iac boardroom

13
International Armoring Corporation

Upload: mark-burton

Post on 03-Mar-2016

224 views

Category:

Documents


0 download

DESCRIPTION

Discuss with partners our potential in new markets

TRANSCRIPT

Page 2: IAC Boardroom

Value of International Armoring Corporation

IAC Name &

Reputation

Client Referrals

Global Purchasing

Power

Worldwide Sales & Service

Advanced Technology

Page 3: IAC Boardroom

IAC PROVIDES:

Transfer of Technology: Initial Training in U.S. Facility Training at China Facility Facility Design (layout, equipment, etc.) Technology Transfer Updates

Designed Armor Kits: Armoring Components Consumables Specific Model Designs

Use of the IAC Name & Trademarks IAC Marketing & Sales Processes

Worldwide Client Referrals Access to Marketing Designs

Worldwide Purchasing Power Industry Expertise (>100 Years/7,000 vehicles) IAC USA Manager to live local compensated by IAC China

Page 4: IAC Boardroom

Partners Responsible for the Following:

Together with IAC, follow agreed upon Standards Provide Qualified, Equipped Local Facility Assist in-Regional Marketing and Sales Hire and Qualify Local Talent Follow IAC Standard Operating Procedures

Inspection, Install, Quality Control, etc. Exceeding Expectations:

Timely Delivery Quality Product Unsurpassed Customer Service

Page 5: IAC Boardroom

2012 Projected Sales

15 units per month = 180 units per year

15

Page 6: IAC Boardroom

1: 50% Buy the vehicle plus armoring$130,000

2: 50% Buy Armor Only$ 70,000

Assumptions

Page 7: IAC Boardroom

Minimum Unit Sales Scenario for IAC

0

37.5

75.0

112.5

150.0

Year 1 Year 2 Year 3 Year 4

131085

Per YearPer Month$ 6mm

$ 9mm

$ 12mm

$ 15mm

Page 8: IAC Boardroom

Gross profit margin43% of Armoring price

Assumption

Page 9: IAC Boardroom

Assumption 1:

Sales 5 cars/mth = $530,000 / Gross Profit =

$150,000

60 cars / yr = $6.3 mm/ Gross Profit = $1.8mm

Gross Profit

Page 10: IAC Boardroom

Assumption 2:

Sales 15 cars/mth = $1.59mm / Gross Profit =

$450k

180 cars / yr = $18.9 mm/ Gross Profit = $5.4mm

Gross Profit

Page 11: IAC Boardroom

Continued Partnership

Continued Technology Upgrades for Armoring with Advanced Materials

Training at Local Facility Once Per Year The latest Methods and Designs for Armoring

IAC USA will continue to provide Armor Kits to partners along with Periodic Technology Upgrades. A Technology Upgrade will include:

Page 12: IAC Boardroom

Action Items - Getting Started

Required Initial Investment Initial Investment Paid upon Mutually Agreed

Performance Signing of Contract Training of Technicians Setup of Facility Building of First Vehicles Product Launch

The initial investment applies to future buy-out.

Page 13: IAC Boardroom