I-394 MnPASS Enhancements: A Vision for the Future

MnPASS Community Advisory Group Meeting

July 10, 2008

Infrastructure Improvements - Project Scope

• Traffic Operations Analysis

• Concept Alternatives

• Transit & Carpool Access

• Concept of Operations & Enforcement Plans

• Recommendations & Implementation Steps

Areas Studied

Costs and Implementation Steps

Alternative Analysis Summary

• Reversible Section - Ultimate 1 (Moveable barrier)• Reversible Section - Ultimate 2 (Permanent barrier)• TH 100 Interchange

• I-394/I-94 EB 1A• I-394/I-94 EB 1B• I-394/I-94 WB 2A

• 3rd Avenue Collector/Distributor• Dunwoody Ramps

• I-394/I-494 Alt 1• I-394/I-494 Alt 3

Existing Condition

I-394 EB, Year 2006 AM Peak Hour, Base Conditions

I-394 EB, Year 2006 PM Peak Hour, Base Conditions

Reversible Section - (Moveable barrier)

LOS• EB I-394 - Improved operations during the p.m. peak

hour, however queues will still develop at the I-94 off-ramps extending back to Penn Ave.

• EB I-394 – Operations remain the same as existing during the a.m. peak hour

• WB I-394 – Operations remain the same as existing during the a.m. and p.m. peak hours

Reversible Section - Ultimate 1 (Moveable barrier)

Reversible Section - Ultimate 1 (Moveable barrier)

Thru-put• EB I-394 – Increased thru-put during the p.m. peak hour,

however, no increase is expected on the ramp to EB I-94 (already at capacity)

Access• Provides direct MnPass connections for all traffic

movements at I-394/TH 100• Provides an additional MnPass ramp at Dunwoody Blvd• Provides a new access to westbound I-94 for eastbound

MnPass Traffic

Reversible Section – Permanent Barrier

Reversible Section - Ultimate 1 (Permanent barrier)

LOS• Same as Moveable barrier option

Thru-put• Same as Moveable barrier option

Access• Maintains direct MnPass connections for existing traffic

movements at I-394/TH 100 • Maintains existing MnPass ramp at Dunwoody Blvd• Provides a new access to westbound I-94 for eastbound

MnPass Traffic

I-394 / TH 100 Interchange - Ultimate

I-394 / TH 100 Interchange - Recommended

Recommended Alternative – 5D

I-394 EB, Year 2006 AM Peak Hour, 5D

I-394 EB, Year 2006 - PM Peak Hour, 5D

Reversible Section - Recommendations

• Reversible – Ult. 1 (Moveable barrier)• TH 100 area (EB direction)

– Alt 5d = reconstruct EB to add 3rd lane– Staged Implementation

• w/ HOV to EB I-94• w/ HOT to EB I-94• w/ HOT to EB I-94 & full width shldrs at 100

Comparison of Benefits

Comparison of Costs

Questions and More Information

Visit: www.mnpass.net

or

Contact Brian Scott, PE

SRF Consulting Group, Inc.

763-475-0010

[email protected]

MnPASS Access Points