed in the mining sector, a company must be willing to
accept the risk that not all of its projects will bear fruit.
14. While the risk is substantial, so too can be the reward. The discovery of a
world-class deposit is rare, and has the potential to generate enormous profits
for a mining company. Mining rights over such deposits can be highly valuable
assets, and the competition to acquire them (and hold onto them) is fierce. For
this reason, even when a mine could be operated profitably, some of the
dominant mining companies sometimes decide to obtain mining rights which
are then not exploited; leaving the commodity in the ground, unmined, can
increase the market price of what has already been mined, and an unexploited
right to mine has the effect of preventing a commercial competitor from mining
on that site.
15. BSGR does not operate in this way. BSGR is a smaller company than mining
giants such as Rio Tinto, Vale and BHP Billiton and can therefore make
decisions more quickly. Governments favour this, and BSGR has built up an
excellent reputation.1
1 Beny Steinmetz Witness Statement (CWS-1), para 11.
9
16. Mining companies which operate in Africa bear a heavy responsibility. For
many African countries, such as Guinea, natural resources represent their chief
(if not their only) significant asset, and their route out of poverty. Wealth is
created from these resources by their extraction and sale. It is incumbent on
mining companies to deploy their rights and develop their projects
expeditiously, thereby creating wealth for their host country, as well as profit
for themselves. BSGR has a proven track record in this regard, having brought
mines in Sierra Leone, Zambia, the DRC, Macedonia, Kosovo and Guatemala
into production. So far as BSGR’s work in Guinea is concerned, prior to the
improper intervention of President Alpha Condé’s government, BSGR and its
joint venture partner was on target to achieve its first production of iron ore by
the end of 2012. This would have represented the first ever production of iron
ore in Guinea since its independence in 1958. Instead, the people of Guinea are
yet to derive any benefit from their vast reserves of iron ore, having been badly
served both by international mining companies (in the form of both Rio Tinto
and Vale) and their own government.
17. In addition to the mining component of BSGR's activities in Guinea, there was
also a very substantial and crucial infrastructure component so as to export the
iron ore out of the country. This included but was not limited to the financing
and construction or rehabilitation of three railways, the rehabilitation of an
existing port and later the construction of new port.
18. Until the events which are the subject of this arbitration, BSGR’s operations
had never been impugned.
1.4 Related proceedings
19. The underlying background facts giving rise to this arbitration also give rise to
a claim which will shortly be brought by two of BSGR’s subsidiary companies,
BSG Resources (Guinea) Limited ("BSGR Guernsey") and BSG Resources
(Guinea) Sarl Limited ("BSGR Guinea") v. Guinea (the "Second ICSID
Arbitration"). The claimants in that arbitration, and BSGR as Claimant in this
arbitration, will in due course make an application for the consolidation of this
arbitration and the forthcoming Second ICSID Arbitration.
10
20. The Brazilian mining company Vale and BSGR entered into a joint venture in
April 2010 in relation to the BSGR group’s investments in Guinea, as described
more fully below. Vale has commenced LCIA arbitration proceedings (LCIA
No.14283) against BSGR pursuant to the arbitration agreement contained in
their joint venture agreement. If it were not for the unlawful actions of the
Respondent, the LCIA proceedings would not have been commenced.
1.5 The BSGR group
21. BSGR is a company registered under the laws of the bailiwick of Guernsey
with registration number 46565. Its principal office is in West Wing, Frances
House, Sir William Place, St Peter Port, Guernsey. BSGR was incorporated in
2003 as a limited company in Jersey; and migrated in March 2007 to
Guernsey.2
22. BSGR is part of the “BSG group”, an international diversified mining group
with operations in multiple countries within the Beny Steinmetz Group
(“BSG”). BSG is a group of companies ultimately owned by the Balda
Foundation, a Liechtenstein trust of which Mr Beny Steinmetz is a beneficiary.3
BSG has global operations in natural resources, real estate and the diamond
industry. BSGR is BSG’s natural resources company.4
BSGR has been active in
the natural resources sector since 1999. It has projects all over the world, but
Africa and the Former Soviet Union have historically been a particular focus of
its investments. Before BSGR’s investment in the project in Guinea, its African
mining experience included (i) a diamond mining operation in Sierra Leone;
(ii) copper and cobalt production in Zambia and the DRC and (iii) an alumina
smelting project in South Africa, as well as numerous other exploration
projects in iron ore, coal and other commodities.5 BSGR has a 15-year track
record of developing, as well as executing, mining operations, employing over
2 Yossie Tchelet Witness Statement (CWS-4), para 12.
3 CWS-1, para 1.
4 BSGR’s Chronicle of Events and Overview of BSGR’s Iron Ore Investment in Guinea in Response to
the Technical Committee dated 26 December 2012 (Exhibit C-0001), p.3-7. 5 BSGR Presentation dated May 2005 (Exhibit C-0002).
11
8,000 people whilst creating value and prosperity both for its stakeholders and
also for the host countries.6
23. BSGR’s investments in Guinea were made principally through its
shareholdings in three subsidiaries, the BVI company BSG Resources (Guinea)
Limited ("BSGR Guinea BVI"), the Guernsey company BSG Resources
(Guinea) Limited ("BSGR Guernsey") and the Guinean company BSG
Resources (Guinea) Limited Sarl ("BSGR Guinea").
24. BSGR Guinea BVI is a company registered under the laws of the British Virgin
Islands on 28 October 2005 with the registration number 682852 and with its
registered office in the British Virgin Islands, Akara Building, 24 De Castro
Street, Wickhams Cay I, Road Town, Tortola.
25. BSGR Guernsey is a company registered under the laws of the Bailiwick of
Guernsey on 10 February 2009 with the registration number 50001 and with its
registered office in Guernsey, West Wing Frances House, Sir William Place St
Peter Port Guernsey GY1 1GX.
26. BSGR Guinea is a company incorporated under the laws of Guinea on 24
November 2006 with its registered offices at Immeuble Bleu, 5ème étage
Résidence 2000, Moussoudougou-C/Matam, Conakry, Republic of Guinea,
Post Box 6389.
6 CWS-1, para 12.
12
27. Up to November 2006, BSGR held its investment in Guinea as follows:
28. As at November 2006, BSGR held its investment in Guinea as follows:
BSGR
100%
BSGR Steel Holdings
82.35%
BSGR Guinea BVI
100%
BSGR Guinea Sárl
BSGR
100%
BSGR Steel Holdings
82.35%
BSGR Guinea BVI
13
29. As at March 2008, the structure was streamlined and the investment was held
as follows:
30. As at January 2009, an internal re-structuring took place and BSGR Guernsey
was inserted into the corporate structure. BSGR’s shareholding was therefore
structured as follows:
BSGR
100%
BSGR Steel Holdings
100%
BSGR Guinea 100%
BSGR Guinea Sárl
BSGR
100%
BSGR Guernsey
100%
BSGR Guinea Sárl
14
31. Following a sale of 51% of the shares in BSGR Guernsey to Vale in April 2010,
the position was as follows:
32. In addition, BSGR Guinea changed its name to VBG-Vale BSGR Sarl ("VBG
Guinea") and BSGR Guernsey changed its name to VBG-Vale BSGR (Guinea)
Guernsey ("VBG Guernsey"). On 14 June 2010 the Guinean Court of First
Instance in Conakry formally registered “VBG – Vale BSGR Guinea” as the
new name of BSGR Guinea. However, each company remained as the same
corporate entity and, for consistency, each will continue to be referred to herein
as BSGR Guernsey and BSGR Guinea respectively.
VBG-VALE BSGR (GUINEA) 100%
VBG-VALE BSGR SARL
BSGR 49%
VALE S.A 51%
15
33. Following the re-purchase of the Vale shareholding by BSGR on 13 March
2015, the position has reverted to that as at January 2009:
34. Accordingly, BSGR Guinea is once again a wholly owned subsidiary of BSGR
Guernsey. Furthermore, VBG Guinea changed its name back to BSG
Resources (Guinea) S.A.R.L. ("BSGR Guinea"); and VBG Guernsey changed
its name back to BSG Resources (Guinea) Limited ("BSGR Guernsey").
II. BACKGROUND FACTS
35. The factual background set out below (and in the accompanying witness
evidence) will assist the Tribunal in understanding: (a) the process by which
BSGR and its subsidiaries initially made their substantial investments in
Guinea; (b) the nature of the highly valuable bundle of property and contractual
rights held by BSGR and its subsidiaries in Guinea from time to time; and (c)
the unlawful conduct and campaign waged by Guinea against the BSGR group,
which ultimately resulted in April 2014 in the illegal expropriation of those
valuable rights without any compensation.
16
2.1 The geographical areas in question
36. The exploration and mining rights in question in this arbitration covered two
geographical areas in particular:
(i) “Simandou North and Simandou South” shown in the map above as
Simandou-South Zogota. This included (in Simandou South) an area on
Mount Younon, near the village of Zogota which became known as the
Zogota Project; and
(ii) An area referred to herein as “Simandou Blocks 1 and 2” shown in the
map above as Block 1 and Block 2.
2.2 The Guinean opportunity
37. By 2005, BSGR had assembled a significant and diverse portfolio of mining
and metal assets and, in Africa, had invested in South Africa, Sierra Leone,
17
Zambia and the DRC.7
It had developed a reputation as an ambitious and
accomplished investor in the African natural resources market.
38. BSGR learned that large iron ore resources were thought to exist in the
Simandou region of Guinea. However, no survey had ever identified the precise
locations of these deposits.8
39. BSGR, through its subsidiary BSGR Guinea BVI, set about preparing its
application for prospecting permits over areas of Simandou North and
Simandou South. Prospecting permits (also known as research permits or
exploration permits) conferred on the holder the exclusive right to conduct
exploratory (i.e. prospecting) work over the area they covered. They did not
confer a right to mine any deposits which were discovered. The application
process was governed by Guinea’s 1995 Mining Code (“the Mining Code”).
Article 28 of the Mining Code provided that a prospecting permit was issued by
order of the Minister of Mines, on recommendation by the Agency for the
Promotion and Development of Mining (the "Centre de Promotion et de
Développement Minier" or “CPDM”).9
The applicant had to demonstrate that it
was committed to carrying out the work and possessed sufficient technical and
financial capability to do so.
40. Perhaps because the Simandou region was widely rumoured to hold vast
resources of iron ore, BSGR was not the only applicant for prospecting permits
in the Simandou region. Rio Tinto, Vale (at the time known as Companhia Vale
do Rio Doce or “CVRD”), Mitsubishi and BHP Billiton also submitted
applications.
41. All five companies were summoned separately for meetings with
representatives of the Ministry of Mines and the CPDM. The purpose of the
7 Exhibit C-0001, para.19.
8 Ibid, para. 20.
9 Mahmoud Thiam Witness Statement (CWS-5), para. 24.
18
meetings was to assess each applicant’s technical and financial capability to
carry out the necessary works.10
42. When BSGR attended its meeting with the Ministry of Mines and the CPDM, it
gave a presentation highlighting its significant experience in exploration and
mining in Africa.11
BSGR was able to demonstrate not only that it had the
technical and financial capabilities to carry out the prospecting works and
Feasibility Studies, but also that it could (and would) do so more expeditiously
than the larger mining companies. Mr Struik made clear at the meeting that
BSGR regarded Simandou North and Simandou South as a core asset that
required immediate capital investment in order to determine whether an
operational iron ore mine could be established in these areas. By contrast, other
companies regarded the Simandou project as a strategic future asset for their
books (and to keep off the books of competitors) which would only require
capital if developed in the long term. Mr Struik also demonstrated that BSGR,
as a privately owned company, acted decisively and had the ability to make
quick decisions. Its activities were not hampered by the corporate bureaucracy
that affected most major mining companies.12
2.3 Prospecting permits over Simandou North and Simandou South
43. On 6 February 2006 the then Minister of Mines, Dr Ahmed Tidiane Souaré,
issued two ministerial orders:
(i) The first order granted BSGR Guinea BVI four prospecting permits
covering 2047 square kilometres in the prefectures of Beyla, Macenta,
Nzérékoré and Yomou (the “Simandou South Permits”)13;
10
Exhibit C-0001, para. 29; Letter from Cesare Morelli to Marc Struik dated 15 June 2015 (Exhibit C-
0003). 11
Exhibit C- 0002. 12
Marc Struik Witness Statement (CWS-2), para 22. 13
Decree No. 2006/706/MMG/SGG dated 6 February 2006 (Exhibit C-0004).
19
(ii) The second order granted BSGR Guinea BVI three prospecting permits
covering 1286 square kilometres in the prefecture of Kérouané (the
“Simandou North Permits”)14
.
44. In accordance with Articles 29 and 30 of the Mining Code, these permits were
each granted for a period of 3 years, renewable twice for periods of 2 years at a
time. At each renewal, 50% of the area covered by the permits had to be
retroceded to the Republic of Guinea.
45. Amongst other things, the permits required (a) the submission of monthly
activity reports and quarterly financial reports to the CPDM; (b) the carrying
out of a work program and the completion of a Feasibility Study; and (c)
payment of administration fees, stamp duty and land tax.
46. Several senior Government officials have explained under oath how BSGR
obtained these mining rights. The gist of their evidence is that these rights were
obtained in accordance with the Mining Code and standard administrative
proceedings.
47.
14
Decree No. 2006/707/MMG/SGG dated 6 February 2006 (Exhibit C-0005). 15
16
[PROTECTED]
[PROTECTED][PROTECTED]
20
48.
49. Three other senior Guinean officials, who were working at the Ministry of
Mines at the time the Simandou South Permits and the Simandou North
Permits were issued to BSGR, have testified in the Guinean criminal
investigation and the Swiss criminal investigation: (1) Mr Guillaume Curtis
who was the Economic Advisor to the Minister of Mines between 2002 and
2008 (between 2011 and 2014 he was the Secretary-General of the Ministry of
Mines and he is currently the Director-General of the Public Markets Authority
in Guinea), (2) Mr Aboubacar Koly Kourouma who was an official within the
Ministry of Mines between 1999 and 2009 and the Secretary-General of the
Ministry of Mines between 2009 and 2011, (3) Mr Noramou Cécé who was the
personal advisor on mines of President Conté in 2002 and the technical advisor
to the Minister of Mines between 2003 and 2008.
18
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
21
50. As will be set out further below, when the allegation of corruption and the role
of Ms Mamadie Touré will be specifically addressed, the gist of their evidence
is that there was no corruption involved in this matter and that Mamadie Touré
played no role in it. As their statements cover a longer period of time, including
the time when the Simandou North Permits and Simandou South Permits were
issued, it follows that, also according to these three officials, these rights were
not obtained by corruption.
2.4 The Memorandum of Understanding
51. On 20 February 2006 the BSGR group, through its BVI entity, entered into a
Memorandum of Understanding with Guinea, which set out the framework for
the parties’ co-operation (the “MOU”).19
BSGR committed to carrying out a
Feasibility Study within 30 months of the date on which the prospecting
permits were granted. The Feasibility Study was to include a detailed analysis
of the infrastructures required, including communication networks, export
facilities and the supply of electricity. Guinea, in turn, undertook to grant
BSGR a mining concession within six months of the completion of the
Feasibility Study, provided that BSGR had complied with the relevant
regulations of the Mining Code.
52.
19
Memorandum of Understanding between the Republic of Guinea and BSG Resources (Guinea)
Limited dated 20 February 2006 (Exhibit C-0009). 20
[PROTECTED]
[PROTECTED]
22
53. Not one of the witnesses has questioned the validity of the MOU or suggested
that it was entered into following corruption on the part of BSGR.
2.5 BSGR group investment in Simandou North and Simandou South
54. BSGR then began to plan its exploration programme. In November 2006,
BSGR Guinea was established as a local company in Guinea and a 100%
subsidiary of BSGR Guernsey. All its activities were conducted out of the
company office in Quartier Minière, Conakry.
55. An exploration camp was established in Kérouané in late 2006 and geological
mapping and drilling activities were commenced in Simandou North. Several
contractors were engaged, including (i) MSA Geological Consultants, a well-
known South African company, to conduct detailed field mapping and (ii)
Fugro Airborne Surveys (Pty) Limited to conduct airborne geophysical surveys
of the areas covered by its prospecting permits.
56. Initial fieldwork in 2007 in Simandou South resulted in the discovery of an iron
ore deposit on Mount Younon, near the village of Zogota. This became known
as the Zogota Project. Consequently, it was decided to cease exploration work
in Simandou North (as the initial drilling results were not encouraging) and to
move the staff and equipment onto the Zogota Project. A second exploration
camp was established in N’Zérékoré (about an hour and a half’s drive from
Zogota).
57. Foraco (a French drilling company) and another company, Geoprospects Ltd,
were contracted to carry out the drilling activities in Zogota. An additional
camp was set up in Simandou South, much closer to the drilling sites, in order
to expedite progress on the Zogota Project.
58. Foraco’s and Geoprospects’ work continued through 2008 and 2009 and a total
of 180 holes and 16,173 metres were drilled. In accordance with the Mining
Code and the terms of the relevant permits, monthly activity reports were
23
submitted to the CPDM throughout this period and the BSGR group worked
towards the completion of a Feasibility Study in respect of the Zogota Project.
2.6 Application for and grant of Blocks 1 and 2 Permit
59. On 28 July 2008, the Republic of Guinea withdrew the mining rights on
Simandou Blocks 1 to 4 from Rio Tinto's subsidiary Simfer S.A ("Simfer").
These areas therefore became available to other interested mining companies,
including BSGR.
60. On 5 August 2008, BSGR Guinea submitted an application for a prospecting
permit in respect of Simandou Blocks 1, 2 and 3. At least two other companies
(AfriCanada and a Chinese company) also submitted applications.
61. On 9 December 2008, the Minister of Mines at the time, Dr Loucény Nabé,
issued a decree granting BSGR Guinea a prospecting permit over Simandou
Blocks 1 and 2, covering an area of 369 square kilometres in the prefecture of
Kérouané. 21
In accordance with Articles 29 and 30 of the Mining Code the
Blocks 1 and 2 Permit was issued for a term of three years and was renewable
twice for maximum periods of two years each. Amongst other things, the
Permit required (a) the submission of monthly activity reports and quarterly
financial reports to the CPDM; (b) the carrying out of a work program and the
completion of a Feasibility Study; and (c) the payment of administrative fees,
stamp duty and surface tax.
62. Several senior ministers and officials in the Guinean administration have given
evidence on why Blocks 1 and 2 were first withdrawn from Simfer and on how
the Blocks were issued to BSGR. The thrust of this evidence is that no undue
influence was used, let alone that BSGR obtained those rights by corruption.
63.
21
Decree No. 2008/4980/MMG/SGG dated 9 December 2008 (Exhibit C-0010).
[PROTECTED]
24
[PROTECTED]
[PROTECTED]
25
64.
22
23
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
26
65.
66.
67.
68. The validity of the Blocks 1 and 2 Permit, issued by Minister of Mines Nabé
under the presidency of the deceased General Lansana Conté, was further
established by the confirmation of these rights by the regime that succeeded
General Conté, i.e. by President Captain Camara and his Minister of Mines Mr
Thiam.
24
25
26
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
27
69. First, on 21 January 2009 BSGR Guinea applied to renew the Simandou North
Permits and Simandou South Permits. 50% of each of Simandou South and
Simandou North was retroceded, as required by the Mining Code. The renewal
of these permits was granted by Minister Thiam on 10 June 2009.27
70. Secondly, on 5 May 2009, Minister Thiam issued a certificate confirming the
validity of the Blocks 1 and 2 Permit.28
BSGR Guinea therefore commenced
work on its drilling programme for Blocks 1 and 2 in May 2009.
2.7 The Base Convention and the Zogota Mining Concession
71. Meanwhile, BSGR and its subsidiaries continued to work towards the
completion of the Feasibility Study in respect of the Zogota Project. After
much hard work, the Feasibility Study was completed and submitted to the
CPDM on 16 November 2009.29
Running to some 450 pages, it demonstrated
the existence of a commercially operational iron ore deposit at Zogota. It was
the first such Feasibility Study ever to be submitted to the CPDM.
72. The CPDM conducted an initial review of the Feasibility Study and
recommended to the Ministry of Mines that BSGR and its subsidiaries be
invited to commence negotiations for a mining and infrastructure agreement.
On 1 December 2009 Minister Thiam established a Commission to conduct
these negotiations.30
73. The Commission consisted of 20 members from numerous governmental
departments, the Central Bank and the National Company of Mining
Infrastructure. Mr Avidan and Mr Struik led the negotiations on behalf of
BSGR. They were assisted by Tania Rakitina (a financial manager working in
BSGR Guinea’s Conakry office), Mohamed Doumbia (BSGR Guinea’s local
27
Decree No. A 2009/1327/PR/MMEH/SGG dated 10 June 2009 (Exhibit C-0012). These permits were
superseded when BSGR entered into the Base Convention and was granted the Zogota Mining
Concession. 28
Certificate of Validity of Permit No. 2008/I-4980/MMG/SGG issued by Mahmoud Thiam dated 5
May 2009 (Exhibit C-0013). 29
Zogota Feasibility Study dated October 2009 (Exhibit C-0014). 30
Decree No. A 2009/3466/PRG/SGG/MMEH dated 1 December 2009 (Exhibit C-0015).
28
counsel) and Ibrahima Sory Touré (BSGR Guinea’s Director of External
Relations).31
74. The Commission met every day from around 9am to 6pm, and met with BSGR
on several of those days. BSGR paid for the catering during these negotiations
and also paid each member of the Commission a daily allowance, in line with
standard practice.32
75. It was very important to BSGR to obtain permission from Guinea to export iron
ore through Liberia. Given the proximity of the Zogota Project to the Liberian
border, and the existence of rail and port infrastructure in Liberia, the project’s
economic viability depended upon the ability to export the iron ore mined at
Zogota from Liberia, rather than from Guinea.33
The exportation of iron ore
from Zogota through Liberia added an important infrastructure component to
the deal with Guinea. This component included inter alia (i) the construction of
a 102 km heavy cargo railway between the mine in Zogota and the village of
Sanniquellie on the border with Liberia (the "Sanniquellie railway"), (ii) the
rehabilitation of the existing cargo railway between Sanniquellie and the port of
Buchanan on the Liberian coast and (iii) the rehabilitation of the port of
Buchanan. In addition, BSGR agreed to reconstruct the 600 km passenger and
light cargo railway between Conakry and Kankan (the “Trans-Guinean
railway”). The details of this agreement formed part of the negotiations of the
Base Convention.
76. In return for also granting the right to export through Liberia the iron ore from
Blocks 1 and 2 (should a mining concession later be granted for those areas),
BSGR also agreed to extend the Trans-Guinean railway with another 200 km,
to the city of Kérouané. To be able to export the expected additional 30 million
tons of iron ore from Blocks 1 and 2, additional infrastructure works were
required, including (i) the construction of a heavy cargo railway between
Blocks 1 and 2 and Sanniquellie, (ii) the construction of a second heavy cargo
31
CWS-2, para. 79. 32
Ibid., paras 82-83. 33
Ibid., paras 84-85.
29
railway between Sanniquellie and the port of Buchanan and (iii) the
construction of a new deep-sea port southeast of Buchanan.
77. The Base Convention was signed on 16 December 2009. The relevant terms of
the Base Convention are addressed in detail below. Broadly speaking, the Base
Convention constituted a “mining agreement” for the purposes of the Mining
Code and an "infrastructure agreement" for the purposes of the Public-Private
Partnerships legislation in Guinea. It defined the rights and obligations of the
respective parties thereto and the conditions on which BSGR's mines would be
operated. In the words of Article 11 of the Mining Code, it was a “guarantee
to the mine title holder that these conditions will remain unvaried”. It also
specified the terms on which BSGR Guinea was entitled to operate within the
Zogota Mining Concession, including with regard to commercial production of
iron ore and its sale.
78. The Base Convention also spelt out the scale of the investments to be made by
BSGR and its subsidiaries, over two “phases”, and which included, in Phase I,
the building of (i) an open cast iron ore mine at Zogota; (ii) the construction of
the Sanniquellie railway; (iii) the reconstruction of 50% of the Trans-Guinean
railway; and (iv) the construction of an industrial area at Zogota. In Phase II,
BSGR was required to (v) construct a new railway from Blocks 1 and 2 to
Sanniquellie; (vi) construct a second railway between Sanniquellie and
Buchanan in Liberia; (vii) develop a new port southeast of Buchanan and (viii)
complete the rehabilitation to the Trans-Guinean railway between Conakry and
Kankan and (ix) extend the Trans-Guinean railway from Kankan to Kérouané.
79. BSGR and its subsidiaries were also required to submit a Feasibility Study in
respect of Blocks 1 and 2 within 24 months of the date of signature of the Base
Convention. The conclusions and terms of the Feasibility Study would facilitate
the negotiations for the grant of a Mining Concession over Blocks 1 and 2. By
clauses 11 and 12 of the Base Convention, BSGR undertook to invest billions
of dollars in inter alia the Zogota project and the Trans-Guinean railway.
80. On 19 March 2010, Guinea’s new President, General Sékouba Konaté:
30
(i) ratified the Base Convention by Presidential Decree34
; and
(ii) granted BSGR Guinea a mining concession in relation to the Zogota
deposit (an area of 1,024 square kilometres within Simandou South), in
accordance with Article 8 of the Base Convention.35
In accordance with
Article 41 of the Mining Code, the Zogota Mining Concession included
the exclusive and valuable right to carry out all kinds of prospecting and
development of deposits within the area of the concession. If substances
other than iron were identified, BSGR Guinea was obliged to inform the
Minister of Mines before carrying out any prospecting works. In this
event, BSGR Guinea had a right of first refusal, with the operating
terms to be defined in another agreement.
81. Several members who were involved in the negotiation of the Base Convention
and Zogota Mining Concession have given evidence on these negotiations.
The thrust of their evidence is that there was no corruption involved and that
the Base Convention was entered into and the Zogota Mining Concession was
granted in accordance with the law.
82.
34
Presidential Order No. 003/PRG/CNDD/SGG/2010 dated 19 March 2010 (Exhibit C-0016). 35
Presidential Order No. D2010/024/PRG/CNDD/SGG dated 19 March 2010 (Exhibit C-0017). 36
[PROTECTED]
[PROTECTED]
31
83.
84.
37
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
32
85.
2.8 Joint Venture with Vale
86. The award of the Blocks 1 and 2 Permit had dramatically increased the size of
the iron ore project in Guinea, and the investment needed to sustain it had
increased correspondingly. Thus, the BSGR group began to look for a joint
venture partner in April 2009.
87. After a number of prospective partners were deemed unsuitable, the BSGR
group eventually entered into negotiations with Vale in February 2010
regarding the creation of a joint venture and in particular, the potential sale to
Vale of a stake in BSGR Guernsey. The parties negotiated the detailed terms of
a Framework Agreement and a Shareholders’ Agreement, which were signed
on 30 April 2010. This involved the purchase by Vale of a 51% stake in BSGR
38
39
40
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
33
Guernsey. Vale agreed to pay a total of USD 2.5 billion for the stake, of which
USD 500 million was paid immediately and the USD 2 billion balance was to
be paid as and when contractually agreed milestones had been met.
88. BSGR Guernsey was renamed “VBG – Vale BSGR (Guinea) Guernsey” and its
subsidiaries were also renamed to reflect the joint venture.
89. On 19 March 2010 Minister Thiam wrote to Vale, stating that the Government
of Guinea welcomed the proposed joint venture and assuring Vale that BSGR
held legal rights through a duly obtained mining concession.41
90. On 16 April 2010, BSGR informed the Ministry of Mines that negotiations
regarding a joint venture with Vale were taking place.42
BSGR explained, “The
intention is that the Joint Venture will involve the purchase by Vale of a share
of 51% in BSG Resources (Guinea) Limited and, consequently, an indirect
share in BSG Resources (Guinea) SARL”. The letter explained that although no
formal approval was required under the terms of the Mining Code or the Base
Convention, both BSGR and Vale agreed that the obtaining of such approval
for the implementation of the joint venture was an important element in its
success.
91. The Ministry of Mines confirmed, by countersigning BSGR’s letter on the
same day, that it had no objection to the proposed joint venture and specifically
the acquisition of a 51% share of the share capital of BSG Resources (Guinea)
Limited.43
92. On 14 June 2010 the Guinean Court of First Instance in Conakry formally
registered “VBG – Vale BSGR Guinea” as the new name of BSGR Guinea44
.
However, as noted earlier, each company remained as the same corporate entity
41
Letter from Minister of Mines Mahmoud Thiam to E Ledsham of Vale dated 19 March 2010 (Exhibit
C-0023). 42
Letter from BSGR to Minister of Mines Mahmoud Thiam with Endorsement from Minister of Mines
Mahmoud Thiam dated 16 April 2010 (Exhibit C-0024). 43
Ibid. 44
Registration of change of name of VBG-VALE BSGR Guinea dated 14 June 2010 (Exhibit C-0025).
34
and, for consistency, each will continue to be referred to herein as BSGR
Guernsey and BSGR Guinea respectively.
2.9 Further investments in relation to Zogota and Blocks 1 and 2
93. At first, BSGR and its joint venture partner Vale were able to perform their
obligations under the Base Convention and the Blocks 1 and 2 Permit without
obstruction and work progressed quickly.
94. On 2 July 2010, Minister Thiam directed BSGR Guernsey and BSGR Guinea
to commence work on the feasibility study in respect of Sanniquellie railway.45
On the same day, Minister Thiam also directed to commence work on the
feasibility study for the Trans-Guinean railway.46
95. On 25 October 2010 BSGR notified the Ministry of Mines that the name of
BSGR Guinea had been changed.47
On 1 November 2010 Minister Thiam
acknowledged the change and “wish[ed] the new company great success”.48
96. On 22 November 2010, Ministry of Mines Thiam authorized BSGR Guinea to
commence work on the first 40 km of the Trans-Guinean railway.49
Following
this authorisation, the construction of the first 9km started and studies were
commissioned for the following 330 km sections.
97. Further activities included the completion of further social and environmental
studies as well as the construction of camps, maintenance and paving access
roads.
98. After much hard work, on 14 September 2011 BSGR and its joint venture
partner submitted a Feasibility Study in respect of Simandou Blocks 1 and 2,
just three years after BSGR had been granted a prospecting permit in those
45
Order of Service No. 0658/MMG/CAB issued by Mahmoud Thiam dated 2 July 2010 (Exhibit C-
0026). 46
Order of Service Re Reconstruction of the Conakry Kankan railroad issued by Mahmoud Thiam dated
2 July 2010 (Exhibit C-0027). 47
Dag Cramer Judicial Review Witness Statement (Exhibit C-0028); Letter from BSGR to the Ministry
of Mines dated 25 October 2010 (Exhibit C-0029). 48
Letter from Ministry of Mines to BSGR dated 1 November 2010 (Exhibit C-0030). 49
Letter from Minister of Mines Mahmoud Thiam and Minister of Transportation Mathurin Bangoura to
BSGR Guinea dated 22 November 2010 (Exhibit C-0031).
35
areas. This was a very impressive accomplishment, and stood in contrast to
Simfer S.A. (the prior holder of the prospecting permit in those areas) which
had failed to produce a feasibility study at all (and to date still have not
produced such study), despite having held permits for 11 years and for an
additional 6 years following the return to Rio Tinto of Blocks 3 and 4 in
December 2008 and granting of an exploration permit. The feasibility study
demonstrated the existence of commercially operational deposits within
Simandou Blocks 1 and 2. In accordance with its rights under Article 10 of the
Blocks 1 and 2 Permit, Article 26 of the Mining Code and Article 10.2 of the
Base Convention, BSGR Guinea applied for a mining concession to be
issued.50
2.10 Summary of investments made in Guinea
99. Accordingly, by April 2014 (when, as described below, BSGR's assets were
expropriated by Guinea), BSGR had directly and indirectly made very
significant investments into Guinea over the course of a number of years.
Those investments included both large financial contributions (exceeding USD
62 million) and non-financial contributions, as explained in the attached
evidence.51
100. In addition, a considerable amount (and effort) was spent in Liberia in relation
to an Infrastructure Development Agreement that would connect Guinea to
Liberia, enable the export of the iron ore form Zogota and Blocks 1 and 2
through Liberia and open up a free trade zone between the two countries with
much positive impact on the Mano River Region.
101. Furthermore, and against the background set out above, BSGR’s shareholdings
in its subsidiaries (including in particular BSGR Guinea BVI, BSGR Guernsey
and BSGR Guinea) constituted a key investment made by BSGR in Guinea.
50
Letter from VBG-VALE BSGR Guinea to the Ministry of Mines dated 14 September 2011
accompanying the feasibility study (Exhibit C-0032). 51
CWS-4, para. 43. BSGR also made a number of financial contributions which were related to and
made pursuant to the projects described herein but which did not flow directly into Guinea. These
investments will become particularly important at the quantum stage of the present proceedings.
36
The economic value of that shareholding in BSGR Guinea (and in BSGR
Guernsey) was derived from the important assets held by BSGR Guinea,
namely (a) the Zogota Mining Concession; (b) the Base Convention and (c) the
Blocks 1 and 2 Permit.
2.11 The election of Alpha Condé and the campaign against BSGR
102. President Alpha Condé was confirmed as the new President of Guinea by the
Supreme Court on 3 December 201052
. This followed a challenge to the
election result on the basis of fraud in some electoral districts. BSGR and its
subsidiaries' troubles began shortly thereafter.
103. On 8 February 2011, BSGR’s local counsel and others met with President
Condé and three members of the Ministry of Transportation. At that meeting
President Condé and the Minister of Transportation, Ahmed Tidiane Traoré,
made their position clear:53
(i) President Condé refused to sign the Protocole d’Accord regarding the
rehabilitation of the Trans-Guinean Railway. President Condé stated
that he would not sign any final document before a new Mining Code
was issued and there was an agreement regarding the time and cost of
the initiative.
(ii) President Condé stated that he would claim 50% of the money that
BSGR received from Vale under the joint venture agreements. He
commented, “It is inconceivable that people get rich thanks to assets
that should belong to the Guinean people”.
(iii) Under a new Mining Code, the Government would get 20% free carry
with the option to buy (at market value) an additional 15% of all mining
projects in the country.
52
BBC, "Guinea's Alpha Condé confirmed presidential poll winner" dated 3 December 2010 (Exhibit
C-0033). 53
Email from Daniel Pollak to Asher Avidan dated 9 February 2011 (Exhibit C-0034).
37
(iv) All deals signed before the accession of President Condé’s government
which did not privilege the interests of the Guinean people would be
revised and their terms amended.
(v) Minister Traoré noted that the US$1 billion that had been committed to
the rehabilitation of the Trans-Guinean railway may not be sufficient,
and that BSGR might have to pay the difference, from the money it
owed Guinea from the sale of its rights and concessions to Vale54
.
104. The new Government’s intention to extort money from BSGR and its
subsidiaries was clear. What followed can best be described as a campaign
against BSGR and its subsidiaries fought both on the ground in Guinea and in
the international press and which culminated, in April 2014, in the forcible (and
predetermined) taking by executive decree of the valuable mining and other
rights which BSGR and subsidiaries had obtained by dint of their hard work
and expertise, as outlined above.55
105. On 10 February 2011 legal adviser to the Ministry of Mines, Momo Sakho,
issued a document entitled “Policy Information for the Guinean Mining Sector”,
essentially announcing a shake-up of current mining practices and the intention
of the State to take profit from all phases of mining activity.56
106. Mr Avidan, the President of BSGR, then held two meetings in early February
2011 with President Condé. Mr Avidan was accompanied by Mr Saad (then
CEO of BSGR Guinea) and Mr Touré.57
During these meetings, President
Condé demanded a sum of US$1.25 billion from BSGR to be paid to him; and
threatened to halt the building of the Trans-Guinean railway and withdraw the
consent to exporting iron ore through Liberia if BSGR did not make that
payment. The demand appears to have been made on the wholly unjustified
54
Ibid., p. 2. 55
56
Policy Information for the Guinean Mining Sector dated 10 February 2011 (Exhibit C-0035). 57
Asher Avidan Witness Statement (CWS-3) paras 66-67;
[PROTECTED]
[PROTECTED]
38
basis that Guinea ought to be entitled to share in the monies BSGR received
from Vale for participating in the joint venture. President Condé thought that
BSGR had received a sum of US$2.5 billion from Vale up front for the joint
venture (the actual figure was US$500 million). He wrongly considered that it
was appropriate in such circumstances that he (or Guinea) ought to receive
50% of the monies received by BSGR pursuant to that joint venture.
Significantly, there was no suggestion whatsoever during these meetings that
BSGR had obtained its rights by corruption.
107. Mr Avidan reported this demand back to BSGR's board and others.
Unsurprisingly, it was rejected by both BSGR and Vale. There was simply no
basis whatsoever for Guinea to demand any such payment; or for BSGR to pay
it - particularly in circumstances where (i) Guinea had been aware of and had
consented to the terms of the joint venture; and (ii) BSGR and its subsidiaries
had obtained its rights in full compliance with the Mining Code.
108. However, the fact that the President was himself prepared to make this demand
for payment is significant. It demonstrates that, from the outset, the new
government was - from the top down - prepared to make unlawful demands and
threats against the BSGR group which had nothing to do with the group’s
performance or conduct in Guinea; but everything to do with the value
extracted from its investments. 58
109. Moreover, not only was the President prepared to make threats, but he was also
prepared to carry them out. In an effort to explain the background to the joint
venture, Mr Avidan wrote to the President on 14 March 2011 setting out the
benefits that BSGR’s investments would have for Guinea and the reasons
behind seeking external investment from a joint venture partner.59
110. BSGR received no response to this letter. Rather, and despite this attempt to
explain BSGR’s position, Guinea subsequently began an unjustified
investigation into BSGR and its subsidiaries. Its unlawful interference with
58
59
Letter from BSGR to the President of Guinea dated 14 March 2011 (Exhibit C-0036). [PROTECTED]
39
BSGR, its subsidiaries and their individual and collective investments, was
clearly linked to the refusal to accede to President Condé’s unjustified demands
for payment.
111. According to the whistle-blower website Mediapart, the subsequent
investigations into BSGR were directly linked to its refusal to accede to
President Condé’s demands for payment:
“The Steinmetz Group is certainly in trouble since it refused to put
its hand in its pocket to preserve its rights in Simandou. Rio Tinto,
which still owns half (but originally owned it in its entirety), has
agreed to pay an additional 700 million dollars. It was when BSGR
refused, that investigations into its dealings began.”60
112. For example, even before receipt of Mr Avidan’s letter, on 4 March 2011 the
Financial Times reported a senior official from the Ministry of Mines saying
“All contracts will be reviewed and reworked by the beginning of the second
half of this year… The government will become a minority shareholder in all
mining contracts”.61
This was despite the fact that the government was not a
shareholder under the Base Convention; and despite Article 167.2 of the
Mining Code, which expressly provided that:
“Due to the degree of investment required, the State does not take
free shares in the capital of a company operating substances of
special interest. If the State wishes to have a share in such a
company, the details are worked out with the investor within the
scope of the mining agreement. In all cases the State’s share in the
capital of such a company will be limited to a level which does not
hamper investors’ control of their operations.”62
113. Then, on 8 April 2011, the Ministry of Transportation wrongfully halted all
work on the ground in respect of the Trans-Guinean railway and informed
BSGR Guinea that the completion of the railway would be put out to tender.63
60
Mediapart, "Guinea, mining paradise that makes the world's mouth water" dated 7 October 2013
(Exhibit C-0037). 61
Financial Times, "Guinea to review mining licences" dated 4 March 2011 (Exhibit C-0038). See also
62
Guinean Mining Code 1995 Article 167.2 (Exhibit CL-0001). 63
Letter from Minister of Transport El Hadj Tidiane Traoré to BSGR Guinea dated 8 April 2011
(Exhibit C-0039).
[PROTECTED]
40
There was no reason at all to do this.64
Indeed, President Condé ignored the
advice of his own Minister who on 20 April 2011 advised him that this course
of action was not in the State’s best interests.65
114. The treatment of BSGR and its subsidiaries by Guinea contrasted strikingly
with the contemporaneous treatment of other companies which also had mining
rights in Guinea. For example, on 22 April 2011, Rio Tinto announced that it
and its subsidiary Simfer had entered into a “Settlement Agreement” with
Guinea which “secure[d] Rio Tinto’s mining title in Guinea”.66
The agreement
related to Blocks 3 and 4 of Simandou, in respect of which Rio Tinto
maintained prospecting permits. In return for the “resolution of all outstanding
issues and finalisation of new investment agreement terms” Simfer had agreed
to pay USD 700 million to Guinea “upon Promulgation of Presidential Decrees
granting its mining concession and the approval of the proposed Chalco and
Rio Tinto Simandou joint venture”. Critically, the press announcement stated:
“The parties have agreed that the terms of the Settlement
Agreement will not be affected by any changes introduced by the
Government of Guinea as a result of its current review of the
Mining Code or any future reviews.
Sam Walsh. Chief executive, Rio Tinto Ore said “Today’s
agreement gives us the certainty we need to allow us to invest and
move forward quickly…”67
115. In other words, Rio Tinto had paid a sum of USD 700 million in return for (a)
the promise of a grant of a mining concession; (b) the approval of its joint
venture and (c) to extract itself from any “current review of the Mining Code or
any future reviews”.68
In addition, the key terms of the Settlement Agreement
included the grant to Guinea (at no cost) of a 15% stake in the project, with the
right to take up a further 20% stake.69
Moreover, and despite the clear terms of
64
CWS-3, paras 70 and 72.1. 65
Letter to the President of Guinea regarding the Memorandum on the joint enterprise between Vale and
BSGR dated 20 April 2011 (Exhibit C-0040). 66
Rio Tinto Press Release, "Rio Tinto and Government of Guinea sign new agreement for Simandou
iron ore project" dated 22 April 2011 (Exhibit C-0041). 67
Ibid. 68
As explained below, Rio Tinto was not the only company that took this course. 69
Exhibit C-0041.
41
the Base Convention, and the advice of Minister Sakho, and despite the letter to
BSGR which indicated that execution of the Trans-Guinean Railway would be
put out to tender, the press announcement stated that a key term of the
Settlement Agreement included “A new rail line through Guinea” with Simfer
acting as a joint venture operator in the venture and with “priority use” of the
infrastructure and in which the Government was able to hold a maximum 51%
stake.
116. As threatened by the President in February 2011, a new mining code was
introduced and duly came into force on 9 September 2011 (“the 2011 Mining
Code”). However, by its own terms the 2011 Mining Code did not apply in
respect of any of the rights held by BSGR and its subsidiaries, including in
particular the mining rights held by BSGR Guinea under the Base Convention,
the Mining Concession and the Blocks 1 and 2 Permit. This is discussed in
more detail below.
117. On 4 October 2011 the Ministry of Mines wrongfully issued a notice to stop all
of BSGR Guinea’s works in Guinea, bizarrely claiming that they had been
initiated “without authorisation” or by a company of which it was unaware
named “VALE”.70
118. On 31 October 2011, the Ministry of Mines acknowledged receipt of the BSGR
Feasibility Study in respect of Blocks 1 and 2 (submitted on 14 September
2011). However, notwithstanding (a) that clear notice had been provided to the
Ministry of Mines regarding the joint venture between Vale and BSGR; (b) the
Ministry’s own formal acknowledgment of this (e.g. on 16 April 2010 and 1
November 2010) and (c) the Conakry Court of Appeal Order of 14 June 2010;
the Ministry inexplicably stated that it did not recognise the entity which had
carried out the Feasibility Study:
70
Letter from the Ministry of Mines to BSGR dated 4 October 2011 (Exhibit C-0042); Exhibit C-0028,
para. 71.2.
42
“In addition, the department has received a feasibility study from a
company named VBG (Vale BSGR Guinea) which is not the holder
of any title issued by the State of Guinea.”71
119. The Ministry also spuriously claimed that the Feasibility Study was prepared
“without the competent technical services of the Department of Mines and
Geology being involved for the validation of the various stages in conformance
with the applicable laws and regulations.” Finally, the Ministry asked BSGR
to provide an account of the wage status of all its Guinean and expatriate
workers, in particular the engineers.72
120. Despite asserting in its letter of 31 October 2011 that it would grant a delay of
three months in the imposition of the stop notice issued on 4 October 2011, on
17 November 2011 the Ministry of Mines wrongfully repeated its earlier
unlawful notice to stop the works. It stated inter alia that:
“Following letter dated 4 October 2011, the Ministry of
Mines…attracted the attention of [BSGR Guinea] regarding the
executing of Mining works and civil engineering on a large scale
by a certain company named VALE, in the zones where BSGR is
present.
In the absence of authorizations granting BSGR and VALE to
undertake these works, the Ministry of Mines and Geology has
given you formal notice to stop, or engage in stopping without any
delay, the abovementioned works.
Furthermore, in order for the Ministry of Mines to better
understand the situation of your company, we have requested that
you forward to us, within 48 hours, the totality of acts, agreements
and conventions that connect you to the State of Guinea or any
other partners”73
121. In the same document, the Ministry of Mines sent BSGR Guinea a detailed list
of queries for BSGR Guinea to answer.74
71
Letter from the Ministry of Mines to BSGR dated 31 October 2011 (Exhibit C-0043); Exhibit C-0028,
para. 71.2. 72
Ibid. 73
Letter from the Minister of Mines to VBG Vale BSGR dated 17 November 2011 (Exhibit C-0044). 74
Ibid.
43
122. Despite the significant disruption that this caused to its activities, BSGR
responded to those queries in detail. In a letter to the Minister of Mines dated
28 November 2011, BSGR explained its activities in Guinea and its partnership
with Vale and provided access to a data room containing documents supporting
that explanation.75
123. On 19 January 2012 the Ministry of Mines wrote again to BSGR, to complain
that it had delayed submitting its Feasibility Study on Zogota, despite the fact
that the original Feasibility Study had been submitted to the Ministry of Mines
in November 2009 and was available in the data room.76
Nevertheless, in an
attempt to co-operate, BSGR agreed to provide the Feasibility Study again, in
hard copy.77
124. On 3 February 2012 BSGR’s lawyers, Skadden Arps and Veil Jourde,
submitted to the Ministry of Mines four copies of 15 lever arch files comprising
50,000 pages confirming the legality of BSGR Guinea’s vested rights in Zogota
and Blocks 1 and 2.78
This was despite the fact that Guinea had already been
kept fully abreast of the joint venture agreements, ten hard copies of the
complete Zogota Feasibility Study had been handed over to the CPDM and
Ministry of Mines in November 2009, the documents also having been
disclosed to Guinea in electronic copy in the data room (and despite the fact
that Guinea’s requests fell outside any audit and inspection rights afforded by
the Mining Code and Base Convention).
125. However, notwithstanding the co-operation which BSGR sought to achieve
with the Government, it continued to face disruption to its activities in
75
Letter from BSGR to the Minister of Mines dated 28 November 2011 (Exhibit C-0045). 76
Letter from the Minister of Mines Mohamed Fofana to BSGR dated 19 January 2012 (Exhibit C-
0046); Exhibit C-0028, para. 71.3.2. 77
Letter from BSGR to the Minister of Mines Mohamed Fofana dated 20 January 2012 (Exhibit C-
0047). 78
Letter from Veil Jourde to the Minister of Mines dated 3 February 2012 (Exhibit C-0048); Exhibit C-
0028, para. 71.3.3.
44
Simandou, leading it to conclude that the objective of the State was to
expropriate its assets. 79
126. Accordingly, on 28 February 2012, BSGR complained about this interference.
It wrote to President Condé, raising its many concerns and calling for the
President’s personal intervention to “take every possible measure to remove the
obstacles” faced.80
This request was rebuffed: Mohamed Lamine Fofana, the
Minister of Mines, replied on 20 March 2012, and accused BSGR of attempting
to “establish privileged communication links” by writing directly to the
President.81
2.12 The Technical Committee “investigation”
127. Instead of assisting the BSGR group, Guinea did the precise opposite: on 26
March 2012 a National Mining Commission (“NMC”) was established by
Presidential decree.82
The NMC was granted the power to examine “the
extension, renewal, lease and cancellation applications for mining titles on the
basis of the provisions of the [2011] Mining Code”.83
128. This was shortly followed by a further Presidential decree, dated 29 March
2012, dividing the responsibilities of the NMC between two sub-committees84
:
(i) the Strategic Committee, which was given responsibility for political and
strategic issues related to the overall review programme for Mining Permits and
Conventions;85
and (ii) the Technical Committee, which was described as “the
operational arm of the [NMC] concerning the overall continuation,
redevelopment or withdrawal [of mining rights]”.86
It was responsible for daily
activities related to analyses of Mining Permits and Conventions.
79
80
Letter from BSGR to the President of Guinea dated 28 February 2012 (Exhibit C-0049); Exhibit C-
0028, para. 71.4; CWS-3, para. 72.6. 81
Letter from the Minister of Mines Mohamed Fofana to BSGR dated 20 March 2012
(Exhibit C-0050). 82
Decree No. D/2012/041/PRG/SGG dated 26 March 2012 (Exhibit C-0051). 83
Ibid., Article 2. 84
Decree No. D/2012/045/PRG/SGG dated 29 March 2012 (Exhibit C-0052). 85
Ibid., Article 3.1. 86
Ibid., Article 3.2.
[PROTECTED]
45
129. On 11 October 2012, Guinea stated that it would not grant BSGR Guinea a
right to export the iron ore originating from Simandou blocks 1 and 2 through
Liberia.87
Guinea gave no justification for the decision, which was a material
breach of the Base Convention. In addition, the Feasibility Study had made it
clear that the export of ore via Liberia was central to the economic and
technical viability of the project.
130. On 30 October 2012, the Technical Committee wrote to BSGR Guinea (the
"Allegations Letter”).88
In that letter, the Technical Committee wrongfully
accused the BSGR group of obtaining mining titles by bribery and corruption
(but without providing disclosure of any of the evidence relied upon). The
Technical Committee wrongfully alleged in particular that (i) BSGR Guinea
had failed to co-operate with previous requests for information; (ii) the joint
venture with Vale was illegal and (iii) that BSGR Guinea had obtained its
mining rights by bribery and corruption.
131. Each of the allegations made by the Technical Committee was (and is)
demonstrably wrong. For the avoidance of doubt, each and every allegation
against the Claimant and the BSGR group as recorded on 30 October 2012 is
emphatically denied.
132. That letter also outlined a procedure for a “Program of Review of Mining Titles
and Agreements” which was “intended to detect any irregularities and make
these titles and agreements consistent with the provisions of the Mining Code
of 2011”. However, for the reasons explained below, the procedure adopted
by the Technical Committee (and by Guinea in general) was both (i) unlawful
under Guinean law and/or international law; and (ii) devoid of either procedural
and/or substantive fairness. As such, not only was the process of investigation
of the spurious allegations against BSGR entirely flawed, the eventual
87
Letter from Ministry of Mines to Ricardo Saad dated 11 October 2012 (Exhibit C-0053). 88
Letter from the Technical Committee to VBG-VALE BSGR Guinea dated 30 October 2012 (Exhibit
C-0054).
46
“recommendations” made by the Technical Committee itself were unsafe,
wrong, and cannot be given any weight.
133. From this stage, the campaign against the BSGR group gathered momentum.
The Allegations Letter itself stated that:
“The CTRTCM intends to maintain the strict confidentiality of this
letter as well as the allegations appearing in it and the procedures
that will follow. Nevertheless, any final decision or action by the
Government as well as any explication of said decision or action
will be made public upon completion. You are hereby requested to
respect this confidentiality and avoid any public comments
regarding this procedure until its conclusion. Failure to do so will
be grounds for the CTRTCM to take any measure deemed
appropriate.”89
134. Despite this, on 3 November 2012, Tom Burgis of the Financial Times
published an article based on the contents of the Allegations Letter. It was
clear that the author had seen the Allegations Letter before it had even been
provided to BSGR or to Mahmoud Thiam, who was implicated in the letter.90
135. BSGR responded to the Allegations Letter on 26 December 2012.91
In the
following months, BSGR made multiple requests to the Technical Committee
for disclosure of the evidence that it purportedly relied upon.92
It was not until
7 May 2013, over six months after the date of the Allegations Letter, that the
Technical Committee first provided BSGR with an (obviously incomplete)
handful of documents.93
2.13 The end game
89
Ibid. 90
Dag Cramer Witness Statement, para. 31.3(CWS-7); CWS-5, paras 112-113; 91
Letter from BSGR to the Technical Committee dated 26 December 2012 (Exhibit C-0055). 92
CWS-7, paras 31.13-31.14; Exhibit C-0028, para. 79.1. 93
This was obviously not the entirety of the evidence and on 4 June 2013 Skadden Arps again requested
that the Technical Committee produce all the evidence on which it relied. This request was ignored
until a further six months later, when on 4 December 2013, the Technical Committee disclosed
evidence it purported to rely on in support of its allegations, again in incomplete form. This was over
one year since the date of the Allegations Letter, and only three working days before a hearing was
scheduled to take place.
[PROTECTED]
47
136. The Technical Committee review ran in parallel with a campaign waged by
Guinea in the local and international press which sought to prejudice BSGR’s
case.94
It also evidenced that the process itself had been pre-judged and that it
was directed towards the specific goal of ousting BSGR. This was apparent
even prior to the commencement of the review. For example, on 7 February
2012, the Minister of Mines, Mohamed Fofana, stated during the Investing in
African Mining Indaba conference in Cape Town that BSGR “didn’t follow the
law” in reaching a deal with Vale.95
In a letter dated 20 March 2012 to the
Claimant, Mr Fofana does not deny having made such statements, nor that he
harboured a prejudice against the company:
"It is regretful that my words may have thus been interpreted.
Indeed, the eventual preoccupations that I may have cannot in any
case lead the Ministry to pronounce itself on the validity of the titles
and conventions that is outside the review process aforementioned"96
137. This prejudicial treatment continued and intensified after the Allegations Letter.
By way of example:
(i) In March 2013, Mr Avidan, the President of BSGR, had been declared
persona non grata in Guinea. He received no formal notice of this.97
(ii) In April 2013, two BSGR employees in Guinea (Mr Bangoura and Mr
Touré) were imprisoned without charge and held in appalling
conditions.98
Mr Bangoura was a security agent and Mr Touré was
Director of External Relations. As identified in the evidence that Mr
James Libson of Mishcon de Reya gave to the High Court in England,
they were subjected to numerous human rights violations committed by
Guinea, including the ordeal of being held in prison for seven months
without charge (before they were released on bail) during which they
were held in appalling conditions.
94
95
Bloomberg, "BSG Role in Guinea's Vale Venture Faces State Review" dated 8 February 2012 (Exhibit
C-0056). 96
Exhibit C-0050. 97
CWS-3, paras 80-81. 98
James Libson Witness Statement in support of BSGR's Judicial Review Application dated 26
November 2014, paras 12-41 (Exhibit C-0057).
[PROTECTED]
48
(iii) On 14 June 2013, President Alpha Condé was interviewed at Chatham
House during a question and answer session entitled "Guinea in
Transition: Reform, Resources and Regional Relations".99
In response
to a question about declaring BSGR's President, Asher Avidan, a
persona non grata, Alpha Condé accused BSGR of playing "a role in
some of the political turmoil faced in Guinea at the moment" and,
notwithstanding a hollow reference to remaining "respectful of the
principle of innocent until proven guilty", commented that "soon there
should be some revelations that will allow more openness into the
matter".
(iv) On 17 June 2013, in an interview with President Condé for the UK
Channel Four News, BSGR was described as Condé's "bête noire".
President Condé added that "I don’t see how this deal [the granting of
rights to BSGR] is of any benefit to Guinea".100
(v) On 21 October 2013, Tom Burgis of the Financial Times reported that:
"In his clearest statement of intent to date, Mr Condé declared in a
speech at the start of October that his government had “started a battle
to recover our mines which were acquired fraudulently”101
138. Against the above background, Guinea’s intention to strip the BSGR group of
its investments and assets had become clear. But any lingering doubts were
removed by the public views of the President during an interview on 4
November 2013, in which President Condé stated that:
"We are currently engaged in an extremely difficult battle, which
you are following, since the international press has been
publishing it. This is our battle to retrieve our wealth….I'm not
fighting to retrieve this wealth for me; I'm fighting to retrieve this
wealth for Guinea.
Every Guinean patriot should make this his own fight.
99
Transcript of Chatham House Q&A Session, "Guinea in Transition: Reform, Resources and Regional
Relations" dated 14 June 2013 (Exhibit C-0058). 100
Transcript of Channel 4 news broadcast of "Guinea Corruption and diamonds" dated 17 June 2013
(Exhibit C-0059). 101
Financial Times, "Guinea corruption probe advances but wait for Simandou goes on" dated 21
October 2013 (Exhibit C-0060).
49
All people who are willing to fight with me to ensure that the riches
of Guinea serve the people of Guinea, are people I'm ready to work
with……. This Technical Committee is responsible for the review of
the contract and makes proposals. We expect the Technical
Commission to make proposals to the committee that I chair. We
will make a decision based on the proposition that will be made by
the Commission concerning the modules 1 and 2. It is very
important that the world realizes that it is a scandal that someone
may supposedly pay a few hundred million, and can make up to 5
billion on the back of the Guinean people. I believe that this is now
something known worldwide." 102
139. Although not explicitly named, it is plain that the “contract” under review was
the Base Convention. The emotive language and the invocation of a patriotic
call to arms – that too before having even seen the Technical Committee's
recommendations – made it perfectly clear that President Condé (who was in
control of the whole process) had already decided that BSGR Guinea’s mining
rights should be removed. As he stated: “We [the committee which he chairs]
will make a decision”.
140. It should be noted that other mining companies were not subject to the same
review process. The strikingly different treatment of Rio Tinto by Guinea has
already been discussed above. Similarly, in or around March 2013 it appears
that RusAl agreed to make a payment to Guinea of around USD 832 million
which, according to a press report from that time, “will reassure RusAl about
its future both with regards resuming operations at the Friguia refinery and
conserving its rights on the part of the giant Dian Dian bauxite deposit” in a
deal which “brings to mind the $700 million that Rio Tinto laid out in 2011 in
an out-of-court settlement with Conakry in order to maintain its rights on
Simandou.” 103
Similarly, it appears that Sable Mining Africa was granted
lucrative mining rights by Guinea, including to the right to export through
Liberia.104
102
Transcript of interview with Alpha Condé dated 4 November 2013 (Exhibit C-0061). 103
Africa Mining Intelligence, "US RusAl to sign $832 million check for Conakry" dated 26 March 2013
(Exhibit C-0062). 104
Sable Mining Africa, "Focusing on Iron Ore. Sable Mining Report and Accounts", p.2 (Exhibit C-
0063); CWS-8, para. 18.
50
141. Throughout the process before the Technical Committee, BSGR complained
about the lack of due process and apparent prejudice being shown to the
company, including by reference to bringing ICSID proceedings. These
complaints were not heeded.105
2.14 Expropriation of BSGR’s investments
142. Against that background, it was unsurprising when on 21 March 2014, the
Technical Committee recommended to the Strategic Committee that it propose
to the Minister of Mines:
(i) the withdrawal of the Blocks 1 & 2 Permit;
(ii) the withdrawal of the Zogota Mining Concession;
(iii) the cancellation of the Base Convention;
(iv) that BSGR Guinea be enjoined to “communicate to the services of the
Ministry of Mines all studies, reports, data, results samples etc. that
would have been realised or obtained in the mining operations of VBG
in Guinea”; and
(v) that BSGR Guinea as the holder of the titles and agreement in question
and members of the BSGR group be excluded “from the proceedings of
reattribution of the titles and agreement subject to this recommendation”
143. The Technical Committee made this recommendation on the alleged basis
(which is emphatically denied) that BSGR and/or BSGR Guernsey and/or
BSGR Guinea had allegedly obtained those rights by corruption and other
unlawful means. It stated that:
“There is a series of precise and concurring indications that
establish with sufficient certainty the existence of corrupt practices
105
CWS-7, para 31.7.
51
tarnishing the granting of mining titles and the mining agreement
in question to BSGR; and
Such corrupt practices nullify the mining titles and the mining
agreement currently held by VBG”106
144. From there on, matters progressed quickly.
145. On 2 April 2014, the Strategic Committee issued its opinion to President Condé
and the Minister of Mines and Geology, concurring with the Technical
Committee's recommendation.
146. On 17 April 2014, President Condé issued a Presidential Order terminating the
Zogota Mining Concession107
which stated that:
“Due to the fraudulent nature of the conditions of its enactment,
Decree D/2010…dated March 19, 2010, granting BSG Resources
(Guinea) Limited the mining concession for the zone known as
Zogota…is revoked.”
147. On 18 April 2014, the Minister of Mines and Geology issued a Ministerial
Order terminating the Blocks 1 and 2 Permit108
which stated that:
“Due to the fraudulent nature of the conditions of its enactment,
Ministerial Order….granting to BSGR Guinee Limited the mining
exploration permit for Simandou blocks 1 & 2 encompassing a
surface area of 369 km2 in the Kerouane Prefecture…is revoked.”
148. On 23 April 2014, the Minister of Mines and Geology issued a Ministerial
Order terminating the Base Convention109
. That stated:
“As a consequence of Decree D/2014/098/PRG/SGG of April 17,
2014 concerning the revocation of Decree…dated March 19, 2010,
granting a mining concession to BSG Resources (Guinea) Limited,
the cancellation of the agreement entered into on December 16,
2009, between the Republic of Guinea and the companies BSG
106
Technical Committee's recommendation concerning the titles and mining agreement held by the
company BSGR Guinea dated 21 March 2014, p. 32 (Exhibit C-0064). 107
Decree D/2014/98/PRG/SGG dated 17 April 2014 (Exhibit C-0065). 108
Order No. A 2014/1204/MMG/SGG dated 18 April 2014 (Exhibit C-0066). 109
Order No. A 2014/1206/MMG/SGG dated 23 April 2014 (Exhibit C-0067).
52
Resources (Guinea) Limited and BSG Resources (Guinea) Sarl for
mining the Zogota/ N’Zérékoré iron ore deposits is certified.”
149. On 24 April 2014, the Government of Guinea informed BSGR Guinea and
BSGR of the termination of the Base Convention, the Zogota Mining
Concession and the Blocks 1 and 2 Permit, resulting in the expropriation of
assets arising from rights held by BSGR Guernsey and BSGR Guinea, without
any compensation having been paid or even offered.110
150. These actions of Guinea, which individually and collectively resulted in the
unlawful revocation and/or termination of BSGR Guinea’s mining rights,
including (i) the Zogota Mining Concession, (ii) the Blocks 1 and 2 Permit, and
(iii) the Base Convention, will collectively be referred to herein as “the
Measures”.
151. As a result of the Measures, BSGR and its subsidiaries were illegitimately
stripped of the very significant mining rights and assets which they had
lawfully accumulated. Moreover, as a further consequence the Government of
Guinea had and retained the benefit of the Feasibility Study BSGR had
completed on the Trans-Guinean railway, the Feasibility Study BSGR had
completed and submitted on Blocks 1 and 2 (which the Government never
responded to), the works it had undertaken at Zogota (including building
villages and roads for employees, environmental studies, construction of the
mines etc) and the works it had undertaken on the various railways. Guinea has
to date provided no compensation in respect of these valuable investments.
2.15 The Measures were politically motivated
152. BSGR does not need to provide any explanation for the true motives behind
Guinea’s conduct in order to succeed in its claims in this arbitration. For
example, it is enough that it establishes that under the Investment Code and/or
Mining Code, Guinea has expropriated its investments without providing
110
Letter from the Ministry of Mines to VBG-VALE BSGR Guinea dated 24 April 2014
(Exhibit C-0068).
53
compensation. It does not need to go on to identify (let alone prove) the reasons
as to why Guinea wanted to expropriate those investments.
153. However, the facts enumerated above demonstrate that there was a determined
campaign of harassment waged by Guinea against BSGR and its subsidiaries;
and that, contrary to the impression which Guinea sought to give, this
campaign had nothing to do with the merits of the investments made by BSGR
in Guinea or its conduct. What has now emerged is a substantial body of
evidence which indicates that there was, in fact, an ulterior motive behind this
campaign and the imposition of the Measures. This motive illuminates
Guinea’s conduct and clearly demonstrates that its complaints about BSGR
were a mere fig leaf to distract from the true purpose behind the campaign
which resulted in the Measures.
154. The true explanation for Guinea’s actions is that the mining rights which were
validly held by BSGR Guinea, and of which it was stripped in April 2014, had
been promised by President Condé before his election, to other outside interests.
Those interests fulfilled their side of the illicit bargain by assisting President
Condé in coming to power. Once he was in power, he fulfilled his side of the
bargain by stripping the BSGR group of its rights.111
155. The evidence is set out in full in the statement Dag Cramer made to the English
High Court in respect of BSGR's judicial review application (the "Cramer
Judicial Review statement").112
In summary, the available evidence suggests
that, unbeknown to BSGR, in early 2010, the then Presidential candidate Alpha
Condé entered into a series of secret and unlawful agreements pursuant to
which he would be provided with funds and logistical support to rig the
upcoming election, in exchange for providing those supports with rights in the
country's mines, including Simandou.
156. More specifically, the evidence strongly indicates that the election was rigged,
resulting in a huge swing in Alpha Condé's favour from 18% of the vote in the
111
112
Exhibit C-0028. [PROTECTED]
54
first round of the election to 52% in the second round, securing victory. Funds
were transferred to Alpha Condé by way of a recorded loan of US$25million
and further unrecorded transfers believed to be "much much more" to support
this process.113
157. In light of this, President Condé attempted to reward his backers. For example,
he entered into an agreement known as the Palladino Contract, pursuant to
which the provider of a US $25million loan in funding for his election was put
in a position where it could become entitled to a 30% share in the assets of
SOGUIPAMI, the state mining company.114
Similarly, he promised Sable
Mining Africa valuable mining concessions in return for providing logistical
and financial assistance during the election. Accordingly, it was necessary for
President Condé to nationalise or expropriate assets to fulfil these illicit deals.
The actions taken against the BSGR group must be viewed against this
background.
158. Moreover, as described above, the treatment of BSGR by Guinea contrasted
strikingly with the treatment of (i) Rio Tinto, which in return for a payment of
USD 700 million to Guinea and the granting of a 15% stake in its mines was
excused from the entire review process;115
(ii) RusAl, which similarly agreed to
make a payment to Guinea of USD 836 million;116
and (iii) Sable Mining
Africa, which was granted lucrative mining rights by Guinea, including the
right to export through Liberia.117
159. This difference in treatment has raised suspicions that the deal with Sable
Mining Africa was a cover to reward it for financial and logistical assistance
provided to President Condé during his election campaign and to Sable's
director, Aboubacar Sampil, who is implicated in the rigging of the election
and remains a close associate of President Condé's son.118
That the three
companies were treated so differently from BSGR – which refused to make a
113
Exhibit C-0049, p.6. 114
Exhibit C-0028, paras 19.2 and 54-58. 115
Exhibit C-0041. 116
Exhibit C-0062. 117
Exhibit C-0063, p.2. 118
[PROTECTED]
55
payment to President Condé – is a further indication of the political motivation
behind the prejudicial review of the BSGR group’s rights.119
Thus, far from
obtaining its rights by bribery and corruption, as alleged, it was BSGR’s refusal
to pay a bribe which ultimately led to the revocation of its rights.
160. Furthermore, President Condé enlisted help from overseas supporters in order
to cause BSGR maximum harm and prejudice. This extended to placing
pressure upon the BSGR’s UK PR advisors to terminate BSGR’s retainer and
the making and spreading of allegations that BSGR had repeatedly attempted to
organise a coup d’état in Guinea.120
This has also led to the questioning without
foundation of unconnected businessmen in Guinea and the US about their links
with BSGR, purely on the basis that they share the same nationality as Mr
Steinmetz.121
161. In summary, the withdrawal of the BSGR group’s mining rights was a political
process orchestrated by President Condé for his own interests.
III. BSGR’S CLAIMS
3.1 Summary
162. In summary, notwithstanding (i) Guinea’s entry into the Base Convention; (ii)
the grant of the Zogota Mining Concession; (iii) the issue of the Blocks 1 and 2
Permit; (iv) Guinea’s confirmation by words and/or conduct of the validity of
the investments in Zogota and in Blocks 1 and 2; and (v) the massive and
highly successful investments BSGR and its subsidiaries had made in Guinea
over the course of a number of years, Guinea unlawfully and without
justification expropriated the valuable investments that had been made to date.
It did so in a discriminatory fashion and without provision of any compensation.
Put bluntly, the unjustified withdrawal and/or revocation of BSGR’s valuable
investments including the mining and associated rights held by its subsidiaries
119
Exhibit C-0028, para. 19.4. 120
Ibid., paras 86-87. 121
CWS-3, paras 82-83.
56
was a patently political process orchestrated by President Condé for his own
interests.
163. This conduct gives rise to liability as a matter of both Guinean and international
law, as explained below. Specifically, Guinea’s acts and omissions constituted
breaches of the obligations it owed to BSGR under:
(i) Articles 5, 6 and/or 30 of the Investment Code; and
(ii) Articles 11, 21, 22, 26 and/or 41 of the Mining Code;
(iii) Articles 7.1, 7.22, 7.2.7 and 7.2.12 of the Act on the Financing,
Construction, Exploitation, Maintenance and Transfer of Development
Infrastructures by the Private Sector (the "BOT Act"); and
(iv) International law.
164. Before addressing the breaches of Guinean and/or international law on which
BSGR relies, we identify below the nature of the mining rights and the
infrastructure rights held by BSGR and its subsidiaries and of which they were
stripped as a result of the Measures.
3.2 Mining Rights
165. By virtue of the operation of inter alia (i) the Mining Code, (ii) the Base
Convention and (iii) the Zogota Mining Concession, BSGR and its subsidiaries
were granted and entitled to exercise a bundle of highly valuable contractual
and proprietary rights. Thus, a proper analysis of the nature and extent of these
mining rights requires close scrutiny of both the Base Convention and the
Mining Code in particular.
3.2.1 The Mining Code
57
166. The Mining Code was the relevant legislation operative in Guinea at the
material time at which the mining rights in questions were obtained. The
Mining Code addressed all aspects of reconnaissance, prospecting, operation,
possession, holding, circulation, trade and transformation of mineral substances
in Guinea, including iron ore.122
167. The starting position under the Mining Code was that all minerals in its
territory (whether on the surface or below ground) belonged to the State: see
Article 3. That provision went on to state:
“However, holders of operating titles acquire owner-ship of the
substances they extract. The rights to extract substances are a
particular form of property, distinct from rights to the surface.”
(emphasis added)
168. Title I to the Mining Code comprised Chapters I to VII. Chapter IV
(containing Articles 8-11) set out who had the right to operate mines. Pursuant
to Article 8 of the Mining Code:
(i) Any natural or legal person (including foreign natural or legal persons)
possessing the technical and financial capacity to do prospecting work
was entitled to apply for a reconnaissance licence or prospecting permit,
and to undertake those activities in accordance with the conditions set
out in the Mining Code.
(ii) Mining substances could be “developed” (i.e. operated and/or exploited)
by (a) any natural or legal person constituted as a public or private
corporation under Guinean law (with sufficient technical and financial
capacity) or (b) any natural or legal person possessing Guinean
nationality. Thus, mining operation permits and mining concessions
could be granted to those persons.
122
Exhibit CL-0001, Article 2.
58
169. By virtue of Article 10, the right to carry out “mining...operations” could only
be acquired under a “mining title”. Chapter V (Articles 12-14) then identified
the conditions for obtaining such a “mining title”, which was defined in Article
1(20) as “titles granting rights to search, prospect or operate/exploit mining
substances…” Chapter VI set out certain obligations pertaining to those parties
that carried out mine operations; and Chapter VII provided those parties with
certain “General guarantees” including, by Article 21, certain “Fundamental
Freedoms” and a promise of non-discrimination in Article 22.
170. Title II of the Mining Code identified the various mining titles available under
Guinean law. These were:
(i) A reconnaissance licence – these conferred on the holder the right to
search for one or several mining substances. This licence could be
issued for a maximum of 3 months.
(ii) A prospecting permit – this conferred on the holder the exclusive right
to “prospect” i.e. search for mining substances. A prospecting permit
could be issued for a maximum of 2 or 3 years (depending on whether
the prospecting permit was industrial-scale or semi-industrial scale) and
renewed twice. The aim of a prospecting permit is to allow the holder
to explore an area in the hope of discovering a commercially viable
deposit. During the time when a prospecting permit is in force only its
holder has the right to an operating permit or mining concession for the
deposits found within the prospecting site.
(iii) An operating permit – this conferred on the holder the right to search,
prospect develop and freely dispose of the mineral substances for which
they were issued. An operating permit could be issued for a maximum
of 5 or 10 years (depending on whether it applied to industrial or semi-
industrial permit) and could be renewed for several 5-year periods.
(iv) A mining concession – this conferred on the holder the exclusive right
to carry out all kinds of prospecting and development of deposits of
59
mining substances for which the concession is granted within the limits
of its perimeter and without limits of depth.
171. The two mining titles at issue in this case are a prospecting permit and a mining
concession.
172. Thus, the Blocks 1 and 2 Permit granted BSGR Guinea the exclusive right to
search for mining substances in that area and the right to an operating permit or
mining concession for the deposits found within the prospecting site.
173. BSGR Guinea also held a mining concession in respect of the Zogota deposit.
Under the Mining Code, a concession could be issued for a maximum of 25
years and could be renewed one or more times for a maximum period of 10
years each. A concession was issued where one or more commercially viable
deposits have been discovered upon evidence duly constituted by a feasibility
study, and for which “operations require sizeable works and investments”.123
174. In other words, if commercially viable deposits have been proven in an area,
the holder of a prospecting permit could apply for a mining concession to
develop that deposit.
175. More specifically, as regards a mining concession, Article 41 provided:
“Rights conferred
Concession confers on its holder the exclusive right to carry out all
kinds of prospecting and operating of deposits of mining
substances for which the concession is granted, within the limits of
its perimeter, and without limits of depth.
Concessions may only be granted where one or more deposits are
discovered upon evidence duly constituted by a feasibility study,
and for which operations require sizable works and investments.
Concessions are immoveable, divisible, assignable rights which
can be pledged to secure the loan of operating funds.”
123
CL-0001, Article 41.
60
176. Article 42 explained that “granting of a concession cancels any prospecting or
operating permit previously issued to the holder for the area defined in the
concessions.”
177. The Mining Code expressly provided that the right to extract substances
pursuant to an operating title (such as an operating permit or mining
concession) was, as a matter of Guinean law, a species of property.
3.2.2 The Base Convention
178. Turning to the Base Convention, Article 11 of the Mining Code explained how
the Mining Code was intended to interact with the Base Convention. It
provided:
“Industrial mining operation permits and mining concessions are
issued in conjunction with mining agreements, set out in standard
form by decree.
Mining agreements define the rights and obligations of the
respective parties and set out the legal, financial, tax, and social
conditions which govern operation for the duration of the
agreement.
They constitute a guarantee to the mine title holder that these
conditions will remain unvaried.
In cases where the State is party to one or more mining or
quarrying operations with third parties, the nature and terms of the
State’s participation are expressly defined in advance in the mining
agreement which accompanies the…mining concession.
Mining agreements signed by the Minister of Mines and
prospective title holders or their authorised representatives are
executory and bind the parties after being approved by decree in
the case of operation permits or after ratification in the case of
concessions. Once in effect mining agreements can only be
amended by written agreement of the parties, and the amendments
take effect only when the above procedural steps have been
followed.”
179. The purpose of the Base Convention was identified in Article 4 thereof:
“In accordance with Article 11 of the Mining Code, the purpose of
61
this Agreement is to define the rights and obligations of the Parties
and the general economic, legal, administrative, financial, fiscal,
customs and excise, mining, environmental, social, transport and
shipping conditions according to which the Parties undertake to
carry out the Project for working the iron deposits at Zogota in the
N’Zérékoré prefecture~·.
To this end it consists of:
(i) For BSG Resources to design, finance, develop and operate an
iron ore mine within the area of the Concession; transportation of
the iron ore by railway over Guinean and Liberian territory;
shipping the ore from the port of Buchanan in Liberia.
(ii) For the Government, to grant the facilities and guarantees that
it agrees to subscribe for BSG Resources to facilitate carrying out
the Project (mine, accessories and subsidiaries, and the railway
lines).
(iii) For the Parties, to define the consequences of possible non-
compliance with their respective undertakings under the terms of
this Agreement.”
180. By virtue of Article 5, the applicable law of the contract was the “Applicable
Laws of the Republic of Guinea” which meant “…the Mining Code and other
laws, regulations and degrees, and any other legislative instrument of Guinean
law, including rules, regulations, resolution or other directives or standards
that require compliance, published officially, having the force of law, and in
effect at the time of their application”. The “Mining Code” referred to herein
was expressly defined as “the act ratified by Law L/95/036/CTRN of 30 June
1995 representing the Mining Code of the Republic of Guinea including any
amendment, modification, supplement or extension hereof as well as any
related application decree”.
181. Article 8 provided that the Mining Concession “granted under Order No.
[note: not specified] shall be executed in accordance with the provisions of the
Mining Code and this Agreement.” The “Mining Concession” was defined in
clause 1 as:
“ "Mining Concession": refers to a mining concession granted to
the company by the Government in virtue of the effective Mining
Code and the conditions stipulated by the present agreement
62
related to the area covered by the Mining Concession.”
182. The Base Convention imposed certain positive obligations upon BSGR Guinea.
In particular, it was required to construct a mine at Zogota and commence the
commercial operation by 31 May 2012.124
Pursuant to Article 15.3 the
commercial operation was deemed to commence when the level of stocks at the
mine and the port of Buchanan allowed for the export of 25,000 tons of iron ore
for a consecutive period of 30 days. In addition, and this will be dealt with
under a separate section, the Base Convention required BSGR and its
subsidiaries to construct a wide range of development infrastructures. Finally,
BSGR Guinea was also required to submit a Feasibility Study in respect of
Blocks 1 and 2 within 24 months of the date of signature of the Base
Convention. The conclusions and terms of the Feasibility Study would facilitate
the negotiations for the grant of a mining concession over Blocks 1 and 2.125
183. The Base Convention also granted BSGR and its subsidiaries a number of
wide-ranging and important rights. In particular, by virtue of Article 22.1(a) to
Article 22.1(l) of the Base Convention, they were granted:
(i) the exclusive right to carry out the Mining Operations (as referred to
and defined in the Base Convention);
(ii) the right to freely arrange its assets and to organize the businesses as it
sees fit;
(iii) the freedom to recruit and dismiss, in accordance with current
legislation in the Republic of Guinea;
(iv) the free circulation in the Republic of Guinea of its staff, assets and
products;
124
Article 15.1 and 15.2 of the Base Convention dated 16 December 2009 (Exhibit C-0069). 125
Ibid., Article 10(2).
63
(v) the right to unrestricted importation of goods and services, including
insurance and the funds required for the Mining Operations;
(vi) the freedom to export and to sell the Mining Produce from the
Concession (as referred to and defined in the Base Convention) on the
international and/or domestic market;
(vii) the right to transport or have transported the Mining Produce to a
storage, processing or loading location;
(viii) the right to benefit from any agreement entered into between the
Government and other Governments to facilitate the transport of the
Mining Produce over the territory of these Governments;
(ix) the freedom to set up in Guinea processing plants and iron ore
processing;
(x) the right to acquire, use and operate any means of communication, and
type of aircraft or other means of transport as well as the auxiliary
facilities or equipment required for the Mining Operations;
(xi) the freedom to carry out large-scale sampling and attempts at processing
the Mining Produce from the Concession in order to determine the
mining potential; and
(xii) the freedom to take, take out and export reasonable quantities,
specimens or samples as part of the Prospecting Activities (as referred
to and defined in the Base Convention).
184. Furthermore, the circumstances in which the rights granted to BSGR and its
subsidiaries under the Base Convention and/or the Zogota Mining Concession
could be terminated or impinged upon were limited in a number of important
respects.
64
185. First, by virtue of Article 31 of the Base Convention, Guinea was obliged in the
event of an expropriation or nationalization of BSGR Guinea or any part of its
assets to pay fair and equitable compensation based on the market value of the
Mining Operations (i.e. all the operations and work carried out as part of
Mining Work, including Prospecting Activities) at the date of the expropriation
or nationalization. Put simply, it could not simply seek to strip BSGR Guinea
of its assets (or expropriate that company itself) without paying appropriate
compensation.
186. Secondly, under Article 32 (first paragraph), Guinea warranted the stabilization
of Current Legislation (i.e. all the valid legislative and regulatory texts of the
Republic of Guinea) and of all provisions stipulated in the Base Convention, as
from the date of the grant of the Concession and throughout its full duration.
Thus, this reinforced the promise and guarantee provided by Article 11 of the
Mining Code, viz. that the Base Convention constituted “a guarantee to the
mine title holder that these conditions will remain unvaried.” In other words,
Guinea promised that it would not change the rules of the game mid-way
through the investment.
187. Thirdly, the Base Convention contained a most-favoured-nation provision.
Pursuant to Article 32 (fourth paragraph), Guinea promised that BSGR Guinea
“shall benefit from any more favourable Article granted in respect of the
provisions of this Agreement that will be included in a mining agreement
concluded at a later date with another mining company carrying out similar
activities.”
188. Fourthly, the circumstances in which a contractual termination could take place
were themselves limited. Clause 26.2 addressed “Cancellation” of the Base
Convention. It provided as follows:
“The Government, in accordance with the Mining Code, can
cancel the Company's Concession, which involves termination of
this Agreement.
Apart from the situations stated in the Mining Code, the
65
Concession can be terminated if the Company refuses to carry out
a final decision in arbitration in accordance with clause 38 of this
Agreement.”
189. Thus, there was (save in one limited respect) no independent contractual basis
on which the Base Convention and/or the Zogota Mining Concession could be
terminated above and beyond the provisions of the Mining Code. Save in that
one (irrelevant) respect, it was to the Mining Code – and only to the Mining
Code - that Guinea was entitled to look in order to effect a valid termination of
the Base Convention and/or the Zogota Mining Concession.
190. Article 60 of the Mining Code addressed “revocation” of a mining title, and
itself provided a limited and exhaustive number of grounds on which the
issuing authority was entitled to exercise its discretion to revoke a mining title.
Article 60 provided as follows:
“Mining titles constituted under this Code may be revoked by the
issuing authority for one of the following grounds:
● when the prospecting, operation or development period is
suspended for more than six months in the case of explorations,
and more than eighteen (18) months for operations, or severely
restricted without legitimate grounds and in such a way as to be
detrimental to the public interest;
● when the feasibility study shows the existence of an
economically and commercially operable deposit with- in the
perimeter set out in a prospecting permit but no development
follows within for up to thirty-six (36) months;
● for violation of one of the provisions of this Code;
● mining or expenses of the title holder are less over a total of two
consecutive years than the whole of the minimum program for
works or the minimum amount of expenses forecast for such period
by the mining title or documents of reference of the concession,
except in cases of justifiable force majeure, providing they do not
exceed eighteen (18) months.
● failure by the holder to keep registers of extraction, sales and
shipping in a regular fashion and in accordance with standards
established by the prevailing regulations, or refusal to produce
such registers to the qualified agents of the Direction Nationale de
Mines;
66
● failure to pay taxes or duties;
● prospecting or development activities carried out outside the
perimeter of the mining title or for substances not designated
therein; development undertaken with a prospecting permit;
● loss of financial guarantees or loss of technical capacity which
constituted performance warranty by the holder;
● assignment, transfer or sub-leasing of mining rights without
prior authorization as prescribed in article 62 below.
Revocation cannot occur unless the Minister of Mines has sent a
notice giving a delay which cannot be less than:
● two months for prospecting permits,
● three months for operating permits and concessions.”
191. At no material time was BSGR or any of its subsidiaries ever in breach of any
of the aforementioned (and limited) grounds on which revocation could
potentially be ordered. Nor, importantly, did Guinea even purport to assert that
BSGR or any of its subsidiaries was so in breach; nor did Guinea ever seek to
justify the Measures on the basis of an alleged right of revocation under Article
60 of the Mining Code or Clause 26.2 of the Base Convention. We explore
this in some detail below.
3.2.3 The new 2011 Mining Code
192. As a matter of Guinean law, it is clear that the 2011 Mining Code did not and
could not have any legitimate application whatsoever to either (i) the Base
Convention; (ii) the Zogota Mining Concession or (iii) the Blocks 1 and 2
Permit (or any other rights held under any of those various instruments).
193. This is made clear in Article 217 (Transitional Provisions) of the 2011 Mining
Code itself. More specifically, Article 217-I provides that “This Code does not
affect the ownership and validity of mining titles existing before its adoption.”
194. That Code goes on to explain that it applies “in full to the holders of Mining
Titles and Authorizations which have not yet been the subject of a Mining
67
Agreement.” As regards mining concessions granted prior to the entry into
force of the 2011 Mining Code, however, Article 217-I provides that:
“With regard to the holders of Mining Concessions signed in strict
compliance with mining legislation in force at the time of signing,
the provisions of this Code will be applied through amendments to
the existing Agreement, in the form of supplementary clauses,
which will not be valid and will not enter into force until after
having been approved by the Council of Ministers, signed by the
Minister responsible for Mines, been the subject of a legal opinion
of the Supreme Court and ratified by the National Assembly.
195. Article 217-I provides that those amendments (which relate to three broad areas
identified in the Article) “shall be applicable from the date of ratification of the
amendments to the basic Mining Agreement, for all Mining Activities
subsequent to this date. Until the date on which each amendment is ratified, the
terms of the original Mining Agreement will apply.”
196. Article 217-I also explained that such amendments would be agreed by a
process of negotiation with titleholders:
“Negotiations between the Government and the titleholders of the
aforementioned Mining Concessions will be undertaken as part of
a comprehensive program for the review of Mining Concessions
and Titles, initiated by the Technical Committee and a Strategic
Committee, both of which were created by regulation. Existing
mining rights and associated obligations of the State will be taken
into account, as well as the particular circumstances surrounding
the grant of each Mining Title, and any other relevant details,
attributes or context necessary to guarantee the feasibility of the
projects and the longevity of mining.”
197. It provided a timeline for those anticipated negotiations:
“The mining companies concerned must fully cooperate with the
review program in order to obtain, no longer than 24 months after
the publication of this amended Code, amendments accepted and
signed by all Parties. This deadline does not take into account the
additional period necessary for the National Assembly to complete
the ratification procedure of the negotiated supplementary clauses.”
68
198. However, it also envisaged the possibility that the amendments could not be
agreed between a concessionaire/permit holder and the State:
“At the end of the 24 month period, if no supplementary clause has
been signed by the holder of a Mining Agreement, the Parties will
meet to evaluate the points they agree and disagree on, and to
produce, in as short a time as possible, mutually accepted
supplementary clauses, adapted to the economic terms of the
project or mining operation.”
199. Thus, it was clear that, unless and until the procedure outlined in Article 217-I
had been satisfied, including in particular (a) the negotiation of amendments to
the relevant agreements; (b) the agreement of the terms as between the parties;
and (c) the four-step constitutional processes outlined in Article 217-I had been
completed (namely, approval by the Council of Ministers, signature by the
Minister responsible for Mines, a legal opinion from the Supreme Court, and
ratification by the National Assembly), the provisions of the 2011 Mining Code
had no application to any prior Mining Concession or Mining Agreement
entered into before 9 September 2011.
200. In this case, no amendment was made to the Base Convention or to the Zogota
Mining Concession.126
In short, by its own terms the 2011 Mining Code had
no application to the Base Convention or to the Zogota Mining Concession.
3.2.4 Conclusions
201. In summary, by virtue of the express provisions of Guinean law discussed
above, the nature, extent and duration of the rights that BSGR and its
subsidiaries held under the Base Convention, the Zogota Mining Concession
and the Blocks 1 and 2 Permit was to be determined by the operation of the
1995 Mining Code, the Base Convention and the Zogota Mining Concession in
particular; and not by the 2011 Mining Code.
69
202. Moreover, BSGR Guinea (and the wider BSGR group, including BSGR itself
as shareholder) had a legitimate expectation that those valuable rights would be
treated in accordance with and by reference to that contract and the legislation
which was in force at the time it obtained those rights. Guinea not only
promised to respect this expectation by virtue of, inter alia, Article 32 of the
Base Convention but also more generally by Article 30 of the Investment Code,
which provided in relevant part that:
“No law or regulation taking effect after the date of execution of
the investment may restrict the guarantees referred to in the book 1
of this code regarding said investment. Similarly, no law or
regulation taking effect after the effective date of approval may
reduce or eliminate the benefits or impede the exercise of the rights
that have been granted to the company and its investors.”
3.3 Infrastructure Rights
203. By virtue of the operation of the Base Convention, BSGR and its subsidiaries
were granted and entitled to exercise a bundle of contractual infrastructure
rights. Thus, a proper analysis of the nature and extent of BSGR's infrastructure
rights requires close scrutiny of both the Base Convention and the BOT Act.127
3.3.1 The BOT Act
204. The BOT Act was the relevant legislation operative in Guinea at the material
time at which BSGR and its subsidiaries obtained their infrastructure rights.
The BOT Act addresses aspects of the financing, construction, operation,
maintenance and transfer of development infrastructure projects, including
mining infrastructures and transport infrastructures, such as railways and ports.
205. Article 1.1 of the BOT Act defines a " BOT agreement" as follows:
"Any operation of financing, construction, operation, maintenance,
and potentially transfer of ownership of development
infrastructures by the private sector, in all its different variants, as
indicated in Article 1.4 below".
127
Act L/97/012/AN on the Financing, Construction, Exploitation, Maintenance and Transfer of
Development Infrastructures by the Private Sector dated 1 June 1998 (Exhibit CL-0002).
70
206. Article 1.2 provides the following definition of "development infrastructures by
the private sector":
"Any infrastructure and development project normally financed
and operated by the public sector, but which will be now fully or
partially undertaken by the private sector, including but not limited
to the hydroelectric infrastructures such as dams and plants,
mining infrastructures, transport infrastructures such as roads,
ports, railways and airports, power installations,
telecommunications installations, agricultural infrastructures and
developments, public buildings, tourist projects, education and
health projects, IT networks and free zones. This type of project
must be undertaken under the contractual provisions defined
hereunder, and in accordance with any successive modifications
approved by the President of the Republic of Guinea" (emphasis
added).
207. Articles 1.3 to 1.11 of the BOT Act then lists a number of variants and
contractual arrangements under which development infrastructures may be
financed, constructed, operated, maintained and potentially transferred. For the
purpose of the present case, Article 1.3 and 1.4 are the most relevant ones,
providing respectively:
(i) “Build-Operate-Transfer” (BOT): An agreement through which an
investor takes on the financing and construction of a given
infrastructure or development project, and its operation and
maintenance. The investor operates the infrastructure over a
determined period during which it is authorized to receive fees,
charges and miscellaneous costs from the user under user tariffs
not exceeding the levels indicated in its bid or negotiated and
included in the contract, to enable the investor to recover its
investment and its costs of operation and maintenance of the
project, including its profit margin. At the end of the initial
predetermined period, which must not exceed the duration defined
in Article 12 below, the investor transfers the infrastructure to the
State, in its entirety and free of charge".
(ii) “Build-and-Transfer” (BT): an agreement through which an
investor takes on the financing and construction of a given
infrastructure or development project, and after its completion
transfers it to the State, in exchange for reimbursement of the
investment cost plus a reasonable profit margin, in accordance
with a pre-established financing plan approved by the parties. This
71
type of contract may be applied to any infrastructure construction
or development project operation, including structures which, for
strategic or security reasons, must be operated directly by the State
or any entity designated by it".
208. Article 1.13 of the BOT Act defines an "investor" as:
"one or more legal entities, Guinean or foreign, concession holders
of one or more structures belonging to a complex that they have
constructed or rehabilitated at their cost in accordance with the
terms of a BOT Agreement signed with the State".
3.3.2 The Base Convention as a qualifying development infrastructure project
209. By virtue of the nature and duration of the rights granted to and obligations
imposed on BSGR and its subsidiaries by the Base Convention, (i) the Base
Convention constitutes a "BOT agreement", (ii) BSGR and its subsidiaries
qualify as "investors" and (iii) the commitments that BSGR and its subsidiaries
undertook in relation to the construction, reconstruction and rehabilitation of
several railways and ports qualify as "development infrastructures".
210. The purpose of the Base Convention to set out the infrastructure arrangements
between the Republic of Guinea and BSGR was set out at the very beginning of
the agreement. The preamble provides that:
"Whereas in this framework the Republic of Guinea has informed
the mining investors of […] the principle that the mining
infrastructures (railway and port) located on the national territory
belong to the Government as well as any new mining
infrastructure that would be implemented;
[…] Whereas BSG Resources wishes to develop the areas at its
disposal through the design, financing, development and
construction in Guinea of a complex consisting of an iron ore
mine and its dependencies (plants, storage areas, power stations,
lodgings etc) and of a railway, with a nominal production capacity
of 30 million ton a year of iron ore".
211. Article 10(1) of the Base Convention detailed the development infrastructures
that BSGR and its subsidiaries agreed to construct in relation to the Zogota
operation:
72
"The Company shall develop:
a) An open cast iron ore mine at Zogota in the prefecture of
N'Zérékoré;
b) An industrial area at Zogota that shall include:
• Storage and loading areas,
• Workshops,
• A railway line in Guinea 102 km long,
• A railway depot,
• Facilities and equipment,
• Electrical power station with output of ..... MW,
• Offices,
• A water treatment station,
• A residential area;
• A hospital for employees.
c) A port area in Buchanan, Republic of Liberia, which shall
include:
• Storage and loading areas,
• Workshops,
• Offices,
• A residential area.
d) The Conakry-Kankan railway"
212. Article 10(2) of the Base Convention detailed the development infrastructures
that BSGR and its subsidiaries agreed to construct in relation to the operations
in and around Blocks 1 and 2:
"The Company will develop in this phase:
- Two iron ore mines,
- Industrial facilities and equipment,
- Suitable railway infrastructure required for removing the
iron ore.
- A residential area at Kerouane,
- Extension of equipment and installations to the port of
Buchanan".
213. Article 11 of the Base Convention provided the amounts of money that BSGR
and its subsidiaries were required to invest in constructing the infrastructure in
and around Zogota:
"The Company undertakes to invest as part of this Agreement the
sum of USD 2,542,000,000 to carry out the project, broken down
as follows:
73
Mines: USD 243,000,000
Industrial facilities and equipment: USD 496,000,000
Residential areas and hospital: USD 71,000,000
Railway and rolling stock: USD 845,000,000
Port: USD 463,000,000
Contingency (20%): USD 424,000,000"
214. Article 12 of the Base Convention imposed the obligation to construct the
Trans-Guinean railway and invest USD 1 billion in it:
"The Company undertakes to rebuild this railway and will submit
the feasibility study to the Government for approval. The cost of
this reconstruction is budgeted at USD 1billion (1,000,000,000)
plus 20% for contingencies.
The Company undertakes to build 50% of this railway during the
first phase of the project.
The Government undertakes to grant a full exemption from duties,
taxes and fees on all the goods, materials, equipment and services
required for creating this infrastructure."
215. Article 14.2 (a) of the Base Convention required the Republic of Guinea to
provide BSGR with the authorisations required to construct a railway as to
allow the exportation of the iron ore.
216. Article 16.1.1 of the Base Convention sat out the ownership structure of the
Sanniquellie railway and the payment obligations:
"It is expressly agreed that the Government shall be the owner of
the railway irrespective of its method of financing. The railway
line of 102 km that will be constructed in Guinean territory
outside of the Concession Perimeter shall be subject to a usage fee.
The Company shall carry out the surveys, finance and construct
the railway line and provide for its operation and maintenance.
The Company shall allocate the agreed fees for use of the railway
as a repayment for the investment it will have made.
After complete repayment of the loans, the Company shall
continue to provide maintenance of the railway and shall pay the
Government fees for use of the railway. These fees shall be fixed
according to the same principles as those used in similar
infrastructure used under the same conditions in the Republic of
Guinea"
74
217. Article 16.2.1 of the Base Convention stipulated the development and
maintenance of the other infrastructures:
"Subject to compliance with the Applicable Law, the Company can
build, use, improve and maintain any infrastructure, including
roads, bridges, airfields, port or rail installations, and transport-
related installations, as well as electrical power stations,
telephone and other communications lines, pipelines, water pipes
or other networks or installations necessary for the Mining
Operations.
At the Company's request, the Government and the Company must
analyse such infrastructure or other requirements related to the
Mining Operations, including but not limited to energy and
transportation requirements with a view to entering into a fair
agreement for the sharing of costs and profits from such
infrastructure."
218. The arrangements in relation to the Sanniquelie railway constituted a classic
Build-Operate-Transfer agreement: BSGR was required to construct, finance,
operate and maintain the railway and to pay a usage fee. Until BSGR had
recouped its investment in the railway, it was allowed to set-off the investment
against the usage fee. Once the investment was recouped, BSGR was required
to pay the usage fee to the Republic of Guinea. It was the parties' understanding
to put the same mechanism in place in relation to the other development
infrastructures that BSGR would construct and finance.
219. The arrangements in relation to the Trans-Guinean railway were different in the
sense that BSGR only agreed to finance and construct the railway but not to
operate and maintain it. Once the construction would be completed, BSGR
would immediately transfer the railway to the Republic of Guinea. The Trans-
Guinean railway arrangement therefore constituted a "Build-Transfer"
agreement be it that Guinea was not required, contrary to what is provided in
the classic definition of a classic Build-Transfer agreement, to reimburse
BSGR's investment cost.
3.4 Breaches of the Investment Code
3.4.1 Breach of Article 5 of the Investment Code
75
220. Article 5 of the Investment Code provides:
“The Guinean government shall not proceed to any expropriation
or nationalization of investments carried out by individuals or
corporations, with exception of public interest cases as provisioned
by law.
In cases of public interest, expropriation measures must not be
discriminatory and must provide for fair and adequate
compensation, whose amount will be determined according to the
rules and conventional practices of international law.” 128
221. This provision entitled BSGR, as a corporation which had made investments in
Guinea, to be protected against any expropriation or nationalization of its
investments, or any expropriation measure, save where that measure was in the
public interest as provisioned by law, non-discriminatory and provided fair and
adequate compensation.129
222. In this case, Guinea expropriated BSGR’s investments in a manner which was
not in the public interest, was not provisioned by law, was discriminatory, and
without providing fair and adequate compensation.
a. “Investments carried out by…corporations”
223. As explained above, BSGR Guinea was a party to the Base Convention with
Guinea and had contractual rights thereunder, held the title to the Zogota
Mining Concession; and held the Blocks 1 and 2 Permit.
224. Under Guinean law, the title and rights granted to BSGR Guinea under the
Zogota Mining Concession in particular constituted in rem proprietary rights.
128
See Article 5 of the Investment Code of the Republic of Guinea dated 30 June 1995
(Exhibit CL-0003). 129
Note in this regard that general Guinean law similarly protected BSGR’s investments. Article 13 of
the Guinean Constitution provides that “the right to property is guaranteed. No one may be
expropriated if it is not legally recognized in the interest of all, and subject to fair and prior
compensation" (Exhibit CL-0004); Article 534 of the Civil Code of Guinea (which itself refers to
Article 13 of the Constitution) states that that "we cannot force people to give up his property, except
for a public purpose and with just compensation” (Exhibit CL-0005).
76
225. BSGR itself had made an “investment” in Guinea by virtue of its indirect
shareholding in BSGR Guinea and by financing all of the works that were
carried out under its mining titles. That shareholding was held as follows:
(i) From April 2006 until March 2008, BSGR held its interest in BSGR
Guinea through its 82.35% shareholding in BSGR BVI. From March
2008, BSGR held the entire interest in BSGR BVI, and thus BSGR
Guinea was its wholly owned subsidiary.
(ii) From January 2009, BSGR owned and controlled BSGR Guinea as its
wholly owned subsidiary, held via its 100% shareholding BSGR
Guernsey.
(iii) From April 2010 to 13 March 2015, BSGR owned 49% of BSGR
Guernsey (which continued to hold 100% of BSGR Guinea).
(iv) Since 13 March 2015, when BSGR bought out Vale’s 51% interest in
BSGR Guernsey, BSGR Guinea has reverted to a wholly owned
subsidiary of BSGR.
226. Whilst the term “investment” is not expressly defined in the Investment Code it
is plain that BSGR’s shareholding in BSGR Guinea constituted an “investment”
to which it was entitled to protection pursuant to Article 5 of the Investment
Code (and entitled to the guarantees in Articles 21 and 22 of the Mining Code).
(i) First, and before turning to the text itself, whilst the term “investment”
is not defined, it appears unrestricted in the Investment Code. It should
therefore be given a wide rather than narrow reading. This comports
with the policy objective in Article 1 of the Code which is “intended to
define the framework and conditions in which investments in Guinea
are operated, the guarantees offered to investors, as well as the
encouragement accorded to those who contribute significantly to the
achievement of the priority economic and social development
objectives.”
77
(ii) Secondly, and in a similar vein, Article 2(1) provides useful guidance
that the term “investment” was intended to cover a very wide scope of
activity. Article 2(1), contained in the “General investment conditions
and investor guarantees” provides that “Any person is free to undertake
a commercial, industrial, mining, agricultural or services activity in the
territory of the Republic of Guinea.”
(iii) Thirdly, this analysis gains strong support from Article 3 of the
Investment Code. Article 3 guarantees an investor’s ability to make
certain “transfers” out of Guinea. The “transfers” which are protected
depend upon the investor having “carried out a capital investment
originating from abroad”. That term is defined as including inter alia
purchases or provision of equity in a locally incorporated company.
Thus, Article 3 considers a shareholding in a local company as a
“capital investment originating from abroad” and an “investment” and
protects (a) all income generated from that “investment”; (b) the
liquidation proceeds of “said investment” and (c) the “compensation
defined in Article 5 below”. That is a reference to compensation
payable under Article 5, i.e. pursuant to an expropriation. Thus, Article
3 expressly recognises that a (foreign) parent company's shareholding in
a local company can be the subject of expropriation. If the parent then
receives compensation as a result, Article 3 protects the ability of that
parent to extract the money from Guinea.
(iv) Fourthly, BSGR’s analysis follows the orthodox approach in investment
treaty cases. Numerous investment treaty cases have recognised that an
indirect shareholding of the type that BSGR held in BSGR Guinea
constitutes an “investment” in the host state.130
If the drafters of the
Investment Code had intended for a far more restrictive notion of the
130
See, by way of example, Daimler Financial Services AG v Argentina, ICSID Case No. ARB/05/1,
Award dated 22 August 2012, paras 76 and 89-91 (Exhibit CL-0006); CMS v Argentina, ICSID Case
No. ARB/01/08, Annulment Decision dated 25 September 2007, paras. 58 et seq (Exhibit CL-0007);
Noble Energy Inc. and Machalapower CIA Ltd v Ecuador, ICSID Case No. ARB/05/12, Decision on
Jurisdiction dated 5 March 2008, para. 77 (Exhibit CL-0008).
78
concept of “investment” to be applied, they would have made that clear
– particularly in circumstances where Article 5 expressly refers to
“conventional practices of international law” in determining the amount
of compensation for an expropriatory measure. It would be very odd, in
those circumstances, if a shareholding was not recognised as an
“investment”, given that “conventional practices of international law”
recognise this as a classic “investment” for which compensation ought
to be granted.
227. The Measures clearly constituted an “expropriation” of BSGR’s investment in
Guinea within the meaning of Article 5. This raises two issues: (a) whether
Article 5 covers an expropriation of the type suffered by BSGR; and (b) the
nature and effect of the Measures on BSGR’s investments.
b. Indirect expropriation of BSGR’s investment in BSGR Guinea
228. Article 5 applies to an “expropriation or nationalization” of an investment and
to “expropriation measures”.
229. Article 5 plainly protects a company against not only direct expropriation (i.e.
an outright taking), but also to an indirect expropriation, including
“expropriation measures”, that is measures which have the effect of
substantially depriving an investment of its value. This follows from the fact
that the “investment” which is protected by Article 5 includes a shareholding in
a local company (as explained above). If, as must be the case, Article 5 extends
the scope of protection to such “investments”, it must be the case that the
term(s) “expropriation or nationalization” and/or “expropriation measures” was
intended to cover the indirect expropriation that occurred in this case to
BSGR’s shareholding in BSGR Guinea.
230. Indirect expropriation has been said to include:
"…not only open, deliberate and acknowledged takings of property,
such as outright seizure or formal or obligatory transfer of title in
favour of the host State, but also covert or incidental interference
79
with the use of property which has the effect of depriving the
owner, in whole or in significant part, of the use or reasonably-to-
be expected economic benefit of property even if not necessarily to
the obvious benefit of the host State.”131
231. Modern tribunals almost invariably consider the test for indirect expropriation
to be whether the investor has been “substantially deprived” of the economic
benefit of its investment. As stated in Deutsche Bank v Sri Lanka:
“In general terms, a substantial deprivation of rights, for at least a
meaningful period of time, is required. The required level of
interference with rights has been variously described as
“unreasonable”; “an interference that renders rights so useless
that they must be deemed to have been expropriated”; “an
interference that deprives the investor of fundamental rights of
ownership”; “an interference that makes rights practically
useless” “an interference sufficiently restrictive to warrant a
conclusion that the property has been “taken””; “an interference
that makes any form of exploitation of the property disappear”;
“an interference such that the property can no longer be put to
reasonable use”.”132
232. The Measures clearly fit this description. Their overall (and intended) effect
was to strip BSGR Guinea of all of its relevant assets, including in particular
(a) the rights granted under the Zogota Mining Concession; (b) the rights
granted under Blocks 1 and 2 Permit and (c) its contractual rights under the
Base Convention. BSGR Guinea’s title to the Zogota Mining Concession and
the Blocks 1 and 2 Permit was immediately and involuntarily taken and
returned to the Government. Any and all contractual rights that BSGR Guinea
had under the Base Convention were similarly immediately and involuntarily
taken from it.
233. As stated above, the only assets of any note held by BSGR Guinea constituted
(a) its rights under the Base Convention; (b) the Zogota Mining Concession (c)
the Blocks 1 and 2 Permit and (d) assorted ancillary mining rights.
131
Metalclad Corporation v United Mexican States, ICSID Case No. ARB(AF)/97/1, Award dated 30
August 2000, para. 103 (Exhibit CL-0009). 132
Deutsche Bank AG v. Democratic Socialist Republic of Sri Lanka, ICSID Case No. ARB/09/2, Award
dated 31 October 2012, para. 503 (Exhibit CL-0010).
80
234. As such, the Measures resulted in the permanent and substantial deprivation of
the value of BSGR’s shareholding in BSGR Guinea. That constituted a wholly
unreasonable and unwarranted interference with BSGR’s shareholding in
BSGR Guinea and rendered those rights so useless, or so practically useless,
that they must be deemed to have been expropriated. Thus, whilst title to that
shareholding formally remained with BSGR, Guinea’s interference with the
assets of BSGR Guinea meant that it became practically impossible for BSGR
any longer to exploit those property and other rights. Put bluntly, the effect of
those Measures was to strip BSGR Guinea to the bone and leave BSGR holding
an empty corporate shell.
235. Accordingly, the entire value of the indirect shareholding held by BSGR in
BSGR Guinea fundamentally depended upon the continued existence of these
rights and assets and the ability of BSGR Guinea to exploit those rights and
assets. As explained in the evidence of Mr Tchelet, when BSGR Guinea was
stripped of its assets in April 2014, it had the effect of rendering BSGR’s
shareholding (held via shareholding in BSGR Guernsey) entirely valueless133
.
Thus, an indirect expropriation of BSGR’s investments has plainly occurred.
c. The Measures constituted an involuntary taking of BSGR’s
investments
236. It is clear that the Measures constituted an involuntary taking of BSGR’s
investments and consequently an expropriation of those investments.
237. First, by way of the Zogota Mining Concession in particular, BSGR Guinea
itself held property rights in rem in the Zogota Project (and not just contractual
rights to operate the Concession and/or a licence to do so). Thus, without more,
the involuntary taking of those proprietary rights and the transfer of title to the
Government was itself an act of expropriation (at least in relation to those in
rem rights).
238. Second, the Measures were implemented by Guinea in the purported exercise
of its sovereign powers. The evidence plainly shows that Guinea was not acting
133
CWS-4, para. 45.
81
as a mere contractual counterparty to BSGR Guinea or as a prudent regulator of
the mining industry. Far from it.134
The Measures were not, and did not even
purport to be, the result of any contractual or regulatory right or power
allegedly held under the Base Convention or the applicable Mining Code.
Rather, they were simply the product of a sovereign state’s discretionary
decision to exercise its sovereign power so as to forcibly take valuable property
and/or contractual rights.
239. This is demonstrated by both (a) the campaign of harassment waged against
BSGR, as outlined above, which is fundamentally inconsistent with any
suggestion that Guinea was acting pursuant to any purported contractual or
regulatory right or power; and (b) the nature of the Measures themselves. The
revocation of BSGR Guinea’s rights was not pursuant to any contractual or
regulatory termination procedure. Instead, the Measures were imposed via
various executive Decrees. Furthermore, those Decrees, by which BSGR
Guinea was stripped of its assets, did not themselves invoke any statutory or
other legal justification for the course which Guinea had chosen to take. In
truth, they were simply promulgated by the President and the Minister of Mines
in the purported exercise of their executive discretion, acting on behalf of a
sovereign State.
240. In other words, Guinea did not even bother with the veneer of any contractual
or other justification for its actions. It simply decided that the logical end of its
campaign against the BSGR group would be the revocation of the mining rights
and the termination of the Base Convention without compensation.
241. In this regard, note the following observations of the ICSID Tribunal in Vivendi
v Argentina:
“Turning to Respondent’s proposition that an act of state must be
presumed to be regulatory, absent proof of bad faith, this is
incorrect. There is extensive authority for the proposition that the
state’s intent, or its subjective motives are at most a secondary
consideration. While intent will weigh in favour of showing a
134
By way of example, there was no basis for the imposition of the NMC or its sub-committees under
the Base Convention or the applicable Mining Code.
82
measure to be expropriatory, it is not a requirement, because the
effect of the measure on the investor, not the state’s intent, is the
critical factor. As Professor Christie explained in his famous
article in the British Yearbook of International Law more than 40
years ago, a state may expropriate property where it interferes with
it even though the state expressly disclaims such
intention….international tribunals, jurists and scholars have
consistently appreciated that states may accomplish expropriations
in ways other than by formal decree…
…As the tribunal in Santa Elena correctly pointed out, the purpose
for which the property was taken “does not alter the legal
character of the taking for which adequate compensation must be
paid.”135
242. The position is a fortiori where the state does in fact accomplish the
expropriation by way of a ‘formal decree’.
243. Third, even if the Measures were purportedly implemented by Guinea pursuant
to an alleged contractual and/or regulatory power (which is denied), those
Measures still constituted an expropriation.
244. That is for two separate and free-standing reasons, both of which demonstrate
that the Measures were made without any legal basis under Guinean or
international law.
(i) First, the process by which Guinea reached the decision to implement
the Measures was fundamentally flawed both in process and in
substance and unlawful as a matter of Guinean law. As such, there was
no valid justification under Guinean or international law for the
implementation of the Measures; and
(ii) Secondly, there was (and is) no substance to the allegations made by
Guinea in any event. They are and were wrong. Thus, leaving aside the
flawed review process undertaken in Guinea, BSGR and its subsidiaries
never in fact engaged in any corruption or bribery, or other conduct,
135
Vivendi v Argentina, ICSID Case No. ARB/97/3, Award dated 20 August 2007, para 7.5.20 (Exhibit
CL-0011).
83
which could properly be said to justify implementation of the Measures
under local or international law.
245. In these circumstances, and whatever Guinea may say now in an ex post facto
attempt to justify the imposition of the Measures, each of these reasons reveals
that that their true nature and effect was indeed expropriatory.
246. In light of their importance to this case, each reason will be addressed under a
separate heading, respectively under heading 3.8 "Flaws in the process by
which Guinea decided to implement the Measures" and under heading 3.9 "No
substance to the corruption allegations" further below.
247. Finally, even if (contrary to the foregoing submissions) the Measures were
purportedly imposed by Guinea pursuant to the Base Convention and/or the
Mining Code, and even if Guinea had some legitimate contractual or regulatory
basis for imposing them (which is denied), the Measures still effected an
expropriation which deserves compensation under the Investment Code. This is
for two separate reasons.
(i) First, the evidence discloses that Guinea in fact imposed the review
process which culminated in the Measures with a pre-determined result
in mind, viz. to oust the BSGR group from its mining operations. Thus,
any attempt by Guinea to justify its conduct at the time by reference to a
putative contractual and/or regulatory right was (and is) a mere fig leaf
for what was, in reality, an a priori and politically motivated decision
and/or one that was the product of unlawful discrimination on the part
of Guinea against the BSGR group. Any attempted justification for its
conduct along those lines is, at best, a pretext. The reality is that Guinea
acted in bad faith and/or abused whatever alleged contractual or
regulatory right it may have had, in order to revoke BSGR Guinea’s
rights. That is classic expropriatory conduct.
(ii) Second, and in any event, the revocation of the Zogota Mining
Concession and the Blocks 1 and 2 Permit and termination of the Base
Convention constituted a wholly disproportionate reaction on the part of
84
Guinea as compared with the harm allegedly said to have been caused
by the BSGR group. Accordingly it ought properly to be considered an
expropriation.
248. This proportionality principle has been accepted by a number of international
tribunals, which have demonstrated a ready willingness to consider whether,
objectively, a State has been justified in imposing a severe penalty in response
to the harm purportedly caused by the investor.136
249. For example, in Deutsche Bank v Sri Lanka a majority of the Tribunal stated:
“The Tribunal does not agree with Sri Lanka that it has an
extremely broad discretion to interfere with investments in the
exercise of “legitimate regulatory authority”. A number of
tribunals, including Tecmed v. Mexico, Azurix v. Argentina, and
LG&E v. Argentina have adopted a proportionality requirement in
relation to expropriatory treatment. It prevents the States from
taking measures which severely impact an investor unless such
measures are justified by a substantial public interest.”137
250. As noted in Occidental v Ecuador this principle “is applicable as a matter of
general international law, and has been applied in many ICSID arbitrations in
the past.” The Tribunal analysed the concept in detail:
“As to this latter point, the Tribunal considers that the Respondent
failed to properly appreciate the Claimants’ argument. The
argument is not that the State must prove harm, but that any
penalty the State chooses to impose must bear a proportionate
relationship to the violation which is being addressed and its
consequences. This is neither more nor less than what is
encapsulated in the Respondent’s own constitutional rules about
proportionality. In cases where the administration wishes to
impose a severe penalty, then it appears to the Tribunal that the
State must be able to demonstrate (i) that sufficiently serious harm
was caused by the offender; and/or (ii) that there had been a
flagrant or persistent breach of the relevant contract/law, sufficient
to warrant the sanction imposed; and/or (iii) that for reasons of
deterrence and good governance it is appropriate that a significant
136
Exhibit CL-0001, this proportionality principle is reflected in the Mining Code, including by the use
of the word “may” in Article 60 thereof. Moreover, under general Guinean law a declaration of
public interest must precede a lawful expropriation, which can only be granted after a public inquiry
that is required to analyse the proportionality of the envisaged taking: see Land and Federal Code at
articles 54 et seq. 137
Exhibit CL- 0010, para 522.
85
penalty be imposed, even though the harm suffered in the
particular instance may not have been serious. The potential
justification predicated on deterrence explains why, for example, it
may be proportionate to give a heavy fine for speeding even where
no accident occurred and where, plainly, the State suffered no
direct “harm” from the driver’s breach of the law. The potential
for harm, and the need to deter others from acting in the same way,
justifies the imposition of a penalty even though no identifiable
harm was caused in the particular instance.”138
251. The Tribunal went on to note the importance of the link between the harm
allegedly caused by an investor’s conduct and the sanction imposed by the
State when considering the issue of proportionality:
“The test at the end of the day will remain one of overall judgment,
balancing the interests of the State against those of the individual,
to assess whether the particular sanction is a proportionate
response in the particular circumstances. Accordingly, while it is
possible to envisage many instances where punishment is imposed
for violations which have not directly caused harm, it is
immediately apparent that such punishments tend to be at the lower
end of the scale – they are intended to educate and deter both the
offender and the general populace. But more serious punishments
are still usually reserved for instances where true harm has been
suffered. And typically, the more serious the harm then the more
serious the punishment. This is a familiar principle in all legal
systems…”139
252. In this case, the Technical Committee did not establish either (i) that
sufficiently serious harm was caused by BSGR Guinea; and/or (ii) that there
had been a flagrant or persistent breach of any relevant contract or law
sufficient to warrant the sanction imposed (indeed, no such contract or law was
even cited); and/or (iii) that for reasons of deterrence and good governance it
was appropriate that a significant penalty be imposed. The Technical
Committee alleged – but did not prove – that BSGR was a company which
“did not have any significant experience in the mining sector”, a proposition
which is self-evidently and demonstrably wrong in light of the evidence
proffered above and in this Memorial.
138
Occidental Petroleum Corporation v Ecuador, ICSID Case No. ARB/06/11, Award dated 5 October
2012, para. 416 (Exhibit CL-0012). 139
Ibid., para. 417.
86
253. As explained above, the imposition of the Measures by the President and/or
Ministry of Mines required the exercise of its discretion. In exercising that
discretion, it was incumbent upon the President and/or Ministry to act in a
proportionate manner. However, the reaction of the Guinean authorities was
wholly disproportionate in completely revoking all of BSGR Guinea’s valuable
mining rights and terminating the Base Convention on the basis of the most
flimsy and insubstantial evidence.
d. The Measures constituted an illegal expropriation
254. For the reasons stated above, BSGR submits that the Measures constituted an
illegal expropriation in further breach of Article 5 of the Investment Code and
international law, in that they were unjustified under applicable Guinean law
and/or not in the public interest and/or (c) discriminatory.
e. No compensation provided in respect of the expropriation
255. In further breach of Article 5 of the Investment Code (and Articles 13 of the
Constitution and/or Article 534 of the Civil Code), Guinea has failed to provide
BSGR with any compensation, let alone fair, adequate or effective
compensation for the expropriation of its investments.
3.4.2 Breach of Article 6 of the Investment Code
256. Pursuant to Article 6(1) of the Investment Code, Guinea undertakes that a
foreign company will “receive the same treatment as Guinean nationals
regarding applicable laws and obligations relating to their activities.”
257. Guinea has acted in breach of this obligation by way of the Measures, which
constituted an illegal expropriation in breach of Article 5 of the Investment
Code for the reasons set out above. It has further breached this obligation, for
example by withdrawing BSGR's right to export iron ore through Liberia while
it has granted this right to other companies, including Sable Mining Africa.
87
3.4.3 Breach of Article 30 of the Investment Code
258. In addition to the material breaches of Article 5 outlined above, Guinea’s
conduct in respect of BSGR’s investments constituted a breach of Article 30 of
the Investment Code.
259. Article 30 provides as follows:
“No law or regulation taking effect after the date of execution of
the investment may restrict the guarantees referred to in the book 1
of this code regarding said investment. Similarly, no law or
regulation taking effect after the effective date of approval may
reduce or eliminate the benefits or impede the exercise of the rights
that have been granted to the company and its investors.”
260. At all material times, BSGR has held an indirect shareholding in BSGR Guinea.
At the time of the Measures, it held (through BSGR Guernsey) an effective
49% stake in BSGR Guinea; which has now reverted to a 100% shareholding
(via BSGR Guernsey). For the reasons set out above, BSGR benefited from the
investment guarantees granted by Guinea in Book 1 of the Investment Code.
261. Thus, Article 30 of the Investment Code guaranteed to BSGR that no law or
regulation imposed after the investment that it made in BSGR Guinea would
either (a) “restrict the guarantees referred to in the book 1 of this code”,
including the guarantee against expropriation; or (b) reduce or eliminate the
benefits or impede the exercise of rights that it had been granted.
262. However, by the conduct described above, Guinea is in breach of its
obligations to BSGR in Article 30 of the Investment Code.
263. First, Guinea wrongly expropriated BSGR’s investments in BSGR Guinea
without providing compensation. In doing so, Guinea has failed to respect the
benefits and guarantees to which BSGR was entitled under Article 5 and thus
has also acted in breach of its obligations in Article 30.
264. Second, BSGR had a legitimate expectation, founded at the time of its initial
investment in BSGR Guinea and/or by virtue of the Mining Concession and/or
88
the Base Convention and/or Article 30(1) itself, that its subsidiaries’ mining
rights would be determined by reference to and in accordance with the
prevailing legislation in force at the time, i.e. the 1995 Mining Code. It was
that legislation which mandated the limited circumstances in which the Mining
Concession, Prospecting Permits and the Base Convention could be revoked or
terminated.
265. Thus, the failure of Guinea to apply the 1995 Mining Code to BSGR’s
investments constituted a breach of Article 30 of the Investment Code.
266. Third, if and insofar as Guinea seeks to justify the imposition of the Measures
on the grounds that they were permitted under the 2011 Mining Code, that also
constitutes a breach of Article 30(1). Guinea was in breach of Article 30(1)
even if the Measures would have been justified under the new 2011 Mining
Code (assuming, arguendo, that the 2011 Mining Code could somehow validly
be applied to BSGR and its investments).
267. By Article 30, Guinea had promised that no law or regulation taking effect after
the date of BSGR’s investments would restrict the guarantees under Article 5
or eliminate or reduce the benefits or impede the exercise of rights that had
been granted to it in respect of its investments. Thus, even if, arguendo, the
2011 Mining Code justified the imposition of the Measures (in contrast to the
1995 Mining Code), the application of that later legislation resulted in a
reduction or elimination of benefits to which BSGR was entitled (namely, the
right to compensation under Article 5 of the Investment Code).
3.5 Breaches of the Mining Code
268. The Measures taken by Guinea as described above violate a number of
Guinea’s obligations under the Mining Code.
3.5.1 Breach of Article 21 of the Mining Code
269. Article 21 of the Mining Code provides that:
89
“In accordance with international conventions, and subject to the
laws and regulations of the Republic of Guinea, all persons
designated in article 8 are guaranteed:
the right to dispose freely of their property and organize their
enterprise as they wish;
freedom of hiring and firing, subject to [with] prevailing laws
and regulations;
unlimited access to raw materials;
freedom of circulation of personnel and products within the
Republic of Guinea;
freedom to import goods and services and any necessary
funds;
freedom to dispose of their products on international markets,
to export and dispose of products in foreign markets.”
270. BSGR was a person “designated in article 8”, being a person (a) “possessing
the technical and financial capability to do prospecting work”; and/or (b)
indirectly operating and/or exploiting mining substances via its end subsidiary
BSGR Guinea, being a private “corporation under Guinean law”.
271. Thus, Guinea was obliged to guarantee each of these ‘fundamental freedoms’
to BSGR. In breach of Article 21, by reason of the conduct set out above
Guinea denied BSGR:
(i) the right to dispose freely of its property and organize its enterprise as it
wished;
(ii) freedom of hiring and firing;
(iii) access to raw materials;
(iv) freedom of circulation of personnel and products within the Republic of
Guinea;
90
(v) freedom to import goods and services and any necessary funds;
(vi) freedom to export and/or dispose of its products on international
markets.
3.5.2 Breach of Article 22 of the Mining Code
272. By virtue of Article 22 of the Mining Code, Guinea was and is obliged not to
discriminate against BSGR as compared with Guinean nationals. Guinea has
further breached this obligation, for example by withdrawing BSGR's right to
export iron ore through Liberia while it has granted this right to other
companies, including Sable Mining Africa.
273. Furthermore, Guinea failed to comply with its obligations under the Mining
Code to grant and maintain BSGR’s Guinea’s mining titles and/or BSGR
Guernsey and BSGR Guinea’s rights under the Base Convention, thereby
substantially impacting on BSGR’s investment (comprised of its shareholding
in and financing of BSGR Guinea and the other subsidiaries).
3.5.3 Breach of Article 11 of the Mining Code
274. By Article 11 of the Mining Code, the Base Convention was a “guarantee to
the mine title holder that the [legal, financial, tax and social conditions] will
remain unvaried” that once ratified it bound the parties and could only be
amended by written agreement. In breach of Article 11, Guinea terminated the
Base Convention without any legal or other justification.
3.5.4 Breach of Article 26 of the Mining Code
275. By Article 26 of the Mining Code, BSGR Guinea, as holder of the Blocks 1 and
2 Permit, had the right to an operating permit or concession for the deposits
found within the prospecting site. On 14 September 2011, BSGR Guinea
submitted a feasibility study which demonstrated the existence of commercially
operational deposits of iron ore within Blocks 1 and 2. Notwithstanding that,
91
Guinea failed to respond to the Feasibility Study, let alone grant BSGR Guinea
an operating permit or concession in relation to those deposits. That conduct
was in breach of Article 26.
3.5.5 Breach of Article 41 of the Mining Code
276. By Article 41 of the Mining Code, BSGR Guinea, as holder of the Zogota
Mining Concession, had the “exclusive right to carry out all kinds of
prospecting and development of deposits of mining substances for which the
concession is granted, within the limits of its perimeter, and without limits of
depth”. By implementing the Measures, Guinea failed to maintain that
exclusive right in favour of BSGR Guinea.
277. The breaches of the Mining Code as set out above give rise to liability on the
part of Guinea to BSGR, including for losses suffered by it as a result of these
breaches. By reason of the Guinea’s conduct, BSGR has suffered and/or will
suffer a total loss in the value of all or part of its investments.
3.6 Breaches of the BOT Act
3.6.1 Breach of Article 7.1 of the BOT Act
278. By Article 7.1 of the BOT Act, Guinea guarantees "the free and peaceable use
of the resources making it possible to exercise the activities subject of the
project throughout the duration of the concession".
279. The unlawful termination by the Republic of Guinea of the Base Convention
and the unlawful withdrawal of the Blocks 1 and 2 Permit and the Zogota
Mining Concession in or around 24 April 2014, violated BSGR and its
subsidiaries' right to the free and peaceful usage of the works it had undertaken
at Zogota, including building villages and roads for the employees, the
construction of the mine, and the works it had undertaken on the various
railways.
92
280. By letter of 8 April 2011, the Minister of Transport ordered BSGR Guinea to
stop all the work on the ground in respect of the Trans-Guinean railway.140
This
stop order violated BSGR's right to the free and peaceful usage of the Trans-
Guinean railway under Article 7.1 of the BOT Act.
281. By letter of 4 October 2011, the Minister of Mines ordered BSGR Guinea to
stop all of BSGR's works in Guinea, including the construction of the Zogota
mine and the construction of the Sanniquellie railway. This stop order violated
BSGR's right under Article 7.1 of the BOT Act to the free and peaceful usage
of the mine in Zogota and the construction of the Sanniquellie railway.
3.6.2 Breach of Article 7.2.2 of the BOT Act
282. By Article 7.2.2 of the BOT Act, Guinea guarantees "to provide all permits and
all authorisations necessary to exercise the rights guaranteed by this Law and
by the BOT Agreement".
283. By letter of 8 April 2011, Minister of Transport ordered BSGR Guinea to stop
all the work on the ground in respect of Trans-Guinean railway. This stop order
constituted a breach of Article 7.2.2 of the BOT Act in that BSGR Guinea was
no longer authorized to work on the construction of the Trans-Guinean railway.
284. By letter of 4 October 2011, the Minister of Mines ordered BSGR Guinea to
stop all of BSGR's works in Guinea, including the construction of the Zogota
mine.141
This stop order constituted a breach of Article 7.2.2 of the BOT Act in
that BSGR Guinea was no longer authorized to work on the construction of a
mine in Zogota and the construction of the Sanniquellie railway.
3.6.3 Breach of Article 7.2.7 of the BOT Act
285. By Article 7.2.7 of the BOT Act, Guinea guarantees "the investor the non-
expropriation of all its assets and capital subject of the BOT Agreement".
140
Exhibit C-0039. 141
Exhibit C-0042.
93
286. This provision entitled BSGR, as a corporation which had made investments in
the infrastructure in Guinea, to be protected against any expropriation or any
expropriation measure. In this case, and as demonstrated in relation to the
breaches of the Investment Code, Guinea expropriated BSGR's investments and
this in breach of Article 7.2.7 of the BOT Act.
3.6.4 Breach of Article 7.2.12 of the BOT Act
287. By Article 7.2.12 of the BOT Act, Guinea guarantees "the investor adequate
compensation in the event where the retrocession to the State of the subject of
the BOT Agreement is undertaken wholly or partly before the planned
deadline".
288. Whilst the term "retrocession" is not defined in the BOT Act, it appears
unrestricted in the BOT Act. It should therefore be given a wide rather than
narrow reading. This comports with the policy objective in Article 2(2) of BOT
Act according to which the Republic of Guinea "encourages all forms of
capital and technological investment made by means of a BOT Agreement in
accordance with the principles and rules fixed in this Law".
289. The common understanding of the term "retrocession" is the return, voluntary
or not, of a right, a property or an asset. In the case at hand, as a result of the
Measures, the Republic of Guinea retained the benefit of the Feasibility Study
BSGR had completed on the Trans-Guinean railway, the Feasibility Study
BSGR had completed on Blocks 1 and 2, the works it had undertaken at Zogota
(including villages and roads for employees, environmental studies,
construction of mines) and the works it had undertaken on the various railways.
Guinea has to date provided no compensation in respect of these works and
studies in breach of Article 7.2.12 of the BOT Act.
3.7 Breaches of international law
94
290. Guinean law incorporates and/or applies customary international law. Many
Guinean statutes refer to the “customary practice of international law”,
including expressly in Article 5 of the Investment Code which refers to “the
rules and conventional practices of international law”. Furthermore, Article 21
of the Mining Code refers to fundamental freedoms guaranteed “in accordance
with international conventions”.
291. The minimum standard of treatment in customary international law is an
umbrella concept which "consists of a series of interconnecting and
overlapping elements or standards that apply to both the treatment of
foreigners and their property".142
292. Accordingly, Guinea was bound as a matter of Guinean law, incorporating
and/or applying customary international law, by the following obligations:
(i) An obligation not to expropriate BSGR’s investment unless the taking
was for a public purpose, as provided by law, conducted in a non-
discriminatory manner and with compensation in return.143
(ii) An obligation to prevent arbitrary conduct in relation to BSGR’s
investment in Guinea.144
(iii) An obligation to provide BSGR with full protection and security.145
142
Newcombe & Paradell, Law and Practice of Investment Treaties: Standards of Treatment (Kluwer
2009), para. 236 (Exhibit CL-0013). 143
See e.g. Dumberry, The Fair and Equitable Treatment Standard (2013), para. 1.01E (Exhibit CL-
0014). 144
Ibid., para. 1.01E; Dolzer & Schreuer, Principles of International Investment Law (2nd
Ed, 2012)
p.195 (“The traditional understanding of the customary minimum standard seems to have covered
actions deemed arbitrary. It would follow that the treaty standard against arbitrariness is also
covered by customary international law”)(Exhibit CL-0015). And see the ICJ in Elettronica Sicula
S.p.A. (ELSI) (United States of America v. Italy), Judgement dated 20 July 1989, para. 128 (referring
to “a willful disregard of due process of law, an act which shocks, or at least surprises, a sense of
juridical propriety”) (Exhibit CL-0016). 145
See ElPaso v Argentina, ICSID Case No. ARB/03/15, Award dated 31 October 2011, para. 522
("The Tribunal considers that the full protection and security standard is no more than the
traditional obligation to protect aliens under international customary law… The case-law and
commentators generally agree that this standard imposes an obligation of vigilance and due
diligence upon the government.”) (Exhibit CL-0017).
95
(iv) An obligation to accord to BSGR fair and equitable treatment. In Waste
Management (No 2) v Mexico (2004) 11 ICSID Reports 361, at 386 the
Tribunal said: “The minimum standard of fair and equitable treatment is
infringed by conduct attributable to the State and harmful to the
claimant if the conduct is arbitrary, grossly unfair, unjust or
idiosyncratic, is discriminatory and exposes the claimant to sectional or
racial prejudice, or involves a lack of due process leading to an
outcome which offends judicial propriety – as might be the case with a
manifest failure of natural justice in judicial proceedings or a complete
lack of transparency and candour in an administrative process.”146
(v) An obligation to prevent a denial of justice.147
(vi) An obligation not to engage in an abuse of rights.148
293. For the reasons set out above, Guinea’s conduct amounted to a clear breach of
each of those obligations owed to BSGR, and for which BSGR is entitled to
relief.
3.8 Flaws in the process by which Guinea decided to implement the Measures
294. Guinea decided to expropriate BSGR's mining rights by a process that lacked
both procedural and substantive due process.
295. The OECD Draft Convention on the Protection of Foreign Property is of some
assistance in establishing what “due process” means in this context. The
Commentary provides that due process:
146
Waste Management (No 2) v Mexico, ICSID Case No. ARB(AF)/00/3, Award dated 30 April 2004,
para. 386 (Exhibit CL-0018). 147
Exhibit CL-0014, para. 1.01E; Bishop and Crawford, Foreign Investment Disputes: Cases, Materials
and Commentary (2nd
ed, 2014), para. 8.05: (“Under customary international law, states may be
held liable for failing to provide foreign investors with due process…”)
(Exhibit CL-0019). 148
Exhibit CL-0019, para. 8.06: (“States that abuse their law making powers as a means of avoiding
contractual obligations are acting contrary to international law").
96
“…implies that whenever a State seizes property, the measures
taken must be free from arbitrariness. Safeguards existing in its
Constitution or other laws or established by judicial precedent
must be fully observed; administrative or judicial machinery used
or available must correspond at least to the minimum standard
required by international law”149
296. In ADC v Hungary, the Tribunal noted that:
“The Tribunal agrees with the Claimants that “due process of
law”, in the expropriation context, demands an actual and
substantive legal procedure for a foreign investor to raise its
claims against the depriving actions already taken or about to be
taken against it. Some basic legal mechanisms, such as reasonable
advance notice, a fair hearing and an unbiased and impartial
adjudicator to assess the actions in dispute, are expected to be
readily available and accessible to the investor to make such legal
procedure meaningful. In general, the legal procedure must be of a
nature to grant an affected investor a reasonable chance within a
reasonable time to claim its legitimate rights and have its claims
heard. If no legal procedure of such nature exists at all, the
argument that “the actions are taken under due process of law”
rings hollow. And that is exactly what the Tribunal finds in the
present case.”150
297. The Technical Committee review process failed to meet this test and was in
breach of Guinean and international law. It suffered from the following
fundamental flaws.
3.8.1 The review process was ultra vires
298. There was no justification at all under Guinean law for the imposition of a
review process to be undertaken by the NMC and a Technical Committee
constituted thereunder with regard to BSGR Guinea’s mining rights or the Base
Convention and allegations of bribery or corruption. From its inception the
process was therefore ultra vires and of no legal effect as a matter of Guinean
and/or international law. Furthermore, the purported imposition of that review
regime on BSGR’s investments was itself a breach of Guinea’s obligations.
149
OECD Draft Convention on the Protection of Foreign Property dated December 1962 (Exhibit CL-
0020). 150
ADC Affiliate Ltd & Anor v Hungary, ICSID Case No. ARB/03/16, Award dated 2 October 2006,
para. 435 (Exhibit CL-0021).
97
299. The NMC and its Technical Committee were established pursuant to the 2011
Mining Code and the review of the Zogota Mining Concession and other
mining rights was purportedly conducted pursuant to that Code (albeit that, as
explained below, when imposing the Measures, Guinea did not rely upon any
underlying legal basis for doing so). However, that raised a fundamental
threshold problem with the entire process: the Zogota Mining Concession, the
Blocks 1 and 2 Permit and the Base Convention had all been granted prior to
the introduction of the 2011 Mining Code. Thus, the 2011 Mining Code had no
application to those rights. By its own terms, it did not apply in respect of
mining titles (such as the Zogota Mining Concession or Blocks 1 and 2 Permit)
or mining agreements (such as the Base Convention) all of which had been
executed prior to 9 September 2011. Accordingly, the Technical Committee
had no jurisdiction to review the legitimacy of the rights granted by those
instruments.
300. Despite this, by setting up the Technical Committee to review those rights
Guinea purported to apply the 2011 Mining Code. In doing so, Guinea
therefore purported to apply its own legislation retroactively, in breach of
Article 9 of the Guinean Constitution and Article 7-2 of the African Charter on
Human Rights (which applied in Guinea by virtue of the Preamble and Article
151 of the Constitution).151
301. Guinea’s attempted reliance on the 2011 Mining Code was also a breach of
Article 30 of the Investment Code and Article 32 of the Base Convention as
explained hereabove.
302. Finally, it is important to note that under the legislation which applied to the
Zogota Mining Concession and the Base Convention, i.e. the 1995 Mining
Code, a fraudulent misrepresentation carried a criminal sanction. But that
legislation did not give the State the right to revoke a concession in such
circumstances.
3.8.2 The process was unfair, partial and dependent
151
Legal Opinion of Bechillon and Labetoulle dated 9 December 2012 (Exhibit C-0070).
98
303. The review process suffered from the inherent and systemic problem that it did
not involve a fair, unbiased and impartial adjudication of the BSGR group’s
conduct. This was due to (i) the manner in which the NMC and its two sub-
committees was composed and controlled by President Condé, (ii) the process
in which the Technical Committee in fact engaged was unfair and (iii) the fact
that the end result of the review process was pre-determined.
a. Composition of the review committees
304. The subcommittees of the National Mining Committee or NMC which were
involved in the review process of BSGR's mining rights were controlled
directly or indirectly at every level by President Condé.
305. Firstly, according to Article 5 of the 29 March 2012 decree, the four members
making up the Strategic Committee were “placed under the direct authority of
the Head of State”.152
Furthermore, the members were four existing ministers
of State, who were appointed to those roles by the President: the Minister for
Mines and Geology, the Minister for Economy and Finance, the Minister for
Justice and the Minister for Public Works and Transport. Accordingly, not only
were the members of the Strategic Committee formally “under the direct
authority” of President Condé, but their ministerial jobs depended on
remaining in his favour.153
As President Condé himself stated in an interview
dated 4 November 2013, “We expect the Technical Commission to make
proposals to the committee that I chair.”
306. Secondly and according to the legal opinion of Daniel Labetoulle, Honorary
Chair of the Litigation Division of the French Council of State, and Denys de
Béchillon, Professor of Public Law, 16 of the 18 members of the Technical
Committee were nominated by the President or members of his government.154
152
Exhibit C-0052, Article 5. 153
Exhibit C-0028, para 77.2.1. 154
Exhibit C-0070; Exhibit C-0022, para 77.2.2.
99
307. Thirdly, the Technical Committee was placed under the authority of the
Strategic Committee, and thus under the indirect authority of the President.155
308. Fourthly, the decision of the Strategic and Technical Committees could only be
executed after approval by the President.156
309. Given the above, Labetoulle and de Béchillon concluded that:
"The closeness of this link with the executive branch poses a legal
problem of primary importance… it is once again that guarantees
of "objective" impartiality are imperatively required so that an
authority of this kind can legitimately be asked to express an
opinion on the allegations of corruption and on the maintenance or
withdrawal of rights and good conferred by authentic acts. And yet,
the system that has just been described does not offer – cannot
offer – such guarantees. As a minimum, a firmly guaranteed
statutory independence is necessarily required. It is clearly this
statutory independence… that the organic features of this
Commission do not present"
b. The process in which the Technical Committee engaged was
unfair
310. The manner in which the Technical Committee in fact engaged in the review
process was devoid of procedural fairness. This unfairness included the
following fundamental flaws in basic due process.
311. Firstly, the burden of proof was reversed with Guinea insisting that BSGR
demonstrate why no corruption had taken place. This was notwithstanding that
(i) the Committee admitted in the Allegations Letter that “neither the validity,
nor the probative force of these items has yet been evaluated” and (ii) no
evidence had been disclosed to support the allegations. This approach was all
the more flawed since the Allegations Letter stated that if BSGR did not
respond, the Committee would “consider your conduct as recognition of the
merits of the allegations… These omissions may therefore justify a decision
155
Exhibit C-0052, Article 6. 156
Exhibit C-0028, para 77.2.3.
100
contrary to your interests, regardless of any other evidence.” This was a highly
prejudicial procedure and unlawful as a matter of Guinean law.
312. Secondly, the allegations made by the Committee were unsupported by
evidence, and/or the Committee failed to provide BSGR with the purported
evidence on which they were based or (where evidence was provided) that was
patently incomplete. For example:
(i) In its letter of 26 December 2012 and in the following months, BSGR
made multiple requests to the Technical Committee for disclosure of the
evidence that it purported to rely upon.157
It was not until 7 May 2013,
over six months after the date of the Allegations Letter, that the
Technical Committee provided any documents, and even then it was
only a handful of documents.158
This was obviously not the entirety of
the evidence and on 4 June 2013 Skadden Arps again requested that the
Technical Committee produce all the evidence on which it relied.159
This request was ignored until a further six months later, when on 4
December 2013, the Technical Committee disclosed evidence it
purported to rely on in support of its allegations, again in incomplete
form.160
This was over one year since the date of the Allegations Letter,
and only three working days before a hearing was scheduled to take
place.
(ii) The “evidence” that was disclosed by the Technical Committee was
incomplete and relied on by the Technical Committee without question.
It related in its entirety to the false allegation that BSGR colluded with
Ms Mamadie Touré, presenting no evidence in respect of the multiple
other allegations in the Allegations Letter. Furthermore, the main
evidence to support this one allegation was an affidavit from Ms Touré,
which BSGR had (and still has had) no opportunity to test by way of
157
Exhibit C-0055; Exhibit C-0028, para 79.1. 158
Letter from the Technical Committee to VBG-VALE BSGR Guinea dated 7 May 2013
(Exhibit C-0071). 159
Letter from Skadden Arps to the Technical Committee dated 4 June 2013 (Exhibit C-0072). 160
Letter from the Technical Committee to VBG-VALE BSGR Guinea dated 4 December 2013
(Exhibit C-0073).
101
cross examination, and which, as stated by Skadden Arps on behalf of
BSGR “refers to a wholly incredible and unsupported set of events and
our client considers this to be an entirely concocted, self-serving
statement by a witness who has previously (unsuccessfully) sought to
extort money from BSGR”.161
(iii) The Technical Committee relied as proof of the corruption allegations
on the fact that BSGR did not appear at the hearing before the Technical
Committee, which took place on one day (16 December 2013). At page
3 of the Allegations Letter, it stated that “in the event that you do not
provide the named witnesses or not attend the CTRTCM session of
which you will have been notified, the CTRTCM may consider your
conduct as recognition of the merits of the allegations hereby set forth
against you. These omissions may therefore justify a decision contrary
to your interests, regardless of any other evidence.” However, the
Committee scheduled hearings in Guinea despite the fact that (as it
knew or ought to have known) BSGR representatives were unable to
attend. They were unable to attend because in particular (i) the President
of BSGR had been wrongfully declared persona non grata in March
2013; (ii) two BSGR employees in Guinea had been imprisoned without
charge and held in appalling conditions; and (iii) wholly false
allegations had been made (and published) that Mr Steinmetz was
involved in a coup and assassination attempt on the President. As early
as 4 June 2013, Skadden Arps on behalf of BSGR had raised concerns
about the safety of any BSGR employees or officers visiting Guinea.162
However, only after the hearing took place did the Technical Committee
suggest that BSGR representatives could have attended under a letter of
safe passage from the Government, or by video link. As set out in
Skadden’s letter of 26 February 2014, “It is telling that these
161
Exhibit C-0028, para 79.4; Letter from Skadden Arps to Technical Committee dated 8 December
2013, p.2 (Exhibit C-0074); 162
Exhibit C-0072. [PROTECTED]
102
suggestions have only now been made after the hearing and after the
CTRTCM has made its decision.”163
(iv) The hearings were organised to ensure that there was no opportunity to
test the truth of the central witness relied up on by Guinea (Ms Touré).
Ms Touré was not cross-examined or even called as a witness. BSGR’s
request to question Ms Touré in person was denied. Yet Ms Touré’s
evidence was central to the case put against the BSGR group.
(v) The Technical Committee failed to address the BSGR group’s
substantive responses to the allegations, of 26 December 2012, 4 June
2013 and 8 December 2013. Specifically, Skadden’s letter of 4 June
2013 (to which no substantive response had ever been received) was
referred to only in passing and without any engagement as to its content.
Skadden’s letter of 8 December 2013 (which the Chairman dismissed as
simply “challenging the procedure” of the Technical Committee) was
entirely disregarded as regards the annex to that letter which responded
point-by-point to the numerous allegations repeated or re-cast by the
Technical Committee in its letter to BSGR Guinea/BSGR of 1
November 2013 (and to which annex no response has been
forthcoming). Instead, the hearing was held on the pretence that the
BSGR group did not have answers to Guinea’s allegations.164
(vi) The Technical Committee presided over the leaking of information to
sympathetic members of the media, in order to cause prejudice to the
BSGR group and BSGR in particular.165
On at least two occasions,
documents appeared in the media before they had been provided to
BSGR.166
Leaked documents appeared in The Financial Times, and
when on 7 May 2013 those documents were finally provided to BSGR,
the Technical Committee relied on the fact that the Claimant had
refused to comment to The Financial Times regarding them.167
That
163
Letter from Skadden to Technical Committee dated 26 February 2014, p.3 (Exhibit C-0075). 164
Exhibit C-0028, paras 80.6 to 80.7. 165
166
Exhibit C-0028, para 81; CWS-5, para 110. 167
Exhibit C-0071; Exhibit C-0028, para 81.6.
[PROTECTED]
103
approach was all the more objectionable given that the allegations made
by the Technical Committee in October 2012 effectively gagged the
Claimant and the BSGR group from making any comment in respect of
the review procedure, stating that it was required to maintain
confidentiality and not make public any comments regarding the
procedure. Failure to do so would be grounds for the Technical
Committee to “take any measures that it deems appropriate”.
Notwithstanding that position, the Technical Committee itself relied on
the fact that the Claimant had refused to comment on the leaked media
reports.
313. As will be demonstrated in the course of these proceedings, the exercise
conducted by the Technical Committee and the Strategic Committee was not
(and was not intended to be) an objective fact-finding mission. As a result, its
‘findings’ and ‘conclusions’ were fundamentally incorrect and based on wholly
unreliable evidence.
c. The conclusion was pre-determined
314. Even before the Technical Committee had completed its review and without
providing BSGR, BSGR Guernsey or BSGR Guinea with all the evidence on
which that committee relied, President Condé had declared his intention to
expropriate the Claimants’ rights and assets.168
315. On 21 October 2013, Tom Burgis of the Financial Times reported that:
“In his clearest statement of intent to date, Mr Condé declared in
a speech at the start of October that his government had started a
battle to recover our mines which were acquired fraudulently”.169
3.9 No substance to the corruption allegations
3.9.1 Preliminary observations
168
169
Exhibit C-0060. [PROTECTED]
104
316. Putting to one side the wholly flawed process that took place at the time, as
described above, and turning to the allegations themselves, it is clear that they
were and are demonstrably false. As such, the Measures were in any event not
a legitimate contractual or regulatory response on the part of Guinea to a
perceived issue, whether with the BSGR group or with the manner in which it
had obtained its rights. There had been no breach of the Base Convention or of
the Zogota Mining Concession, or of any other relevant provision of Guinean
law, whether by BSGR Guinea or any other related entity that might have
justified the revocation of BSGR Guinea’s valuable rights. As such, given that
there was in fact no basis for the revocation of those mining rights under
Guinean law, the taking of BSGR Guinea’s property was unlawful and
expropriatory.
317. In this regard, it is important to note at the outset that neither the Technical
Committee nor the Strategic Committee, nor the President, nor the Minister of
Mines, purported to justify (or explain) any of the Measures on the basis of any
alleged breach of either (a) the Base Convention and/or (b) the Zogota Mining
Concession and/or (c) the applicable Mining Code. In other words, Guinea
simply relied upon alleged “indications” of corruption without relying or even
purporting to rely upon any legal underpinning for the imposition of the
Measures.
318. Be that as it may, BSGR anticipates that Guinea will in this arbitration seek to
rely upon some or all of the same allegations that were made by the Technical
Committee in an attempt to justify the expropriation that took place.
319. However, those allegations were never properly pleaded against BSGR or
proven within the Technical Committee process. As such, if and to the extent
that Guinea wishes now to rely upon the allegations advanced by the Technical
Committee, it is incumbent upon it properly to plead and prove those
allegations in this arbitration. See, in this regard, for example, the approach of
the Tribunal in Burlington v Ecuador which investigated whether the taking at
105
issue there was in fact justified under local law170
; and the approach in Vigotop
v Hungary where the Tribunal considered that it had to consider whether the
contractual termination grounds proffered “in fact existed”.171
320. In this context, therefore, if Guinea seeks to rely upon the allegations and
putative ‘findings’ of the Technical Committee as a purported basis for
justification of the Measures, BSGR will respond to those (and any other)
allegations in detail in its Reply, if and when they have been (finally) pleaded
out in Guinea’s Defence. For the avoidance of doubt, however, BSGR denies
in the strongest terms the substance of the (un-particularised and unproven)
allegations of corruption advanced by the Technical Committee and by Guinea
more generally. If it becomes necessary to explore these matters in this
arbitration, it will become apparent that those allegations were (and are)
demonstrably false.
321. Furthermore, this raises three further issues if Guinea is going to make
allegations of corruption against BSGR: (a) those allegations must be squarely
put and pleaded in the present proceedings; (b) the Tribunal must apply an
elevated standard of proof to such allegations; and (c) Guinea is not entitled (as
a matter of law) to rely upon matters not previously raised in an attempt to
justify the imposition of the Measures.
322. As to issue (a) the Tribunal will no doubt bear these words of Professor Wälde
firmly in mind (stated in his Separate Opinion in Thunderbird v Mexico) when
considering allegations of corruption:
“Such insinuations are now frequently employed by both claimant
investors and respondent governments. They should be disregarded
– explicitly and implicitly, except if properly and explicitly
submitted to the tribunal, substantiated with a specific allegation of
corruption and subject to proper legal and factual debate for the
tribunal. That is simply the implication of the “fair hearing”
170
Burlington v Ecuador, ICSID Case No. ARB/08/05, Award dated 14 December 2012, para 506 et seq
(Exhibit CL-0022). 171
Vigotop Limited v. Hungary, ICSID Case No. ARB/11/22, Award dated 1 October 2014, para. 329
(Exhibit CL-0023).
106
principle ... It is therefore particularly important for a tribunal not
to get influenced, directly or indirectly, by “insinuations” meant to
colour and influence the arbitrators’ perception and activate a
conscious or subconscious bias, but to make the decision purely on
grounds that have been subject to a full and fair hearing by both
parties. Cards should be placed, “face up”, on the table rather
than be waved around, with hints and suggestions....”172
323. As to issue (b), the consistent practice of international tribunals has been to
apply an elevated standard of proof of “clear and convincing evidence”, i.e.
beyond the balance of probabilities.173
324. Finally, as to issue (c) it is important to note in this context that as a matter of
Guinean law, Guinea cannot now seek to justify its conduct on the basis of a
ground of complaint which it may now assert it was entitled to rely upon at the
time, but in circumstances where it did not in fact do so. This poses a
fundamental and insurmountable obstacle to any attempt by Guinea to
construct an ex post facto justification for its unlawful conduct.
3.9.2 BSGR did not corrupt Guinean officials
325. At the heart of these proceedings is Guinea's allegation, that BSGR and its
subsidiaries obtained their mining rights by corrupting Guinean officials.
Guinea submits that “there is a series of precise and concurring indications
that establish with sufficient certainty the existence of corrupt practices
tarnishing the granting of mining titles and the mining agreement in question to
BSGR".174
These corrupt practices would nullify the mining titles and the
mining agreement that were held by BSGR and its subsidiares.
172
Thunderbird v Mexico, Separate Opinion of Professor Walde in the Arbitration under Chapter XI of
NAFTA and UNCITRAL Arbitration Rules (Exhibit CL-0024). 173
EDF (Services) Limited v Romania, ICSID Case No. ARB/05/13, Award dated 8 October 2009, paras.
221-224, 227 and 232 (Exhibit CL-0025); Siag v Egypt ICSID Case No. ARB/05/15, Award dated 1
June 2009, paras. 325-32 (Exhibit CL-0026). 174
Exhibit C-0064, p. 3.
107
326. The Government further alleges that both prior to and in parallel with the award
of its mining rights and the entry into the Base Convention, BSGR would have
offered gifts and granted benefits to Guinean officials and their relatives.175
327. Nothing is, however, more distant from the truth. Not one of the Guinean
officials who have testified under oath, either in the Guinean criminal
investigations or in the Swiss criminal proceedings or in both, has
acknowledged even an attempt by BSGR to bribe, let alone the existence of
corruption or other unlawful practices.
328. To paraphrase the Technical Committee, if there is a series of precise and
concurring indications, they point in the opposite direction of what the
Government is alleging: they establish that there was no corruption in the
award of BSGR's mining rights.
a. The Simandou North Permits, the Simandou South Permits and
the Memorandum of Understanding
329.
(i)
(ii)
175
Ibid., para 27, p. 10. 176
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
108
330.
(i)
(ii)
b. Blocks 1 and 2 Permit
331.
177
178
179
180
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
109
332.
(ii)
181
182
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
110
c. The Base Convention and the Zogota Mining Concession
333.
(i)
(ii)
334.
183
184
185
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
111
335.
336.
337.
PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
112
3.9.3 No involvement of Ms Mamadie Touré
338. The spider in BSGR's alleged corruption web was, according to the Republic of
Guinea, Ms Mamadie Touré. In the Technical Committee Report it is alleged
that Ms Touré would repeatedly have intervened with the Guinean authorities,
on behalf of BSGR and its subsidiaries, to acquire both the Blocks 1 and 2
Permit, the Base Convention and the Zogota Mining Concession.
339.
(i)
(ii)
(iii)
188
189
190
191
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
113
(iv)
(v)
(vi)
(vii)
340.
192
193
194
195
196
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
114
341.
342. In summary, this evidence establishes that BSGR did not use Ms Mamadie
Touré as their conduit to obtain mining rights. As established here-above,
BSGR obtained all of its rights in accordance with the Mining Code and the
applicable administrative processes and on the basis of the commitments and
investments that it was making on a daily basis to the benefit obviously of itself
but also of the Republic of Guinea and its citizens.
3.9.4 No undue pressure by President Conté
197
[PROTECTED]
[PROTECTED]
[PROTECTED]
115
343. The final piece in the Government's corruption puzzle is that BSGR would
have used Ms Mamadie Touré to exercise pressure on her alleged husband,
President Conté, who would in turn have exercised pressure on his Ministers of
Mines to grant mining rights to BSGR.198
344. Whereas the record undoubtedly establishes that President Conté was indeed
taking an active interest in the status of the mining operations in his country
(the opposite would be completely surprising, not to say odd, given the
potential of the Guinea's mineral deposits and the impact that successful mining
operations could have on the destiny of the country and its citizens), the record
establishes that President Conté did not simply instruct his Ministers to grant
BSGR the rights that it was looking for but that he was conducted by whatever
guidance his senior officials were giving them.
345.
346.
198
Exhibit C-0064, paras 126 and 127. 199
200
201
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
116
347.
348.
202
[PROTECTED]
[PROTECTED]
[PROTECTED]
[PROTECTED]
117
349.
203
[PROTECTED]
[PROTECTED]
[PROTECTED]
118
350. Furthermore, President Conté died shortly after the award of the Blocks 1 and 2
Permit. The Base Convention and the Zogota Mining Concession were awarded
more than a year later. Ms Mamadie Touré, let alone the deceased President
Conté had no involvement whatsoever in the granting of those rights.
3.9.5 Conclusions
351. Whilst the Technical Committee asserted that there were “indications” that
established “with sufficient certainty” the existence of corrupt practices which
were said to "tarnish" the mining titles and the Base Convention, and whilst
Guinea purported to level corruption allegations against BSGR and its
subsidiaries, the reality is that (a) those allegations were never properly pleaded
or proven, and the process by which the Technical Committee reached its
conclusions was fundamentally flawed; and (b) the allegations lacked any merit
in any event. As such, the Measures constituted an unlawful expropriation.
IV. JURISDICTION
4.1 Article 25(1) of the ICSID Convention
352. Four conditions must be met in order for ICSID to have jurisdiction over a
dispute. Those conditions are set out in Article 25(1) of the ICSID Convention,
which provides as follows:
“The jurisdiction of the Centre shall extend to any legal dispute
arising directly out of an investment, between a Contracting State
[PROTECTED]
119
(or any constituent subdivision or agency of a Contracting State
designated to the Centre by that State) and a national of another
Contracting State, which the parties to the dispute consent in
writing to submit to the Centre. When the parties have given their
consent, no party may withdraw its consent unilaterally.”
353. Thus, the four conditions are:
(i) the dispute must be “legal”;
(ii) it must be one “arising directly out of an investment”;
(iii) it must be “between a Contracting State (or any constituent subdivision
or agency of a Contracting State designated to the Centre by that State)
and a national of another Contracting State”; and
(iv) the parties to the dispute must “consent in writing to submit [it] to the
Centre.”
354. The present dispute between BSGR and Guinea fulfils each of these conditions
for the reasons set out below.
4.2 The Dispute is a legal dispute
355. The subject matter of the present dispute is Guinea’s breaches of each of the
applicable investment laws, including (amongst other matters) its illegal and
continued expropriation of BSGR’s investments in Guinea without providing
prompt, adequate and effective compensation, leading to the value of those to
be destroyed or substantially diminished.
356. The dispute is clearly legal in nature because it concerns the existence or scope
of BSGR’s legal rights, and the nature and extent of the relief to be granted to
BSGR for the harm caused and their respective losses suffered as a result of
Guinea’s violation of those legal rights.
120
357. This dispute is thus a legal dispute, as required by Article 25(1) of the ICSID
convention.
4.3 This Dispute arose directly out of an Investment
358. As described above, this dispute concerns Guinea’s failure to comply with its
obligations under (a) the Investment Code and (b) the Mining Code, and in
respect of BSGR’s investments in Guinea.
359. It is clear that BSGR’s shareholding in and financing of BSGR Guinea and the
other subsidiaries involved in the project constituted an “investment” in Guinea
within the meaning of Article 25 of the ICSID Convention. Numerous ICSID
tribunals have accepted that such a shareholding falls within the scope of the
term “investment” in Article 25. As noted in the recent decision in Levi v Peru:
“Several Arbitral Tribunals have repeatedly stated that investors
with an indirect interest, including a minority interest, may on the
basis of the ICSID Convention request protection of the rights
accorded to them by an investment treaty.”204
360. Further, for the reasons stated above, the Investment Code and Mining Code
plainly considered BSGR’s shareholding to be an “investment” under each of
those instruments. The same applies in relation to the development of
infrastructures under the BOT Act. The jurisdiction of the Tribunal is governed
by the terms of the instruments expressing the parties’ consent to ICSID
arbitration, i.e. the Investment Code, the Mining Code and the BOT Act. Given
that Guinea considered BSGR’s shareholding and infrastructure works to be an
investment for the purposes of obtaining the protections guaranteed by its
Investment Code, Mining Code and the BOT Act it is clear that it must
similarly be considered an ‘investment’ for the purposes of Article 25 of the
ICSID Convention.205
204
Levi v Peru, ICSID Case No. ARB/10/27 Award dated 26 February 2014, para. 144 (Exhibit CL-
0027). 205
CL-0007, paras. 68-76.
121
361. It is also clear that the dispute arose “directly” out of BSGR’s investment in
BSGR Guinea. A number of ICSID decisions have construed these words in
Article 25 broadly, finding that the term “directly” in Article 25 relates to the
“dispute” (rather than the investment).206
It is clear that the Measures, which
were imposed against the BSGR group as a whole, and plainly with full
knowledge of BSGR’s shareholding in BSGR Guinea, give rise to a dispute
“arising directly out of an investment”.
4.4 This Dispute is between a Contracting State and a National of another
Contracting State
362. The present dispute is between BSGR as Claimant and Guinea as Respondent.
363. Guinea signed the ICSID Convention on 27 August 1968 and deposited
instruments of ratification on 4 November 1968. The ICSID Convention
entered into force in the Republic of Guinea on 4 December 1968.
364. BSGR is a company registered under the laws of the Bailiwick of Guernsey
with the registration number 46565. BSGR was incorporated in 2003 as a
limited company in Jersey; and migrated in March 2007 to Guernsey. Guernsey
constitutes a British Crown dependency of the United Kingdom of Great
Britain and Northern Ireland (“the United Kingdom”). The ICSID Convention
entered into force in the UK on 18 January 1967. On 11 June 1973, the United
Kingdom designated Guernsey as a constituent subdivision of the United
Kingdom pursuant to Article 25(1) and Article 25(3) of the ICSID Convention
and notified the Centre that Guernsey had approved its consent to ICSID
jurisdiction. BSGR is therefore a national of another Contracting State for the
purposes and within the meaning of Article 25(2)(b) of the ICSID Convention.
4.5 The Parties have consented in writing to ICSID Arbitration
206
See e.g. Fedax v Venezuela, 5 ICSID Rep 183, Decision on Jurisdiction dated 1997, para. 192
(Exhibit CL-0028); Siemens AG v Argentina, ICSID Case No ARB/02/8, Decision on Jurisdiction
dated 3 August 2004, para.150 (Exhibit CL-0029); Metalpar SA & Buen Aire SA v Argentina, ICSID
Case No ARB/03/5, Decision on Jurisdiction dated 27 April 2006, paras 84-93 [Spanish only]
(Exhibit CL-0030).
122
365. The requirements of Article 25 of the ICSID Convention are satisfied in
relation to the disputes arising under each of (i) the Investment Code and (ii)
the Mining Code.
4.5.1 The Investment Code
366. As regards the Investment Code, Article 28(2) provides in relevant part:
“Art.28.- 1) Disputes arising from the interpretation or application
of this Code, shall be settled by the competent Guinean courts in
accordance with the laws and regulations of the Republic.
2) However, disputes between the Guinean government and foreign
nationals regarding the application or interpretation of this Code,
shall, unless otherwise agreed by the parties, be settled by
arbitration conducted:
in accordance with the provisions of the Convention of 18 March
1985 "Settlement of investment related disputes between the States
and Nationals of other States" established under the auspices of the
International Bank for Reconstruction and Development, ratified
by the Republic of Guinea on November 4, 1986…”
367. Article 28(2) of the Investment Code contains an offer by Guinea to arbitrate
disputes arising between the Guinean government and “foreign nationals.” As
stated above, BSGR is a foreign national for the purposes of the Investment
Code.
368. Article 25 of the ICSID Convention requires the consent in writing by the
parties. It is established practice that a national of a Contracting State may
accept an offer to arbitrate contained in the legal instrument by instituting
proceedings and that this shall count as having satisfied Article 25 of the ICSID
Convention.
369. Accordingly, by the filing of its Request for Arbitration, BSGR accepted the
offer to arbitrate its dispute with Guinea in accordance with Article 25 of the
ICSID Convention and within the meaning of Article 28(2) of the Investment
Code.
123
4.5.2 The Mining Code
370. Article 184 of the Mining Code contains an offer by Guinea to arbitrate
disputes arising between Guinea and “mining investors”. It provides as follows:
“Disputes between one or several mining investors and the State
with regard to the extent of their rights and obligations, the
performance or non-performance of their undertakings at the end
of their titles, assignment, transfer, or sub-leasing of their rights
arising therefrom may be submitted to amicable settlement
procedure.
If one of the parties feels that amicable procedure has failed, the
dispute is brought before either the appropriate Guinean court or
international arbitration in accordance with the agreement of
March 18 1965 for the settlement of disputes with respect to
investments between States and nationals of other States,
established under the aegis of the Banque Internationale pour la
Reconstruction et de Développement.
In cases where the Centre International pour le Reglement des
Différends relatifs aux Investissements (CIRDI) declines
jurisdiction over a dispute referred to it, the dispute shall be settled
by the arbitration court of the Chambre de Commerce
Internationale (CCI) according to its own rules and procedures…”
371. BSGR is a "mining investor" within the meaning of the Mining Code. Further,
over an extended period of time, Guinea has always considered BSGR itself to
be an investor.
372. First, the preamble to the 2006 Memorandum of Understanding includes the
following provisions:
"BSGR, who manifested interests for the for high mining potentials
of the REPUBLIC OF GUINEA, initiated contacts with the
Guinean authorities in order to set up a partnership for the
development of a part of the SIMANDOU FERROUS DEPOSITS
("SIMANDOU FERROUS DEPOSITS");
BSGR is an international mining group dedicated to the
prospecting, development and trading of mineral resources, and
with respect to this project, BSGR has delegated to its subsidiary
BSGR Guinea, the management of the SIMANDOU FERROUS
PROJECT";
124
BSGR holds a majority interest in an engineering company named
Bateman Engineering, dedicated to mining, metals and minerals
engineering, construction and management"; and
BSGR has the will, the financial and technical capabilities to
cooperate with the REPUBLIC OF GUINEA to take various
commercial initiatives".207
373. Notwithstanding that the Memorandum of Understanding was, strictly speaking,
entered into by BSGR's BVI subsidiary, the Government of Guinea saw itself
as entering into a partnership with BSGR and by extension the BSGR
Group. There was no meaningful distinction drawn between BSGR and its
wholly owned subsidiaries. This document records that it was BSGR that first
expressed an interest in Simandou's iron ore deposits, that BSGR BVI's role
arose by way of delegated authority from BSGR, that the Government's interest
was not limited merely to BSGR Guinea BVI but also to other group
companies with a contribution to make and that it was BSGR which had the
capabilities to bring Simandou's iron ore deposits to commercial production.
374. Second, Annex 1 to the Base Convention contains a power of attorney,
authorising Messrs Avidan and Struik to enter into "documents, conventions or
agreements involving [BSGR Guernsey and/or BSGR Guinea] with the relevant
and appropriate Authorities in Guinea in connection with the BSGR Group's
interest and activities in connection with the development and production of
Iron Ore, including, but not limited to, the BSGR Group's concessions known
as Simandou Blocks 1-2 and Simandou South". 208
In other words, it was
specifically agreed by BSGR and the Government of Guinea, on entering into
the Base Convention, that the "interest and activities" - ergo, the investments -
covered by that convention were those of the BSGR Group. Equally
importantly, it was also agreed and acknowledged that the concessions arising
from Simandou South and Simandou Blocks 1 and 2 belonged to BSGR. By
the incorporation of that power of attorney into the Base Convention, Guinea
has expressly agreed that BSGR is an investor.
207
Exhibit C-0009. 208
Exhibit C-0069.
125
375. Third, the report of the Technical Committee similarly indicates that the
Government of Guinea saw itself as having entered into an agreement with
BSGR. By way of example, that report states that:
(i) as per the summary, that "in the mining sector, BSGR obtained the
benefit of several mining titles and one mining agreement…", before
referring to the exploration permits for Simandou North, Simandou
South, Simandou Blocks 1 and 2 and the Base Convention;
(ii) at paragraph 12 in the factual background section that "in order to
expand its activity in [the natural resources] sector, according to the
information in the possession of the Committee, at the beginning of
2000, the BSGR Group decided to invest in the mining sector in the
Republic of Guinea" at paragraph 15 that "the BSGR Group also
resorted to several companies for the development of its activities
(together 'BSGR')…created to carry the titles and agreements of which
the BSGR Group could benefit", and at paragraph 16 that "legal
representatives of BSGR…contacted the Guinean authorities in order to
indicate to them the wish of the BSGR Group to invest in mines in
Guinea". 209
376. The report of the Technical Committee was the Government of Guinea's own
review into the factual background whereby BSGR acquired its mining rights
in Simandou. Taken together, it is clear from the extracts above that even the
Government of Guinea accepts that it was entering into a relationship with
BSGR, as the head company of what it considered to be the BSGR Group and
that on that basis, BSGR was an investor for the purposes of the ICSID
Convention.
377. Fourth, at the First Session of this arbitration on 23 April 2015, Counsel for
Guinea stated as follows:
209
Exhibit C-0064.
126
"Just as at the beginning when they signed the base convention, it
was clear that all decisions would be spearheaded by BSGR
Limited, the party to this case. Annex 1 to the base convention that
you have to the exhibits, I will circulate this now. This is the letter
that should have been provided after the signature of the base
convention, where the leaders of BSG Resources Limited confirmed
their responsibility for the people singing under the subsidiaries.
Here we have a situation where BSGR, for reasons that will
become interesting in the follow up to this procedure, BSGR has
decided to set up a company in the Cayman islands, in Guernsey,
quite an opaque organisation for their own reasons they created
several different companies. In any case it was BSGR, which is the
party here in front of us which was the active party. When you look
at the Request for Arbitration here, everything is BSGR through
these two subsidiaries. They obtained rights through these
subsidiaries, they ignored the separation between these two
companies and still acting as the managers in this case, they are
party to the Base Convention and there are obligations that they
must uphold. I am not going to enter into the technical details of
the Guinean Mining law since a Guinean mining company was the
one that was supposed to sign this convention but in fact it was a
company based in Guernsey that signed this agreement. We should
not treat this company any differently.
From a practical point of view to come back to an English
sentence; BSGR is trying to use this convention as a sword and a
shield; "we can attack Guinea by saying that you have not
respected the obligations of this convention, but when there is
something we do not like, we are hiding behind the fact it was our
subsidiary which was 100% controlled by us that signed this." for
all of these reasons, it is clear that BSGR led all of these
operations, accepted the French language for this contract and
now today for their own reasons, BSGR would like to conduct this
in English".210
378. The Tribunal will recall Guinea's insistence that these proceedings be
conducted in French, on the basis that the Base Convention provides that
proceedings arising under that instrument be conducted in French. Reduced to
its essence, Guinea's submission was this: whilst BSGR is not a named party to
the Base Convention, it is nevertheless bound by its terms. BSGR's position as
regards the proper parties to the Base Convention is reserved. For current
purposes, however, BSGR submits that Guinea cannot on the one hand argue
that the terms of the Base Convention be imposed on BSGR, on the basis that
210
Extract from the audio tapes (oral advocacy on behalf of Guinea) at [39:40].
127
the BSGR Group is to be treated as one vehicle, and at the same time deny that
BSGR is an investor pursuant to the terms of that convention. In other words,
on its own case, Guinea now appears to accept that BSGR, acting on its own or
through its subsidiaries, is and was an investor.
379. Finally, by a letter dated 15 March 2013BSGR put the Republic of Guinea on
notice that it intended to invoke the protections arising under the Investment
Code and the Mining Code, and that it was an investor for the purposes of any
arbitration arising.211
In other words, as long ago as 15 March 2013, BSGR
accepted Guinea's offer to arbitrate any dispute arising under the Investment
Code and the Mining Code in accordance with the ICSID Arbitration
Rules. Guinea has not to date taken issue with the points made by BSGR in
that letter, and so has now waived any entitlement that it may have had to argue
that BSGR is not an investor (the existence of that entitlement being denied in
any event).
V. RELIEF SOUGHT
380. The proceedings have been bifurcated, and the question of the remedies to
which BSGR is entitled (and the quantum of any damages) is for a separate
phase of the proceedings. Moreover, BSGR and the Claimants in the Second
ICSID Arbitration will be seeking consolidation of their claims so as to allow
all relevant claims to be ventilated before the same tribunal.
381. Notwithstanding this, and for the avoidance of doubt, BSGR will be seeking all
available relief, including (without limitation) an award:
(i) Declaring that Guinea’s termination of each of the Base Convention, the
Zogota Mining Concession and the Blocks 1 & 2 Permit was illegal and
unlawful;
(ii) Declaring that Guinea unlawfully failed to ensure that BSGR’s rights
were protected in accordance with Guinean and/or international law.
211
Letter from BSGR to the Government of Guinea dated 15 March 2013 (Exhibit C-0083).
128
(iii) Ordering that Guinea forthwith:-
a) restore the Base Convention and observe the rights granted to
BSGR Guinea and to BSGR Guernsey under the Base
Convention;
b) restore the Mining Concession and observe the rights granted to
BSGR Guinea under the Mining Concession;
c) restore the Blocks 1 and 2 Permit and observe the rights granted to
BSGR Guinea under the Blocks 1 and 2 Permit;
d) ensure that BSGR Guernsey’s and BSGR Guinea’s respective
rights, assets and investments are protected in accordance with
Guinean and international law;
e) prevent BSGR Guernsey’s and BSGR Guinea’s respective rights,
assets and investments from being further subject to expropriation
or to any measure having similar effect;
f) ensure that BSGR Guernsey and BSGR Guinea and their
respective investments are treated in a non-discriminatory manner.
g) ensure that each of BSGR Guernsey and BSGR Guinea have:
the right to dispose freely of their property and to organize
their enterprise as they wish;
the freedom of hiring and firing, subject to prevailing laws
and regulations;
unlimited access to raw materials;
the freedom of circulation of personnel and products within
the Republic of Guinea;
the freedom to import goods and services and any necessary
funds; and
129
the freedom to dispose of their products on international
markets and to export and dispose of products in foreign
markets.
(iv) Ordering that Guinea:-
a) ensure that an accurate summary of the Award is published in the
Financial Times (in A3 size) within 30 days of the date of the
Award and at the expense of Guinea; and
b) submit the summary of the Award for approval to the Claimants
15 days before publication. Failing an agreement between the
Claimants and Guinea on the text of the summary, the text of the
summary will be determined by the Tribunal.
(v) Ordering that Guinea provide prompt, adequate and effective
compensation to BSGR for Guinea’s unlawful conduct, described above,
in an amount in US dollars to be quantified during this arbitration, as
compensation for the losses suffered to date and for any future losses
suffered by BSGR.
(vi) Ordering that Guinea provide an indemnity and/or prompt, adequate and
effective compensation to BSGR, in respect of any losses which BSGR
suffers (or might suffer) as a result of the claims brought by Vale
against BSGR in LCIA Arbitration No. 14283.
(vii) Ordering that Guinea pay moral damages in the amount to be
determined in the course of these proceedings.
(viii) Ordering that Guinea pay interest on such sums and for such periods as
the Tribunal deems appropriate.
(ix) Ordering that Guinea pay BSGR’s costs occasioned by this arbitration
including, without limitation, arbitrators’ fees, administrative costs
fixed by ICSID, the arbitrators' expenses, the fees and expenses of any
experts, and the legal costs incurred by the parties.
(x) Granting BSGR all other relief that the Tribunal deems appropriate.
382. Notwithstanding any future protection, Guinea must pay BSGR compensation
for the losses suffered to date; and Guinea remains liable for any future loss
suffered by BSGR.
383. BSGR reserves the right to add to, modify and/or amend its requested relief in
due course and to add to, modify and/or amend the relief sought, including by
reference to any further steps of Guinea (or agencies or instrumentalities or
entities for which Guinea is responsible) that affect its investments.
Signed
Mishcon de Reya
Submitted for and on behalf of BSG Resources Limited
9 September 20 15
130
Karel Daele James Libson
Mishcon de Reya Solicitors Summit House
12 Red Lion Square WClR 4QD London
Tel: +44 (0) 20 7440 7060 Fax: +44 (0) 20 7831 3487