HYSPEC status. June 16, 2010. HYSPEC Overview. 6~15m Shielding. External building. 15~33m Shielding. Chopper Box B Shielding. Drum Shield. Sample position. Detector Vessel. Detector Vessel, designed and in procurement. Removable hatch for course collimator access. 1/8 ” O-Ring. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: HYSPEC status

HYSPEC status

June 16, 2010

Page 2: HYSPEC status

6~15m Shielding

15~33m Shielding

External building

Drum Shield

Detector Vessel

HYSPEC Overview

Sample position

Chopper Box B Shielding

Page 3: HYSPEC status

Detector Vessel,designed and in

procurement

Page 4: HYSPEC status

Removable hatch for course collimator access

Front section removable

1/8” O-Ring

¼” O-Ring (Hidden)

Page 5: HYSPEC status
Page 6: HYSPEC status

PIP Shield all in, &Guide installation

Page 7: HYSPEC status

Secondary shutter being installed

Page 8: HYSPEC status

Shield blocks delivered

Page 9: HYSPEC status

Shield blocks getting ready

Page 10: HYSPEC status

Monochromator delivered

Page 11: HYSPEC status

Monochromator Shield component lead pours