Inaugural Mee+ng Thursday 27th October, 2011
Comprehensive Disaster Management
The Project Objective Components Schedule
The Technical Advisory Committee Role Composition Operation
2
Agenda
"
Comprehensive Disaster Management
“Natural hazards by themselves do not cause disasters – it is the combination of an exposed, vulnerable and ill-prepared
population or community with a hazard event that results in a disaster”
United Nations International Strategy for Disaster Reduction (UNISDR, Briefing Note 2008)
4
Thought
The management of all hazards through all phases of the disaster management cycle by all peoples – public and private sectors, all segments of civil society and the general population in hazard prone areas.
CDM involves risk management and integration of vulnerability assessment into the development planning process.
(Caribbean Disaster Emergency Response Agency 2001, 2006)
5
Comprehensive Disaster Management
6
CDM Across The Disaster Management Cycle
Na5onal Disaster Management Authority (ODPM)
Mi5gate
Transfer
(NEOC)
Prepare
Respond
Recover
Monitor & Review / Communicate & Consult
Context Iden5fy Risks
Assess Risks
Treat Risks
Avoid
Manage Consequences
GOVT
Comprehensive Disaster Management
7
Accept
Diagram adapted in part from Australian Standard: AS/NZS 4360:2004
1. Institutional capacity building at national and regional levels
2. Enhanced knowledge management
3. Mainstreaming of disaster risk management into national and sectoral plans
4. Building community resilience
Resilience: The ability of a society exposed to hazards to resist, absorb, accommodate to and recover from the effects of a hazard in a timely
and efficient manner 8
Enhanced Comprehensive Disaster Management (CDM) Strategy Priority Areas
1. Make Disaster Risk Reduction a national priority
2. Improve risk information and early warning
3. Build a culture of safety and resilience
4. Reduce the underlying risk factors
5. Improve response effectiveness by strengthening disaster preparedness
9
UN ISDR Hyogo Framework Priorities for Action
"
The Project
To assist the GORTT to improve the delivery of Comprehensive Disaster Management to the general public, in order to reduce vulnerability and increase resilience to natural hazards and disasters
Specifically:
1. To prepare a Country Disaster Risk Evaluation
2. To strengthen institutional capacity for disaster risk management, emphasising risk reduction and incorporating climate change adaptation
11
Project Objectives
Project Details
Beneficiary: The Republic of Trinidad and Tobago
Executing Agency: Ministry of National Security, through the Office of Disaster Preparedness and Management
Financing: US $500,000 – IDB Disaster Prevention Fund and US $150,000 – Local Counterpart
Timetable: 24 months for execution
Project Components
1. Country Disaster Risk Evaluation Hazard identification, historical review and probabilistic
analysis
Inventory and categorisation of elements exposed, and vulnerability analysis
Risk assessment; hazard and risk mapping;
Presentation of options for risk financing
Update of Indicators of Disaster Risk and Risk Management
National workshops with stakeholders
Project Components
2. Institutional strengthening and capacity building Disaster Risk Management Specialist with ODPM for 9
months
Individual consultant to establish community emergency response teams in at least 2 highly vulnerable communities
Detailed assessment of the country’s institutional capacity to manage risks associated with natural hazards (next slide)
Project Components
Institutional Capacity Assessment: Review of legal framework and practice
Evaluation of the government’s institutional capacity to manage identified risk
Recommendations for updating the disaster risk management system
Individual packages of institutional strengthening needs for key stakeholder entities
Project proposal for institutional strengthening of DRM system for implementation under the Public Sector Transformation Programme
Project Schedule
"
Technical Advisory Committee
Role of the TAC
Provide technical guidance
Monitor project implementation
Assist in the selection of consultants
Review and provide technical feedback on project outputs
TAC Composition
ODPM
GOVERNMENT
VULNERABLE COMMUNITIES
NGOs ACADEMIA
PRIVATE SECTOR
TAC Operation
Chair
Secretary
Meeting Location
Meeting Frequency
Mode of Communication
21
Contact Information
22
Questions?