Background to the problem
• The Assembly Hall is the main focal point for school activities : Assembly, Religious Instruction , School functions , physical education and is a social meeting place for students at lunch time and recess time.
Problem Statement Uncomfortable Hall
• Poor assembly hall design , material choice and layout , outdated fans and café activities creates heat and noise.
• The heat and noise makes an uncomfortable environment for guests , students and teachers leading to disinterest, restlessness , disruptions and general discomfort for all with a diminished response to the objectives of the exercise.
“ Students endure rather than enjoy ”
Problem 1 – High Temperatures
Unoccupied Hall 34°c. The temperature then elevates to 38°c when occupied with 526students and 45 staff members.
Problem 2 – High Noise Levels
• The noise level is exasperated by 6 electrically powered cooling fans contributing 35 decibels of noise
The factors above contribute to noise pollution in the hall
•the students’ body temperature , •heat radiated from the galvanize in the roof •heat generated by fan motors•cafeteria kitchen
The outdated industrial fans circulate all this heat throughout the hall
Source of Heat
Galvanise surface being heated by sun light
Roof
TABLE 1 –SHOWING TEMPERTURE IN HALL AND SURROUNDINGS
TIME ASSEMBLY HALL
CORRIDOR WALK WAY CAFÉ
9:00 34 degrees Celsius
34 degrees Celsius
32 degrees Celsius
36 degrees Celsius
12 :00 38 degrees Celsius
39 degrees Celsius
34 degrees Celsius
40 degrees Celsius
2:00 34 degrees Celsius
35 degrees Celsius
32 degrees Celsius
38 degrees Celsius
Graph showing temperatures at different times of the day
Solutions
Solar Powered Extractor Fans-Benefits• Extracts the heat from within the hall and expels it through the roof into the open atmosphere • Uses no electricity and pays for itself• Reduces heat build-up and moisture• Decreases cooling costs• Fights mould and fungal decay•Reduces damaging condensation•Sleek slim line unit
Removal of industrial fans
• BENEFITS: • noise reduction • Lower electricity bill. Fans are 1/4 HP
consuming 2. 9Amps of electricity • Cost to remove :$500
SOLAR EXTRACTOR FAN AT WORK
COST INCLUDING INSTALATION:$28600.00
SOLUTIONS
BUBBLE HEAT RESISTANT BARRIER
•Benefits• Double layer of polyethylene bubble reflect up to 97% of radiant heat, less heat enters through roof. • Radiant Barriers are very easy to handle and install. Cost inclusive of installation $ 9043.00
BUBBLE HEAT RESISTANT BARRIER AT WORK
SOLUTIONS Heat Reflective Paint Applied To Existing Galvanise On Roof
Benefits : reflects the UV/ I.R. rays from the sun so the temperature of galvanise does not increase appreciably Cost inclusive of installation $ 2342.00
SOLUTION
Plants Placed in Hall•Benefit :The plants absorb the heat by the process transpiration and releases water vapour . This helps to create a cool atmosphere in the assembly hall . •It is aesthetically pleasing creating a cool green scene •Cost $500.00
Fund raisers to offset procurement costs
• Popcorn sale =$500
• Cake sales=$1000
• Dress down activity =$3000
• Christmas concert =$1500
• Raffle =$1500
• Bar-Be-Que =$10,000
OVERALL BENEFITS
• More comfortable hall manifested in a better learning environment.
• example of green building design at work to inspirer student body to greater environmental consciousness,
• Electricity bill reduced by 10% . • Organisational and project management skills
improved .