Innovations that address energy-efficiency
needs of the ENTIRE datacenter
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
2/23
2
IBM System & Technology Group
2008 IBM Corporation
Which 14 server configuration consumes more power?Each solution is configured with 14 Dual processor L5420, with 4GB of memory and(2) 146GB hard drives with (4) Ethernet ports per server.
Bladecenter E with HS21 Bladecenter H with HS21 System x 3650
7U 9U
28U
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
3/23
3
IBM System & Technology Group
2008 IBM Corporation
0
2000
4000
6000
8000
10000
12000
14000
BCE BCH x3650
Idle Power
Max Meas.
Rated SysAT&T 5400WEnvelope
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
4/23
4
IBM System & Technology Group
2008 IBM Corporation
Reduction in Cabling/Faster Deployment/Easier to Manage
System x 3650
Power Supply 1 Power Supply 2
9 8 7 6 5 4 3 2 1
FANSTATUS
WS-C6509-NEB
ServerTechno
logyCDU
CiscoCatalyst65
00Switch
6-7 Cables perserver minimum
ServerTechno
logyCDU
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
5/23
5
IBM System & Technology Group
2008 IBM Corporation
Full redundancy without the extra clutter
Mainframe class redundantBlowers provide the cooling
IBM BladeCenter Complete
redundancyDual I/O, dual power
Power Domain A
Power Domain B
I/O Connector
I/O Connector
Datacenter Power in
Datacenter Power in
Mainframe class redundantBlowers provide the cooling
Power Supply1 Power Supply 2
9 8 7 6 5 4 3 2 1
FANSTATUS
WS-C6509-NEB
Ethernet cable consolidationto core network
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
6/23
6
IBM System & Technology Group
2008 IBM Corporation
What is your concern? Carbon foot print. Cost. Density.
Carbon foot print
Every watt of power consumed has a predictable effect on theenvironment
Each watt saved reduces CO2 emissions
Cost
1KW used to power a server costs the average business $870/year. Lowering energy usage will drive down your utility bill
Density
For most clients today server density is determined by power/coolingavailability not U size
When you drive out wasteful power, you can reclaim that power in theform of additional performance
For a typical client with a 10KW rack saving 25% on power usuallymeans 25% greater performance in every rack
It all starts with reducing power consumption.Saving electricity delivers many benefits.
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
7/23
7
IBM System & Technology Group
2008 IBM Corporation
Efficient Power Delivery
There are two kinds of power
DC the type of power the server components run on
AC the type of power that we distribute in the data center
Power supply converts AC to DC
Typical
Power
Supply
400W AC in 280W DC out
Example: 280W DC at 70% efficiency =
400AC power input
Heat
BladeCenter
Power
Supply
308W AC in 280W DC out
Example: 280W DCC at 91% efficiency
= 308AC power input
H
eat
Less DC assetsLess AirLess heat
better performance/watt
lower cost data center
simply greener IT
lower energy billsLess power
92WPOWER &COOLING
SAVED
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
8/23
8
IBM System & Technology Group
2008 IBM Corporation
Increasing Power EfficiencyPower supplies typically work better at high
loading/utilization A problem for servers with N+N power
Its a cost issue, expensive to design supplycomponents that work efficiently across range ofload
BC has four supplies can afford and chose to investin efficiency of our supplies
91% peak efficiency
nearly 85% efficiency at 20% load
Load on supply
Efficiency
BladeCenter
Typical Supply
Wasted
Power
HP turns power supplies on and off as needed within the chassis totackle this problem
HP power supply is extremely inefficient at low loading Their power supplies need to be heavily loaded to hit high efficiency
This will likely work to improve efficiency but will be difficult for facility people to manage
May lead to shorter MTBF on supply
May require more than two separate power feeds for each chassis
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
9/23
9
IBM System & Technology Group
2008 IBM Corporation
HP BladeSystem c-Class
BladeZone 1
2 FH or4 HH
BladeZone 4
2 FH or4 HH
BladeZone 3
2 FH or4 HH
BladeZone 2
2 FH or4 HH
Fan 6 Fan 7 Fan 8 Fan 8 Fan 10
Fan 1 Fan 2 Fan 3 Fan 4 Fan 5
PS 1 PS 6PS 5PS 4PS 3PS 2
HPs Architecture
BL460c Intel Xeon 5100 & 5300 Series BL480c Intel Xeon 5100 & 5300 Series
BL465c AMD 2000 Series BL685c AMD 8000 Series SB40c direct attached storage (1/2 hi only)
Zones layout could be limiting for some users!
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
10/23
10
IBM System & Technology Group
2008 IBM Corporation
Back of HP c-class chassis
I/O Bays
Up to 8 Single Wide
Must be same side by side Up to 3 Double-wide
First row does not appear to support adouble-wide
Redundant Management Modules Up to 10 fans 4 standard $149 each
6 power cables
In their attempt to imitate BladeCenter, HP neglects to future proof. Oops!
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
11/23
11
IBM System & Technology Group
2008 IBM Corporation
Fan and Power Placement Rules = Complexity
PS = N
PS = N+1
PS = N+N
16 HH8 FH
12 HH6 FH
8 HH4 FH
4 HH2 FH
Max Number ofBlades
Fan Placement
(from rear ofunit)
Blade (from frontof unit)
Zone 1-4Zone 1-3Zone 1-2Zone 1Blades InsertedIn
Recommend all customers purchase 8 Fans. 10 fans for optimum power and cooling
Rules enforced by OnBoard AdministratorComplexity for IT on what goes where!
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
12/23
12
IBM System & Technology Group
2008 IBM Corporation
The Power in understanding Power The data center consumes power in two ways
Power used by the server/chassis and other IT hardware(IT Load)
Power used for cooling the IT via air handlers and AC units
Server/chassis power consumption
While this is a useful metric at the server/chassis level, it
does not address the power used by the other ITcomponents in the rack/data center
This metric does not address the power needed to eliminatethe heat generated by the servers and other IT hardware
Dell only focuses on a
portion of the IT Loadleaving more than
55% of the customersenergy costs ignored.
Efficient IT, power, and cooling provide countless benefits for the data center Reduces carbon footprint to lessen the environmental impact
Drives substantial cost savings
Improves data center optimization
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
13/23
13
IBM System & Technology Group
2008 IBM Corporation
If energy-efficiency is the ULTIMATE goal, IBM has the FINAL answer!
IBM Cool Blue Energy-Efficient Tools and Innovations IBM Rear Door Heat eXchanger
IBM Energy Self Assessment Tool IBM System x and BladeCenter Power Configurator IBM Systems Director Active Energy Manager
IBM BladeCenter Energy-Efficient Innovations Solid-state drives
Low Voltage Processors and green DIMMs IBM BladeCenter HS12 & JS12 single-socket blades IBM BladeCenter E
MANY NOTAVAILABLEFROM DELL
OR HP
Energy-efficient innovations NO ONE can matchAt the server, chassis, rack and data center level
Additional IBM Services and Innovations available to you
IBM Asset Recovery Services IBM Green Solutions Center
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
14/23
14
IBM System & Technology Group
2008 IBM Corporation
IBM Solid State DrivesThe energy-efficient and highly reliable local storage choice
Having local disks on every server consumes a tremendous amount of power.
Conventional 2.5 SAS/SATA drives use as much as 16W per drive.
Solid-state drives have no moving mechanical parts, make no noise and havemuch better overall mechanical reliability than conventional hard disk drives.
ONLY FROM IBM
Enterprise Level Solid State Drives
87% less power than conventional HDD 1 Watt per drive
4X the reliability of conventional HDDs1
Support for all major operating systems
NOTAVAILABLEFROM DELL
OR HP
Trim power & increase uptime & availability using IBMs innovative Solid State Drives1 NOTE: This is based on IBM internal performance testing.
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
15/23
15
IBM System & Technology Group
2008 IBM Corporation
New 45nm processor technology delivers 10-25% performance increase at price andpower point replacement
Easy migration drop in performance improvement
Low Voltage versions available NOW
AMD will provide the best performance/watt for many HPC application LS41/42 much lower power than HP 4way blade
Solid state technology cuts 87% out of local storage power
4, 8, 16, and 32GB solutions shipping NOW
New GREEN DIMMS (low power memory) coming in Q3 driving out even more fromFBD power budgets
BladeCenter E the ultimate green chassis
Driving out wasteful consumption
12.5W50WQC 2.5GHz
20W40WDC 3.0GHz
HS21 and HS21 XM W/CorePower
Better Hardware. More Options. Manage down your power usage.
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
16/23
16
IBM System & Technology Group
2008 IBM Corporation
More ways to save Power and Go Green - Memory
New Green FBDIMMs feature
1Gb technology instead of 512MB
AMD+ buffer instead of C1
x8 DRAM instead of x4
Chipkill enabled
Power reduction is 30% per DIMM 4GB: from 14W to 10W
2GB: from 10W-7W
Announce in September/October 2008
x3400,x3500,x3550,x3650,Z30 ,HS21,HS21XM,& iDataPlexPC2-5300 CL5 ECC Low Power FBDIMM 667MHz
46C7418 2GB (2x 1GB Kit) Single Rank 09/16/200846C7419 4GB (2x 2GB Kit) Dual Rank 09/16/200846C7420 8GB (2x 4GB Kit) Quad Rank 09/16/2008
46C7577 16GB (2x 8GB Kit ) HS21 & XM Only 10/14/2008
Same Performance. Same Price. 30% Lower Power
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
17/23
17
IBM System & Technology Group
2008 IBM Corporation
IBM BladeCenter EThe best energy-efficient chassis offering available today!
Capabilities
Utilizes power supplies that are up to 91% energy-efficient and can reach peak
efficiency even under small loads 31% more dense than Dell
Combined with the IBM highly available, low-power solid-state drives, low-voltageprocessors, single-socket blades and you have power efficiency that cant be beat!
Here is how you can save power with IBM BladeCenter today:
NOTAVAILABLEFROM DELL
OR HP
-28,928 WattsTotal Savings per 224 blades
- 100 Watts per chassisBladeCenter E Chassis
-1808 watts per chassisTotal Savings per chassis
$26,217Total Energy Savings $ per year
-122 Watts per bladeTotal Savings per blade
ApproximateSavingsComponent
- 30 Watts per bladeLow Voltage Processor
- 80 Watts per bladeSingle-socket Blade
- 12 Watts per bladeSolid State Drives
1 NOTE: This is based on IBM internal measurements. Savings calculated (Watts/1000) * .10/kwh * 24 hrs/day * 365 days/year
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
18/23
18
IBM System & Technology Group
2008 IBM Corporation
IBM Rear Door Heat eXchangerWater cooling is 4000X more efficient than air Capabilities
A water-cooled, heat exchanger designed to remove heatgenerated from the back of your computer systems before it
enters the room Patented rear heat exchanger can reduce heat at the
source
Utilizes chilled water to dissipate heat generated bycomputer systems while requiring no additional fans or
electricity! Customer Benefits
Increase server density without increasing coolingrequirements.
Effective solution for a data center wishing to deal withcomputer room hot spots, or is at the limit of its coolingcapacity, but still has useable floor space to add racks ofsystems.
Passively removes up to 60% of the heat generated in afully populated rack.
NOTAVAILABLEFROM DELL
$8,322/yrSavings
168kW6 Racks
$1,387/yrSavings per rack
100kWHeat removed
Example:
* NOTE: Assumes $.10/kwh, 24 hours/day, 365 days/year
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
19/23
19
IBM System & Technology Group
2008 IBM Corporation
Leadership beyond the hardware advantagesIBM power tools leave the competition way behind
IBM Energy Self Assessment Tool (ESA)
You cant manage what you dont see or cant measure.Use this tool to help you assess your data centers energyefficiency
Helps you determine where you can focus to improve theoperational effectiveness of your data center for better
energy management
IBM System x and BladeCenter Power Configurator
Get better information for up-front planning by sizing thepower needs of your unique configurations
Select systems and IT infrastructure that best fit your datacenter infrastructure before you commit to buying the firstserver
ESA NOTAVAILABLEFROM DELL
OR HP
IBM Energy Self Assessment Tool: http://www-03.ibm.com/systems/optimizeit/cost_efficiency/energy_efficiency/services.html
IBM System x and BladeCenter Power Configurator: http://www-03.ibm.com/systems/bladecenter/resources/powerconfig/index.html
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
20/23
20
IBM System & Technology Group
2008 IBM Corporation
IBM Systems Director Active Energy ManagerBetter power planning and management
Without planning & management tools Power requirements were sized by label ratings Caused excessive infrastructure costs
LIMITEDFUNCTION
FROM DELL
Power
Time
Label Rating
Power Configurator
Actual Measured Worst Case
Potentialover
Design
possible
With IBMs innovative AEM Management tool
IBM unique function included with every System xand BladeCenter server at no additional charge
Monitors and tracks power over time Make the smartest choices based on actual
measured information Cap power when needed to save more power
Planning your datacenter is EASY with IBM1. Assess your energy-efficiency with the Self
Assessment Tool
2. Size your unique configuration with the IBM Power
Configurator3. Take advantage of IBM Energy-efficiencyServicesto help you optimize your IT
4. Implement AEMto monitor & manage over time
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
21/23
21
IBM System & Technology Group
2008 IBM Corporation
See IBM innovation in action!Visit the Research Triangle Park Executive Briefing Center
IBM GREEN Solutions Center
Featured Solutions
IBM BladeCenter, IBM System x, IBM System Storage, IBM System x iDataPlex Partnership solutions from key IBM Big Green Partners: APC, Eaton and Emerson IBM Global Technology Services and STG Lab Services Offerings Facilities and Infrastructure monitoring and management solutions including IBM Tivoli
solutions and IBM Systems Director Active Energy Manager
Rack and Room level cooling technologies
NEW!
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
22/23
22
IBM System & Technology Group
2008 IBM Corporation
IBM Big Green and BladeCenter client successstoriesW3i, a downloadable content solutions company that runs Freeze.com, streamlinedand simplified its entire IT infrastructure and eliminated the expense of additionalpower and cooling equipment for its data center by migrating to IBM BladeCenterservers.
Zumiez Inc., a leading specialty action sports retailer, reduced the amount ofelectricity used by 15 percent by implementing an IBM BladeCenter solution.
Move, Inc., the world's largest moving community, consolidated its existinginfrastructure onto a virtualized IBM BladeCenter system with AMD Opteronprocessors to help dramatically increase computing performance and datacenterpower efficiency.
The Georgia Institute of Technology uses IBM Rear Door Heat eXchanger to reduceserver heat emissions into the room by up to 55 percent on the world's 42nd most
powerful supercomputing clusters in its Center for the Study of Systems Biology
Sustainability Victoria is using PowerExecutive, IBM BladeCenter servers, and IBMSystem Storage to slash its energy use by more than 50%.
-
7/31/2019 Ibm Blade Center Easy to Be Green Att
23/23