Page 1: Illinois Tollway Construction Contracts 101

Illinois Tollway Construction Contracts 101

July 12, 2012

Page 2: Illinois Tollway Construction Contracts 101

2

Move Illinois Program

TAKE CARE OF EXISTING SYSTEM NEEDS

ILLINOIS ROUTE 53/120 EXTENSION

JANE ADDAMS MEMORIAL TOLLWAY

(I-90)

ELGIN O’HARE WEST BYPASS

I-294/I-57 INTERCHANGE

ILLIANA EXPRESSWAY

Page 3: Illinois Tollway Construction Contracts 101

3

Tollway Construction Contracts 101

} Webinar purpose } Presenters } Materials covered } Materials not covered } Questions and answers

Page 4: Illinois Tollway Construction Contracts 101

4

How To Do Business with the Tollway

} Getting started with construction contracts } Accessing required documents } Understanding bid process and contract documents } Submitting your bid

Page 5: Illinois Tollway Construction Contracts 101

5 5

Goods and Services

} Opportunities posted at www.purchase.state.il.us } Illinois Procurement Bulletin (IPB)

Page 6: Illinois Tollway Construction Contracts 101

6 6

Bid Letting Schedule

Page 7: Illinois Tollway Construction Contracts 101

7

Tollway Contract Process Timeline

Springfield Notice to proceed/construction begins

BID OPENING

Prior to Bid Opening After Bid Opening

Advertisement of Bids Duration: 2-6 weeks

Pre-Bid Meeting

Contract Addenda/Addendum Up to 5 days before bid

Tollway Board Approval Duration: Up to 30 days

Conditional Notice of Award Duration: 2-4 weeks

Procurement Policy Board Duration 4-6 weeks

Page 8: Illinois Tollway Construction Contracts 101

8 8

Notification of IPB Bid Opportunities

} Email notifications www.purchase.state.il.us

Page 9: Illinois Tollway Construction Contracts 101

9

Tollway Bid Opportunities and Resources

} www.illinoistollway.com/doing-business

Page 10: Illinois Tollway Construction Contracts 101

10 10

Locating the Documents

Online access–www.illinoistollwayplanroom.com

Accurate Repro 630-428-4433

Ask for “Plan Room”

There is no charge to view some of the source documents, but there is a charge to print contract documents for bidding purposes

Page 11: Illinois Tollway Construction Contracts 101

11

Register to Access Documents

} www.illinoistollwayplanroom.com

Page 12: Illinois Tollway Construction Contracts 101

12

Inside the Plan Room

Page 13: Illinois Tollway Construction Contracts 101

13

Inside the Plan Room

Page 14: Illinois Tollway Construction Contracts 101

14

Pay Items List (P-Pages)

Page 15: Illinois Tollway Construction Contracts 101

15

Prequalification–Registration and Authorization

} Illinois Department of Transportation

} www.dot.state.il.us/const/ prequalapp.html

} 217-782-3413

Prequalification must be maintained each year. The State of Illinois has requirements that must

be met or updated on a regular schedule.

Page 16: Illinois Tollway Construction Contracts 101

16

Multi-project Labor Agreement

} Contractors and subcontractors must be signatory } Bargaining agreements must be filed with Tollway } Wage stipulations require: § Union employees § Pay prevailing union wages

Page 17: Illinois Tollway Construction Contracts 101

17

Diversity and Strategic Development Increasing economic opportunity § Minority-owned

§ Women-owned

§ Disadvantaged businesses

§ Historically under-employed individuals

Page 18: Illinois Tollway Construction Contracts 101

18 18

Current Diversity Efforts

} Focus Groups } Unbundling efforts § Contracts under $5 million

} Communicate Opportunities § Email alerts

} Community outreach § Plans and specifications to assist

agencies § Networking events

Page 19: Illinois Tollway Construction Contracts 101

19

Recognized DBE Certifications

Page 20: Illinois Tollway Construction Contracts 101

20

Certification Assist Agencies } Alliance of Business Leaders & Entrepreneurs

(ABLE) } Federation of Women Contractors } American Brotherhood of Contractors Business

Development Center } Asian American Institute } Association of Asian Construction Enterprises } Black Contractors United } Chatham Business Association Small Business

Development, Inc. } National Association of Women Business

Owners } Rainbow/PUSH Coalition } Suburban Minority Contractors Association } Uptown Center Hull House } Women Construction Owners & Executives } Women’s Business Development Center

} Chicago Area Gay & Lesbian Chamber of Commerce

} Chicago Minority Supplier Development Council, Inc.

} Chicago Urban League } Cosmopolitan Chamber of Commerce } Federation of Women Contractors } Hispanic American Construction Industry

Association } Illinois Hispanic Chamber of Commerce } Chicago Women in Trades (CWIT) } Coalition for United Community

Labor Force } Englewood Black Chamber of Commerce } South Shore Chamber, Incorporated } United Neighborhood Organization (UNO) } National Organization of Minority

Engineers

www.cityofchicago.org

Page 21: Illinois Tollway Construction Contracts 101

21

Diversity and Strategic Development

} Disadvantaged Business Enterprise (DBE) } Equal Employment Opportunity (EEO) Program } Earned Credit Program (ECP)

Page 22: Illinois Tollway Construction Contracts 101

22

Disadvantaged Business Enterprise (DBE)

The DBE program includes DBE/MBE/WBE

} DBE contract goals } Utilization plans and certifications } Reviews contractors’ DBE payments } Tracks and compiles actual DBE participation data § Form 2114 § Form 0003

Page 23: Illinois Tollway Construction Contracts 101

23

Equal Employment Opportunity Program

Monitoring and Reporting

} Weekly certified payroll reports § Achieve established EEO goals

(19.6 percent minority/6.9 percent female)

} Periodic site visits § Confirm presence of reported workforce

} Referrals § Assistance meeting workforce goals–referrals

Page 24: Illinois Tollway Construction Contracts 101

24

Earned Credit Program

} Rewards initiative } Bid credits

} Diversify and expand the pool of individuals doing business with the Illinois Tollway } [email protected]

Example: Operating Engineer

$39.75 hourly wage

2,080 hours/year

$82,680 yearly wages

50% ECP percentage

$41,340 ECP credit

Page 25: Illinois Tollway Construction Contracts 101

25

Definition and Types of Bonds

} Contract Bonds § Bid Bonds-guarantees bid reliability § Performance Bonds–secure the contractor’s performance § Payment Bonds–secure payment of labor and materials

Page 26: Illinois Tollway Construction Contracts 101

26

Indemnification

} Claims arising from the work under the contract } Expenses incurred in the defense of Tollway claims

or suits

To the fullest extent permitted by law, the Contractor shall indemnify and save harmless the Tollway, its directors, officers, employees, agents and its Consulting Engineer, and the State of Illinois from any and all claims, suits, actions, costs and fees of every nature or description, arising from, growing out of, or connected with the work to be performed under this Contract.

Page 27: Illinois Tollway Construction Contracts 101

27 27

Scope of Insurances Contractor and Subcontractor* } Commercial General Liability } Business Automobile Liability } Worker’s Compensation Insurance } Excess/Umbrella Liability } Builder’s Risk Insurance } Railroad Insurance (as required) } Other special insurance (as required) * limits of coverage for subcontractors will be determined by contractor

Page 28: Illinois Tollway Construction Contracts 101

28 28

Minimum Limits of Liability

} Commercial General Liability § Not less than $1 million per occurrence and $2 million annual

general aggregate § Endorsed on a per-project basis § Coverage maintained for two years minimum

Page 29: Illinois Tollway Construction Contracts 101

29 29

Minimum Limits of Liability

} Commercial General Liability } Business Automobile Liability § Minimum of $1 million combined single limit per occurrence

Page 30: Illinois Tollway Construction Contracts 101

30 30

Minimum Limits of Liability

} Commercial General Liability } Business Automobile Liability } Worker’s Compensation § Illinois State required statutory limits § $1 million per accident employer’s liability

Page 31: Illinois Tollway Construction Contracts 101

31 31

Minimum Limits of Liability

} Commercial General Liability } Business Automobile Liability } Worker’s Compensation } Excess/Umbrella Liability § Not less than $25 million per occurrence and in annual

aggregate

Page 32: Illinois Tollway Construction Contracts 101

32 32

Minimum Limits of Liability

} Commercial General Liability } Business Automobile Liability } Worker’s Compensation } Excess/Umbrella Liability } Builder’s Risk Insurance § Contractor obtains for term of contract § Must meet General Provisions requirements § Policy limit equal to original contract award amount

Page 33: Illinois Tollway Construction Contracts 101

33 33

Starting the Bid Process

} Understand the bid documents § “Bid what is in the contract”

} Engineering contract documents § Plans (including Standards) § Contract Requirement Book(s) § Tollway specifications § IDOT specifications § Manuals included in contract § Addenda

Page 34: Illinois Tollway Construction Contracts 101

34

Engineering Contract Documents

} Contract plans

Page 35: Illinois Tollway Construction Contracts 101

35 35

Engineering Contract Documents

Contract Requirements Book “Orange Book”

Page 36: Illinois Tollway Construction Contracts 101

36

Engineering Contract Documents Page A-1 (Project Summary ) Page

Sealed bid date

Pre-bid meeting

Contract start and completion dates

Description of work

How to obtain contract plans, special provisions, and

other contract documents

Contract questions, contract information, and deadline

dates

Page 37: Illinois Tollway Construction Contracts 101

37

Engineering Contract Documents

} Addenda

Page 38: Illinois Tollway Construction Contracts 101

38

Engineering Contract Documents

} Standard drawings

Page 39: Illinois Tollway Construction Contracts 101

39

Engineering Contract Documents

} Specifications

Page 40: Illinois Tollway Construction Contracts 101

40

Hierarchy of Contract Documents

Special Provisions

Plans

Tollway Supplemental Specifications

IDOT Recurring Special Provisions

IDOT Supplemental Specifications

Standard Specifications

Page 41: Illinois Tollway Construction Contracts 101

41

Engineering Contract Documents–Manuals

} Contractor’s Quality Program Manual

Page 42: Illinois Tollway Construction Contracts 101

42

Engineering Contract Documents–Manuals

} Roadway Traffic Control and Communications Manual

Page 43: Illinois Tollway Construction Contracts 101

43

Engineering Contract Documents–Manuals

} Lane Closure Reference Guide

Page 44: Illinois Tollway Construction Contracts 101

44

NPDES Permit ILR40

Page 45: Illinois Tollway Construction Contracts 101

45

Engineering Contract Documents–Manuals

} Erosion and Sediment Control, Landscape Design Criteria

Page 46: Illinois Tollway Construction Contracts 101

46 46

ESC Manual–Contractor Responsibilities

} Coordinating the Pre-Construction Erosion Sediment Control (ESC) Meeting

Page 47: Illinois Tollway Construction Contracts 101

47 47

ESC Manual–Contractor Responsibilities

} Coordinating the Pre-Construction Erosion Sediment Control (ESC) Meeting } Providing trained inspectors to conduct the ESC

inspections

Page 48: Illinois Tollway Construction Contracts 101

48 48

ESC Manual–Contractor Responsibilities

} Coordinating the Pre-Construction Erosion Sediment Control (ESC) Meeting } Providing trained inspectors to conduct the ESC

inspections } Identifying the need for ESC maintenance

Page 49: Illinois Tollway Construction Contracts 101

49 49

ESC Manual–Contractor Responsibilities

} Coordinating the Pre-Construction Erosion Sediment Control (ESC) Meeting } Providing trained inspectors to conduct the ESC

inspections } Identifying the need for ESC maintenance } Identifying the need for changes in the ESC plan

Page 50: Illinois Tollway Construction Contracts 101

50 50

ESC Manual–Contractor Responsibilities

} Coordinating the Pre-Construction Erosion Sediment Control (ESC) Meeting } Providing trained inspectors to conduct the ESC

inspections } Identifying the need for ESC maintenance } Identifying the need for changes in the ESC plan } Developing the Storm Water Pollution Prevention Plan

Page 51: Illinois Tollway Construction Contracts 101

51

Contract Warranty/Surety

} Warranty against defective work } All contract work items § Period of one year

} Surety Bond } Contractor Guarantee

Page 52: Illinois Tollway Construction Contracts 101

52

Contractor Warranty

} Special Provision } Contract Bid Pay Item } Maintenance Bond

Page 53: Illinois Tollway Construction Contracts 101

53

Manufacturer’s Warranty

} Warranty on specified systems and materials…for duration period specified

Page 54: Illinois Tollway Construction Contracts 101

54

Review

} Prequalification } Bonding, indemnification, insurance } DBE requirements } Contract documents

Page 55: Illinois Tollway Construction Contracts 101

55

Bid Submittal Requirements

Contractors } Submit Certification/Financial Disclosure forms

(conflicts of interest)

Page 56: Illinois Tollway Construction Contracts 101

56

Bid Submittal Requirements

Contractors } Submit financial and conflicts of interest } Delinquent debt certification

Page 57: Illinois Tollway Construction Contracts 101

57

Bid Submittal Requirements

Contractors } Submit financial and conflicts of interest } Delinquent debt certification } Re-certification for multi-year projects

Page 58: Illinois Tollway Construction Contracts 101

58

Bid Submittal Requirements

Contractors } Submit financial and conflicts of interest } Delinquent debt certification } Re-certification for multi-year projects } Copy of all subcontracts, values exceed $25,000

Page 59: Illinois Tollway Construction Contracts 101

59

Bid Submittal Requirements

Contractors } Submit financial and conflicts of interest } Delinquent debt certification } Re-certification for multi-year projects } Copy of all subcontracts, values exceed $25,000 } Subcontractor Agreement with Subcontractor

Certification Disclosure

Page 60: Illinois Tollway Construction Contracts 101

60

Qualifications of Bidder

s

Page 61: Illinois Tollway Construction Contracts 101

61 61

Disqualifiers

Two Public Acts § PA 095-971 establishes certain registration requirements and

campaign contribution restrictions for state vendors and bidders

§ PA 096-795 makes significant revisions to the Illinois Procurement Code and places new requirements on vendors and bidder

Page 62: Illinois Tollway Construction Contracts 101

62

Bid Communication Requirements

Page 63: Illinois Tollway Construction Contracts 101

63

Disqualifiers

Page 64: Illinois Tollway Construction Contracts 101

64 64

} Two public acts § PA 096-795 makes significant revisions to the Illinois

Procurement Code and places new requirements on vendors and bidders

§ PA 095-971 establishes certain registration requirements and campaign contribution restrictions for state vendors and bidders

} Prohibited bidders and contractors } Omission of the following–Disclosures, Board of Elections,

Anticipated Subcontractors

Disqualifiers

Page 65: Illinois Tollway Construction Contracts 101

65

Subcontractor Considerations

} Subcontractor’s must be approved } Contractor’s self-performance must be more than 35% } Subcontractor cannot have delinquent debt } D/M/WBE firm must maintain valid certification

Page 66: Illinois Tollway Construction Contracts 101

66 66

Preparing a Bid

} Bid process and procedures } What’s included in a bid: § Administration § Contingencies § Safety § All inclusive (Expect no change orders) § Profit

Page 67: Illinois Tollway Construction Contracts 101

67

Pay Items List (P-Pages)

Page 68: Illinois Tollway Construction Contracts 101

68

Bid Question and Answer Opportunities

} Pre-bid meeting

Page 69: Illinois Tollway Construction Contracts 101

69

Bid Question and Answer Opportunities

} Pre-bid meeting } Other opportunities to ask questions

Page 70: Illinois Tollway Construction Contracts 101

70

Bid Question and Answer Opportunities } Pre-bid meeting } Other opportunities to ask questions } Community Resources for responding to bids § African American Contractors Association § Black Contractors United § Chicago Minority Supplier Developer Center § Chicago Urban League § Federation of Women Contractors § Hispanic American Construction Industry Association § Illinois Hispanic Chamber of Commerce § Latin American Chamber of Commerce § Rainbow Push Coalition § Rock Valley College/Procurement Technical Assistance Center § Suburban Minority Contractors Association

Page 71: Illinois Tollway Construction Contracts 101

71

Resources for Responding to Bids } ILLINOIS PTAC AT COLLEGE OF DUPAGE

Lisle, Illinois 630/942-2184

} ILLINOIS PTAC AT NORTH BUSINESS & INDUSTRIAL COUNCIL (NORBIC) Chicago, Illinois 773/594-9292

} ILLINOIS PTAC AT ILLINOIS HISPANIC CHAMBER OF COMMERCE (IHCC) Chicago, Illinois 312/492-9960 Provides services to all Illinois-based businesses and is not limited to Hispanic-owned businesses

} ILLINOIS PTAC AT WOMEN’S BUSINESS DEVELOPMENT CENTER (WBDC) Chicago, Illinois 312/853-3477 Provides services to all Illinois-based businesses and is not limited to women-owned businesses

} ILLINOIS PTAC AT COLLEGE OF LAKE COUNTY Grayslake, Illinois 847/543-2025

} ILLINOIS PTAC AT ROCK VALLEY COLLEGE Rockford, Illinois 815/921-2091

} ILLINOIS PTAC AT HEARTLAND PARTNERSHIP Peoria, Illinois 309-495-5907

} ILLINOIS PTAC AT BLACK HAWK COLLEGE Moline, Illinois 309/797-2806

www.ildceo.net

Page 72: Illinois Tollway Construction Contracts 101

72 72

Competency of Bidders

} Statement of experience and financial condition

Page 73: Illinois Tollway Construction Contracts 101

73 73

Competency of Bidders

} Statement of experience and financial condition } Sworn statement identifying key management and

supervisory personnel

Page 74: Illinois Tollway Construction Contracts 101

74 74

Competency of Bidders

} Statement of experience and financial condition } Sworn statement identifying key management and

supervisory personnel } Proposed subcontracted portions

Page 75: Illinois Tollway Construction Contracts 101

75 75

Competency of Bidders

} Statement of experience and financial condition } Key management and supervisory personnel } Proposed sublet portions } Value of uncompleted work

Page 76: Illinois Tollway Construction Contracts 101

76 76

Bidder’s Certificate of Eligibility

} The following conditions apply: } Financial rating: § Equal or exceed–total estimated project value

} Contractor appropriate work ratings § 50 percent minimum–estimated project cost

Page 77: Illinois Tollway Construction Contracts 101

77 77

Proposal Requirements and Conditions

} Submit on Tollway furnished Proposal Form } Acceptance conditioned on bidder furnishing Contract

Bonds executed by a Surety } Proposal § Individual § Partnership § Corporation § Joint Venture

Page 78: Illinois Tollway Construction Contracts 101

78 78

Proposal Guaranty

} Mandatory inclusion in proposal } Guaranty in the amount equal to 5 percent of the total

proposal amount } Payable to the order of the Tollway § Bank draft § Cashier’s check § Certified check § Bid Bond

Page 79: Illinois Tollway Construction Contracts 101

79 79

Contractor

} Contractor § Meet prerequisites § Comply with all requirements § Secure bonding, indemnification and insurance § Prepare all documents

Page 80: Illinois Tollway Construction Contracts 101

80 80

Subcontractors “Tips”

} Select an area of focus

Page 81: Illinois Tollway Construction Contracts 101

81 81

Subcontractors “Tips”

} Select an area of focus } Know scope and quote all items

Page 82: Illinois Tollway Construction Contracts 101

82 82

Subcontractors “Tips”

} Select an area of focus } Know scope and quote all items } Understand DBE paperwork

Page 83: Illinois Tollway Construction Contracts 101

83 83

Subcontractors “Tips”

} Select an area of focus } Know scope and quote all items } Understand DBE paperwork } Know the schedule

Page 84: Illinois Tollway Construction Contracts 101

84 84

Subcontractors “Tips”

} Select an area of focus } Know scope and quote all items } Understand DBE paperwork } Know the schedule } Contact the Project Manager with questions

Page 85: Illinois Tollway Construction Contracts 101

85 85

Subcontractors “Tips”

} Select an area of focus } Know scope and quote all items } Understand DBE paperwork } Know the schedule } Contact the Project Manager with questions } Attend the pre-bid meeting

Page 86: Illinois Tollway Construction Contracts 101

86 86

Subcontractors “Tips”

} Select an area of focus } Know scope and quote all items } Understand DBE paperwork } Know the schedule } Contact the Project Manager with questions } Attend the pre-bid meeting } Submit final questions

Page 87: Illinois Tollway Construction Contracts 101

87 87

Subcontractors “Tips”

} Select an area of focus } Know scope and quote all items } Understand DBE paperwork } Know the schedule } Contact the Project Manager with questions } Attend the pre-bid meeting } Submit final questions } Download a plan holders list

Page 88: Illinois Tollway Construction Contracts 101

88 88

Respond to Bid

} Sealed bids

Page 89: Illinois Tollway Construction Contracts 101

89 89

Respond to Bid

} Sealed bids } Lowest responsive and responsible bid awarded

Page 90: Illinois Tollway Construction Contracts 101

90 90

Respond to Bid

} Sealed bids } Lowest responsive and responsible bid awarded } You won the bid… Now what?

Page 91: Illinois Tollway Construction Contracts 101

91 91

Review

} Prequalification } Bonding, indemnification and insurance } DBE requirements } Contract documents } Final bid submittal } Sample Contract Requirement Book § also known as the “Orange Book”

Page 92: Illinois Tollway Construction Contracts 101

92 92

Disclaimer } The Illinois Tollway presents this webinar solely as a courtesy to the construction

contractor community. With respect to this presentation, the Tollway states the following: i. it contains only general information from the Tollway and is not directed at any individual

party (or parties), nor with respect to any particular solicitation for service to the Tollway;

ii. it is not intended to be relied upon, other than for general informational purposes, when submitting a response to a formal solicitation;

iii. it is not presented to impart legal advice to any party, and the Tollway recommends that any party consult its own attorney or other advisor(s) prior to submitting a bid;

iv. the laws, regulations and Tollway practices mentioned in this presentation are for informational purposes only, subject to change at any time, and may be interpreted or applied in manners differently than as presented herein; and

v. the Tollway assumes no duty to update any party, and therefore no party should expect to receive same, regarding any change or development in laws, regulations or Tollway practices.

} In addition to the foregoing, the Tollway specifically informs all parties that their participation in this webinar, or review of this presentation, shall have no bearing on or guarantee of award of future business from the Illinois Tollway.”

Page 93: Illinois Tollway Construction Contracts 101

THANK YOU THANK YOU

Page 94: Illinois Tollway Construction Contracts 101

94

Helpful Resources } www.illinoistollway.com

} www.dot.state.il.us

} www.cityofchicago.org

} www.aptac-us.org

} www.ildceo.net

Illinois Tollway

Illinois Department of Transportation

City of Chicago

Association of Procurement Technical Assistance Centers

Illinois Department of Commerce and Economic Opportunity