ibwave: high level deployment process for enterprise small cells
TRANSCRIPT
http://scf.io/case/xxx
High level deployment process for enterprise small cells
DOCUMENT
SURVEY
Client &Site info
DESIGN
Planning& Design
MAINTAIN
MaintenanceUpgrades
BUILD
Install &Commission
4 basic steps to deploy enterprise small cell networks: survey / design / build / maintain
http://scf.io/case/xxx
Design tool objectives for enterprise small cell networks
Overall design tool objective for an enterprise small cell network:Minimize TCO while enabling scalability
PORTABLE: Easy to carry on-site
INTUITIVE: RF expertise not required
AFFORDABLE: Accessible to all field personnel
COMPLETE & ACCURATE: Getting it right the 1st time
INTEGRATED: Complete end-to-end workflow
55% time savings achieved by surveying & designing a Huawei Lampsite enterprise small cell site using iBwave Mobile Planner. www.ibwave.com http://scf.io/case/xxx
240K sq ft mall, Manila (Philippines)
LTE design criteria: Coverage: RSRP -92 dBm @ 99%Quality: SNIR 10dB @ 99%
Number of required small cells: 8
Survey & design: 4.5 hours
Time savings: 5 hours (55%)
Tool used: iBwave Mobile Planner
Case study of iBwave Mobile Planner: on-site survey & design tool