8
EXPLANATORY NOTES TO SUBMISSION FOR LEVY EXEMPTION 1. Application shall be accompanied by:- i) IBS Score forms ii) 1 set of overall construction layout plan iii) 1 set of beams and columns layout plan for every floor. iv) 1 set of wall layout plan for every floor. v) 1 set of elevation shop drawings. 2. All drawings need to be endorsed by a certified engineer. 3. Construction components in the shop drawings need to be marked with colour. 4. Summary of beams, walls, columns, slab, doors, and windows need to be include in the floor layout plan. Construction components include precast/non-precast beams, columns, slabs, walls etc. Minimum requirement for IBS Score: Total Score = Score for Structural System (>25) (>50) + Score for Wall System (>15) + Score for Other Labour Saving (>10) Factor

Upload: ariffin-ngah

Post on 07-Apr-2015

261 views

Category:

Documents


15 download

TRANSCRIPT

Page 1: IBS Score Form

EXPLANATORY NOTES TO SUBMISSION FOR LEVY EXEMPTION

1. Application shall be accompanied by:- i) IBS Score forms ii) 1 set of overall construction layout plan iii) 1 set of beams and columns layout plan for every floor. iv) 1 set of wall layout plan for every floor. v) 1 set of elevation shop drawings.

2. All drawings need to be endorsed by a certified engineer. 3. Construction components in the shop drawings need to be marked with colour. 4. Summary of beams, walls, columns, slab, doors, and windows need to be include

in the floor layout plan. Construction components include precast/non-precast beams, columns, slabs, walls etc.

Minimum requirement for IBS Score: Total Score = Score for Structural System (>25) (>50) + Score for Wall System (>15) + Score for Other Labour Saving (>10) Factor

Page 2: IBS Score Form

Form CIDB IBS Score M1

Project Registration No:

Project Category:

Project Name: Contract Value:

Contractor Name: Developer / Owner Name:

Architecture Consultant Civil/Structure Engineer Consultant Name:

List of Submitted Drawings1) ___________________________________ 6) _______________________________2) ___________________________________ 7) _______________________________3) ___________________________________ 8) _______________________________4) ___________________________________ 9) _______________________________5) ___________________________________ 10) _______________________________

We hereby declare that the information given and the IBS Score submitted herewith is true and complete.

The total IBS Score for the proposed building / project is ____________

Date: ______________ Name & Signature of Qualified Person

Designation:___________________________

Reg No. (Arch/PE/QS):________________

CALCULATION FOR IBS SCORE

For office use

Page 3: IBS Score Form

Project Name : __________________________________________________________________________

Type/Block No : ____________________________________ Total no of Units/blocks:____________

Contract Value:_____________

1.1 FLOOR = PRECAST CONCRETE SLAB

a) Precast column and beams

b) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formworkg) In-situ column and beams with stick build formwork

PROJECT DETAILS

____________________________________________________________________________________________________________________________________________________________________________________

Others __________________ Institutional

Others ________________ m2

Institutional ________________ m2

For mixed development, please indicate the area of the category:

Industrial

Category of Building

Residential (landed) Commercial

Residential (high rise)

Industrial ________________ m2Residential (landed) ________________ m2

Commercial ________________ m2

Residential (high rise) ________________ m2

PART 1: STRUCTURAL SYSTEMS

0.9

0.8

0.8

1.0 CONCRETE

0.7

0.9

0.6

1.0

CALCULATIONS OF OVERALL IBS SCORE

ELEMENTSAREA (m2)

IBS FACTOR

COVERAGE %

IBS CONTENT

SCORE

CALCULATION OF IBS SCORE

Page 4: IBS Score Form

a) Precast column and beamsb) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formworkg) In-situ column and beams with stick build formwork

a) Precast column and beams

b) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formwork

g) In-situ column and beams with stick build formwork

a) Precast column and beams

b) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formwork

g) In-situ column and beams with stick build formwork 0.0

0.3

0.4

0.5

0.4

0.5

0.3 1.4 FLOOR = IN-SITU CONCRETE USING TIMBER

FORMWORK

0.6

0.5

0.5

0.6

0.5

0.7

0.6

0.5

1.2 FLOOR = IN-SITU CONCRETE ON PERMANENT METAL FORMWORK

1.3 FLOOR = IN-SITU CONCRETE WITH REUSABLE SYSTEM FORMWORK

0.6

0.7

0.8

0.7

ELEMENTS AREA (m2) (a)

IBS FACTOR

0.8

0.9

IBS CONTENT

SCORE

COVERAGE %

Page 5: IBS Score Form

a) Precast column and beamsb) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formworkg) In-situ column and beams with stick build formwork

a) Precast column and beamsb) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formworkg) In-situ column and beams with stick build formwork

a) Precast column and beamsb) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formwork

g) In-situ column and beams with stick build formwork

0.5

0.4

0.6

0.4

0.6

1.7 NO FLOOR

1.0

0.7

0.6

0.0

0.9

0.8

0.8

0.9

0.6

1.6 FLOOR = TIMBER FRAME FLOORING SYSTEM

1.0

0.7

0.8

0.9

0.8

0.9

COVERAGE %

IBS CONTENT

SCORE

1.5 FLOOR = STEEL FLOORING SYSTEM

1.0

ELEMENTS AREA (m2) (a)

IBS FACTOR

Page 6: IBS Score Form

a) Floor using precast concrete slabb) Floor using in-situ concrete on permanent metal formworkc) Floor using in-situ concrete with reusable system formworkd) Floor using in-situ concrete with stick built formworkd) Floor using steel flooring system

e) Floor using timber frame flooring system

a) Prefab timber roof truss

b)Prefab metal roof truss

c) Timber roof truss

TOTAL AREA 100%

2.0 STEEL

1.0

2.1 COLUMNS AND BEAM = STEEL

0.9

Sub-total for structural system (maximum 50 points) ( A )

0.6

f) No floor 1.0

3.0 TIMBER FRAME SYSTEM 1.0

4.0 ROOF SYSTEM

1.0

0.9

0.7

1.0

1.0

1.0

Page 7: IBS Score Form

PART 2: WALL SYSTEMS

100%

% USAGE FOR THISPROJECT

Nos 2

Nos 2

1

1

Nos 2

Nos 2

storey 2

m2 3

m2 5

Nos 1

Nos 1

Nos 1

m2 1

Nos or m2 1

ii) Prefab Staircases

iii) Prefab Lift-Shafts

iv) Spray Plaster

v) Other Labour Saving Product/ Solution

PART 3: OTHER SIMPLIFIED CONSTRUCTION SOLUTIONS

1.0 Utilisation of standardised components based on MS 1064

ELEMENTS UNITUSAGE

75%≤ X ≤100%50%≤ X < 75%IBS

SCORE

TOTAL (maximum 100 points) (A + B + C )

a) Beams

i) Prefab Toilet Units 0.5

3.0 Other Prefabricated Components and Labour Saving Solutions

Sub-total for other simplified construction solutions (maximum 20 points) ( C )

0.5

0.5

0.5

0.5

1

1

0.5

0.5

d) Windows

b) Columns

c) Doors

c) Walls

d) Slabs

1

1

ii) Vertical repetition of structural floor layout

2.0 Repetition of structural layout

b) For building 1 or 2 storeys

i)Horizontal repetition of structural floor layout

a) For building of floor more than 2 storeys

i) Repetition of floor to floor height 1

2

1

IBS CONTENT

SCORE a) Precast concrete panel 1

b) Metal cladding 1.0

ELEMENTS Length (m)

IBS FACTOR

COVERAGE %

c) Prefabricated timber panel 1.0

d) Glass panel 1.0

e) Dry wall system 1.0

f) In-situ concrete with reusable system formwork 0.5

i) Common brickwall 0.0

Sub-total for wall system (maximum 30 points) ( B )

g) In-situ concrete with stick built formwork 0.0

h) Precision precast block 0.5

TOTAL AREA

Page 8: IBS Score Form

TOTAL IBS SCORE FOR THIS PROJECT = ________________

TOTAL

SUMMARY SHEET (Multiple Building Project

BLOCK NAME AREA (m2)COVERAGE AREA (%)

IBS SCORE OF BUILDING

IBS SCORE OF PROJECT