Hybrid Solar PV Power Plants
Webinar on “Hybrid Renewable Power Plants: Opportunities and Challenges"
![Page 2: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/2.jpg)
FFC ENERGY LTD – AT A GLANCE
Capacity 49.5 MW
Wind Turbine Model Nordex S77,1.5- HCV
Location Jhampir, District Thatta
Land Area 1,283 Acres
Total Wind Turbines 33
Benchmark Production 143.55 GWh per annum
Commercial Operations May 16, 2013
![Page 3: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/3.jpg)
JHAMPIR‐120 km from Karachi
PAKISTAN SINDH WIND CORRIDOR
![Page 4: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/4.jpg)
Wind Power Plants In Sindh Region
FFCELZORLU
TGF
FWEL – II
FWEL ‐ ISAPPHIRE
MASTER
YUNUSTAPAL
METRO
GUL AHMED
TENAGA
HYDRO CHINA
UNITED ENERGY
SACHALJHAMPIRHAWA TGS TGTTB 1
TB 2
TB 3
HARTFORD
ZAFAIR
![Page 5: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/5.jpg)
FFCEL Site
Unutilized Spaces Available within Wind Farm
![Page 6: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/6.jpg)
Growth Trend of Wind Plants - Pakistan
Commissioned = 1240 MW
In Pipeline = 600 MW800
![Page 7: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/7.jpg)
• Sindh wind corridor realizable capacity ‐ over ~10 GW• Tariff lowered to 6.7 – 7 $c/kWh – comparable to any technology
• Potential for Local industry growth– Tower manufacturing, – Blade and nacelle assembly – Services sector– Allied component supplies
• However, Grid Evacuation Capacity is limiting factor• Grid enhancement projects underway ‐ New Projects expected as and when new allocations are available
Potential and Issue
![Page 8: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/8.jpg)
Opportunity
Grid Allocation50 MWAvailable for Solar
AEDB worked on concept in 2016‐17, found it workable
![Page 9: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/9.jpg)
50 MW
45 MW 5 MW35 MW 15 MW25 MW 25 MW50 MW 0 MW
Interconnected Power Control
Project Concept
![Page 10: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/10.jpg)
Resource Assessment
![Page 11: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/11.jpg)
Wind & Solar Potential
![Page 12: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/12.jpg)
Annual Average Daily Pattern
0
100
200
300
400
500
600
700
800
900
1000
6.2
6.4
6.6
6.8
7
7.2
7.4
7.6
7.8
8
8.2Solar
Irradiance
W/m2
Wind
Speed
m/s
Hour of the Day
Diurnal Pattern of Solar and Wind Resource at FFCEL Plantsite, Jhampir
Wind Speed Solar Global Irradiance
Value Creation Zone
![Page 13: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/13.jpg)
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Wind Farm Annual Production
Grid Capacity Utilization 33 %
Wind Farm Output – 144 GWh
![Page 14: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/14.jpg)
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Combined Annual Production
Combined Output
Grid Capacity Utilization 48 %Combined Output – 207GWh
![Page 15: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/15.jpg)
Conclusion of Study
![Page 16: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/16.jpg)
• Pattern of wind & solar resources is conducive for hybrid
• Hybrid Solar assist in smoothing variations in Wind output
• 25 – 40 MW Solar Plant for 50 MW Wind Plant Possible
• ~ 600 MW Solar PV Plants can be installed by next year
• Increased grid utilization factor – from 33% to 48%
• No additional grid infrastructure enhancement needed
• Reduction in overall per unit O&M cost of grid
• Addition of electricity at tariffs lower to overall basket price
• Addition of battery storage viability expected in 2 – 3 years
Results & Benefits
![Page 17: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/17.jpg)
M/s Hero Future Energies on April 13, 2018 inaugurated a 28.5 MW Solar PV Plant at its 50 MW Wind Power Plant in Karnataka, India under similar Grid Restriction Arrangement
Has any one done it?
![Page 18: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/18.jpg)
• Concept has been approved in principle by AEDB and has issued LOIs to interested investors
• FFC has submitted its Feasibility study to AEDB which is under review for approval
• Suitable Upfront tariff for such hybrid Solar PV Projects shall provide stimuli for quick deployment as;
– No new grid planning / grid development needed
– Quick installation within 8 – 10 months possible
Progress & Way forward
![Page 19: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site](https://reader034.vdocuments.mx/reader034/viewer/2022042016/5e74ddb5210af93bb61a45e0/html5/thumbnails/19.jpg)