ibm interconnect 2013 expert integrated systems keynote: sgx transformation journey

6
SGX Transformation Journey IBM InterConnect 2013 MBS Singapore Niguel Brooks SVP, Architecture & Infrastructure 10/10/2013 Version 1.0

Upload: ibm-events

Post on 20-Jan-2015

3.309 views

Category:

Technology


2 download

DESCRIPTION

http://ibm.com/interconnect See how SGX leveraged IBM PureSystems technology to improve their business.

TRANSCRIPT

Page 1: IBM InterConnect 2013 Expert Integrated Systems Keynote: SGX Transformation Journey

SGX Transformation Journey IBM InterConnect 2013 – MBS Singapore

Niguel Brooks SVP, Architecture & Infrastructure 10/10/2013

Version 1.0

Page 2: IBM InterConnect 2013 Expert Integrated Systems Keynote: SGX Transformation Journey

SGX The Asian Gateway

Asia’s most International exchange

Premier International listings venue

Trading wide range of securities, derivatives

and commodity products

Asia’s longest trading hours

Fastest trading engine and co-location

Central clearing house and Asia’s only

clearing services for OTC commodities and

financial derivatives

SGX at a Glance - The Asian Gateway

IBM InterConnect conference Singapore 2013

Revenue1 Market Cap2 Employees

US$562 million US$5.9 billion - 2nd in Asia ~600

Page 3: IBM InterConnect 2013 Expert Integrated Systems Keynote: SGX Transformation Journey

SGX The Asian Gateway

IT Challenges

– Agility and time to market

– Limited resources, budget and cost pressures

– System complexity and standards approach

– The 3R’s (Reliability, Resiliency & Recoverability)

– Technology governance, risks and security

Key Drivers and Technology Challenges

InterConnect 2013 #IBMINTERCONNECT

….....………and of course flawless execution!

Business Drivers

– Grow existing and new business

– Competitive landscape pressures

– Regulation and market structure changes

– Service availability

Page 4: IBM InterConnect 2013 Expert Integrated Systems Keynote: SGX Transformation Journey

SGX The Asian Gateway

Proof of Concept – Experiences

InterConnect 2013 #IBMINTERCONNECT

Installation and setup

– PureApplication System installed and configured within a day

Migration timeframe and PoC results

– Upgrade SGX applications from WAS V6.1

to WAS V8.5 over two day period

– Migrated from Windows to Linux

– Consolidate clusters and nodes

Integration with SGX build

– O/S build and 3rd party software installation

– Tools integration and security hardening

POC results

– Successful migration in record time

– Demonstrated ease of support and deployment

Page 5: IBM InterConnect 2013 Expert Integrated Systems Keynote: SGX Transformation Journey

SGX The Asian Gateway

PureApplication Solution Evaluation

InterConnect 2013 #IBMINTERCONNECT

Operational Efficiency

– Simplified maintenance and support of new solution

Agility

– Faster time to market new applications

– Flexible application infrastructure, performance optimization

Resiliency / Risk Reduction

– No single point-of-failure, high-availability architecture

– Minimise human error with automation framework

– Role based access, segregation of environments

Migration

– Ease of migrate existing applications and expertise to support Cost

– Cheaper to operate over the existing solution

– Predictable costs over the solution lifetime

Page 6: IBM InterConnect 2013 Expert Integrated Systems Keynote: SGX Transformation Journey

SGX The Asian Gateway

SGX Transformation journey continues….

InterConnect 2013 #IBMINTERCONNECT

PureApplication Deployment

– Project approved to replace the existing WAS environments supporting SGX’s

trade reporting, clearing and back-office applications

Final thoughts

– Utilise expert migration services

– Transformation creates new challenges

– Always keep your goals in sight

Application and Operational Process Optimisation

– Consolidation and simplification of the existing WAS setup

– Review SGX internal support and deployment model

– Performance and capacity management capabilities

– Explore new use cases for PureApplication platform