1 IEC 61968-6 Maintenance & Construction from Design to the SOA Implementation Developing Utility Industry Standards to Help Utilities Lower Life-Cycle Costs for Enterprise Application Integration Contact Nada Reinprecht For Further Information E-mail: [email protected] INTERNATIONAL ELECTROTECHNICAL COMMISSION

Upload: buidiep

Post on 06-Apr-2018

256 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

1

IEC 61968-6 Maintenance & Construction from Design to the SOA

Implementation

Developing Utility Industry Standards to Help Utilities Lower Life-Cycle Costs for Enterprise

Application Integration

Contact Nada Reinprecht For Further Information

E-mail: [email protected]

INTERNATIONAL

ELECTROTECHNICAL

COMMISSION

Page 2: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

2

Topics

Status of 61968-6

Work Management Interface Reference Model

Process for Work Integration Development

CIM Models for Work

Use Cases & Message Design

Interoperability testing; CIM SOA implementation (Part 100)

Page 3: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

Status of 61968-6

Completed CDV stage (Committee Draft for Validation)

First Draft International Standard (FDIS) created and updated with comments from IEC National Committees

Currently applying final updates to the CIM Normative

FDIS submission expected by the end of August

IS may be published first half of the next year

Page 4: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

4

Topics

Status of 61968-6

Work Management Interface Reference Model

Process for Work Integration Development

CIM Models for Work

Use Cases & Message Design

Interoperability testing; CIM SOA implementation (Part 100)

Page 5: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

Application Integration InfrastructureApplication Integration Infrastructure

Network OperationsNetwork Operations(NO) (NO) –– IEC 61968IEC 61968--33

Network OperationsNetwork OperationsMonitoring (NMON)Monitoring (NMON)

Network ControlNetwork Control(CTL)(CTL)

Fault ManagementFault Management(FLT)(FLT)

Operational FeedbackOperational FeedbackAnalysis (OFA)Analysis (OFA)

Operation StatisticsOperation Statistics& Reporting (OST)& Reporting (OST)

Network CalculationsNetwork Calculations-- Real Time (CLC)Real Time (CLC)

Records & AssetRecords & AssetManagement Management

(AM) (AM) –– IEC 61968IEC 61968--44

Substation & NetworkSubstation & NetworkInventory (EINV)Inventory (EINV)

GeographicalGeographicalInventory (GINV)Inventory (GINV)

Asset InvestmentAsset InvestmentPlanning (AIP)Planning (AIP)

Operational PlanningOperational Planning& Optimization & Optimization

(OP) (OP) –– IEC 61968IEC 61968--55

Network OperationNetwork OperationSimulation (SIM)Simulation (SIM)

Switch ActionSwitch ActionScheduling (SSC)Scheduling (SSC)

Power Import Power Import SchedSched..& Optimization (IMP)& Optimization (IMP)

Maintenance andMaintenance andConstructionConstruction

(MC) (MC) –– IEC 61968IEC 61968--66

Maintenance &Maintenance &Inspection (MAI)Inspection (MAI)

Construction WMS Construction WMS (CON)(CON)

Design &Design &Estimate (DGN)Estimate (DGN)

SchedulingScheduling& Dispatch (SCH)& Dispatch (SCH)

FieldFieldRecording (FRD)Recording (FRD)

Network ExtensionNetwork ExtensionPlanning Planning

(NE) (NE) –– IEC 61968IEC 61968--77

NetworkNetworkCalculations (NCLC)Calculations (NCLC)

Project DefinitionProject Definition(PRJ)(PRJ)

ConstructionConstructionSupervision (CSP)Supervision (CSP)

ComplianceComplianceManagement (CMPL)Management (CMPL)

CustomerCustomerSupport Support

(CS) (CS) –– IEC 61968IEC 61968--88

Customer ServiceCustomer Service(CSRV)(CSRV)

Trouble CallTrouble CallManagement (TCM)Management (TCM)

Meter Reading & ControlMeter Reading & Control(MR) (MR) –– IEC 61968IEC 61968--99

Meter ReadingMeter Reading(RMR)(RMR)

External to DMSExternal to DMS(EXT)(EXT)

Energy TradingEnergy Trading(ET)(ET)

RetailRetail(RET)(RET)

SalesSales(SAL)(SAL)

Customer Account Customer Account Management (ACT)Management (ACT)

FinancialFinancial(FIN)(FIN)

Business Planning & Business Planning & Reporting (BPR)Reporting (BPR)

Dispatcher Training Dispatcher Training (TRN)(TRN)

General inventory General inventory management (GIM)management (GIM)

Load ControlLoad Control(LDC)(LDC)

Meter Maintenance Meter Maintenance (MM)(MM)

Meter Data (MD)Meter Data (MD)Stakeholder Planning & Stakeholder Planning &

Management (SPM)Management (SPM)

Supply Chain & Supply Chain & Logistics (SC)Logistics (SC)

PremisesPremises(PRM)(PRM)

Human ResourcesHuman Resources(HR)(HR)

Point Of SalePoint Of Sale(POS)(POS)

Meter OperationsMeter Operations(MOP)(MOP)

Advanced Metering Advanced Metering Infrastructure (AMI)Infrastructure (AMI)

Meter Data Meter Data Management IMDM)Management IMDM)

Metering SystemMetering System(MS)(MS)

Demand ResponseDemand Response(DR)(DR)

Interface Reference Model (IRM) identifies information

exchange requirements among utility business functions; IEC

61968 sequence diagrams are organised by IRM

Page 6: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

Work management in context of Enterprise Asset Management; Diagram illustrates asset life cycle and transition between ‘Asset’ and ‘Operational

Equipment’ point of view

EQUIPMENT DESIGN BUILD OPERATE MAINTAIN

Material Management

Work Management

AS DESIGNED ASSET in Asset

Management System

AS BUILT ASSET in Asset

Management System

POWER SYSTEM

RESOURCE in Energy

Management System,

Outage Management

System

ASSET in Asset Management

System

NETWORK

EXTENSION

PLANNING

Page 7: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

Work is created any time a person is required to perform an activity related to company assets. Examples of work include

Construction work (e.g. service installations, line extensions, and system betterment projects)

Service work (e.g meter replacements, Turn-on, Turn-off, etc.)

Maintenance work (e.g. routine oil changes, painting, etc.)

Inspection work (e.g. pole inspections, vault inspections, Substation inspections)

Trouble work (e.g. Power outage, voltage quality problem, etc.)

Page 8: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

61968-6 Centric View of Message Types for Maintenance Purposes

8

Operational

Planning &

Optimization

Network Operation

Simulation

(OP-SIM)

Network Operations

Fault Management

(NO-FLT)

Field Recording

(MC-FRD)

Mobile Workforce

[ 10 ] [ 12 ]

Network Monitoring

NO-NMON

[ 1 ]

Customer Support

(CS)

Customer Service

CSRV

[ 11 ] Available / Used Materials

[ 12 ] Bill Of Materials / Material Status

[ 13 ] Crew Composition

[ 14 ] Actual Labor Cost

[ 15 ] Failure Event

[ 16 ] New/Updated or get Asset

[ 17 ] Special Read Request / Response

[ 18 ] Install, Remove, Repair, Connect and Disconnect

[ 19 ] Meter History

[ 20 ] Map

[ 21 ] Outage Notification from Field Crew

[ 22 ] Outage Confirmation Request

[ 1 ] SCADA Measurements, failures, conditions

[ 2 ] Switching Plan

[ 3 ] Request for Service

[ 4 ] Materials Reservation

[ 5 ] Request for Planned Maintenance/Inspection Work

[ 6 ] Request for Unplanned Work

[ 7 ] Follow-up Work

[ 8 ] Switching Order

[ 9] Work Request from Network Operations

[10 ] Work Order

[ 11 ]

[ 7 ]

[ 3 ]

Records & Asset

Management (AM)

Geographical Inventory

(GINV)

Substation & Network

Inventory (EINV)

[ 13 ]

[ 6 ]

Work Scheduling

& Dispatching

(MC-SCHD)

Work Planning

[ 5 ]

General Inventory

Management

(AM-GIM)

Materials Inventory

Work Scheduling

& Dispatching

(MC-SCHD)

Crew Management

[ 4 ]

[ 2 ]

61968 Part 6

Defined by other 61968 Parts

Key

[ 14 ]

[ 8 ]

{ 15 }

Work Scheduling

& Dispatching

(MC-SCHD)

[ 13 ]

[ 10 ]

[ 9 ]

Meter Reading &

Control

(MR&C)

[ 17 ]

[ 18 ]

{ 19 }

[ 20 ]

[ 12 ]

[ 16 ]

[ 10 ]

[ 21 ]

[ 22 ]

Maintenance and Inspection

(MC-MAI)

Preventive Maintenance

Page 9: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

9

Topics

Status of 61968-6

Work Management Interface Reference Model

Process for Work Integration Development

CIM Models for Work

Use Cases & Message Design

Interoperability testing; CIM SOA implementation (Part 100)

Page 10: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

Information Models, Profiles and Messages

Page 11: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

CIM Integration Development Process Implemented to Work Business Domain

11

pkg [Package] NewDirection [NewDirection]

Core discipline

Syntax Specifications

+ RDF XML

+ XSD XML

61968 Usecases

Information Model

+ CIM

+ CIM Extensions

+ Foreign Model

notes

Semantic definitions expressed as

relationships in UML Class diagrams

61968 Profiles

notes

A collection of elements suited for a

particular purpose. Both standard and

custom profiles may be built from the

CIM.

Message payload syntax

notes

Specific message payloads. The more

popular syntaxes include XSD XML

and RDF XML, but other syntaxes are

possible.

«view»

Transport

+ CoAP

+ ESB

+ HTTP

+ JMS

+ Web Services

+ XMPP

61970 Usecases

«viewpoint»

Syntax

Specifications::

RDF XML

«viewpoint»

Syntax

Specifications::

XSD XML::EXI

«viewpoint»

Syntax

Specifications::

XSD XML

Network capacity

+ Constrained Network

+ High-bandwidth network

Payload Env elopes

+ Full Bodied IEC 61968-100:2013 Envelope

+ SOAPTransmitted Message

notes

This is the complete message transmitted over

the wire. It is an assemblage of a message

payload (optional,) a payload envelope

(optional,) over a transport mechanism.

«import»«import»

«conform»

«import»

Part 100

supports

some of

technologies

than just

JMS

Page 12: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

Work Management Profiles Design in in CIM Tool pointing to Maintenance Order

Page 13: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

13

Topics

Status of 61968-6

Work Management Interface Reference Model

Process for Work Integration Development

CIM Models for Work

Use Cases & Message Design

Interoperability testing; CIM SOA implementation (Part 100)

Page 14: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

CIM model of Work

class Wor kOv er v iew

Wor k

+ requestDateTime :DateTime [0..1]

Document

BaseWor k

+ kind :WorkKind [0..1]

+ priority :Priority [0..1]

+ statusKind :WorkStatusKind [0..1]

Location

Wor kLoca t ion

Wor kTask

+ instruction :String [0..1]

+ schedOverride :String [0..1]

+ taskKind :WorkTaskKind [0..1]

TimeSchedule

Wor kTimeSchedule

+ kind :WorkTimeScheduleKind [0..1]

Ma intenanceLoca t ion

+ block :String [0..1]

+ lot :String [0..1]

+ nearestIntersection :String [0..1]

+ subdivision :String [0..1]

Asset

Wor kAsset

Tool

+ lastCalibrationDate :Date [0..1]

Vehicle

+ odometerReadDateTime :DateTime [0..1]

+ odometerReading :Length [0..1]

+ usageKind :VehicleUsageKind [0..1]

IdentifiedObject

Mater ia l I tem

+ quantity :IntegerQuantity [0..1]

«enumeration»

Wor kSta tusK ind

waitingOnApproval

approved

cancelled

waitingToBeScheduled

scheduled

waitingOnMaterial

inProgress

completed

closed

«enumeration»

Wor kTimeScheduleK ind

estimate

request

actual

earliest

latest

«enumeration»

VehicleUsageK ind

crew

user

contractor

other

«enumeration»

Wor kTaskK ind

install

remove

exchange

investigate

+WorkTask 0..1

+MaterialItems 0..*

+Work 1

+WorkTasks0..*

+BaseWork0..1

+TimeSchedules

0..*

+BaseWorks

0..*

+WorkLocation

0..1

Page 15: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

Asset CIM Model is used for work messages

class AssetsOv er v iew

IdentifiedObject

Asset

+ acceptanceTest :AcceptanceTest [0..1]

+ critical :Boolean [0..1]

+ electronicAddress :ElectronicAddress [0..1]

+ initialCondition :String [0..1]

+ initialLossOfLife :PerCent [0..1]

+ lifecycle :LifecycleDate [0..1]

+ lotNumber :String [0..1]

+ purchasePrice :Money [0..1]

+ serialNumber :String [0..1]

+ status :Status [0..1]

+ type :String [0..1]

+ utcNumber :String [0..1]

AssetConta iner

IdentifiedObject

AssetFunct ion

+ configID :String [0..1]

+ firmwareID :String [0..1]

+ hardwareID :String [0..1]

+ password :String [0..1]

+ programID :String [0..1]

ComMedia

IdentifiedObject

Sea l

+ appliedDateTime :DateTime [0..1]

+ condition :SealConditionKind [0..1]

+ kind :SealKind [0..1]

+ sealNumber :String [0..1]

IdentifiedObject

AssetModel

IdentifiedObject

Asset Info

P r oductAssetModel

+ corporateStandardKind :CorporateStandardKind [0..1]

+ modelNumber :String [0..1]

+ modelVersion :String [0..1]

+ usageKind :AssetModelUsageKind [0..1]

+ weightTotal :Weight [0..1]

OrganisationRole

AssetOr ganisa t ionRole

OrganisationRole

Manufactur er

AssetOwnerAssetUser

Ma inta iner

Document

P r ocedur e

+ instruction :String [0..1]

+ kind :ProcedureKind [0..1]

+ sequenceNumber :String [0..1]

Document

P r ocedur eDa taSet

+ completedDateTime :DateTime [0..1]

Hazard

AssetLoca t ionHaza r d

+Procedures

0..*

+Assets

0..*

+Procedure 0..1

+ProcedureDataSets 0..*

+Assets 0..*

+AssetInfo 0..1

+Assets

0..*

+AssetContainer0..1

+Assets

0..*

+OrganisationRoles

0..*

+AssetContainer

0..1

+Seals

0..*

+AssetModel

0..1

+AssetInfo

0..1

+ProductAssetModel

0..*

+Manufacturer

0..1

Page 16: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

Service Orders require CIM model of Customer

class Customer sOv er v iew

OrganisationRole

Customer

+ kind :CustomerKind [0..1]

+ locale :String [0..1]

+ priority :Priority [0..1]

+ pucNumber :String [0..1]

+ specialNeed :String [0..1]

+ status :Status [0..1]

«deprecated»

+ vip :Boolean [0..1]

Document

Customer Account

+ billingCycle :String [0..1]

+ budgetBill :String [0..1]

Agreement

Customer Agr eement

+ loadMgmt :String [0..1]

Document

P r icingStr uctur e

+ code :String [0..1]

+ dailyCeilingUsage :Integer [0..1]

+ dailyEstimatedUsage :Integer [0..1]

+ dailyFloorUsage :Integer [0..1]

+ revenueKind :RevenueKind [0..1]

+ taxExemption :Boolean [0..1]

IdentifiedObject

Ser v iceCa tegor y

+ kind :ServiceKind [0..1]

WorkLocation

Ser v iceLoca t ion

+ accessMethod :String [0..1]

+ needsInspection :Boolean [0..1]

+ siteAccessProblem :String [0..1]

Document

Ta r if f

+ endDate :Date [0..1]

+ startDate :Date [0..1]

Customer Not if ica t ion

+ contactType :String [0..1]

+ contactValue :String [0..1]

+ earliestDateTimeToCall :DateTime [0..1]

+ latestDateTimeToCall :DateTime [0..1]

+ trigger :NotificationTriggerKind [0..1]

Hazard

IncidentHaza r d

Document

Tr oubleTicket

+ dateTimeOfReport :DateTime [0..1]

+ firstResponder :String [0..1]

+ reportingKind :TroubleReportingKind [0..1]

+ resolvedDateTime :DateTime [0..1]

+ troubleCode :String [0..1]

+TroubleTicket

0..1

+Hazards

0..*

+TroubleTickets

0..*

+Customer

0..1

+Notification

0..1

+TroubleTickets

0..*

+Notifications

0..*

+Customer

0..1

+Customer

1

+CustomerAgreements

0..*

+Customer 1

+CustomerAccounts

0..*

+CustomerAccount

1

+CustomerAgreements

0..*

+CustomerAgreements

0..*

+ServiceCategory 0..1+CustomerAgreements 0..*

+PricingStructures 0..*

+CustomerAgreements

0..*

+ServiceLocations

0..*

+PricingStructures

0..*

+Tariffs 0..*

+ServiceCategory 1

+PricingStructures

0..*

Page 17: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

17

Topics

Status of 61968-6

Work Management Interface Reference Model

Process for Work Integration Development

CIM Models for Work

Use Cases & Message Design

Interoperability testing; CIM SOA implementation (Part 100)

Page 18: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

Below sequence diagram illustrates an example use case

Maintenance

of High

Voltage

Transformer

Page 19: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

From CIM to the specific Work message; Example of Maintenance Order XML schema

Message

CIM

ConcreteMessage

Profile

XMLSchema

Conforms to CIM

Conforms to Profile

Conforms to Message

Assembly

Conforms to Syntax

Restricts/Narrows CIM

Is assembled as

Is mapped to

Message

CIM

ConcreteMessage

Profile

XMLSchema

Conforms to CIM

Conforms to Profile

Conforms to Message

Assembly

Conforms to Syntax

Restricts/Narrows CIM

Is assembled as

Is mapped to

Page 20: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

Example of use case for Meter Installation and Removal

sd Part 6:50.1 - Trouble response or meter serv ice request

«CIM»

MR-MDM

(from Approved

Actors)

«CIM»

CS-CSRV

(from Approved

Actors)

«CIM»

MC-FRD

(from Approved

Actors)

«CIM»

AM-MAM

(from Approved

Actors)

«CIM»

MR-MS

A

(from Approved

Actors)

«CIM»

MC-MWM

(from Proposed

Actors)

Field Crew

(from Approved

Actors)

ref

Part 9:180.1 - Initial or Final Read

Meter exchange could

be initiated by other

actors.

Assumptions: Meters are

returned to the meter

shop for repair and

return to inventory, or

disposal.

CREATE(ServiceOrder)

REPLY(ServiceOrder)

CREATE(ServiceOrder)

REPLY(ServiceOrder)

get final read()

CHANGED(ServiceOrder)

replaceMeter()

get first read()

CHANGED(ServiceOrder)

EXECUTE(OperationSet)

REPLY(OperationSet)

EXECUTE(OperationSet)

REPLY(OperationSet)

EXECUTE(OperationSet)

REPLY(OperationSet)

Closed(ServiceOrder)

Closed(ServiceRequest)

Page 21: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

Common part of the message is the same as in Maintenance Order. Specifics for providing Customer and Appointment details added. Necessary Meter details also added

Service Order message

Page 22: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

22

Topics

Status of 61968-6

Work Management Interface Reference Model

Process for Work Integration Development

CIM Models for Work

Use Cases & Message Design

Interoperability testing; CIM SOA implementation (Part 100)

Page 23: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

These messages were tested in the CIM international IOP; One of tested use cases was a corrective maintenance as per below diagrams

Page 24: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

Testing applied SOA implementation of CIM messages (Part 100) with ESB and web services

Page 25: IEC 61968-6 Maintenance & Construction from Design to …cimug.ucaiug.org/Meetings/Oslo2014/Supporting Documents/CIM... · IEC 61968-6 Maintenance & Construction from Design to the

And this is how it works!

25

(*) IEC 61968 Part 6 - 2011 CIM Interop 28 March - 1 April, 2011 - Paris, France

EAMESB

CIM (*)

Network Operations

Asset & Work Mgmt

CIM

CIM

CIM (*)

DMS/EMS