ibl mock-up installation
DESCRIPTION
IBL mock-up installation. 18/03/2011. Marco Ciapetti. Actual layout in bldg 180. Building the center tower. Building the center tower. Building the center tower. Building the center tower. Shims. Shims. Shims. Shims. Adjustable feet. Adjustable feet. Adjustable feet. - PowerPoint PPT PresentationTRANSCRIPT
IBL mock-up installation
18/03/2011
Marco Ciapetti
Actual layout in bldg 180
Building the center tower
Building the center tower
Building the center tower
Building the center tower
Shims
Shims
Shims
Shims
Adjustable feet
Adjustable feet
Adjustable feet
Heavy load rails
Heavy load rails
Heavy load rails
Special mini-van (side C)
Standard mini-vans (side C)
Long stairs
Mini-van extension
Short stairs and rot. Table rails
Folding bridges (side A)
Folding bridges (side A)
Scaffolding (side A)
Floor covers for the gap
Floor covers for the gap
Tower handrails
Tower handrails
Tower handrails
Rotation table
Pit table
IBL mock-up
IBL mock-up installed