7/29/2019 Improvments to Croydon
1/21
APPENDIX 1
CROYDON HIGH STREETS
INITIAL PROJECT SCOPE
-
7/29/2019 Improvments to Croydon
2/212
West Croydon Masterplan
West Croydon Station
East Croydon Station
South End Station
Croydon Opportunity Area
London Road
Central areaorth nd
igh treet
eorge treet
Old TownChurch treet
urrey treet Market
Matthews ard
eeves Corner
South Endouth nd oad
elsdon oad
Croham oad
T CT TT CAT
-
7/29/2019 Improvments to Croydon
3/213
Introduction.................................................................................................................................................
Project 1 - London Road, Old Town and Central Area physical improvements.............................................
Project 2 - South End.physical improvements..............................................................................................
Project 3 - George Street Tram Stop Relocation...........................................................................................
Project 4 - Retail Support Package...............................................................................................................
p3
p4-15
p16-19
p20-21
no further information included in this appendix
TABLE OF CONTENTS
CAVEAT
The work presented in this paper is based on engagement work done in the last 5 months with the local community and local ward
councillors. This initial scope for the High Street project is based on their concerns, comments and ideas.
However, this scope is subject to change once a design team is appointed and more detailed design proposals are developed and
costings are done. All changes will be discussed with local stakeholders and the GLA through ongoing engagement and consultation .
-
7/29/2019 Improvments to Croydon
4/214
-
7/29/2019 Improvments to Croydon
5/215
CTT A BA ATA
ondon oad is the northern gateway to the Town Centre and runs from est Croydon tation up to the former est Croydon Congregational Church
(now a temple and community centre). t is approximately 1km in length.
Businesses along ondon oad were subject to looting during the civi l disturbances on 8 August 2011. everal buildings were burnt down and the plots
are still sitting vacant today. ince August 2011 18 of street users and 60 of businesses in ondon oad feel that the area has declined.
acancy rates on ondon oad are nearly double the national average at 21. owever this does represent a decrease from 24 in 2008. This high rate
LVLQXHQFHGE\WKHKLJKYDFDQF\RI%FODVVXVHVRIFHVLQGXVWU\VWRUDJH
The highest recorded footfall along ondon oad is at the southern end of the igh treet near est Croydon tation where weekly footfall at this point
approximate 35000 people. owever recorded footfall decreases quickly travelling orth and drop to 5500 by aint ames oad. This demonstrates that
people are not willing to travel north from the station there is very little attraction to travel along ondon oad.
A
The purpose of the ondon oad igh treet project is to change peoples perceptions of the area to make it more appealing and draw more people along
the street. The project will encourage people to turn right out of est Croydon station. The project will build on the areas ethnic shopping offer address
the physical issues along the ondon oad thus helping to change perceptions of the area and attracting new people.
The 3.15m budget will be split between public realm and building facade improvement works. ome key focuses for the project will be;
- at the entrance to ondon oad (from est Croydon station to the idl building) with the aim of creating a welcoming environment and get people to
turn right into the street; and
- delivering a new linear amenity space at the base of odiac Court tied with new uses delivered around the edge of the space via the business
support and retail support packages.
LONDON ROAD (PROJECT 1)
5
-
7/29/2019 Improvments to Croydon
6/216
LONDON ROAD (PROJECT 1)LONDON ROAD (PROJ T 1)
SAINTJAMESROAD(A213)
SUMNERROAD(A213)
DENNETTROAD
GREENSIDEROAD CAMPBELLROAD
NORTHEND
STATIO
NROAD
KIDDERMIN
STERROAD
HAND
CROF
TRO
AD
6
T C MATA (Adopted 2011)
TAC T A
T AC
M A
AMT AC
A AMT AC
AA
MMT
AA MMT
AA MMT
MMT
MMT
N
-
7/29/2019 Improvments to Croydon
7/21
AA MMT
Objectives:
- nhance the general quality of existing shop parades building on their
existing character along with lower level public realm improvements.
Works:
- ublic realm: basic streetscape improvements street de-cluttering
rationalised on-street parking and servicing arrangements
- Building facade improvements: shop front improvements new
security shutters.
LONDON ROAD(PROJECT 1) has a total budget of 3.15m. The works will be split between public realm works and building
facade improvements.
ublic realm works: 2600000 -1km of street
Building facade improvements: 550000 - 45 units (30)
TAC T A
Objectives:
- ncourage people to turn right onto ondon oad at est Croydon station and building onondon oads distinctive ethnic offer .
Works:
- ublic realm: new paving extended footways street de-cluttering new street furniture new
planting rationalised parking layouts and retail servicing.
- Building facade improvements: enhanced building and shop fronts improved window displays
new security shutters co-ordinated art.
T AC
Objectives:
- Create a more pleasant physical environment to link the ondon oad entrance with the proposed
linear amenity space and existing retail areas to the north.
Works:
- ublic realm: new co-ordinated street art improved lighting and planting to soften the western
side of the street in front of idl street de-cluttering enhancements to the bus waiting facilities.
- Building facade improvements: Building art improvements to the public space in front of the CA
building.
MMT (X2)
Objectives:
- unction improvements to create a more
pleasant environment for pedestrians and
cyclists to move between the different
sections of ondon oad.
Works:
- ublic realm: new and improved paving
pedestrian crossings cycle lanes cycle
standing.
A AMT AC (X2)
Objectives:
- A new community-led amenity space in the centre of ondon oad offering space attractions and
different functions for people including; market space play space for all ages a meeting point
with eating and drinking retail space.
- mprovements to the existing amenity space at the northern end of ondon oad.
Works:
- Coordination of empty public and private spaces to provide one coherent space including new
paving planting seating play lighting road crossings art
-
7/29/2019 Improvments to Croydon
8/218
-
7/29/2019 Improvments to Croydon
9/219
CTT A BA ATA
Croydon ld Town is the counterpoint to the modern character of ew Town around ast Croydon station. t contains a range of historical assets there
are three conservation areas and a number of listed and locally listed buildings as well as urrey treet market one of the oldest markets in ondon.
These assets make ld Town a unique location in the Croydon Town Centre with great variety in high street character and uses.
espite the presence of these heritage assets many people outside of this area are not aware of its existence. ne of the main objectives of the ld Townhigh streets project is to create a co-ordinated and recognisable physical environment that celebrates and promotes the areas rich heritage assets.
7RGD\WKHDUHDVXIIHUVIURPSRRUPDLQWHQDQFHDQXQFRRUGLQDWHGSXEOLFUHDOPWUDIFGLVWXUEDQFHDQGDODFNRISK\VLFDOFRQQHFWLRQVWRWKHVXUURXQGLQJ
area.
urthermore on the night of Monday 8th August 2011 Croydons ld Town suffered tremendous damage to both its physical fabric and its reputation
when it became a victim of civil unrest and arson. The large locally listed building on eeves Corner which sits within the Church treet Conservation Area
ZDVFRPSOHWHO\GHVWUR\HGE\UHDQGWKHSURSHUWLHVRSSRVLWHWKLVVLWHRIZKLFKDUHORFDOO\OLVWHGVXIIHUHGIURPVHYHUHUHGDPDJHDQGKDYHQRWVRIDU
been repaired. ince these events 16 of street users and 6 of businesses feel that the area has declined.
ld Town has a retail vacancy rate of 20 - which is twice the national average. owever this rate has been almost stagnant since 2008 with a small drop
in 2009.
There is a large amount of variation in footfall levels throughout the ld Town with the highest footfall observed on urrey treet (around 50000 per
week). ootfall levels on Church treet gradually reduce as you move westwards away from the pedestrian hotspot at orth nd from 2180 to 22 800
at the junction with ld alace oad. ot surprisingly those areas with the highest footfalls record the lowest vacancy rates. A major opportunity of this
project is to create improve the connections and legibility between urrey treet and orth nd (areas with high footfall) and those areas with lower footfall
levels so that more pedestrians can permeate through onto other streets in ld Town.
A
The purpose of the ld Town igh treet project is to reinforce the areas status as Croydon Centres historical core and support local businesses
including on urrey treet Market - by addressing the physical issues along the main treets and attracting new people into the area.
The 1.50m budget will be split between public realm and building facade improvement works and while the spending will focus more intensively on
Church treet and urrey treet complementary measures are proposed on the links (as shown on next page) to allow improved connections with the
wider areas
The high streets project will also complement the emerging ortas ilot project that is underway in the area and which is focussed on the urrey treet
area of ld Town.
A critical aspect of the project is to increase the visibility of ld Towns main assets: its historic heritage which might be accomplished through the creation
of a heritage trail and urrey treet Market which could be achieved through the creation of ateway features.
OLD TOWN (PROJECT 1)
9
-
7/29/2019 Improvments to Croydon
10/2110
T (PROJECT 1)
CHURCHSTR
EET
SURREYSTREET
HIG H
S TR
EE
T
HIGHSTREET
NORTHEND
EXCH
ANGE
SQUARE
CHURCHROAD OLDPALACEROAD
CHURCH
STRE
ET
ROMANWAY
REEVESCORNER
DRUM
MON
DRO
ADFIR
THROAD
TAMWORTH
ROAD
10
N
CTA AA TT
(see next pages for objectives)
TT
MAT
CC TT
MMT
MMT
CC
A
+ TA TA
MA A
A
MTAT
AC
AC
AC
AC
-
7/29/2019 Improvments to Croydon
11/211111
A CT
Objectives:
- Church oad: bring life into this Council owned space by creating a feature in this underused
space.
- umping tation: transform an unsightly functional element in a piece of art that contributes
positively to xchange quare.
- oman ay underpass: enhance underpass.
- $WWUDFWQHZSHRSOHDQGUDLVHWKHSUROHRIWKHDUHDE\FUHDWLQJDKHULWDJHWUDLO
Works:
- Treatment of pumping station by artist.
- Coordination of empty public and private spaces around the Church all to provide one coherent
space including new paving planting art seating play lighting with scope for possible arranged
activities.
- Art and /or lighting installation in oman ay underpass
- nstall plaques on heritage buildings sign trail with appropriate paving insets.
Objectives:
- mprove the street scene along key streets
into ld Town to encourage people into the
area from its surroundings.
Works:
- ublic realm: new paving new pedestrian
crossings street de-cluttering new planting
signage visual co-ordinated art.
MMT (X3)
Objectives:
- mprove nodes at each end of urrey treet and at the top of Crown ill to facilitate pedestrians
movements and draw people into ld Town and urrey treet Market.Works:
- ublic realm: new and improved paving street de-cluttering and new street furniture signage
planting gateway feature(s).
- Coordinate node improvements on urrey treet with works opposite on igh treet and Mint alk.
TT MAT
Objectives:
- hysical improvements to support the existing market traders creating an improved operational
environment that will also attract new market traders
- hysical improvements to urrey treet to support the emergence of a new lunch time food offer- ,QWHUYHQWLRQVWRHQKDQFHWKHH[LVWLQJWUDIFPDQDJHPHQWDQGVHUYLFLQJLVVXHV
Works:
- ublic realm: new paving street de-cluttering and new street furniture review and rationalised
SDUNLQJDQGVHUYLFLQJLJQDJHEDUULHURUEROODUGVWRVXSSRUWWUDIFPDQDJHPHQWVWUDWHJ\
- Market traders requirements: identify existing needs and lacks and address them. This might include
providing suitable ampere voltage upgrading toilets or a bakers oven.
- Building facade improvements: enhanced building and shop fronts co-ordinating with opportunities
for pop-up shops possibility to focus on 10/11 urrey treet and co-ordinate with a retail support
strategy.
OLD TOWN(PROJECT 1) has a total budget of 1.50m. The works will be split between public realm works and building facade improvements.
ublic realm works: 1225000 - 65m of street (Church treet and urrey treet)
+ 3 key projects and supporting measures on access links (50m)
Building facade improvements: 25000 - 30 units (28)
CC TT
Objectives:
- nhance the general quality of the existing shop parade building on their existing
character along with public realm improvements with rationalised servicing and delivery.Works:
- XEOLFUHDOPUHSDLUH[LVWLQJSDYLQJDQGRULGHQWLI\VSHFLFDUHDVWREH
replaced. treet de-cluttering improved drainage and de-cluttering at Church
treet tram rationalised on-street parking and servicing arrangements.
ootway extension /paving of loading bays.
- Building facade improvements: building painting and shop front improvements.
-
7/29/2019 Improvments to Croydon
12/2112
-
7/29/2019 Improvments to Croydon
13/2113
CTT A BA ATA
North End
orth nd is the most successful retail street in the Croydon Town Centre and the backbone that links all of the other town centre high streets. t is a
pedestrianised street which provides access to both the hitgift and the Centrale shopping centres.
There is a retail vacancy rate of 5 half of the national average (although up from 3 in 2008). The area suffered from limited damage during the civil
disturbances in August 2011.
orth nd experiences substantially more footfall than all other parts of Central Croydon and recorded pedestrian footfall varies between 125.000 132000
per week.
7KHUHDUHFXUUHQWO\VLJQLFDQWSUHSODQQLQJDSSOLFDWLRQGLVFXVVLRQVXQGHUZD\ZLWKERWKDPPHUVRQVDQGHVWHOGZLWKUHJDUGVWKHSRWHQWLDO
redevelopment of the hitgift and Centrale shopping centres. uch redevelopments would result in wholesale upgrades to orth nd as part of a co-
ordinated programme of public realm works. t is anticipated that planning applications would be submit (from both) later in the year and as part of this
process the details for orth nd improvements will be secured. As such the level of discussion with local businesses with regards to what this public
realm improvement project can deliver has been kept to a minimum although there have been early discussions with the Town Centre B team.
High Street and George St
eorge treet and igh treet are key historical high streets the street contains a large number of locally and nationally listed buildings. owever these
VWUHHWVGRVXIIHUIURPUHODWLYHO\KLJKOHYHOVRIYDFDQF\IRUUHWDLOXQFKDQJHGFRPSDUHGWRDQGIRURIFHVSDFH
The highest recorded footfall is on eorge treet outside the Allders epartment tore with over 50000 recorded pedestrians in a week. This level of
IRRWIDOOGRHVFDXVHSHGHVWULDQFDSDFLW\LVVXHVDWWKHHQWUDQFHWR$OOGHUV7KLVJXUHLVOLNHO\LQXHQFHGE\*HRUJHWUHHW7UDPVWRSDQGWKHIDFWWKDW
eorge treet is currently the main pedestrian route between ast Croydon tation and orth nd.
ootfall reduces steadily along the igh treet when travelling outh from its junction with eorge treet /Church treet (just below 50000 recorded
footfall) to where it meets outh nd (5220 recorded footfall) with one exception where it meets urrey treet market.
A
7KH&HQWUDO$UHDSURHFWZLOOWDUJHWWKRVHDUHDVWKDWZRXOGQRWXQGHUJRVLJQLFDQWSXEOLFUHDOPLPSURYHPHQWVDVDUHVXOWRIDUHGHYHORSPHQWRIWKHUHWDLO
core.
950k will be allocated for public realm and building facade improvement works and the spending will focus most intensively on the creation of an
improved space at atherine treet hop arade and an art installation at the Croydon lyover improved node junctions at eorge treet and ellesley
oad igh treet and urrey treet with some complementary measures (mainly decluterring and repairs) along the whole of orth nd eorge treet
rummond oad and igh treet.
URSRVDOVZLWKLPPHGLDWHDQGYLVLEOHUHVXOWVZLOOVWUHQJWKHQ&UR\GRQVFRUHUHWDLODUHDDWDFUXFLDOWLPHDQGUHEXLOGFRQGHQFHDPRQJVWEXVLQHVVHVDQG
shoppers.
CENTRAL AREA (PROJECT 1)
13
-
7/29/2019 Improvments to Croydon
14/2114
CTA AA (PROJECT 1)JECT 1)
NORTHEND
KATHARINE STREET
THECROYDON
FLYOVER
(A232)
MASONSAV
ENUE
WESTST
REET
LONDONROAD
POPL
ARWALK
SURREYSTREET
HIGHS
TREET
GEORGE
STREET
TAM
WORTH
ROAD
DRUM
MOND
ROAD
CHURCHS
TREET
WELLESLEY
ROAD
14
N
A TT
(see previous pages for objectives)
T TT
(see previous pages for objectives)
T TT
(see next pages for objectives)
MMT
MMT
ATA TT
AA
TT
TAM T
C
B
T
TT
TT
MM A
-
7/29/2019 Improvments to Croydon
15/211515
T A TT
Objectives:
- nhance the general quality of the existingpublic realm.
Works:
- ublic realm: repair existing paving and /
RULGHQWLI\VSHFLFDUHDVWREHUHSODFHG
treet de-cluttering review existing planting.
ootway extension /paving of loading bays.
CT
Objectives:
- eorge treet tram stop: free space cluttered by tram stop to create a more pleasant pedestrian
environment.- Croydon lyover Bridge: create a gateway /landmark feature.
Works:
- eorge treet tram stop: relocate eorge treet tram stop.
- Croydon lyover Bridge: art and lighting. The installation might serve to announce Croydons
estaurant uarter in one direction and Croydons ld Town and shopping area in the other.
MM A
Objectives:
- mprove the physical connection between
ld Town and orth nd.Works:
- ublic realm: new paving improved security
address blank facades art.
- Co-ordinate proposals with ld Town igh
treets proposals.
MMT (X2)
Objectives:
- mprove nodes to facilitate pedestrians
movement.Works:
- ublic realm: ew and improved paving
street de-cluttering and new street furniture
planting.
- Coordinate with other works in ld Town and
ellesley oad.
ATA TT AA
Objectives:
- Create an improved amenity space opposite the Town all.
This work can be incorporated in a future plans for a larger civic
square as set out in Mid Croydon masterplan .
Works:
- ublic realm: coordination of public and private spaces by
atharine treet shop parade to provide a coherent space
including new paving planting seating play lighting.
- Building facade improvements: enhanced building and shop
fronts co-ordinating with opportunities for pop-up shops.
The CENTRAL AREA(PROJECT 1) has a total budget of 1.5m (0.8m for eorge treets tram stop relocation + 0.95m).
The works will be split between public realm works eorge treets tram stop relocation and building facade improvements.
ublic realm works: 880000 - 800m of street + atharine treet hop arade
eorge treets tram stop: 800000
Building facade improvements: 0000 - units (50 of atherine treet hop arade)
-
7/29/2019 Improvments to Croydon
16/2116
-
7/29/2019 Improvments to Croydon
17/211
CTT A BA ATA
outh nd is a gateway location at the southern end of the Town Centre and includes the southern part of igh treet outh nd and elsdon oad. t is
approximately 800m in length.
Businesses along outh nd were subject to looting during the civil disturbances on 8 August 2011. ince then 14 of street users and 45 of
businesses in outh nd feel that the area has declined.
outh nd has a mixed business base. ver the last number of years it is emerging as the Town Centres alternative restaurant quarter and the area
includes a number of successful restaurants (both chain and independent). There are a total of 11 shops and businesses operating along outh nd the
PDRULW\RIZKLFKDUHVKRSVQDQFLDOSURIHVVLRQDODQGUHVWDXUDQWV7KHUHDUHDSSUR[LPDWHO\SHRSOHHPSOR\HGZLWKLQWKHSURHFWDUHDDQGWKHUHLV
DOVRDVLJQLFDQWUHVLGHQWLDOFDWFKPHQWDUHDRISHRSOHWKDWXVHRXWKQGDVWKHLUPDLQKLJKVWUHHW
The area does have a retail vacancy rate of 13 and this tends to be focussed at the junction of Brighton oad and along outh nd illage (elsdon
RDG7KLVYDFDQF\UDWHLVVOLJKWO\DERYHWKHQDWLRQDODYHUDJHRIRZHYHUWKHYDFDQF\UDWHIRURIFHVLQWKHDUHDLV
The highest footfall in the outh nd area is on elsdon oad (outh nd illage) with almost 5800 recorded pedestrians noted over the course of aZHHN7KLVJXUHLVOLNHO\LQXHQFHGE\WKHSUR[LPLW\WRRXWK&UR\GRQVWDWLRQRRWIDOOUHPDLQVIDLUO\FRQVLVWHQWDORQJWKHHQWLUHVWUHWFKRIRXWKQG
varying broadly between 4.000 and 5250 with the eastern side of the road maintaining a slightly higher amount of footfall than the western side.
A
The purpose of the outh nd igh treet project is to support and build on the areas emerging status as a restaurant quarter by addressing the physical
issues along the street and thus helping to change perceptions of the area and attracting new people. The project area matches the boundary of outh
QGHVWDXUDQWXDUWHUDVLGHQWLHGE\WKHORFDOEXVLQHVVJURXS
The 2.85m budget will be split between public realm and building facade improvement works and spending will focus more intensively on outh nds
estaurant uarter Core and outh nd illage (shown on next page).
A critical aspect of the project will be to increase the usable footway space (through footway extension and decluttering) to increase opportunities for
restaurants to spill onto the street.
SOUTH END (PROJECT 2)
1
-
7/29/2019 Improvments to Croydon
18/2118
T (PROJECT 2)
COMBEROAD(A212)
ABERDE
ENROAD
SOUTH
BRIDGEROAD(A
236)
SPICESYARD
WESTS
TREET
HIGHSTREET
S O U T H E N D
BRIGHTONROAD
SELSDONEND
HEATH
FIELD
ROAD
WARH
AMRO
AD
BARTLETT
STREET
MASONSA
VENUE
PARKERROAD
LOWERCOMBESTREET(A212)
18
T TAAT AT C
T A
CT AC
CT AC
CT AC
CT AC
CTA AA TT
(see previous page for objectives)
MMT
MMT
MMT
T AC
T AC
T AC
N
-
7/29/2019 Improvments to Croydon
19/211919
CT AC
Objectives:
- Create new and enhance existing pocket spaces for people to
physically and visually enjoy.Works:
- ublic realm: ew high quality paving street de-cluttering benches
and planting co-ordinated art.
- Building facade improvements: shop front improvements.
SOUTH END(PROJECT 2) has a total budget of 2.80m. The works will be split between public realm works
and building facade improvements.
ublic realm works: 2300000 - 800m of street
Building facade improvements: 500000 - 40 units (20)
T AC (X3)
Objectives:
- ncourage people to enter Croydons estaurant uarter. Create a more pleasant physical
environment to link outh nd to Croydons town centre outh Croydon tation and Brighton
oad.
Works:
- ublic realm: ew paving new pedestrian crossings street de-cluttering and new street furniture
new planting rationalised parking and servicing co-ordinated art.
- Building facade improvements: enhanced building and shop fronts co-ordinating with
opportunities for pop-up shops.
T TAAT AT C
Objectives:
- upport the work done to market the area as Croydons restaurant quarter by creating a more
pleasant physical environment and generating opportunities for establishments to spill onto thestreet while maintaining public transport and cycle capacity.
Works:
- ublic realm: ew paving extended footways improved side streets crossings street de-
cluttering and new street furniture rationalised parking and servicing.
- Building facade improvements: enhanced building and shop fronts co-ordinating with
opportunities for pop-up shops.
T A
Objectives:
- nhance the streets more intimate and distinctive local high street character
- ew spaces at northern entrance and by uskin ouse parade.
Works:
- ublic realm: ew paving street de-cluttering and new street furniture new planting creating
green links to tree lined arham oad and t eters Church rationalised parking and servicing.
- Building facade improvements: enhanced building and shop fronts co-ordinating with
opportunities for pop-up shops.
MMT (X2)
Objectives:
- unction improvements to create a more
pleasant environment for pedestrians and
cyclists to move between the different
sections of outh nd.
Works:
- ublic realm: ew and improved paving
pedestrian crossings cycle lanes cycle
standing.
-
7/29/2019 Improvments to Croydon
20/2120
-
7/29/2019 Improvments to Croydon
21/21
GEORGE STREET TRAM STOP RELOCATION (PROJECT 3) has a total budget of 0.8m.
CTT A BA ATA
The area around the existing eorge treet Tram top is currently cluttered and overcrowded. The recorded footfall at that point is over 50000 recorded
pedestrians in a week. t also obstructs the entrance to the Allders department store.
urthermore Croydon Councils long tern plans are to create a new passage between ark treet and aint eorges treet in the continuation of aint
eorges alk. f the Tram stop were to remain in i ts current location it would then block the natural pedestrian desire line.
A
The purpose of the eorge treet Tram top relocation project is to release usable footway space thus releasing the pressure on the northern footway
and enabling the natural pedestrian desire line.