セ@ ikocckocc.sa/public/static/1520687271_job_references.pdf · 2018-03-10 · construction...

106
I KOCC Construction Chemical Applications d...11 9 Kingdom Oasis Contracting Co. Job References

Upload: others

Post on 12-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

セ@

IKOCC Construction Chemical Applications

セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@

Kingdom Oasis Contracting Co. Job References

Page 2: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

1

Location

Jubail

Jubail

Khobar

Dammam

Jubail

Dammam

Dammam

Khobar

Hasa

Jubail

Jubail

Jubail

Qatif

King F. Airport

Ras Tanoura

Ras Tanoura

Ras Tanoura

Khobar

Khobar

Khobar

Khobar

Jubail

Jubail

Jubail

Khobar

Jubail

Jubail

Khobar

Jubail

Dammam

Khobar

Khobar

Unit

M2

M2

M2

M2

M2

Packers

M2

M2

M2

Packers

Foundations

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

Packers

LM

M2

Packers

M2

M2

Packers

M2

M2

M2

Job Type

Epoxy Floor Coating

Epoxy Floor Coating

Epoxy Floor Coating

Epoxy Floor Coating

Self-leveling

Crack Injection

Epoxy Floor Coating

Epoxy Floor Coating

Tanks lining

Crack Injection

Foundations Waterproofin

Epoxy Floor Coating

Epoxy Floor Coating

Epoxy Floor Coating

Walls Waterproofin

Epoxy Floor Coating

Self-leveling

Anti-Carbonation

Epoxy Floor Coating

Tanks lining

Self-leveling

Fiber Glass Lining

Crack Injection

Concrete Repair, Crack Inject

Heavy Duty Car Park System

Crack Injection

Walls Waterproofin

Epoxy Floor Coating

Crack Injection

Epoxy Floor Coating

Epoxy Floor Coating

Self-leveling

Self-leveling

Self-leveling

Qty.

1,5007,0001,0004,0002,0001,2001,0007008,0001,0003771,0004,5002,0001,5005,0005,50013,5008,0002502,0003005001,0007,0002,3201,0001,0001,5432,1007801,000

JOB REFERENCE

Contractor

M.M. Al-Harbi & Partners Contracting Co. Ltd.

Al Mulhim Steel Buildings

El-Tawil Contracting

Saudi Icon Constriction

Al Mulhim Steel Buildings

SYSTECH

Al Wefag

El-Tawil Contracting

ACWA L.L.C

Sadim United

Secutronic

Atlas Copco

Al Mutawa Contracting

Rimal for Treading & Contracting

Rezayat Co. Ltd

Rezayat Co. Ltd

Rezayat Co. Ltd

Asmael General Contracting

Al Rashid Treading & Contracting Co.

Ahmed Bin Aif

Ahmed Bin Aif

Saudi Kier Construction

Arabian Consolidated Construction

SHMOUKH AL-BARZ GEN. CONT. EST.

Asmael General Contracting

Khonini International

Saudi Services for Electro-Mechanic Works

Noor Advanced Contracting Company

TEKFEN

Al-Id Trading & Cont. Est

Lizwan Real State

Lizwan Real State

Al Arwanan Contracting company

Batook Chewing Gum Ind. Ltd.

Project

712-C05 (BECHTEL)

Al Fanar Factory

Workshop

Paxxal Factory

Al Fanar Factory

2nd Phase Sanitation

Al Wefag Warehouse

Salsabil Arabia Workshop

SANG Housing (Natl.Guard)

Commercial Building

SADARA

ATLAS Warehouse

Al Taraji Sports Club

UPS Warehouse

380/230 KV Substation

380/230 KV Substation

380/230 KV Substation

Centro Rotana Hotel

Al Rashid Towers

Tank

Warehouse

Mutraiah Housing (BECHTEL)

Commercial Building

Petrokemya ABS (SABIC)

Centro Rotana Hotel

Dev. of Down Stream Industrial

138/115 KV Substation

Retal Squre

Propylene Oxide (SADARA)

Al Reem Tower

Al-Kahmous Food Cort

Al-Kahmous Food Cort

Amiantit Factory

Batook Factory

Dammam

Dammam2,356750

M2

M2

Page 3: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

2

Location

Jubail

Jubail

Dammam

Jubail

Khobar

Dhahran

Dammam

Dammam

Hasa

Yanbu

Yanbu

Yanbu

Jeddah

Jeddah

Khobar

Khobar

Khobar

Dammam

Jubail

Jubail

Jubail

Dammam

Dammam

Dammam

Dammam

Dammam

Dammam

Dammam

Unit

M2

Packers

M2

M2

M2

Packers

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

LM

M2

M2

M2

M2

M

M2

M2

M2

Job Type

Walls Waterproofing

Crack Injection

Self-leveling

Concrete Repair

Epoxy Floor Coating

Crack Injection

Epoxy Floor Coating

Self-leveling

Self-leveling

Concrete finishing

Steel fibers technique Epoxy

Floor Coating

Self-leveling

Concrete Repair

Self-leveling

Walls Waterproofing

Epoxy Floor Coating Concrete

Repair

Structural Screed

Polyurethane Flooring System

Self-leveling

Epoxy Floor Coating Concrete

Repair

Structural Screed

Epoxy Floor Coating

Self-leveling

Self-leveling

Epoxy Floor Coating

Joint Sealant

Epoxy Floor Coating

Concrete Repair

Epoxy Floor Coating

Epoxy Floor Coating

Epoxy Wall Coating

Qty.

8202701,120201,2003601,2001,3001,3002,0002,0002,00010,0002,2006,5003,0005,5003,50010,000

10,000

1,0001,76050

1,2001,2001,1004,00011,0003,5008,0002,7001300

JOB REFERENCE

Contractor

Spectrum Engineering Solutions, Inc

Rock drillers foundation

Al-Kawaser united Co

Saudi Binladen Group

BUILD ARABIA CONTRACTING EST.

Azmeel Cont. Company.

Aba Husain For Power & Energy .

Aba Husain For Power & Energy .

Aba Husain For Power & Energy .

Al-Direa Al-Arabie.

Al-Direa Al-Arabie.

Al-Direa Al-Arabie.

Tania Bottled Water Factory

Tania Bottled Water Factory

Saudi Services for Electro-Mechanic

Saudi Services for Electro-Mechanic

Saudi Services for Electro-Mechanic

Saudi Services for Electro-Mechanic

Project

115/13.8 KV Substation

Marriot Hotel

115/13.8 KV Al-Khodariah Substation

Saudi Railway (SAR)

Almajdouie Motors "Changan car"

1085-ARAMCO-SOUTHE DH-HOME

115/13.8 KV Faisaliah Substation

115/13.8 KV Faisaliah Substation

115/13.8 KV Ain Morjan Substation

Saudi Carbonate Factory

Saudi Carbonate Factory

Saudi Carbonate Factory

Turook Al-Hazm

Turook Al-Hazm

DM Housing 380/230 KV Substation

DM Housing 380/230 KV Substation

DM Housing 380/230 KV Substation

DM Housing 380/230 KV Substation

Autism Center

Autism Center

Aryaf Bakeries

Shahini Fridge

Villa

Fire station

Fire station

Sahara Commercial

Almajdouie Steel Industries Factory

Almajdouie Steel Industries Factory

Almajdouie Steel Industries Factory

Al-Ajlan Tower

Al-Ajlan Tower

Basamah Fridge

Jubail Existing 3s Center

Jubail Existing 3s Center

Gulf Icon Contracting

Gulf Icon Contracting

Majd Real Estate

Professional Application Gen. Cont

Asas Al Jubail Contracting Est.

China Railway 18th Bureau Group Co.

China Railway 18th Bureau Group Co.

Professional Application Gen. Cont.

Silicon Trading and Contractig

Silicon Trading and Contractig

Silicon Trading and Contractig

Nawafeth Consulting Group

Nawafeth Consulting Group

Professional Application Gen. Cont

Abdul Latif Jameel Lands Co. Ltd.

Abdul Latif Jameel Lands Co. Ltd.

Jubail 2,300 M2

700 MJubail

Page 4: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

3

Project: 380/230 KV Substation

Client: SEC

Main Contractor: National Contracting Co.

Contractor: Rezayat Co. Ltd.

Location: Juaymah

Execution Date: May 2015

Material Used: Nitoflor EPU10Nitoflor SL300Nitocote CM210

Quantity: 13,000 M2

CASE STUDY

Page 5: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

4

PROJECT BACKGROUND

The Saudi Electricity Company (SEC) plans to construct a bulk supply point in Juaymah, Ras Tanura, Eastern Province, Saudi Arabia.

The purpose of the project is to meet the rise in demand for electricity in the region.

OFFERED SERVICE

Kingdom Oasis Contracting has proposed to apply a complete package of industrial flooring and waterproofing system for the wall

Our scope of work included the preparation of the concrete substrate (walls and floors) to ensure perfect application of the flooring and waterproofing materials

A total of 3 coats have been applied for walls waterproofing, 2 coats of Polyurethane flooring system, and a 3 MM epoxy self-leveling

VALUE TO CLIENT

Our dedicated team of engineers and workers have accomplished all the requested work on time and with top quality to meet SEC expectations.Moreover, all requests from our client have been fulfilled immediately with-out any delay.

PROJECT DETAILS

Page 6: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

5

PROJECT PHOTOS

Concrete substrate before surface preparation for Waterproofing

Surface preparation and concrete repair

Page 7: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

6

Final coat of Nitocote CM210

PROJECT PHOTOS

Application of first coat

Page 8: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

7

PROJECT PHOTOS

Surface preparation for Epoxy Polyurethane application

Application of first coat

Page 9: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

8

Final Coat of Nitoflor EPU100

PROJECT PHOTOS

Page 10: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

9

PROJECT PHOTOS

Surface preparation for Self-Leveling application

Application of primer

Page 11: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

10

PROJECT PHOTOS

Application of Self-Leveling

Page 12: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

11

BEFORE & AFTER

Page 13: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

12

BEFORE & AFTER

Page 14: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

13

Project: SANG Housing Project

Client: National Guard

Consultant: National Contracting Co.

Contractor: Bin Laden – Arabtec L.L.C

Sub-Contractor: ACWA L.L.C

Location: Al – Hasa

Execution Date: March 2014 Material Used: Nitocote EPU Nitomortar TC2000

Quantity: 8,000 M2

CASE STUDY

Page 15: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

14

PROJECT BACKGROUND

The Villas Housing Project is a residential development consisting of 5,000 Villas of Type “A and B” (G + 2) including complete Infrastructure Works, located in the Eastern Province of the Kingdom of Saudi Arabia (KSA).

The Villas Housing Site is divided into five (5) developments with a total housing Built up Area of approximately 1.6 million m² and a total site area of around 6 million m².

OFFERED SERVICE

Kingdom Oasis Contracting has offered to apply a concrete protective coat-ing system for sewage water tank to protect the concrete substrate.

Our scope of work included the preparation of the concrete substrate and repairing all the cracks and honeycombs to ensure good quality of protec-tive coatings application.

VALUE TO CLIENT

Our professional engineers and workforce have shown a great deal of com-mitment to deadlines and quality, as the project was delivered to our client within 35 days.

PROJECT DETAILS

Page 16: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

15

Concrete substrate before surface preparation

PROJECT PHOTOS

Concrete substrate after grinding & full lining of Epoxy putty

Page 17: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

16

PROJECT PHOTOS

Touch up repair between the 1st and 2nd coat

Structure after the application of final coat

Page 18: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

17

BEFORE & AFTER

Page 19: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

18

Project: AL TARAJY SPORTS CLUB

Client: General Presidency of Youth Welfare

Contractor: : Al Mutawa Treading & General Contracting Co.

Location: Qatif

Execution Date: March 2015 Material Used: Nitoflor EPU10

Quantity: 4,500 M2

CASE STUDY

Page 20: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

19

PROJECT BACKGROUND

The project is comprised of unique sport facilities that will raise sporting ability in Saudi Arabia.

With several halls and training grounds that feature modern technologies, the facilities entail a qualitative shift in the Saudi sport landscape.

OFFERED SERVICE

Kingdom Oasis Contracting has proposed a system that includes ce-ment-based repair mortars for honeycombs and a 500 Microns protective coating material suitable for UV conditions.

Our scope of work includes: concrete repair, primer application, and 2 coats of Epoxy Polyurethane.

VALUE TO CLIENT

Client’s main concern was time, hence, we have committed to complete the project within 30 days, and we managed to fulfill this requirement with a high level of quality, which has shown the professionalism and dedication of our highly skilled workers and engineers.

PROJECT DETAILS

Page 21: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

20

PROJECT PHOTOS

Surface preparation & concrete repair

Page 22: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

21

PROJECT PHOTOS

Application for Primer

Page 23: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

22

PROJECT PHOTOS

Application for first coat

Page 24: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

23

PROJECT PHOTOS

Final coat of Nitoflor EPU10

Page 25: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

24

BEFORE & AFTER

Page 26: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

25

Project: 712-C05

Client: Royal Commission

Consultant: Bechtel

Contractor: M.M. Al-Harbi & Partners Contracting Co. Ltd.

Location: Jubail

Execution Date: November 2014

Material Used: Sikafloor 264, Sikadur P

Quantity: 1,500 M2

CASE STUDY

Page 27: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

26

PROJECT BACKGROUND

The scope of work of this project consists of the construction of a new irrigation pumping station, storage tanks and a new telecom exchange building with video head end facility in the north-west corner of sector F2.

The primary infrastructure in sector F3 will also be developed. Works include access roads, drainage, electrical power supply, potable water, sanitary wastewater, irrigation water, telecoms, street lighting, footpaths and landscaping.

OFFERED SERVICE

Kingdom Oasis Contracting has proposed to apply a durable industrial flooringsystem to repair the damaged concrete and enhance its appearance.

Our scope of work included the preparation of the concrete substrate and repairing all the cracks and pinholes to ensure good quality of industrial flooring system application

VALUE TO CLIENT

the client was satisfied from the quality of work we have offered, especially that several contractors were doing mechanical work parallel with the application of the epoxy flooring system and taking into consideration the tight deadline.

PROJECT DETAILS

Page 28: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

27

Concrete substrate after grinding & touch-up repair of Epoxy putty

PROJECT PHOTOS

Concrete substrate before surface preparation

Page 29: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

28

PROJECT PHOTOS

Touch-up repair on the 1st coat

Final coat

Page 30: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

29

BEFORE & AFTER

Page 31: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

30

Project: 2nd phase sanitation project

Client: Water Directorate of EP

Consultant: Diwaneyah consulting services

Contractor: SYSTECH

Location: Dammam

Execution Date: January 2015 Material Used: Nitofill WS60, Nitofill UR63 and Nitomortar TC2000 Quantity: 1,200 packers

CASE STUDY

Page 32: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

31

PROJECT BACKGROUND

The projects involve the construction of water reservoirs, pipelines, water and sanitation networks and stations.

The first contract entails the operation and maintenance of a water and sanitation project in Dammam at the cost of SR 75.7 million for three years

OFFERED SERVICE

The client was suffering form water leakage in 4 major tanks; however, Kingdom Oasis Contracting offered a permanent solution for the problem.

Our scope of work includes exposing the cracks from where the water is coming and applying a suitable injection system into the concrete to seal all the gaps inside it.

VALUE TO CLIENT

The client was in a process to handover the project; therefore we have assigned our dedicated team of highly skilled manpower to do the job in perfect way and handover the project in time with zero leakage.

PROJECT DETAILS

Page 33: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

32

PROJECT PHOTO

Water leakage in floors and walls

Exposing the cracks and inserting the injection packers

Page 34: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

33

PROJECT PHOTO

Injecting the water stop resin to stop the water inside the concrete

Injecting the flexible Polyurethane resin to permanently stop the water

Page 35: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

34

Project: Al-Rashid Towers

Contractor: Al Rashid Trading & Contracting Company (RTCC)

Location: Khobar

Execution Date: February 2016

Material Used: MasterTop 1205 MasterTop 1200MasterBrace ADH 2200

Quantity: 8,000 M2

CASE STUDY

Page 36: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

35

PROJECT BACKGROUND

Convenient and plentiful car parking spaces, the best shopping mall and entertainment facilities in the Eastern Province and a wide range of Restau-rants are all close at hand Driver’s rooms and maid rooms are available.

Al-Rashid Residence, an incomparable retreat is continuing to set unprec-edented standards in luxury and service from the striking beauty and com-fort of its designer, interiors and world-class cuisine.

OFFERED SERVICE

Kingdom Oasis Contracting has offered to apply a durable industrial floorsystem for the parking area, including all road markings and curbstone painting.Moreover, we offered to repair the damaged concrete areas to ensure good finishing of the final coat of epoxy syste

VALUE TO CLIENT

Our professional team of engineers and painters were committed to com-plete the project with the minimum time required and with maximum pos-sible quality.

PROJECT DETAILS

Page 37: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

36

PROJECT PHOTO

Surface preparation

Primer application

Page 38: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

37

PROJECT PHOTO

Application of first coat

Touch-up repair & sanding

Page 39: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

38

PROJECT PHOTO

Application of final coat

Preparation for arrows and curbstone painting

Page 40: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

39

PROJECT PHOTO

Page 41: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

Project: Batook Factory

Contractor: Batook Chewing Gum Ind. Ltd.

Location: Dammam

Execution Date: September 2016

Material Used: MasterTop 1230 MasterTop 1200 MasterBrace ADH 2200

Quantity: 750 M2

CASE STUDY

40

Page 42: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT BACKGROUND

Batook Chewing Gum Industries Limited is a Saudi family owned company committed to providing world class quality chewing gum products and service , Batook's Management System has been registerd to ISO and its Food Safety Management System fulfills the requirements of HACCP & GMP - Hazard Analysis and Critical Control Point & Good Manufacturing Practices .

OFFERED SERVICE

Kingdom Oasis Contracting has offered to apply a durable industrial floor system for the factory .

Our scope of work includes: Concrete repair, Primer application and application of self-leveling

VALUE TO CLIENT

Our professional team of engineers and painters, they did maintenance and repairing flooring, which led to add beauty to the appearance of the plant with high quality

PROJECT DETAILS

41

Page 43: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Surface preparation

Concrete repair

42

Page 44: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Primer application

Application of Self-leveling

43

Page 45: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Application of Self-leveling

44

Page 46: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

Project: Almajdouie Motors "Changan car"

Contractor: Build Arabia Contracting Est.

Location: Khobar

Execution Date: November 2016

Material Used: MasterTop 1205 MasterTop 2200 Masterseal GG 470

Quantity: 1,200 M2

CASE STUDY

45

Page 47: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT BACKGROUND

Opened «ALMAJDOUIE Motor Company», authorized dealer for Changan cars in the Kingdom, its integrated president in the Eastern Province, and her second in the Kingdom after the Riyadh Center, which opened this year. The center is located on the old airport road in Al-Khobar, one of the most main roads in the Eastern Province, a leading standard of modern equipment. It provides all services to customers under one roof, ranging from sales through to after-sales services. It also includes a large storage warehouse to provide spare parts without delay.

And began construction of the «Integrated Changan Center», which covers an area of 3,000 square meters, nearly a year ago, and now the facility overlooking the final-look that will make President lounge, and maintenance department fashionably, and a warehouse for spare parts to provide the necessary reform of the pieces

OFFERED SERVICE

Kingdom Oasis Contracting has offered to apply a durable industrial floor system for maintenance department and a warehouse for spare parts .

Our scope of work includes: Concrete repair, 2 coats of Epoxy system,expansion joint treatment and Road marking

VALUE TO CLIENT

Our professional team of engineers and painters were committed to com-plete the project with the minimum time required and with maximum pos-sible quality, To make the repair shop and a warehouse of spare parts more modern

PROJECT DETAILS

46

Page 48: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Surface preparation

Epoxy Coating and Road Marking

47

Page 49: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

48

Page 50: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

Project:Mutrafiah Housing Project, Jubail

Client: SABIC

Contractor: Saudi Kier Construction Limited

Location: Jubail

Execution Date: January 2016

Material Used: Nitocote EP405, Nitoprime 31, and Nitomortar TC2000

Quantity: 300 M2

CASE STUDY

49

Page 51: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT BACKGROUND

The project is part of a series of ongoing and planned housing projects aimed at achieving SABIC’s strategic of providing Housing Project (HOP) residential units to its Saudi employees.

OFFERED SERVICE

Kingdom Oasis Contracting has offered to apply a concrete protective coat-ing system for water lift station tank to protect the concrete substrate.

Our scope of work included the preparation of the concrete substrate and repairing all the cracks and honeycombs, primer coat and 3 layer of nontoxid epoxy coating with 2 layer of fiber glass to ensure good quality of protective coatings application.

VALUE TO CLIENT

The client needs a high quality protection system for a lift station, therefore we have assigned our dedicated team of highly skilled manpower to do the job in perfect way and handover the project in time.

PROJECT DETAILS

50

Page 52: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Surface preparation

Primer application

51

Page 53: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Installing the Fiberglass

Applying the 1st coat

52

Page 54: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Applying the 2nd coat

53

Page 55: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

Project: Site Development of

Downstream Industrial

Client: Royal Commission

Contractor: Khonaini International Co.LTD

Location: Jubail

Execution Date: February 2016

Material Used: MasterInject 1335,

MasterInject 1320, MasterBrace ADH 2200

Quantity: 2,320 packers

CASE STUDY

54

Page 56: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT BACKGROUND

There is no doubt that the advanced infrastructure of Jubail is the corner-

stone which has allowed the various industrial, commercial and social sec-

tors to establish themselves through integrated action. Jubail infrastructure

has the capability to operate continuously without failure of power or sup-

plies in any of its existing facilities while meeting community requirements

at modern and high living standards where all the necessities of life and

tourist and recreational facilities are available, which are the most import-

ant characteristics of any city looking to enter the bright future

The Royal Commission is working to upgrade and increase the capacity of

such infrastructure while paving the way for the private sector to participate

in the development and growth into the horizons of the 21 st century.

OFFERED SERVICE

The client was suffering from water leakage in 9 major Valve chamber and 6 lift station, however, Kingdom Oasis Contracting offered a permanent solution for the problem.

Our scope of work includes exposing the cracks from where the water is

coming and applying a suitable injection system into the concrete to seal

all the gaps inside it.

VALUE TO CLIENT

The customer needs a high quality protection system for the lift station and valve chambers from the leakage, so we have appointed a specialized team of highly skilled manpower to do the job in an ideal way with the minimum time required and with zero leakage.

PROJECT DETAILS

55

Page 57: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Water leakage in floors and walls

Exposing the cracks and inserting the injection packers

56

Page 58: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Injecting the water stop resin to stop the water inside the concrete

Injecting the flexible Polyurethane resin to permanently stop the water

57

Page 59: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

Project: Amiantit Factory

Contractor: Al Arwanan Contracting company

Location: Dammam

Execution Date: September 2016

Material Used: Nitoflor SL1000

Nitoprime 31 Nitomortar TC2000Nitoflor TF1000Thioflex 600

Quantity: 2,356 M2

CASE STUDY

58

Page 60: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT BACKGROUND

The Saudi Arabian Amiantit Company (Amiantit) was established in1968 in Dammam in the Kingdom of Saudi Arabia to manufacture pipes for the local market. Since then, Amiantit has grown and developed into a major diversified industrial group with operations spanning the globe.

Today, Amiantit markets a wider range of pipe products than any other pipe manufacturer, and provides a total solution to customers fluid transfer needs, designed to optimise the applied technology and costs.

OFFERED SERVICE

Kingdom Oasis Contracting has offered to apply a 1 MM epoxy self-leveling, a durable industrial floor system for the factory .Moreover, we offered to repair the damaged concrete areas

using epoxy screed to ensure good finishing of the final coat of epoxy system.

VALUE TO CLIENT

Our technical team has made a great effort to repair the floors and settle them in an excellent way to ensure a good quality of the application of industrial flooring system

PROJECT DETAILS

59

Page 61: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Surface preparation

Concrete repair

60

Page 62: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Primer application

Application of Self-leveling

61

Page 63: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Application of Self-leveling

Joint treatment

62

Page 64: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

BEFORE & AFTER

63

Page 65: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

64

Project:Tania Bottled Water Factory

Client: Tania Bottled Water

Contractor: Turook Al-Hazm

Location: Jeddah

Execution Date: November 2016

Material Used: Nitoflor SL3000, Nitoprime 31

Renderoc HS XTRA , Nitoprime Zincrich and

Nitomortar TC2000

Quantity: 10,000 M2 floor & 2200 M2 tank

CASE STUDY

Page 66: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

65

PROJECT BACKGROUND

Tania is a fully Saudi company; origin, formation & management constructed in Jeddah Industrial City 2 in Saudi Arabia.

They have many offices and branches and they liaise with many partners and clients around the Kingdom to guarantee delivering Tania water to their customers around KSA.

The Project aims to cover water supply in Western Region of Saudi Arabia

OFFERED SERVICE

Kingdom Oasis Contracting has proposed to apply Self Leveling industrial flooring System and Concrete Repair for 6 underground Water Tanks wallsOur scope of work included the preparation of the concrete subs trate to ensure perfect application of the flooring materials and application of honeycombs concrete repair

VALUE TO CLIENT

our Client was looking for a Durable solution for the concrete floors and damaged water tanks . Kingdom Oasis Contracting provided These solutions and implemented them with their highly proffesional team on the fastest time possible.

PROJECT DETAILS

Page 67: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

66

PROJECT PHOTO

Concrete substrate before surface preparation

Concrete substrate after grinding & touch-up repair of Epoxy putty

Page 68: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

67

PROJECT PHOTO

Application Of Primer

Application of Self-Leveling

Page 69: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

68

PROJECT PHOTO

Tank Walls before Conctrete Repair

Saw Cut and Extent of Concrete Removal

Page 70: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

69

PROJECT PHOTO

Priming , Cleaning Reinforcement & Concrete and Repair Application by hand

Page 71: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

70

PROJECT PHOTO

Page 72: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

71

PROJECT PHOTO

Page 73: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

72

PROJECT PHOTO

Page 74: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

73

Project: Saudi Carbonate Factory

Client: Saudi Carbonate Co.LTD

Contractor: Al-direa Al-Arabie

Location: Yanbu

Execution Date: January 2017

Material Used: Dramix 3D (80/60BG),

Nitoflor FC150, Nitomortar TC2000

Quantity: 2000 M2

CASE STUDY

Page 75: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

74

PROJECT BACKGROUND

Saudi Carbonate Company Limited being the major calcium carbonate supplier in KSA that was licensed to produce Calcium Carbonate (CaCO3) .

OFFERED SERVICE

Our scope of work includes Concrete finishing using Steel fibers technique & application of Two Coats of high build Epoxy Flooring system .

VALUE TO CLIENT

The Client was expected the Concrete floor to have a minimum Possible tolerance and smoothness , whcih was completely delivered by our Professional team of engineers and technician while meeting the required time frame .

PROJECT DETAILS

The Project is an extension to the current Factory , as it was required to meet the increase in demand in Saudi market .

Page 76: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

75

PROJECT PHOTO

Fixing Formwork , all auxiliary reinforcement , and Polyethylene Sheets

Casting and finishing Concrete mixed with steel fibers

Page 77: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

76

PROJECT PHOTO

Casting and finishing Concrete mixed with steel fibers

Applying Curing Compund and Saw-Cutting the Joints

Page 78: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

77

PROJECT PHOTO

Surface preparations by grinding & touch up repair

Applying the first Coat of Epoxy

Page 79: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

78

PROJECT PHOTO

touch up repair and sanding

Application of final coat of Epoxy

Page 80: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

79

PROJECT PHOTO

Page 81: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

Project:Propylene Oxide Plant - SADARA Project

Client: SADARA

Contractor: TEKFEN

Location: Jubail

Execution Date: January 2015

Material Used: Nitoill WS60, Nitoill UR63, and Nitomortar TC2000

Quantity: 1,543 packers

CASE STUDY

80

Page 82: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT BACKGROUND

The Sadara project is world scale chemical project being constructed in

Jubail Industrial City in Saudi Arabia.

Foster Wheeler will accompany the Dow and Saudi Aramco mega

jointventure Sadara Chemical Company with engineering, procurement

and construction management works for a propylene oxide (PO) unit at

Jubail Industrial City/Saudi Arabia. The unit will be part of a world-scale,

fully in-tegrated chemicals complex, one of the largest of its kind in the

world.

OFFERED SERVICE

The client was suffering form water leakage in Sump tanks; however,

Kingdom Oasis Contracting offered a permanent solution for the problem.

Our scope of work includes exposing the cracks from where the water is

coming and applying a suitable injection system into the concrete to seal

all the gaps inside it.

VALUE TO CLIENT

The customer has been experiencing water leakage problems in expansion joints and walls, so we have appointed a dedicated team of highly skilled manpower to do the job in an ideal manner with minimum time required and zero leakage.

PROJECT DETAILS

81

Page 83: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Water leakage in floors and walls

Exposing the cracks and inserting the injection packers

82

Page 84: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Injecting the water stop resin to stop the water inside the concrete

Injecting the flexible Polyurethane resin to permanently stop the water

83

Page 85: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

84

Page 86: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

Project: Almajdouie Steel Industries

Contractor: Silicon Trading and Contracting

Location: Dammam

Execution Date: April 2017

Material Used: MasterBrace ADH 2200

Mastertop 1200Mastertop 1210Mastertop 1205Mastertop 1241MasterSeal GG 470

Quantity: - Epoxy Floor Coating 11,000 M2

- Self-leveling 4,000 M2 - Joint Sealant 3,500 M

CASE STUDY

85

Page 87: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT BACKGROUND

Al Majdouei Steel Industries is a leader in the trailers industry.It has been a leader in the field of production with about 200 trailers a month. The engineering sector, supported by state-of-the-art technology, conducts testing, product performance tests and quality, and implements R & D strategy.The company has grown to meet the growing demand in the Middle East and Africa, offering diverse products such as trailers, pipe conveyors, cement containers, fuel tanks, low trailers and refrigerators.The plant was the first to introduce the third axis on trailers in the Gulf region to enhance its specifications and efficiency.

OFFERED SERVICE

Kingdom Oasis Contracting has offered to apply a 1 MM epoxy self-leveling, a durable industrial floor system for the factory, and a 600 Microns epoxy floor coating.Moreover, we offered to repair the damaged concrete areas and expansion joint using epoxy screed to ensure good finishing of the final coat of epoxy system.

VALUE TO CLIENT

The concrete surface was highly permeable and our technical team has made a great effort and used an innovative techniques to overcome this permeability issue to complete the project within 45 days in order to meet the client expectation

PROJECT DETAILS

86

Page 88: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Surface preparation

87

Page 89: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

88

PROJECT PHOTO

Concrete repair

Page 90: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Primer application

89

Page 91: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

90

PROJECT PHOTO

Application of Self-leveling

Page 92: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

91

PROJECT PHOTO

Application of Self-leveling

Page 93: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Application of Scratch Coat

Application of Epoxy Coat

92

Page 94: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Epoxy Floor Coating

93

Page 95: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

94

BEFORE & AFTER

Page 96: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

Project: Jubail 1 3s Center - Workshop

Contractor:ALJ Lands -Tatweer Jameel

Location: Jubail

Execution Date: November 2017

Material Used: Nitomortar TC2000

Nitoprime 31 Nitoflor SL2000 Nitoflor FC140 Thioflex 600 GG

Quantity: Epoxy Wall Coating 700 M2

Self-leveling 2,300 M2Joint Sealant 500 M

CASE STUDY

95

Page 97: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT BACKGROUND

Abdullatif Jameel is supported in the Saudi market through a wide network of strategically distributed sales and maintenance centers throughout the Kingdom to provide peace of mind to its customers wherever you are.

Abdul Latif Jameel Land Is the real estate development department in Saudi Arabia, that department is a multi-faceted business type that includes activities starting from the repair and renovation of existing buildings, and one of them is the repair and renovation of Jubail 1 3s Center - Workshop

OFFERED SERVICE

Kingdom Oasis Contracting has offered to apply a 2 MM epoxy self-leveling, and a 400 Microns epoxy Wall coating.Moreover, we offered to close the edges of the tiles by full lining repair to ensure good finishing of the final coat of epoxy system.

VALUE TO CLIENT

As KOCC alywas aims to add value to their client and meet their requirment, we have shown our flexibilty by dedicationg two technical teams to work in two diffrent shifts to accelerate the operations, devided the workshop area to three zones not to interrupt the client maintenance activities.

PROJECT DETAILS

96

Page 98: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Surface preparation

97

Page 99: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Floor repairing

98

Page 100: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Primer application

99

Page 101: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Application of Self-leveling

100

Page 102: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Application of Self-leveling

101

Page 103: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Application of Road Marking

102

Page 104: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

PROJECT PHOTO

Application of Road Marking

103

Page 105: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

BEFORE & AFTER

104

Page 106: セ@ IKOCCkocc.sa/public/static/1520687271_Job_references.pdf · 2018-03-10 · Construction Chemical Applications セケ Y QYッNQj@ [[セャッッNji@ d...119 セセ@ Kingdom

BEFORE & AFTER

105