I-405 Sepulveda Pass Widening Project Community Advisory Committee Meeting June 24, 2010 1

Upload: others

Post on 06-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

I-405 Sepulveda Pass Widening Projectp g jCommunity Advisory Committee Meeting June 24, 2010

1

Page 2: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

MWD LA-29 ProjectMWD LA 29 Project

Drilling to install beams for shoring to support excavation at Sunset Bl and Church Ln

2

Page 3: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

MWD LA-29 ProjectMWD LA 29 Project

Installing 27-foot-long beams for shoring in pre-drilled holes at Sunset Bl and Church LnSunset Bl and Church Ln

3

Page 4: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

MWD LA-29 ProjectMWD LA 29 Project

d l Beam and plate shoring to support 30-foot by 30-foot by 12-foot deep excavationfoot-deep excavation

4

Page 5: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

MWD LA-29 ProjectMWD LA 29 Project

Exposing in service 34Exposing in-service 34-inch-diameter steel water supply pipeline in Sunset Bl and 42-in Sunset Bl and 42inch-diameter steel water pipeline in Church Ln

5

Page 6: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

MWD LA-29 ProjectMWD LA 29 Project

C i d d i Compact equipment used during excavation to protect nearby oak trees

Installation of 36-inch-diameter steel pipe in the LADWP property between Beloit St and Church Ln

6

Page 7: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

MWD LA-29 ProjectMWD LA 29 Project

Segments of 36-inch-diameter steel pipe arrive at Beloit St

7

Page 8: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

MWD LA-29 ProjectMWD LA 29 Project

U f ll i ll 36 i h l i h id f B l i S Use of small crane to install 36-inch steel pipe on north side of Beloit St helps minimize impact to community

8

Page 9: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

MWD LA-29 Project—More Information

C I f i• Contact InformationLocated on back of handout

• Websitewww.ladwp.comp• Search “MWD LA-29”

9

Page 10: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Skirball Cultural Center—North Building ProjectSkirball Cultural Center North Building Project

Dates: June 14, 2010 to September 2012Dates: June 14, 2010 to September 2012

Size: 32,000 Sq. Ft.

Location: North part of property on top of North Parking p p p y p gGarage

Type: Cultural and Educational Resource Building

10

Page 11: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Skirball Cultural Center—Soil Haul RouteSkirball Cultural Center Soil Haul Route

• General Contractor: Matt Construction• General Contractor: Matt Construction

• Soil to be exported: 9,300 yards

• Construction activity: contained mostly Construction activity: contained mostly on Skirball Cultural Center property

• Dates: July 19 to August 30

• Haul route: Sepulveda Bl. 250 yards south, on Skirball Center Dr. Bridge, enter I-405 North exit SR 126 enter I 405 North, exit SR 126

11

Page 12: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Skirball Cultural Center—Soil Haul RouteSkirball Cultural Center Soil Haul Route

12

Page 13: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Skirball Cultural Center—Construction ContactSkirball Cultural Center Construction Contact

Ben Elisondo, Director of OperationsSkirball Cultural Center

l d l d2701 N. Sepulveda Blvd.Los Angeles, CA 90049(310) 440-4777( )[email protected]

13

Page 14: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Tonight’s Objectives

• Present final landscape and Visual Quality Concepts plans

• Show how CAC feedback has been incorporated

A i i th ti ti• Answer remaining aesthetics questions

• Address any issues

• Finalize plans in order to move to constructionp

14

Page 15: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Aesthetics Design Timeline

• Summer 2009 – Aesthetics Team develops three aesthetics themes for corridor

O t b 2009 Th th t d t CAC• October 2009 – Three themes presented to CAC

• Fall 2009 – CAC members share themes with their communities

• November 2009 – CAC provides feedback to team• November 2009 CAC provides feedback to team

• Winter 2009-2010 – Team selects one theme and revises aesthetics based on CAC comment

15

Page 16: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Aesthetics Design Timeline (Contd.)

• January 2010 – Revised aesthetics presented at public open house

J 2010 R i d h i d CAC• January 2010 – Revised aesthetics presented to CAC

• February 2010 – Revised plant palette presented to CAC

S i 2010 A h i fi li h i • Spring 2010 – Aesthetics team finalizes aesthetics based on CAC and public feedback

• June 2010 – Final aesthetics presented to CACJune 2010 Final aesthetics presented to CAC

16

Page 17: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Hardscape Themes Considered

h d dThemes ConsideredTheme 1 – An aesthetic that, to a large extent, matches the existing

bridges and walls in the corridor

Theme 2 – Uses surrounding buildings’ aesthetics, primarily art deco, as inspiration

Theme 3 Inspired by recent trends in highway architectureTheme 3 – Inspired by recent trends in highway architecture

17

Page 18: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Bridges Overview—CAC Feedback

• Minimalist approach• Sleek design harmonious from one • Sleek design, harmonious from one

bridge to the next• Incorporate current style of Mulholland

B idBridge

18

Page 19: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Bridges—Sunset Bl.

19

Page 20: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

d k b ll Bridges—Skirball Center Dr.North ViewNorth View

20

Page 21: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

d k b ll Bridges—Skirball Center Dr.

S h ViSouth View

21

Page 22: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Bridges—Mulholland Dr.

South View

22

Page 23: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Undercrossings Overview—CAC FeedbackUndercrossings Overview CAC Feedback

Existing Structure Northbound• Undercrossings in the same area should have consistent look

• Simple, modern, unadorned design

23

Page 24: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Undercrossings—Olympic Bl.Undercrossings Olympic Bl.

NorthboundNorthbound

Proposed Improvements

24

Page 25: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Undercrossings—Olympic Bl.Undercrossings Olympic Bl.

Proposed Improvements

25

Page 26: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Undercrossings—Church Ln.Undercrossings Church Ln.

P d IProposed Improvements

26

Page 27: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Sound Walls Overview—CAC Feedback

P f Th 2 i h fl d il i b i f h • Prefer Theme 2 with fluted pilasters in urban portion of the project

• Pilasters radiate out from Wilshire

• Starting at Sunset and moving north, do not use pilasters

• At north end and south end of project, match to existing walls

Visual simulation—sound Visual simulation sound wall with pilaster

27

Page 28: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Walls—Sound Walls

Sound wall at north end of projectSound wall at south end of project

p j

28

Page 29: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Walls—MSE Retaining

CAC feedback:CAC feedback:• Blend sound wall Theme 2 with

Retaining Wall (MSE) Theme 3• Maintain consistency with

surroundings

29

MSE retaining wall with sound wall and pilasters

Page 30: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Walls—Cast-in-Place

CAC feedback:• Prefer Theme 2

Th 2 ll h • Theme 2 allows each square to be painted for less garish graffiti removal

Cast-in-place

g g

pretaining wall with gridded fractured fin texture

30

Page 31: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Walls—Soil Nail

CAC feedback:CAC feedback:• Prefer rock-like walls that will blend into the

natural landscape

• Prefer design similar to Getty’s walls

Mimic Rock Finish

31

Page 32: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Walls Cast in Place (City) Soil Nail (Urban)Walls—Cast-in-Place (City), Soil Nail (Urban)

Cast-in-Place (City):Cast in Place (City):Smooth concrete texture with roughened lower band

Soil Nail (Urban):Soil Nail (Urban):Steel trowel finish with roughened lower band

32

Page 33: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Landscape Overview

Development of Landscape Plan:

• CAC feedback

Aesthetic req irements ie enhancement screening etc• Aesthetic requirements – view enhancement, screening, etc.

• Functional requirements – detention basins, bioswales

• Location – West LA, San Fernando Valley, Sepulveda Pass

• Maintenance requirements

• Water requirements

• Mitigation requirementsg q

• Site-appropriate foliage

33

Page 34: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

One-Month Construction Look Ahead

34

Page 35: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Wilshire SegmentWilshire Segment

Wilshire Loops, W of 405p ,• Driving piles for SB 405 to EB Wilshire off-ramp

• Sidewalk closed on EB/WB Wilshire for two days each, not at the same timetime

• Create access and clear & grub for NB 405 to EB Wilshire off-ramp

• One lane closure on SB Sepulveda from Wilshire to Ohio

Santa Monica UC • Create access and clear and grub

35

Page 36: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Wilshire SegmentWilshire Segment

Constitution UCConstitution UC• Utility Relocation

• Temporary lane closure on Constitution and Sepulveda

Walls• 1685: W of I-405, north of Constitution

1686/1672 t f I 405 th f Wil hi d C tit ti• 1686/1672: east of I-405, north of Wilshire and Constitution

• One lane closure on SB Sepulveda Bl. from Montana Av. to Wilshire Bl.

• Bike/pedestrian path closed from Brentwood Glen Av. to Constitution Av./p p

36

Page 37: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Mulholland SegmentMulholland Segment

Getty Trail Head • Crusher site operation during the daytime and nighttime hours• Retaining wall construction along the NB I-405Retaining wall construction along the NB I 405

Sherman Oaks Wall construction• Clearing/grubbing and grading of work zone area along NB and SB I-

405

Valley Vista• Demolition of three houses in mid July • Demolition of three houses in mid July • Conduct clearing and grubbing operations in mid July during daytime• Will begin construction of sound wall in August

37

Page 38: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Mulholland SegmentMulholland Segment

Skirball Bridge Demolition and Reconstruction Activityg y• Conduct bridge preparation work and set up construction yards in

late June

• Set-up K-rail in early July at the center of the bridge to separate traffic • Set up K rail in early July at the center of the bridge to separate traffic from the work zone

• Reconfigure traffic to maintain one lane of traffic in each direction during construction in early Julyduring construction in early July

• Demolition of north side of Bridge (7 nights) - Over SB I-405 – 2 nights

O er NB I 405 2 nights - Over NB I-405 – 2 nights - Over NB off-ramp – 1 night

• Reconstruction of north side of Bridge ( 7 months)

38

Page 39: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Sunset Segment Sunset Segment

Sepulveda Bl. Improvements (Montana to Ovada)p p ( )• Utility relocation (NB closure of Sepulveda Bl. during non-peak hours)

• Bronwood Av. vault work (24/7 closure for 3 weeks)

M t A ff l• Montana Av. off-ramp closure

1720/1730 Retaining Wall Construction• Vegetation removal• Vegetation removal

• Temporary fence and sound blanket installation

39

Page 40: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Sunset Bridge Replacement – Current WorkSunset Bridge Replacement Current Work

R h d i l (l d i )• Remove hazardous material (lead paint)

• Clear and grub

• Create access roads around bridge• Create access roads around bridge

• Support bridge and abutments

• Remove conduits, hand rail, guard rail, light polese ove co du ts, a d a , gua d a , g t po es

• Remove wood inside bridge

• Support (in place) 34-inch active water line system

• Re-stripe freeway for K-rail placement

40

Page 41: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

Sunset Bridge Future Work ScheduleSunset Bridge Future Work Schedule

R l f b id ( i i ht )• Removal of bridge (six nights)– Over NB I-405 - two nights

– Over SB I-405 - two nights

– Over Sepulveda Bl - two nights

• Removal of columns/abutments (three nights)

• Reconstruction of bridge (10 months)

• Remove and reconstruct northern side of bridge Winter 2011Winter 2011

1241

Page 42: I-405 Sepulveda Pass Widening Project - Metromedia.metro.net/projects_studies/I405/images/I-405... · Wilshire Loopp,s, W of 405 • Driving piles for SB 405 to EB Wilshire off-ramp

For More Information

Project Hotline: (213) 922-3665

[email protected]

t t/405www.metro.net/405

www.facebook.com/405project

Twitter: http://twitter com/I 405Twitter: http://twitter.com/I_405

Nixle: nixle.com