implementation and verification of bmps to reduce eaa farm ...€¦ · tp load: 129 mt fwm tp...

30
Implementation and Verification of BMPs to Reduce EAA Farm P Loads: Implementation and Verification of BMPs to Reduce EAA Farm P Loads: Implementation and Verification of BMPs to Reduce EAA Farm P Loads: Implementation and Verification of BMPs to Reduce EAA Farm P Loads: Floating Aquatic Vegetation Impact on Farm P Load Floating Aquatic Vegetation Impact on Farm P Load Master Permit for BMP Research SOW Master Permit for BMP Research SOW 7 th th Annual Public Meeting on the Annual Public Meeting on the Long Long Term Plan for Achieving Water Quality Goals for the Term Plan for Achieving Water Quality Goals for the Long Long-Term Plan for Achieving Water Quality Goals for the Term Plan for Achieving Water Quality Goals for the Everglades Protection Area Tributary Basins Everglades Protection Area Tributary Basins February 25, 2010 February 25, 2010 Samira Daroub Samira Daroub [email protected] [email protected] Timothy Lang Timothy Lang [email protected] [email protected]

Upload: others

Post on 19-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

Implementation and Verification of BMPs to Reduce EAA Farm P Loads:Implementation and Verification of BMPs to Reduce EAA Farm P Loads:Implementation and Verification of BMPs to Reduce EAA Farm P Loads:Implementation and Verification of BMPs to Reduce EAA Farm P Loads:Floating Aquatic Vegetation Impact on Farm P LoadFloating Aquatic Vegetation Impact on Farm P Load

Master Permit for BMP Research SOWMaster Permit for BMP Research SOW

77thth Annual Public Meeting on theAnnual Public Meeting on theLongLong Term Plan for Achieving Water Quality Goals for theTerm Plan for Achieving Water Quality Goals for theLongLong--Term Plan for Achieving Water Quality Goals for theTerm Plan for Achieving Water Quality Goals for the

Everglades Protection Area Tributary BasinsEverglades Protection Area Tributary Basins

February 25, 2010February 25, 2010

Samira DaroubSamira Daroub [email protected]@ufl.eduTimothy LangTimothy Lang [email protected]@ufl.edu

Page 2: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

MASTER PREMIT FOR BMP RESEARCH MASTER PREMIT FOR BMP RESEARCH, TESTING, IMPLEMNTATIONSCOPE OF WORK RELATIVE TOSCOPE OF WORK- RELATIVE TOCHAPTER 40E-63, FAC, PART III

• Final SOW submitted to SFWMD September 17, 20099

• Public workshop conducted on November 18, 2009

• Master permit SOW approval- 15 January 2010

2

Page 3: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

P i O liPresentation Outline• EAA basin performanceEAA basin performance• Previous IFAS BMP research• BMP research SOW▫ Justification▫ Objectives

h d▫ Methods▫ Expected Outcomes▫ TimelineTimeline

• Current priorities

3

Page 4: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

EAA BMP TableEAA BMP Table

• Minimum 25 points• EAA basin P loads have an

l d i faverage yearly reduction of nearly 50%

• Typical BMP farm permit includes:includes:-water detention-fertilizer spill prevention-fertilizer app control

di t t l-sediment controls• Sediment controls not as

well defined/understood; high potential for g pimprovement

Page 5: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

EAA Basin Performance

EAA Basin Performance80%

100%Partial BMP

ImplementationPre-BMP

ImplementationFull BMP

ImplementationWY1996 First Compliance Year

EAA Basin Performance

60%

80%

uctio

n (%

)

20%

40%

Compliance > 25%

WY2009 Observed TP Load Reduction: 68%or

us L

oad

Red

u

0%

TP Load Reduction: 68%TP Load: 129 mtFWM TP Conc.: 119 ppb

Tota

l Pho

spho

-40%

-20%

80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09

Base Line Period (1978-1988)Average Annual Concentration: 173 ppbRainfall Adjusted Predicted Load: 407 mt

T

198

198

198

198

198

198

198

198

198

198

199

199

199

199

199

199

199

199

199

199

200

200

200

200

200

200

200

200

200

200

Water Years (May 1 - April 30)

1-Year 3-Year Rolling Average Source: SFWMD

Page 6: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

EAA Basin Performance

Source: SFWMD

6

Page 7: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

EAA Soil DepthEAA Soil Depth

1973Torry >51 in

Terra Ceia >51 in

Pahokee 36-51 in

1973Torry >51 in

Terra Ceia >51 in

Pahokee 36-51 in

1988Torry >51 in

Terra Ceia >51 in

Pahokee 36-51 in

Lauderhill 20-36 in

1988Torry >51 in

Terra Ceia >51 in

Pahokee 36-51 in

Lauderhill 20-36 in

Lake Lake OkeechobeeOkeechobee

Lake Lake OkeechobeeOkeechobee

Lake Lake OkeechobeeOkeechobee

Dania <20 in

Lake Lake OkeechobeeOkeechobee

Dania <20 in

WCA 1WCA 1 WCA 1WCA 1

WCA 2WCA 3 WCA 2WCA 3 WCA 2WCA 3 WCA 2WCA 3

7

Page 8: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

EAA Irrigation Water0.4

0.5)

S5A Sub‐basin Inflow Concentration (S‐352)

• Water delivered from three structures: S2, S3, and S-352

• Increasing P trend in Lake O 0.1

0.2

0.3

TP C

onc

(mg

L-1 )

girrigation waters at all three locations

• Greatest P increase is for WPB canal

0.5S6/7 Sub‐basin Inflow Concentration (S‐351)

007/92 07/94 07/96 07/98 07/00 07/02 07/04 07/06

Date

canal• Hurricanes of 2004 and 2005

elevated Lake P concentrations by suspending P-enriched

0 1

0.2

0.3

0.4

TP C

onc

(mg

L-1 )

sediments• EAA Inflow P levels did not

recover as quickly at S-352 as S-2 and S-3

0

0.1

07/92 07/94 07/96 07/98 07/00 07/02 07/04 07/06Date

0 5S8 Sub‐basin Inflow Concentration (S‐354) 2 and S 3

?Higher P loads into WPB canal may influence farm P loads

? Sediments in conveyance canals b f P

0.2

0.3

0.4

0.5

Con

c (m

g L-

1 )

may be a source of P to irrigation waters/STAs

8

0

0.1

07/92 07/94 07/96 07/98 07/00 07/02 07/04 07/06

TP

Date

Page 9: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

Previous EAA-BMP Studies*

1. BMP efficacy (92-02)2. Sedimentation basin effectiveness (98-00)

P ti l t d di l d P ( 8 )3. Particulate and dissolved P (98-02)4. Particulate P source and transport (00-04)5 Aerial survey of FAV (00-02)5. Aerial survey of FAV (00-02)6. BMP demonstration farm (03-04)7. Statistical analysis of factors affecting BMP 7 y g

performance (06-08)

*Studies by UF/IFAS with EAA-EPD and/or FDEP funding

9

Page 10: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOWBMP Research SOWJustificationJustification

40 60% f f P l d i i ti l t f• 40-60% of farm P load is in particulate form

• Exported particulate P has canal origins

R tl d it d P dil t t d• Recently deposited P readily transported

• Floating Aquatic Vegetation (FAV) is a source of exported particulatesexported particulates

Particulate and Dissolved P Study 1998-2002Particulate P Source and Transport Study 2000-2004

fSurvey of FAV on Two EAA Farms 2000-2002BMP Demonstration Farm 2002-2003

10

Page 11: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

Particulate P Sources and TransportParticulate P Sources and TransportTop 50% Load Phosphorus Content Distribution UF9200A 2002

8,000

6,000

7,000

tent

- m

g/kg

4,000

5,000

osph

orus

Con

Biomass Mobilization

2,000

3,000

ded

Solid

s Ph

o

Sediment Erosion

-

1,000

0 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 1 0

Susp

end

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0

Cumulative Fraction of Top 50% of Load

11

Page 12: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOWBMP Research SOWBMP Research SOWBMP Research SOW

What happens when FAV is controlled?

Co-precipitation of P with CaCO3 in aquatic systems with high pH will lead to denser less labile inorganic

What happens when FAV is controlled?

with high pH will lead to denser, less labile inorganic sediments (Murphy et al., 1983; Reddy et al., 1987; Danen-Louwerse et

al., 1995)

↓ Less production of mobile particulates↓ Reduce flux of P from canal sediments

, 995)

∆ Change canal water P speciation? Reduce overall farm P loads

12

Page 13: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

EAAEAA BMP R h SOW 2009BMP R h SOW 2009 20142014EAAEAA--BMP Research SOW 2009BMP Research SOW 2009--20142014Objectives

1. Evaluate FAV management practices in EAA farm canals for impact on farm drainage P load and particulate P physico-chemical load and particulate P physico-chemical properties

2. Use the results to develop a BMP for managing p g gFAV and reducing farm P loads.

HypothesisFAV f f l d l l bil FAV-free farm canals generate denser, less-labile,

less transportable sediments than canals that do not control FAV growthg

13

Page 14: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOWBMP Research SOWBMP Research SOWBMP Research SOWExperimental DesignExperimental Design

PairedPaired--farms study (4 pairs)farms study (4 pairs)PairedPaired farms study (4 pairs)farms study (4 pairs)

▫ Two farm pairs each in S5A and S-6 sub basins

▫ Calibration and treatment time periodsp

▫ Measure changes after initiation of practices

▫ Improved vs. typical FAV control practicesp yp p

14

Page 15: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOWBMP Research SOWExperimental DesignExperimental Design

Typical FAV control Improved FAV control

Typical FAV control during Typical FAV control during Typical FAV control during calibration period.

Grower keeps same typical control practices during

Typical FAV control during calibration period.Initial mechanical harvesting of FAV; Chemical spot control practices during

treatment periodof FAV; Chemical spot spraying to control FAV during treatment period

15

Page 16: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOW BMP Research SOW BMP Research SOW BMP Research SOW Experimental DesignExperimental Design

Advantages of the paired-farm basins approach:Advantages of the paired farm basins approach:• Climate and hydrologic differences from year to year are

statistically controlled • Farm basins need not be identical • Farm basins need not be identical • Water quality change can be attributed to the treatment alone

rather than farm basin differences • Using paired event data rather than monthly values calibration • Using paired event data, rather than monthly values, calibration

may be achieved in shorter time

16

Page 17: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOW BMP Research SOW BMP Research SOW BMP Research SOW PairedPaired--Farm Basin Study DesignFarm Basin Study Design

Treatedi = b0 +b1 (Controli) + e

m P

load Calibration Period

After Treatment

ated

farm

After Treatment

Tre

Control farm P loadControl farm P load

17

Page 18: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOWBMP Research SOWBMP Research SOWBMP Research SOWMethodologyMethodology

A.Initial survey of EAA farms will be conducted A.Initial survey of EAA farms will be conducted to provide researchers a representative range of farm canal characteristics and FAV biomass for farms within a sub-basin.

B.Data for drainage water P concentrations, d i fl d i i f ll i drainage flow, and pumping to rainfall ratio will be obtained from SFWMD’s BMP permit database Data will be statistically analyzed to database. Data will be statistically analyzed to observe trends and relationships among the farms.

18

Page 19: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOWBMP Research SOWBMP Research SOWBMP Research SOWMethodologyMethodology

C. Two pairs of farms will be chosen in each of pthe S5A and S6 sub basins. Farm selection criteria:

F i b 6 8 i h i l 1. Farm size between 640 to 1280 acres with a single exit pump station

2.Similar dimensions of main farm canals3.Similar land use and cropping history.4.Significant P load regression relationship of the Significant P load regression relationship of the

i d fi d fpaired farmspaired farms5.Same irrigation source canal6.Willingness of the grower to cooperate for ~5 years6.Willingness of the grower to cooperate for 5 years

19

Page 20: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOWBMP Research SOWBMP Research SOWBMP Research SOWMethodologyMethodology

D. Site survey of eight selected study farmsD. Site survey of eight selected study farms• Canal system configuration

• Cropping historypp g y

• BMP plan and implementation

• Soil depth and variation

• Sediment characterization and depth

• Ambient canal water P speciation

E i d l l i i f • Estimated canal velocities for recent water years

• Check pump calibrations

• FAV management practices• FAV management practices

20

Page 21: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOWBMP Research SOWBMP Research SOWBMP Research SOWMethodologyMethodology

E. Monitoring of farmsE. Monitoring of farms• Levels of inflow and outflow farm canals

• Pump RPMs of drainage pumps

• Drainage flow via data loggers using pump calibration equations, RPMs, and canal levels

• Estimated velocity by data loggers from drainage flows and • Estimated velocity by data loggers from drainage flows and canal levels

• Rainfall by tipping bucket rain gauge

• Drainage flow samples composited by auto-samplers triggered by data logger

• Flow composite samples held in refrigerated containers on-Flow composite samples held in refrigerated containers onsite until sample collection

21

Page 22: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOWBMP Research SOWMethodologyMethodology

F. Sample collectioni h i f i d• Drainage water - 24 hours in refrigerated

container• Ambient farm canal water - twice monthly• Ambient farm canal water - twice monthly• Sediment – depth measured and sampled 2X

year• FAV biomass – collected every two months

22

Page 23: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOWBMP Research SOWBMP Research SOWBMP Research SOWMethodologyMethodology

G. AnalysesG. Analyses• Water samples - TP, TDP, PP, SRP, DOP, TSS, pH,

and Ca • Canal sediments - TP, ash content, pH and bulk

densityS lid b l d f th f i l • Solids may be analyzed further for mineralogy using solid state assessment, e.g., x-ray diffraction

• FAV samples - biomass, species composition,& TP FAV samples biomass, species composition,& TP

23

Page 24: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP Research SOWBMP Research SOWMethodologyMethodology

H. Statistical Analyses• Analysis using SAS ANCOVA model

P i d t h d t d d i ith t d • Paired watershed study design with repeated measures

• Potential covariates: flow, canal level, velocity, rainfally

• Covariates included to increase precision

• Bivariate plots will be presented w/equations

i f h ill b i d• Estimates of percentage change will be estimated

• Data may also be pooled and analyzed by sub-basin

24

Page 25: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP R h SOWBMP R h SOWBMP Research SOWBMP Research SOWExpected OutcomeExpected Outcome

Development of a BMP for managing farm canals to produce denser, less mobile sediments, thus providing growers with an additional tool in their efforts to reduce growers with an additional tool in their efforts to reduce off-farm P loading.

One year prior to completion of data collection of project, sediment data will be analyzed A meeting with EAA-sediment data will be analyzed. A meeting with EAAEPD will be arranged for a discussion on temporal trends of sediment accumulation and disappearance from farm canalscanals.

The analysis and discussion will determine if there is justification to consider an additional Scope of Work to research sediment transport research sediment transport.

25

Page 26: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

BMP R h SOWBMP R h SOWBMP Research SOWBMP Research SOW-- TimelineTimeline

Tasks and Activities Timeline

1.00 Approval of SOW Month 0

1.01 EAA farm canal survey Month 1-2

1 02 Site selection of eight study farms Month 31.02 Site selection of eight study farms Month 3

1.03 Installation of monitoring equipment Month 4-5

1.04 Begin calibration period Month 6

1.05 Begin treatment period Month 305 g p 3

1.06 Progress report July 2010

1.07 Annual report 2011 July 2011

1.08 Annual report 2012 July 2012

1.09 Annual report 2013 July 2013

1.10 Annual report 2014 July 2014

1.11 End of sampling Month 66

1 12 Draft Final Report Month 721.12 Draft Final Report Month 721.13 Final Report Month 74

26

Page 27: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

Current PrioritiesCurrent PrioritiesInitial survey of EAA farms will be conducted to

provide researchers a representative range of provide researchers a representative range of farm canal characteristics and FAV biomass for farms within a sub-basin.

Eight or more farms in each sub-basin will be surveyed. • canal dimensions and layout• canal dimensions and layout• estimated average and maximum flow velocities• prevalent FAV species coverage, management strategies

sediment depths is al obser ations of sediments• sediment depths; visual observations of sediments• canal cleaning schedules• average farm soil depth and cropping history

27

Page 28: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

C t P i itiCurrent PrioritiesFinalize farm selectionFinalize farm selection▫ BMP advisory Committee- meeting held end of Jan.▫ Meet with farm cooperators/personnel

P t l ti t SFMWD▫ Present selections to SFMWD▫ Collect cooperator farm data

Monitoring equipment installationMonitoring equipment installation▫ Sensors: Canal levels, pump RPMs, rainfall▫ Drainage water auto-samplers w/refrigeration▫ Solar panels data loggers radio telemetry▫ Solar panels, data loggers, radio telemetry

28

Page 29: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

C t P i itiCurrent PrioritiesInitiate baseline monitoringInitiate baseline monitoring▫ Sediment depth measurements and cores▫ Biweekly ambient canal waters

D il it d f i t d d i t ▫ Daily composited, refrigerated, drainage waters ▫ Bimonthly FAV biomass samples

29

Page 30: Implementation and Verification of BMPs to Reduce EAA Farm ...€¦ · TP Load: 129 mt FWM TP Conc.: 119 ppb T otal Phosph-40% -20% 8 0 8 1 8 2 8 3 8 4 8 5 8 6 8 7 8 8 8 9 9 0 9 1

Thank YouThank YouThank YouThank You

Samira DaroubSamira DaroubUF/IFASEverglades Research and Education Center3200 E. Palm Beach Rd.Belle Glade, FL [email protected]