City of New Prague Comprehensive Plan, 2014 Chapter 10, Page 1 PUBLIC UTILITIES I. INTRODUCTION This portion of the Comprehensive Plan will review the: Municipal Wastewater Treatment/Sanitary Sewer System Municipal Water System Municipal Electric System Municipal Storm Water System; and Identify Public Utilities Policies and Objectives. II. SANITARY SEWER SYSTEM A. Existing Sanitary Sewer System. The City of New Prague’s wastewater treatment facility is a state of the art facility constructed between the summer of 2008 and fall of 2010 with the initial discharge occurring in February 2011 and the first full year of operation being in 2012. The facility uses biological aerated filters, parallel plate clarifiers, membrane filtration and UV disinfection. The biosolids produced at the facility are dried and utilized as agricultural soil amendments. Capacity. The wastewater treatment plant currently has a capacity of 2,500,000 gallons per day (average annual flow). Average demand for the system currently is 655,000 gallons per day, with a peak demand of 1,087,000 gallons per day. The treatment plant currently serves the City of New Prague as well as the Cedar Lake Area Water and Sanitary Sewer District, which was added to the system in 2001. The City has a Joint Powers Agreement with the District to provide up to 100,000 gallons per day and allow for up to 325 connections. As of February 2003, 275 homes were connected with peak flows of 40,000 gallons per day. As of July 2014, the City of New Prague provided service to 2,745 accounts, of which approximately 81% are residential and 19% are commercial/industrial. System components.The existing sanitary sewer facilities can be divided into two distinct components: the sewage collection system and the wastewater treatment plant. The New Prague sanitary sewer collection system is illustrated on Map 10-1. The treatment plant removes Biochemical Oxygen Demand (BODs), suspended solids, and ammonia and provides disinfection. The influent, after treatment, is discharged into Phillips Creek, which is a part of the Sand Creek Watershed. The sanitary sewer collection system within the City of New Prague was placed into service at various times. As a part of new financial reporting requirements, the City is required to create an itemized inventory of the value of each individual collection main and when each main was placed into service, for the purposes of itemizing asset depreciation in conjunction with Government Accounting Standards Board (GASB) 34 directive. The collection system extends to a majority of the homes and businesses in New Prague. While the City of New Prague accepts sewage from the Cedar Lake Sanitary Sewer District (See Map 10-7), the City does not own or maintain any of the infrastructure associated with this area. The sanitary sewer collection system includes a network of collection pipes with nine lift stations scattered throughout the City (See Map 10-1). Improvements have been done as required to

Upload: others

Post on 22-Mar-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

City of New Prague Comprehensive Plan, 2014 Chapter 10, Page 1

UPUBLIC UTILITIES I. INTRODUCTION

This portion of the Comprehensive Plan will review the:

Municipal Wastewater Treatment/Sanitary Sewer System

Municipal Water System

Municipal Electric System

Municipal Storm Water System; and

Identify Public Utilities Policies and Objectives.

II. SANITARY SEWER SYSTEM

A. Existing Sanitary Sewer System. The City of New Prague’s wastewater treatment facility is a state of the art facility constructed between the summer of 2008 and fall of 2010 with the initial discharge occurring in February 2011 and the first full year of operation being in 2012. The facility uses biological aerated filters, parallel plate clarifiers, membrane filtration and UV disinfection. The biosolids produced at the facility are dried and utilized as agricultural soil amendments.

CCCapacity. U The wastewater treatment plant currently has a capacity of 2,500,000 gallons per day (average annual flow). Average demand for the system currently is 655,000 gallons per day, with a peak demand of 1,087,000 gallons per day. The treatment plant currently serves the City of New Prague as well as the Cedar Lake Area Water and Sanitary Sewer District, which was added to the system in 2001. The City has a Joint Powers Agreement with the District to provide up to 100,000 gallons per day and allow for up to 325 connections. As of February 2003, 275 homes were connected with peak flows of 40,000 gallons per day. As of July 2014, the City of New Prague provided service to 2,745 accounts, of which approximately 81% are residential and 19% are commercial/industrial. USystem components. U The existing sanitary sewer facilities can be divided into two distinct components: the sewage collection system and the wastewater treatment plant. The New Prague sanitary sewer collection system is illustrated on Map 10-1. The treatment plant removes Biochemical Oxygen Demand (BODs), suspended solids, and ammonia and provides disinfection. The influent, after treatment, is discharged into Phillips Creek, which is a part of the Sand Creek Watershed. The sanitary sewer collection system within the City of New Prague was placed into service at various times. As a part of new financial reporting requirements, the City is required to create an itemized inventory of the value of each individual collection main and when each main was placed into service, for the purposes of itemizing asset depreciation in conjunction with Government Accounting Standards Board (GASB) 34 directive. The collection system extends to a majority of the homes and businesses in New Prague. While the City of New Prague accepts sewage from the Cedar Lake Sanitary Sewer District (See Map 10-7), the City does not own or maintain any of the infrastructure associated with this area. The sanitary sewer collection system includes a network of collection pipes with nine lift stations scattered throughout the City (See Map 10-1). Improvements have been done as required to

City of New Prague Comprehensive Plan, 2014 Chapter 10, Page 2

maintain the system. Some design standards for new sanitary sewer system improvements are included in the City’s subdivision ordinance. These regulations may need to be expanded to ensure consistency with the City’s Comprehensive Sanitary Sewer Plan for the 2026 Service Area. According to the Public Works Director, approximately 20% of New Prague’s wastewater treatment collection system consists of old clay pipes, while the remaining 80% of the pipes are 30 years old or newer. Much of the new pipe is the result of new residential, commercial and industrial growth and expansion of the system as well as reconstruction of older streets and utilities in the core area of the City. UInfiltration/InflowU. According to the Comprehensive Sanitary Sewer Plan for 2026 Service Area, completed in December 2003, the City does have some isolated areas where infiltration and inflow (I/I) occurs into the sanitary sewer system. The City has been addressing the I/I through the type of manhole used, testing of all new sanitary sewer lines, prohibition of roof and foundation lines to the sanitary sewer system, replacement of older lines and modifications to lift stations to prevent flooding. Flood proofing of structures along Sand Creek and Phillips Creek was recommended in the study as a method of further correcting I/I problems. There are a limited number of residential units and businesses in the City limits (approximately 7), which are currently serviced by individual sewage treatment systems (ISTS) (See Map 10-2). Minnesota Rules Chapter 7080 governs construction and abandonment of ISTS’s. The Scott and Le Sueur County Environmental Services offices are responsible for implementing MN Rules 7080 locally. The City is considering a street reconstruction project in the area in which a majority of the ISTSs are located. If completed, these units would be connected to municipal sewer as a part of the project. UPublic Input U. As a part of the Comprehensive Plan process a survey of 22 individuals occurred. Participants were asked to rank the sanitary sewer utility. 71% ranked it as “good“ and 29% rated it as “excellent”. B. Maintenance of the Sanitary Sewer System. The City of New Prague Public Works staff has divided the City into four sections for the purpose of developing a maintenance program. Each section of the system is cleaned every four years (one section per year). Routine maintenance and repair expenses are funded through the City’s Sewer Enterprise Fund.

C. Sanitary Sewer Plans. The Comprehensive Sanitary Sewer Plan for the 2026 Service Area was adopted by the City in December of 2003. Strong consideration should be made to update the Comprehensive Sanitary Sewer Plan for the 2026 Service Area as the City has grown considerably since it was written in 2003. The City is currently divided into five major sanitary sewer districts:

The Downtown Sanitary Sewer District (DS)

The Central Sewer District (CS)

The County Road 37 District (CR)

The School Sewer District (SS); and

The Cedar Lake District (CL)

According to the Comprehensive Sanitary Sewer Plan for 2026 Service Area, in order to service future growth the following additional major sewer districts will need to be added:

City of New Prague Comprehensive Plan, 2014 Chapter 10, Page 3

The Northwest District (NW)

The Northcentral District (NC)

The Northeast District (NE)

The Sand Creek District (SD)

The South Central District (SC); and

The Southwest District (SW);

These future sewer districts extend beyond the anticipated 2035 population (planned to serve a population of approximately 70,000 people) and land use needs, however these district boundaries were utilized when identifying the boundaries of the projected 2035 growth.

The Wastewater Treatment Facility, located at 601 12th Street NE, began construction in 2008 and was started up for the first time in the fall of 2010. The first discharge took place in February of 2011 following by full operation in the spring of 2012. The facility is a Biological Aerated Filter (BAF) plant which includes odor treatment units and drying of biosolids. The facility was constructed based on the need to meet more stringent testing regulations as well as 2030 population projections developed during the 2004/2005 Comprehensive Planning process which projected a population of just over 16,000 residents in New Prague. Cost of the project totaled over $30 million dollars. D. Sanitary Sewer Rates and Fees. Sewer rates effective in 2015 are $10.52 base charge plus $15.55 for each 1,000 gallons contributed. The City also charges Sewer Connection Charges (SCC) at the time of building permit issuance equal to $7,150 ($5,934.50 to the wastewater fund and $1,215.50 to the trunk line fund) per residential equivalency unit (REU). Rates are based on operational needs while SCC fees are based on estimated costs required to pay off the City’s $30 million dollar wastewater treatment facility and also to support the construction of trunk facilities to service the new growth.

E. Proposed Sanitary Sewer Facilities.

The treatment facility in New Prague has capacity to accommodate the City of New Prague with some additional growth as well as the Cedar Lake District. Due to recent exponential growth, the capacity is becoming limited.

Capital expenses should be included in a capital improvement fund and paid for through an Enterprise Operating Fund or through the issuance of bonds and repayment from trunk area charges and/or connection fees (SAC). An itemized list of projects and the proposed time frame for construction are included in the Comprehensive Sanitary Sewer Plan for the 2026 Service Area. The following are major expenses relating to the sanitary sewer system that are planned:

Expansion of the wastewater treatment plant or relocation/construction of a new wastewater treatment plant.

Trunk Sewer improvements ranging from $26.5 to $28.0 million, as follows: Gravity sewer mains: $13.7 to $15.6 million Force mains: $1.0 to $1.5 million Lift stations: $1.4 to $1.7 million “Deep Sewer Option”: $2.7 million Easements for sewer projects: $5.5 to $7.0 million

Infiltration/Inflow program and implementation (flood proofing along Sand Creek and Phillips Creek)

City of New Prague Comprehensive Plan, 2014 Chapter 10, Page 4

III. WATER.

A. Existing Water System. The City of New Prague’s municipal water system serves a majority of New Prague residents and businesses with the exception of one residential private well, which is used for irrigation purposes, The City requires connection to the municipal system once a private well fails. UWells.U The City’s water system includes municipal wells, storage tanks/towers and treatment facilities. Map 10-3 illustrates the locations of these facilities. The City has six municipal wells. Wells 1, 2, 3 and 5 draw water from the Franconnia Ironton Galeselle (FIG) Aquifer. Wells #4 and #6 draw water from the Mt. Simon Aquifer. Well #1 was drilled in 1925 with a design capacity of 550 gpm at a depth of 582 feet. Well #2 was drilled in 1938 with a design capacity of 280 gpm at a depth of 400 feet. Well #3 was drilled in 1948 with a design capacity of 500 gpm at a depth of 398 feet. Well #4 was drilled in 1988 with a design capacity of 500 gpm at a depth of 652 feet. Well #5 was drilled in 2004 at 305 Lexington, with a design capacity of 500 gpm at a depth of 424 feet. Well #6 was drilled in 2007 at 305 Lexington Ave. S with a design capacity of 1,000 gpm and a well depth of 640 feet. The pumping capacity of the six wells combined is 3,330 gallons per minute. The average demand is 770,000 gallons per day and the peak demand is 1,975,000 gallons per day. The total water hardness is 400 ppm. The water quality is very good with the exception of high iron and manganese content. UStorageU. The City has two elevated storage tanks providing 1,000,000 gallons of storage capacity and one ground storage reservoir near water treatment plant #2, which was a former fuel oil storage tank that was refurbished for water storage. Land has been reserved on the south side of the community on the south side of LeSueur County Road 29 (directly south of the Tikalsky Acres development) for the possible addition of an additional 500,000 gallon water tower. UWater Treatment. U Water is treated at the City’s three water treatment facilities. The Main Street water treatment plant treats water pumped from municipal wells #1, #2 and #3, through a pressure filtration and aeration process to remove iron. Water treatment plant #2 treats water from well #4 through gravity flow aeration. Water treatment plant #3, which was constructed in 2004, treats water from well #5 and #6 through gravity flow aeration. UDistribution System. U The water distribution system includes pipes ranging in size from four inches to 14 inches in diameter. As illustrated on Map 10-3, the four-inch pipe, which is no longer considered an acceptable size, is located primarily on the west side of the original City. As new development and reconstruction projects occur, the City has been constructing a central trunk water main loop. According to the Water Distribution System Analysis, 2001, a second loop on the south side of the City will be required as growth continues. Of the 2,647 municipal water accounts, 2,362 (89%) are residential customers, 278 (11%) are commercial customers and 2 (1%) are industrial customers. UCommunity Input. U As a part of the Comprehensive Plan process in 2004 a survey of 22 individuals occurred. Participants were asked to rank the water utility. 61% ranked it as “good, 35% as “excellent” and the remaining 4% ranked it as “fair”. B. Water Utility Maintenance. The City has implemented a water utility maintenance schedule that includes flushing of hydrants on an annual basis, with dead end water mains flushed twice each year. Various water mains and service lines are replaced on an annual basis and coordinated with street and other utility projects.

City of New Prague Comprehensive Plan, 2014 Chapter 10, Page 5

C. Water Utility Plans. A “Water Distribution System Analysis” study was completed for the City in September 2001. The study evaluates the existing municipal drinking water system and areas proposed to be serviced by municipal drinking water, includes an evaluation of the existing system, and recommends new construction routes and improvements to the existing water system to accommodate anticipated growth. It is important to note the Water Distribution System Analysis was completed in 2001 and included recommendations for future water facilities based on population projections of 6,721 by the year 2010 and 9,118 people by the year 2020. If growth continues to exceed previous projections, it may be necessary to update the Water Plan to ensure sufficient planning and budgeting for capital expenditures related to water facilities. The City of New Prague has adopted a Part I and Part II Wellhead Protection Plan, which were completed in 2006 and 2008 respectively. The purpose of a Wellhead Protection Plan is to ensure the current and future safety of the City’s drinking water supply and includes the following elements as required by the Minnesota Department of Health:

1. The delineation of the wellhead protection area and the drinking water supply management area.

2. An assessment of the vulnerability of the drinking water supply management area. 3. A review of expected changes to the physical environment, land use and surface and

ground water sources. 4. A plan for the management of the wellhead protection area. 5. A plan to monitor the adequacy of wellhead protection measures and a plan to implement

the wellhead protection plan.

D. Water Rates and Fees. Water rates effective in 2015 are $13.79 base charge per month, plus $3.89 for each 1,000 gallons used. The City also charges Water Connection Charges (WCC) of $1,800 per residential equivalency unit (REU). In addition, the City charges $2,814 per acre fee to developers for a water area access charge (WAAC). Rates are based on operational needs while WAAC fees are based on estimated costs required to support the construction of water facilities to service the new growth.

E. Proposed Water Facilities. The City has a five-year capital improvement plan (CIP) for future water projects. The CIP includes:

Well #6 at an estimated cost of $150,000 to $200,000 (at 305 Lexington)

A second water loop on the south side of the City to be development driven; and

Water main replacement projects, extensions and looping projects are planned.

IV. ELECTRICAL UTILITY

A. Existing Electrical Facilities The New Prague Utilities Commission owns and operates a municipal electric utility, which provides electrical service to the area illustrated on Map 10-4. Xcel Energy services a small portion of the south side of the City. Minnesota Valley Electric Cooperative currently serves the areas generally east of 10tth Ave. SE, west of 8th Ave. NW and other smaller areas as also indicated on Map 10-4.

City of New Prague Comprehensive Plan, 2014 Chapter 10, Page 6

The Electric Utility owns and operates five diesel and dual fuel (diesel/natural gas) generation units that are available for back up. The City has two electric substations; one located at 300 East Main Street and a second in the industrial park. The electric utility also occupies a 9,600 square foot industrial/warehouse building that was constructed in 1988. See Map 10-5 for the first page of the electric utility map book. The Electric Utility owns and maintains all streetlights within its service territory. New Prague Electric Utility is a member of the Southern Minnesota Municipal Power Agency (SMMPA), which provides wholesale electricity to 18 cities. The New Prague Electric Utility contains two divisions: Generation, which is operated by four employees and Distribution, which employs four individuals. The New Prague Utilities Commission Provides electrical high voltage distribution to its customers through a distribution system that is networked by two substations each capable of carrying system loads in the event of failure of any one substation. The transmission system that feeds NPUC substations is loop fed and capable of being isolated between substations or fed form two transmission feeds in the event of failure of one of the feeds. Transmission switching has been upgraded in 2001 and in 2013 to provide isolation of failed transmission sources and independent operation of substations when required. The New Prague Utilities Commission has the ability and operation procedures in place to run its generation facilities as an alternate power source in the event the transmission grid or generation source has failed. NPUC has sufficient generation to serve all of its commercial and residential customers. NPUC generation facilities are fueled by two sources and are capable of supplying NPUC customers for an indefinite duration. The City of New Prague has all of its major info structure facilities (fresh water, waste water treatment and waste water lift stations) fed by electric lines that are supplied by NPUC generation and on site generation. This should prove to be very beneficial in a disaster event. New Prague utilities is under full allocation contract through SMMPA and therefore all of the State of Minnesota mandates are met through our wholesale provider. SMMPA is on track to meet the State mandate to have 25% of their energy come from renewable resources by 2025. The renewable resources vary in their makeup with wind, biofuel and hydro making up majority of the renewable generation at the present time. The New Prague utilities also works through SMMPA to administer its CIP program (conservation improvement program). This is also a mandated program set forth by the State of Minnesota requiring all utilities to spend 1.5% of its gross revenue towards conservation projects with its customers.

UCommunity Input. U The New Prague Electric Utility has been both reliable and cost-competitive. As a part of the Comprehensive Plan process in 2004 a survey of 22 individuals occurred. Participants were asked to rank the electric utility. 55% ranked it as “good, 36% as “excellent” and the remaining 9% ranked it as “average”. B. Electrical Plans.

The New Prague Utilities Commission is in the process of exploring the possibility of a future buy-out of the MN Valley Electric Coop electric service territory, which falls within the corporate limits of the City of New Prague. An agreement was in place which prohibited this from occurring prior to the year 2011. As it currently stands, as land is annexed into the City, it would be added to the New Prague Utilities Commission service area, if a buy-out agreement is reached.

City of New Prague Comprehensive Plan, 2014 Chapter 10, Page 7

The Electric Utility budgets approximately $150,000 per year for capital improvement upgrades and to service new developments. C. Electrical Rates and Fees. The New Prague Utilities Commission has established electrical rates for residential, commercial, small industrial, industrial and large industrial customers. Off-peak rebates programs are offered to businesses. The Utility also offers security lighting rental for $8.09 per month. The Electric Utility is a not-for-profit entity. The utility does contribute service and fee-in-lieu of tax contributions to the City in an amount equal to approximately $40,000 per year.

V. STORM WATER UTILITY

A. Existing Storm Water Facilities. The City of New Prague is committed to preserving its natural resources as evidenced by its review of storm water drainage issues and its desire to educate the public on issues relative to surface water quality. Surface water management is used to guide the development and expansion of the City’s drainage system in a cost-effective manner that preserves existing water resources. Goals of surface water management include, but are not limited to: reduction of public expenditures necessary to control excessive volumes and rates of runoff; flood prevention especially those urban in nature; identification of current and future drainage patterns; protection and enhancement of the area’s natural habitat; promotion of ground water recharge; protection of the water quantity and quality in wetland, Phillips Creek and Sand Creek, and reduction in erosion from surface flows. New Prague’s Storm Water facilities include a combination of storm sewer trunk lines, pipes, channels, manholes, overland drainage ways, catch basins and ponds. A map illustrating New Prague’s storm sewer system is attached as Map 10-6. UCommunity Input. U As a part of the Comprehensive Plan process a survey of 22 individuals occurred. Participants were asked to rank the storm water utility. 55% ranked it as “good, 18% as “excellent”, 18% rated it as “average, 4.5% rated it as “fair” and the remaining 4.5% ranked it as “poor”. B. Maintenance of the Storm Water System. Storm water pipes are currently replaced in coordination with other street and utility projects. Storm water ponds, their inlets and outlets are maintained by Public Works staff. C. Storm Water Plans.

The City adopted a Comprehensive Storm Water Management Plan in 1998, which focused on existing development at that time. An updated Surface Water Management Plan (SWMP) was prepared in 2004, which includes:

1. The division of the City into drainage districts and sub-districts including a growth area to accommodate a population of 20,000;

2. A determination of storm water runoff under ultimate land conditions; 3. The general layout and sizing of trunk storm sewers and open channels; 4. Tributary areas, storage volumes and high water levels of all required ponding areas 5. Development of wetland management policies to ensure compliance with local, state and

federal wetland regulations;

City of New Prague Comprehensive Plan, 2014 Chapter 10, Page 8

6. Estimated construction and implementation cost of the Surface Water Management Plan; 7. Grading plan review processes; 8. Storm Water Utility funding needs; and 9. Recommendations for education of City residents, staff and the development community.

D. Storm Water Fees. In order to service the future growth with regional ponds, trunk pipe and channels the 2004 Surface Water Management Plan estimates a cost of $11,204,380. The Plan suggests the gross acreage in the growth area is 4,185 acres, which it notes would accommodate a population of 20,000. The Plan further breaks out recommended area charge rates for various land uses as follows:

Low density residential (1-6 units per acre): $3,012 Medium density residential (6 to 12 units per acre): $4,818 High density residential (12 or more units per acre): $5,723; and Commercial and industrial: $5,723.

The City currently does not charge developers a per acre fee for storm water management fees.

V. MUNICIPAL UTILITIES POLICIES AND OBJECTIVES

A. Municipal Utility Objectives

1. Continue to provide quality utility services to New Prague residents and businesses

at cost effective rates. 2. Continue to plan for future utility needs and structure rates and fees to ensure future

development pays for infrastructure costs needed to support the growth.

3. Continue to upgrade existing utility infrastructure as well as plan for future extensions and improvements.

B. Municipal Utility Policies

1. The City should review and calculate the impact of all proposed development and land subdivision on the capacity of the existing sanitary sewer system to determine whether the City can provide services requested within a timely manner (i.e. two years).

2. The City should update its Water Distribution Plan to include future growth areas and

update future capital needs based on current population projections. 3. The City should emphasize redevelopment/infill in existing urban areas to maximize

existing municipal utilities. 4. The City should continually review the appropriateness of: utility rates, sewer and water

availability and connection charges and trunk area charges to determine whether or not said fees are sufficient to provide for future reconstruction and expansion of the system.

5. To avoid duplicate costs the City should coordinate future street

construction/reconstruction with needed municipal utility construction and reconstruction. 6. Standard review procedures should be established to ensure all (re) development within

the City is in compliance with the grading and storm water management controls outlined in the Surface Water Management Plan.

City of New Prague Comprehensive Plan, 2014 Chapter 10, Page 9

7. Development proposals shall be reviewed in accordance with the Wellhead Protection Plan. Any potentially contaminating land uses must be sited outside the wellhead protection area.

!

!

!!

!

!

!

!

!

!

!

!!!

! ! ! !

! ! ! !

!

!

!

!

!

! !!

! !

!

!

! !

!!

!

!

!

!

!

! ! !

!! !

!

!

! ! ! !! ! ! ! ! ! ! ! ! ! ! ! !

!

!

!

!!

!!

! ! !

! !

!

!

!

!

J

!!

!

!

!

!

J!

!

!!

!

!

!!!!!!!

!

!

!

!

!!

!

!

!

! !!

!

!

!

!

!

! ! !!

!

!

!

!

! !

!

!!

!

!

!

!

!

! !

!

!

!

!

! !

!

!

!

!

!

!!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!!

!!

!

J

L !

!!!!!!!

!

!

!

!

!

!

!

!!

!

! !

!

! !

!

!!

!

!!

!!!!

!

!

!

!

!

!!

!! ! ! !

!! !

!!

!

!

!

!!

!

!

!

!

! !

!!

!

!!

!

!!

!

!

!

!!

!

!

!

!

!

!

!

!!

!

!

!!!! !

!

!

!

!

!

!

!!

!

!

!

!

!

!

!!!

! !

!!

! !

J

!

!

!!!

!!

! ! !

!

!

! !!!!!

!!!!

!!!!

!

!

!

!

!

!

!! !

!

!

!

!!

!!!

!

!

! !

!!

!

!

!!

!!!!

!

!

!

!

!

!

!

!

!

!

!!

!!!

! ! !

!!

!

!

!

!

!

!!

!

!

!

! !

! !

!

!

!

!

!!!!! J!

! !

!

!

!

!

!!!!

!

!

!

!!

!

J

!!!!

!

!

!

!

!

!

!

!

!

!!!

!!

!

!

!

!

! !

J!

!

! !!J!

!

!

!

!

! ! ! ! !

! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

! !!

!

!

!

!

! !

!

!!

!

!

!

!

!

!

!

!

!! !!

!!!!

!!

!!!

!! ! !

!!

! !!

!

!

!

!

!

! !

!

!

!

!

!!

!

!

!

!

!

!!

!

!

!!!

!

!

!

!

!

!!

! !

!

!

!

!!

!!!

!

!

!

!

!

!

!

!

!!!!

!!

! ! !! ! ! !

!

!

!

!

!!

!

!

!! !

!

!

!!

!

!

!

!!!

!

!

!

! !!!!

!

!

!

!!

!!

!!

!!!

!

!

!

!

J

!! !

! !

!

!

!

!!

!

!

!! !

!

!

!

! !!!!!

!

!

!

!

!

!

!

!!

!! ! ! ! ! !

!!!

! !

!

!

!

!

!

!

! !

!

!

!!

!

!!

!

!

!

!

!

!

! !!!!

!

!

!

!

!

!! !

!!!

!

!

!

!

!

!!!!!!!!

!

!!!!!!!!

!

!

!!

!

!

!!!!

!

!

!

!

!

#

Windcrest Cir

7th Av

e. NW

Rising

Moo

n All

ey

#

Windcrest Cir

Danube

Cir NE

TerranceCir NE

Wenc

el Av

e NE

Freed

om Av

e NE

Independence St NE

Englis

h Ave

NW

Histor

y Ct N

W

MathCt NW

Music St. NW

° °

Liberty Park

Chalu

psky

Ave N

E

4th Street SE

Dohe

rty Av

e. SE

Fiddle

r Ct

SEFid

dler A

ve SE

10th

Ave.

SE

3rd Street SE

12th Street NW

Lady

slippe

r Ave

Cotto

nwoo

d Lan

e NE

Cherrywood Drive NE

3rd Street NE

1st Street NE1st Street NW

3rd Street NE

6th Street NE

5th Street NE

Lexin

gton A

ve. N

Bruzek Ln

Bohemia Street

Philip

Pkwy

.

Liberty Ln NE

Eclip

se Pk

wy. N

Colum

bus A

ve. N

.

1st A

ve. N

W

6th Street NW

3rd Av

e. NW

Hwy.

21

4th Av

e SW

Main Street W

Windcrest Lane

9th Street SE

8th Street SE

6th Street Cir

Lexin

gton A

ve S

2nd Street NE

7th Street NE

Centr

al Av

e. N.

4th Street NE

Colum

bus A

ve. S

1st Street NE

Colum

bus A

ve. N

Colum

bus A

ve. N

12th Street NE

TH 21

6th Street NW

2nd A

ve SW

4th Street SW

Main Street E

7th Street NE

4th Street NE

Cty R

d 37

7th Av

e. SE

1st Street SE

3rd Street NW

6th Street NE

5th Street NE

Fores

t Gr

een C

ircle

7th St. NE

Bernas Ln

Vrtis LnGooseberry Ln

6th Street NW

5th Street NW

4th Street NW

3rd Street NW

2nd Street NW

1st. A

ve. N

W

2nd A

ve. N

W

4th Av

e. NW

6th A

ve. N

W

5th A

ve. N

W

Main Street W

5th Av

e SW

2nd St SW

1st St SW

2nd A

ve. S

W

1st A

ve SW

1st Street SW

2nd Street SW

3rd Street SW

5th Street SW

Centr

al Av

e S

1st A

ve SE

Coun

ty Ro

ad 14

4

Wind

crest

Dr

Colum

bus

Ave.

S

10th Street SE

Mead

ow

Lane

Centr

al A

ve S Pa

rk Av

e S

Linco

ln Av

e.

Sunri

se A

ve N

Lexin

gton

Ave N

Suns

et Av

e N

Lynd

ale A

ve N

Persh

ing A

ve N

Linco

ln Av

e N

2nd Street NE

3rd Street NE

1st A

ve N

E

7th Street NE

4th Street NE

5th Street SE

4th Street SE

3rd Street SE

2nd Street SE 2nd Street SE

1st Street SE

Main Street

2nd Street NE

4th Street NE

5th Street SE

Woodlands Ct. SE

Scien

ce Av

e NW

Heritage Trail NE

2nd Street NW

8th Av

e. NW

Praha St. SE

Jillian St. SEVillage St. SE

7th Street Ct SE

8th Street Ct SE

9th Street SE

12th

Ave.

SE

Horse

shoe L

n SE

10th

Ave.

SE

3rd Street SE

Redpoll Ave SE

Alton

Ave (

twp)

Bavaria Ln

7th Street NW

Gym

Ct NW

Art St

. NW

Speech St. NW

FutureAthletic

Complex

?±A@?A@

?ºA@

?ºA@

?A@

?±A@

Highview Drive NE

Ironwood Ave. NEHighviewCir

12th Street SE

10th A

ve. SE

Park Ln. SE

Park

Ct. S

E

10th Street Cir. SE

Naylo

r Ave

nue

2nd Street NWColorado Street NW

4th Street NW

6th Street NW

11th

Aven

ue N

W

Jeffe

rson

Ave.

NW

Clevel

and

Ave.

NW

Grant Ave. NW

Kenn

edy A

ve. NW

1st Street NW

Flag Blvd.

11th Street Ct. NE 11th Street NE

Prairie

Ct.

NE

Herita

ge

Ct. N

E Patriot Street NEHerita

ge Tr

ail N

E

Fairw

ay Dri

ve SE

9th St

reet C

t. SE

Everg

reen

Ave.

SE

Horizon Drive SE

Pragu

eCt.

SE

11th StreetCir

Churc

h St.

S{ S{

H ighland Dri ve

C halu

psky

Ave.

SE

Tikalsky Street SE

Olivia Street SEAdelin

e Av

e. SE

Eastla

nd Av

e. SE

Autum

nAve

.SE

Alton

Ave.

SE

Herita

ge Ln

Private Sewer Lines-Shardan Townhomes

Private Sewer LinesJillian Street SEPraha Street SE

Flows from Cedar Lake SanitarySewer CollectionSystem

Sd

Sd

Ss

WastewaterTreatmentFacility

City of New PragueSanitary Sewer MapJuly 2014: Map 10-1

!

!

!!

!

!

!

!

!

!

!

!!!

! ! ! !

! ! ! !

!

!

!

!

!

! !!

! !

!

!

! !

!!

!

!

!

!

!

! ! !

!! !

!

!

! ! ! !! ! ! ! ! ! ! ! ! ! ! ! !

!

!

!

!!

!!

! ! !

! !

!

!

!

!

J

!!

!

!

!

!

J!

!

!!

!

!

!!!!!!!

!

!

!

!

!!

!

!

!

! !!

!

!

!

!

!

! ! !!

!

!

!

!

! !

!

!!

!

!

!

!

!

! !

!

!

!

!

! !

!

!

!

!

!

!!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!!

!!

!

J

L !

!!!!!!!

!

!

!

!

!

!

!

!!

!

! !

!

! !

!

!!

!

!!

!!!!

!

!

!

!

!

!!

!! ! ! !

!! !

!!

!

!

!

!!

!

!

!

!

! !

!!

!

!!

!

!!

!

!

!

!!

!

!

!

!

!

!

!

!!

!

!

!!!! !

!

!

!

!

!

!

!!

!

!

!

!

!

!

!!!

! !

!!

! !

J

!

!

!!!

!!

! ! !

!

!

! !!!!!

!!!!

!!!!

!

!

!

!

!

!

!! !

!

!

!

!!

!!!

!

!

! !

!!

!

!

!!

!!!!

!

!

!

!

!

!

!

!

!

!

!!

!!!

! ! !

!!

!

!

!

!

!

!!

!

!

!

! !

! !

!

!

!

!

!!!!! J!

! !

!

!

!

!

!!!!

!

!

!

!!

!

J

!!!!

!

!

!

!

!

!

!

!

!

!!!

!!

!

!

!

!

! !

J!

!

! !!J!

!

!

!

!

! ! ! ! !

! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

! !!

!

!

!

!

! !

!

!!

!

!

!

!

!

!

!

!

!! !!

!!!!

!!

!!!

!! ! !

!!

! !!

!

!

!

!

!

! !

!

!

!

!

!!

!

!

!

!

!

!!

!

!

!!!

!

!

!

!

!

!!

! !

!

!

!

!!

!!!

!

!

!

!

!

!

!

!

!!!!

!!

! ! !! ! ! !

!

!

!

!

!!

!

!

!! !

!

!

!!

!

!

!

!!!

!

!

!

! !!!!

!

!

!

!!

!!

!!

!!!

!

!

!

!

J

!! !

! !

!

!

!

!!

!

!

!! !

!

!

!

! !!!!!

!

!

!

!

!

!

!

!!

!! ! ! ! ! !

!!!

! !

!

!

!

!

!

!

! !

!

!

!!

!

!!

!

!

!

!

!

!

! !!!!

!

!

!

!

!

!! !

!!!

!

!

!

!

!

!!!!!!!!

!

!!!!!!!!

!

!

!!

!

!

!!!!

!

!

!

!

!

#

Windcrest Cir

7th Av

e. NW

Rising

Moo

n All

ey

#

Windcrest Cir

Danube

Cir NE

TerranceCir NE

Wenc

el Av

e NE

Freed

om Av

e NE

Independence St NE

Englis

h Ave

NW

Histor

y Ct N

W

MathCt NW

Music St. NW

° °

Liberty Park

Chalu

psky

Ave N

E

4th Street SE

Dohe

rty Av

e. SE

Fiddle

r Ct

SEFid

dler A

ve SE

10th

Ave.

SE

3rd Street SE

12th Street NW

Lady

slippe

r Ave

Cotto

nwoo

d Lan

e NE

Cherrywood Drive NE

3rd Street NE

1st Street NE1st Street NW

3rd Street NE

6th Street NE

5th Street NE

Lexin

gton A

ve. N

Bruzek Ln

Bohemia Street

Philip

Pkwy

.

Liberty Ln NE

Eclip

se Pk

wy. N

Colum

bus A

ve. N

.

1st A

ve. N

W

6th Street NW

3rd Av

e. NW

Hwy.

21

4th Av

e SW

Main Street W

Windcrest Lane

9th Street SE

8th Street SE

6th Street Cir

Lexin

gton A

ve S

2nd Street NE

7th Street NE

Centr

al Av

e. N.

4th Street NE

Colum

bus A

ve. S

1st Street NE

Colum

bus A

ve. N

Colum

bus A

ve. N

12th Street NE

TH 21

6th Street NW

2nd A

ve SW

4th Street SW

Main Street E

7th Street NE

4th Street NE

Cty R

d 37

7th Av

e. SE

1st Street SE

3rd Street NW

6th Street NE

5th Street NE

Fores

t Gr

een C

ircle

7th St. NE

Bernas Ln

Vrtis LnGooseberry Ln

6th Street NW

5th Street NW

4th Street NW

3rd Street NW

2nd Street NW

1st. A

ve. N

W

2nd A

ve. N

W

4th Av

e. NW

6th A

ve. N

W

5th A

ve. N

W

Main Street W

5th Av

e SW

2nd St SW

1st St SW

2nd A

ve. S

W

1st A

ve SW

1st Street SW

2nd Street SW

3rd Street SW

5th Street SW

Centr

al Av

e S

1st A

ve SE

Coun

ty Ro

ad 14

4

Wind

crest

Dr

Colum

bus

Ave.

S

10th Street SE

Mead

ow

Lane

Centr

al A

ve S Pa

rk Av

e S

Linco

ln Av

e.

Sunri

se A

ve N

Lexin

gton

Ave N

Suns

et Av

e N

Lynd

ale A

ve N

Persh

ing A

ve N

Linco

ln Av

e N

2nd Street NE

3rd Street NE

1st A

ve N

E

7th Street NE

4th Street NE

5th Street SE

4th Street SE

3rd Street SE

2nd Street SE 2nd Street SE

1st Street SE

Main Street

2nd Street NE

4th Street NE

5th Street SE

Woodlands Ct. SE

Scien

ce Av

e NW

Heritage Trail NE

2nd Street NW

8th Av

e. NW

Praha St. SE

Jillian St. SEVillage St. SE

7th Street Ct SE

8th Street Ct SE

9th Street SE

12th

Ave.

SE

Horse

shoe L

n SE

10th

Ave.

SE

3rd Street SE

Redpoll Ave SE

Alton

Ave (

twp)

Bavaria Ln

7th Street NW

Gym

Ct NW

Art St

. NW

Speech St. NW

FutureAthletic

Complex

?±A@?A@

?ºA@

?ºA@

?A@

?±A@

Highview Drive NE

Ironwood Ave. NEHighviewCir

12th Street SE

10th A

ve. SE

Park Ln. SE

Park

Ct. S

E

10th Street Cir. SE

Naylo

r Ave

nue

2nd Street NWColorado Street NW

4th Street NW

6th Street NW

11th

Aven

ue N

W

Jeffe

rson

Ave.

NW

Clevel

and

Ave.

NW

Grant Ave. NW

Kenn

edy A

ve. NW

1st Street NW

Flag Blvd.

11th Street Ct. NE 11th Street NE

Prairie

Ct.

NE

Herita

ge

Ct. N

E Patriot Street NEHerita

ge Tr

ail N

E

Fairw

ay Dri

ve SE

9th St

reet C

t. SE

Everg

reen

Ave.

SE

Horizon Drive SE

Pragu

eCt.

SE

11th StreetCir

Churc

h St.

S{ S{

H ighland Dri ve

C halu

psky

Ave.

SE

Tikalsky Street SE

Olivia Street SEAdelin

e Av

e. SE

Eastla

nd Av

e. SE

Autum

nAve

.SE

Alton

Ave.

SE

Herita

ge Ln

Private Sewer Lines-Shardan Townhomes

Private Sewer LinesJillian Street SEPraha Street SE

Flows from Cedar Lake SanitarySewer CollectionSystem

Sd

Sd

Ss

WastewaterTreatmentFacility

®

Current to: July 2014Prepared by: New Prague Planning DepartmentFile: W:\GIS\Projects\Mxds\SanitarySystemMap_10_1.mxd

0 1,320 2,640660 Feet

! Manhole

Sanitary Sewer Lines

Sanitary FacilitiesJ Lift StationL Waste Water

Treatment Facility

#

#

#

#

#

#

#?±A@

?ºA@

?±A@

?ºA@

?A@ ?A@

E©GH E©GH

EoGH

EoGH#

#

#

#

#

#

#?±A@

?ºA@

?±A@

?ºA@

?A@ ?A@

E©GH E©GH

EoGH

EoGH

City of New PragueIndividual SewageTreatment Systems

July 2014: Map 10-2

®0 0.50.25

Miles

Disclaimer: This map was prepared using the City's GIS and is based on the County and City Street Data maintained by the County and City. While the City believes that the data is accurate, the City does not warrant that data in the GIS is error free and the City does not represent that the GIS data can be used for purposes such as navigation or any other purposed requiring the exact measurement of distance and direction or the precise depiction of geographic features. This disclaimer is pursuant to Minnesota Statutes 466.03 Subd. 21. The user of this map acknowledges that the City shall not be liable for any damages that may arise from this map or the information it contains.

Current to: July 2014Prepared by: New Prague Planning DepartmentFile: W:\GIS\Projects\Mxds\ISTS_Map 10_2.mxd

Individual Sewage Treatment SystemExisting City LimitsExisting Road Corridors

#

Water

.. .

.

..

.

..

.. .

.

...

.

.

.. .

... .

..

.

.

.

.

. .

..

. ..

. . .

.

.

. .

.

.

.. .

..

.

.

. ..

..

.

....

.

...

.

.

. .

...

...

. ...

.

..

.....

.

. .

.

.

. ...

.

..

. ...

.

.

.....

...

.

.

.

..

.

..

.

. .

.

.

..

.

.

....

... .

..

. .

.

..

.

..

...

.

.

.

..

.

. ..

....

.

.

.

.

.

..

..

.

..

..

.

. ..

..

... .

.

. .

. .

. . ..

.

..

.

.

.

..

. ...

..

..

..

.. .

. ....

....

..

..

...

....

.

. ..

..

..

.

.

..

..

.

. .. . .

. . .

..

.

.

..

..

. . ..

.

.

.

.

..

..

.

. .

.

.

.

. .. . .

.

.

.

..

.

.

.

.. .

.

.

.

. . ...

. .

.

.

... .

. .

.

.

. .

..

. ..

..

.

..

.. .

.

..

.

.

.. ....

.

..

.

..

.

.

..

..

.

.

. ..

....

.

.

.

.. .

..

.

.

.. . .

.

.

.

...

.

.

..

.

.

.

..

. .

.

.

.

.

. ..

.

...

.

..

.

...

.

.

..

.

..

..

.

.

..

.

..

.

...

...

..

..

... .

..

... .

.

..

..

.

.. .

.. .

.. .

....

.

.

.

.......

.. .

. ..

.

...

.

Ñ Ñ Ñ

Ñ ÑÑ

ÑÑÑ

Ñ Ñ Ñ

Ñ

Ñ Ñ ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

ÑÑ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ Ñ Ñ

Ñ ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ Ñ Ñ

ÑÑ

ÑÑ

Ñ Ñ ÑÑ

Ñ

Ñ

ÑÑ

Ñ ÑÑ

Ñ

Ñ

Ñ Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑÑ

Ñ Ñ Ñ

Ñ

Ñ

Ñ

ÑÑÑÑÑÑ

Ñ Ñ ÑÑ

Ñ

Ñ

Ñ

Ñ

ÑÑ

ÑÑ

ÑÑ

Ñ

Ñ

Ñ

ÑÑ Ñ

Ñ Ñ Ñ

Ñ

ÑÑ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ

ÑÑ

Ñ

Ñ Ñ

Ñ

ÑÑÑÑ

Ñ

ÑÑ

Ñ

Ñ

Ñ

ÑÑ

ÑÑ

Ñ

Ñ

ÑÑ

Ñ Ñ Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑÑ

Ñ

ÑÑ Ñ Ñ

Ñ

Ñ

Ñ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ Ñ

Ñ

Ñ ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

ÑÑÑ

Ñ

ÑÑÑÑ

ÑÑ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

ÑÑ

ÑÑ

Ñ

Ñ

ÑÑ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

ÑÑ

ÑÑ

ÑÑ

Ñ

Ñ

Ñ

Ñ

ÑÑÑ

Ñ

Ñ

ÑÑ

Ñ

ÑÑ

ÑÑ

Ñ

Ñ

ÑÑÑÑ

Ñ

Ñ

Ñ

Ñ ÑÑÑÑÑ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

ÑÑ

Ñ

Ñ

Ñ

Ñ

ÑÑ

ÑÑ

ÑÑ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ

Ñ

ÑÑ

Ñ

ÑÑ

Ñ

Ñ

ÑÑ Ñ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ

ÑÑ Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ ÑÑ

Ñ

ÑÑÑ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ Ñ Ñ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ Ñ

Ñ

Ñ Ñ Ñ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ

Ñ

ÑÑÑÑÑÑÑÑÑ

Ñ

ÑÑ

Ñ Ñ Ñ Ñ Ñ Ñ

Ñ

Ñ

Ñ

Ñ

^^

XXX

X

X

!

!

!!.

!.

!.

GG

#

Windcrest Cir

7th Av

e. NW

Rising

Moo

n All

ey

#

Windcrest Cir

Danube

Cir NE

TerranceCir NE

Wenc

el Av

e NE

Freed

om Av

e NE

Independence St NE

Engli

sh Av

e NW

Histor

y Ct N

W

MathCt NW

Music St. NW

° °

Liberty Park

Chalu

psky

Ave N

E

4th Street SE

Dohe

rty Av

e. SE

Fiddle

r Ct

SEFid

dler A

ve S

E

10th

Ave.

SE

3rd Street SE

12th Street NW

Lady

slippe

r Ave

Cotto

nwoo

d Ave

Cherrywood Drive NE

3rd Street NE

1st Street NECty R

d 37

1st Street NW

3rd Street NE

6th Street NE

5th Street NE

Lexin

gton A

ve. N

Bruzek Ln

Bohemia Street

Philip

Pkwy

.

Liberty Ln NE

Eclip

se Pk

wy. N

Colum

bus A

ve. N

.

1st A

ve. N

W

6th Street NW

3rd Av

e. NW

Hwy.

21

4th Av

e SW

Main Street W

Windcrest Lane

9th Street SE

8th Street SE

6th Street Cir

Lexin

gton A

ve S

2nd Street NE

7th Street NE

Centr

al Av

e. N.

4th Street NE

Colum

bus A

ve. S

1st Street NE

Colum

bus A

ve. N

Colum

bus A

ve. N

12th Street NE

TH 21

6th Street NW

2nd A

ve SW

4th Street SW

Main Street E

7th Street NE

4th Street NE

Cty R

d 37

7th Av

e. SE

1st Street SE

3rd Street NW

6th Street NE

5th Street NE

Fores

t Gr

een C

ircle

7th St. NE

Bernas Ln

Vrtis LnGooseberry Ln

6th Street NW

5th Street NW

4th Street NW

3rd Street NW

2nd Street NW

1st. A

ve. N

W

2nd A

ve. N

W

4th Av

e. NW

6th A

ve. N

W

5th A

ve. N

W

Main Street W

5th Av

e SW

2nd St SW

1st St SW

2nd A

ve. S

W

1st A

ve SW

1st Street SW

2nd Street SW

3rd Street SW

5th Street SW

Centr

al Av

e S

1st A

ve SE

Coun

ty Ro

ad 14

4

Wind

crest

Dr

Colum

bus

Ave.

S

10th Street SE

Mead

ow

Lane

Centr

al A

ve S Pa

rk Av

e S

Linco

ln Av

e.

Sunri

se A

ve N

Lexin

gton

Ave N

Suns

et Av

e N

Lynd

ale A

ve N

Persh

ing A

ve N

Linco

ln Av

e N

2nd Street NE

3rd Street NE

1st A

ve N

E

7th Street NE

4th Street NE

5th Street SE

4th Street SE

3rd Street SE

2nd Street SE 2nd Street SE

1st Street SE

Main Street

2nd Street NE

4th Street NE

HIGHSCHOOL

PRIMARYSCHOOL

MIDDLESCHOOL

INTE

RMED

IATE

SCHO

OL

Foundry Hill Park

Southside Park

New PragueGolf Course

MemorialPark

NorthsidePark

GreenwayPark

Swimming Pool

5th Street SE

Woodlands Ct. SE

Scien

ce Av

e NW

Heritage Trail NE

2nd Street NW

8th Av

e. NW

Praha St. SE

Jillian St. SEVillage St. SE

7th Street Ct SE

8th Street Ct SE

9th Street SE

Settler'sPark 12

th Av

e. SE

Horse

shoe L

n SE

10th

Ave.

SE

3rd Street SE

Redpoll Ave SE

Alton

Ave (

twp)

Bavaria Ln

7th Street NW

Gym

Ct NW

Art S

t. NW

Speech St. NW

Sliding HillSkate Park

FutureAthletic

Complex

?±A@?A@

?ºA@

?ºA@

?A@

?±A@

Highview Drive NE

Ironwood Ave. NEHighviewCir

12th Street SE

10th A

ve. SE

Park Ln. SE

Park

Ct. S

E

10th Street Cir. SE

Naylo

r Ave

nue

PRIMARYSCHOOL

2nd Street NWColorado Street NW

4th Street NW

6th Street NW

11th

Stree

t NW

Jeffe

rson

Ave.

NW

Clevel

and

Ave.

NW

Grant Ave. NW

Kenn

edy A

ve. N

W

1st Street NW

Flag Blvd.

11th Street Ct. NE 11th Street NE

Prair

ie Ct

. NE

Herita

ge

Ct. N

E

Herita

ge Pa

rk

Patriot Street NEHerita

ge Tr

ail N

E

Fairw

ay Dr

ive SE

9th St

reet C

t. SE

Everg

reen

Ave.

SE

Horizon Drive SE

Prag

ueCt

. SE

CityPark

11th StreetCir

Churc

h St.

PhilippsPark

S{ S{

H ighland Dri ve

Chalu

psky

Ave.

SE

Tikalsky Street SE

Olivia Street SEAdeli

ne

Ave.

SE

Eastl

and A

ve. S

EAu

tu mnA

ve.S

E

Alton

Ave.

SE

Herita

ge Ln

Ss

City of New PragueWater Sytem Map

April 2014: Map 10-3.. .

.

..

.

..

.. .

.

...

.

.

.. .

... .

..

.

.

.

.

. .

..

. ..

. . .

.

.

. .

.

.

.. .

..

.

.

. ..

..

.

....

.

...

.

.

. .

...

...

. ...

.

..

.....

.

. .

.

.

. ...

.

..

. ...

.

.

.....

...

.

.

.

..

.

..

.

. .

.

.

..

.

.

....

... .

..

. .

.

..

.

..

...

.

.

.

..

.

. ..

....

.

.

.

.

.

..

..

.

..

..

.

. ..

..

... .

.

. .

. .

. . ..

.

..

.

.

.

..

. ...

..

..

..

.. .

. ....

....

..

..

...

....

.

. ..

..

..

.

.

..

..

.

. .. . .

. . .

..

.

.

..

..

. . ..

.

.

.

.

..

..

.

. .

.

.

.

. .. . .

.

.

.

..

.

.

.

.. .

.

.

.

. . ...

. .

.

.

... .

. .

.

.

. .

..

. ..

..

.

..

.. .

.

..

.

.

.. ....

.

..

.

..

.

.

..

..

.

.

. ..

....

.

.

.

.. .

..

.

.

.. . .

.

.

.

...

.

.

..

.

.

.

..

. .

.

.

.

.

. ..

.

...

.

..

.

...

.

.

..

.

..

..

.

.

..

.

..

.

...

...

..

..

... .

..

... .

.

..

..

.

.. .

.. .

.. .

....

.

.

.

.......

.. .

. ..

.

...

.

Ñ Ñ Ñ

Ñ ÑÑ

ÑÑÑ

Ñ Ñ Ñ

Ñ

Ñ Ñ ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

ÑÑ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ Ñ Ñ

Ñ ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ Ñ Ñ

ÑÑ

ÑÑ

Ñ Ñ ÑÑ

Ñ

Ñ

ÑÑ

Ñ ÑÑ

Ñ

Ñ

Ñ Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑÑ

Ñ Ñ Ñ

Ñ

Ñ

Ñ

ÑÑÑÑÑÑ

Ñ Ñ ÑÑ

Ñ

Ñ

Ñ

Ñ

ÑÑ

ÑÑ

ÑÑ

Ñ

Ñ

Ñ

ÑÑ Ñ

Ñ Ñ Ñ

Ñ

ÑÑ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ

ÑÑ

Ñ

Ñ Ñ

Ñ

ÑÑÑÑ

Ñ

ÑÑ

Ñ

Ñ

Ñ

ÑÑ

ÑÑ

Ñ

Ñ

ÑÑ

Ñ Ñ Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑÑ

Ñ

ÑÑ Ñ Ñ

Ñ

Ñ

Ñ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ Ñ

Ñ

Ñ ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

ÑÑÑ

Ñ

ÑÑÑÑ

ÑÑ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

ÑÑ

ÑÑ

Ñ

Ñ

ÑÑ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

ÑÑ

ÑÑ

ÑÑ

Ñ

Ñ

Ñ

Ñ

ÑÑÑ

Ñ

Ñ

ÑÑ

Ñ

ÑÑ

ÑÑ

Ñ

Ñ

ÑÑÑÑ

Ñ

Ñ

Ñ

Ñ ÑÑÑÑÑ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

ÑÑ

Ñ

Ñ

Ñ

Ñ

ÑÑ

ÑÑ

ÑÑ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ

Ñ

ÑÑ

Ñ

ÑÑ

Ñ

Ñ

ÑÑ Ñ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ Ñ Ñ Ñ Ñ Ñ Ñ

ÑÑ Ñ

ÑÑ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ ÑÑ

Ñ

ÑÑÑ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ Ñ Ñ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ Ñ

Ñ

Ñ Ñ Ñ

Ñ Ñ

Ñ

Ñ

Ñ

Ñ

Ñ Ñ

Ñ

ÑÑÑÑÑÑÑÑÑ

Ñ

ÑÑ

Ñ Ñ Ñ Ñ Ñ Ñ

Ñ

Ñ

Ñ

Ñ

^^

XXX

X

X

!

!

!!.

!.

!.

GG

#

Windcrest Cir

7th Av

e. NW

Rising

Moo

n All

ey

#

Windcrest Cir

Danube

Cir NE

TerranceCir NE

Wenc

el Av

e NE

Freed

om Av

e NE

Independence St NE

Engli

sh Av

e NW

Histor

y Ct N

W

MathCt NW

Music St. NW

° °

Liberty Park

Chalu

psky

Ave N

E

4th Street SE

Dohe

rty Av

e. SE

Fiddle

r Ct

SEFid

dler A

ve S

E

10th

Ave.

SE

3rd Street SE

12th Street NW

Lady

slippe

r Ave

Cotto

nwoo

d Ave

Cherrywood Drive NE

3rd Street NE

1st Street NECty R

d 37

1st Street NW

3rd Street NE

6th Street NE

5th Street NE

Lexin

gton A

ve. N

Bruzek Ln

Bohemia Street

Philip

Pkwy

.

Liberty Ln NE

Eclip

se Pk

wy. N

Colum

bus A

ve. N

.

1st A

ve. N

W

6th Street NW

3rd Av

e. NW

Hwy.

21

4th Av

e SW

Main Street W

Windcrest Lane

9th Street SE

8th Street SE

6th Street Cir

Lexin

gton A

ve S

2nd Street NE

7th Street NE

Centr

al Av

e. N.

4th Street NE

Colum

bus A

ve. S

1st Street NE

Colum

bus A

ve. N

Colum

bus A

ve. N

12th Street NE

TH 21

6th Street NW

2nd A

ve SW

4th Street SW

Main Street E

7th Street NE

4th Street NE

Cty R

d 37

7th Av

e. SE

1st Street SE

3rd Street NW

6th Street NE

5th Street NE

Fores

t Gr

een C

ircle

7th St. NE

Bernas Ln

Vrtis LnGooseberry Ln

6th Street NW

5th Street NW

4th Street NW

3rd Street NW

2nd Street NW

1st. A

ve. N

W

2nd A

ve. N

W

4th Av

e. NW

6th A

ve. N

W

5th A

ve. N

W

Main Street W

5th Av

e SW

2nd St SW

1st St SW

2nd A

ve. S

W

1st A

ve SW

1st Street SW

2nd Street SW

3rd Street SW

5th Street SW

Centr

al Av

e S

1st A

ve SE

Coun

ty Ro

ad 14

4

Wind

crest

Dr

Colum

bus

Ave.

S

10th Street SE

Mead

ow

Lane

Centr

al A

ve S Pa

rk Av

e S

Linco

ln Av

e.

Sunri

se A

ve N

Lexin

gton

Ave N

Suns

et Av

e N

Lynd

ale A

ve N

Persh

ing A

ve N

Linco

ln Av

e N

2nd Street NE

3rd Street NE

1st A

ve N

E

7th Street NE

4th Street NE

5th Street SE

4th Street SE

3rd Street SE

2nd Street SE 2nd Street SE

1st Street SE

Main Street

2nd Street NE

4th Street NE

HIGHSCHOOL

PRIMARYSCHOOL

MIDDLESCHOOL

INTE

RMED

IATE

SCHO

OL

Foundry Hill Park

Southside Park

New PragueGolf Course

MemorialPark

NorthsidePark

GreenwayPark

Swimming Pool

5th Street SE

Woodlands Ct. SE

Scien

ce Av

e NW

Heritage Trail NE

2nd Street NW

8th Av

e. NW

Praha St. SE

Jillian St. SEVillage St. SE

7th Street Ct SE

8th Street Ct SE

9th Street SE

Settler'sPark 12

th Av

e. SE

Horse

shoe L

n SE

10th

Ave.

SE

3rd Street SE

Redpoll Ave SE

Alton

Ave (

twp)

Bavaria Ln

7th Street NW

Gym

Ct NW

Art S

t. NW

Speech St. NW

Sliding HillSkate Park

FutureAthletic

Complex

?±A@?A@

?ºA@

?ºA@

?A@

?±A@

Highview Drive NE

Ironwood Ave. NEHighviewCir

12th Street SE

10th A

ve. SE

Park Ln. SE

Park

Ct. S

E

10th Street Cir. SE

Naylo

r Ave

nue

PRIMARYSCHOOL

2nd Street NWColorado Street NW

4th Street NW

6th Street NW

11th

Stree

t NW

Jeffe

rson

Ave.

NW

Clevel

and

Ave.

NW

Grant Ave. NW

Kenn

edy A

ve. N

W

1st Street NW

Flag Blvd.

11th Street Ct. NE 11th Street NE

Prair

ie Ct

. NE

Herita

ge

Ct. N

E

Herita

ge Pa

rk

Patriot Street NEHerita

ge Tr

ail N

E

Fairw

ay Dr

ive SE

9th St

reet C

t. SE

Everg

reen

Ave.

SE

Horizon Drive SE

Prag

ueCt

. SE

CityPark

11th StreetCir

Churc

h St.

PhilippsPark

S{ S{

H ighland Dri ve

Chalu

psky

Ave.

SE

Tikalsky Street SE

Olivia Street SEAdeli

ne

Ave.

SE

Eastl

and A

ve. S

EAu

tu mnA

ve.S

E

Alton

Ave.

SE

Herita

ge Ln

SsCurrent to: July 2014Prepared by: New Prague Planning DepartmentFile: W:\GIS\Projects\Mxds\WaterSystemMap 10-3.mxd

®0 0.50.25 Miles

.

Ñ

G booster stations!. filter plants! reservoirX wells^ towers

water linesGatehydrant

#

Windcrest Cir

7th Av

e. NW

Rising

Moo

n All

ey

#

Windcrest Cir

Danube

Cir NE

TerranceCir NE

Wenc

el Av

e NE

Freed

om Av

e NE

Independence St NE

Engli

sh Av

e NW

Histor

y Ct N

W

MathCt NW

Music St. NW

° °

Liberty Park

Chalu

psky

Ave N

E

4th Street SE

Dohe

rty Av

e. SE

Fiddle

r Ct

SE

Fiddle

r Ave

SE

10th

Ave.

SE

3rd Street SE

12th Street NW

Lady

slipp

er Av

e

Cotto

nwoo

d Ave

Cherrywood Drive NE

3rd Street NE

1st Street NECty R

d 37

1st Street NW

3rd Street NE

6th Street NE

5th Street NE

Lexin

gton A

ve. N

Bruzek Ln

Bohemia Street

Philip

Pkwy

.

Liberty Ln NE

Eclip

se P

kwy.

N

Colum

bus A

ve. N

.

1st A

ve. N

W

6th Street NW

3rd Av

e. NW

Hwy.

21

4th Av

e SW

Main Street W

Windcrest Lane

9th Street SE

8th Street SE

6th Street Cir

Lexin

gton A

ve S

2nd Street NE

7th Street NE

Centr

al Av

e. N.

4th Street NE

Colum

bus A

ve. S

1st Street NE

Colum

bus A

ve. N

Colum

bus A

ve. N

12th Street NE

TH 21

6th Street NW

2nd A

ve SW

4th Street SW

Main Street E

7th Street NE

4th Street NE

Cty R

d 37

7th Av

e. SE

1st Street SE

3rd Street NW

6th Street NE

5th Street NE

Fores

t Gr

een C

ircle

7th St. NE

Bernas Ln

Vrtis LnGooseberry Ln

6th Street NW

5th Street NW

4th Street NW

3rd Street NW

2nd Street NW

1st. A

ve. N

W

2nd A

ve. N

W

4th Av

e. NW

6th A

ve. N

W

5th A

ve. N

W

Main Street W

5th Av

e SW

2nd St SW

1st St SW

2nd A

ve. S

W

1st A

ve SW

1st Street SW

2nd Street SW

3rd Street SW

5th Street SW

Centr

al Av

e S

1st A

ve SE

Coun

ty Ro

ad 14

4

Wind

crest

Dr

Colum

bus

Ave.

S

10th Street SE

Mead

ow

Lane

Centr

al A

ve S Pa

rk Av

e S

Linco

ln Av

e.

Sunri

se A

ve N

Lexin

gton

Ave N

Suns

et Av

e N

Lynd

ale A

ve N

Persh

ing A

ve N

Linco

ln Av

e N

2nd Street NE

3rd Street NE

1st A

ve N

E

7th Street NE

4th Street NE

5th Street SE

4th Street SE

3rd Street SE

2nd Street SE 2nd Street SE

1st Street SE

Main Street

2nd Street NE

4th Street NE

HIGHSCHOOL

PRIMARYSCHOOL

MIDDLESCHOOL

INTER

MEDI

ATE

SCHO

OL

Foundry Hill Park

Southside Park

New PragueGolf Course

MemorialPark

NorthsidePark

GreenwayPark

Swimming Pool

5th Street SE

Woodlands Ct. SE

Scien

ce Av

e NW

Heritage Trail NE

2nd Street NW

8th Av

e. NW

Praha St. SE

Jillian St. SEVillage St. SE

7th Street Ct SE

8th Street Ct SE

9th Street SE

Settler'sPark 12

th Av

e. SE

Horse

shoe

Ln SE

10th

Ave.

SE

3rd Street SE

Redpoll Ave SE

Alton

Ave (

twp)

Bavaria Ln

7th Street NW

Gym

Ct NW

Art S

t. NW

Speech St. NW

Sliding HillSkate Park

?±A@?A@

?ºA@

?ºA@

?A@

?±A@

Highview Drive NE

Ironwood Ave. NEHighviewCir

12th Street SE

10th

Ave.

SEPark Ln. SE

Park

Ct. S

E

10th Street Cir. SE

Naylo

r Ave

nue

PRIMARYSCHOOL

2nd Street NWColorado Street NW

4th Street NW

6th Street NW

11th

Aven

ue N

W

Jeffe

rson

Ave.

NW

Cleve

land

Ave.

NW

Grant Ave. NW

Kenn

edy A

ve. N

W

1st Street NW

Flag Blvd.

11th Street Ct. NE 11th Street NE

Prair

ie Ct

. NE

Herita

ge

Ct. N

E

Herita

ge Pa

rk

Patriot Street NEHerita

ge Tr

ail N

E

Fairw

ay Dr

ive SE

9th St

reet C

t. SE

Everg

reen

Ave.

SE

Horizon Drive SE

Prag

ueCt

. SE

CityPark

11th StreetCir

Churc

h St.

PhilippsPark

S{S{

H ighlan d D ri ve

Cha lu

psk y

Ave.

SE

Tikalsky Street SE

Olivia Street SEAdeli

ne

Ave.

SE

Eastl

and A

ve. S

EAu

tumn

Ave.

SE

Alton

Ave.

SE

Herita

ge Ln

Ss

City of New PragueElectric Service

TerritoriesJuly 2014: Map 10-4

#

Windcrest Cir

7th Av

e. NW

Rising

Moo

n All

ey

#

Windcrest Cir

Danube

Cir NE

TerranceCir NE

Wenc

el Av

e NE

Freed

om Av

e NE

Independence St NE

Engli

sh Av

e NW

Histor

y Ct N

W

MathCt NW

Music St. NW

° °

Liberty Park

Chalu

psky

Ave N

E

4th Street SE

Dohe

rty Av

e. SE

Fiddle

r Ct

SE

Fiddle

r Ave

SE

10th

Ave.

SE

3rd Street SE

12th Street NW

Lady

slipp

er Av

e

Cotto

nwoo

d Ave

Cherrywood Drive NE

3rd Street NE

1st Street NECty R

d 37

1st Street NW

3rd Street NE

6th Street NE

5th Street NE

Lexin

gton A

ve. N

Bruzek Ln

Bohemia Street

Philip

Pkwy

.

Liberty Ln NE

Eclip

se P

kwy.

N

Colum

bus A

ve. N

.

1st A

ve. N

W

6th Street NW

3rd Av

e. NW

Hwy.

21

4th Av

e SW

Main Street W

Windcrest Lane

9th Street SE

8th Street SE

6th Street Cir

Lexin

gton A

ve S

2nd Street NE

7th Street NE

Centr

al Av

e. N.

4th Street NE

Colum

bus A

ve. S

1st Street NE

Colum

bus A

ve. N

Colum

bus A

ve. N

12th Street NE

TH 21

6th Street NW

2nd A

ve SW

4th Street SW

Main Street E

7th Street NE

4th Street NE

Cty R

d 37

7th Av

e. SE

1st Street SE

3rd Street NW

6th Street NE

5th Street NE

Fores

t Gr

een C

ircle

7th St. NE

Bernas Ln

Vrtis LnGooseberry Ln

6th Street NW

5th Street NW

4th Street NW

3rd Street NW

2nd Street NW

1st. A

ve. N

W

2nd A

ve. N

W

4th Av

e. NW

6th A

ve. N

W

5th A

ve. N

W

Main Street W

5th Av

e SW

2nd St SW

1st St SW

2nd A

ve. S

W

1st A

ve SW

1st Street SW

2nd Street SW

3rd Street SW

5th Street SW

Centr

al Av

e S

1st A

ve SE

Coun

ty Ro

ad 14

4

Wind

crest

Dr

Colum

bus

Ave.

S

10th Street SE

Mead

ow

Lane

Centr

al A

ve S Pa

rk Av

e S

Linco

ln Av

e.

Sunri

se A

ve N

Lexin

gton

Ave N

Suns

et Av

e N

Lynd

ale A

ve N

Persh

ing A

ve N

Linco

ln Av

e N

2nd Street NE

3rd Street NE

1st A

ve N

E

7th Street NE

4th Street NE

5th Street SE

4th Street SE

3rd Street SE

2nd Street SE 2nd Street SE

1st Street SE

Main Street

2nd Street NE

4th Street NE

HIGHSCHOOL

PRIMARYSCHOOL

MIDDLESCHOOL

INTER

MEDI

ATE

SCHO

OL

Foundry Hill Park

Southside Park

New PragueGolf Course

MemorialPark

NorthsidePark

GreenwayPark

Swimming Pool

5th Street SE

Woodlands Ct. SE

Scien

ce Av

e NW

Heritage Trail NE

2nd Street NW

8th Av

e. NW

Praha St. SE

Jillian St. SEVillage St. SE

7th Street Ct SE

8th Street Ct SE

9th Street SE

Settler'sPark 12

th Av

e. SE

Horse

shoe

Ln SE

10th

Ave.

SE

3rd Street SE

Redpoll Ave SE

Alton

Ave (

twp)

Bavaria Ln

7th Street NW

Gym

Ct NW

Art S

t. NW

Speech St. NW

Sliding HillSkate Park

?±A@?A@

?ºA@

?ºA@

?A@

?±A@

Highview Drive NE

Ironwood Ave. NEHighviewCir

12th Street SE

10th

Ave.

SEPark Ln. SE

Park

Ct. S

E

10th Street Cir. SE

Naylo

r Ave

nue

PRIMARYSCHOOL

2nd Street NWColorado Street NW

4th Street NW

6th Street NW

11th

Aven

ue N

W

Jeffe

rson

Ave.

NW

Cleve

land

Ave.

NW

Grant Ave. NW

Kenn

edy A

ve. N

W

1st Street NW

Flag Blvd.

11th Street Ct. NE 11th Street NE

Prair

ie Ct

. NE

Herita

ge

Ct. N

E

Herita

ge Pa

rk

Patriot Street NEHerita

ge Tr

ail N

E

Fairw

ay Dr

ive SE

9th St

reet C

t. SE

Everg

reen

Ave.

SE

Horizon Drive SE

Prag

ueCt

. SE

CityPark

11th StreetCir

Churc

h St.

PhilippsPark

S{S{

H ighlan d D ri ve

Cha lu

psk y

Ave.

SE

Tikalsky Street SE

Olivia Street SEAdeli

ne

Ave.

SE

Eastl

and A

ve. S

EAu

tumn

Ave.

SE

Alton

Ave.

SE

Herita

ge Ln

Ss

® 0 0.50.25 Miles

Disclaimer: This map does not represent a survey of the land. The Electric Service Territories on this map reflect approved changes through December 1, 2006. Questions regarding interpretation of this map should be directed to the City Planning Department or City Utility Department. This map was prepared using the City's GIS and is based on the County and City Parcel Data maintained by the County and City and Electric Service Territories maintained by NPUC and MVEC. While the City believes that the data is accurate, the City does not warrant that data in the GIS is error free and the City does not represent that the GIS data can be used for purposes such as navigation or any other purposed requiring the exact measurement of distance and direction or the precise depiction of geographic features. This disclaimer is pursuant to Minnesota Statutes 466.03 Subd. 21. The user of this map acknowledges that the City shall not be liable for any damages that mayarise from this map or the information it contains.

Current to: July 2014Prepared by: New Prague Planning DepartmentFile: W:\GIS\Projects\Mxds\ElectricServiceAreaMap10_4.mxd

Electric ServiceTerritories

Right of WayCity LimitsRailroad

MVECNPUC

A5 A6 A7 A8B4 B5 B6 B7 B8 B9 B10C4 C5 C6 C7 C8 C9 C10 C11D4 D5 D6 D7 D8 D9 D10 D11

E3 E4 E5 E6 E7 E8 E9 E10 E11F2 F3 F4 F5 F6 F7 F8 F9 F10 F11

G1 G2 G3 G4 G5 G6 G7 G8 G9 G10 G11 G12H1 H2 H3 H4 H5 H6 H7 H8 H9 H10 H11 H12 H13I1 I2 I3 I4 I5 I6 I7 I8 I9 I10 I11 I12 I13J1 J2 J3 J4 J5 J6 J7 J8 J9 J10 J11 J12 J13K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13N1 N2 N3 N4 N5 N6 N7 N8 N9 N10 N11 N12 N13O1 O2 O3 O4 O5 O6 O7 O8 O9 O10 O11 O12 O13P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13R1 R2 R3 R4 R5 R6 R7 R8 R9 R10 R11 R12 R13S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 T11 T12 T13

U2 U3 U4 U5 U6 U7 U8 U9 U10 U11 U12 U13V2 V3 V4 V5 V6 V7 V8 V9 V10 V11 V12 V13W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13

X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 X13Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12 Y13Z4 Z5 Z6 Z7 Z8 Z9 Z10 Z11 Z12 Z13

AA5 AA6 AA7 AA8 AA9 AA10 AA11 AA12 AA13AB8 AB9 AB10 AB11 AB12

?A@ ?A@

G¡WX

G¢WX

GjWX

GoWX

?±A@

ST1 6 4

280th St W

Wood

land T

r

290th St

280th St E

290th St

Edgewood

La

Farm

La

175th

La

181s

t Ave

171s

t Ave

Naylor Ave

Koep

er Av

e NE

Redw

ing Av

e

Bohnsack Way

270th St

Aberd

een A

ve

Lucy St

270th St W270th St WDe

lmar

Ave

Map D

ocum

ent: \

\arcs

erver1

\GIS

\NEW

P\_Ba

sema

p\ESR

I\Map

Boo

ks\20

14\N

ewp_

Electr

icLoc

ation

Map_

11x1

7.mxd

Date

Save

d: 9/1

0/201

4 9:57

:42 AM

Electrical System Map BookCity of New Prague

Location MapSeptember, 2014

CLIENTLOGO

G rid

C ity o f N e w P ra g u e P a rc e ls

P a rc e ls

C ity o f N e w P ra g u e M u n ic ip a l B o u n d a ry

P ro te c te d W a te rs - B a s in s

P ro te c te d W a te rs - W a te rc o u rs e

0 2 ,0 0 0F e e t

Source: Scott County, Le Sueur County, MnDNR, ESRI

Legend I

kondich
Typewritten Text
(Map 10-5)

#

Windcrest Cir

7th Av

e. NW

Rising

Moo

n All

ey

#

Windcrest Cir

Danube

Cir NE

TerranceCir NE

Wenc

el Av

e NE

Freed

om Av

e NE

Independence St NE

Engli

sh Av

e NW

Histor

y Ct N

W

MathCt NW

Music St. NW

° °

Liberty Park

Chalu

psky

Ave N

E

4th Street SE

Dohe

rty Av

e. SE

Fiddle

r Ct

SEFid

dler A

ve SE

10th

Ave.

SE

3rd Street SE

12th Street NW

Lady

slippe

r Ave

Cotto

nwoo

d Ave

Cherrywood Drive NE

3rd Street NE

1st Street NECty R

d 37

1st Street NW

3rd Street NE

6th Street NE

5th Street NE

Lexin

gton A

ve. N

Bruzek Ln

Bohemia Street

Philip

Pkwy

.

Liberty Ln NE

Eclip

se Pk

wy. N

Colum

bus A

ve. N

.

1st A

ve. N

W

6th Street NW

3rd Av

e. NW

Hwy.

21

4th Av

e SW

Main Street W

Windcrest Lane

9th Street SE

8th Street SE

6th Street Cir

Lexin

gton A

ve S

2nd Street NE

7th Street NE

Centr

al Av

e. N.

4th Street NE

Colum

bus A

ve. S

1st Street NE

Colum

bus A

ve. N

Colum

bus A

ve. N

12th Street NE

TH 21

6th Street NW

2nd A

ve SW

4th Street SW

Main Street E

7th Street NE

4th Street NE

Cty R

d 37

7th Av

e. SE

1st Street SE

3rd Street NW

6th Street NE

5th Street NE

Fores

t Gr

een C

ircle

7th St. NE

Bernas Ln

Vrtis LnGooseberry Ln

6th Street NW

5th Street NW

4th Street NW

3rd Street NW

2nd Street NW

1st. A

ve. N

W

2nd A

ve. N

W

4th Av

e. NW

6th A

ve. N

W

5th A

ve. N

W

Main Street W

5th Av

e SW

2nd St SW

1st St SW

2nd A

ve. S

W

1st A

ve SW

1st Street SW

2nd Street SW

3rd Street SW

5th Street SW

Centr

al Av

e S

1st A

ve SE

Coun

ty Ro

ad 14

4

Wind

crest

Dr

Colum

bus

Ave.

S

10th Street SE

Mead

ow

Lane

Centr

al A

ve S Pa

rk Av

e S

Linco

ln Av

e.

Sunri

se A

ve N

Lexin

gton

Ave N

Suns

et Av

e N

Lynd

ale A

ve N

Persh

ing A

ve N

Linco

ln Av

e N

2nd Street NE

3rd Street NE

1st A

ve N

E

7th Street NE

4th Street NE

5th Street SE

4th Street SE

3rd Street SE

2nd Street SE 2nd Street SE

1st Street SE

Main Street

2nd Street NE

4th Street NE

HIGHSCHOOL

PRIMARYSCHOOL

MIDDLESCHOOL

INTE

RMED

IATE

SCHO

OL

Foundry Hill Park

Southside Park

New PragueGolf Course

MemorialPark

NorthsidePark

GreenwayPark

Swimming Pool

5th Street SE

Woodlands Ct. SE

Scien

ce Av

e NW

Heritage Trail NE

2nd Street NW

8th Av

e. NW

Praha St. SE

Jillian St. SEVillage St. SE

7th Street Ct SE

8th Street Ct SE

9th Street SE

Settler'sPark 12

th Av

e. SE

Horse

shoe L

n SE

10th

Ave.

SE

3rd Street SE

Redpoll Ave SE

Alton

Ave (

twp)

Bavaria Ln

7th Street NW

Gym

Ct NW

Art S

t. NW

Speech St. NW

Sliding HillSkate Park

FutureAthletic

Complex

?±A@?A@

?ºA@

?ºA@

?A@

?±A@

Highview Drive NE

Ironwood Ave. NEHighviewCir

12th Street SE10

th Ave.

SE

Park Ln. SE

Park

Ct. S

E

10th Street Cir. SE

Naylo

r Ave

nue

PRIMARYSCHOOL

2nd Street NWColorado Street NW

4th Street NW

6th Street NW

11th

Aven

ue N

W

Jeffe

rson

Ave.

NW

Clevel

and

Ave.

NW

Grant Ave. NW

Kenn

edy A

ve. NW

1st Street NW

Flag Blvd.

11th Street Ct. NE 11th Street NE

Prair

ie Ct

. NE

Herita

ge

Ct. N

E

Herita

ge Pa

rk

Patriot Street NEHerita

ge Tr

ail N

E

Fairw

ay Dr

ive SE

9th St

reet C

t. SE

Everg

reen

Ave.

SE

Horizon Drive SE

Prag

ueCt

. SE

CityPark

11th StreetCir

Churc

h St.

PhilippsPark

S{ S{

H ighlan d Dri ve

Chalu

psk y

Ave.

SE

Tikalsky Street SE

Olivia Street SEAdeli

ne

Ave.

SE

Eastl

and A

ve. S

EAu

tu mnA

ve.S

E

Alton

Ave.

SE

Herita

ge Ln

Ss

City of New PragueStorm Sewer System

Map 10-6

#

Windcrest Cir

7th Av

e. NW

Rising

Moo

n All

ey

#

Windcrest Cir

Danube

Cir NE

TerranceCir NE

Wenc

el Av

e NE

Freed

om Av

e NE

Independence St NE

Engli

sh Av

e NW

Histor

y Ct N

W

MathCt NW

Music St. NW

° °

Liberty Park

Chalu

psky

Ave N

E

4th Street SE

Dohe

rty Av

e. SE

Fiddle

r Ct

SEFid

dler A

ve SE

10th

Ave.

SE

3rd Street SE

12th Street NW

Lady

slippe

r Ave

Cotto

nwoo

d Ave

Cherrywood Drive NE

3rd Street NE

1st Street NECty R

d 37

1st Street NW

3rd Street NE

6th Street NE

5th Street NE

Lexin

gton A

ve. N

Bruzek Ln

Bohemia Street

Philip

Pkwy

.

Liberty Ln NE

Eclip

se Pk

wy. N

Colum

bus A

ve. N

.

1st A

ve. N

W

6th Street NW

3rd Av

e. NW

Hwy.

21

4th Av

e SW

Main Street W

Windcrest Lane

9th Street SE

8th Street SE

6th Street Cir

Lexin

gton A

ve S

2nd Street NE

7th Street NE

Centr

al Av

e. N.

4th Street NE

Colum

bus A

ve. S

1st Street NE

Colum

bus A

ve. N

Colum

bus A

ve. N

12th Street NE

TH 21

6th Street NW

2nd A

ve SW

4th Street SW

Main Street E

7th Street NE

4th Street NE

Cty R

d 37

7th Av

e. SE

1st Street SE

3rd Street NW

6th Street NE

5th Street NE

Fores

t Gr

een C

ircle

7th St. NE

Bernas Ln

Vrtis LnGooseberry Ln

6th Street NW

5th Street NW

4th Street NW

3rd Street NW

2nd Street NW

1st. A

ve. N

W

2nd A

ve. N

W

4th Av

e. NW

6th A

ve. N

W

5th A

ve. N

W

Main Street W

5th Av

e SW

2nd St SW

1st St SW

2nd A

ve. S

W

1st A

ve SW

1st Street SW

2nd Street SW

3rd Street SW

5th Street SW

Centr

al Av

e S

1st A

ve SE

Coun

ty Ro

ad 14

4

Wind

crest

Dr

Colum

bus

Ave.

S

10th Street SE

Mead

ow

Lane

Centr

al A

ve S Pa

rk Av

e S

Linco

ln Av

e.

Sunri

se A

ve N

Lexin

gton

Ave N

Suns

et Av

e N

Lynd

ale A

ve N

Persh

ing A

ve N

Linco

ln Av

e N

2nd Street NE

3rd Street NE

1st A

ve N

E

7th Street NE

4th Street NE

5th Street SE

4th Street SE

3rd Street SE

2nd Street SE 2nd Street SE

1st Street SE

Main Street

2nd Street NE

4th Street NE

HIGHSCHOOL

PRIMARYSCHOOL

MIDDLESCHOOL

INTE

RMED

IATE

SCHO

OL

Foundry Hill Park

Southside Park

New PragueGolf Course

MemorialPark

NorthsidePark

GreenwayPark

Swimming Pool

5th Street SE

Woodlands Ct. SE

Scien

ce Av

e NW

Heritage Trail NE

2nd Street NW

8th Av

e. NW

Praha St. SE

Jillian St. SEVillage St. SE

7th Street Ct SE

8th Street Ct SE

9th Street SE

Settler'sPark 12

th Av

e. SE

Horse

shoe L

n SE

10th

Ave.

SE

3rd Street SE

Redpoll Ave SE

Alton

Ave (

twp)

Bavaria Ln

7th Street NW

Gym

Ct NW

Art S

t. NW

Speech St. NW

Sliding HillSkate Park

FutureAthletic

Complex

?±A@?A@

?ºA@

?ºA@

?A@

?±A@

Highview Drive NE

Ironwood Ave. NEHighviewCir

12th Street SE10

th Ave.

SE

Park Ln. SE

Park

Ct. S

E

10th Street Cir. SE

Naylo

r Ave

nue

PRIMARYSCHOOL

2nd Street NWColorado Street NW

4th Street NW

6th Street NW

11th

Aven

ue N

W

Jeffe

rson

Ave.

NW

Clevel

and

Ave.

NW

Grant Ave. NW

Kenn

edy A

ve. NW

1st Street NW

Flag Blvd.

11th Street Ct. NE 11th Street NE

Prair

ie Ct

. NE

Herita

ge

Ct. N

E

Herita

ge Pa

rk

Patriot Street NEHerita

ge Tr

ail N

E

Fairw

ay Dr

ive SE

9th St

reet C

t. SE

Everg

reen

Ave.

SE

Horizon Drive SE

Prag

ueCt

. SE

CityPark

11th StreetCir

Churc

h St.

PhilippsPark

S{ S{

H ighlan d Dri ve

Chalu

psk y

Ave.

SE

Tikalsky Street SE

Olivia Street SEAdeli

ne

Ave.

SE

Eastl

and A

ve. S

EAu

tu mnA

ve.S

E

Alton

Ave.

SE

Herita

ge Ln

Ss

® 0 0.50.25 Miles

Disclaimer: This map does not represent a survey of the land. The zoning districts on this mapreflect approved zoning changes through January 3, 2006. Zoning Districts are subject toofficial amendments and the zoning designations shown on this map must be interpreted bythe City Code and City Policy. Questions regarding zoning districts or interpretation of thismap should be directed to the City Planning Department. This map was prepared using theCity's GIS and is based on the County and City Parcel Data maintained by the County and City.While the City believes that the data is accurate, the City does not warrant that data in the GISis error free and the City does not represent that the GIS data can be used for purposes such asnavigation or any other purposed requiring the exact measurement of distance and direction or theprecise depiction of geographic features. This disclaimer is pursuant to Minnesota Statutes 466.03 Subd. 21.The user of this map acknowledges that the City shall not be liable for any damages that mayarise from this map or the information it contains.

Current to: July 2014Prepared by: New Prague Planning DepartmentFile: W:\GIS\Projects\Mxd\Stormsewer_System_Map_10_6.mxd

Storm Sewer Ponds

Storm Sewer LinesStorm Sewer Structures

?ºA@

?±A@

?A@ ?A@?±A@

?ºA@E©GH

E©GH

EoGH

EoGHEjGH

E¢GH

?ºA@

Sö EaGH

S¿

?±A@

EjGH

S¿

S¿

?±A@

S

E¡GHE¡GH

EeGH

New Prague

CedarLake

PleasantLake

HickeyLake

HELENA

98 7

5 42

61

7

65

8

34

11

27

18

22 19

3133

30

16 13

35

29 28

24

17

26

21

36

15

20

25

10

23

32

12

1418

19

30

31

987

32

29

20

17

7 811

10

12

2 1 63456 5

3

Lake

Ave

Kent

Ave

Le S

ueur

Ave

State Hwy 19

County Hwy 2915th Street SW

1st A

ve SE

Coun

ty Hw

y 30

Coun

ty Rd

143

State

Hwy 1

3

Coun

ty Hw

y 164

Main St E

Centr

al Av

e S

Main St W

2nd St SE

Colum

bus A

ve S

1st St SE

1st A

ve SW4th

Ave S

W

Coun

ty Rd

144

County Rd 146

4th St SW

3rd St SW 3rd St SE

2nd St SW

1st St SW

9th St SE

Park Ave

Lexin

gton A

ve S

2nd A

ve S

W

Unkn

own o

r No S

treetn

ame

Linco

ln Av

e S

4th St SE

10th St SE

Wind

crest

Dr

2nd A

ve S

W

State Hwy 19

4th St SE

9th St SE

Unkn

own o

r No S

treetn

ame

City of New PragueCedar Lake SanitarySewer District Area

(Map 10-7)

®0 10.5 Miles

?ºA@

?±A@

?A@ ?A@?±A@

?ºA@E©GH

E©GH

EoGH

EoGHEjGH

E¢GH

?ºA@

Sö EaGH

S¿

?±A@

EjGH

S¿

S¿

?±A@

S

E¡GHE¡GH

EeGH

New Prague

CedarLake

PleasantLake

HickeyLake

HELENA

98 7

5 42

61

7

65

8

34

11

27

18

22 19

3133

30

16 13

35

29 28

24

17

26

21

36

15

20

25

10

23

32

12

1418

19

30

31

987

32

29

20

17

7 811

10

12

2 1 63456 5

3

Lake

Ave

Kent

Ave

Le S

ueur

Ave

State Hwy 19

County Hwy 2915th Street SW

1st A

ve SE

Coun

ty Hw

y 30

Coun

ty Rd

143

State

Hwy 1

3

Coun

ty Hw

y 164

Main St E

Centr

al Av

e S

Main St W

2nd St SE

Colum

bus A

ve S

1st St SE

1st A

ve SW4th

Ave S

W

Coun

ty Rd

144

County Rd 146

4th St SW

3rd St SW 3rd St SE

2nd St SW

1st St SW

9th St SE

Park Ave

Lexin

gton A

ve S

2nd A

ve S

W

Unkn

own o

r No S

treetn

ame

Linco

ln Av

e S

4th St SE

10th St SE

Wind

crest

Dr

2nd A

ve S

W

State Hwy 19

4th St SE

9th St SE

Unkn

own o

r No S

treetn

ame

Disclaimer: This map was prepared using the City's GIS and is based on the County and City Street Data maintained by the County and City. While the City believes that the data is accurate, the City does not warrant that data in the GIS is error free and the City does not represent that the GIS data can be used for purposes such as navigation or any other purposed requiring the exact measurement of distance and direction or the precise depiction of geographic features. This disclaimer is pursuant to Minnesota Statutes 466.03 Subd. 21. The user of this map acknowledges that the City shall not be liable for any damages that may arise from this map or the information it contains.

Current to: November 2014Prepared by: New Prague Planning DepartmentFile: W:\GIS\FireServiceArea\CedarLakeSanitarySewerDistrict.mxd

Lakes

County RoadsRailroadRivers / StreamsNew Prague City LimitsSectionsTownshipsCounty BoundaryCity Boundaries

Cedar Lake Sanitary Sewer District