icold をめぐる動き(第17報)jcold.or.jp/cm/wp-content/uploads/asset/j/icold...icold...
TRANSCRIPT
HydropowerIWRA ESHA1,239 1720077 ICOLD 1994 20062008 2010
Practical
solutions for sustainable future 17 H. M. Prasser
P. BurgherrPaul Scherrer 2005,000,000 Sirius star 1970 305m305 1,524m 1,524m 4,000
1 HYDRO2011
1. 2. 3. 4.
10. 11. 12. 13. 14. 15. 16.
23. 24. 25. 26. 27. 28. 30.
5. 6. 7. 8. 9.
17. 18. 19. 20. 21. 22.
29. 31. 32. 33.
13
Sagar D. N. D. Hartford, IAEA ICOLD Bulletin
RedundancyDiversitySegregation Defense in Depth DesignFault
TolerantFail to a Safe Condition H. Kreuzer, 50,000 21,000 165,000 /
2.
Australian National
Committee on Large Dams ANCOLD 20111026 28 320 ANCOLD
2 2011 ANCOLD
26 27 28
1. 2. 3.
4. 5. 2010 2011 6. 7. 8. 9.
ANCOLD
EUREKA89) happy hour
14
ICOLD director SE ATM 140
Max
Walker
Issue 6, 2011 pp.29-59.
solutions for sustainable future 17 H. M. Prasser
P. BurgherrPaul Scherrer 2005,000,000 Sirius star 1970 305m305 1,524m 1,524m 4,000
1 HYDRO2011
1. 2. 3. 4.
10. 11. 12. 13. 14. 15. 16.
23. 24. 25. 26. 27. 28. 30.
5. 6. 7. 8. 9.
17. 18. 19. 20. 21. 22.
29. 31. 32. 33.
13
Sagar D. N. D. Hartford, IAEA ICOLD Bulletin
RedundancyDiversitySegregation Defense in Depth DesignFault
TolerantFail to a Safe Condition H. Kreuzer, 50,000 21,000 165,000 /
2.
Australian National
Committee on Large Dams ANCOLD 20111026 28 320 ANCOLD
2 2011 ANCOLD
26 27 28
1. 2. 3.
4. 5. 2010 2011 6. 7. 8. 9.
ANCOLD
EUREKA89) happy hour
14
ICOLD director SE ATM 140
Max
Walker
Issue 6, 2011 pp.29-59.