imca inspection acceptance discard-criteria rev.3
TRANSCRIPT
CABLE LAID SLINGS
By: Cor Dekker
Inspection & QHSE
Manager
IMCA INSPECTION, ACCEPTATION AND DISCARD
CRITERIA
IMCA M179 Revision Sub-workgroup
7 October 2013
4.2 Revision of IMCA M179
Guidance on the use of cable laid Slings and Grommets
PROPOSE DRAFT TEXST FOR INSPECTION AND DISCARD CRITERIA
Responsibility – C. Dekker
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
IMCA 9 July 2014
C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
NOW
Ch. 9. Inspection and Thorough Examination
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
NOW Appendix 5
Assessment of the condition of the sling or grommet and discard
guidance
Which is derived from ISO 8792 - 1986
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
Art. 5 Inspection, thorough examination
and discard criteria
Content is the same as in IMCA 179 with minor
textual changes
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
• Interpretations of the text is difficult
• Depending on: - employment (Independent inspector, owners representative)
- background (Steel wire rope specialist, steel wire rope user)
- time path (objectivity) (Material and/or time available for replacement)
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
IMCA 9 July 2014
Examples
REJECT / ACCEPT
According IMCA 179/ISO 8792
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION OF THE ROPE
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION OF THE ROPE
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
The other side
DISTORTION OF THE ROPE
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
Displacement > D
DISTORTION OF THE ROPE
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION OF THE ROPE
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie
Core protrusion
C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION OF THE ROPE
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie
Core protrusion
C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION OF THE ROPE
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie
Core protrusion
C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION OF THE ROPE
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION OF THE ROPE
Rope distortion Broken wires
Used sling
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
LOCALISED BREAKS
Wear & Tear
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
Valley breaking
LOCALISED BREAKS
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
CORROSION IMCA
9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
Tail ends < 3xD
TERMINATION IMCA
9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
LOCALISED BREAKS
Broken core rope
IMCA 9 July 2014
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie C. Dekker
27-06-2014 C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie
IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA
Undistorted rope < 15xD
TERMINATION IMCA
9 July 2014
C. Dekker
QUESTIONS ?
27-06-2014 C. Dekker
IMCA 9 July 2014
C:\Users\Cor.UOS-NL\Desktop\IMCA - Workgroup\Presentatie