Notice to Bidders: The above referenced bid is hereby amended as follows: The following questions or requests for clarification were received regarding this project. Following each question or request for clarification is the response. 1) City Standards call for DR-18, while Note #1 Calls for DR-25, “Unless Otherwise
Specified”. Please clarify what DR Rating Pipe Should be? Response: All pipe shall be DR 18 in accordance with City Standards.
2) Should ALL pipe be the same DR? Should Pipe 12” and under be DR-18 while 18”
should be DR-25? Response: All pipe should be the same DR regardless of size.
3) Drawings show many connections to existing 6” Waterline. There is no 6” Pipe Bid
Item. This seems to imply that ALL Pipe appurtenant to these connections ought to be 8” w/ a Reducer at the connection. Is that Correct? Response: No that is not correct. Size of pipe varies for each connection and is either 6-inch, 8-inch or 12-inch. Reducers will be required at hot tap connections to transition from the main line to the hot tap (where applicable). Refer to the Valve and Stub Out Schedule on Sheet D-01 for the size of pipe and size of hot tap valve (if required) to be installed for each connection. For example, at STA 51+15 the diameter of the pipe to be installed is 8-inch with a 6-inch hot tap connection to the existing pipe.
4) Plan Sheet C-04, sta 49+01 shows a “Blow Off Valve Assembly”, what Bid Item should
this be included in? Response: Change Blow Off Valve Assembly to a Double Steamer Hydrant.
5) Bid Item #3 calls for 500 – LF of 12” Waterline while Plans show approximately 100 LF.
If 500 is correct please provide locations for this pipe. Response: 500 LF is correct. Additional quantity is included to account for replacement of fire lines or other connections that may require 12-inch diameter pipe.
6) Bid Item #8 calls for 4-inch Meg-A-Lug Fittings yet NONE are called out in the Drawings.
Are there 4” appurtenances? Please provide call outs to clarify. Response: Bid item has been included for replacement of 4-inch appurtenances that may be encountered during completion of the work.
PURCHASING
7) Bid Item #15 calls for 4-inch Gate Valve and Valve Boxes yet NONE are called out in the
Drawings. Are there 4” appurtenances? Please provide call outs to clarify. Response: Bid item has been included for replacement of 4-inch gate valves that may be encountered during completion of the work.
8) Bid Item #16 calls for 12-EA 6-inch Gate Valve and Valve Boxes yet 15 are shown/called
out in the Drawings. Please clarify quantities. Response: An updated Bid Schedule is attached.
9) Bid Item #17 calls for 24-EA 8-inch Gate Valve and Valve Boxes yet 23 are shown/called
out in the Drawings. Please clarify quantities. Response: An updated Bid Schedule is attached.
10) Bid Item #18 calls for 5-EA 10-inch Gate Valve and Valve Boxes yet NONE are
shown/called out in the Drawings. Please clarify quantities. Response: Bid item has been included for replacement of 10-inch gate valves that may be encountered during completion of the work.
11) Bid Item #19 calls for 2-EA 12-inch Butterfly Valve and Valve Boxes yet 1 is shown/called
out in the Drawings. Please clarify quantities. Response: An updated Bid Schedule is attached.
12) Bid Item #20 calls for 7-EA 18-inch Butterfly Valve and Valve Boxes yet 9 are
shown/called out in the Drawings. Please clarify quantities. Response: An updated Bid Schedule is attached.
13) Bid Item #24 calls for 22-EA Double Steamer Fire Hydrants yet 15 are shown/called out
in the Drawings. Please clarify quantities. Response: An updated Bid Schedule is attached.
14) Bid Item #24 states Incl. All Piping, Fittings & Joint Restraint, Blocking and Aggregate,
Gate Valve and Valve Box. But if All Valves, Fittings, and pipe are in this Bid Item that will require the Other Bid Item Quantities to be reduced. Please verify the Scope of these Bid Items. Response: Bid Item # 24 shall include the hydrant and piping only. The fittings and valves shall be included in the other bid items.
15) Bid Item #7 Bell Restraining Harnesses Series 2800 - All Sizes. The EBAA 2800 series
is specifically for C905 or diameters 14” thru 36”. Will 1600 series be acceptable for smaller diameter Harnesses? Response: No the Series 1600 is not acceptable. The EBAA Series 1900 shall be used for 4-in through 12-in pipe.
16) Please provide scope and/or details for Bid Item #25, Temporary Waterline, 2" to 4".
Response: We do not anticipate that temporary waterline will be required but a bid item has been included in the event that Contractor elects to install temporary waterline during completion of the work.
PURCHASING
17) Spec 012200, 1.2, 4, b, 1: Measurement and Payment for DUCTILE IRON FITTINGS 4”
to 18” states that the Price shall include fittings, glands, bolts and appurtenances. This seems incorrect if Glands are to be included in Items #8 thru #14? Please clarify. Response: Measurement and Payment for Ductile Iron Fittings will be updated and will only include the fitting. All bolts, glands, etc. will be included as part of bid items #8 through #14.
18) Plan Sheets C-01 – C-08, Keyed Note #6 calls out “Reconnect to Existing Water Service
per COF Std D-220.” D-220 is for a 4” Service. Note #6 occurs 28 times, Are all 28 of these 4” Services? Please define the Scope of these reconnections: Will new Valves be required? Should each reconnection include a Tee, Valve, Pipe, and Coupling? Response: All water services are not 4-inch diameter. Size of water services will vary. No tee, pipe, valve, etc. will be required for small diameter services (i.e. < 2-inch). Larger diameter water services (i.e. > 2-inch) shall require a tee, valve, pipe and coupling. All tapping saddles shall be stainless steel with stainless steel bolts.
19) Bid Item #26: Transfer Existing Water Service Line to New Waterline, Incl. Tapping
Saddle and Tubing, All Sizes, CIP. These don’t seem to be shown in the Drawings, sizes and quantities are unknown. For Bid Purposes can a schedule be provided so everybody is quoting the same sizes and quantities of material? Response: Bid Item #26 is for transferring the existing water services from the old pipeline and re-connecting them to the new 18-inch waterline. These are shown on the drawings as Keyed Note #6 – Reconnect Existing Water Service. For the purposes of bidding assume that 50% of the existing water services are 1-inch diameter and 50% are 2-inch diameter. Bid Item #27 is for completing repairs to existing water services that are damaged by the Contractor during completion of the work. We do not anticipate that any services will be damaged but a bid item has been included in the event that Contractor completes repairs to existing services during completion of the work.
20) The contractor is supplying all of the pipe and fittings? Response: Yes the Contractor is supplying all pipe, fittings, etc.
21) Provide clarification regarding the pavement requirements for Murray Rd which is within
NMDOT right-of-way. Response: The Contractor shall pave from the center stripe of the road and north up to the edge of the shoulder, the edge of existing paving, or up to the edge of the existing curb line. Paving in the trench zone shall be 4-inches of asphalt over 12-inches of base course. Outside of the trench zone Contractor shall mill to a depth of 3-inch and re-pave with 3-inches of asphalt – from curb line or edge of existing asphalt to center stripe of driving lane.
PURCHASING
All compaction requirements for work done in Murray Drive (US 64) shall be per current NMDOT Standard Specifications for Highway and Bridge Construction, current edition. (See applicable sections.) See attached detail for additional information. A Bid Item has been added for Milling Asphalt to be used only for the repaving of Murray Drive (US 64) – not for removal of asphalt surface to pipe trenching.
22) Provide clarification regarding AIS Certification.
Response: As part of submittal process Contractor shall provide certification indicating all materials meet AIS provisions. Refer to Item 8 in the Special Conditions.
23) Provide clarification regarding MBE / WBE participation.
Response: All prospective bidders shall make the six good faith efforts as outlined by EPA at http://www.epa.gov/osbp/dbe_efforts.htm. A Proposal that omits XP-215, or does not support that a good faith effort was made, will be considered non-responsive and the Bid Proposal rejected. See Contract Documents for additional information.
24) In regards to the QA/QC Testing, are we required to use two firms? Response: One (1) firm can be used for testing.
25) Is open-graded friction course (OGFC) required on Highway 64? Response: It is not required in the permit.
DRAWINGS 1) Sheet C-01
From STA 8+00 to STA 9+25 and STA 10+50 to STA 12+25, the new 18-inch PVC pipe shall be installed in a casing. Casing diameter shall be 16" larger than nominal diameter of carrier pipe. Design of casing pipe shall conform to the following:
Material - Steel (Grade - D) Min. Wall Thickness - 0.4375" Joints - Full Penetration Butt Welds** Live Load - Cooper's E-80 Railroad Loading *All steel used for pipe shall have a minimum yield point of 36,000 psi. **Longitudinal joint factor - 0.70
Casing isolators/spacers shall be model C12G - 2 psi and casing end seals shall be model "S" as manufactured by Pipeline Seal and Insulator, Inc., Houston, TX or Engineer Approved Equal.
PURCHASING
Casing spacers to be installed at intervals based on manufacturer's recommendations. Top of casing shall be a minimum of 48" below lowest point of roadway along alignment of installation. All excavation shall be compacted to 95% of the maximum dry density as determined by ASTM D698. Moisture content shall be ± 2% of optimum. Loose lift thickness shall not exceed 8". Contractor shall take special care when compacting around pipe to ensure adequate compaction. The work for these 2 crossings shall be completed at night to minimize disruption to traffic. Contractor shall submit a traffic control plan to the City for approval prior to starting work and shall maintain traffic through these intersections during construction. Approximately between STA 11+00 to STA 12+00, Contractor to replace loop vehicle detectors if damaged during construction. A bid item has been added to the bid tab for this work.
2) Sheet D-01, replace Valve and Stub Out Schedule table with the following:
3) Add Double Steamer Hydrants at the following stations: STA 6+25, 12+00, 49+10, 60+00 and 64+00
Contractor to verify final location of all fire hydrants in field.
4) Sheet C-02 STA 19+30.57 – On 12” waterline in Malta Ave - add a 12” Tee and 12” Butterfly Valve with Blind Flange for Future Connection to the west - (Verify final location in field.)
5) Sheet C-03 STA 32+19.30 – Extend 12” PVC waterline approximately 100 LF to south side of US 64 and hot tap and tie into existing waterline. STA 49+10 delete Blow-off Valve Assembly and replace with Double Steamer Fire Hydrant.
PURCHASING
6) Sheet C-05
STA 56+38.09 - Extend 12” PVC waterline approximately 100 LF to south side of US 64 and hot tap and tie into existing waterline.
7) Sheet C-06 Add (2 each) - 18” Butterfly Valves at approximately STA 76+25 at the intersection of Sandstone and Maple Street.
8) Sheet T-01 Construction Traffic Control General Notes, delete Note 25.
9) Sheet T-11 Add the following: General Notes: 1. Contractor shall schedule and coordinate any required traffic signal timing and
operational adjustments with the City of Farmington Traffic Engineering Division.
SPECIFICATIONS 1) Bid Form
Replace the bid form with the attached. Contractor to note bid items have been added for 4-inch PVC pipe, 6-inch PVC pipe, Steel Casing, Retroreflectorized Painted Markings, Loop Vehicle Detector and Cold Milling.
2) Section 01 22 00 – Measurement and Payment Revise Part 1, Section 1.2, Item D, Article 4.b, to read as follows:
b. Payment: 1) Payment will be made at the stipulated price indicated in the Bid Proposal
for Each pound of fittings installed as listed in AWWA C-110 Table 10.3. Price Bid shall include but not be limited to the following: fittings; warranties; Record Drawings; cleaning and all other materials, equipment and labor incidental thereto.
Revise Part 1, Section 1.3, Item B, Article 1.a, to read as follows:
a. Measurement: 1) Measurement for payment of Mobilization will be the lump sum Contract
price for "Mobilization".
Revise Part 1, Section 1.3, Item B, Article 2.a, to read as follows: b. Measurement:
1) Measurement for payment of Construction Traffic Control will be the lump sum Contract price for "Construction Traffic Control".
3) The City of Farmington Technical Specifications are attached to this Addendum and
are in addition to the previously included Technical Specifications.
4) The Geotechnical Report is attached to this Addendum.
PURCHASING
A pre-bid conference was held in the Executive Conference Room, 800 Municipal Dr. at 10:30 A.M. on March 8, 2017. The purpose of this pre-bid was to answer any questions, as might arise, with respect to the requirements and execution of the proposal. Questions resolved at this meeting are included in the recording and will be kept in the Bid File. Bidders interested in receiving the recording may obtain them by accessing the Purchasing page of the City of Farmington website, www.fmtn.org or by calling (505) 599-1373.
Receipt of this addendum shall be noted on Form AF-1 (a) in Tab I – Bidding Requirements for the above referenced bid. If your bid has already been submitted to this office, and this addendum will affect your bid quote, please contact this office and we will return your bid. Any bids that have been received, and are not requested to be returned will remain in this office unopened until March 21, 2017 at 2:00 p.m.
s/ Kay Rose
Kay Rose Buyer II Phone: (505) 599-1372 Fax: (505) 599-1377 Email: [email protected]
CITY OF FARMINGTON
2P Zone Waterline Replacement - Phase I BID PROPOSAL FORM AF-3
COF PROJECT #15-13 Addendum One
BID #17-117480
OPENING DATE: March 21, 2017 @ 2:00 P.M.
ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL
1 Mobilization LS 1
2Furnish and Install 4-inch DR18 Waterline Pipe, Incl. Trenching & Compacted
Backfill to any Depth, CIPLF 100
3Furnish and Install 6-inch DR18 Waterline Pipe, Incl. Trenching & Compacted
Backfill to any Depth, CIPLF 200
4Furnish and Install 8-inch DR18 Waterline Pipe, Incl. Trenching & Compacted
Backfill to any Depth, CIPLF 1,000
5Furnish and Install 12-inch DR18 Waterline Pipe, Incl. Trenching &
Compacted Backfill to any Depth, CIPLF 500
6Furnish and Install 18-inch DR18 Waterline Pipe, Incl. Trenching &
Compacted Backfill to any Depth, CIPLF 8,500
7 Ductile Iron Fittings, 12-inch Dia. & Smaller, CIP LB 5,000
8 Ductile Iron Fittings, 14-inch Dia. & Larger, CIP LB 25,000
9 Bell Restraining Harnesses Series 2800 or Series 1900- All Sizes, CIP EA 155
10 4-inch Meg-A-Lug Fittings, CIP EA 10
11 6-inch Meg-A-Lug Fittings, CIP EA 60
12 8-inch Meg-A-Lug Fittings, CIP EA 140
13 10-inch Meg-A-Lug Fittings, CIP EA 10
14 12-inch Meg-A-Lug Fittings, CIP EA 20
15 18-inch Meg-A-Lug Fittings, CIP EA 120
16 24-inch Meg-A-Lug Fittings, CIP EA 2
17 4-inch Gate Valve and Valve Box, CIP EA 5
18 6-inch Gate Valve and Valve Box, CIP EA 15
19 8-inch Gate Valve and Valve Box, CIP EA 27
20 10-inch Gate Valve and Valve Box, CIP EA 5
21 12-inch Butterfly Valve and Valve Box, CIP EA 7
22 18-inch Butterfly Valve and Valve Box, CIP EA 11
23Pressurized Connection, Existing Waterline, All Sizes, Incl. Fittings, CIP (Wet
Tap)EA 8
24 Non-Pressurized Connection, Existing Waterline, All Sizes, Incl. Fittings, CIP EA 10
25 Waterline Dechlorination Equipment EA 1
26
Furnish and Install New Double Steamer Fire Hydrant, Any Depth Incl. All
Piping, Fittings & Joint Restraint, Blocking and Aggregate, Gate Valve and
Valve Box, CIP
EA 20
27Temporary Waterline, 2" to 4", Incl. Installation, Flushing, Use, & Removal,
COMPLF 1,000
28Transfer Existing Water Service Line to New Waterline, Incl. Tapping Saddle
and Tubing, All Sizes, CIPEA 30
29 Repair Existing Water Service EA 10
30 Repair Existing Sanitary Sewer Service EA 10
31 Air Relief Valve Assembly incl. Vault Per Std Dwg D-209 EA 2
32 Load, Haul and Dispose of Unsuitable Material, CIP CY 9,200
33 Furnish and Install Pipe Bedding Material to Top of Pipe - 1" Minus Rock TON 11,500
34 Furnish and Install Backfill Material TON 7,500
35 Asphalt Removal, Disposal and Haul (Pipe Trench) SY 10,000
36 Subgrade Prep SY 10,000
37 Furnish and Install Base Course, CIP TON 7,900
38 Furnish and Install Hot Mix Asphalt Type B or C, PG (58-28), CIP TON 4,500
39Cold Milling 0" - 4" Depth - Milling, Haul & Disposal, CIP (Resurfacing US 64)
SY 12,000
40 Temporary Pavement 4" AC Nominal, CIP SY 500
41 Additional Asphalt Surface Course Replacement 1" Increments SY 1,000
42 4" Conc. Sidewalk or Valley Gutter Removal, Disposal and Replacement SY 1,000
43 2" Standard Curb & Gutter, Removal, Disposal and Replacement LF 1,000
44 48" Smooth Interior Polyethylene Pipe (ADS N-12), CIP LF 100
45 Furnish and Install Steel Casing, CIP LF 300
46 Construction Traffic Control & Barricading incl. Flagmen, CIP LS 1
47 Sign Message Boards EA 2
48 Retroreflectorized Painted Markings 4" , CIP LF 10,800
49 Loop Vehicle Detector, CIP EA 2
50 Portable Toilets LS 1
51 Project Sign (4-ft x 4-ft), CIP EA 4
52 Testing Allowance LS 1 100,000.00$ 100,000.00$
53 Utility Relocation Allowance LS 1 30,000.00$ 30,000.00$
54 Wet Tap Certification Allowance LS 1 25,000.00$ 25,000.00$
TOTAL BID ITEMS 1-54:
NOTE: Unless otherwise indicated, all items include labor, equipment and materials necessary to properly furnish, install and/or complete the work.
TOTAL OF ITEMS 1 THROUGH 54 INCLUSIVE IN WORDS:
THE SUM OF ______________________________________________________________________________________________
_____________________________________________________DOLLARS AND _________________________________CENTS.
April 29, 2009
HDR Engineering, Inc.
2155 Louisiana Boulevard NE, Suite 9500
Albuquerque, New Mexico 87110
Attention: Mr. Gabriel Alvarado, P.E.
Regarding: Limited Geotechnical Services
Sandstone Avenue / Murray Drive Waterline
Farmington, New Mexico
Project No. 69095006
Ladies and Gentlemen:
Terracon Consultants, Inc. (Terracon) has completed a limited geotechnical exploration for the
proposed waterline project in Farmington, New Mexico. The services provided were performed
in general accordance with our Proposal Number G08-581 dated November 14, 2008. The
results of our subsurface exploration including the site location map, boring location plan and
logs of borings are attached.
Based on the geotechnical engineering analyses, subsurface exploration and laboratory test
results, it is our opinion that the site is suitable for the proposed reconstruction. The design and
construction recommendations, based upon geotechnical conditions, are included in this report.
We appreciate being of service to you in the geotechnical engineering phase of this project, and
are prepared to assist you during the construction phases as well. If you have any questions
concerning this report or any of our testing, inspection, design and consulting services, please
do not hesitate to contact us.
Sincerely,
TERRACON CONSULTANTS, INC.
Heather M. Dawson Kim M. Preston, P.E.
Staff Professional Office Manager
Mary E. Wells, P.E.
Principal
Distribution: Addressee (3)
Limited Geotechnical Services Terracon Sandstone Avenue / Murray Drive Waterline Farmington, New Mexico Terracon Project No. 69095006 April 29, 2009
2
PROJECT DESCRIPTION
The subject alignment for the proposed waterline begins near the intersection of South Miller
Avenue and East Murray Drive. The alignment follows Murray Drive east to the intersection of
Murray Drive with Bloomfield Highway where the alignment continues east along the Bloomfield
Highway. The alignment turns north on Sandstone Avenue, then east along Southside River
Road. The alignment ends at the intersection of Southside River Road and Energy Court.
SITE EXPLORATION
Twenty three borings were drilled and sampled on April 1 and 2, 2009. The approximate boring
locations are indicated on the attached Boring Location Plans. The purpose of the geotechnical
subsurface exploration was to obtain data to provide the depth to the surface of the underlying
bedrock or other impenetrable layer, or at least 8 feet below existing ground surface, whichever
was encountered first. The results of the field exploration are presented on the attached boring
logs.
SUBSURFACE CONDITIONS
Asphaltic concrete pavement overlying aggregate base course was encountered at the surface
in each of the borings with the exception of for Boring B-18 where aggregate base course was
encountered at the surface. Generally, the underlying soil materials encountered at the boring
locations consisted of silty sand, clayey sand, clayey silty sand, and poorly graded sand with
silt. The sand soils contained varying amounts of gravel. Poorly graded gravel with silt and
sand was also encountered in some of the borings. Auger refusal was encountered in the
majority of the borings except Borings B-16, B-18, and B-21 through B-23 on a stratum of gravel
and cobble materials. For detailed soil conditions at a specific location, please refer to the
attached Logs of Borings.
Groundwater Conditions: Groundwater was not encountered in the borings. These
observations represent groundwater conditions at the time of the field exploration, and may not
be indicative of other times, or at other locations. Groundwater levels can be expected to
fluctuate with varying seasonal weather conditions, local irrigation schedules and other factors.
Zones of perched and/or trapped groundwater may also occur at times in the subsurface soils
overlying bedrock, on top of the bedrock surface or within permeable fractures in the bedrock
materials. The location and amount of perched water is dependent upon several factors,
including hydrologic conditions, type of site development, irrigation demands on or adjacent to
the site, fluctuations in water features, seasonal and weather conditions.
Limited Geotechnical Services Terracon Sandstone Avenue / Murray Drive Waterline Farmington, New Mexico Terracon Project No. 69095006 April 29, 2009
3
ENGINEERING ANALYSES AND RECOMMENDATIONS
Geotechnical Considerations: Based on the geotechnical engineering analyses, subsurface
exploration and laboratory test results, it is our opinion that the site is suitable for the proposed
reconstruction. The design and construction recommendations, based upon geotechnical
conditions, are included in this report.
Pavement Recommendations: Recommended replacement flexible pavements for repair of
the existing streets include asphaltic concrete over aggregate base course over scarified,
moisture conditioned and compacted subgrade. Based on the observed thickness of the
asphaltic concrete in the borings advanced along the alignment, the pavement structural section
recommendations are presented in the following table.
Auburn Avenue Pavement Recommendation
Asphaltic
Concrete
(inches)
Aggregate Base Course
(inches)
Scarified, Moisture Conditioned
and Compacted Subgrade
(inches)
4 6 8
Fill Materials and Placement: Approved on-site and imported soils to be used as engineered
fill and backfill should conform to the following:
Percent finer by weight
Gradation (ASTM C136)
3" ........................................................................................................... 100
No. 4 Sieve....................................................................................... 50-100
No. 200 Sieve................................................................................ 45 (max)
• Liquid Limit......................................................................... 35 (max)
• Plasticity Index.................................................................... 8 (max)
• Maximum expansive potential (%)* ............................................ 0.5
*Measured on a sample compacted to approximately 95 percent of the ASTM
D698 maximum dry density at about 3 percent below optimum water content.
The sample is confined under a 100 psf surcharge and submerged.
Compacted, granular pipe bedding should be provided in accordance with the pipe
manufacturer’s recommendations or for a depth of at least 8 inches above and below
Limited Geotechnical Services Terracon Sandstone Avenue / Murray Drive Waterline Farmington, New Mexico Terracon Project No. 69095006 April 29, 2009
4
underground utility pipes to distribute vertical loads and to protect the pipe during backfill
and compaction operations. The pipe bedding should be rounded and have a maximum
particle size of ¾ inch and a maximum of 5 percent passing the No. 200 sieve.
Placement and Compaction: Recommended compaction criteria for engineered fill
materials and scarified subgrade soils are as follows:
Minimum Percent
Material (ASTM D698)
Subgrade soils beneath fill areas:
Greater than 5 feet below finished subgrade elevation .................... 100
Less than or equal to 5 feet below finished subgrade elevation....... 100
Aggregate base course below pavement .............................................. 100
Miscellaneous backfill.............................................................................. 95
On-site soils and/or imported fill materials should be compacted within 3 percent of
optimum moisture content.
Compliance: Recommendations for pavements supported on compacted fills or
prepared subgrade depend upon compliance with recommendations contained in this
report. To assess compliance, observation and testing should be performed under the
direction of the geotechnical engineer.
Excavation and Trench Construction: Excavations into the on-site soils will encounter
a variety of conditions. The individual contractor(s) should be responsible for designing
and constructing stable temporary excavations as required to maintaining stability of
both, the excavation sides and bottoming. All excavations should be sloped or shored in
the interest of safety following local and federal regulations, including current OSHA
excavation and trench safety standards.
As a safety measure, it is recommended that all vehicles and soil piles be kept to a
minimum lateral distance from the crest of the slope equal to no less than the slope
height. The exposed slope face should be protected against the elements.
The individual contractor(s) is responsible for designing and constructing stable,
temporary excavations as required maintaining stability of both, the excavations sides
and bottom. All excavations should be sloped or shored in the interest of safety
following local and federal regulations, including current OSHA excavation and trench
safety standards.
Limited Geotechnical Services Terracon Sandstone Avenue / Murray Drive Waterline Farmington, New Mexico Terracon Project No. 69095006 April 29, 2009
5
The contractor should retain a geotechnical engineer to monitor the soils exposed in all
excavations and provide engineering services for slopes. This will provide an
opportunity to monitor the soil types encountered and to modify the excavation slopes as
necessary. It also offers an opportunity to observe the stability of the excavation slopes
during construction.
Additional Design and Construction Considerations:
Surface Drainage: Positive drainage should be provided during construction and
maintained throughout the life of the proposed project. Infiltration of water into the
subgrade soils and utility excavations must be prevented during construction and for the
life of the project. Backfill in utility trenches should be well compacted and free of all
construction debris to reduce the possibility of moisture infiltration.
Corrosion Protection: Experience with the soils in the project area indicates that ASTM
Type II Portland cement is suitable for concrete on and below grade. Foundation
concrete should be designed in accordance with the provisions of the ACI Design
Manual, Section 318, Chapter 4.
GENERAL COMMENTS
Terracon should be retained to review the final design plans and specifications so comments
can be made regarding interpretation and implementation of our geotechnical recommendations
in the design and specifications. Terracon also should be retained to provide observation and
testing services during grading, excavation, foundation construction and other earth-related
construction phases of the project.
The analysis and recommendations presented in this report are based upon the data obtained
from the borings performed at the indicated locations and from other information discussed in
this report. This report does not reflect variations that may occur between borings across the
site, or due to the modifying effects of weather. The nature and extent of such variations may
not become evident until during or after construction. If variations appear, we should be
immediately notified so that further evaluation and supplemental recommendations can be
provided.
The scope of services for this project does not include either specifically or by implication any
environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or
prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the
potential for such contamination or pollution, other studies should be undertaken.
Limited Geotechnical Services Terracon Sandstone Avenue / Murray Drive Waterline Farmington, New Mexico Terracon Project No. 69095006 April 29, 2009
6
This report has been prepared for the exclusive use of our client for specific application to the
project discussed and has been prepared in accordance with generally accepted geotechnical
engineering practices. No warranties, either expressed or implied, are intended or made. Site
safety, excavation support, and dewatering requirements are the responsibility of others. In the
event that changes in the nature, design, or location of the project as outlined in this report are
planned, the conclusions and recommendations contained in this report shall not be considered
valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this
report in writing.
Site Location Map
Project Mngr: KMP
Drawn By:
Checked By:
Approved By:
HMD
KMP
KMP
Project No. 69095006
Scale
File No.
Date:
~ 1:24,000
Site Map.doc
04/28/09
#4A CR 3499 Flora Vista, New Mexico
505.334.2900 Fax: 505.334.9703
FIG No.
1 Sandstone Avenue / Murray Drive
Waterline Replacement Farmington, New Mexico
Approximate Location of the Portion of Waterline to be Replaced
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
2
Legend
- Approximate Boring Location
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
3
Legend
- Approximate Boring Location
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
4
Legend
- Approximate Boring Location
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
5
Legend
- Approximate Boring Location
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
6
Legend
- Approximate Boring Location
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
7
Legend
- Approximate Boring Location
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
8
Legend
- Approximate Boring Location
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
9
Legend
- Approximate Boring Location
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
10
Legend
- Approximate Boring Location
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
11
Legend
- Approximate Boring Location
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
12
Legend
- Approximate Boring Location
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
13
Legend
- Approximate Boring Location
Boring Location Plan Project Mngr:
Drawn By:
Checked By:
Approved By:
KMP
HMD
KMP
KMP
Project No:
Scale:
File No:
Date:
69095006
NTS
Boring.doc
04/28/2009
#4A CR 3499
Flora Vista, New Mexico 505.334.2900 Fax: 505.334.9703
Sandstone Avenue / Murray Drive Waterline Replacement
Farmington, New Mexico
FIG No.
14
Legend
- Approximate Boring Location
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-2-09
Boring Location: 10+75
WATER LEVEL OBSERVATIONS, ft
TESTS
4.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
CLAYEY SILTY SAND WITH GRAVEL;brown, moist.
0.3333
0.8333
3.5
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 3.5feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
GRABSCSM
ASPHALT
DR
Y U
NIT
WT
pcf
69095006
4-2-09
DE
PTH
, ft.
BORING STARTED
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-1
JOB #
GR
AP
HIC
LO
GPage 1 of 1
WL
WL
WL APPROVED KMPHMDFOREMANRIG
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-2-09
Boring Location: 16+60
WATER LEVEL OBSERVATIONS, ft
TESTS
1.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
POORLY GRADED GRAVEL WITH SILTAND SAND; brown and gray, moist.
0.3333
0.8333
2
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 2feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
GRABGPGM
ASPHALT
DR
Y U
NIT
WT
pcf
69095006
4-2-09
DE
PTH
, ft.
BORING STARTED
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-2
JOB #
GR
AP
HIC
LO
GPage 1 of 1
WL
WL
WL APPROVED KMPHMDFOREMANRIG
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
Boring Location: 23+20
WATER LEVEL OBSERVATIONS, ft
Farmington, New Mexico
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
PROJECTSandstone Avenue / Murray Drive Waterline
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
SITE
CME-7569095006
HDR Engineering, Inc.
0.3333
Exploration terminated at approximately 1.5feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
0.8333
1.5
ASPHALT
4-2-09
GRAVELLY POORLY GRADED SANDWITH SILT; brown and gray, moist.
TESTS
DESCRIPTION
BASE COURSE
CO
RE
SIZ
E
4-2-09
CLIENT
DR
Y U
NIT
WT
pcf
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
DE
PTH
, ft.
LOG OF BORING NO. B-3
JOB #
GR
AP
HIC
LO
GPage 1 of 1
WL
WL
WL APPROVED KMPHMDFOREMANRIG
BORING STARTED
BORING COMPLETED
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-2-09
Boring Location: 29+80
WATER LEVEL OBSERVATIONS, ft
TESTS
1.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
GRAVELLY POORLY GRADED SANDWITH SILT; brown and gray, moist.
0.3333
0.8333
2.5
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 2.5feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
GRABSPSM
ASPHALT
DR
Y U
NIT
WT
pcf
69095006
4-2-09
DE
PTH
, ft.
BORING STARTED
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-4
JOB #
GR
AP
HIC
LO
GPage 1 of 1
WL
WL
WL APPROVED KMPHMDFOREMANRIG
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
Boring Location: 36+40
WATER LEVEL OBSERVATIONS, ft
Farmington, New Mexico
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
PROJECTSandstone Avenue / Murray Drive Waterline
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
SITE
CME-7569095006
HDR Engineering, Inc.
0.3333
Exploration terminated at approximately 1.5feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
0.8333
1.5
ASPHALT
4-2-09
GRAVELLY SILTY SAND; brown andgray, moist.
TESTS
DESCRIPTION
BASE COURSE
CO
RE
SIZ
E
4-2-09
CLIENT
DR
Y U
NIT
WT
pcf
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
DE
PTH
, ft.
LOG OF BORING NO. B-5
JOB #
GR
AP
HIC
LO
GPage 1 of 1
WL
WL
WL APPROVED KMPHMDFOREMANRIG
BORING STARTED
BORING COMPLETED
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-2-09
Boring Location: 43+00
WATER LEVEL OBSERVATIONS, ft
TESTS
1
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
CLAYEY SILTY SAND WITH GRAVEL;brown and gray, moist, trace cobbles.
0.3333
0.8333
3
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 3feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
GRABSCSM
ASPHALT
DR
Y U
NIT
WT
pcf
69095006
4-2-09
DE
PTH
, ft.
BORING STARTED
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-6
JOB #
GR
AP
HIC
LO
GPage 1 of 1
WL
WL
WL APPROVED KMPHMDFOREMANRIG
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-2-09
Boring Location: 49+60
WATER LEVEL OBSERVATIONS, ft
TESTS
2.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
GRAVELLY CLAYEY SILTY SAND; brownand gray, moist.
0.3333
0.8333
2
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 2feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
GRABSCSM
ASPHALT
DR
Y U
NIT
WT
pcf
69095006
4-2-09
DE
PTH
, ft.
BORING STARTED
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-7
JOB #
GR
AP
HIC
LO
GPage 1 of 1
WL
WL
WL APPROVED KMPHMDFOREMANRIG
BORING COMPLETEDWL
WL
WL
0.3333
0.8333
3
GR
AP
HIC
LO
G
ASPHALTBASE COURSE
CLAYEY SILTY SAND WITH GRAVEL;brown and gray, moist.
Exploration terminated at approximately 3feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
Farmington, New Mexico
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
Page 1 of 1
HDR Engineering, Inc.CLIENT
LOG OF BORING NO. B-8
JOB # 69095006
DR
Y U
NIT
WT
pcf
4-2-09
DE
PTH
, ft.
RIG
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
4-2-09
GRABSCSM
3.0
TESTS
DESCRIPTION
BORING STARTED
PROJECT
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
Boring Location: 56+20
WATER LEVEL OBSERVATIONS, ft
APPROVED KMPHMDFOREMAN
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-2-09
Boring Location: 62+80
WATER LEVEL OBSERVATIONS, ft
TESTS
2.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
GRAVELLY CLAYEY SILTY SAND; brownand gray, moist.
0.25
0.75
4
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 4feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
GRABSCSM
ASPHALT
DR
Y U
NIT
WT
pcf
69095006
4-2-09
DE
PTH
, ft.
BORING STARTED
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-9
JOB #
GR
AP
HIC
LO
GPage 1 of 1
WL
WL
WL APPROVED KMPHMDFOREMANRIG
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-2-09
Boring Location: 69+40
WATER LEVEL OBSERVATIONS, ft
TESTS
1.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
GRAVELLY POORLY GRADED SANDWITH SILT; brown and gray, moist.
0.25
0.75
2
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 2feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
GRABSPSM
ASPHALT
DR
Y U
NIT
WT
pcf
69095006
4-2-09
DE
PTH
, ft.
BORING STARTED
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-10
JOB #
GR
AP
HIC
LO
GPage 1 of 1
WL
WL
WL APPROVED KMPHMDFOREMANRIG
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-2-09
Boring Location: 76+00
WATER LEVEL OBSERVATIONS, ft
TESTS
3.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
CLAYEY SILTY SAND WITH GRAVEL;brown and gray, moist, trace to withcobbles.
0.3333
0.8333
3.5
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 3.5feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
GRABSCSM
ASPHALT
DR
Y U
NIT
WT
pcf
69095006
4-2-09
DE
PTH
, ft.
BORING STARTED
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-11
JOB #
GR
AP
HIC
LO
GPage 1 of 1
WL
WL
WL APPROVED KMPHMDFOREMANRIG
WATER LEVEL OBSERVATIONS, ft
GRABSM 3
TESTS
DESCRIPTION
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-1-09
Boring Location: 82+60Farmington, New Mexico
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
ASPHALT0.4167
1
3.5
4
BASE COURSE
SILTY SAND WITH GRAVEL; brown andgray, moist.
GRAVELLY SILTY SAND WITHCOBBLES; brown and gray, moist.Exploration terminated at approximately 4feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
BLO
W C
OU
NTS
, n
BORING STARTED
RE
CO
VE
RY
4-1-09
TYP
E
FOREMAN
DE
PTH
, ft.
DR
Y U
NIT
WT
pcf
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
HDR Engineering, Inc.CLIENT
LOG OF BORING NO. B-12
JOB # 69095006
GR
AP
HIC
LO
G
RIG
Page 1 of 1
BORING COMPLETEDWL
WL
WL APPROVED KMPHMD
WATER LEVEL OBSERVATIONS, ft
GRABSCSM
7.0
TESTS
DESCRIPTION
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-1-09
Boring Location: 89+90Farmington, New Mexico
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
ASPHALT0.375
0.875
3
4
BASE COURSE
CLAYEY SILTY SAND; brown, moist,trace gravel, increasing clay with depth.
GRAVELLY SILTY SAND; brown andgray, moist, trace cobbles.
Exploration terminated at approximately 4feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
BLO
W C
OU
NTS
, n
BORING STARTED
RE
CO
VE
RY
4-1-09
TYP
E
FOREMAN
DE
PTH
, ft.
DR
Y U
NIT
WT
pcf
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
HDR Engineering, Inc.CLIENT
LOG OF BORING NO. B-13
JOB # 69095006
GR
AP
HIC
LO
G
RIG
Page 1 of 1
BORING COMPLETEDWL
WL
WL APPROVED KMPHMD
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-1-09
Boring Location: 94+70
WATER LEVEL OBSERVATIONS, ft
TESTS
4.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
GRAVELLY CLAYEY SAND; brown andgray, moist.
0.3333
0.8333
3
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 3feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
GRABSC
ASPHALT
DR
Y U
NIT
WT
pcf
69095006
4-1-09
DE
PTH
, ft.
BORING STARTED
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-14
JOB #
GR
AP
HIC
LO
GPage 1 of 1
WL
WL
WL APPROVED KMPHMDFOREMANRIG
WATER LEVEL OBSERVATIONS, ft
GRABSM 3.0
TESTS
DESCRIPTION
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-1-09
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
Boring Location: 103+80Farmington, New Mexico
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
Sandstone Avenue / Murray Drive WaterlineSITE
ASPHALT0.4167
1
4
8
BASE COURSE
SILTY SAND WITH GRAVEL; brown andgray, moist, trace cobbles.
SILTY SAND; brown, moist, trace gravel.
Exploration terminated at approximately 8feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
CME-75
5
4-1-09RIG
DE
PTH
, ft.
DR
Y U
NIT
WT
pcf
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
HDR Engineering, Inc.CLIENT
LOG OF BORING NO. B-15
JOB # 69095006
GR
AP
HIC
LO
G
BORING STARTED
Page 1 of 1
BORING COMPLETEDWL
WL
WL APPROVED KMPHMDFOREMAN
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-1-09
Boring Location: 108+50
WATER LEVEL OBSERVATIONS, ft
TESTS
2.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
CLAYEY SILTY SAND WITH GRAVEL;brown and gray, moist, lenses of cobbles at5 feet and 10 feet below existing groundsurface.
0.4167
1
10
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 10feet below existing ground surface. Nogroundwater encountered.
GRABSCSM
ASPHALT
CO
RE
SIZ
E
69095006
4-1-09
DR
Y U
NIT
WT
pcf
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
5
10
BLO
W C
OU
NTS
, n
DE
PTH
, ft.
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-16
JOB #
GR
AP
HIC
LO
GPage 1 of 1
BORING STARTEDWL
WL
WL APPROVED KMPHMDFOREMANRIG
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-1-09
Boring Location: 117+90
WATER LEVEL OBSERVATIONS, ft
TESTS
2.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
GRAVELLY CLAYEY SILTY SAND; brownand gray, moist.
0.4167
1
2
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 2feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
GRABSCSM
ASPHALT
DR
Y U
NIT
WT
pcf
69095006
4-1-09
DE
PTH
, ft.
BORING STARTED
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
BLO
W C
OU
NTS
, n
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-17
JOB #
GR
AP
HIC
LO
GPage 1 of 1
WL
WL
WL APPROVED KMPHMDFOREMANRIG
4-1-09
Boring Location: 122+00
WATER LEVEL OBSERVATIONS, ft
Farmington, New Mexico
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
Sandstone Avenue / Murray Drive WaterlineSITE
CME-7569095006
HDR Engineering, Inc.
0.5
10
BASE COURSE
CLAYEY SAND; light brown, moist, tracegravel.
Exploration terminated at aprroximately 10feet below existing ground surface. Nogroundwater encountered.
PROJECT
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
GRABSC 5.0
TESTS
DESCRIPTION
CLIENT
4-1-09
DE
PTH
, ft.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
CO
RE
SIZ
E
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
5
10
BLO
W C
OU
NTS
, n
DR
Y U
NIT
WT
pcf
WL
WL
WL
LOG OF BORING NO. B-18
JOB #
GR
AP
HIC
LO
GPage 1 of 1
BORING COMPLETED
APPROVED KMPHMDFOREMANRIG
BORING STARTED
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-1-09
Boring Location: 128+80
WATER LEVEL OBSERVATIONS, ft
TESTS
4.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
SILTY SAND WITH GRAVEL; brown,moist.
0.4167
1
8
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 8feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
GRABSM
ASPHALT
CO
RE
SIZ
E
69095006
4-1-09
DR
Y U
NIT
WT
pcf
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
5
BLO
W C
OU
NTS
, n
DE
PTH
, ft.
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-19
JOB #
GR
AP
HIC
LO
GPage 1 of 1
BORING STARTEDWL
WL
WL APPROVED KMPHMDFOREMANRIG
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-1-09
Boring Location: 135+10
WATER LEVEL OBSERVATIONS, ft
TESTS
5.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
CLAYEY SILTY SAND WITH GRAVEL;brown, moist.
0.41670.5833
5
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 5feet below existing ground surface due toauger refusal on cobbles and boulders. Nogroundwater encountered.
GRABSCSM
ASPHALT
CO
RE
SIZ
E
69095006
4-1-09
DR
Y U
NIT
WT
pcf
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
5
BLO
W C
OU
NTS
, n
DE
PTH
, ft.
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-20
JOB #
GR
AP
HIC
LO
GPage 1 of 1
BORING STARTEDWL
WL
WL APPROVED KMPHMDFOREMANRIG
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-1-09
Boring Location: 142+00
WATER LEVEL OBSERVATIONS, ft
TESTS
4.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
CLAYEY SILTY SAND ; brown, moist,trace cobble to no cobbles.
0.33330.5
10
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 10feet below existing ground surface. Nogroundwater encountered.
GRABSCSM
ASPHALT
CO
RE
SIZ
E
69095006
4-1-09
DR
Y U
NIT
WT
pcf
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
5
10
BLO
W C
OU
NTS
, n
DE
PTH
, ft.
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-21
JOB #
GR
AP
HIC
LO
GPage 1 of 1
BORING STARTEDWL
WL
WL APPROVED KMPHMDFOREMANRIG
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/29/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-1-09
Boring Location: 148+60
WATER LEVEL OBSERVATIONS, ft
TESTS
4.0
Sandstone Avenue / Murray Drive WaterlineSITE
CME-75
HDR Engineering, Inc.
Farmington, New Mexico
CLAYEY SILTY SAND; red brown, moist.
0.33330.6667
10
DESCRIPTION
BASE COURSE
Exploration terminated at approximately 10feet below existing ground surface. Nogroundwater encountered.
GRABSCSM
ASPHALT
CO
RE
SIZ
E
69095006
4-1-09
DR
Y U
NIT
WT
pcf
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
5
10
BLO
W C
OU
NTS
, n
DE
PTH
, ft.
BORING COMPLETED
CLIENT
LOG OF BORING NO. B-22
JOB #
GR
AP
HIC
LO
GPage 1 of 1
BORING STARTEDWL
WL
WL APPROVED KMPHMDFOREMANRIG
BO
RE
HO
LE_9
9 L
OG
OF
BO
RIN
G.G
PJ
TE
RR
AC
ON
.GD
T 4
/28/
09
UN
CO
NFI
NE
DS
TRE
NG
TH, p
si
PROJECT
4-1-09
Boring Location: 154+70
WATER LEVEL OBSERVATIONS, ft
Farmington, New Mexico
DESCRIPTION
The stratification lines represent the approximate boundary linesbetween soil and rock types: in-situ, the transition may be gradual.
TESTSSandstone Avenue / Murray Drive Waterline
SITE
CME-7569095006
SILTY SAND; red brown, moist, increasinggravel with depth.
0.4167
1
10
BASE COURSE; tensar below basecourse.
GRABSM 5.0
ASPHALT
CO
RE
SIZ
E
HDR Engineering, Inc.
4-1-09
DR
Y U
NIT
WT
pcf
SAMPLES
US
CS
SY
MB
OL
WA
TER
CO
NTE
NT,
%
TYP
E
RE
CO
VE
RY
5
10
BLO
W C
OU
NTS
, n
DE
PTH
, ft.
WL
WL
WL
CLIENT
LOG OF BORING NO. B-23
JOB #
GR
AP
HIC
LO
GPage 1 of 1
BORING COMPLETED
BORING STARTED
APPROVED KMPHMDFOREMANRIG
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 99 91 82 75 60 35 24.6
Specification
% GRAVEL = 17.9 D85 = 6.0 D15 =
% SAND = 57.5 D60 = 0.4 D10 =
% SILT & CLAY = 24.6 D50 = 0.3 CU =
D30 = 0.1 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-1 @ 1-3'
Liquid Limit: 21
Plasticity Index: 5
USCS Classification: SC-SM
Material Description: Clayey Silty Sand with Gravel
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 97 75 48 45 29 15 10.6
Specification
% GRAVEL = 51.8 D85 = 13.4 D15 = 0.2
% SAND = 37.6 D60 = 6.5 D10 =
% SILT & CLAY = 10.6 D50 = 5.0 CU =
D30 = 0.5 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-2 @ 1-2'
Liquid Limit: None
Plasticity Index: NP
USCS Classification: GP-GM
Material Description: Poorly Graded Gravel with Silt and Sand
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 84 67 52 44 31 14 9.1
Specification
% GRAVEL = 47.6 D85 = 19.5 D15 = 0.2
% SAND = 43.2 D60 = 6.9 D10 = 0.1
% SILT & CLAY = 9.1 D50 = 3.8 CU = 79.9
D30 = 0.4 CC = 0.3
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-4 @ 1-2.5'
Liquid Limit: None
Plasticity Index: NP
USCS Classification: SP-SM
Material Description: Gravelly Poorly Graded Sand with Silt
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Muray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 97 84 72 62 45 25 19.8
Specification
% GRAVEL = 28.4 D85 = 10.0 D15 =
% SAND = 51.8 D60 = 1.5 D10 =
% SILT & CLAY = 19.8 D50 = 0.5 CU =
D30 = 0.2 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-6 @ 1-3'
Liquid Limit: 21
Plasticity Index: 5
USCS Classification: SC-SM
Material Description: Clayey Silty Sand with Gravel
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
TEST SUMMARY
TERRACON
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 99 80 68 59 44 23 17.5
Specification
% GRAVEL = 32.2 D85 = 11.5 D15 =
% SAND = 50.4 D60 = 2.2 D10 =
% SILT & CLAY = 17.5 D50 = 0.5 CU =
D30 = 0.2 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-7 @ 1-2'
Liquid Limit: 22
Plasticity Index: 6
USCS Classification: SC-SM
Material Description: Gravelly Clayey Silty Sand
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
TEST SUMMARY
TERRACON
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 98 84 70 61 45 23 17.1
Specification
% GRAVEL = 29.9 D85 = 10.2 D15 =
% SAND = 53.0 D60 = 1.7 D10 =
% SILT & CLAY = 17.1 D50 = 0.5 CU =
D30 = 0.3 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-8 @ 1-3'
Liquid Limit: 21
Plasticity Index: 4
USCS Classification: SC-SM
Material Description: Clayey Silty Sand with Gravel
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
TEST SUMMARY
TERRACON
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 98 78 62 51 36 19 14.7
Specification
% GRAVEL = 38.2 D85 = 11.9 D15 = 0.1
% SAND = 47.1 D60 = 4.1 D10 =
% SILT & CLAY = 14.7 D50 = 1.7 CU =
D30 = 0.3 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-9 @ 1-3'
Liquid Limit: 22
Plasticity Index: 5
USCS Classification: SC-SM
Material Description: Gravelly Clayey Silty Sand
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
TEST SUMMARY
TERRACON
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 98 73 58 49 36 14 10.1
Specification
% GRAVEL = 42.4 D85 = 14.1 D15 = 0.2
% SAND = 47.5 D60 = 5.3 D10 =
% SILT & CLAY = 10.1 D50 = 2.1 CU =
D30 = 0.4 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-10 @ 1-2'
Liquid Limit: None
Plasticity Index: NP
USCS Classification: SP-SM
Material Description: Gravelly Poorly Graded Sand with Silt
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
TEST SUMMARY
TERRACON
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 83 80 72 67 55 31 21.4
Specification
% GRAVEL = 27.9 D85 = 20.1 D15 =
% SAND = 50.6 D60 = 0.5 D10 =
% SILT & CLAY = 21.4 D50 = 0.4 CU =
D30 = 0.1 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-11 @ 1-3'
Liquid Limit: 21
Plasticity Index: 5
USCS Classification: SC-SM
Material Description: Clayey Silty Sand with Gravel
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 100 91 85 82 70 38 26.8
Specification
% GRAVEL = 14.5 D85 = 4.2 D15 =
% SAND = 58.7 D60 = 0.3 D10 =
% SILT & CLAY = 26.8 D50 = 0.3 CU =
D30 = 0.1 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-12 @ 1-3'
Liquid Limit: 19
Plasticity Index: 3
USCS Classification: SM
Material Description: Silty Sand with Gravel
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 99 95 91 89 82 63 45.1
Specification
% GRAVEL = 8.7 D85 = 0.5 D15 =
% SAND = 46.2 D60 = 0.1 D10 =
% SILT & CLAY = 45.1 D50 = 0.1 CU =
D30 = CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-13 @ 1-3'
Liquid Limit: 23
Plasticity Index: 7
USCS Classification: SC-SM
Material Description: Clayey Silty Sand
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 98 79 66 58 41 23 17.7
Specification
% GRAVEL = 33.5 D85 = 12.2 D15 =
% SAND = 48.7 D60 = 2.4 D10 =
% SILT & CLAY = 17.7 D50 = 0.6 CU =
D30 = 0.3 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-14 @ 1-3'
Liquid Limit: 23
Plasticity Index: 8
USCS Classification: SC
Material Description: Gravelly Clayey Sand
HDR Murray Waterline
5/1/2009
TEST SUMMARY
TERRACON
69095006
4/2/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 95 86 78 74 59 28 18.1
Specification
% GRAVEL = 21.9 D85 = 8.7 D15 =
% SAND = 60.0 D60 = 0.4 D10 =
% SILT & CLAY = 18.1 D50 = 0.4 CU =
D30 = 0.2 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-15 @ 1-3'
Liquid Limit: 19
Plasticity Index: 2
USCS Classification: SM
Material Description: Silty Sand with Gravel
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 97 84 71 62 42 20 15.0
Specification
% GRAVEL = 29.4 D85 = 9.9 D15 = 0.1
% SAND = 55.6 D60 = 1.3 D10 =
% SILT & CLAY = 15.0 D50 = 0.5 CU =
D30 = 0.3 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-16 @ 1-3'
Liquid Limit: 22
Plasticity Index: 6
USCS Classification: SC-SM
Material Description: Clayey Silty Sand with Gravel
HDR Murray Waterline
5/1/2009
TEST SUMMARY
TERRACON
69095006
4/2/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 99 82 69 62 46 23 16.3
Specification
% GRAVEL = 31.1 D85 = 11.2 D15 =
% SAND = 52.6 D60 = 1.4 D10 =
% SILT & CLAY = 16.3 D50 = 0.5 CU =
D30 = 0.3 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-17 @ 1-2'
Liquid Limit: 20
Plasticity Index: 4
USCS Classification: SC-SM
Material Description: Gravelly Clayey Silty Sand
HDR Murray Waterline
5/1/2009
TEST SUMMARY
TERRACON
69095006
4/2/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 99 96 94 93 89 57 42.1
Specification
% GRAVEL = 6.2 D85 = 0.4 D15 =
% SAND = 51.7 D60 = 0.2 D10 =
% SILT & CLAY = 42.1 D50 = 0.1 CU =
D30 = CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-18 @ 1-3'
Liquid Limit: 22
Plasticity Index: 9
USCS Classification: SC
Material Description: Clayey Sand
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 94 88 84 82 76 31 22.2
Specification
% GRAVEL = 15.8 D85 = 5.4 D15 =
% SAND = 62.0 D60 = 0.3 D10 =
% SILT & CLAY = 22.2 D50 = 0.3 CU =
D30 = 0.1 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-19 @ 1-3'
Liquid Limit: 17
Plasticity Index: 2
USCS Classification: SM
Material Description: Silty Sand with Gravel
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 96 91 87 84 76 47 29.7
Specification
% GRAVEL = 13.4 D85 = 2.8 D15 =
% SAND = 56.8 D60 = 0.3 D10 =
% SILT & CLAY = 29.7 D50 = 0.2 CU =
D30 = 0.1 CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-20 @ 1-3'
Liquid Limit: 20
Plasticity Index: 5
USCS Classification: SC-SM
Material Description: Clayey Silty Sand with Gravel
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 99 94 91 88 76 48 32.3
Specification
% GRAVEL = 9.2 D85 = 0.7 D15 =
% SAND = 58.5 D60 = 0.3 D10 =
% SILT & CLAY = 32.3 D50 = 0.2 CU =
D30 = CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-21 @ 1-3'
Liquid Limit: 21
Plasticity Index: 5
USCS Classification: SC-SM
Material Description: Clayey Silty Sand with Gravel
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 100 99 95 94 91 49 30.4
Specification
% GRAVEL = 5.0 D85 = 0.4 D15 =
% SAND = 64.6 D60 = 0.3 D10 =
% SILT & CLAY = 30.4 D50 = 0.2 CU =
D30 = CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-22 @ 1-3'
Liquid Limit: 20
Plasticity Index: 6
USCS Classification: SC-SM
Material Description: Clayey Silty Sand
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
.
Sieve Size 1 1/2" 3/4" 3/8" #4 #10 #40 #100 #200
% Passing (Cumulative) 100 99 96 92 91 79 59 44.0
Specification
% GRAVEL = 7.7 D85 = 0.6 D15 =
% SAND = 48.2 D60 = 0.2 D10 =
% SILT & CLAY = 44.0 D50 = 0.1 CU =
D30 = CC =
Sample Date:
Project No.:
Project Name:
Report Date:
Sample Location: B-23 @ 1-3'
Liquid Limit: 19
Plasticity Index: 2
USCS Classification: SM
Material Description: Silty Sand
TEST SUMMARY
TERRACON
69095006
4/2/2009
HDR Murray Waterline
5/1/2009
GRAIN SIZE - mm
GRAIN SIZE DISTRIBUTION GRAPH
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0010.010.11101001000
PE
RC
EN
T F
INE
R
6"
1.5
"
#4
#200
GENERAL NOTES
DRILLING & SAMPLING SYMBOLS:
SS: Split Spoon - 1-3/8" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger
ST: Thin-Walled Tube - 2" O.D., unless otherwise noted PA: Power Auger
RS: Ring Sampler - 2.42" I.D., 3" O.D., unless otherwise noted HA: Hand Auger
DB: Diamond Bit Coring - 4", N, B RB: Rock Bit
BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary
The number of blows required to advance a standard 2-inch O.D. split-spoon sampler (SS) the last 12 inches of the total 18-inch penetration with a 140-pound hammer falling 30 inches is considered the “Standard Penetration” or “N-value”. For 3” O.D. ring samplers (RS) the penetration value is reported as the number of blows required to advance the sampler 12 inches using a 140-pound hammer falling 30 inches, reported as “blows per foot,” and is not considered equivalent to the “Standard Penetration”or “N-value”.
WATER LEVEL MEASUREMENT SYMBOLS:
WL: Water Level WS: While Sampling N/E: Not Encountered
WCI: Wet Cave in WD: While Drilling
DCI: Dry Cave in BCR: Before Casing Removal
AB: After Boring ACR: After Casing Removal
Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations.
DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
CONSISTENCY OF FINE-GRAINED SOILS RELATIVE DENSITY OF COARSE-GRAINED SOILS
Unconfined
Compressive
Strength, Qu, psf
Standard
Penetration or
N-value (SS)
Blows/Ft.
Consistency
Standard
Penetration or
N-value (SS)
Blows/Ft.
Ring Sampler (RS)
Blows/Ft.
Relative Density
< 500 0 - 1 Very Soft 0 – 3 0-6 Very Loose 500 – 1,000 2 - 4 Soft 4 – 9 7-18 Loose 1,000 – 2,000 4 - 8 Medium Stiff 10 – 29 19-58 Medium Dense 2,000 – 4,000 8 -15 Stiff 30 – 49 59-98 Dense 4,000 – 8,000 15 - 30 Very Stiff > 50 > 99 Very Dense 8,000+ > 30 Hard
RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY
Descriptive Term(s) of other
constituents
Percent of
Dry Weight
Major Component
of Sample
Particle Size
Trace < 15 Boulders Over 12 in. (300mm) With 15 – 29 Cobbles 12 in. to 3 in. (300mm to 75 mm)
Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm)
RELATIVE PROPORTIONS OF FINES Sand
Silt or Clay #4 to #200 sieve (4.75mm to 0.075mm)
Passing #200 Sieve (0.075mm)
PLASTICITY DESCRIPTION Descriptive Term(s) of other
constituents
Percent of
Dry Weight Term Plasticity Index
Trace With
Modifiers
< 5 5 – 12 > 12
Non-plastic
Low Medium
High
0 1-10 11-30 > 30
GENERAL NOTES Description of Rock Properties
WEATHERING
Fresh Rock fresh, crystals bright, few joints may show slight staining. Rock rings under hammer if crystalline.
Very slight Rock generally fresh, joints stained, some joints may show thin clay coatings, crystals in broken face show bright. Rock rings under hammer if crystalline.
Slight Rock generally fresh, joints stained, and discoloration extends into rock up to 1 in. Joints may contain clay. In granitoid rocks some occasional feldspar crystals are dull and discolored. Crystalline rocks ring under hammer.
Moderate Significant portions of rock show discoloration and weathering effects. In granitoid rocks, most feldspars are dull and discolored; some show clayey. Rock has dull sound under hammer and shows significant loss of strength as compared with fresh rock.
Moderately severe All rock except quartz discolored or stained. In granitoid rocks, all feldspars dull and discolored and majority show kaolinization. Rock shows severe loss of strength and can be excavated with geologist’s pick.
Severe All rock except quartz discolored or stained. Rock “fabric” clear and evident, but reduced in strength to strong soil. In granitoid rocks, all feldspars kaolinized to some extent. Some fragments of strong rock usually left.
Very severe All rock except quartz discolored or stained. Rock “fabric” discernible, but mass effectively reduced to “soil” with only fragments of strong rock remaining.
Complete Rock reduced to ”soil”. Rock “fabric” not discernible or discernible only in small, scattered locations. Quartz may be present as dikes or stringers.
HARDNESS (for engineering description of rock – not to be confused with Moh’s scale for minerals)
Very hard Cannot be scratched with knife or sharp pick. Breaking of hand specimens requires several hard blows of geologist’s pick.
Hard Can be scratched with knife or pick only with difficulty. Hard blow of hammer required to detach hand specimen.
Moderately hard Can be scratched with knife or pick. Gouges or grooves to ¼ in. deep can be excavated by hard blow of point of a geologist’s pick. Hand specimens can be detached by moderate blow.
Medium Can be grooved or gouged 1/16 in. deep by firm pressure on knife or pick point. Can be excavated in small chips to pieces about 1-in. maximum size by hard blows of the point of a geologist’s pick.
Soft Can be gouged or grooved readily with knife or pick point. Can be excavated in chips to pieces several inches in size by moderate blows of a pick point. Small thin pieces can be broken by finger pressure.
Very soft Can be carved with knife. Can be excavated readily with point of pick. Pieces 1-in. or more in thickness can be broken with finger pressure. Can be scratched readily by fingernail.
Joint, Bedding and Foliation Spacing in Rocka
Spacing Joints Bedding/Foliation Less than 2 in. Very close Very thin 2 in. – 1 ft. Close Thin 1 ft. – 3 ft. Moderately close Medium 3 ft. – 10 ft. Wide Thick More than 10 ft. Very wide Very thick
Rock Quality Designator (RQD)b Joint Openness Descriptors
RQD, as a percentage Diagnostic description Openness Descriptor
Exceeding 90 Excellent No Visible Separation Tight 90 – 75 Good Less than 1/32 in. Slightly Open 75 – 50 Fair 1/32 to 1/8 in. Moderately Open 50 – 25 Poor 1/8 to 3/8 in. Open Less than 25 Very poor 3/8 in. to 0.1 ft. Moderately Wide Greater than 0.1 ft. Wide
a. Spacing refers to the distance normal to the planes, of the described feature, which are parallel to each other or nearly so. b. RQD (given as a percentage) = length of core in pieces 4 in. and longer/length of run.
References: American Society of Civil Engineers. Manuals and Reports on Engineering Practice - No. 56. Subsurface Investigation for Design and Construction of Foundations of Buildings. New York: American Society of Civil Engineers, 1976.
U.S. Department of the Interior, Bureau of Reclamation, Engineering Geology Field Manual.
Form 111—6/98
UNIFIED SOIL CLASSIFICATION SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Soil Classification
Group Symbol
Group NameB
Cu ≥ 4 and 1 ≤ Cc ≤ 3E GW Well-graded gravelF Clean Gravels Less than 5% finesC
Cu < 4 and/or 1 > Cc > 3E GP Poorly graded gravelF
Fines classify as ML or MH GM Silty gravelF,G, H
Coarse Grained Soils
More than 50% retained
on No. 200 sieve
Gravels More than 50% of coarse fraction retained on No. 4 sieve Gravels with Fines More
than 12% finesC Fines classify as CL or CH GC Clayey gravelF,G,H
Cu ≥ 6 and 1 ≤ Cc ≤ 3E SW Well-graded sandI Clean Sands Less than 5% finesD
Cu < 6 and/or 1 > Cc > 3E SP Poorly graded sandI
Fines classify as ML or MH SM Silty sandG,H,I
Sands 50% or more of coarse fraction passes No. 4 sieve Sands with Fines
More than 12% finesD Fines Classify as CL or CH SC Clayey sandG,H,I
PI > 7 and plots on or above “A” lineJ CL Lean clayK,L,M Silts and Clays Liquid limit less than 50
inorganic
PI < 4 or plots below “A” lineJ ML SiltK,L,M
Liquid limit - oven dried Organic clayK,L,M,N
Fine-Grained Soils 50% or more passes the No. 200 sieve
organic
Liquid limit - not dried < 0.75 OL
Organic siltK,L,M,O
inorganic PI plots on or above “A” line CH Fat clayK,L,M
Silts and Clays Liquid limit 50 or more
PI lots below “A” line MH Elastic SiltK,L,M
Liquid limit - oven dried Organic clayK,L,M,P organic
Liquid limit - not dried < 0.75 OH
Organic siltK,L,M,Q
Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-in. (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
6010
2
30
DxD
)(D
F If soil contains ≥ 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
HIf fines are organic, add “with organic fines” to group name.
I If soil contains ≥ 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,” whichever is predominant.
L If soil contains ≥ 30% plus No. 200 predominantly sand, add “sandy” to group name.
M If soil contains ≥ 30% plus No. 200, predominantly gravel, add “gravelly” to group name.
N PI ≥ 4 and plots on or above “A” line.
O PI < 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.