PKS JURUUKUR BAHAN
Item
Description
Unit
Quantity
Rates Amount
RM RM
A.
B.
C.
D.
E.
SUSPENSION BRIDGE
OVERALL STRUCTURAL WORKS
ELEMENT NO.1: SUSPENSION
STRUCTURE
Vibrated reinforced concrete Grade 35 as
described in:-
Pillar
Footing
Beam
High Tensile Steel Bar Reinforcement as
described in:-
High Tensile Steel Bars
Suspension Cables
M3
M3
M3
Kg
Kg
50
250
150
45,000
20,000
220.00
220.00
220.00
3.50
10.00
11 000.00
55 000.00
33 000.00
157 500.00
200 000.00
Total to overall summary page 456 500.00
DOCUMENTE/4 – BILLS OF QUANTITIES
PKS JURUUKUR BAHAN
Item
Description
Unit
Quantity
Rates Amount
RM RM
A.
B.
C.
D.
SUSPENSION BRIDGE
OVERALL STRUCTURAL WORKS
ELEMENT NO.2: MAIN STRUCTURE
22mm Thick tempered glass 30% of blue tint
as described in Manufacture Specification:-
Flooring
1.2m High 12mm Thick tempered glass 30%
of blue tint with stainless steel railing design
as described in Manufacture Specification:-
Railing
8mm Thick tempered glass 30% blue tint as
described in Manufacture Specification:-
Walls
12.38mm Thick laminated glass (colour to be
selected by Client) completed with Hollow
Mild Steel section painted with white Powder
Coated as described in Manufacture
Specification:-
Canopy
M2
M2
M2
M2
250
72
180
72
560.00
450.00
327.00
625.60
140 000.00
32 400.00
58 860.00
46 987.20
Total to overall summary page 278 238.20
DOCUMENTE/4 – BILLS OF QUANTITIES
PKS JURUUKUR BAHAN
Item
Description
Unit
Quantity
Rates Amount
RM RM
A.
SUSPENSION BRIDGE
OVERALL STRUCTURAL WORKS
ELEMENT NO.3: DOORS
Supply, delivery to site and install the
following door as described all to the
approval and satisfaction of Client
Aluminium Glass Door
6mm Thick approved aluminium glass sliding
door overall size 1800 x 2100mm high in double
leaf all as per “Door Schedule” (Type SD1)
No.
6
1450.00
8700.00
Total to overall summary page 8700.00
DOCUMENTE/4 – BILLS OF QUANTITIES
PKS JURUUKUR BAHAN
Item
Description
Unit
Quantity
Rates Amount
RM RM
A.
B.
C.
D.
E.
F.
G.
SUSPENSION BRIDGE
OVERALL STRUCTURAL WORKS
ELEMENT NO.4: MECHANICAL &
ELECTRICAL WORKS
Cold Water Piping C/W all accessories
50mm Diameter HDPE pipe PN 20
20mm Diameter HDPE pipe PN 20
Waste Water Piping
150mm Diameter HDPE pipe PN 10
Multimedia Supply
“Amphenol Spectra Strip” 30.5m Length Fibre
Optic Ribbon 12 x 125µm cables with orange
PVDF jacket
Electrical Supply
3 Phase Power Supply from TNB BHD c/w all
necessary cabling, steel trunking, internal
wiring works and power points
3 phase cable (Lump Sum)
Internal wiring works (Lump Sum)
Power point (Lump Sum)
M
M
M
No.
40
25
40
1
50.00
40.00
75.00
5500.00
2000.00
1000.00
3000.00
5500.00
20 000.00
5000.00
1000.00
Total to overall summary page 37 500.00
DOCUMENTE/4 – BILLS OF QUANTITIES
PKS JURUUKUR BAHAN
Item
Description
Unit
Quantity
Rates Amount
RM RM
SUSPENSION BRIDGE
OVERALL SUMMARY
Element No. 1: Suspension Structure
Element No. 2: Main Structure
Element No. 3: Door
Element No. 4: Mechanical and Electrical
Works
456 500.00
278 238.00
8700.00
37 500.00
Total Overall Cost 780 938.00