improvement to interstate 40 from i-240 to the choctaw road interchange environmental assessment...
TRANSCRIPT
![Page 1: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/1.jpg)
Improvementto
Interstate 40 From I-240 to the Choctaw Road
Interchange
Environmental Assessment
March 23, 2010Harmony Christian Church
Public Hearing
![Page 2: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/2.jpg)
Overview
• Introduction
• Project Team
• Purpose
• Study Area
• Why This Project is Needed
• Goals/Objectives
• Preferred Alternative
• Why We Are Here
![Page 3: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/3.jpg)
Introduction
• FHWA
• ODOT
• TETRA TECH
![Page 4: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/4.jpg)
Purpose
The purpose of the project is to address physical deficiencies, congestion, and safety issues on I-40 from the
I-240 merge to Choctaw Road.
![Page 5: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/5.jpg)
Study Area
![Page 6: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/6.jpg)
Why This Project is Needed• Traffic backs up at the Choctaw Road exits
• The acceleration / deceleration lanes for
I-40/I-240 ramps and Choctaw Road are
too short
• Low exit ramp design speeds at Choctaw Road
• Inadequate vertical sight distances
• No traffic signals on Choctaw Road
• High accident rates
• Substandard vertical clearance at the bridge
• Need for safe pedestrian and bicycle access
![Page 7: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/7.jpg)
Goals / Objectives
• Improve the safety and operation of I-40 and
the Interchanges
• Minimize Impact to the Environment
• Meet the Purpose and Needs for the project
![Page 8: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/8.jpg)
Preferred Alternative
• Diamond Interchange– Three lanes per direction (I-40)– Auxiliary lanes (I-240)– Increased Traffic Storage and Decreased Driver
Confusion and Enhance Pedestrian Safety– Simplified Construction Sequencing
(Approximately 20 months)– Traffic signals with dedicated turn lanes
![Page 9: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/9.jpg)
Preferred Alternative (Cont.)
– Choctaw Road widening to five lanes with curb and gutter (include ADA compliant sidewalks)
– Accommodate Multimodal Facilities (i.e Park-n-Ride, Bicycle Access)
– Fewer Potential Relocations– Additional Right-of-Way– Retaining Walls
![Page 10: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/10.jpg)
Preferred Alternative
With Limits of No Access
![Page 11: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/11.jpg)
Environmental Analysis
• Wetlands, Streams, Ponds, Water Quality• Threatened and Endangered Species• Cultural Resources• Hazardous Materials• Farmland• Land use, Economic and Right-of-Way Impacts• Traffic Noise• Air quality• Temporary Construction Impacts• Community Concerns
![Page 12: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/12.jpg)
Right of Way
• Right-of-Way and Relocations
![Page 13: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/13.jpg)
Why We Are Here
• Input on the Preferred Alternative– Online comments (emails to [email protected])– Written - comment forms available– Verbal – record your comments with the Court Reporter– Comments due by April 23rd.
![Page 14: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/14.jpg)
Information Sources
Environmental Assessment:
1. http://www.okladot.state.ok.us/meetings/a2010/i40ea/
2. ODOT Central Office, 200 N.E. 21st Street, Room 3D 2A (2 copies)
3. Harmony Christian Church
4. Midwest City Public Library
5. Choctaw Public Library
Nancy Ashton – ODOT
Phone: 405-521-2676
200 NE 21st Street
Oklahoma City, OK 73105
E-mail: [email protected]
Jonathan Heusel – Tetra Tech
Phone: 405-606-8600
119 North Robinson Avenue
Oklahoma City, OK 73102
E-mail: [email protected]
![Page 15: Improvement to Interstate 40 From I-240 to the Choctaw Road Interchange Environmental Assessment March 23, 2010 Harmony Christian Church Public Hearing](https://reader036.vdocuments.mx/reader036/viewer/2022062404/5515710e55034691418b50ab/html5/thumbnails/15.jpg)
Thank You !