implementation of poa standards the point of view of a doe

10
Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25 March 2012

Upload: dustin-boyle

Post on 30-Dec-2015

20 views

Category:

Documents


0 download

DESCRIPTION

Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25 March 2012. SUMMARY. PRESENTATION OF AENOR PoA EXPERIENCE MAIN ISSUES ON PoA VALIDATION NEW PoA STANDARD EB 65 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Implementation  of  PoA standards The point  of  view  of a DOE

Implementation of PoA standards

The point of view of a DOE

Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG.

Bonn, 24 – 25 March 2012

Page 2: Implementation  of  PoA standards The point  of  view  of a DOE

• PRESENTATION OF AENOR

• PoA EXPERIENCE

• MAIN ISSUES ON PoA VALIDATION

• NEW PoA STANDARD EB 65

• OPPORTUNITIES

SUMMARY

Page 3: Implementation  of  PoA standards The point  of  view  of a DOE

• AENOR = ASOCIACIÓN ESPAÑOLA DE NORMALIZACIÓN Y CERTIFICACIÓN (SPANISH ASSOCIATION FOR STANDARDIZATION AND CERTIFICATION)

• AENOR: Spain + 12 branch offices in Europe, Africa and America

• Non profitable association

• Standardization body of Spain + certification company

PRESENTATION OF AENOR

Page 4: Implementation  of  PoA standards The point  of  view  of a DOE

• Validation of 17 Poas

• 2 registered: waste compost programme (Uganda); Turbococinas (El Salvador)

• 1 PoA requesting registration (energy efficient lighting, Senegal)

• 14 validation on going

• Sectoral scopes: 1; 3; 13; 15.

PoA EXPERIENCE

Page 5: Implementation  of  PoA standards The point  of  view  of a DOE

PoA EXPERIENCE

Page 6: Implementation  of  PoA standards The point  of  view  of a DOE

• Eligibility criteria not enough clear or detailed

• Demonstration of additionality is based on opinions, non on substantiated facts

• CPA starting date is not in accordance with requirements

• Additionality and eligibility

•Some eligibility criteria are not verifiable

MAIN ISSUES ON PoA VALIDATION

Page 7: Implementation  of  PoA standards The point  of  view  of a DOE

• Monitoring plan is not detailed and it is non described according to the Procedure for Registration of a programme of activities as a single CDM project activity. (EB 55 annex 38) (sampling vs. surveys)

• Guidelines on the assessment of investment analysis is not properly and completely explained.

• Emission Factor: PoA-DD does not specify if the EF is fixed ex ante

or each CPA will use its own Emission Factor.

MAIN ISSUES ON PoA VALIDATION

Page 8: Implementation  of  PoA standards The point  of  view  of a DOE

NEW PoA STANDARD EB 65

• Eligibility criteria: “Validating DOE and/or the Board may specify additional criteria depending on the specific characteristics of a PoA”.

• The CME shall develop and implement a management system

• The revision of eligibility criteria of a registered PoA may be initiated by the Board at any time during the lifetime of the PoA if an issue related to environment integrity is identified.

•Application of multiple CDM methodologies (…) Combinations of technologies/measures and methodologies vary across CPAs of a PoA.

Page 9: Implementation  of  PoA standards The point  of  view  of a DOE

• Further clarification on additionality

• New procedures for CPA withdrawal

• DOE liability

OPPORTUNITIES

Page 10: Implementation  of  PoA standards The point  of  view  of a DOE

Thank you very much for your kind attention

Luis Fernando Robles Olmos

Head, Climate Change Unit

AENOR

E-mail: [email protected]