i-295/i-76/route 42 direct connection, contract 2 mapscontract 4 new st. mary cemetery partial...
TRANSCRIPT
Contract #2
Contract #2 ROUTE 168 INTERCHANGE
• Four Stages on both I-295 NB and SB
• STOP-signs at On-Ramps (Rt168 NB to I-295 SB)
• 11’ Cattle Chutes in some stages
Contract #2 AL-JO’S CURVE TO BELL ROAD
• Proposed Roadway Higher and Narrow Median
• Numerous Shifts in Traffic • Temporary Ramps Maintain Same
Movements • Cannot Maintain State Police U-Turn • Ramp D Covered Roadway Opens