Page 1: ICETHROWER AKTUELLT LÄGE OCH RESULTATstandupforwind.se/digitalAssets/491/491178_3ice... · Vattenfall Vindkraft AB Skellefteå Kraft AB Dala Vind AB Time schedule Oct 2013 – Sep

VINDKRAFTSFORSKNING I FOKUS 7 oktober, 2015 Jenny Lundén Pöyry Sweden

ICETHROWER – AKTUELLT LÄGE OCH RESULTAT

Page 2: ICETHROWER AKTUELLT LÄGE OCH RESULTATstandupforwind.se/digitalAssets/491/491178_3ice... · Vattenfall Vindkraft AB Skellefteå Kraft AB Dala Vind AB Time schedule Oct 2013 – Sep

COPYRIGHT©PÖYRY

WHAT IS THE PROBLEM?

6-7 OKTOBER 2015

VINDKRAFTSFORSKNING I FOKUS 2

Page 3: ICETHROWER AKTUELLT LÄGE OCH RESULTATstandupforwind.se/digitalAssets/491/491178_3ice... · Vattenfall Vindkraft AB Skellefteå Kraft AB Dala Vind AB Time schedule Oct 2013 – Sep

COPYRIGHT©PÖYRY

WHAT IS THE PROBLEM?

6-7 OKTOBER 2015

VINDKRAFTSFORSKNING I FOKUS 3

1. Wind turbines drop ice pieces occasionally

2a. The emotional conclusion is “often” and “long distance” (km!)

2b. The pragmatic approach is ”now and then” and “within 1D”

3. Risk level is generally poorly investigated and hard to calculate

Page 4: ICETHROWER AKTUELLT LÄGE OCH RESULTATstandupforwind.se/digitalAssets/491/491178_3ice... · Vattenfall Vindkraft AB Skellefteå Kraft AB Dala Vind AB Time schedule Oct 2013 – Sep

COPYRIGHT©PÖYRY

IS THERE A SOLUTION TO THE PROBLEM?

6-7 OKTOBER 2015

VINDKRAFTSFORSKNING I FOKUS 4

Level of confidence can be increased by more observations

Discrepancies between different turbines can be investigated

A generic tool to increase the possibility to calculate and

communicate risk both for service personnel and for the public

Page 5: ICETHROWER AKTUELLT LÄGE OCH RESULTATstandupforwind.se/digitalAssets/491/491178_3ice... · Vattenfall Vindkraft AB Skellefteå Kraft AB Dala Vind AB Time schedule Oct 2013 – Sep

COPYRIGHT©PÖYRY VINDKRAFTSFORSKNING I FOKUS

5

WHICH IS OUR APPROACH?

6-7 OKTOBER 2015 5

Joint research project within Energimyndigheten’s

research program “Wind power in cold climate”.

Pöyry Sweden Project leader

Consultant

ProgramoGrafik Consultant

2 turbines in mid Swedish

forest

without blade heating

2 turbines in north Swedish

mountain terrain

with blade heating

2 turbines in north Swedish

forest

without blade heating

Dala Vind Skellefteå Kraft Vattenfall Vindkraft

Page 6: ICETHROWER AKTUELLT LÄGE OCH RESULTATstandupforwind.se/digitalAssets/491/491178_3ice... · Vattenfall Vindkraft AB Skellefteå Kraft AB Dala Vind AB Time schedule Oct 2013 – Sep

COPYRIGHT©PÖYRY

WHICH IS OUR APPROACH?

6-7 OKTOBER 2015

VINDKRAFTSFORSKNING I FOKUS 6

To collect data from grounded ice fragments (x,y; weight; photos)

To create a database for common use

Develop a usable simulation tool for risk evaluation based on collected data

Verify and integrate the existing tool KASTIS into a common tool box

Financing

Total budget SEK 982.000

65%

11%

13%

11%

Energimyndigheten

Vattenfall Vindkraft AB

Skellefteå Kraft AB

Dala Vind AB

Time schedule

Oct 2013 – Sep 2016

Page 7: ICETHROWER AKTUELLT LÄGE OCH RESULTATstandupforwind.se/digitalAssets/491/491178_3ice... · Vattenfall Vindkraft AB Skellefteå Kraft AB Dala Vind AB Time schedule Oct 2013 – Sep

COPYRIGHT©PÖYRY

WHEN WILL WE HAVE RESULTS?

6-7 OKTOBER 2015

VINDKRAFTSFORSKNING I FOKUS 7

Data collection during winter 2013-2016

Development of models 2015/2016

Report Q3 2016

Link from Winterwind web site

Page 8: ICETHROWER AKTUELLT LÄGE OCH RESULTATstandupforwind.se/digitalAssets/491/491178_3ice... · Vattenfall Vindkraft AB Skellefteå Kraft AB Dala Vind AB Time schedule Oct 2013 – Sep

COPYRIGHT©PÖYRY

HOW WILL THE RESULTS BE PRESENTED?

6-7 OKTOBER 2015

VINDKRAFTSFORSKNING I FOKUS 8

Results from exploratory investigations

Data base from observations

Vindkraftverk X-koordinat Y-koordinat

Koordinatsystem RT90 2,5 gon V

Nr Observation Kasttid Vid kasttillfället Fyndplats Vikt Längd Bredd

år månad dag tid år månad dag tid Driftsmod Vindstyrka Riktning Ber riktn Temp Tryck X-koordinat Y-koordinat Istyp kg Ursprung Foto cm cm

1

2

3

4

5

6

7

8

Statistic simulation program module

Page 9: ICETHROWER AKTUELLT LÄGE OCH RESULTATstandupforwind.se/digitalAssets/491/491178_3ice... · Vattenfall Vindkraft AB Skellefteå Kraft AB Dala Vind AB Time schedule Oct 2013 – Sep

COPYRIGHT©PÖYRY

EXAMPLE OF OUTCOME – PRELIMINARY RESULTS

6-7 OKTOBER 2015

VINDKRAFTSFORSKNING I FOKUS 9

0 50 100 1500

100

200

300

400

Avstånd från turbin

Id.

nr.

Alla tillgängliga iskast:314 st

0 20 40 60 80 100 120 140 1600

0.05

0.1

Avstånd från turbin, 10 m - intervall

Rela

tiv f

rekvens

Page 10: ICETHROWER AKTUELLT LÄGE OCH RESULTATstandupforwind.se/digitalAssets/491/491178_3ice... · Vattenfall Vindkraft AB Skellefteå Kraft AB Dala Vind AB Time schedule Oct 2013 – Sep

COPYRIGHT©PÖYRY

EXAMPLE OF OUTCOME – PRELIMINARY RESULTS

6-7 OKTOBER 2015

VINDKRAFTSFORSKNING I FOKUS 10

7.1253 7.1254 7.1254 7.1254 7.1255 7.1255 7.1256 7.1257 7.1257

x 106

1.6246

1.6247

1.6247

1.6248

1.6248

1.6249

1.6249

x 106

RT90 X

RT

90 Y

90

180

270

360

Turbin

R = rotorradie

R = 180 m

Slumpmässiga iskast

6.7424 6.7424 6.7424 6.7425 6.7425 6.7426 6.7427 6.7427 6.7428

x 106

1.4773

1.4774

1.4774

1.4775

1.4775

1.4776

1.4776

x 106

RT90 X

RT

90 Y

90

180

270

360

Page 11: ICETHROWER AKTUELLT LÄGE OCH RESULTATstandupforwind.se/digitalAssets/491/491178_3ice... · Vattenfall Vindkraft AB Skellefteå Kraft AB Dala Vind AB Time schedule Oct 2013 – Sep

COPYRIGHT©PÖYRY

EXAMPLE OF OUTCOME – PRELIMINARY RESULTS

6-7 OKTOBER 2015

VINDKRAFTSFORSKNING I FOKUS 11

0 20 40 60 80 100 120 140 160 1800

0.002

0.004

0.006

0.008

0.01

0.012

0.014

0.016

0.018

0.02

Avstånd från turbin [m]

Anta

l is

kast/

m2

Alla tillgängliga iskast:314 st

45m

= 0

.5R

D

90m

= 1

RD

135m

= 1

.5R

D

180m

= 2

RD

Page 12: ICETHROWER AKTUELLT LÄGE OCH RESULTATstandupforwind.se/digitalAssets/491/491178_3ice... · Vattenfall Vindkraft AB Skellefteå Kraft AB Dala Vind AB Time schedule Oct 2013 – Sep

COPYRIGHT©PÖYRY

THANK YOU!

6-7 OKTOBER 2015 VINDKRAFTSFORSKNING 12

CONTACT:

Bengt Göransson

MAIL: [email protected]

PHONE: +46 10 474 0056