ICEE Demonstration Project

ByDr. W F Fok / Prof K P Cheung

Date: Dec 7, 2009 (Mon)Time: 12:30pm

Venue: 2/F Yam Pak Bldg

Agenda

• Layout of the demo room

• Projects to be demonstrated

• Renovation works involved

• System diagram

• Work schedule

• Discussion

Existing layout of the Yam Pak Bldg 2/F

Proposed demo room area

Proposed layout of the demo room

Visitor path

Zone A

Zone B

Zone CZone D

A door should

be opened between zone B

and zone C

Streamlined artistic partition

Project 1

Project 2

Project 4

Pro

ject

7

Project 3

Project 6

Video show

Pro

ject

8P

roje

ct 9

Pro

ject

12

Project 11

Project 10Pro

ject

13

Project 14

Project 5

ZoningZone Room Capacity

A Energy Collection 2 projects

B Grid and Control 5 projects

C Energy Storage and Saving

5 projects

D Environment 2 projects

Roof Energy Collection

GE Agrobiotech4 - 6 projects

Project (Indoor demo)Proj. Title In-charge Proj. Title In-charge

A1 Solar PV Energy* Prof K Y Chan / Prof F.Liu

C8 Energy Storage (small scale in the indoor demo room, real scale at the roof)

Prof K Y Chan

A2 Wind Energy* Prof D Leung / Prof M Leung

C9 Solid-State Lighting Dr Anthony Choi

B3 Delivering Renewable Energy in DC Microgrids

Prof. FF wu/ Dr J Zhong

C10 Reserved for future

B4 Smart Grid Prof V Li

Dr Yang

C11 Reserved for future

B5 Reserved for future C12 Reserved for future

B6 Reserved for future D13 Urban ventilation Dr CH Liu/

Prof Yuguo Li

B7 Reserved for future D14 GE Agrobiotechnology Dr Wallace Lim

* For energy collection: poster display and web monitoring in the demo room, real installation at the roof

At the roof

Facing Chow Yei Ching Bldg

Battery and Equipment room at the roof

Green house

Micro wind turbine

N

S

PV panels

PV panelsThe existing solar facilities will be removed except that the supporting frame can be reused. New PV panels will be installed. 10 pcs of 500W PV panels can be hosted in the existing frame. Capacity: 5kW

Covering the building service facilities

Covering the building service facilities

Existing building facilities will be covered by plastic grass carpet for appearance improvement and easy maintenance

plastic grass carpet

Covering the building service facilities

Covering the building service facilities

Existing building facilities will be covered by plastic grass carpet for appearance improvement and easy maintenance

Existing solar facilities to be removed

Anther solar facilities including the frame should be removed to provide space for the green house

Existing solar facilities to be removed

Greenhouse for GE agrobiotech demo

Micro wind turbine

Before

After

Battery and Equipment room at the roof

Battery and Equipment Room

Battery and Equipment Room

Solar Panel

Micro wind turbine

System diagram

SmartCharger

Internet

To be shared with world via Internet

In battery room at roof

SensorsSystem

CCTVQuadMux

DC/AC

Wind speed, temperature, humidity, light intensity…etc.

Powering up LED and demo equipment

Real-time monitoring the status at the roof

Charger Status

ICEE Demo Web portal

In battery room at roof

At roof

In demo room on 2/F

Project Schedule2009 2010

Tasks Nov Dec Jan Feb Mar Apr May Jun Jul Aug

Finalize overall design xx Xx

Tender building works xx Xx

Building works xx Xx Xx

Finalize the detailed design of each project

Xx

Purchase demo materials

Xx Xx

Lab installation and testing

xx Xx

Installation in the demo room

Xx Xx Xx x

Posters, display, brochures

Xx Xx

Testing and dry run Xx X

Official launch and

Opening ceremony

xx

Other discussions

• The pamphlet for each project [ref. Wallace’s pamphlet- when?

• Web cam and internet display of demo items?

• Summer students to help, budget?