in material mgt
TRANSCRIPT
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 1/26
PRESENTED BY:
AASTHA GARG AKANKSHA MALHOTRA
MANASVI SINGH
MAYANK KAPOOR
MOHIT BHAMBRI
PANKUL ASHOK
PARV BANSAL
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 2/26
A scientific technique concerned with:• Acquisition
• Control and use of materials needed
• flow of goods and services ,connected withproduction process having some predeterminedobjectives in view.
Source : MATERIAL MANAGEMENT Procedures ,Text and CasesBy A.K. Dutta
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 3/26
Do you know how many average no. of parts arethere in a car?
14000
Do you know the no. of parts in a Boeing 747?
6 million
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 4/26
Keep your production line moving from momentyou receive raw materials until you ship the endproduct to your customers.
Track materials as they move through assembly orprocessing to the finished goods warehouse tofulfill customer orders.
Boost warehouse productivity; reduce packing timeand increase the quantity and accuracy of
shipments with a mobile solution.
Source : http://www.motorola.com/Business/US-EN/Business+Solutions
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 5/26
RIMARY OBJECTIVES:
Low Prices
High Inventory TurnoverContinuity of supply
Consistency of Quality
Favorable Supplier relations
Source :Materials management by A.K. Chitale & R.C. Gupta
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 6/26
SECONDARY OBJECTIVES
a) Favorable reciprocal relations
b) New material and productsc) Economic make-or-buy or outsourcing
d) Standardization
e) Product improvementf) Forecast
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 7/26
• Have details materials on hand when needed
• Pay the lowest possible prices, consistent with
quality and value requirement for purchases
materials
• Minimize the inventory investment
• Operate efficiently
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 8/26
• Purchasing
• Production House• Central Service of supply
• Warehouses
• Mini stores/Retail Outlets• Product Design
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 9/26
Image Scanner RFID Computer
Barcode Reader
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 10/26
MATERIAL
MANAGER
CONTAINER
MANAGER
CAMPAIGN
AND BATCH
MANAGERBATCH
REPORT
MANAGER
MANUFACTURING PROCEDURES
MANAGER
INTEGRATED
RECORDS
DATABASE
R E C O R
D S
RECOR
DS
R E C O R
D S
RECOR
DS
RECOR
DS
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 11/26
Records of :
• Maintenance & repairs
• Preventive maintenance
• Master maintenance plan
• Materials / spares used
• Starting and Expiry date
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 12/26
• Verify records
• History sheet of equipment
• Log book of maintenance & repairs
• Performance record of equipment
• Put up in proper form & to the properauthority
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 13/26
Expenditure of Indian Railways on operation,maintenance and
production, etc. is around 11,000 crores
37% stores for operation, repairs and maintenance,
2% stores for construction,
38% stores for manufacture of rolling stock.
Indian Railways has 215 stores depots spread all overstocking
2.8 lacs item, are the main hubs of inventory holding.
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 14/26
Railways has adopted E-procurement. It envisagesputting all purchase activities on the internet,wherein issue of tenders, receipt of bids, issue of contracts etc. would be done online.
The introduction of this system will bringtransparency and improve efficiency by way of reduced procurement time cycle and expeditious
payment to suppliers.
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 15/26
Integrated Computerized System for Stores
Department of Indian Railways and has been developed using
centralized system architecture using J2EE Open SourceEnvironment.
Purchase Module
Finance Module
Depot Module
Sales and Auction Module
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 17/26
Provide more value and better service to itscustomers, Boeing developed a website on the WorldWide Web to give customers direct access to itsextensive part information and ordering system.
Customers can order parts and view part informationthrough the award winning Boeing PART Page website(Part Analysis & Requirement Tracking).
Through the Boeing PART Page, current data such aspart inventories, prices, part interchangeability,quotes and purchase order status are at yourfingertips.
The system is simple and accessible to any authorized
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 18/26
• Parts
• Orders
• Quotes
• Accuracy and speed
• Cost savings
• Security
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 20/26
Electronics Corporation of India Ltd.(ECIL) is aPublic Enterprise under the Department of Atomic
Energy established with the purpose of supportingIndia’s Nuclear Power Programme and help thecountry achieve self-reliance in professionalelectronics.
Source: http://www.iimm.org/knowledge_bank/1_customer-centric-materials-
management.htm
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 21/26
The post-liberalisation period of 90s wascharacterised by intense competition from both theMNCs and private sector.
The impact of the globalisation process and thesanctions in the wake of Pokhran-11 experimentshave brought the company to the brink of sickness
in 1998-99.
Source: http://www.iimm.org/knowledge_bank/1_customer-centric-materials-
management.htm
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 22/26
All the processes involved in Integrated MaterialsManagementwere fully computerized for speedy disposal of
materialrequisitions, resulting in substantial reductions in
lead timesacross various operations.
These simple initiatives were implementedeffectively resultingin incredible results that culminated in the historic
turnaround of the company that brought wide recognition and
national awards
like SCOPE award for Outstanding Performance andContribution
Source: http://www.iimm.org/knowledge_bank/1_customer-centric-materials-
management.htm
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 23/26
BETWEEN 1998-99 and 2002-03
• Turnover shot from Rs. 250 crore to Rs. 1000 crore
• Profitability reversed from a loss of Rs. 60 crore to aprofit of
130 crore
• Networth increased from Rs. 7 crore to Rs. 309 crore
• Loans outstanding and Statutory Outstanding became ni
• Inventory levels and Sundry Debtors demonstratedefficientWorking Capital Management
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 24/26
BETWEEN 1998-99 and 2002-03
• Substantial cost reductions were realised throughnegotiationsand improved quality levels across various processes
• Procurement lead – times reduced substantially from
about 60days to 30 days Customer Satisfaction Index
improvedphenominaly from 66% to 95%
8/4/2019 In Material Mgt
http://slidepdf.com/reader/full/in-material-mgt 25/26
ReferencesMATERIAL MANAGEMENT Procedures ,Text and Cases By A.K. Dutta
http://www.motorola.com/Business/US-EN/Busines
Materials management by A.K. Chitale & R.C.Gupta
http://www.iimm.org/knowledge_bank/1_customewww.plm.automation.siemens.com
www.boeing.com