hybrid testfest u - intercor · 2020. 4. 7. · security (emyr thomas) 6. schedule and...
TRANSCRIPT
![Page 1: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/1.jpg)
HYBRID TESTFEST U.K
1st Webinar
18th July 2018
![Page 2: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/2.jpg)
INTRODUCTION
Moderator:
Peter Schmitting ERTICO, Activity Leader InterCor TESTFEST
Speakers:
Clifford Lunnon Highways England, Project manager U.K TESTFEST
Chris Chorlton WSP Evaluation Manager
Trevor Hardy TfL Technical Manager
Emyr Thomas HE Security Manager
Jason Burrows WSP TESTFEST Coordinator
2
![Page 3: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/3.jpg)
Webinar Moderation
• All participants are muted during presentation
• Participants can “Ask questions”
• Use the control panel to write your question during the
presentation
• Ideally refer to a slide number in your question
• The moderator will review your question during the webinar
• Webinar will be recorded
• Recorded Webinar will be posted on the InterCor website
• FAQs from the webinar will be captured and posted on the InterCor
website
3
![Page 4: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/4.jpg)
Webinar Contents
1. Introduction to InterCor (Peter Schmitting)
2. Hybrid TESTFEST objectives (Cliff Lunnon)
3. Test sites (Cliff Lunnon)
4. Scenarios (Chris Chorlton & Trevor Hardy)
5. Security (Emyr Thomas)
6. Schedule and Preconditions (Jason Burrow)
7. Options for Participation (Cliff Lunnon)
8. Follow up Jason Burrow)
9. Expected outcome and follow-up (Peter Schmitting)
4
![Page 5: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/5.jpg)
Introduction to InterCor
Peter Schmitting- ERTICO
3
5
![Page 6: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/6.jpg)
InterCor Introduction
•InterCor is a study of 1530 km of four member states under the TEN-T Core road network connecting from the North Sea – Mediterranean to the Arc Atlantique Corridor.
6
![Page 7: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/7.jpg)
InterCor Introduction 7
![Page 8: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/8.jpg)
InterCor introduction
Streamline and pilot selected ‘Day 1 services’ in four member states and facilitate a first assessment of C-ITS services on freight and logistics by building on a common hybrid communication architecture
• Traffic management
• In Vehicle Signage
• Probe Data
• Road Work Warning
• GLOSA
• Freight and Logistics
• Multi-modal Cargo Transport Optimization (MCTO)
• Truck parking
6
![Page 9: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/9.jpg)
InterCor TESTFEST Schedule
TESTFESTS to date:
• ITS-G5, Netherlands, July 17 • Services RWW, IVS, PVD, July 3 – 6, 2017 - Dordrecht
• PKI, France, April 18 • Services RWW, IVS, PVD, GLOSA, April 23 – 26, 2018, Reims
• Pre- Hybrid, Netherlands, June 18 • Services GLOSA (ITS-G5 +Cellular), June 13 – 14, Helmond
Upcoming TESTFESTS:
• Hybrid, United Kingdom, October 2018 • Services RWW, IVS, PVD, GLOSA, October 8th – 12th , UK
• Final TESTFEST, Belgium, March 2019
3
9
![Page 10: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/10.jpg)
Hybrid TESTFEST Objectives
Cliff Lunnon – Highways England
3
10
![Page 11: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/11.jpg)
Hybrid TESTFEST Objectives
3
Ref. Objective
1. Test Vehicle-to-Infrastructure ITS-G5 and Cellular communications, by providing a UK “Hybrid Testfest”.
2. Test four different services (GLOSA, IVS, RWW and PVD) using ITS-G5 communications.
3. Test three different services (GLOSA, IVS and RWW) using cellular communications and the InterCor IF2 protocol.
4. Use both real and simulated service information distributed directly into vehicles and collected from participating fleet vehicles (i.e. CAM and PVD).
5. Investigate and assess the performance of the communication technologies.
6. Investigate and assess interoperability issues between different InterCor member states.
7. Utilise the findings of the evaluation to input into the redevelopment of the service profiles and technical specifications.
8. Support the European harmonisation of C-ITS technology.
11
![Page 12: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/12.jpg)
Test Sites
Cliff Lunnon - Highways England
12
![Page 13: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/13.jpg)
Test Site Locations 13
![Page 14: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/14.jpg)
14 Venue Location
![Page 15: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/15.jpg)
Venue Facilities
3
15
![Page 16: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/16.jpg)
Scenarios (1)
Chris Chorlton - WSP
16
![Page 17: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/17.jpg)
17 Motorway Test Site
![Page 18: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/18.jpg)
Motorway Test Sites 18
TWO SITES LOCAL TO THE TEST CENTRE
SUB TEST SITE 1
• IVS Speed Limits (Hybrid)
• IVS Dynamic Speed Limits (Hybrid)
• RWW Alert Planned Closure (Hybrid)
• IVS In Vehicle Signs, supporting RWW (Hybrid)
• Probe Vehicle Data (ITS-G5)
SUB TEST SITE 2
Cellular served interoperability Cross Border route
• IVS Message Sign in Country B “Welcome to”
• IVS fixed Speed Limit in Country B
• IVS Message Sign in Country A “Welcome to”
![Page 19: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/19.jpg)
Motorway Sub Test Site 1 19
![Page 20: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/20.jpg)
Motorway Sub Test Site 1 20
• Speed limit
• Variable Speed Limit
• Road Works Warning
• Supporting IVS
• Lane 1 RWW closure 300m
![Page 21: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/21.jpg)
Motorway Sub Test Site 2
21
Transition
Zone Country A Country B
![Page 22: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/22.jpg)
Motorway Sub Test Site 2
22
• Prove the concept of intercountry
interoperability
• 2 different C-ITS services (TCC)
• 2 IF2 – Country A, B
• Handover area where both services can
send messages.
• Service provider will need to subscribe to
both IF2’s
• OBU will connect to relevant service
based on GPS
![Page 23: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/23.jpg)
23 Rural Test Site
![Page 24: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/24.jpg)
Rural Test Site
ONE SITE RURAL KENT
• GLOSA (ITSG5)
24
Drive time to site: 5 mins (approx.)
![Page 25: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/25.jpg)
Rural Test Site 25
![Page 26: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/26.jpg)
Rural Test Site 26
• GLOSA Time to Green Time to Red
and Speed Advice
![Page 27: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/27.jpg)
Scenarios (2)
Trevor Hardy - TfL
27
![Page 28: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/28.jpg)
28 Urban Test Site
![Page 29: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/29.jpg)
Urban Test Site
ONE SITE GREATER LONDON
• GLOSA (cellular)
• IVS (cellular)
• RWW cellular)
29
Drive time from Test Centre to site:
35 mins (approx.)
Drive time from Test Centre to site :
45 mins (approx.)
![Page 30: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/30.jpg)
Urban Test Site (Cellular only A2 & A102) 30
![Page 31: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/31.jpg)
Urban Test Site (Cellular only A2 & A102) 31
• RWW (Roadworks Warning) o RWW - Alert planned closure of a road
or a carriageway
• IVS o IVS - Dynamic Speed Limit Information
o IVS - Embedded VMS
• GLOSA o GLOSA – Time to Red
o GLOSA – Time to Green
![Page 32: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/32.jpg)
Services - Summary
Chris Chorlton - WSP
32
![Page 33: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/33.jpg)
Services - Summary 33
Service Test site(s)
Free Text (Cellular) Motorway sub test site 2
IVS (Cellular) Urban test site & motorway sub test site 2
IVS (Hybrid) Motorway sub test site 1
Interoperability (Cellular) Motorway sub test site 2
GLOSA (Cellular) Urban test site
GLOSA (ITS-G5) Rural test site
PVD (ITS-G5) Motorway sub test site 1
RWW (Cellular) Urban test site
RWW (Hybrid) Motorway sub test site 1
![Page 34: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/34.jpg)
Security
Emyr Thomas – Highways England
34
![Page 35: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/35.jpg)
ITS-G5 Security
3
Certificate formats to comply with ETSI TS103 097 v1.2.1
A standalone UK Hybrid TESTFEST trust domain will be established, dedicated for the duration of the TESTFEST
Manual distribution; participants expected to load certificates onto their devices
No ITS-G5 CRL or CTL - Certificate validity expires at the end of the TESTFEST
35
![Page 36: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/36.jpg)
Cellular Security
3
Each vehicle subscribes to one service provider (home, foreign or a participant cellular SP)
Commercial environment - a vehicle subscribes to one or more service providers
Security is the responsibility of the SP
Data integrity and authenticity: security layered between the Cellular SP and the Cellular OBU not at a message level (like with ITS-G5).
An interface specification for cellular communication is in development and will be communicated to all participants to ensure interoperability.
36
![Page 37: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/37.jpg)
Schedule & Preconditions
Jason Burrows – WSP
37
![Page 38: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/38.jpg)
Schedule
3
38
Time Monday 8th Oct
Test Centre
Tuesdays 9th Oct
Test Centre
Wednesday 10th Oct
Test Centre / Kier Depot
Thursday 11th Oct
Test Centre
08:00 Participant Arrival & Set up Participant Arrival & Set up Participant Arrival & Set up Participant Arrival & Set up
08:30
09:00 Opening remarks and Briefing Daily Briefing Daily Briefing Daily Briefing
09:30 Hybrid tests:
Hybrid served IVS &
RWW
(ITS-G5 & Cellular)
Technical
Team M2
KCC C-ITS
corridor
available
TRAVEL TO
LONDON
------------------------
-------------
Cellular served
GLOSA (TfL)
&
Cellular served
urban IVS & RWW
(TfL)
TRAVEL TO
LONDON
----------------------
------------
Technical Team
TfL C-ITS
corridor
available
KCC ITS-G5
GLOSA test
Technical Team M2
KCC C-ITS corridor
available
10:00 Bench test:
Local test (event centre) to
establish communications
10:30
11:00
11:30
12:00
12:30
13:00 LUNCH
13:30
14:00 Daily Briefing Daily Briefing Daily Briefing Daily Briefing
14:10 Baseline test:
Basic ITS-G5 and cellular
operation on live roads.
Interoperability tests:
Cellular served cross
border
Technical
Team M2
KCC C-ITS
corridor
available
Cellular served
GLOSA (TfL)
&
Cellular served
urban IVS & RWW
(TfL)
Technical Team
TfL C-ITS
corridor
available
Hybrid tests:
Hybrid served
IVS & RWW
(ITS-G5 &
Cellular)
Technical Team M2
KCC C-ITS corridor
available
14:30
15:00
15:30
16:00
16:30
17:00 De-briefing De-briefing De-briefing De-briefing
17:30
18:00 Closing Test centre Closing Test centre Closing Test centre Closing Test centre
![Page 39: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/39.jpg)
Core Preconditions
1. Participants must register their attendance on each day.
2. A safety briefing is scheduled prior to each morning and
afternoon testing session - attendance mandatory.
3. All drivers must be accompanied.
4. Participants are to ensure that their vehicles are
appropriately insured, and that drivers have appropriate
permits.
5. Test Centre will be accessible for registered participants
only.
6. Participation is non-exclusive for InterCor members subject
to registration, the scope of participation and the availability
of places; in that order.
30
39
![Page 40: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/40.jpg)
Core Preconditions
7. Participants will take part in the TESTFEST at their own expense
8. Participants must provide their own test vehicle, but as a minimum must provide peripherals such as antenna, cables, adaptors, power supplies etc.
9. InterCor partners are required to share test data; other participants voluntary. Logging specifications will be provided.
10. ITS-Stations are assumed to be compliant to standards, e.g. be able to pass the ETSI Plugtests™. Compliancy is the responsibility of the participant.
40
![Page 41: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/41.jpg)
41 Options for Participation
Cliff Lunnon – Highways England
![Page 42: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/42.jpg)
42
Cellular Minimum • OBU / SP
• Country A & B
subscription
•GLOSA
•RWW
• IVS (speed advisory + free text)
Cellular Optional • Country A subscription
• Own country data simulated service
• IVS (speed advisory + free text)
ITS-G5 Minimum • OBU / HMI
•GLOSA
•RWW
• IVS (speed advisory)
•PVD
Options for Participation
![Page 43: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/43.jpg)
Follow Up
Jason Burrows – WSP
43
![Page 44: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/44.jpg)
Follow up - Documents
• Action Plan • scope
• test scenarios and timings
• schedule
• facilities
• supporting information
• Baseline Specification
• Logging formats
• Scenario participant forms
• FAQs from webinar
• Due 20th August
44
![Page 45: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/45.jpg)
Follow Up - Registration
Registration is now open on InterCor website:
45
![Page 46: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/46.jpg)
Follow up - Meetings
Scheduled date:
• 2nd webinar planned for 3rd September
• TBC face to face meeting early September - London
• TBC basic remote connection event early October.
30
46
![Page 47: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/47.jpg)
CLOSING REMARKS
Peter Schmitting – ERTICO
Thank You – we look forward to welcoming you to the UK.
30
47
![Page 48: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason](https://reader035.vdocuments.mx/reader035/viewer/2022071416/61127659c92648360b79a0fa/html5/thumbnails/48.jpg)
For contact [email protected]
Further information [email protected]
InterCor: www.intercor-project.eu