ibs score form
TRANSCRIPT
EXPLANATORY NOTES TO SUBMISSION FOR LEVY EXEMPTION
1. Application shall be accompanied by:- i) IBS Score forms ii) 1 set of overall construction layout plan iii) 1 set of beams and columns layout plan for every floor. iv) 1 set of wall layout plan for every floor. v) 1 set of elevation shop drawings.
2. All drawings need to be endorsed by a certified engineer. 3. Construction components in the shop drawings need to be marked with colour. 4. Summary of beams, walls, columns, slab, doors, and windows need to be include
in the floor layout plan. Construction components include precast/non-precast beams, columns, slabs, walls etc.
Minimum requirement for IBS Score: Total Score = Score for Structural System (>25) (>50) + Score for Wall System (>15) + Score for Other Labour Saving (>10) Factor
Form CIDB IBS Score M1
Project Registration No:
Project Category:
Project Name: Contract Value:
Contractor Name: Developer / Owner Name:
Architecture Consultant Civil/Structure Engineer Consultant Name:
List of Submitted Drawings1) ___________________________________ 6) _______________________________2) ___________________________________ 7) _______________________________3) ___________________________________ 8) _______________________________4) ___________________________________ 9) _______________________________5) ___________________________________ 10) _______________________________
We hereby declare that the information given and the IBS Score submitted herewith is true and complete.
The total IBS Score for the proposed building / project is ____________
Date: ______________ Name & Signature of Qualified Person
Designation:___________________________
Reg No. (Arch/PE/QS):________________
CALCULATION FOR IBS SCORE
For office use
Project Name : __________________________________________________________________________
Type/Block No : ____________________________________ Total no of Units/blocks:____________
Contract Value:_____________
1.1 FLOOR = PRECAST CONCRETE SLAB
a) Precast column and beams
b) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formworkg) In-situ column and beams with stick build formwork
PROJECT DETAILS
____________________________________________________________________________________________________________________________________________________________________________________
Others __________________ Institutional
Others ________________ m2
Institutional ________________ m2
For mixed development, please indicate the area of the category:
Industrial
Category of Building
Residential (landed) Commercial
Residential (high rise)
Industrial ________________ m2Residential (landed) ________________ m2
Commercial ________________ m2
Residential (high rise) ________________ m2
PART 1: STRUCTURAL SYSTEMS
0.9
0.8
0.8
1.0 CONCRETE
0.7
0.9
0.6
1.0
CALCULATIONS OF OVERALL IBS SCORE
ELEMENTSAREA (m2)
IBS FACTOR
COVERAGE %
IBS CONTENT
SCORE
CALCULATION OF IBS SCORE
a) Precast column and beamsb) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formworkg) In-situ column and beams with stick build formwork
a) Precast column and beams
b) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formwork
g) In-situ column and beams with stick build formwork
a) Precast column and beams
b) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formwork
g) In-situ column and beams with stick build formwork 0.0
0.3
0.4
0.5
0.4
0.5
0.3 1.4 FLOOR = IN-SITU CONCRETE USING TIMBER
FORMWORK
0.6
0.5
0.5
0.6
0.5
0.7
0.6
0.5
1.2 FLOOR = IN-SITU CONCRETE ON PERMANENT METAL FORMWORK
1.3 FLOOR = IN-SITU CONCRETE WITH REUSABLE SYSTEM FORMWORK
0.6
0.7
0.8
0.7
ELEMENTS AREA (m2) (a)
IBS FACTOR
0.8
0.9
IBS CONTENT
SCORE
COVERAGE %
a) Precast column and beamsb) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formworkg) In-situ column and beams with stick build formwork
a) Precast column and beamsb) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formworkg) In-situ column and beams with stick build formwork
a) Precast column and beamsb) Precast column and in-situ beams with reusable formworkc) Precast column and in-situ beams with timber formworkd) Precast beams and in-situ columns with reusable formworkse) Precast beams and in-situ column with timber formworkf) In-situ column and beams with reusable system formwork
g) In-situ column and beams with stick build formwork
0.5
0.4
0.6
0.4
0.6
1.7 NO FLOOR
1.0
0.7
0.6
0.0
0.9
0.8
0.8
0.9
0.6
1.6 FLOOR = TIMBER FRAME FLOORING SYSTEM
1.0
0.7
0.8
0.9
0.8
0.9
COVERAGE %
IBS CONTENT
SCORE
1.5 FLOOR = STEEL FLOORING SYSTEM
1.0
ELEMENTS AREA (m2) (a)
IBS FACTOR
a) Floor using precast concrete slabb) Floor using in-situ concrete on permanent metal formworkc) Floor using in-situ concrete with reusable system formworkd) Floor using in-situ concrete with stick built formworkd) Floor using steel flooring system
e) Floor using timber frame flooring system
a) Prefab timber roof truss
b)Prefab metal roof truss
c) Timber roof truss
TOTAL AREA 100%
2.0 STEEL
1.0
2.1 COLUMNS AND BEAM = STEEL
0.9
Sub-total for structural system (maximum 50 points) ( A )
0.6
f) No floor 1.0
3.0 TIMBER FRAME SYSTEM 1.0
4.0 ROOF SYSTEM
1.0
0.9
0.7
1.0
1.0
1.0
PART 2: WALL SYSTEMS
100%
% USAGE FOR THISPROJECT
Nos 2
Nos 2
1
1
Nos 2
Nos 2
storey 2
m2 3
m2 5
Nos 1
Nos 1
Nos 1
m2 1
Nos or m2 1
ii) Prefab Staircases
iii) Prefab Lift-Shafts
iv) Spray Plaster
v) Other Labour Saving Product/ Solution
PART 3: OTHER SIMPLIFIED CONSTRUCTION SOLUTIONS
1.0 Utilisation of standardised components based on MS 1064
ELEMENTS UNITUSAGE
75%≤ X ≤100%50%≤ X < 75%IBS
SCORE
TOTAL (maximum 100 points) (A + B + C )
a) Beams
i) Prefab Toilet Units 0.5
3.0 Other Prefabricated Components and Labour Saving Solutions
Sub-total for other simplified construction solutions (maximum 20 points) ( C )
0.5
0.5
0.5
0.5
1
1
0.5
0.5
d) Windows
b) Columns
c) Doors
c) Walls
d) Slabs
1
1
ii) Vertical repetition of structural floor layout
2.0 Repetition of structural layout
b) For building 1 or 2 storeys
i)Horizontal repetition of structural floor layout
a) For building of floor more than 2 storeys
i) Repetition of floor to floor height 1
2
1
IBS CONTENT
SCORE a) Precast concrete panel 1
b) Metal cladding 1.0
ELEMENTS Length (m)
IBS FACTOR
COVERAGE %
c) Prefabricated timber panel 1.0
d) Glass panel 1.0
e) Dry wall system 1.0
f) In-situ concrete with reusable system formwork 0.5
i) Common brickwall 0.0
Sub-total for wall system (maximum 30 points) ( B )
g) In-situ concrete with stick built formwork 0.0
h) Precision precast block 0.5
TOTAL AREA
TOTAL IBS SCORE FOR THIS PROJECT = ________________
TOTAL
SUMMARY SHEET (Multiple Building Project
BLOCK NAME AREA (m2)COVERAGE AREA (%)
IBS SCORE OF BUILDING
IBS SCORE OF PROJECT