icao performance based navigation symposium pbn, are we ...€¦ · faa: after aircraft cert,...
TRANSCRIPT
ICAO Performance Based Navigation Symposium
PBN, Are We Ready To Go
October 17, 2012
Dave Nakamura ICCAIA
ROI 12-00308-BCA
Airplanes and Capability Where Airplanes Can Be Used A Challenge to Implementation Is There Still Work To Do? Another Challenge The In-Service Fleet
Fleet capability demonstrated long before RNP criteria issued.
Manufacturer PBN Readiness
Airplanes and Capability
1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 20062007200820092010 2015 2020 2025
737 747-400A330/A340
A320/ 777
767/757
717/MD90 MD11 MD10 A380 787 747-8
RNP ARAMC 20-26RNP APCHAMC 20-27
RNP ARAC90-101
RNP/VNAVAC90-105
ICAOPBN9613
9613 U/D
Where Airplanes Can Be Used In PBN Operations RNP has many forms in many places.
Manufacturer PBN Readiness
RNAV 1/2RNP 2, 1, AR
RNP 12 => 4
RNP APCH, RNP AR,RNAV 1/5
RNP 10 => 4
RNP 10 => 4
RNP 10
RNP 4
RNP 4RNP 1, AR
GLSRNP AR
RNP AR
RNP AR
RNP 1, AR
There is a lot to track and understand, and some big differences.
One Challenge – Regulatory Compliance
Manufacturer PBN Readiness
Europe
USA RNP 10: N8400.12ABRNAV: AC90-96ARNP 4: N8400.33RNAV 2: AC90-100
N8400.71RNAV 1: AC90-100
N8400.71
RNP 10: NPA 20-8BRNAV: AMC 20-4
RNAV 2: AC90-100AN8400.71
RNAV 1: AC90-100AN8400.71N8260.54
RNP APCH: AC90-105VNAV: AC20-138CRNP: AC20-138CRNP AR N8260.52
AC20-153AC90-101A
Specials AC120-29A
PRNAV: TGL 10RNP AR: AMC 20-26RNP APCH: AMC20-27VNAV: AMC20-27
PRNAV: TGL 10RNP AR AMC 20-26RNP APCH: AMC20-27VNAV: AMC20-27
RNAV 2: AC90-100AN8400.71
RNAV 1: AC90-100AN8400.71N8260.54
RNP APCH: AC90-105VNAV: AC20-138CRNP: AC20-138CRNP AR N8260.52
AC20-153AC90-101A
Specials AC120-29A
RNP.3 RNP.5 RNP1
RNP2
RNP4-12...
RNP2
RNP1RNP.5
FAFRNP.3
RNP.1
Manufacturer
FAA Airworthiness Evaluation FAAOPS Evaluation
Operator
Manufacturer
EASA Airworthiness + OPS Readiness Evaluation
Manufacturer Operator
NAA OPS Evaluation
Operational Approval
Operational Approval
Manufacturer
AFM RNP value« turn-key »
AFM RNP value« ops enabler »
FAA: After aircraft cert, operator has primary responsibility to ensure aircraft can perform as needed for intended operations. Manufacturer support as necessary.
EASA: As part of aircraft cert, all artifacts for possible intended operations must be demonstrated by manufacturer and in place. Operator is evaluated based upon manufacturers material.
Differences in criteria and regulatory approach.
One Challenge – Regulatory Compliance
Manufacturer PBN Readiness
Where We Might Have More To Do
Operational Requirements:Reduced separation & spacing, improved access, optimize airspace design & usage, operational flexibility, etc
Standards & Guidance:SARPS, PANS-Ops, PANS-ATM, DO-236, D0-283, EURO Nav Standard, AWO Manual, RNP Roadmap, etc
Aircraft & Infrastructure:ATS: Flt Plan Designators, Navaids,etcA/C: Equipage, capability
Application Development:Procedures, Specials, Trials, Ops Spec criteria, charts, ATS procedures, etc
Regulatory Criteria:US: AC’s, FAR, Notices, HBATs, Manuals, TERPS, etc. EU: ACJ’s, JAR, Procedure Manual, AIC, TGL, etc
Operational Concept:Trajectory based operations with RNAV, RNP, & VNAV for access, capacity, efficiency & safety
Operational Implementation:Ops Approvals, ATM Manuals, AIM,Charts, Op Manual & Specs, AFM, etc
?
?
?
√??
√
There are other pieces to the implementation solution.
Manufacturer PBN Readiness
ManfProfitManfProfitRevenues Costs
Market
Price
NewAirplane
Services
RetrofitLifecycle
Costs
ImplementCosts
OperatorValue
Efficiency Costs
Revs
Labor
TrainingSpares
Downtime
Prerequisites
Training
Maintenance
NR
Rec.
SupplierPmts.
Kitting
Eng.
Mfg.
Test & Cert
Supplier
Eng.
Supplier
Mfg.
EnabledFuture
Business
∆ APSales
∆ AP SaleRevs
IndustryDevelopment
RegulationDevel.Regulatory
Mandate
ProcedureDevel.
StandardsDevel.
Alignment toHigher Level Strategies
AirlineBus. Case*
Airlines Manufacturer
*Assumption = 18 month ROI required
Wt./Fuel
Return on Investment
One More Challenge – Making the Business Case
Manufacturer PBN Readiness
Implementation more complicated than people think.
Fleet Size
Fleet by Model
ManufactureOperation
YearsMixed Fleet
Operations SpecificCritical MassNote: more time, complex & cost if multiple retrofits, a good cost benefit rationale and ROI are required.
Flow – 10 years+?Start CNSRetrofit
TechnologyRefresh
SystemsUpdate
SystemsUpdate
SystemsUpdates
New Standards and Regulatory Guidance
OEM Upgrades
The In-Service Fleet
Manufacturer PBN Readiness
The End