ICEE Demonstration Project
ByDr. W F Fok / Prof K P Cheung
Date: Dec 7, 2009 (Mon)Time: 12:30pm
Venue: 2/F Yam Pak Bldg
Agenda
• Layout of the demo room
• Projects to be demonstrated
• Renovation works involved
• System diagram
• Work schedule
• Discussion
Proposed layout of the demo room
Visitor path
Zone A
Zone B
Zone CZone D
A door should
be opened between zone B
and zone C
Streamlined artistic partition
Project 1
Project 2
Project 4
Pro
ject
7
Project 3
Project 6
Video show
Pro
ject
8P
roje
ct 9
Pro
ject
12
Project 11
Project 10Pro
ject
13
Project 14
Project 5
ZoningZone Room Capacity
A Energy Collection 2 projects
B Grid and Control 5 projects
C Energy Storage and Saving
5 projects
D Environment 2 projects
Roof Energy Collection
GE Agrobiotech4 - 6 projects
Project (Indoor demo)Proj. Title In-charge Proj. Title In-charge
A1 Solar PV Energy* Prof K Y Chan / Prof F.Liu
C8 Energy Storage (small scale in the indoor demo room, real scale at the roof)
Prof K Y Chan
A2 Wind Energy* Prof D Leung / Prof M Leung
C9 Solid-State Lighting Dr Anthony Choi
B3 Delivering Renewable Energy in DC Microgrids
Prof. FF wu/ Dr J Zhong
C10 Reserved for future
B4 Smart Grid Prof V Li
Dr Yang
C11 Reserved for future
B5 Reserved for future C12 Reserved for future
B6 Reserved for future D13 Urban ventilation Dr CH Liu/
Prof Yuguo Li
B7 Reserved for future D14 GE Agrobiotechnology Dr Wallace Lim
* For energy collection: poster display and web monitoring in the demo room, real installation at the roof
At the roof
Facing Chow Yei Ching Bldg
Battery and Equipment room at the roof
Green house
Micro wind turbine
N
S
PV panelsThe existing solar facilities will be removed except that the supporting frame can be reused. New PV panels will be installed. 10 pcs of 500W PV panels can be hosted in the existing frame. Capacity: 5kW
Covering the building service facilities
Existing building facilities will be covered by plastic grass carpet for appearance improvement and easy maintenance
plastic grass carpet
Covering the building service facilities
Existing building facilities will be covered by plastic grass carpet for appearance improvement and easy maintenance
Existing solar facilities to be removed
Anther solar facilities including the frame should be removed to provide space for the green house
Battery and Equipment room at the roof
Battery and Equipment Room
Battery and Equipment Room
Solar Panel
Micro wind turbine
System diagram
SmartCharger
Internet
To be shared with world via Internet
In battery room at roof
SensorsSystem
CCTVQuadMux
DC/AC
Wind speed, temperature, humidity, light intensity…etc.
Powering up LED and demo equipment
Real-time monitoring the status at the roof
Charger Status
ICEE Demo Web portal
In battery room at roof
At roof
In demo room on 2/F
Project Schedule2009 2010
Tasks Nov Dec Jan Feb Mar Apr May Jun Jul Aug
Finalize overall design xx Xx
Tender building works xx Xx
Building works xx Xx Xx
Finalize the detailed design of each project
Xx
Purchase demo materials
Xx Xx
Lab installation and testing
xx Xx
Installation in the demo room
Xx Xx Xx x
Posters, display, brochures
Xx Xx
Testing and dry run Xx X
Official launch and
Opening ceremony
xx