ibm interconnect 2013 expert integrated systems keynote: spindo

9
PT. Steel Pipe Industry of Indonesia Tbk (SPINDO) The Hanny Purnomo © 2013 IBM Corporation

Upload: ibm-events

Post on 20-Jan-2015

3.374 views

Category:

Technology


1 download

DESCRIPTION

http://ibm.com/interconnect

TRANSCRIPT

Page 1: IBM InterConnect 2013 Expert Integrated Systems Keynote: Spindo

PT. Steel Pipe Industry of Indonesia Tbk (SPINDO)

The Hanny Purnomo

© 2013 IBM Corporation

Page 2: IBM InterConnect 2013 Expert Integrated Systems Keynote: Spindo

#IBMINTERCONNECT

Company Profile

Page 3: IBM InterConnect 2013 Expert Integrated Systems Keynote: Spindo

#IBMINTERCONNECT

Company Profile

Jakarta Representative Office

Head

Office

Plant I

Plant II

Plant III Plant VI Plant IV

Plant V

Plant VII

Page 4: IBM InterConnect 2013 Expert Integrated Systems Keynote: Spindo

#IBMINTERCONNECT

Company Profile

PT. Steel Pipe Industry of Indonesia Tbk (SPINDO).

established in 1971.

the biggest production volume in Indonesia & ASEAN.

the widest product size range in Indonesia & ASEAN.

Feb.2013, listed in Indonesia Stock Exchange (ISSP.JK).

sales projection in 2013 USD 340 mio.

Page 5: IBM InterConnect 2013 Expert Integrated Systems Keynote: Spindo

#IBMINTERCONNECT

Challenges

SAP ERP servers.

since 2005.

located in Head Office.

Objectives.

serve users: nearly 24x7.

unplanned down time: 0%.

Problems.

availability: slow recovery.

performance: slow.

EOSL dates: varied widely.

technology gap.

space consumption: high.

Page 6: IBM InterConnect 2013 Expert Integrated Systems Keynote: Spindo

#IBMINTERCONNECT

Solution

IBM PureFlex System with Power.

SAPS#.

IOPS.

hardware integration.

hardware virtualization.

resource management.

database compression.

Page 7: IBM InterConnect 2013 Expert Integrated Systems Keynote: Spindo

#IBMINTERCONNECT

Implementation

December 2012.

hardware.

current capacity is fit for 3 years (2013-2015).

expandable for more than 7 years (2013-2019 ).

7 years of maintenance agreement (2013-2019).

March 2013.

migration of 8 years of live data (2005-2013).

Page 8: IBM InterConnect 2013 Expert Integrated Systems Keynote: Spindo

#IBMINTERCONNECT

Results

March 2013.

processing time for data reporting: up to 7.9 times faster.

time for backup: 3.7 times faster.

total database size: cut by 36%.

energy consumption: cut by 40 percent.

space: reduced by more than 50%.

Page 9: IBM InterConnect 2013 Expert Integrated Systems Keynote: Spindo

#IBMINTERCONNECT

Why choose IBM?

Principal IBM

Principal (Local Support)

IBM Indonesia - Geo Expansion - Surabaya Branch

Distributor BPT (Blue Power Technology)

Business Partner WCS (Wahana Cipta Sinatria) Surabaya Branch

Support Team IBM-STG, IBM-SWG, IBM- GBS

End User SPINDO (PT. Steel Pipe Industry of Indonesia Tbk)