ibs scoring in malaysia -...
TRANSCRIPT
Datuk Ir. Elias IsmailSenior General Manager
Technology Development Sector
Construction Industry Development Board (CIDB)
IBS CONFERENCE
26th March 2019
IBS SCORING IN MALAYSIA :
HOW CAN CIDB AND
INDUSTRY PLAYERS WORK
HAND IN HAND TO
PROMOTE USAGE OF IBS?
1
CONTENTS
1
2
3
ABOUT IBS
IBS ECOSYSTEM4
HOW CAN WE WORK HAND IN
HAND TO PROMOTE IBS
IBS SCORE
5 IBS DATA & STATISTIC
6 CONCLUSION
2
ABOUT IBS
3
Industrialised Building System or IBS” means
the technique of construction whereby
components are manufactured in a
controlled environment, either at site or off-
site and subsequently transported,
positioned and assembled into
construction worksACT 520
ABOUT IBS
Design
Production
Delivery
Form a Completed Unit
Installation 4
Precast Concrete Metal Framing Block Work
Timber Framing InnovativeReusable Formwork
1 2 3
4 5 6
ABOUT IBS – TYPES OF IBS SYSTEMS AND COMPONENTS
5
GOVERNMENT
SECTOR
-Surat Pekeliling
Perbendaharaan
Bil. 7 tahun 2008
Projek kerajaan yang bernilai RM10 Juta dan keatas wajib mencapaiminimum 70 IBS Skor sejakdari 2008
PRIVATE
SECTOR
Pekeliling KSU
Kementerian KPKT
Bil. 1 Tahun 2017
-Bertarikh 10
Januari 2018
ABOUT IBS - IBS POLICYX
Projek swasta yang bernilaiRM50 Juta dan ke ataswajib mencapai minimum 50 IBS Skor
6
IBS SCORE
7
8
MC on MS 1064
PART 3 : OTHER SIMPLIFIED CONSTRUCTION – 30 SCORE
Repetitiveness
PART 1 : STRUCTURE SYSTEM – 50 SCORE
Roof Structure
Column
Floor Structure
Wall/Panel
PART 2 : WALL SYSTEM – 20 SCORE
Productivity
Beam
IBS SCORE CALCULATIONX
8
HOW CAN WE WORK HAND IN
HAND TO PROMOTE IBS
9
OLIGOPOLY
Market Share by small no. of players and control market
Low delivery of the targeted affordable housing
DELIVERY
QUALITY
Quality in manufacturing and installation process of IBS components
R&D
Poor commercialization for local R&D Products
SME
No real development from new IBS SME company
IBS ISSUES ON THE GROUND
TECHNOLOGY
Low usage of new technology and innovation in the IBS
CONVENTIONAL METHOD
High dependency on conventional method
10
X HOW CAN WE WORK HAND IN HAND TO PROMOTE IBS
11
CIDB HAND IN HAND TO PROMOTE IBSX
12
IBS ECOSYSTEM
12
17
IBS ECOSYSTEM
13
X
IBS DATA & STATISTIC
14
DESCRIPTIONB01 B02 B19 B22 B23
JUMLAHBumi Non Bumi Bumi Non Bumi Bumi Non Bumi Bumi Non Bumi Bumi Non Bumi
JOHOR 80 13 584 81 14 1 23 2 12 3 813
KEDAH 82 5 399 23 0 0 6 0 0 1 516
KELANTAN 142 0 433 7 4 0 10 0 6 0 602
MELAKA 48 1 168 22 29 1 34 1 0 0 304
NEGERI SEMBILAN 172 5 257 24 1 0 3 0 2 0 464
PAHANG 57 5 507 24 4 1 22 1 4 0 625
PERAK 47 6 271 39 4 1 61 1 15 1 446
PERLIS 8 0 162 1 1 0 8 0 2 0 182
PULAU PINANG 37 6 499 69 0 2 1 1 3 0 618
SABAH 39 15 253 58 5 1 10 1 4 0 386
SARAWAK 158 74 307 99 5 4 25 8 9 1 690
SELANGOR 202 54 1197 194 19 21 91 17 21 4 1820
TERENGGANU 19 2 465 12 5 1 6 0 11 0 521
WILAYAH PERSEKUTUAN KUALA LUMPUR 112 32 671 204 16 10 37 5 5 0 1092
WILAYAH PERSEKUTUAN LABUAN 3 0 4 0 1 0 1 0 1 0 10
WILAYAH PERSEKUTUAN PUTRAJAYA 3 1 3 1 0 0 0 0 0 0 8
JUMLAH 1209 219 6180 858 108 43 338 37 95 10 9097
KONTRAKTOR IBS
BUMI 7930
NON BUMI 1167
JUMLAH 9097NOTE:B01-SISTEM KONKRIT PRATUANG B02-SISTEM KERANGKA KELULI B19-SISTEM ACUAN B22-SISTEM BLOK B23-SISTEM KERANGKA KAYU
STATSTICS OF IBS CONTRACTORS REGISTERED WITH CIDB
(UNTIL DECEMBER 2018)X
15
SENARAI PEMBEKAL KOMPONEN IBS SEHINGGA DISEMBER 2018
NEGERI
Precast Concrete System (Sistem Konkrit Pratuang)
Reusable Formwork System (Sistem Acuan Berulang)
Metal Framing System (Sistem Kerangka Logam)
Timber Framing System (Sistem Kerangka Kayu)
Blockwork System (Sistem Blok)
Innovative System (Sistem Inovatif)
JUMLAH KESELURUHANSETIAP NEGERI
PRECAST ONSITE PRECAST FORMWORK STEEL STRUCTURE METAL ROOF TRUSSES TIMBER FRAME BLOCK INOVATIVE
Pengeluar PengedarJUMLAH
Pengeluar PengedarJUMLAH
Pengeluar PengedarJUMLAH
Pengeluar PengedarJUMLAH
Pengeluar PengedarJUMLAH
Pengeluar PengedarJUMLAH
Pengeluar PengedarJUMLAH
Pengeluar PengedarJUMLAH
Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah Bumi Jumlah
1 JOHOR 1 22 22 3 4 4 1 2 2 1 5 5 1 4 4 1 1 4 4 9 1 10 52
2 K.LUMPUR 0 1 2 2 0 1 1 1 1 1 0 0 1 2 3 7
3 KEDAH 3 4 4 0 1 1 2 2 2 1 1 0 1 1 1 1 2 2 12
4 KELANTAN 1 1 1 0 0 0 1 3 3 0 1 1 1 2 2 2 7
5 MELAKA 1 3 3 1 1 0 1 2 2 1 1 1 1 1 2 2 0 10
6 N. SEMBILAN 4 7 7 1 2 2 3 3 0 1 1 1 0 2 3 3 2 2 18
7 P.PINANG 2 2 0 1 1 1 1 1 2 2 0 1 1 0 7
8 PAHANG 1 2 2 1 1 1 0 0 1 2 2 0 1 3 3 0 8
9 PERAK 1 3 3 0 0 1 1 1 2 2 0 1 1 1 3 7 2 9 16
10 PERLIS 1 1 1 0 0 0 0 0 0 0 1
11 SABAH 2 7 7 0 0 4 4 3 3 0 2 4 1 5 3 1 4 23
12 SARAWAK 3 5 5 1 1 0 5 5 1 3 3 1 1 2 2 2 2 2 19
13 SELANGOR 5 18 18 2 7 7 1 21 7 28 3 10 10 1 7 7 0 4 10 1 11 6 22 3 9 31 112
14 TERENGGANU 2 2 2 1 1 0 0 2 2 2 2 2 2 1 1 1 0 8
Jumlah 25 77 0 0 77 8 19 0 0 19 2 28 0 8 36 6 30 0 1 31 11 32 0 0 32 2 5 0 0 5 15 33 0 2 35 12 50 3 15 65 300
Kategori Jumlah
PengeluarBumi 81
274Non Bumi 193
PengedarBumi 3
26Non Bumi 23
JUMLAH KESELURUHAN 300 300
IBS MANUFCTURER STATISTIC
(UNTIL DECEMBER 2018)
X
16
19
23
52
8
8
7
12
1
10
112
16
7
18
7
300 PENGELUAR IBS
IBS MANUFCTURER STATISTIC
(UNTIL DECEMBER 2018)X
17
IBS INSTALLER STATISTIC UNTIL DECEMBER 2018X
IBS PROFESSIONAL STATISTIC
(UNTIL DECEMBER 2018)X
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2016 2017 2018
JUMLAH PROFESIONAL IBS TERLATIH
JUMLAH PROFESIONAL IBS TERLATIH
356
1713
1984
19
Currently, the industry is at medium level of prefabrication adoption but is heading into a more rapid implementation of IBS in future.
Advanced technology and modern methods of construction using prefabrication and offsite construction are needed to cope with current global construction industry.
CIDB and industry must work hand in hand to implementing IBS in the ground level to delivering efficient, sustainable and productive construction environment.
CONCLUSION
20
Thank You