hybrid & module testing status

17
1 Hybrid & Module Testing Hybrid & Module Testing Status Status Week of 6/6-6/10

Upload: mina

Post on 30-Jan-2016

38 views

Category:

Documents


0 download

DESCRIPTION

Hybrid & Module Testing Status. Week of 6/6-6/10. UCSB Hybrid Testing Status. This Week: 1 shorts in PA Repairable 4 modules repaired. Cumulative: 1 with Shorts in PA Repairable 1 Major Scratch in PA Repairable 2 noisy on edge channels Should be ok 1 Smashed APV-PA Bonds Repairable - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Hybrid & Module Testing Status

1

Hybrid & Module Testing StatusHybrid & Module Testing Status

Week of 6/6-6/10

Page 2: Hybrid & Module Testing Status

2

UCSB Hybrid Testing StatusUCSB Hybrid Testing Status

Weekly CumulativePass Fail Pass Fail % Pass

L12su 0 0 0 0 0.00%L12sd 0 0 0 0 0.00%L12pd 0 0 0 0 0.00%L34p+L12pu 1 0 370 6 98.40%L56p 12 -3 585 4 99.32%R2N 0 0 0 0 0.00%R2S 0 0 0 0 0.00%R5N 0 1 75 4 94.94%R5S 0 0 108 0 100.00%R6 1 -1 118 5 95.93%R7 7 0 53 2 96.36%Total 21 -3 1309 21 98.42%

Page 3: Hybrid & Module Testing Status

3

UCSB Hybrid Testing FailuresUCSB Hybrid Testing Failures

This Week:1 shorts in PA

• Repairable4 modules repaired

Cumulative:1 with Shorts in PA

• Repairable1 Major Scratch in PA

• Repairable2 noisy on edge channels

• Should be ok1 Smashed APV-PA Bonds

• Repairable6 Failed Inspection

• Never should have sent1 Broken Ceramic1 Bad Bond Feet1 Weak Wirebonds1 Too Many Opens4 with unknown failure

• Effects entire chip(s)

Page 4: Hybrid & Module Testing Status

4

FNAL Hybrid Testing StatusFNAL Hybrid Testing Status

Weekly CumulativePass Fail Pass Fail % Pass

L12su 0 0 0 0 0.00%L12sd 0 0 0 0 0.00%L12pd 0 0 0 0 0.00%L34p+L12pu 0 0 291 14 95.41%L56p 33 0 549 8 98.56%R2N 0 0 12 0 100.00%R2S 0 0 19 0 100.00%R5N 0 0 32 1 96.97%R5S 0 0 44 3 93.62%R6 24 1 42 2 95.45%R7 0 0 0 0 0.00%Total 57 1 989 28 97.25%

Page 5: Hybrid & Module Testing Status

5

FNAL Hybrid Testing FailuresFNAL Hybrid Testing Failures

This Week: Cumulative:7 with Shorts in PA

• Repairable

1 Major Scratch in PA• Repairable

1 Damaged during repair

5 Too Many Opens + Noisy

14 with unknown failure• Effects entire chip(s)

Page 6: Hybrid & Module Testing Status

6

US Hybrid Testing StatusUS Hybrid Testing Status

Weekly CumulativePass Fail Pass Fail % Pass

L12su 0 0 0 0 0.00%L12sd 0 0 0 0 0.00%L12pd 0 0 0 0 0.00%L34p+L12pu 1 0 661 20 97.06%L56p 45 -3 1134 12 98.95%R2N 0 0 12 0 100.00%R2S 0 0 19 0 100.00%R5N 0 1 107 5 95.54%R5S 0 0 152 3 98.06%R6 25 0 160 7 95.81%R7 7 0 53 2 0.00%Total 78 -2 2298 49 97.91%

Page 7: Hybrid & Module Testing Status

7

UCSB ARCS Testing StatusUCSB ARCS Testing Status

Weekly CumulativeA B F A B F % A or B

L12pu 0 0 0 0 0 0 0.00%L12pd 0 0 0 0 0 0 0.00%L12su 0 0 0 0 0 0 0.00%L12sd 0 0 0 0 0 0 0.00%L34p 24 0 0 169 1 2 98.84%L56p 12 0 0 520 1 3 99.43%R5N 0 0 0 64 1 1 98.48%R5S 0 0 0 42 0 0 100.00%R6 21 0 0 118 0 0 100.00%R7 23 0 0 23 0 0 100.00%Total 80 0 0 936 3 6 99.37%

Page 8: Hybrid & Module Testing Status

8

UCSB ARCS Testing FailuresUCSB ARCS Testing Failures

This WeekNone

Cumulative2 with too much current

1 with >2% bad channels

1 with bad DCU• Repairable

1 with CF frame shorted to HV• Repairable

1 with bad Dec. Mode chip

Page 9: Hybrid & Module Testing Status

9

UCSB ARCS Testing Results UCSB ARCS Testing Results

945 Total Tested936 Grade A

3 Grade B

6 Grade F

This week:10 of 44032 channels bad (0.023%)

Total Production:304.5 of 643328 channels bad (0.047%)

Total UCSB HPK Modules Tested

0100200300400500600700800900

1000

1/3/

05

1/17

/05

1/31

/05

2/14

/05

2/28

/05

3/14

/05

3/28

/05

4/11

/05

4/25

/05

5/9/

05

5/23

/05

6/6/

05

Grade A

Grade B

Grade F

Total

Weekly UCSB HPK Modules Tested

010

2030

4050

6070

8090

100

1/3

/05

1/1

7/0

5

1/3

1/0

5

2/1

4/0

5

2/2

8/0

5

3/1

4/0

5

3/2

8/0

5

4/1

1/0

5

4/2

5/0

5

5/9

/05

5/2

3/0

5

6/6

/05

Grade A

Grade B

Grade F

Total

Page 10: Hybrid & Module Testing Status

10

FNAL ARCS Testing StatusFNAL ARCS Testing Status

Weekly CumulativeA B F A B F % A or B

L12pu 0 0 0 12 0 0 0.00%L12pd 0 0 0 0 0 0 0.00%L12su 0 0 0 0 0 0 0.00%L12sd 0 0 0 0 0 0 0.00%L34p 9 0 0 216 1 2 99.09%L56p 51 0 0 509 1 3 99.42%R5N 0 0 0 0 0 0 0.00%R5S 0 0 0 0 0 0 0.00%R6 0 0 0 0 0 0 0.00%R7 0 0 0 0 0 0 0.00%Total 60 0 0 737 2 5 99.33%

Page 11: Hybrid & Module Testing Status

11

FNAL ARCS Testing FailuresFNAL ARCS Testing Failures

This Week (8387-8446, 60 modules).• 1 mod, real pinholes (8417, chs 1,4,6,7 PASi pulled), OK.• 1 mod 30 mkA at 15V (8421, ch 289 PASi pulled), OK.• no PHL- • 3 SHT (8411, 8430, 8434).

Cumulative (7835-8446)2 grade “B” (mishandling; missing bonds on p/a)7970 - breakdown current behavior @430VTotal of 14 pinholesGrade F – problem with chip #2 (every 8th channel is identified as PHL-)Grade F-High current 8289

Cumulative (7702-8446, 745 modules, ARCSed 744)

2 grade “B” (mishandling; missing bonds on p/a)2 grade “F” mishandling1 grade “F” under study7970 - breakdown current behavior @430V

Page 12: Hybrid & Module Testing Status

12

FNAL ARCS Testing Results FNAL ARCS Testing Results

747 Total Tested737 Grade A

2 Grade B

5 Grade F

This week:

Total Production:

Page 13: Hybrid & Module Testing Status

13

US ARCS Testing StatusUS ARCS Testing Status

Weekly CumulativeA B F A B F % A or B

L12pu 0 0 0 12 0 0 0.00%L12pd 0 0 0 0 0 0 0.00%L12su 0 0 0 0 0 0 0.00%L12sd 0 0 0 0 0 0 0.00%L34p 33 0 0 385 2 4 98.98%L56p 63 0 0 1029 2 6 99.42%R5N 0 0 0 64 1 1 98.48%R5S 0 0 0 42 0 0 100.00%R6 21 0 0 118 0 0 100.00%R7 23 0 0 23 0 0 0.00%Total 140 0 0 1673 5 11 99.35%

Page 14: Hybrid & Module Testing Status

14

UCSB LT Testing StatusUCSB LT Testing Status

Failed module has too much current

Weekly CumulativePass Fail Pass Fail % Pass

L12pu 0 0 0 0 0.00%L12pd 0 0 0 0 0.00%L12su 0 0 0 0 0.00%L12sd 0 0 0 0 0.00%L34p 28 0 169 1 99.41%L56p 0 0 493 0 100.00%R5N 1 0 68 0 100.00%R5S 0 0 41 0 100.00%R6 18 0 118 0 100.00%R7 11 0 11 0 100.00%Total 58 0 900 1 99.89%

Page 15: Hybrid & Module Testing Status

15

Modules 30200020008325 – 8345, 8425-8434, 8413-8422 were tested during June 9 – June 13.We did 4 runs.K-Mux errors were happening two times – only in the beginning of new run,

program had to be restartedQuick connect between hose and coldbox was damaged and leaking. Replaced

quick connect and renewed the liquid – delay in one run.

Module 8348 had high leakage current (~2.8uA@450V) and steeper then usual.

Modules 8331, 8336-8345, 8431 had high noise in the cold record (~3.5ADC) -> all channels marked NOISY -> xml :-1:

Possible reason – no HV bias during cold cycle. Need more quiet time to investigate.

Backlog: 54 modules

FNAL LT Testing StatusFNAL LT Testing Status

Page 16: Hybrid & Module Testing Status

16

FNAL LT Testing StatusFNAL LT Testing Status

Weekly CumulativePass Fail Pass Fail % Pass

L12pu 0 0 0 0 0.00%L12pd 0 0 12 0 100.00%L12su 0 0 0 0 0.00%L12sd 0 0 0 0 0.00%L34p 0 0 216 1 99.54%L56p 40 0 472 1 99.79%R5N 0 0 0 0 0.00%R5S 0 0 0 0 0.00%R6 0 0 0 0 0.00%R7 0 0 0 0 0.00%Total 40 0 700 2 99.72%

Page 17: Hybrid & Module Testing Status

17

US LT Testing StatusUS LT Testing Status

Weekly CumulativePass Fail Pass Fail % Pass

L12pu 0 0 0 0 0.00%L12pd 0 0 12 0 100.00%L12su 0 0 0 0 0.00%L12sd 0 0 0 0 0.00%L34p 28 0 385 2 99.48%L56p 40 0 965 1 99.90%R5N 1 0 68 0 100.00%R5S 0 0 41 0 0.00%R6 18 0 118 0 100.00%R7 11 0 11 0 100.00%Total 98 0 1600 3 99.81%