improving cooling system efficiency with pre-cooling aj schutte 15 august 2012
DESCRIPTION
IMPROVING COOLING SYSTEM EFFICIENCY WITH PRE-COOLING AJ Schutte 15 August 2012. Introduction. National power network under strain Electricity price increases Mining is electricity intensive Cost effective mining Inefficient mine cooling and ventilation system. South African mining. - PowerPoint PPT PresentationTRANSCRIPT
IMPROVING COOLING SYSTEM EFFICIENCY WITH PRE-COOLING
AJ Schutte
15 August 2012
Introduction National power network under strain
Electricity price increases
Mining is electricity intensive
Cost effective mining
Inefficient mine cooling and ventilation system
South African mining Reduce operational cost
SA mining depth requires cooling
Surface refrigeration system
System components
Dams and transfer pumps
Heat exchange towers
Refrigeration machines
Surface refrigeration system layout
Mine cooling Surface refrigeration
Cooling load Mine production water
Bulk air coolers (BAC)
Cooling components Pre-cooling towers
Refrigeration machines
BAC thermal load contribution
Production thermal load contribution
Pre-cool tower thermal energy
Resultant refrigeration machine thermal energy
Mine water quality Production cause water temperature increase
Salts dissolve
Evaporation increases solution concentration
Water treatment
Solid particles suspension
Settlers
Mine production surpass settlers and treatment
Pre-cool towers Layout
Fan
Mist eliminators
Spray nozzles
Fill
Production water cools
Crystals + solid particles
Electric motor
Mist eliminator
Fill
Ambient air
Water to pre-cool
dam
Water from chill dam
Spray nozzles
Gear box
Case study: Replace pre-cool towers
Mine production exceeding infrastructure
Summer refrigeration operate at 100%
Winter period maintenance
High efficiency film fill used
Tower fan maintenance
Replaced pre-cool towers Original design
exceed requirement
New fill specified
Direct drive fans
New fill vibrates
Results - Temperatures Inlet temperature of 30oC
Flow 340l/s
Old tower outlet temperature 23oC
New tower outlet temperature 19oC
Improvement of 4oCPre-cool tower electrical energy
Electrical energy saving
Refrigeration machine electrical energy
Pre-cool tower thermal energy
Pre-cool towers thermal energy gained
Resultant refrigeration machine thermal energy
Results - Electricity
1 MW saving through out the day
010002000300040005000600070008000
00:0
001
:00
02:0
003
:00
04:0
005
:00
06:0
007
:00
08:0
009
:00
10:0
011
:00
12:0
013
:00
14:0
015
:00
16:0
017
:00
18:0
019
:00
20:0
021
:00
22:0
023
:00
kW
Hour
Mine refrigeration system power profile
Baseline Actual profile
Conclusion Replacing mine pre-cool towers resulted in a
4oC colder outlet temperature
This resulted in 24hour average electricity
saving of 1MW
Fans utilisation increased
Winter period pre-cooling now possible
The End