i nternational workshop on laser ranging , 13-18 october 2008, pozna ń (poland)

19
International Workshop on Laser Ranging, 13-18 October 2008, Poznań (Poland) Quality assessment of the ILRS EOP Quality assessment of the ILRS EOP „Daily” Product „Daily” Product G. Bianco Agenzia Spaziale Italiana, CGS - Matera C. Sciarretta, V. Luceri Telespazio S.p.A., CGS - Matera

Upload: nibaw

Post on 31-Jan-2016

40 views

Category:

Documents


0 download

DESCRIPTION

Quality assessment of the ILRS EOP „ Daily ” Product. C. Sciarretta, V. Luceri Telespazio S.p.A., CGS - Matera. G. Bianco Agenzia Spaziale Italiana, CGS - Matera. I nternational Workshop on Laser Ranging , 13-18 October 2008, Pozna ń (Poland). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

International Workshop on Laser Ranging, 13-18 October 2008, Poznań (Poland)

Quality assessment of the ILRS EOP Quality assessment of the ILRS EOP „Daily” Product„Daily” Product

G. BiancoAgenzia Spaziale Italiana, CGS - Matera

C. Sciarretta, V. LuceriTelespazio S.p.A., CGS - Matera

Page 2: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

Since 2004, ILRS has been providing, routinely, the weekly combined SSC/EOP solutions to support IERS for the EOP computation and the SLR community for the data reduction.

For each weekly solution- daily estimated ITRF-framed and loose constrained EOP values (x-

pole, y-pole, LOD) - a set of loose constrained coordinates for the acquisition network - several quality evaluation indicators are provided in 3 different files available at CDDIS and EDC:

ilrs.pos+eop.yymmdd.vnn.snxilrs.pos+eop.yymmdd.vnn.sumilrs.eop.yymmdd.vnn.snx

ILRS Weekly Solution

Page 3: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

At present, 8 ACs contribute to the weekly ILRS combined solution: ASI BKG DGFI GA GFZ GRGS JCET NSGF

Each Wednesday, the official ILRS combined solutions (ILRSA, official; ILRSB, backup) are issued along the same timeline: the SLR data acquired (Lageos1/2, Etalon1/2) during a 7-day period (Sunday-Saturday) are processed by the ACs and made available to the CCs within Tuesday.

Data arc 7 daysGeneration frequency 1/weekEOP estimates age 4-10 days

ILRS Weekly Solution

Page 4: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

The ASI-CGS combination procedure is based on the direct combination of loose constrained solutions (“Methodology for global geodetic time series estimation: A new tool for geodynamics”, Davies and Blewitt, 2000).

ILRSA combination approach

j

jjj

j

j

j

j

t

t

t

tt

tt

t

t

t

t

t

t

00

00

0

00

01

01

00

00

0

00

11

11

1

11

000

00

000

00

Y

Y

X

X

I

II

I

II

Y

Y

X

X

P

Y

Y

X

X

Site

Coordinates

Site Velocitie

s

E.O.P.

E.O.P. Rates

X1dot (t1)

Y1dot (t1j)

X0dot (t0)

Y0dot (t0j)

X0dot (t0)

Y0dot (t0j)

The combination is performed along the lines of the iterative Weighted Least Square technique: each contributing solution plays the role of an ‘observation’ whose residuals with respect to the combined solution must be minimized.

Page 5: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

ILRSA EOP performance – a sample <res>=-21+/-168 as<>=48 as

<res>=38+/-165 as<>=47 as

Page 6: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

ILRSA EOP performance – a sample <res>=-4+/-41 s<>=12 s

Page 7: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

The consolidated ILRS weekly product has generated the concept of a ‘rolling’ weekly product to be issued daily to provide the minimum latency SLR contribution to the IERS EOP estimation.

At day N-1, within midnight UTC, each contributing AC makes available its weekly solution “acx.pos+eop.yymmdd.v100.snx” spanning the period [N-8, N-2]; at day N, CCs generate the combined solution, “ccx.eop.yymmdd.v100.snx”.

Data arc 7 daysGeneration frequency 1/dayEOP estimates age 2-8 days

A new ILRS product: Daily Solution

Page 8: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

ILRSA strategy

• ASI-CGS CC adapted the ILRSA weekly combination strategy to the daily product; only a slight tuning has been performed to allow the proper handling of the USNO “finals.daily” as reference values (necessity of computing a reference value for the last LOD estimate).

• A careful revision of the combination procedure has been

performed, in order to allow the fully automated generation of the solutions, including the reporting, to avoid (or minimize) the daily intervention of the analyst.

• Even if not necessary, the SSC/EOP combined, loose SINEX files (“pos+eop”) have been kept available at the archives.

• Automated ILRSA combination procedure, at present, starts every day at 1:30 AM UTC; the starting time may be modified according to ILRS/IERS recommendations.

Daily Solution: the ILRSA strategy

Page 9: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

At present, 5 ACs contribute to the daily ILRS combined solution: ASI BKG GFZ JCET NSGF

25 Feb solution may be assumed as the true start of the pre-operational phase of the daily ILRSA product: it is the first date when all the 5 ACs submitted fully operational solutions (i.e. several small problems were fixed); after then, only few sporadic cases of missing solutions occurred. If late solutions were submitted, they were not analysed to stress the ILRSA combination procedure under realistic operational conditions.

Daily Solution: pre-operational phase

Contributing ACs

0

1

2

3

4

5

6

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47

Solutions between 12 FEB 2008 - 30 MAR 2008

25 FEB

Page 10: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

Quality assessment of the Daily Solution

3D WRMS (SSC wrt SLRF2005)

0

2

4

6

8

10

12

14

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47

Solutions between 12 FEB 2008 - 30 MAR 2008

mm All Sites

Core Sites

The Core station list as agreed after Grasse ILRS AWG (09/07) has been used in the ILRSA daily product. As for the consolidated weekly product, 3d WRMS for all sites is below 10mm, while for the Core sites is slightly above 7mm.

Page 11: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

Quality assessment of the Daily Solution

A preliminary quality evaluation of the daily solution results at the start of the pre-operational phase has been made through the cross comparison with eop C04 and with ILRSA weekly solutions, focussing on the last day EOP estimate, being that one the most critical from the product latency point of view.

The results, based on a month of solutions, indicate an overall precision level (<>) of the last day estimates of the order of 100 as/26s and an accuracy level (WRMS(res)) of the order of 250 as/70s.

Page 12: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

Quality assessment of the Daily SolutionPrePre--operationaloperational phasephase

X pole

-2

-1.5

-1

-0.5

0

0.5

1

1.5

2

54505 54515 54525 54535 54545 54555

MJD

mas

C04-ILRSA daily

C04-ILRSA w eekly

Y pole

-2

-1.5

-1

-0.5

0

0.5

1

1.5

2

54505 54515 54525 54535 54545 54555

MJD

mas

C04-ILRSA daily

C04-ILRSA w eekly

25 FEB 08

<res>=0.14+/-0.20mas<res>= 0.08+/-0.13mas

<res>= -0.04+/-0.27mas<res>= -0.03+/-0.12mas

<>=0.10 mas<>=0.05 mas

<>=0.10 mas<>=0.05 mas

X pole

Y pole

PrePre--operationaloperational phasephase

X pole

-2

-1.5

-1

-0.5

0

0.5

1

1.5

2

54505 54515 54525 54535 54545 54555

MJD

mas

C04-ILRSA daily

C04-ILRSA w eekly

Y pole

-2

-1.5

-1

-0.5

0

0.5

1

1.5

2

54505 54515 54525 54535 54545 54555

MJD

mas

C04-ILRSA daily

C04-ILRSA w eekly

25 FEB 08

<res>=0.14+/-0.20mas<res>= 0.08+/-0.13mas

<res>= -0.04+/-0.27mas<res>= -0.03+/-0.12mas

<>=0.10 mas<>=0.05 mas

<>=0.10 mas<>=0.05 mas

X pole

Y pole

Page 13: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

LOD

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

54505 54515 54525 54535 54545 54555

MJD

ms

C04-ILRSA daily

C04-ILRSA w eekly

PrePre--operationaloperational phasephase

LOD

25 FEB 08

<>=0.026 ms<>=0.012 ms <res>=-0.017+/-0.064ms

<res>= -0.004+/-0.052ms

LOD

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

54505 54515 54525 54535 54545 54555

MJD

ms

C04-ILRSA daily

C04-ILRSA w eekly

PrePre--operationaloperational phasephase

LOD

25 FEB 08

<>=0.026 ms<>=0.012 ms <res>=-0.017+/-0.064ms

<res>= -0.004+/-0.052ms

Quality assessment of the Daily Solution

Page 14: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

Further quality assessment

The accumulation of solutions allows a deeper insight into the performance of

the product vs. the age of the estimated EOP.

Up to now, more than 6 months of individual and combined solutions are

available: from them, “same age” EOP time series have been

constructed and their quality evaluated.

Page 15: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

Further quality assessment

Page 16: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

Daily solution: quality vs EOP age

Page 17: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

Daily solution: quality vs EOP age

An “arc edge” effect is evident for all the contributing solutions and the

combination (each one with a specific level of sensitivity), both in the

estimate residuals and in the estimates uncertainty.

The edge effect, present also in the combined weekly product, is a key

feature to be investigated (and mitigated) to provide low latency, accurate

EOP estimates.

Page 18: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

„Arc edge” effect: remarks

• Part of the “arc edge” effect, for the ‘last day’ estimates is due to

partial lack of observation data: that can be overpassed by pushing

some hours later the issue epoch of the contributing solutions to

collect more data

• Discrepant values among contributing solutions raise the

uncertainty and accuracy of the final combined values

• Fine tuning of the analysis strategy should be done at the AC level

to mitigate „arc edge” effect in the contributing solutions

• New contributors will improve the quality of the daily product

Page 19: I nternational Workshop on Laser Ranging ,  13-18  October 2008, Pozna ń  (Poland)

• ILRS is able to provide routinely a daily EOP product with high quality level: the product is in a pre-operational phase

• The ILRS daily product allows to provide EOP estimates with constant latency lower than the minimum latency of the ILRS weekly solution

• The present quality level of the daily product can be further raised by adding contributing solutions, revising the length of the data arc, tuning the analysis strategy

Summary