Page 1: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

Implementation Roadmap for Lean Implementation

Suhas GokhaleLean Manufacturing

[email protected]

[email protected]

+ 91 9881075056

www.SuhasGokhale.com

Page 2: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

CLUSTER METHODOLOGY

• INTERVENTIONS are– Common Trainings– Hand Holding Visits– Monthly Review Meetings– Plant Visits

Page 3: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

COMMON TRAININGS

• Topics of training based on the Roadmap• Common Training for all cluster members• Each Co. to nominate 3 – 4 members• CEO & Coordinator to attend training• Coordinators to train other employees• Training will be spread over 10 months• One hard copy of the training material

shall be given to each unit (Co.)

Page 4: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

HAND HOLDING VISITS : PURPOSE

• To elaborate and customize what has been taught in Training programs.

• To help the units to identify improvement projects / activities, in line with what has been taught.

• Discuss on the implementing the improvements identified and suggest different options.

• Review progress on the work assigned.

Page 5: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

HAND HOLDING VISITS : METHOD

• The units will be visited by the LMC and the facilitators from OE and Tier I on agreed dates.

• The Unit owner and coordinator to be available.

• The coordinator of the Unit to record all points of action discussed during the visits and commit target dates.

Page 6: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

HAND HOLDING VISITS : METHOD …..contd.

• The handholding visits will seek more information about the units for providing appropriate solutions and implementation method.

• Transparency and cooperation is needed in sharing the information.

• Digital camera is strongly recommended for capturing and analyzing “Before and After” situations.

Page 7: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

INTERNAL MRMs

• It is very much essential that Unit owner conducts formal internal MRMs before the cluster MRM.

• The purpose of internal MRM is to review the progress in a formal way, identify gaps and action plan to fill the gap and record.

• It is suggested to have following persons in the internal MRM. The Unit owner, the coordinator, the zone coordinators and team members.

Page 8: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

MONTHLY REVIEW MEETINGS

• MRM is a monthly meeting of• Unit owner and the coordinators from

Cluster member companies• Coordinators and facilitators from OE and

Tier I. • LMC or his representative.• Special invitees based on the need

– Experts / Industrialists

Page 9: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

PURPOSE OF MRM• To share the experience among the Cluster

members.• To review the progress and results of the Cluster

members.• For conducting the Training programs for Cluster

members.• To have direct interaction between all key

persons involved in the cluster activities.• To give / receive feedback on implementation.• To share concerns and suggestions.

Page 10: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

CONDUCT OF MRMs

• Frequency : Monthly• Dates : Last Thursday of every month• Timing : 10 am to 2 pm in conference hall

(LEAR / Sharda Motor)

2 pm to 6 pm factory visit (hosting member company)

• Coordination : LMC, OE and Tier I• Hosted by : A cluster unit shall host the

MRM by rotation

Page 11: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

CONDUCT OF MRMs….contd.

Requirement of Venue• Should accommodate 30 – 40 persons• A computer, LCD projector, white board,

marker, audio arrangements.• Tea / coffee / Lunch / snacks as

appropriate

Page 12: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

CONDUCT OF MRMs….contd.

• The sequence of MRM is on the next page.• The agenda will be finalized and distributed to all

concerned by LMC in advance.• Lear to take lead in organizing.• The cluster members MUST come prepared with the

presentations in the prescribed formats in SOFT COPY.• The host company to take care of safe & time bound tour

of factory and explanations through volunteers.• CD of all presentations shall be compiled at the end of

the project for circulation in the cluster.

Page 13: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

TYPICALSEQUENCE OF MRMs

1. ABE Enterprises : 29th Dec’11

2. Guru Enterprises : 25th Jan’12

3. Jay Industries : 23rd Feb’12

4. Raj Industries : 29th Mar’12

5. Shiv mfg company : 26th Apr’12

6. Shri Udyog : 31st May’12

7. Star Engine : 28th Jun’12

8. Yash Engineering : 26th July’12

9. Raj Engineering comp : 30th Aug’12

10. Ram Fastners : 27th Sept’ 12

Page 14: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

SUCCESS OF MRMs

It highly depends on• The Unit owner, his coordinators, cluster

members attending the MRMs REGULARLY.• Proper and detail presentations (ppt) by the

Units. Zone wise achievements, Learning during the month, case studies.

• Conducting internal trainings to all employees in the unit by the coordinator.

• Conduct and record of internal MRMs.

Page 15: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

KEY INDICATORS OF OPERATIONAL PERFORMANCE

7 Primary Indicators1.Product Quality

2.Labour productivity

3.Stock Turnover (Inventory Turn Ratio – ITR)

4.Delivery Schedule Achievement

5.Overall Equipment Effectiveness (OEE)

6.Floor Space Utilization

7.Value Added per Personnel Cost (VAPCO)

Page 16: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

KEY INDICATORS OF OPERATIONAL PERFORMANCE contd.

14 Secondary Indicators1. 5 S scores

2. SMED Index

3. Inventory Quality Control (Red, Grey, Green inventory)

4. Floor Space saving

5. Safety

6. Absenteeism

7. OT hours

8. Suggestions per employee

9. Employees Involvement in Improvement activities

10.Machine breakdown hours

11. Machine breakdown frequency

12.Energy Cost Savings

13. Improvements implemented

14.Value Added per person (VAP)

Page 17: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

1. PRODUCT QUALITY• This indicator measures Product Quality

Levels• Expressed in ‘No. of defective parts per

million’• This indicator should decrease over time.• There are three indicators

– Customer complaints (No.s)– Customer returns(ppm)– In process Rejection (ppm)

Page 18: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

2. LABOUR PRODUCTIVITY

• This is a measure of Productivity• This is measured as the ratio between the

no. of accepted units made and the total no. of employees hours associated with the mfg. of these units.

• It includes Direct, Indirect & Admin staff.• This measure should increase over time.

Page 19: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

3. INVENTORY TURNS RATIO

• This measures how frequently the stock of raw material, work in process and finished goods are turned over in relation to the material cost in the Sales revenue.

• Inventory levels are the key indicators of the ‘Leanness’ of the process and are directly related to the simplicity of production flows.

• This increase over time.

Page 20: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

3. INVENTORY TURNS RATIO… contd.

• Unit Company should define its method of calculation of material cost, inventory compilation.

• Unit Company should take a stock of the inventory of RM, WIP, FG on the last day of the month and calculate the ratio.

• Include all materials owned, at subcontractors, warehouse etc.

Page 21: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

3. INVENTORY TURNS RATIO… contd.

Material cost of sales in a particular month

ITR = ------------------------------------------- x 12

Inventory of RM + WIP + FG as on date

Page 22: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

4. DELIVERY SCHEDULE ACHIEVEMENT

• This measures how well a supplier’s dispatches match the planned delivery requirement of the customers.

• Unit of this measure is %• This should increase over time.

Total no. of dispatches achieved

= ------------------------------------------- x 100

Total no. of dispatches planned

Page 23: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

5. OVERALL EQUIPMENT EFFECTIVENESS (OEE)

• This is a composite measure of the Equipment Performance.

• This includes Availability Performance, Operational Performance & Quality performance of the equipment.

• This should increase with time.• Unit of measure is %• OEE = Availability Rate x Performance Rate x Quality Rate x 100

Page 24: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

6. FLOOR SPACE AREA

• This indicator is measured as a ratio of the Sales Revenue generated to the Sq. M of the Unit Co.

• It should increase over time. • Unit is Rs./ Sq.M• Considers shop floor, WIP, FG, Tool room,

unutilized space for this indicator

Sales Value of Production

Floor Space Utilization = ---------------------------------

Shop floor in Sq.M

Page 25: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

7. VALUE ADDED PER PERSONNEL COST (VAPCO)

• This is a financial measure that relates the value added with the cost incurred towards the people involved in the value addition process.

• Unit for this is Rs. / Rs.• This should increase over time. (Sales value of Production – Variable Cost)

VAPCO = ---------------------------------------------------------

Total Personnel Cost

Page 26: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

SECONDARY INDICATORS

These are for improving the Operations• The 5 S Audit cum Score sheet is used to

measure 5 S score of the Unit Co.• Unit for this indicator is %• It should increase over time.• It is improved through

• 5 S audit• WPP (Worst Point Photography)• FPP (Fixed Point Photography)

Page 27: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

SMED Index

• This indicator is a measure of flexibility and agility of the shop floor.

• The purpose of this indicator is to implement ‘Quick Changeover’

• It should reduce over time.• Make a monthly trend graph for this indicator.• Unit for this indicator is %

No. of changeovers in less than 10 min

Formula = ----------------------------------------------------- x 100

Total No. of Changeovers

Page 28: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

INVENTORY CONTROL(Through Red, Grey, Green tags)

• Inventory shall be controlled for RM, WIP, FG

• There are three inventory types• Red - Not Required (in this Qtr)• Grey - Not required today (but in Qtr)• Green - Required today (monthly demand)

• Actions are suggested based on the type / tag of the inventory

Page 29: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

FLOOR SPACE UTILIZATION

• This indicator is measured thru the Sq.M of floor space saved thru improvements

• It can be office space or shop floor• It should increase over time• Unit is Sq.M• Formula : Space Utilization = Floor Space saved

Page 30: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

SAFETYThere are two measures for safety• Accident Frequency Rate – No. of accidents

occurring in the Co. due to unsafe practices/ conditions.– Prepare monthly chart for it. It should reduce over

time.

No. of Accidents

= ----------------------- X 1 million

Total man hours

Man hours lost

• Accident Severity Rate = --------------------- x 1 million

Total man hours avl

Page 31: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

Absenteeism & Overtime

• This indicator measures the willingness of the employees to come to the workplace and perform value added activities

• This indicator should decrease over time.• Unit is % Absenteeism & Rs. for Overtime• Company to prepare trend graph

Page 32: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

SUGGESTIONS PER EMPLOYEE

• This indicator measures the morale of the employees and readiness to accept the change initiatives within the work environment

• Unit is No. / person• This should increase over time Total No. of employee suggestions

Formula : ----------------------------------------------

Total no. of employees

Page 33: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

MACHINE BREAKDOWN

• B’down includes machine stoppage due to• Mechanical faults• Electrical faults• Electronic faults

• Unit of this indicator is hours & No.s• It should decrease over time.• Co. should make a monthly trend graph

Page 34: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

ENERGY COST SAVINGS

• This indicator is a measure of energy input cost reduction in the working of the whole organization.

• Unit is Rs.• Energy savings may be Electrical energy,

Fuel savings etc.• It should increase over time.• Co. should make a monthly trend graph

Page 35: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

IMPROVEMETS IMPLEMENTED

• This indicator is a measure of employee participation levels.

• Unit is No.s• It should increase over period of time.• Co. should make a monthly trend graph

Page 36: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056

VALUE ADDED PER PERSON (VAP)

• This is a financial measure that relates the value added with the No. of people involved in the value addition process.

• Unit is ‘Rs. / Person’• It should increase over period of time.• Co. should make a monthly trend graph

(Sales value of Production – Variable Cost)

VAP = --------------------------------------------------------------

Total No. of persons (Direct, Indirect & Admin)

Variable cost includes cost of RM, BO, Sub contracted processing, consumables, power, payrolls etc.

Page 37: Implementation Roadmap for Lean Implementation Suhas Gokhale Lean Manufacturing suhasgo@gmail.com Suhas_gokhale@rediffmail.com + 91 9881075056