1 Global Design Effort - CFS Global Design Effort - CFS 11-17-08 11-17-08 ILC 08 CFS Parallel Sessions ILC 08 CFS Parallel Sessions ILC 08 ILC 08 CONVENTIONAL FACILITIES CONVENTIONAL FACILITIES AND SITING GROUP AND SITING GROUP Introduction to Process Cooling Water Introduction to Process Cooling Water and HVAC Review Parallel Session and HVAC Review Parallel Session V. Kuchler V. Kuchler

Upload: irene-horton

Post on 30-Dec-2015

25 views

Category:

Documents


0 download

DESCRIPTION

ILC 08 CONVENTIONAL FACILITIES AND SITING GROUP Introduction to Process Cooling Water and HVAC Review Parallel Session V. Kuchler. Process Cooling Value Engineering VE Workshop Conducted at FNAL in Nov 2007 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ILC 08 CONVENTIONAL FACILITIES AND SITING GROUP Introduction to Process Cooling Water

1

Global Design Effort - CFSGlobal Design Effort - CFS

11-17-0811-17-08ILC 08 CFS Parallel SessionsILC 08 CFS Parallel Sessions

ILC 08ILC 08

CONVENTIONAL FACILITIESCONVENTIONAL FACILITIESAND SITING GROUPAND SITING GROUP

Introduction to Process Cooling WaterIntroduction to Process Cooling Waterand HVAC Review Parallel Sessionand HVAC Review Parallel Session

V. KuchlerV. Kuchler

Page 2: ILC 08 CONVENTIONAL FACILITIES AND SITING GROUP Introduction to Process Cooling Water

2

Global Design Effort - CFSGlobal Design Effort - CFS

11-17-0811-17-08ILC 08 CFS Parallel SessionsILC 08 CFS Parallel Sessions

Process Cooling Value EngineeringProcess Cooling Value Engineering• VE Workshop Conducted at FNAL in Nov 2007VE Workshop Conducted at FNAL in Nov 2007• Several Ideas were Discussed for Alternatives Several Ideas were Discussed for Alternatives

to RDR Process Cooling Water Designto RDR Process Cooling Water Design• Adjustments to Process Cooling Design has an Adjustments to Process Cooling Design has an

Effect on HVAC Design as wellEffect on HVAC Design as well• Alternatives were Prioritized and Work BeganAlternatives were Prioritized and Work Began • Then December Budget Difficulties Greatly Then December Budget Difficulties Greatly

Reduced the Resources Needed to Reduced the Resources Needed to ContinueContinue• Work Did Continue (at a Slower Pace)Work Did Continue (at a Slower Pace)• Eventually all Identified Alternatives were Eventually all Identified Alternatives were Investigated and EvaluatedInvestigated and Evaluated

Page 3: ILC 08 CONVENTIONAL FACILITIES AND SITING GROUP Introduction to Process Cooling Water

3

Global Design Effort - CFSGlobal Design Effort - CFS

11-17-0811-17-08ILC 08 CFS Parallel SessionsILC 08 CFS Parallel Sessions

Process Cooling Value Engineering cont.Process Cooling Value Engineering cont.• Klystron Cluster Alternative was Investigated after Klystron Cluster Alternative was Investigated after

the Dubna ILC Meetingthe Dubna ILC Meeting• The CFS Group did Evaluate this Alternative and The CFS Group did Evaluate this Alternative and

Provided Resulting Cost AnalysisProvided Resulting Cost Analysis• Klystron Cluster Alternative Requires R&D and Klystron Cluster Alternative Requires R&D and DemonstrationDemonstration• A Back-up Design Solution Needs to be A Back-up Design Solution Needs to be

Selected in the Unlikely Event that the Selected in the Unlikely Event that the Klystron Klystron Cluster Alternative does not Prove Cluster Alternative does not Prove ViableViable• That is the Object of this Parallel SessionThat is the Object of this Parallel Session