Hybrid ferry Elektra Hybrid ferry Elektra Crew cabins Sauna Corridors Insulation FAST ended works on double-ended hybrid ferry Elektra, built in Crist shipyard for Finnish owner Finferries. FAST scope of work included surface protection, insulation and comprehensive interiors outfitting – crew cabins, bridge and gym. The ecological vessel, one of the few in Europe, has hybrid drive – combustion-electric with rechargeable batteries. The ship of the overall length 96 m and width of 15 m will be operated by only 3 persons crew, and during hard weather may be optionally driven by three generating sets based on combustion engines. They will be adapted to unfavourable climate conditions - system based on Siemens components, life of min. 10 years, has potential to cope with northerly low temperatures and heavy snowfalls. Investor: Finnferries Project: Hybrid ferry Elektra FAST scope of work: Surface protection, insulation and interiors outfitting FAST Project Manager: Marcin Hałaburda, [email protected] Marcin Hałaburda, [email protected] FAST SA project implementation portfolio

Upload: others

Post on 05-Nov-2020

28 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hybrid ferry Elektra - Fast hybrydowy Elektra_ENG_FIN.pdfHybrid ferry Elektra Hybrid ferry Elektra Crew cabins Sauna Corridors Insulation FAST ended works on double-ended hybrid ferry

Hybrid ferry Elektra

Hybrid ferry Elektra

Crew cabins Sauna Corridors Insulation

FAST ended works on double-ended hybrid ferry Elektra, built in Crist shipyard for Finnish owner Finferries. FAST scope of work included surface protection, insulation and comprehensive interiors outfitting – crew cabins, bridge and gym. The ecological vessel, one of the few in Europe, has hybrid drive – combustion-electric with rechargeable batteries. The ship of the overall length 96 m and width

of 15 m will be operated by only 3 persons crew, and during hard weather may be optionally driven by three generating sets based on combustion engines. They will be adapted to unfavourable climate conditions - system based on Siemens components, life of min. 10 years, has potential to cope with northerly low temperatures and heavy snowfalls.

Investor:Finnferries

Project:Hybrid ferry Elektra

FAST scope of work: Surface protection, insulationand interiors outfitting FAST Project Manager: Marcin Hałaburda,[email protected]

Marcin Hałaburda,[email protected]

FAST SA project implementation portfolio