imad company projects list

22
WORK EXPERIENCE COMPLETED/ON-GOING PROJECTS NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER COMMENCED/ COMPLETED MO.-YR. Page 1 of 22 1 S. ARAMCO C&IFD/UPD CONSTRUCTION OF AIR-CONDITIONING PLANT NO. 7 AND EXPANSION OF AIR-CONDITIONING PLANT NO. 1 & 6. Installation of 7 X 600-Tons of chiller units. (All permanent materials supplied by Saudi ARAMCO). 7491/00 DHAHRAN 12-76 04-78 2 PHILLIPS HOLZMAN EARTH FILL AT DAMMAM PORT DAMMAM 02-77 06-77 3 VANHAUTEM DREDGER EARTH FILL AT DAMMAM PORT DAMMAM 02-77 06-77 4 S. ARAMCO UPD TRENCH EXCAVATION IN NORMAL/ ROCKY SOIL 13080/00 DHAHRAN 10-77 06-78 5 S. ARAMCO LCDD INITIAL DEVELOPMENT OF HOME-OWNERSHIP LOTS, INCR. I, NORTH DHAHRAN, Installation of water distribution systems, waste-water collection systems and construction of roads. 13082/00 DHAHRAN 11-77 09-78 6 S. ARAMCO UPD CONSTRUCTION OF AIR- CONDITIONING PLANT No. 8 AND EXPANSION OF AIR CONDITIONING PLANT No. 5. Installation of 3 X 600-Ton of chiller units (All permanent materials supplied by Saudi ARAMCO) 13143/00 DHAHRAN 12-77 05-79 7 S. ARAMCO UPD CONSTRUCTION OF AIR-CONDITIONING PLANT No. 1. Installation of 2 X 600-Ton of chiller units. (All permanent materials supplied by Saudi ARAMCO) 13144/00 ABQAIQ 12-77 02-79 8 S. ARAMCO UPD INSTALLATION OF UNDERGROUND CHILLED WATER SUPPLY AND RETURN LINES. 13515/00 DHAHRAN 03-78 06-78 9 S. ARAMCO UPD CONSTRUCTION OF PERCOLATION FIELD AND INSTALLATION OF SEWER OUTFALL. 13297/00 DHAHRAN 10-78 10-79 10. S. ARAMCO UPD EXTENSION OF ICE PLANT. 13597/00 DHAHRAN 10-78 10-79 11. S. ARAMCO UPD SEWER OUTFALL-Installation of 42” diameter GRE sewer line 10 meters in depth. 15206/00 UTHMANIYAH 05-79 05-80 12. S. ARAMCO MAINTENANCE OF POWER PLANTS AT VARIOUS 16242/00 VARIOUS 05-79 05-80

Upload: ghulam-dastgeer

Post on 13-Mar-2016

262 views

Category:

Documents


2 download

DESCRIPTION

SAUDI ARAMCO PROJECTS

TRANSCRIPT

Page 1: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 1 of 22

1

S. ARAMCO C&IFD/UPD

CONSTRUCTION OF AIR-CONDITIONING PLANT NO. 7 AND EXPANSION OF AIR-CONDITIONING PLANT NO. 1 & 6. Installation of 7 X 600-Tons of chiller units. (All permanent materials supplied by Saudi ARAMCO).

7491/00 DHAHRAN

12-76 04-78

2

PHILLIPS HOLZMAN

EARTH FILL AT DAMMAM PORT DAMMAM 02-77

06-77

3 VANHAUTEM DREDGER

EARTH FILL AT DAMMAM PORT DAMMAM

02-77 06-77

4

S. ARAMCO

UPD

TRENCH EXCAVATION IN NORMAL/ ROCKY SOIL 13080/00

DHAHRAN 10-77 06-78

5 S. ARAMCO LCDD

INITIAL DEVELOPMENT OF HOME-OWNERSHIP LOTS, INCR. I, NORTH DHAHRAN, Installation of water distribution systems, waste-water collection systems and construction of roads.

13082/00 DHAHRAN

11-77 09-78

6 S. ARAMCO UPD

CONSTRUCTION OF AIR- CONDITIONING PLANT No. 8 AND EXPANSION OF AIR CONDITIONING PLANT No. 5. Installation of 3 X 600-Ton of chiller units (All permanent materials supplied by Saudi ARAMCO)

13143/00 DHAHRAN

12-77 05-79

7 S. ARAMCO UPD

CONSTRUCTION OF AIR-CONDITIONING PLANT No. 1. Installation of 2 X 600-Ton of chiller units. (All permanent materials supplied by Saudi ARAMCO)

13144/00 ABQAIQ

12-77 02-79

8

S. ARAMCO

UPD

INSTALLATION OF UNDERGROUND CHILLED WATER SUPPLY AND RETURN LINES.

13515/00 DHAHRAN

03-78 06-78

9

S. ARAMCO

UPD

CONSTRUCTION OF PERCOLATION FIELD AND INSTALLATION OF SEWER OUTFALL.

13297/00 DHAHRAN

10-78 10-79

10.

S. ARAMCO

UPD

EXTENSION OF ICE PLANT. 13597/00 DHAHRAN

10-78 10-79

11.

S. ARAMCO

UPD

SEWER OUTFALL-Installation of 42” diameter GRE sewer line 10 meters in depth.

15206/00 UTHMANIYAH

05-79 05-80

12. S. ARAMCO MAINTENANCE OF POWER PLANTS AT VARIOUS

16242/00 VARIOUS

05-79 05-80

Page 2: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 2 of 22

LOCATIONS.

LOCATIONS

13.

S. ARAMCO

ABGS

INSTALLATION AND COMMISSIONING OF 450 AIR-CONDITIONING UNITS IN SEVEN (7) SCHOOLS.

13672/01 DAMMAM

08-79 05-80

14. S. ARAMCO LCCD

INITIAL DEVELOPMENT OF HOME OWNERSHIP LOTS INCR. I, AL-HASA, Installation of water and sewer network and roads.

13740/01 AL-HASA

01-80 06-81

15. S. ARAMCO UPD

INSTALLATION OF 24” DIA GRE GRAVITY SEWER LINE UP TO 8 METERS IN DEPTH

13777/00 DHAHRAN

02-80 08-80

16. S. ARAMCO UPD

CONSTRUCTION OF WATER BOOSTER STATIONS.

14022/02 DAMMAM/ KHOBAR

04-80 07-81

17.

S. ARAMCO

UPD

FLOW LINES FOR NINE (9) WATER WELLS AT QATIF WATER BOOSTER STATION.

13823/00 QATIF

06-80 03-81

18.

S. ARAMCO

UPD

FIRE FIGHTING SYSTEMS. Installation of 20,000 feet of pipe mains and construction of two (2) Pump Stations.

14073/00 DHAHRAN

07-80 04-81

19. S. ARAMCO UPD

FINAL EFFLUENT SPRAY IRRIGATION FIELD.

29029/01 DHAHRAN

07-81 01-82

20. S. ARAMCO

SAUDI ARABIAN GOVERNMENT OIL AND GAS PIPELINE CROSSING DIVERSION NO. 16.

28065/00 JUBAIL

07-81 10-81

21.

S. ARAMCO

PROCURE AND CONSTRUCT WELL SERVICES MAINTENANCE BUILDING.

29032/00 MUBARRAZ

09-81 09-82

22. S. ARAMCO LCDD

INITIAL DEVELOPMENT OF HOME-OWNERSHIP LOTS, INCR. XII, RAHIMAH

29030/01 RAHIMAH

11-81 12-82

23. S. ARAMCO UPD

EXPANSION OF WATER BOOSTER PUMP STATION AT QATIF WELL FIELD

29152/01 QATIF

05-82 02-83

24. S. ARAMCO UPD

INSTALLATION OF QRT-11 PARALLEL PIPE CROSSING AT TARUT BAY.

29099/00 TARUT BAY

08-82 03-83

Page 3: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 3 of 22

25. S. ARAMCO LCCD

INITIAL DEVELOPMENT OF HOME OWNERSHIP LOTS, INCR. 5,6, & 7, NORTH DHAHRAN. Earthwork. Installation of water distribution networks, waste water collection systems, roads construction.

29063/00 DHAHRAN

01-83 03-84

26. S. ARAMCO C&IFPD

CONSTRUCTION OF ICE PLANT, AC REPAIR WORKSHOP AND WATER DISTRIBUTION LINES.

29192/00

AL-HASA

01-83 04-84

27. S. ARAMCO UPD

REPLACEMENT OF WEST LOOP 20” DIAMETER WATER LINE.

29251/00 DHAHRAN

04-83 03-84

28. S. ARAMCO LCDD

SWCC-Installation of 20” diameter, cement- lined water lines.

29296/00 RAHIMAH

06-83 12-83

29. S. ARAMCO RT&TPD

QRT-12, QATIF RAS TANURA PIPELINE AND UPGRADE RAHIMAH BOOSTER STATION. Installation of 24”/30” diameter cement-lined internally and externally fusion-bonded epoxy coated, 80,000 lineal feet; cross-country pipeline partially on reinforced concrete foundations, partially on pile driven/girders, PIC launcher and receiver. Thrust boring at road crossing. Expansion and upgrade of Rahimah Water Booster Station.

29270/00 RAS TANURA

03-84 05-85

30

PRIVATE CLIENT

CONSTRUCTION OF THE ABU-ADLA PALACE IN BALJURSHI. BALJURSHI 1984

1986

31 S. ARAMCO SAP/C&IPD/

NACPD

WATER AND SEWER IN NORTHERN RAHIMAH, Procure and Install VCP/PVC 30,000 LM of water and sewer lines including appurtenances; manholes, inspection chambers, Cleanouts, fire hydrants, valve boxes and valve chamber, sewer line service connections for 795 existing house.

29339/01 RAHIMAH

04-84 03-86

32 S. ARAMCO

SAP/C&IPD/NACPD

COMPLETE DEVELOPMENT OF HOME-OWNERSHIP LOTS INCR. VI, PH. 2 HAZM SAFWA. Procure and construct/install waste water collection systems; water distribution systems; electrical and telephone systems, street lighting, sidewalks and paving.

29311/01 SAFWA

04-84 02-86

33 S. ARAMCO CIPD/CPD

INITIAL DEVELOPMENT OF HOME OWNERSHIP LOTS, AR-RABIYAH, NORTH DHAHRAN. Procure and install water, sewer and gas distribution systems.

29496/00 AR-RABIYAH

DHAHRAN

02-86 07-86

Page 4: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 4 of 22

34 BALLAST NEDAM

CONSTRUCTION OF 18 VILLAS AT KING KHALID AIR BASE

W7027/AFF KHAMIS/

MUSHAYT

02-86 07-86

35 S. ARAMCO CIPD/IPD

REINFORCEMENT OF DHAHRAN UNDERGROUND UTILITIES WATER AND FORCE MAIN LINES.

29477/01 DHAHRAN

02-86 01-87

36 S. ARAMCO CIPD/IPD

EXPANSION OF AIR-CONDITIONING PLANT No. 7, DHAHRAN.

29491/00 DHAHRAN

03-86 04-87

37 S. ARAMCO RT&NAPDS/

TPU

REPLACEMENT OF FIRE WATER LINES, SAFANIYAH 29241/00

SAFANIYAH 09-86 03-87

38 S. ARAMCO SAPD/CPD

FINAL DEVELOPMENT OF HOME-OWNERSHIP LOTS, INCR. X-XIII, WEST AL-KHOBAR

29490/00 AL-KHOBAR

04-87 02-88

39

S. ARAMCO SAPD/CPD

CONSTRUCTION OF WATER BOOSTER STATION INCR. III, AL-HASA

29517/00 AL-HASA

01-87 05-88

40 S. ARAMCO

SAPD/C&NA/ IPD

FINAL DEVELOPMENT OF HOME-OWNERSHIP LOTS, INCR. 5,6 & 7, NORTH DHAHRAN, (345 LOTS): Adjustment of utilities and utility appurtenances, construction of concrete sidewalks, driveways, treewells, valley gutters, aprons and curbs and gutters, irrigation system, street lighting and street paving.

28718/00 DHAHRAN

NORTH

02-88 12-88

41 IMAD CO.

CONSTRUCTION OF IMAD COMPANY SERVICE CENTER: The work includes construction of a modern Automatic Service Centre; installation of an automatic car wash, maintenance shop and gasoline service station. Test and commission.

AL-KHOBAR 02-88 09-89

42 S. ARAMCO CAPD&CD/

CPD

INITIAL DEVELOPMENT OF HOME OWNERSHIP LOTS, INCR. XI, RAHIMAH, (450 LOTS): Construction/Installation of water collection system, waste water collection systems, electrical and telephone systems, roads and lots monumentations.

38013/01 RAHIMAH

02-89 05-90

43 S. ARAMCO CAPD&CD/

CPD

INITIAL DEVELOPMENT OF HOME-OWNERSHIP LOTS, INCR. III, PHASE I-A, NORTH DHAHRAN (500 LOTS). Removal of existing utilities, site grading, construction/installation of reinforced concrete retaining walls, water distribution systems,

29545/02 DHAHRAN

05-89 05-91

Page 5: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 5 of 22

waste water collection systems, electrical and telephone system, roads and lots monumentations.

44 S. ARAMCO CAPD&CD/

CPD

FINAL DEVELOPMENT OF HOME-OWNERSHIP LOTS INCR. X-XIII, WEST AL-KHOBAR, (387 LOTS): Adjustment of utilities and utility appurtenances, construction of concrete sidewalks, driveways, treewells, valley gutters, aprons, curbs and gutters, street lighting and street paving.

37253/00 AL-KHOBAR

07-90 11-91

45 S. ARAMCO CAPD&CD/

CPD

INITIAL DEVELOPMENT OF HOME OWNERSHIP LOTS INCR. III, PHASE 3, NORTH DHAHRAN, (238 LOTS): Site grading: cut and fill, borrow as fill. Construction of reinforced concrete retaining walls. Installation of water distribution systems, waste water collection systems, electrical and telephone systems, roads grading and paving, sidewalks, curbs, curbs and gutters and street lighting. Construction of detention basin and installation of lot monuments.

37552/00 DHAHRAN

03-91 07-92

46 S. ARAMCO CAPD&CD/

IPD

SIXTH STREET IMPROVEMENT AND UPGRADE SECURITY STATION 2 & 3. Construction of roads diversion: Two (2) guardhouse buildings, space-frame shade structure with cast-in-place reinforce concrete columns to cover entire area of main entrance to 6th street, Dhahran.. Construction of automatic drop-arm gates; installation of utilities; storm drainage pipelines; irrigation system; hardscaping; street lighting; traffic lights and construction of security fence.

37553/01 DHAHRAN

08-91 09-92

47 S. ARAMCO CAPD&CD/

IPD

SEWAGE CONSOLIDATION, RAS TANURA. Installation of 400 meters fiberglass pressure sewer line; 200/300 and 500 mm. diameter . Upgrading of existing sewer lift station: replacement of pumps with motors and piping and associated electrical/instrumentation and civil works.

37554/00 RAS TANURA

08-91 08-92

48 S. ARAMCO CAPD&CD/

IPD

CONSTRUCT WAREHOUSE FACILITIES, TANAJIB. This project comprises of the following: Steel structures approximately 1980 SM, air conditioned warehouse including loading docks, battery charger, pump room, mezzanine and storage racking and binning approx. 355 SM. Administration area, approx. 1010SM. General

37456/00 TANAJIB

10-92 03-94

Page 6: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 6 of 22

Sunshelter w/ 60% enclosure approx. 460 SM Gas Cylinder Sunshelter. Guardhouse with toilet facilities. 55,300 SM. concrete asphalted roads, car parking, shipping and receiving, laydown yard areas, all associated site work utilities, communications, fire-fighting and detection, alarm systems perimeter fencing and landscaping.

49 PRIVATE CLIENT

CONSTRUCTION OF THE GOLDEN BELT PALACE COMPOUND: The compound occupies an area of 11,600 m2 in a plush residential area. The construction includes six (6) modern villas; receiving/visitors centre; swimming pool and recreational facilities.

AL-KHOBAR 01-93 12-94

50 S. ARAMCO CAPD&CD/

CAPD

SITE DEVELOPMENT – GENERAL OFFICE COMPLEX, DHAHRAN. Procurement of materials, construct and commission the necessary site preparation work for the proposed office complex in Dhahran, which includes demolition and removal of pavement, concrete structures, construction of 170 vehicle parking lot, roads, security gatehouse and fencing. Installation/rerouting of underground raw water, drinking water, fire water lines, sewer and storm drainage, valve boxes and sewer manholes. Upgrading of electrical system, electrical manholes, concrete duct bank, cabling, modification of electrical poles. Test and commission.

37850/00 DHAHRAN

02-94 05-94

51 S. ARAMCO NAPD&C/

NPPD

UPGRADING OF THE EXISTING SECURITY FACILITIES AT KHURSANIYAH PUMPSTATION. The work includes demolition and removal of existing perimeter fencing, guardhouse, temporary buildings and electrical lines including wooden poles. Construction of SSD fence, patrol roads, diversion roads, guardhouse and hammam, control arm gates, generator building and percolation field. Relocation and modification of existing electrical power lines and telephone cables, electrical manholes and duct bank. Installation of site security lighting, communications and providing power, water and sewer and telephone system to guardhouse and hammam. Installation of cathodic protection of the pipelines. Test and commission.

37779/00 KHURSANIYAH

02-94 02-95

52 S. ARAMCO CAPD&CD/

CPD

COMPLETION OF HOME-OWNERSHIP LOTS INCR. IX, PHASE I, ABQAIQ. Procurement of materials, construction, test and commission all facilities necessary for completion of the home ownership. Work includes site preparation, demolition and removal of damaged binder course. Provision of asphaltic concrete wearing course on all streets, including traffic signs and street markings. Installation of streets and

37781/00 ABQAIQ

03-94 03-95

Page 7: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 7 of 22

walkways lighting, actuated traffic signal. Adjustments of utility appurtenances and development of four (4) parks which include grading, perimeter fencing, irrigation, planting, landscaping, walkways, garden furniture, shade structure, public hammam, caretaker building, lighting and playground equipment.

53 S. ARAMCO CAPD&CD/IPD

REHABILITATE WASTE WATER FACILITIES, DHAHRAN: Construct replacement sewer and manholes; construct sludge drying facilities, aerobic digesters, blower building and sludge pump station; rehabilitate aeration and settling tanks, splitter boxes, evaporation ponds; replace effluent pumps; associated mechanical, electrical and instrumentation works.

37889/00 DHAHRAN

01-95 10-96

54 S. ARAMCO CAPD&CD/CIPD

13.8 KV DISTRIBUTION SYSTEM: Civil works includes site preparation; construction of manholes and duct banks; Excavation in soils and rock; and fencing. Electrical works includes the installation of transformers and SF6 multiway switches; 13.8 KV and 5 KV underground distribution cables; cable splicing and termination; overhead lines; grounding systems; testing and commissioning of system.

45040/00 DHAHRAN

06-95 12-96

55 S. ARAMCO CAPD&CD/CIPD

COMPLETION OF HOME OWNERSHIP LOTS, INCREMENT II: Work includes installation of primary and secondary power distribution system; installation of the primary and secondary cables television system; installation of the primary and secondary telephone systems; installation of house connection cables to the electrical, telephone and cable television systems; construction house utilities connections for some of the subdivided lots; relocation of some garage ramps including all subsequent works; adjustment of utility appurtenances to match the existing street and sidewalk elevations and repair and/or replace any damaged items; installation of utility markers and monumentations; development of three parks; testing and commissioning.

45151/00 YANBU

10-95 01-97

56 S. ARAMCO CAPD&CD/CIPD

DOHA HOME OWNERSHIP STORM WATER RETENTION BASINS: Construction of one (1) new storm water retention basin and modification of two (2) existing basins; including rip-rapping, construction of retaining wall, installation of fence and gates and associated piping and grounding works.

45510/00 DOHA

12-95 11-96

Page 8: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 8 of 22

57.

S. ARAMCO

CAPD&CD/CIPD

EXPANSION OF SAFWA SEWAGE TREATMENT PLANT: The WORK shall include, but is not limited to the following: ♦ Improving the soil bearing capacity by installing stone

columns, backfilling and compaction. Work shall include dewatering, hauling material in and out, and installation of geotextile.

♦ Construct the new Inlet (Head) work, including procurement, installation and testing of mechanical screening and grit removal systems.

♦ Construct and test concrete split boxes and two carousel aeration tanks including procurement, installation and testing of electrical surface aerators.

♦ Fabrication, construction, procurement and testing of two clarifiers compete with bridge assemblies, submerged mechanism and all concrete and metal works, including new distribution box.

♦ Construction of two new aerobic digesters complete with all concrete, metal and piping.

♦ Fabrication, testing and installation of new sludge thickener. Work shall include procurement, installation and testing of one submersible pump and one wet well.

♦ Construction of thirty two (32) sludge drying beds including piping valves and dewatering pumps.

♦ Construction of new chlorine contact tank. Work shall include the tie-in with the existing chlorination tank.

♦ Construction of extended sea outfall with piping, fittings, rip-rap and diffusers.

♦ Construction of small electrical building to house the panel board, transformer. Work shall include the procurement and installation of the complete electrical network to power the STP expansion including connection with SCECO.

♦ Provide, install and test 500 KVA transformer, 400KW, 480V, 600A, 0.8PF in door generator with day and underground diesel tanks and a swtichgear motor control center (MCC) type rated for 480, 600A, 3Phase. The work shall include all required cables, ducts and ancillaries.

♦ Provide, install and test new control panel and one A/C package for the Motor Control Center from at the existing building.

♦ Provide, install and test all piping works, valves, pumps, fittings and other miscellaneous items to connect the existing STP with the new expansion.

♦ Provide, install and test all miscellaneous hoisting systems, stairs, grating and handrails.

♦ Construction of asphalt pavements, walkways, curbs, street markings and signs and Type IV fence as per the drawings.

45836/00 SAFWA

10-96 04-98

Page 9: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 9 of 22

58.

S. ARAMCO

WRPD

SECURITY ACCESS CONTROL SYSTEM: Jeddah Refinery ♦ Demolish or remove the existing security access system

including turnstiles, dropgates, card readers, computer equipment and fencing and gates local to the existing gatehouse.

♦ Demolish the existing gatehouse and the Clinic Annex building.

♦ Replace the Clinic Annex Building with a new emergency room.

♦ Construct a new gatehouse adjacent to the existing Clinic. ♦ Construct two new vehicle entrance lanes and two (2) new

vehicle exit lanes on opposite sides of the gatehouse including dropgates and card reader bases.

♦ Install six (6) new turnstiles with card readers; three (3) for entrance on one side of the gatehouse and three (3) for exit on the other side of the gatehouse.

♦ Construct a new gate layout including asphalt pavement, lay-bys, and sidewalks. Provide shade structures over the turnstiles and adjacent to the lay-bys beyond the exit from the restricted area.

♦ Construct a new SACS building to house the new security access control equipment including a UPS room, a computer room, AC units, and a hammam.

♦ Construct sewer connections for the water cooler and AC condensate at the gatehouse.

♦ Provide and install an emergency generator and housing to provide back-up power to the gate facilities.

Install the computerized security access equipment. ♦ Provide and install a buried 50-pair copper cable from the

SACS building to the communications room in Building WJ-131 for communication to Dhahran including terminating equipment at both ends.

♦ Construct two (2) four-inch conduits for the communications cable between the SACS Building and the communications room in Building WJ-131.

♦ Provide and install a 25-pair copper cable in buried conduit from the SACS Building to the Guardhouse including terminating equipment at both ends.

♦ Provide and install all telephone equipment including cables, jacks and telephone sets (one telephone per jack).

♦ Provide and install new SSD-1 type fencing and gates local to the gate area as required by the installation of the new facilities.

♦ Provide and install new cable and conduit to supply power to the new security system from existing substation 100B.

72330/00

JEDDAH / YANBU

06-97 01-98

Yanbu Refinery

Page 10: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 10 of 22

♦ Demolish or remove the existing security access system including turnstiles, dropgates, card readers, computer equipment and fencing and gates local to the existing gatehouse.

♦ Construct two (2) new vehicle entrance lanes and two (2) new vehicle exit lanes on opposite sides of the existing gatehouse including dropgates and card reader bases.

♦ Install six (6) new turnstiles with card readers; three (3) for entrance on one side of the gatehouse and three (3) for exit on the other side of the gatehouse.

♦ Construct a new gate layout including asphalt pavement, lay- bys, and sidewalks. Provide shade structures over the turnstiles and adjacent to the lay-bys beyond the exit from the restricted area.

♦ Construct a new SACS building to house the new security access control equipment including a UPS room, a computer room, AC units, and a hammam.

♦ Install the computerized security, access equipment. ♦ Provide and install a buried 50-paid copper cable from the

SACS building to the communications room in the Administration Building for communication to Dhahran including terminating equipment at both ends.

♦ Construct two (2) four-inch conduits for the communications cable between the SACS Building and the Telephone Switch Room in the Administration Building.

♦ Provide and install all telephone equipment including cables, jacks and telephone sets (one telephone per jack).

♦ Provide and install new SSD-1 type fencing and gates local to the gate area as required by the installation of the new facilities.

♦ Provide and install new cable and conduit to supply power to the new security system from existing Substation No. 13.

Page 11: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 11 of 22

59.

S. ARAMCO

C/WRPD

SULAYYIL BULK PLANT UPGRADES AND IMPROVEMENTS The WORK shall include, but is not necessarily limited to the following: 1.0 Electrical power supply and distribution; 2.0 Grounding; 3.0 Non-interruptible power supply; 4.0 Buildings, including Administration and Fire Pump

Housing; 5.0 Earthwork and grading; 6.0 Plant and off-site lighting; 7.0 Firewater and fire protection and utility water; 8.0 Drains, gravity sewer and pressure sewers; 9.0 Process piping; 10.0 Cathodic protection; 11.0 Pipeways and piperacks; 12.0 Equipment, building and piping foundations; 13.0 Miscellaneous structural steel; 14.0 Tie-ins and modifications to piping and electrical systems; 15.0 Plant telecommunications; 16.0 Roads, paving and asphalting; 17.0 Equipment and tank installation; 18.0 Instrumentation systems, and 19.0 Dismantling, demolition and removal of existing facilities; 20.0 Temporary accommodations and support facilities.

44073/00

SULAYYIL

08-97 08-98

Page 12: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 12 of 22

60.

S. ARAMCO

WRPD

FIRE AND SAFETY UPGRADE AT NORTH AND SOUTH JEDDAH BULK PLANT Clay Filter Installation – NJBP ♦ Two (2) new fuel booster / circulation pumps will be provided

for circulating fuel through the new facility. ♦ Two (2) new water coalescers complete with all associated

automatic drain and slug valves will be provided. ♦ Two (2) new clay filters complete with all associated valves,

fittings and three (3) sampling points. One (1) on the upstream of the system and two (2) after the clay filters.

♦ One (1) new Additive Dosing System with all associated valves, fittings, piping and mixing tank for antistatic dilution.

♦ Pipeline connecting the clay filter installation to existing storage tanks T-105, 108, 109 and 110.

♦ A new steel shed (without walls) mounted, on concrete foundations will be provided along with monorail to house the pumps, water coalescers, clay filters and associated piping and valves.

♦ A new motor control center, located in the nearby substation, is to be provided together with a lighting panel board and luminaries in the clay filter shed.

♦ A new dedicated instrument control panel with semigraphic display will be provided in the existing control room.

Fire Fighting System – SJBP ♦ The existing foam storage tanks and eductors system will be

removed and replaced with new skid mounted dedicated fixed foam/water spray deluge system for Truck Loading Rack No. 1 and for Truck Loading Rack No.3.

♦ New fixed fire water monitors, connected to the existing fire main by underground pipework will be provided in the LPG Loading Rack Area.

♦ A new live hose reel, connected to the existing fire main will be provided at the LPG Loading Rack Area.

♦ The existing fire hydrant close to the existing foam tank for Lading Rack No.1 to be relocated.

72399/00 JEDDAH

REFINERY

03-98 03-99

Page 13: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 13 of 22

Emergency Isolating Valves - SJBP ♦ Emergency isolating valves (EIVs) shall be ball valves to

API6D, qualified “Fire-safe”. Each valve shall be equipped with an air operated actuator. Actuators on valves located in fire hazardous areas shall be enclosed in a fire proof removable blanket designed to provide a minimum of 20- minutes fire protection.

♦ Each EIV shall be provided with a local shutdown panel which has dual solenoids valves to open/close the valve plus a test facility. This will allow the operation of individual EIVs to be tested without affecting the remainder.

♦ Existing instrument air lines are to be extended, where necessary, to provide instrument air supplies to the testing panels.

Emergency Isolation Actuating Buttons - SJBP The EIV shall be operated by local actuating buttons at the Loading Racks, by actuating buttons located on a control panel in the PDD Operating Building and individually by actuating buttons on the appropriate local shutdown panel.

61.

PRIVATE CLIENT

CONSTRUCTION OF IMAD COMPANY’S MAIN OFFICE AND PERSONNEL ACCOMMODATION IN AL-BUSTAN COMPLEX, AL-KHOBAR

--

1996 1998

62. S. ARAMCO WRPD

DRAINAGE, DIKING AND CATHODIC PROTECTION AT TABUK BULK PLANT Work includes but not limited to demolition, installation of equipment, construction of dikes & dike walls around protect tanks, installation of product piping, oily water system, electrical & instrumentation works, cathodic protection system, associated civil & structural works, testing & commissioning of entire system

72602/00 TABUK

06-98 03-99

63. S. ARAMCO WRPD

SECURITY COMPLIANCE UPGRADE RABIGH REFINERY A State-of-the Art Intruder Detection System and integrated CCTV Assessment System (IDAS) will be installed for the Rabigh Refinery Process Area perimeter utilizing fiber optic technology including fence sensors, CCTV with Video Motion Detection (VMD) and a laser, microwave or infrared motion detection system. The system will utilize the existing SSD fence. The work includes associated civil works, paving, construction of security building, Testing and commissioning of facilities

72487/00 RABIGH

REFINERY

1998 1999

Page 14: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 14 of 22

64. S. ARAMCO WRPD

BULK PLANTS MODERNIZATION PROJECTS 1. Tabuk Bulk Plant

♦ Truck Loading Facilities ♦ Terminal Management System (TMS) ♦ MCC Building ♦ Infrastructure Upgrades ♦ Tank Gauging ♦ Fire Protection ♦ Instrumentation Upgrades ♦ Demolition

2. Duba Bulk Plant

♦ Truck Loading Facilities ♦ Terminal Management System (TMS) ♦ Oily Water Separation System ♦ Infrastructure Upgrades ♦ MCC Building ♦ Tank Gauging ♦ Product Testing Facility ♦ Fire Protection ♦ Instrumentation Upgrades ♦ Demolition

44354/00 WESTERN

REGION BULK PLANTS

1999 2001

22 Nov. 1999 14 Jan. 2001

11 Sept. 1999 31 Mar. 2001

3. Yanbu Bulk Plant

♦ Truck Loading Facilities ♦ Terminal Management System (TMS) ♦ Infrastructure Upgrades ♦ Instrumentation Upgrades

4. North Jeddah Bulk Plant

♦ Truck Loading Facilities ♦ Pipeline Metering and Proving ♦ Terminal Management System (TMS) ♦ Infrastructure Upgrades ♦ Tank Gauging ♦ Oily Water Separation System ♦ Instrumentation Upgrades ♦ Fire Protection ♦ Demolition

20 Nov. 1999 26 Jan. 2001

12 Apr. 1999 26 Jan. 2001

Page 15: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 15 of 22

5. South Jeddah Bulk Plant ♦ Truck Loading Facilities ♦ Terminal Management System (TMS) ♦ Infrastructure Upgrades ♦ Pipeline Metering and Proving ♦ Instrumentation Upgrades ♦ Demolition

6. King Abdulaziz International Airport

♦ Tank Gauging

17 July 1999 30 Aug. 2000

08 July 1999 31 Jan. 2001

65.

S. ARAMCO

C/WRPD

ABHA BULK PLANT MAJOR CONSTRUCTION WORK The specific scope of work includes but not limited to the following: • Construction of Operations and Maintenance Building • Construction of Gasoline, Diesel and Jet A1 Pumpstations • Construction of Power and Generator Building • Construction of Truck Loading Islands • Construction of Swtichgear Building • Construction of Evaporation Pond and Holding Ponds • Construction of Trunk Radio Tower Antenna • Construction of Guardhouse • Construction of Fire and Raw Water Pumpstation • Rip-rap, asphalting, patrol road and marl road • Installation of SIB and Printer Building • Installation of electrical and instrumentation cables, cathodic

protection including megger testing and miscellaneous testing on cables.

• Plants piping: • Carbon steel pipes and fittings (cement lined and FBE

coated) • RTR pipes and fittings • Copper Nickel

• Sandblasting, painting and coating, cutting and beveling, welding, hydrotesting, magnetic particle and radiographic testing of pipelines.

• Installation of radar tank gauging, terminal management system.

• Precommissioning of the entire system and commissioning assistance.

6400044479

September 2000 February 2003

Page 16: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 16 of 22

66.

S. ARAMCO

SAPD/SAPPD

NEAT CONDENSATE UTILIZATION IN ABQAIQ PLANT The Work includes but is not limited to field engineering, material procurement, construction, installation, testing, pre-commissioning and commissioning assistance as necessary for the upgrading of existing plant. • Modification of Stabilizer Columns, C-11 and C-10 and

associated piping works. • Retraying of Stabilizer Columns with super fractionation trays

and associated piping works. • Re-impellering of existing bottom loading pumps and

associated piping works. • Installation of new six helical baffled heat exchangers and

associated piping works. • Modification of existing fin fan coolers and associated piping

works. • Modification of piping in the Spheroid Area and associated

piping works. • Installation of Blending Station into AL, AXL and associated

piping works. • Modification and upgrading of existing booster pumps and

associated piping works . • Installation of 2 new booster and shipper pumps and associated

piping works.. • Modification and installation of new electrical system. • Modification and installation of new instrumentation system. • Modification and installation of new Distribution Control

System (DCS), Emergency Shutdown (ESD) and Vibration Monitoring System (VMS).

6400044631

ABQAIQ

November 2001*

June 2003

67.

S. ARAMCO

NAPD/NAPPD

TIE-IN SAFY 24” NPS REPLACE WATER DISP AND WATER DISP. HEADER Work includes installation of cross country pipeline, thrust boring, cathodic protection of pipeline, Testing and commissioning of entire system.

6600004961

Safaniyah

August 2002

July 2003

Page 17: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 17 of 22

68.

S. ARAMCO

WRPD

UPGRADE FIREWATER SYSTEM Work includes design and construct the following: ♦ Installation of underground RTR piping with sizes varied from

3” to 20” diameter. ♦ Installation of above ground carbon steel cement line piping

with different sizes varied from 4” to 20”diameter. ♦ Installation of above ground fusion bonded epoxy carbon steel

piping with different sizes varied from 3” to 6” diameter. ♦ Installation of copper nickel with size 1” diameter. ♦ Replacement and addition of fire hydrants with 6” and 4”

diameter inlet. ♦ Replacement and additional fire monitors. ♦ Replacement and additional fire hose reels. ♦ Installation of cooling tank rings ♦ Install of fixed automatic spray system for hydrocarbon

pumps. ♦ Installation of cathodic protection. ♦ Installation fixed automatic spray systems on LPG stations. ♦ Installation of electrical systems. ♦ Installation of instrumentations systems. ♦ Associated civil and structural works. ♦ Testing and commissioning of the entire system.

6600006403

Jeddah Refinery and Marine Area

March 2003* March 2005

69.

S. ARAMCO

NAPD/Cogene-ration Projects

Division

MECHANICAL COGENERATION INTERFACE Uthmaniyah and Shedgum Gas Plants Works at Shedgum Gas Plant Civil Works Construct the East-West Utility Pipe Rack Pipe Bridges and Pipes Racks Pipe Supports and Sleepers Valve Platforms Pedestrian Bridge Valve Boxes and SSD Fences External and Internal Patrols and Paved Roads Pre-Engineered Warehouse Chemical Storage Building Mechanical and Piping Works Fuel Gas Lines Boiler Feed Water Headers and Carrier Pipes 30” Diameter High- Pressure Steam Headers and Manifolds

6600010635

Uthmaniyah and Shedgum Gas

Plants

April 2004 to July 2006*

Page 18: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 18 of 22

Utility and Potable Water, Fire Water Lines, Vent Lines RTR OWS/SWS Headers and Carrier Pipes Well Headers and Piping HVAC in Warehouses Electrical Works Standard Security Fence (SSD) Lighting around the Area Lighting and Grounding around the Interface Area Cable Tray in the Pipe Rack from PIB for all Electrical and Instrument Cables Re-route Overhead 13.8KV Power Lines Route Power Supply Lines to all Motor Operated Valves (MOVs) Electrical Power Supply to Two (2) Warehouses and Chemical Shelter Instrument/ Communication System Integrate New DCS and Marshalling Systems Fiber Optics Links Solenoid Valves and Motor Operated Valves Software Modifications Communications and Pager System Works at Uthmaniyah Gas Plant Civil Works Construct the East-West Utility Pipe Rack Pipe Bridges and Pipe Racks Pipe Supports and Sleepers Valve Platforms Pedestrian Bridge Valve Boxes and SSD Fences External and Internal Patrol Roads and Paved Roads Mechanical and Piping Works Fuel Gas Lines Boiler Feed Water Headers and Carrier Pipes 30” Diameter High- Pressure Steam Headers and Manifolds Utility and Potable Water, Firewater Lines, Vent Lines RTR OWS/SWS Headers and Carrier Pipes Electrical Works Standard Security Fence (SSD) Lighting around the Area Lighting and Grounding around the Interface Area Cable Tray in the Pipe Rack from PIB for all Electrical and Instrument Cables

Page 19: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 19 of 22

Re-route Overhead 13.8KV Power Lines Route Power Supply Lines to all Motor Operated Valves (MOVs) Instrumentation/ Communication Systems Integrate New DCS and Marshalling Systems Fiber Optics Link Solenoid Valves and Motor Operated Valves Software Modifications Communication and Pager Systems

70.

PRIVATE CLIENT

Construction of IMAD Company Compound consisting of 35 Villas on an 11,000 square meter tract of land adjacent to the housing complexes in the Al-Bustan areas.

Al-Khobar

Started 2003 and

Scheduled Completion Date

is 2006

71. S. ARAMCO NAPD

REPLACE OBSOLETE ELECTRICAL DISTRIBUTION EQUIPMENT- ABQAIQ PLANTS (LSTK Project) The Project shall be performed as Engineering Scope:

• Complete Detail Design • Procurement • Construction • Installation • Pre-Commissioning/ Commissioning • Documents • Spare Parts

OBJECTIVE OF BI-10-03082 PROJECT IS TO :

1. Ensure the Continuity of Electrical Operation by Replacing all of the Identified Obsolete Switchgears, MCCs, and Cables.

2. Upgrading the Protection System 3. Elimating the Safety Concern related to the Existing

Power System. ELECTRICAL SCOPE :

A. General • Electrical Equipment Installation for the New

Substation shall be in accordance with Saudi Aramco Engineering Standards SAES-P-116/119.

• All Wirings & Installations of Underground Cables shall be in accordance with Saudi Aramco Engineering Standards SAES-P-104.

6600016578 ABQAIQ

August 2006- September 2010

Page 20: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 20 of 22

• Lighting Installation shall be in accordance with Saudi Aramco Engineering Standard SAES-P-123.

• Grounding Installation shall be in accordance with Saudi Aramco Engineering Standard SAES-P-111.

B. Detail

ELECTRICAL SCOPE OF WORK SHALL INCLUDE BUT NOT LIMITED TO THE FOLLOWING: Temporary Electrical Equipment. There are two (2)- Substations need to be replace the existing Switchgear and their connecting cable duct. The two Substations namely; S/S # 15 & 24 Prior to start this work, a Cut Over Plan and Detail Installation was developed/prepared and approved by Saudi Aramco. This Cut Over Plan shall include both narrative text description which describe fully which Area/Electrical Equipment or Facilities must be shutdown and how long, so that Facilities Operation may not disturb or stop.

1. Electrical Work @ Substation No. 15 • Supply & Install Temporary 480V Outdoor

Switchgear 100-015-SG-001T and Cable Bus as shown in the attached project drawing.

2. Electrical Work @ Substation No. 24 • Supply & Install Temporary Outdoor13.8 KV

SF6 Switchgear, Pad Mounted, as shown in the attached project drawing.

3. Service Building New Substation Service Building to be Constructed as per Saudi Aramco Engineering Standards.

• Substation # 50 and # 62 The works are Lighting/ Small power System, Fire Alarm System, Communication System, Lighting System, Grounding System

Page 21: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 21 of 22

4. Switchyard The Works are New Expanded Switchyard for the new Substation # 50, Extension of 69KV Tubular Bus, Install New 69KV disconnect Switch in Switchyard # 90, Install 69KV Power Cable between S/S # 50 & 90.

5. Other Substations and PIBs • Installation of New Electrical Equipments;

Switchgears, MCCs, Transformers, High Resistance Grounding System, Auxiliary Panels, 125VDC Auxiliary Power Supply.

• Installation Circuit Breakers and Accessories in the existing 480V SWGR.

• Excavation of Electrical Trenches, Backfilling. • Installation of Counduits/Fittings & Supports • Install, splice & terminate direct buried power

cable via junction bo. • Install & terminate control cables. • Alarm System • Grounding System • Demolitions of cables, power supply, relay circuit

breakers, 125V aux. • Modification; Upgrading the protection system in

the existing switchgear. • Pre-Commissioning/Start-up/ Commissioning.

72. S. ARAMCO

NAPD INCREASE WASH WATER SUPPLY SAFANIYAH ON-SHORE PLANT Work are the following:

♦ Install 19.5 KM, 8-inch underground RTR pipeline from Tie-in point near Tanajib Community to Safaniyah Onshore Facilities SSD fence. The pipeline shall cross the Safaniyah Onshore Plant fence and shall remain underground. Transition to metallic and aboveground piping shall be near the gas compression piperack.

♦ Install 1.5 KM, 8-inch internally FBE coated underground/above ground carbon steel pipeline on existing pipe racks and pipe sleepers in Safaniyah Onshore Facilities.

♦ Install tie-in isolation valve with valve box inside Tanajib Community.

♦ Install underground 8-inch tie-in from 14-inch line outside Tanajib Community Fence.

♦ Install Thrust Anchor Blocks at change of pipeline route. ♦ Construct open cut road crossing along the pipeline route. ♦ Construct Thrust bored crossing at SSD fence at Safaniyah

On-shore Facilities. ♦ Install 2-MOVs (6-inch size) and two restricted orifice

6600016579 SAFANIYAH

August 2006 - August 2007

Page 22: IMAD COMPANY PROJECTS LIST

WORK EXPERIENCE

COMPLETED/ON-GOING PROJECTS

NO. CLIENT D E S C R I P T I O N CONTRACT NUMBER

COMMENCED/ COMPLETED

MO.-YR.

Page 22 of 22

with associated piping on inlet line to Tanajib Community Irrigation Water Tanks.

♦ Install two pumps with associated SS piping for injecting Oxygen Scavenger, Existing tank shall be used for the storage of the Oxygen Scavenger at Safaniyah Onshore Facilities.

♦ Install backflow preventer in Safaniyah Onshore Facilities. ♦ Install pipeline vents as per project drawings.

73. S. ARAMCO

Southern Area Project Division

SULFUR PLANTS UPGRADE PHASE II IN SHEDGUM AND UTHMANIYAH (EPC Project) Sulfur Plant Upgrades includes:

♦ Upgrading of ten (10) Sulfur Plants Trains (Five at SGP and Five at UGP).

Each Trains Upgrade Includes:

♦ Replacement of Converter Catalysts with Super Claus Catalysts

♦ Replacement of Claus Catalysts and Cermic Balls ♦ Installation of New Condenser, Steam Condenser and

Coalescer ♦ Installation of New Motor Driven Air Blower in some

Trains ♦ Upgrading of Existing ESD system in some trains ♦ Installation of a new control system for the entire Sulfur

Plants on existing upgraded Invensys DCS System. ♦ Provision of a new Operator Training System ♦ Installation of new 13.6 KV/4.16 KV Transformer at SGP ♦ Installation of Process Piping to Bypass the 3rd converter

system of each train ♦ Installation of Static Mixers at the inlet of the 3rd

converters for each train ♦ Installation of Hot Air and Cold Air Piping to the 3rd

Converter

6600017880 ShGP & UGP

March 2007 – April 2011 *

* = ON-GOING