hvc platepipe update)

163
HVC-PUR 1 STATUS ONGOING STATUS FOR STEEL PLATE(SH) & PIPE(PC) Prepared: T.L.Hoa/Procurement Dept U MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) PO No PO del. HVC NCR MRS Cur U.Price Amount Koudiet/A305 A305-C M1-9644 26-Aug 25-Mar 1 Plate 8 x 2438 x 7400 A36 sh 108 ### quo F A305-C M1-9644 26-Aug 25-Mar 2 Plate 10 x 2438 x 7400 A36 sh 24 33,989.62 quo F Samsun/A306 A306-C M1-9708(R.1) 12-Sep 15-Nov 17-Sep 4 Plate 8 x 2438 x 7400 A36 sh 62 70,245.22 quo F A306-C M1-9708(R.1) 12-Sep 15-Nov 17-Sep 5 Plate 10 x 2438 x 7400 A36 sh 19 26,908.45 quo F MO No. MPR issue. Date MPR need Date MPR rev. date L/ F Deli. term Order date Actual ship. ETA HPport Cust . Clea r Pay- ment Supplier Name

Upload: thaidx

Post on 18-Nov-2014

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hvc PlatePipe Update)

HVC-PUR 1 STATUS

ONGOING STATUS FOR STEEL PLATE(SH) & PIPE(PC)Prepared: T.L.Hoa/Procurement Dept Up dated on

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) PO del. HVC NCR MRS Cur U.Price Amount MV/Voy No

Koudiet/A305

A305-C M1-9644 26-Aug 25-Mar 1 Plate 8 x 2438 x 7400 A36 sh 108 122,362.63 quo F

A305-C M1-9644 26-Aug 25-Mar 2 Plate 10 x 2438 x 7400 A36 sh 24 33,989.62 quo F

Samsun/A306

A306-C M1-9708(R.1) 12-Sep 15-Nov 17-Sep 4 Plate 8 x 2438 x 7400 A36 sh 62 70,245.22 quo F

A306-C M1-9708(R.1) 12-Sep 15-Nov 17-Sep 5 Plate 10 x 2438 x 7400 A36 sh 19 26,908.45 quo F

MO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

L/F

Deli.

term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

SupplierName

Page 2: Hvc PlatePipe Update)

HVC-PUR 2 STATUS

4/8/2023

Remarks To Acct

Page 3: Hvc PlatePipe Update)

HVC-PUR 3 STATUS

ONGOING STATUS FOR STEEL PLATE(SH) & PIPE(PC)Prepared: T.L.Hoa/Procurement Dept Up dated on 4/8/2023

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) PO del. HVC NCR MRS Cur MV/Voy No Remarks To Acct

A304-A M1-9477(R.1) 21-Jul 30-Oct 1 Plate 18 x 2540 x 9200 A572-50 TP1 sh 19 62,740.00 258 F CNF 28-Jul 30-Oct 20% $ PT.Gunung

A304-A M1-9477(R.1) 21-Jul 30-Oct 2 Plate 18 x 2540 x 9800 A572-50 TP1 sh 32 112,540.00 258 F CNF 28-Jul 30-Oct 20% $ PT.Gunung

A304-A M1-9477(R.1) 21-Jul 30-Oct 3 Plate 18 x 2300 x 9400 A572-50 TP1 sh 32 97,760.00 258 F CNF 28-Jul 30-Oct 20% $ PT.Gunung

A304-A M1-9477(R.1) 21-Jul 30-Oct 4 Plate 18 x 2300 x 9800 A572-50 TP1 sh 96 305,760.00 258 F CNF 28-Jul 30-Oct 20% $ PT.Gunung

A304-A M1-9477(R.1) 21-Jul 30-Oct 5 Plate 20 x 2310 x 9000 A572-50 TP1 sh 8 26,110.00 258 F CNF 28-Jul 30-Oct 20% $ PT.Gunung

A304-A M1-9477(R.1) 21-Jul 30-Oct 6 Plate 30 x 1830 x 8850 A572-50 TP1 sh 14 53,400.00 258 F CNF 28-Jul 30-Oct 20% $ PT.Gunung

A304-A M1-9477(R.1) 21-Jul 30-Oct 7 Plate 30 x 1830 x 9400 A572-50 TP1 sh 59 239,010.00 258 F CNF 28-Jul 30-Oct 20% $ PT.Gunung

A304-A M1-9477(R.1) 21-Jul 30-Oct 8 Plate 30 x 1830 x 9800 A572-50 TP1 sh 64 270,270.00 258 F CNF 28-Jul 30-Oct 20% $ PT.Gunung

A304-A M1-9477(R.1) 21-Jul 30-Oct 9 Plate 35 x 1830 x 8850 A572-50 TP1 sh 6 26,700.00 258 F CNF 28-Jul 30-Oct 20% $ PT.Gunung

MO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

L/F

Deli.

term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

SupplierName

Page 4: Hvc PlatePipe Update)

HVC-PUR 4 STATUS

ONGOING STATUS FOR STEEL PLATE(SH) & PIPE(PC)Prepared: T.L.Hoa/Procurement Dept Up dated on 4/8/2023

MPR No. No Item Mat'l desc Mat'l Spec Unit W't (kg) PO del. ETD HVC NCR MRS Cur MV/Voy No Remarks To Acct

EMAL/A298

A298 M1-9635 25-Aug 25-Sep 2 Plate 22 x 2438 x 6096 A36 sh 3 7,698.00 289 F FOB 4-Sep 19-Sep 19-Sep 26-Sep 30-Sep $ Daico TIAN XING

A298 M1-9635 25-Aug 25-Sep 3 Plate 25 x 2438 x 6096 A36 sh 1 2,916.00 289 F FOB 4-Sep 19-Sep 19-Sep 26-Sep 30-Sep $ Daico TIAN XING

A298 M1-9621 25-Aug 5-Oct 1 Checked 6 x 1219 x 2438 SS400 sh 4 580.00 289 F FOB 4-Sep 19-Sep 19-Sep 26-Sep 30-Sep $ Daico TIAN XING

A298 M1-9578 12-Aug 5-Oct 1 Plate 6 x 1524 x 6096 A240-304 sh 13 5,746.42 316 F FOB 3-Sep 28-Sep 27-Sep 3-Oct 7-Oct $ Yoobong HEUNG-A MANILA 0830W

A298 M1-9578 12-Aug 5-Oct 2 Plate 2 x 1219 x 2438 A36 sh 10 467.00 289 F FOB 4-Sep 19-Sep 19-Sep 26-Sep 30-Sep $ Daico TIAN XING

A298 M1-9578 12-Aug 5-Oct 5 Plate 50 x 2438 x 6096 A36 sh 1 5,833.00 289 F FOB 4-Sep 19-Sep 19-Sep 26-Sep 30-Sep $ Daico TIAN XING

A298 M1-9139(R.1) 24-Apr 15-Sep 5-May 3 Plate 14 x 1219 x 9000 SS400 sh 14 16,880.00 229 F FAS 4-Jul 15-Sep 19-Sep 26-Sep 30-Sep $ Sin Hwa Steel TIAN XING

Seraya/A299

A299 M1-9015(R.4) 24-Mar 20-May 28-May 20 Plate 31.75 x 1524 x 6096 A387-91-CL2 sh 3 6,946.48 126 F CFR 17-Apr 24-Jul 8-Sep 11-Oct a L/C $ Igawara APL Spain/V131

A299 M1-9015(R.4) 24-Mar 20-May 28-May 21a Plate 50.8 x 1300 x 6096 A387-91-CL2 sh 1 3,160.25 126 F CFR 17-Apr 24-Jul 8-Sep 11-Oct a L/C $ Igawara APL Spain/V131

A299 M1-9015(R.4) 24-Mar 20-May 28-May 21b Plate 50.8 x 1138 x 6096 A387-91-CL2 sh 1 2,766.44 126 F CFR 17-Apr 24-Jul 8-Sep 11-Oct a L/C $ Igawara APL Spain/V131

QATARLUM/A300

A300 M1-9757 23-Sep 15-Oct 1 SMLS Pip1-1/2" S/40(OD48.3x3.68)-6M A106-B pc 8 194.00 339 F CFR 27-Sep 5-Oct 5-Oct 9-Oct a $ Dae Yeun

A300 M1-9757 23-Sep 15-Oct 2 SMLS Pip1/2" S/40(OD21.3x2.77)-6M A106-B pc 8 61.00 339 F CFR 27-Sep 5-Oct 5-Oct 9-Oct a $ Dae Yeun

A300 M1-9676 4-Sep 25-Sep 1 Plate 20 x 2438 x 6096 SS400 sh 2 4,667.00 289 F FOB 4-Sep 19-Sep 19-Sep 26-Sep 30-Sep $ Daico TIAN XING

A300 M1-9514 25-Jul 15-Aug 3 Plate 2 x 1219 x 2438 A240-321 sh 100 4,713.00 267 F FOB 31-Jul 25-Aug 27-Sep 3-Oct 7-Oct $ Yoobong HEUNG-A MANILA 0830W

A300 M1-9399 27-Jun 27-Jul 14 Plate 2 x 1219 x 2438 A240-321 sh 87 4,100.00 234 F FOB 7-Jul 20-Aug 27-Sep 3-Oct 7-Oct $ Yoobong HEUNG-A MANILA 0830W

A300 M1-9399 27-Jun 27-Jul 19 Plate 50.8 x 1524 x 3048 A387-91-CL2 sh 1 1,852.39 227 F CFR 2-Jul 10-Sep 8-Sep 11-Oct a D/P $ Igawara APL Spain/V131

MO No.

MPR issue.Date

MPR needDate

MPR rev. date

Q'ty (sh)

PO No

L/F

Deli.

term

Order date

ETA HPport

Cust.Clear

Pay-ment

SupplierName

LANTAU BAY 824S

LANTAU BAY 824S

Page 5: Hvc PlatePipe Update)

HVC-PUR 5 STATUS

ONGOING STATUS FOR STEEL PLATE(SH) & PIPE(PC)Prepared: T.L.Hoa/Procurement Dept

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS Cur

In-house

N/A M1-9343 13-Jun urgent 1 W/D Pipe 1" S/40 (OD33.5x3.5t)-6M CB Steel pc 54 839.00 403 L DDP 13-Jun 14-Jun 16-Jun 24-Jul 100% VND

N/A M1-9438 2 Checked Plate 5 x 1500 x 6000 SS400 sh 16 6,084.00 458 L Ex-w 8-Jul 15-Jul 19-Jul 100% VND

N/A W4-9119 21-Apr 21-May 1 Carbon Rod for back gouging Dia 8.0 ea 4,000 144 F CFR 24-Apr 18-May 3-Jun 8-Jun 16-Jun 27-Jun 100% $

N/A W4-9119 21-Apr 21-May 2 Carbon Rod for back gouging Dia 9.5 ea 2,000 144 F CFR 24-Apr 18-May 3-Jun 8-Jun 16-Jun 27-Jun 100% $

Y001 C5-9138 1 Plate 10 x 1500 x 6000 SS400 sh 4 2,826.00 271 L DDP 23-Apr 26-Apr 26-Apr 6-Jun 100% VND

Y301 M1-9110 2 Plate 14 x 2000 x 6000 CT3/SS400 sh 1 1,319.00 271 L DDP 23-Apr 26-Apr 26-Apr 6-Jun 100% VND

Y301 M1-9110 3 Plate 25 x 2000 x 6000 CT3/SS400 sh 1 2,355.00 271 L DDP 23-Apr 26-Apr 26-Apr 6-Jun 100% VND

Y301 M1-9109 2 SMLS Pipe OD273.1 x 9.27-6M API-5L pc 6 2,171.00 267 L DDP 23-Apr 28-Apr 28-Apr 19-May 100% VND

Y301 M1-9110 1 Plate 6 x 1500 x 6000 CT3/SS400 sh 6 2,543.40 256 L DDP 23-Apr 26-Apr 23-Apr 12-May 100% VND

All W4-8895 22-Feb ASAP 1 Plate CT3/SS400 sh 6 33,661.00 127 L DDP 28-Feb 2-Mar 6-Mar 7-Mar 100% VND

Z001 E2-7864 19-Jul 15-Aug 1 Plate 3.2 x 1219 x 2438 SS400 sh 14 1,045.00 233 F FOB 8-Aug 23-Aug 19-Sep 26-Sep 1-Oct 10-Nov 100% $

Z001 C5-8043 28-Aug 1 Plate 1.8 x 1200 x 2400 SS400 sh 10 414.00 518 L DDP 4-Sep 6-Sep 6-Sep 13-Sep 100% VND

Z001 C5-8043 28-Aug 2 Plate 3 x 1225 x 2500 SS400 sh 7 505.00 518 L DDP 4-Sep 6-Sep 6-Sep 13-Sep 100% VND

Z001 C5-8043 28-Aug 3 W/D Pipe OD33.5 x 2.5t-6M SGP pc 7 80.00 518 L DDP 4-Sep 6-Sep 15-Sep 20-Sep 100% VND

Z001 C5-8043 28-Aug 4 W/D Pipe OD21.2 x 2.0t-6M SGP pc 11 62.00 518 L DDP 4-Sep 6-Sep 15-Sep 20-Sep 100% VND

Z006 A6-7888 27-Jul 30-Jul 5 Plate 1.4 x 1.2M x 6M Galv steel sh 6 467.00 420 L DDP 27-Jul 29-Jul 1-Aug 6-Aug 100% VND

Z285 C5-7858 17-Jul 19-Jul 6 Rec.Pipe 50 x 25 x 2.0-6M STK400 pc 16 211.00 405 L DDP 19-Jul 22-Jul 19-Jul 2-Aug 100% VND

Z285 C5-7858 17-Jul 19-Jul 7 SQ.Pipe 50 x 50 x 2.0-6M STK400 pc 29 1,314.00 405 L DDP 19-Jul 22-Jul 19-Jul 2-Aug 100% VND

Z285 C5-7858 17-Jul 19-Jul 8 Rec.Pipe 80 x 40 x 2.3-6M STK400 pc 53 520.00 405 L DDP 19-Jul 22-Jul 19/7,23/7 2-Aug 100% VND

Z284 M1-7683 9 Plate 9 x 1250 x 14150 SS400 sh 23 28,750.00 336 L DDP 21-Jun 24-Jun 25-Jun 21-Jul 100% VND

Y001 M1-7571 29-May 28-May 10 Plate 5 x 1524 x 6096 SS400 sh 1 365.00 298 L DDP 6-Jun 9-Jun 12-Jun 21-Jul 100% VND

Y001 M1-7571 29-May 28-May 11 Plate 6 x 1524 x 6096 SS400 sh 4 1,750.00 298 L DDP 6-Jun 9-Jun 12-Jun 21-Jul 100% VND

Y001 M1-7571 29-May 28-May 12 Plate 8 x 1524 x 6096 SS400 sh 3 1,750.00 298 L DDP 6-Jun 9-Jun 18-Jun 21-Jul 100% VND

Y001 M1-7571 29-May 28-May 13 Plate 10 x 1160 x 6096 SS400 sh 12 6,661.00 298 L DDP 6-Jun 9-Jun 12-Jun 21-Jul 100% VND

Y001 M1-7571 29-May 28-May 14 Plate 10 x 2440 x 11000 SS400 sh 1 2,107.00 298 L DDP 6-Jun 9-Jun 13-Jun 21-Jul 100% VND

Y001 M1-7571 29-May 28-May 15 Plate 10 x 2450 x 9170 SS400 sh 1 1,764.00 298 L DDP 6-Jun 9-Jun 13-Jun 21-Jul 100% VND

Y001 M1-7571 29-May 28-May 16 Plate 10 x 2450 x 9160 SS400 sh 1 1,762.00 298 L DDP 6-Jun 9-Jun 13-Jun 21-Jul 100% VND

Y001 M1-7571 29-May 28-May 17 Plate 10 x 2640 x 7540 SS400 sh 1 1,563.00 298 L DDP 6-Jun 9-Jun 13-Jun 21-Jul 100% VND

Y001 M1-7571 29-May 28-May 18 CHK'D PLATE 4 x 1500 x 6000 SS400 sh 7 2,167.00 298 L DDP 6-Jun 9-Jun 18-Jun 21-Jul 100% VND

Z285 C5-7684 19 Rec.Pipe 80 x 40 x 2.3-6M STK400 pc 525 13,015.00 320 L DDP 14-Jun 16-Jun 19-Jun 29-Jun 100% VND

Z285 C5-7684 20 Rec.Pipe 50 x 25 x 2.0-6M KSD 3568 pc 375 4,954.00 321 L DDP 14-Jun 16-Jun 18-Jun 9-Jul 100% VND

Z285 C5-7684 21 Rec.Pipe 60 x 30 x 2.0-6M KSD 3568 pc 105 1,684.00 321 L DDP 14-Jun 16-Jun 18-Jun 9-Jul 100% VND

Z285 C5-7684 22 Rec.Pipe 60 x 30 x 3.0-6M KSD 3568 pc 10 234.00 321 L DDP 14-Jun 16-Jun 18-Jun 9-Jul 100% VND

Z285 C5-7687 23 W/D Pipe 3/4" (OD26.65x2)-6M BS 1387-1985 pc 6 44.00 321 L DDP 14-Jun 16-Jun 18-Jun 9-Jul 100% VND

Z006 A6-7498 24 Rec.Pipe 80 x 40 x 2.3-6M STK400 pc 193 4,784.00 247 L DDP 14-May 18-May 22-May 29-May 100% VND

Z006 C5-7574 25-May 28-May 25 Rec.Pipe 80 x 40 x 2.3-6M STK400 pc 123 3,049.00 280 L DDP 30-May 2-Jun 5-Jun 9-Jun 100% VND

Z006 C5-7574 25-May 28-May 26 Rec.Pipe 50 x 25 x 2-6M KSD3568 pc 106 1,400.00 278 L DDP 30-May 3-Jun 1-Jun 7-Jun 100% VND

Z006 C5-7574 25-May 28-May 27 W/D Pipe 20A (OD26.65x2t)-6M BS 1387 pc 6 44.00 278 L DDP 30-May 3-Jun 1-Jun 7-Jun 100% VND

Y001 C5-7584 26-May 28-May 28 W/D Pipe 20A S/40(OD26.9x2.6)-6M GPE-BSM BS 1387 pc 6 56.00 278 L DDP 30-May 3-Jun 1-Jun 7-Jun 100% VND

Z006 A6-7498 29 SQ.Pipe 50 x 50 x 3-6M KSD 3568 pc 49 1,284.00 245 L DDP 14-May 17-May 17-May 29-May 100% VND

Z006 A6-7498 30 Rec.Pipe 50 x 25 x 2.0-6M KSD 3568 pc 107 1,413.00 245 L DDP 14-May 17-May 17-May 29-May 100% VND

Z006 A6-7498 31 Rec.Pipe 60 x 30 x 2.0-6M KSD 3568 pc 65 1,043.00 245 L DDP 14-May 17-May 17-May 29-May 100% VND

N/A W4-7240 32 SMLS Pipe 8" x S/160-4.93M (Alloy) SA335-P91 pc 1 542.00 65 F CFR 14-Mar 23-Mar 23-Mar 28-Mar 4-Apr 12-Apr 100% $

N/A W4-7240 33 SMLS Pipe 8" x S/40-6M (Alloy) SA335-P11 pc 1 253.00 65 F CFR 14-Mar 23-Mar 23-Mar 28-Mar 4-Apr 12-Apr 100% $

N/A W4-7240 34 SMLS Pipe 8" x S/40-6M (Alloy) SA335-P22 pc 1 253.00 65 F CFR 14-Mar 23-Mar 23-Mar 28-Mar 4-Apr 12-Apr 100% $

Y001 M5-7304 35 Rec.Pipe 80 x 40 x 2.5-6M STK400 pc 40 1,073.00 174 L DDP 6-Apr 8-Apr 12-Apr 19-Apr 100% VND

Y001 C5-7268 19-Mar 22-Mar 36 Rec.Pipe 25 x 50 x 1.5-6M KSD 3568 pc 20 202.00 169 L DDP 30-Mar 1-Apr 4-Apr 9-Apr 100% VND

Y001 M5-7304 37 Rec.Pipe 80 x 40 x 2.3-6M KSD 3568 pc 111 2,752.00 169 L DDP 30-Mar 1-Apr 4-Apr 9-Apr 100% VND

Y001 M5-7304 38 SQ.Pipe 50 x 50 x 3-6M KSD 3568 pc 70 1,834.00 169 L DDP 30-Mar 1-Apr 4-Apr 9-Apr 100% VND

MO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

40x2000xRL (53600MM)

Page 6: Hvc PlatePipe Update)

HVC-PUR 6 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

Y001 M5-7304 39 Rec.Pipe 50 x 25 x 2-6M KSD 3568 pc 65 859.00 169 L DDP 30-Mar 1-Apr 4-Apr 9-Apr 100% VND

Y001 M5-7304 40 Rec.Pipe 60 x 30 x 2-6M KSD 3568 pc 42 674.00 169 L DDP 30-Mar 1-Apr 4-Apr 9-Apr 100% VND

Y001 M5-7127 28-Feb 3-Feb 41 Rec.Pipe 25 x 50 x 1.5-6M STKR400 pc 10 101.00 128 L DDP 5-Mar 15-Mar 26-Mar 100% VND

N/A A6-5994 18-Apr 19-Apr 42 Plate 1.1 x 1.2M x 6M Galv steel sh 4 29.00 FOR L DDP 18-Apr 19-Apr 19-Apr 28-Apr 100% VND

N/A C7-5938 43 W/D PIPE OD21.2 x 2.5t-6M STK400 pc 1 7.00 194 L DDP 14-Apr 17-Apr 18-Apr 28-Apr 100% VND

Y206 M1-5062(R.1) 24-Jun 20-Jul 12-Jul 44 PLATE 6 x 1500 x 6000 CT3 sh 2 848.00 277 L DDP 14-Jul 19-Jul 16-Jul 26-Jul 100% VND

Y206 M1-5062(R.1) 24-Jun 20-Jul 12-Jul 45 PLATE 10 x 1500 x 6000 CT3 sh 14 9,891.00 277 L DDP 14-Jul 19-Jul 16-Jul 26-Jul 100% VND

Y206 M1-5062(R.1) 24-Jun 20-Jul 12-Jul 46 CHK'D PLATE 3 x 1250 x 4000 CT3 sh 3 398.00 277 L DDP 14-Jul 19-Jul 16-Jul 26-Jul 100% VND

Y206 M1-5062(R.1) 20-Jul 12-Jul 47 PLATE 1.2 x 1250 x 6000 CT3 sh 1 71.00 277 L DDP 14-Jul 19-Jul 16-Jul 26-Jul 100% VND

Amran Cement/L125

L125 M1-3917 5-Apr 7-Apr 1 W/D PIPE 25A(OD33.8x3.1)-6M BPE-BSM(SGP) pc 15 211.00 117 L Ex-W 6-Apr 9-Apr 7-Apr 100% VND

L125 M1-3776 7-Feb 15-Feb 1 W/D PIPE 25A(OD33.8x3.1)-6M BPE-BSM(SGP) pc 5 70.00 69 L Ex-W 6-Mar 9-Mar 9-Mar 29-Mar 100% VND

Seraya EP/A136

A136 M1-4580 1 PLATE 3 x 1250 x 6000 CT3 sh 5 883.00 36 L DDP 27-Jan 29-Jan 28-Jan 100% VND

A136 M-4473 13-Dec 5-Jan 1 SMLS PIPE 1/2" S/80(OD21.3xt3.73) A53-B pc 20 194.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $

A136 M-4473 13-Dec 5-Jan 2 SMLS PIPE 20A S/80(OD26.7xt3.91) A53-B pc 14 185.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $

A136 M-4473 13-Dec 5-Jan 3 SMLS PIPE 25A S/40(OD33.4xt3.38) A53-B pc 18 270.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $

A136 M-4473 13-Dec 5-Jan 4 SMLS PIPE 32A S/40(OD42.2x3.56t) A53-B pc 1 20.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $

A136 M-4473 13-Dec 5-Jan 5 SMLS PIPE 50A S/40 (OD60.3xt3.91) A53-B pc 14 457.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $

A136 M-4473 13-Dec 5-Jan 6 SMLS PIPE 20A S/40(OD26.7xt2.87) A312-304 pc 34 347.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $

A136 M-4473 13-Dec 5-Jan 7 SMLS PIPE 25A S/40(OD33.4xt3.38) A312-304 pc 26 395.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $

A136 M-4473 13-Dec 5-Jan 8 SMLS PIPE OD6/ID5-2M SUS304 pc 1 0.20 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $

A136 M-4473 13-Dec 5-Jan 9 SMLS PIPE OD8/ID6-3M SUS304 pc 1 0.60 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $

A136 M-4473 13-Dec 5-Jan 10 SMLS PIPE OD10/ID8-6M SUS316 pc 1 1.50 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $

A136 M-4473 13-Dec 5-Jan 11 W/D PIPE 32A (OD42.7x3.5)-6M SGP pc 33 626.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $/pc

A136 M-4473 13-Dec 5-Jan 12 W/D PIPE 40A (OD48.6x3.25)-6M SGP pc 5 109.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $/pc

A136 M-4474 13-Dec 30-Dec 1 PLATE 2.3 x 1219 x 6096 SS400 sh 14 1,878.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $

A136 M1-4376 13-Oct 20-Oct 1 W/D PIPE 32A S/80(OD42.2x4.85)- A53-B pc 7 143.00 214 F FOB 18-Oct 25-Oct 2-Dec 10-Dec 10-Jan 100% $/pc

A136 M1-4376 13-Oct 20-Oct 2 W/D PIPE 40A (OD48.3x3.7)-6M A53-B pc 8 197.00 214 F FOB 18-Oct 25-Oct 2-Dec 10-Dec 21-Dec 100% $/pc

A136 M1-4422 11-Nov 13-Nov 1 W/D PIPE 25A(OD33.8x3.1)-6M BPE-BSM(SGP) pc 50 704.00 416 L Ex-W 12-Nov 14-Nov 12-Nov 100% VND

A136 M1-4355 2-Oct 15-Oct 1 W/D PIPE 32A (OD42.7x3.25)-6M SPP pc 16 305.00 202 F FOB 4-Oct 8-Oct 8-Oct 15-Oct 20-Oct 100% $

A136 M1-4355 2-Oct 15-Oct 2 PLATE 6 x 1500 x 6000 SS400 sh 2 848.00 387 L Ex-W 7-Oct 11-Oct 100% VND

A136 M1-4253(R.1) 18-Aug 5-Sep 19-Aug 1 W/D PIPE 4" S/40(OD114.3xt6.02)-6M A53-B pc 64 6,144.00 177 F FOB 20-Aug 4-Sep 3-Sep 9-Sep 13-Sep 100% $/pc

A136 M1-4253(R.1) add 5-Sep 19-Aug 2 SMLS PIPE OD10x2t-6M A312-304 pc 18 27.00 177 F FOB 20-Aug 4-Sep 3-Sep 9-Sep 13-Sep 100% $

A136 M1-4273 24-Aug 6-Sep 1 W/D PIPE 32A S/20(OD42.16x2.77) SUS304 pc 18 294.00 325 L DDP 25-Aug 30-Aug 28-Aug 100% VND

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 1 SMLS PIPE 8A S/40(OD13.72xt2.24) A312-304 pc 6 23.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 2 SMLS PIPE 10A S/40(OD17.14xt2.31 A312-304 pc 544 2,778.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 3 SMLS PIPE 15A S/40(OD21.34xt2.77 A312-304 pc 57 445.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 4 SMLS PIPE 20A S/40(OD26.7xt2.87) A312-304 pc 132 1,346.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 5 SMLS PIPE 25A S/40(OD33.4xt3.38) A312-304 pc 32 480.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 6 SMLS PIPE 40A S/40S(OD48.26xt3.6 A312-304 pc 82 2,017.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 8 SMLS PIPE 80A S/10(OD88.9xt3.05) A312-304 pc 35 1,386.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 9 W/D PIPE 100A S/10(O.D114.3xt3. A312-304 pc 13 671.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $/pc

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 11 SMLS PIPE 20A S/80(OD26.67xt3.91 A53-B pc 397 5,240.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 12 SMLS PIPE 25A S/40S(OD33.4xt3.38 A53-B pc 35 525.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 13 SMLS PIPE 40A S/40(OD48.26xt3.68 A53-B pc 65 1,599.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 14 SMLS PIPE 50A S/40(OD60.32xt3.91 A53-B pc 45 1,458.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $

Page 7: Hvc PlatePipe Update)

HVC-PUR 7 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 15 SMLS PIPE 3" S/40(OD88.9xt5.5)-6M A53-B pc 12 814.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $/pc

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 17 W/D PIPE 15A S/80(OD21.34x3.73) API5L-B pc 1 10.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $/pc

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 19 W/D PIPE 80A(OD89.1x4.05)-6M SPP pc 2 105.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $/pc

A136 M1-4200(R.3) 30-Jul 25-Aug 10-Aug 19a SMLS PIPE 50A S/40(OD60.3xt3.9)- A312-304 pc 1 33.00 167 F FOB 11-Aug 6-Sep 28-Aug 4-Sep 13-Sep L/C $

A136 M1-4234 13-Aug urgent 1 W/D PIPE OD20.5xt2.2-3.7~4.1M(1 JIS G3455(STS 35) pc 5 23.00 FOR L DDP 100% VND

A136 M1-4043 4-Jun 25-Jun 1 W/D PIPE 32A-6M SGP pc 40 811.00 118 F FOB 9-Jun 19-Jun 23-Jun 1-Jul 9-Jul 100% $/pc

A136 M1-4043 4-Jun 25-Jun 2 W/D PIPE 40A-6M SGP pc 25 583.00 118 F FOB 9-Jun 19-Jun 23-Jun 1-Jul 9-Jul 100% $/pc

A136 M1-4043 4-Jun 25-Jun 3 W/D PIPE 50A-6M SGP pc 17 542.00 118 F FOB 9-Jun 19-Jun 23-Jun 1-Jul 9-Jul 100% $/pc

A136 M1-4043 4-Jun 25-Jun 4 W/D PIPE 150A-6M SGP pc 1 119.00 118 F FOB 9-Jun 19-Jun 23-Jun 1-Jul 9-Jul 100% $/pc

A136 M1-4043 4-Jun 25-Jun 5 W/D PIPE 300A-6M SGP pc 2 636.00 118 F FOB 9-Jun 19-Jun 23-Jun 1-Jul 9-Jul 100% $/pc

A136 M1-4043 4-Jun 25-Jun 6 SMLS PIPE 65A S/40(OD76.3x5.2t)- A53-B pc 41 2,244.00 118 F FOB 9-Jun 19-Jun 23-Jun 1-Jul 9-Jul 100% $

A136 M1-4043 4-Jun 25-Jun 7 SMLS PIPE 3" S/40(OD88.9xt5.5)-6M A53-B pc 16 1,085.00 118 F FOB 9-Jun 19-Jun 23-Jun 1-Jul 9-Jul 100% $

A136 M1-4043 4-Jun 25-Jun 8 W/D PIPE 4" S/40(OD114.3xt6.02)-6M A53-B pc 8 768.00 118 F FOB 9-Jun 19-Jun 23-Jun 1-Jul 9-Jul 100% $/pc

A136 M1-4043 4-Jun 25-Jun 9 W/D PIPE 5" S/40(OD139.8x6.55)- A53-B pc 9 1,172.00 118 F FOB 9-Jun 19-Jun 31-Jul 8-Aug 17-Aug 100% $/pc

A136 M1-4043 4-Jun 25-Jun 10 W/D PIPE 6" S/40(OD165.2x7.1)-6 A53-B pc 8 1,330.00 118 F FOB 9-Jun 19-Jun 23-Jun 1-Jul 9-Jul 100% $/pc

A136 M1-3952 add W/D PIPE 32A S/40(OD42.7x3.5)-6 SGP pc 15 304.00 68 F FOB 27-Apr 12-May 7-May 13-May 22-May 3-Jun 100% $

A136 M1-3952 add W/D PIPE 40A S/40(OD48.6x3.5)-6 SGP pc 11 257.00 68 F FOB 27-Apr 12-May 7-May 13-May 22-May 3-Jun 100% $

A136 M1-3952 21-Apr 15-May 3 W/D PIPE 20A S/80(OD27.2x3.9)-6 A53-B pc 25 336.00 68 F FOB 27-Apr 12-May resupply 21-Jul 100% $

A136 M1-3952 21-Apr 15-May 1 W/D PIPE 8A S/40(OD13.72 x 2.24) SUS304 pc 6 24.00 86 F FOB 26-Apr 11-May 8-Jun 22-Jun 9-Jul 15-Jul 100% $/pc

A136 M1-3952 21-Apr 15-May 2 W/D PIPE 20A S/40(OD26.7x2.9)-6 SUS304 pc 25 252.00 86 F FOB 26-Apr 11-May 8-Jun 22-Jun 9-Jul 15-Jul 100% $/pc

A136 M1-3952 21-Apr 15-May 4 W/D PIPE 32A S/40(OD42.7x3.5)-6 SGP pc 30 608.00 86 F FOB 26-Apr 11-May 8-Jun 22-Jun 9-Jul 15-Jul 100% $/pc

A136 M1-3952 21-Apr 15-May 5 W/D PIPE 65A S/40(OD76.3x5.2) - SUS304 pc 1 45.00 86 F FOB 26-Apr 11-May 8-Jun 22-Jun 9-Jul 15-Jul 100% $/pc

A136 M1-3952 21-Apr 15-May 6 W/D PIPE 65A S/20(OD76.3x3.5)-6 SUS304 pc 22 986.00 86 F FOB 26-Apr 11-May 8-Jun 22-Jun 9-Jul 15-Jul 100% $/pc

A136 M1-3952 21-Apr 15-May 7 W/D PIPE 80A S/20(OD89.1x4)-6M SUS304 pc 13 686.00 86 F FOB 26-Apr 11-May 8-Jun 22-Jun 9-Jul 15-Jul 100% $/pc

A136 M1-4039 4-Jun 15-Jun 1 PLATE 1.95 x 1219 x Coil SUS304 kg 2,390.00 194 L DDP 10-Jun 14-Jun 11-Jun 30-Jun 100% VND

A136 M1-4039 1 PLATE 1.98 x 1220 x Coil SUS304 kg 789.00 194 L DDP 10-Jun 14-Jun 11-Jun 30-Jun 100% VND

A136 M1-4039 1 PLATE 1.95 x 1220 x Coil SUS304 kg 563.00 194 L DDP 10-Jun 14-Jun 11-Jun 30-Jun 100% VND

A136 M1-4039 1 PLATE 2.0 x 1220 x Coil SUS304 kg 578.00 194 L DDP 10-Jun 14-Jun 11-Jun 30-Jun 100% VND

A136 M1-4039 1 PLATE 1.97 x 1220 x Coil SUS304 kg 350.00 194 L DDP 10-Jun 14-Jun 11-Jun 30-Jun 100% VND

A136 M1-3771 6-Feb 10-Mar 7 W/D PIPE 20A S/80(OD27.2x3.9)-6 A53-B pc 80 1,075.00 33 F FOB 20-Feb 26-Mar 2-Apr 8-Apr 12-Apr 25-May 100% $/pc

A136 M1-3771 6-Feb 10-Mar 9 SMLS PIPE 15A S/80 (OD21.7 x t3.7) SUS304 pc 19 187.00 33 F FOB 20-Feb 26-Mar 2-Apr 8-Apr 12-Apr 25-May 100% $

A136 M1-3771 6-Feb 10-Mar 11 SMLS PIPE 8A S/80 (OD13.72 x t3.02 SUS304 pc 4 19.00 33 F FOB 20-Feb 26-Mar 2-Apr 8-Apr 12-Apr 25-May 100% $

A136 M1-3721 20-Jan 3-Oct 12 W/D PIPE 32A S/20(OD42.7x3)-6M SUS304 pc 372 6,623.00 28 F FOB 2-Feb 29-Feb 17-Mar 26-Mar 30-Mar OK L/C $

A136 M1-3721 20-Jan 3-Oct 13 W/D PIPE 40A S/20(OD48.6 x3) - 6 SUS304 pc 72 1,472.00 28 F FOB 2-Feb 29-Feb 17-Mar 26-Mar 30-Mar OK L/C $

A136 M1-3953 21-Apr 15-May 1 PLATE 2.86 x 1220 x 6096 SUS304 sh 9 1,518.00 138 L DDP 24-Apr 4-May 29-Apr 13-May 100% VND

A136 M1-3953 21-Apr 15-May 1 PLATE 2.86 x 1220 x 7200 SUS304 sh 1 199.00 138 L DDP 24-Apr 4-May 29-Apr 13-May 100% VND

A136 M1-3953 21-Apr 15-May 1 PLATE 2.86 x 1220 x 8500 SUS304 sh 1 235.00 138 L DDP 24-Apr 4-May 29-Apr 13-May 100% VND

A136 M1-3953 21-Apr 15-May 2 PLATE 6 x 1219 x 2438 SUS304 sh 3 424.00 138 L DDP 24-Apr 4-May 29-Apr 13-May 100% VND

A136 M1-3937 13-Apr 30-Apr 1 W/D PIPE 50A(60.5x3.7)-5.8M SUS304 pc 2 61.00 137 L DDP 19-Apr 20-Apr 19-Apr 100% VND

A136 M1-3937 13-Apr 30-Apr 1 W/D PIPE 50A(60.5x3.5)-6M SUS304 pc 1 30.00 137 L DDP 19-Apr 20-Apr 19-Apr 100% VND

A136 M1-3876 17-Mar 18-Mar 4 PLATE 6 x 1500 x 6000 CT3 sh 3 1,272.00 73 L DDP 19-Mar 22-Mar 23-Mar 29-Mar 100% VND

A136 M1-3876 17-Mar 18-Mar 5 PLATE 3 x 1494 x 6000 CT3 sh 3 633.00 73 L DDP 19-Mar 22-Mar 23-Mar 29-Mar 100% VND

A136 M1-3565(R.2) 14-Nov 10-Jan 24-Feb 1 PLATE 6 x 1219 x 6096 SS400 sh 36 12,600.00 255 F FOB 29-Dec 25-Jan 9-Feb 17-Feb 20-Feb 100% $

A136 M1-3565(R.2) 14-Nov 10-Jan 24-Feb 3 PLATE 12 x 1500 x 6000 SS400 sh 23 19,499.00 41 L DDP 12-Feb 14-Feb 17-Feb 29-Mar 100% VND

A136 M1-3565(R.2) 14-Nov 10-Jan 24-Feb 5 PLATE 16 x 1500 x 6000 SS400 sh 7 7,913.00 40 L DDP 13-Feb 18-Feb 17-Feb 29-Mar 100% VND

A136 M1-3565(R.2) 14-Nov 10-Jan 24-Feb 8 PLATE 3.2 x 1219 x 6096 SS400 sh 210 39,270.00 255 F FOB 29-Dec 25-Jan 9-Feb 17-Feb 20-Feb 100% $

A136 M1-3565(R.2) 14-Nov 10-Jan 24-Feb 9 PLATE 4.5 x 1219 x 6096 SS400 sh 14 3,668.00 255 F FOB 29-Dec 25-Jan 9-Feb 17-Feb 20-Feb 100% $

Page 8: Hvc PlatePipe Update)

HVC-PUR 8 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A136 M1-3633 13-Dec 10-Jan 7 W/D PIPE 15A - 6M SGP pc 10 79.00 245 F FOB 23-Dec 20-Jan 16-Jan 23-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 8 W/D PIPE 20A - 6M SGP pc 7 71.00 245 F FOB 23-Dec 20-Jan 16-Jan 23-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 9 W/D PIPE 25A - 6M SGP pc 30 437.00 245 F FOB 23-Dec 20-Jan 16-Jan 23-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 11 SMLS PIPE 20A S/80 - 6M A53-B pc 500 7,255.00 245 F FOB 23-Dec 30-Jan 15-Jan 22-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 11 SMLS PIPE 20A S/80 - 6M A53-B pc 1961 25,821.00 245 F FOB 23-Dec 30-Jan 15-Jan 22-Jan 5-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 12 SMLS PIPE 65A S/40 - 6M A53-B pc 6 261.00 245 F FOB 23-Dec 20-Jan 16-Jan 23-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 13 SMLS PIPE 4" S/40(OD114.3xt6.02)-6M A53-B pc 3 288.00 245 F FOB 23-Dec 20-Jan 16-Jan 23-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 14 SMLS PIPE 10A S/40(OD17.14xt2.31 A312-304 pc 6 31.00 245 F FOB 23-Dec 20-Jan 16-Jan 23-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 15 SMLS PIPE 10A S/80 - 6M A312-304 pc 17 114.00 245 F FOB 23-Dec 20-Jan 16-Jan 23-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 16 SMLS PIPE 15A S/40(OD21.34xt2.77 A312-304 pc 1 8.00 245 F FOB 23-Dec 20-Jan 16-Jan 23-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 17 SMLS PIPE 50A S/40(OD60.3xt3.9)- A312-304 pc 21 692.00 245 F FOB 23-Dec 20-Jan 16-Jan 23-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 18 SMLS PIPE 80A S/10(OD88.9xt3.05) A312-304 pc 18 696.00 245 F FOB 23-Dec 20-Jan 16-Jan 23-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 19 SMLS PIPE 90A S/10 - 6M A312-304 pc 3 400.00 245 F FOB 23-Dec 20-Jan 16-Jan 23-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 19 SMLS PIPE 90A S/10 - 6M A312-304 pc 6 400.00 245 F FOB 23-Dec 20-Jan 4-Feb 5-Mar 24-Mar 100% $

A136 M1-3633 13-Dec 10-Jan 20 SMLS PIPE 100A S/10(O.D114.3xt3. A312-304 pc 8 401.00 245 F FOB 23-Dec 20-Jan 16-Jan 23-Jan 29-Jan 100% $

A136 M1-3633 13-Dec 10-Jan 21 SMLS PIPE 300A S/10 - 6M A312-304 pc 2 298.00 245 F FOB 23-Dec 30-Jan 4-Feb 5-Mar 24-Mar 100% $

A136 M1-3667(R.1) 24-Dec 10-Feb 24-Feb 2 PLATE 6 x 1530 x 6000 SS400 sh 7 2,967.00 41 L DDP 12-Feb 14-Feb 17-Feb 29-Mar 100% VND

A136 M1-3667(R.1) 24-Dec 10-Feb 24-Feb 4 PLATE 12 x 1500 x 6000 SS400 sh 3 2,543.00 41 L DDP 12-Feb 14-Feb 17-Feb 29-Mar 100% VND

A136 M1-3667(R.1) 24-Dec 10-Feb 24-Feb 5 PLATE 16 x 1500 x 6000 SS400 sh 1 1,130.00 40 L DDP 13-Feb 18-Feb 17-Feb 29-Mar 100% VND

A136 M1-3667(R.1) 24-Dec 10-Feb 24-Feb 8 CHK'D PLATE 3 x 1250 x 4000 SS400 sh 337 44,821.00 40 L DDP 13-Feb 18-Feb 17-Feb 29-Mar 100% VND

A136 M1-3722 20-Jan 3-Oct 1 PLATE 6 x 1530 x 6000 SS400 sh 24 10,174.00 41 L DDP 12-Feb 14-Feb 17-Feb 29-Mar 100% VND

A136 M1-3722 20-Jan 3-Oct 3 PLATE 10 x 1500 x 5960 SS400 sh 2 1,413.00 41 L DDP 12-Feb 14-Feb 22-Mar 29-Mar 100% VND

A136 M1-3722 20-Jan 3-Oct 4 PLATE 12 x 1500 x 6000 SS400 sh 2 1,696.00 41 L DDP 12-Feb 14-Feb 17-Feb 29-Mar 100% VND

A136 M1-3722 20-Jan 3-Oct 5 PLATE 5 x 1220 x Coil SUS304 sh 2 1,177.00 29 L DDP 5-Feb 20-Feb 19-Feb 3-Mar 100% VND

A136 M1-3771 6-Feb 10-Mar 8 W/D PIPE 40A(OD48.4 x 3.1)-6M BPE-BSM(SGP) pc 55 1,143.00 31 L Ex-W 6-Feb 8-Feb 11-Feb 100% VND

A136 M1-3771 6-Feb 10-Mar 10 W/D PIPE 32A(OD42.5 x 3.1)-6M BPE-BSM(SGP) pc 130 2,349.00 31 L Ex-W 6-Feb 8-Feb 11-Feb 100% VND

A136 M1-3772(R.1) 6-Feb 10-Mar 24-Feb 2 PLATE 5 x 1500 x 6000 SS400 sh 3 1,060.00 40 L DDP 13-Feb 18-Feb 17-Feb 29-Mar 100% VND

A136 M1-3772(R.1) 6-Feb 10-Mar 24-Feb 3 PLATE 6 x 1530 x 6000 SS400 sh 3 1,272.00 41 L DDP 12-Feb 14-Feb 17-Feb 29-Mar 100% VND

A136 M1-3772(R.1) 6-Feb 10-Mar 24-Feb 4 PLATE 10 x 1500 x 5960 SS400 sh 1 707.00 41 L DDP 12-Feb 14-Feb 22-Mar 29-Mar 100% VND

A136 M1-3772(R.1) 6-Feb 10-Mar 24-Feb 5 CHK'D PLATE 5 x 1500 x 6000 SS400 sh 26 9,887.00 40 L DDP 13-Feb 18-Feb 17-Feb 29-Mar 100% VND

Seraya Power/A142

A142 M1-3728 27-Jan 10-Feb 1 W/D PIPE 50A S/80(OD60.3x5.54)- A53-B pc 6 269.00 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 100% $

BSE/A144

A144 M1-3858 1 PLATE 0.5 x 1000 x 2000 CT3 sh 3 25.00 FOR L DDP 12-Mar 12-Mar 12-Mar 19-Mar 100% VND

A144 M1-3609 1 W/D PIPE 50A (OD60.33x3.91)-5. SUS304 pc 1 32.00 52 L DDP 25-Feb 27-Feb OK 3-Mar 100% VND

Tibaghi/W148

W148 M1-4010 24-May 25-Jun 1 PLATE 30 x 1524 x 6096 SUS316 sh 1 2,224.00 109 F FOB 31-May 20-Jun 8-Jun 22-Jun 24/6~6/7 OK 100% $

W148 M1-4010 24-May 25-Jun 2 PLATE 15 x 2500 x 6200 (Y.S>3 SM490A sh 3 5,475.00 109 F FOB 31-May 20-Jun 8-Jun 22-Jun 24/6~6/7 OK 100% $

W148 M1-4010 25-Jun add PLATE 15 x 2500 x 6200 (Y.S>3 SM490A sh 5 9,125.00 109 F FOB 31-May 25-Jun 8-Jun 22-Jun 24/6~6/7 OK 100% $

W148 M1-4055 9-Jun 13-Jun 3 PLATE 50 x 1219 x 1219 SUS304 sh 1 583.00 123 F FOB 15-Jun 25-Jun 23-Jun 1-Jul 12-Jul 100% $

W148 M1-4011(R.1) 24-May 25-Jun 26-May 2 SQ.Pipe 200x200x8-11.9M(Y.S>3 STK490 pc 10 5,021.00 107 F CIF 31-May 10-Jun 16-Jun 24-Jun 23-Jul 100% $

W148 M1-4011(R.1) 24-May 25-Jun 26-May 3 Rec.Pipe 400x200x12.5t-11.9M(Y. STKR490 pc 7 6,770.00 107 F CIF 31-May 10-Jun 16-Jun 24-Jun 23-Jul 100% $

W148 M1-4011(R.1) 24-May 25-Jun 26-May 1 W/D PIPE 32A(OD42.2x3.6)-6M (Y A53-B pc 100 2,082.00 106 F FOB 29-May 8-Jun 11-Jun 16-Jun 26-Jun 100% $

W148 M1-3883 19-Mar 25-Apr 1 PLATE 16 x 1620 x 11800 S355JR sh 3 7,203.00 77 F CIF 1-Apr 11-May 22-Apr 19-May 27-May 11-Jun 100% $

W148 M1-3883 1 PLATE 16 x 1330 x 11800 S355JR sh 3 5,913.00 77 F CIF 1-Apr 11-May 22-Apr 19-May 27-May 11-Jun 100% $

W148 M1-3883 1 PLATE 16 x 200 x 3000 S355JR sh 3 226.00 77 F CIF 1-Apr 11-May 22-Apr 19-May 27-May 11-Jun 100% $

W148 M1-3883 1 PLATE 15 x 1620 x 11800 S355JR sh 2 4,502.00 77 F CIF 1-Apr 11-May 22-Apr 19-May 27-May 11-Jun 100% $

Page 9: Hvc PlatePipe Update)

HVC-PUR 9 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

W148 M1-3883 1 PLATE 15 x 1330 x 11800 S355JR sh 2 3,696.00 77 F CIF 1-Apr 11-May 22-Apr 19-May 27-May 11-Jun 100% $

W148 M1-3883 1 PLATE 15 x 200 x 3000 S355JR sh 2 141.00 77 F CIF 1-Apr 11-May 22-Apr 19-May 27-May 11-Jun 100% $

W148 M1-3883 1 PLATE 15 x 2000 x 11800 S355J2G3 sh 1 2,779.00 77 F CIF 1-Apr 11-May 22-Apr 19-May 27-May 11-Jun 100% $

W148 M1-3883 1 PLATE 15 x 200 x 2000 S355J2G3 sh 1 47.00 77 F CIF 1-Apr 11-May 22-Apr 19-May 27-May 11-Jun 100% $

W148 M1-3883 1 PLATE 15 x 2000 x 7000 S355J2G3 sh 1 1,649.00 77 F CIF 1-Apr 11-May 22-Apr 19-May 27-May 11-Jun 100% $

W148 M1-3883 1 PLATE 15 x 2000 x 4000 S355J2G3 sh 1 942.00 77 F CIF 1-Apr 11-May 22-Apr 19-May 27-May 11-Jun 100% $

W148 M1-3883 1 PLATE 15 x 2000 x 2000 S355J2G3 sh 1 471.00 77 F CIF 1-Apr 11-May 22-Apr 19-May 27-May 11-Jun 100% $

W148 M1-4055 9-Jun 13-Jun 1 PLATE 10 x 1500 x 6000 CT3 sh 8 5,652.00 199 L DDP 10-Jun 13-Jun 15-Jun 30-Jun 100% VND

W148 M1-4055 9-Jun 13-Jun 2 PLATE 12 x 1500 x 6000 CT3 sh 5 4,239.00 199 L DDP 10-Jun 13-Jun 15-Jun 30-Jun 100% VND

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 1 W/D PIPE 25A S/40(OD34.0x3.4)-6 A53-B pc 349 5,382.00 33 F FOB 20-Feb 26-Mar 2-Apr 8-Apr 12-Apr 25-May 100% $/pc

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 2 W/D PIPE 32A S/40(OD42.2 x3.6)- A53-B pc 398 8,286.00 33 F FOB 20-Feb 26-Mar 2-Apr 8-Apr 12-Apr 25-May 100% $/pc

W148 M1-3768 5-Feb 10-Mar 1 W/D PIPE 125A(OD141.3x4.8)-6M STK490 pc 26 2,101.00 33 F FOB 20-Feb 26-Mar 2-Apr 8-Apr 12-Apr 25-May 100% $/pc

W148 M1-3889 23-Mar 30-Apr 1 SQ.Pipe 75 x 75 x 6-11.9M EN 10210 S355J2H pc 3 461.00 74 F CIF 1-Apr 21-Apr 20-Apr 29-Apr 22-May OK 100% $

W148 M1-3889 23-Mar 30-Apr 2 Rec.Pipe 200 x 150 x 6t-11.9M EN 10210 S355J2H pc 6 2,264.00 74 F CIF 1-Apr 21-Apr 20-Apr 29-Apr 22-May OK 100% $

W148 M1-3889 23-Mar 30-Apr 3 Rec.Pipe 300 x 200 x 10t-11.9M EN 10210 S355J2H pc 3 2,678.00 74 F CIF 1-Apr 21-Apr 20-Apr 29-Apr 22-May OK 100% $

W148 M1-3662(R.4) 24-Dec 30-Jan 24-Feb 1 PLATE 2.95 x 1520 x 6000 CT3 sh 13 2,746.00 60 L DDP 1-Mar 7-Mar 3-Mar 29-Mar 100% VND

W148 M1-3662(R.4) 24-Dec 30-Jan 24-Feb 3 PLATE 10 x 1500 x 5960 CT3 sh 7 4,946.00 58 L DDP 1-Mar 4-Mar 22-Mar 29-Mar 100% VND

W148 M1-3662(R.4) 24-Dec 30-Jan 24-Feb 4 PLATE 12 x 2500 x 6100 SM490A/YA sh 20 28,731.00 38 F FOB 23-Feb 19-Mar 17-Mar 26-Mar 30-Mar 100% $

W148 M1-3662(R.4) 24-Dec 30-Jan 24-Feb 5 PLATE 12 x 1500 x 6000 CT3 sh 1 848.00 58 L DDP 1-Mar 4-Mar 6-Mar 19-Mar 100% VND

W148 M1-3662(R.4) 24-Dec 30-Jan 24-Feb 6 PLATE 12 x 2500 x 6100 SM490A/YA sh 15 21,548.00 38 F FOB 23-Feb 19-Mar 17-Mar 26-Mar 30-Mar 100% $

W148 M1-3662(R.4) 24-Dec 30-Jan 24-Feb 10 PLATE 20 x 2500 x 6100 SM490A/YA sh 3 7,183.00 38 F FOB 23-Feb 19-Mar 17-Mar 26-Mar 30-Mar 100% $

W148 M1-3662(R.4) 24-Dec 30-Jan 24-Feb 11 PLATE 25 x 2500 x 6100 SM490A/YA sh 2 5,986.00 38 F FOB 23-Feb 19-Mar 17-Mar 26-Mar 30-Mar 100% $

W148 M1-3662(R.5) 24-Dec 30-Jan 27-Feb 12 PLATE 6 x 1500 x 6000 CT3 sh 17 7,206.00 73 L DDP 8-Mar 11-Mar 23-Mar 29-Mar 100% VND

W148 M1-3662(R.4) 24-Dec 30-Jan 24-Feb 13 CHK'D PLATE 6 x 1500 x 6000 CT3 sh 17 7,665.00 58 L DDP 1-Mar 4-Mar 6-Mar 19-Mar 100% VND

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 1 W/D PIPE CHS 33.7 x 4 EN 1019 S355J2H pc 151 2,655.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 2 W/D PIPE CHS 42.4 x 4 EN 1019 S355J2H pc 202 4,593.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 4 W/D PIPE CHS 114.3 x 6t EN 10210 S355J2H pc 14 2,666.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 5 W/D PIPE CHS 168.3 x 8.0t EN 10210 S355J2H pc 7 2,657.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 6 W/D PIPE CHS 219.1 x 6.3t EN 10210 S355J2H pc 10 3,934.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 7 W/D PIPE CHS 219.1 x 10t EN 10210 S355J2H pc 3 1,857.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 9 SQ.Pipe 100 x 100 x 6.3 EN 10210 S355J2H pc 63 13,120.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 10 120 x 120 x 6.3 EN 10210 S355J2H pc 36 9,168.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 11 SQ.Pipe 150 x 150 x 6.3 EN 10210 S355J2H pc 36 11,738.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 12 SQ.Pipe 180 x 180 x 6.3 EN 10210 S355J2H pc 11 4,359.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 13 SQ.Pipe 200 x 200 x 6.3 EN 10210 S355J2H pc 49 21,691.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 14 SQ.Pipe 200 x 200 x 8 EN 10210 S355J2H pc 31 17,154.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 15 SQ.Pipe 250 x 250 x 10 EN 10210 S355J2H pc 1 865.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 16 SQ.Pipe 350 x 350 x 12.5 EN 10210 S355J2H pc 1 1,559.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 17 Rec.Pipe 200 x 150 x 9t EN 10210 S355J2H pc 6 3,234.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 18 Rec.Pipe 250 x 150 x 6.3-6M EN 10210 S355J2H pc 3 1,328.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 19 Rec.Pipe 300 x 200 x 6.0-6M EN 10210 S355J2H pc 4 2,152.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 20 Rec.Pipe 300 x 200 x 10t EN 10210 S355J2H pc 1 865.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 21 Rec.Pipe 400 x 200 x 10t-6M EN 10210 S355J2H pc 9 9,468.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3664(R.2) 24-Dec 30-Jan 12-Jan 22 Rec.Pipe 400 x 200 x 10t-6M EN 10210 S355J2H pc 13 13,675.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3717 19-Jan 28-Feb 1 SQ.Pipe 100 x 100 x 6.3 STK490 pc 9 1,874.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3717 19-Jan 28-Feb 2 SQ.Pipe 200 x 200 x 10 STK490 pc 5 3,392.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3717 19-Jan 28-Feb 3 Rec.Pipe 300 x 200 x 10t STKR490 pc 7 6,056.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

Page 10: Hvc PlatePipe Update)

HVC-PUR 10 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

W148 M1-3717 19-Jan 28-Feb 4 Rec.Pipe 400 x 200 x 10t-6M STKR490 pc 2 2,104.00 15 F CIF 19-Jan 15-Apr 10-Mar 17-Mar 3-Apr L/C $

W148 M1-3718(R.2) 19-Jan 28-Feb 27-Jan 1 PLATE 12 x 2500 x 6100 SM490A sh 2 2,873.00 38 F FOB 23-Feb 19-Mar 17-Mar 26-Mar 30-Mar 100% $

W148 M1-3718(R.2) 19-Jan 28-Feb 27-Jan 2 PLATE 16 x 2500 x 6100 SM490A sh 1 1,915.00 38 F FOB 23-Feb 19-Mar 17-Mar 26-Mar 30-Mar 100% $

W148 M1-3718(R.2) 19-Jan 28-Feb 2-Apr 3 PLATE 20 x 2500 x 6100 SM490A/YA sh 6 14,366.00 38 F FOB 23-Feb 19-Mar 17-Mar 26-Mar 30-Mar 100% $

W148 M1-3718(R.2) 19-Jan 28-Feb 2-Apr 4 PLATE 25 x 2500 x 6100 SM490A/YA sh 5 14,964.00 38 F FOB 23-Feb 19-Mar 17-Mar 26-Mar 30-Mar 100% $

Seraya Tanks/A149

A149 M1-3838 3-Mar 10-Mar 1 W/D PIPE 32A(OD42.5 x 3.1)-6M BPE-BSM(SGP) pc 22 398.00 69 L Ex-W 6-Mar 9-Mar 9-Mar 29-Mar 100% VND

IN AMENAS/A152

A152 M1-4031 1-Jun 2-Jun 1 SMLS PIPE (OD16x2.0)-6.3M SUS304 pc 3 13.00 192 L DDP 3-Jun 3-Jun 3-Jun 30-Jun 100% VND

M-HRSG/A155

A155 M1-3933 12-Apr 25-Apr 1 W/D PIPE 80A(89.1 x 4.2t)-6M SGP pc 8 422.00 83 F FOB 14-Apr 29-Apr 8-Jun 22-Jun 9-Jul 15-Jul 100% $

A155 M1-3933 12-Apr 25-Apr 2 W/D PIPE 90A(101.6x4.2)-6M SGP pc 20 1,212.00 83 F FOB 14-Apr 29-Apr 8-Jun 22-Jun 9-Jul 15-Jul 100% $

A155 M1-3933 12-Apr 25-Apr 3 W/D PIPE 125A(OD139.8x4.5)-6M SGP pc 30 2,700.00 83 F FOB 14-Apr 29-Apr 8-Jun 22-Jun 9-Jul 15-Jul 100% $

A155 M1-3897 29-Mar 31-Mar 1 PLATE 2.8 x 1280 x Coil SUS304 kg 1,110.00 105 L DDP 31-Mar 3-Apr 3-Apr 17-May 100% VND

A155 M1-3934 14-Apr 1 PLATE 0.5 x 1000 x 2000 CT3 sh 3 24.00 FOR L DDP 14-Apr 16-Apr 14-Apr 100% VND

A155 M1-3934 14-Apr 2 PLATE 1 x 2060 x 3000 CT3 sh 2 97.00 FOR L DDP 14-Apr 16-Apr 14-Apr 100% VND

A155 M1-3934 14-Apr 3 PLATE 32 x 2070 x 4200 SS400 sh 1 2,184.00 136 L DDP 15-Apr 18-Apr 19-Apr 100% VND

A155 M1-3758 4-Feb 25-Feb 1 PLATE 1 x 1219 x 2438 SUS304 sh 36 839.00 57 L DDP 27-Feb 8-Mar 9-Mar 18-Mar 100% VND

A155 M1-3758 4-Feb 25-Feb 2 PLATE 1.5 x 1219 x 2438 SUS304 sh 166 5,818.00 57 L DDP 27-Feb 8-Mar 9-Mar 18-Mar 100% VND

A155 M1-3758 4-Feb 25-Feb 3 PLATE 3 x 1219 x 2438 SUS304 sh 18 1,273.00 65 L DDP 5-Mar 10-Mar 9-Mar 18-Mar 100% VND

A155 M1-3736 30-Jan 5-Mar 4-Feb 1 W/D PIPE 25A(OD33.8x3.1)-6M BPE-BSM(SGP) pc 105 1,479.00 31 L Ex-W 6-Feb 8-Feb 11-Feb 100% VND

A155 M1-3736 30-Jan 5-Mar 4-Feb 2 W/D PIPE 32A(OD42.5 x 3.1)-6M BPE-BSM(SGP) pc 110 1,988.00 31 L Ex-W 6-Feb 8-Feb 11-Feb 100% VND

A155 M1-3736 30-Jan 5-Mar 4-Feb 3 W/D PIPE 32A(OD42.7 x 3.6)-6M SUS304 pc 2 42.00 27 F FOB 6-Feb 6-Mar 27-Feb 5-Mar 10-Mar 19-Mar 100% $/pc

A155 M1-3736 30-Jan 5-Mar 4-Feb 4 W/D PIPE 50A(OD60.5 x 4.0)-6M SUS304 pc 2 65.00 27 F FOB 6-Feb 6-Mar 27-Feb 5-Mar 10-Mar 19-Mar 100% $/pc

A155 M1-3736(R.1) 30-Jan 5-Mar 4-Feb 4a W/D PIPE 65A(OD76.3 x 5.2)-6M SUS304 pc 1 55.00 27 F FOB 6-Feb 6-Mar 27-Feb 5-Mar 10-Mar 19-Mar 100% $/pc

A155 M1-3736(R.1) 30-Jan 5-Mar 4-Feb 5 W/D PIPE 80A(OD88.8 x 4.0)-6M BPE-BSM(SGP) pc 6 301.00 31 L Ex-W 6-Feb 8-Feb 11-Feb 100% VND

A155 M1-3736 30-Jan 5-Mar 4-Feb 6 W/D PIPE 100A S/40(OD114.3 x 6. SUS304 pc 2 192.00 27 F FOB 6-Feb 6-Mar 27-Feb 5-Mar 10-Mar 19-Mar 100% $/pc

A155 M1-3736(R.1) 30-Jan 5-Mar 4-Feb 6a W/D PIPE 125A(OD139.8 x 6.6)-6M SUS304 pc 1 130.00 27 F FOB 6-Feb 6-Mar 27-Feb 5-Mar 10-Mar 19-Mar 100% $/pc

A155 M1-3736(R.1) 30-Jan 5-Mar 4-Feb 7 W/D PIPE 150A S/40(OD165.2x7.1) SUS304 pc 1 166.00 27 F FOB 6-Feb 6-Mar 27-Feb 5-Mar 10-Mar 19-Mar 100% $/pc

A155 M1-3737(R.3) 30-Jan 5-Mar 24-Feb 1 PLATE 4 x 1500 x 6000 SS400 sh 24 6,782.00 41 L DDP 12-Feb 14-Feb 17/2, 23/3 29-Mar 100% VND

A155 M1-3737(R.3) 30-Jan 5-Mar 24-Feb 2 PLATE 6 x 1530 x 6000 SS400 sh 175 74,183.00 41 L DDP 12-Feb 14-Feb 17-Feb 29-Mar 100% VND

A155 M1-3737(R.3) 30-Jan 5-Mar 24-Feb 5a PLATE 16 x 1500 x 6000 SS400 sh 2 2,261.00 40 L DDP 13-Feb 18-Feb 17-Feb 29-Mar 100% VND

W165

W165 M1-3993 14-May 1 PLATE 4.5 x 1500 x 6000 CT3 sh 9 2,861.00 168 L DDP 14-May 17-May 14-May 21-May 100% VND

FT-4/A187

A187 M1-6743 6-Oct 9-Oct 1 Plate 3 x 1500 x 3000 A240-304 sh 14 1,498.00 634 L DDP 11-Oct 16-Oct 16-Oct 10-Nov 100% VND

A187 M1-6505 3-Aug 13-Aug 1 Plate 3 x 1219 x 2438 SUS304 sh 24 1,697.00 485 L DDP 7-Aug 9-Aug 8-Aug 14-Aug 100% VND

A187 M1-6300 1 W/D Pipe OD33.4 x t3.78-6.1M A312-304 pc 5 85.00 330 L DDP 22-Jun 25-Jun 24-Jun 11-Jul 100% $

A187 M1-6094 1 Plate 3 x 1250 x 2438 SUS304 sh 6 435.00 266 L DDP 12-May 19-May 10-Jun 100% VND

A187 M1-5942 6-Apr 25-Apr 1 W/D Pipe 1-1/2" S/80(OD48.6 x t5. SUS304 pc 2 64.00 106 F CFR 13-Apr 25-Apr 2-May 12-May 18-May 1-Jun 100% $

A187 M1-5311 12-Sep 30-Sep 1 W/D PIPE 32A (OD42.7 x 5.1) -6M STPG370 pc 10 284.00 210 F CFR 16-Sep 26-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $/pc

A187 W-4868 29-Apr ASAP 1 Tensile/Bend Test Plate sh 96 171 L Ex-w 100% VND

A187 M1-4822 14-Apr 30-Apr 1 PLATE 3 x 1290 x 2438 SUS304 sh 77 5,761.00 145 L DDP 16-Apr 23-Apr 21-Apr OK 100% VND

A187 M1-4822 14-Apr 30-Apr 2 PLATE 2.5 x 1270 x 2500 CT3 sh 3 187.00 150 L Ex-w 18-Apr 21-Apr OK VND

A187 M1-4745 29-Mar 20-Apr 1 W/D PIPE 25A (OD34.0x3.2)-6M SPP pc 80 1,167.00 60 F CFR 6-Apr 21-Apr 15-Apr 20-Apr 26-Apr 10-May 100% $/pc

A187 M1-4745 29-Mar 20-Apr 2 W/D PIPE 32A (OD42.7x4.9)-6M SPPS38 pc 8 227.00 60 F CFR 6-Apr 21-Apr 15-Apr 20-Apr 26-Apr 10-May 100% $/pc

A187 M1-4615(R.1) 14-Feb 20-Mar 1 PLATE 6 x 1524 x 6096 SS400 sh 10 4,376.00 29 F FOB 22-Feb 4-Mar 17-Mar 28-Mar 30-Mar OK 100% $

Page 11: Hvc PlatePipe Update)

HVC-PUR 11 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A187 M1-4615(R.1) 14-Feb 20-Mar 2 PLATE 9 x 1524 x 6096 SS400 sh 3 1,969.00 29 F FOB 22-Feb 4-Mar 17-Mar 28-Mar 30-Mar OK 100% $

A187 M1-4615(R.1) 14-Feb 20-Mar 1 PLATE 2 x 1524 x 6096 SUS304 sh 3 442.00 30 F FOB 22-Feb 10-Mar 17-Mar 28-Mar 30-Mar 21-Apr 100% $

A187 M1-4615(R.1) 14-Feb 20-Mar 2 PLATE 3 x 1524 x 6096 SUS304 sh 5 1,105.00 30 F FOB 22-Feb 10-Mar 17-Mar 28-Mar 30-Mar 21-Apr 100% $

A187 M1-4615(R.1) 14-Feb 20-Mar 3 PLATE 6 x 1524 x 6096 SUS304 sh 13 5,746.00 30 F FOB 22-Feb 10-Mar 17-Mar 28-Mar 30-Mar 21-Apr 100% $

A187 M1-4615(R.1) 14-Feb 20-Mar 4 PLATE 9 x 1219 x 6096 SUS304 sh 1 530.00 30 F FOB 22-Feb 10-Mar 17-Mar 28-Mar 30-Mar 21-Apr 100% $

A187 M1-4615(R.1) 14-Feb 20-Mar 5 PLATE 10 x 1219 x 3048 SUS304 sh 2 589.00 30 F FOB 22-Feb 10-Mar 17-Mar 28-Mar 30-Mar 21-Apr 100% $

A187 M1-4615(R.1) 14-Feb 20-Mar 6 PLATE 12 x 1219 x 2438 SUS304 sh 9 2,545.00 30 F FOB 22-Feb 10-Mar 17-Mar 28-Mar 30-Mar 21-Apr 100% $

DINH VU2/S172

S172 M1-4385 21-Oct 25-Nov 1 W/D PIPE 200A S/80(OD219.1x12.7 A53-B pc 2 773.00 224 F FOB 1-Nov 26-Nov 3-Dec 8-Dec 10-Dec 100% $

S172 M1-4315 16-Sep 15-Oct 1 W/D PIPE 32A S/40(OD42.2x3.56)- A53-B pc 48 976.00 196 F FOB 21-Sep 21-Oct 2-Dec 10-Dec 21-Dec 100% $

S172 M1-4315 16-Sep 15-Oct 2 W/D PIPE 65A S/40(OD73x5.16)-6 A53-B pc 1 52.00 196 F FOB 21-Sep 21-Oct 2-Dec 10-Dec 21-Dec 100% $

S172 M1-4315 16-Sep 15-Oct 3 W/D PIPE 65A S/80(OD73 x 7.01)- A53-B pc 1 69.00 196 F FOB 21-Sep 21-Oct 2-Dec 10-Dec 21-Dec 100% $

S172 M1-4315 16-Sep 15-Oct 4 W/D PIPE 4" S/80(OD114.3x8.56)- A53-B pc 8 1,071.00 196 F FOB 21-Sep 21-Oct 2-Dec 10-Dec 21-Dec 100% $

S172 M1-4315 16-Sep 15-Oct 6 W/D PIPE 400A S/60(OD406.4x16.6 A53-B pc 3 2,882.00 196 F FOB 21-Sep 21-Oct 2-Dec 10-Dec 21-Dec 100% $

S172 M1-4270(R.3) 24-Aug 23-Sep 6-Sep 2 PLATE 28 x 1219 x 12000 SS400 sh 2 6,430.00 192 F CFR 9-Sep 15-Oct 31-Oct 18-Nov 22-Nov L/C $

S172 M1-4270(R.3) 24-Aug 23-Sep 6-Sep 3 PLATE 10 x 2260 x 12000 SM490B sh 4 8,520.00 192 F CFR 9-Sep 15-Oct 31-Oct 18-Nov 22-Nov L/C $

S172 M1-4270(R.3) 24-Aug 23-Sep 6-Sep 4 PLATE 12 x 2250 x 6096 SM490B sh 6 7,750.00 192 F CFR 9-Sep 15-Oct 31-Oct 18-Nov 22-Nov L/C $

S172 M1-4270(R.3) 24-Aug 23-Sep 6-Sep 5 PLATE 15 x 2250 x 12000 SM490B sh 6 19,070.00 192 F CFR 9-Sep 15-Oct 31-Oct 18-Nov 22-Nov L/C $

S172 M1-4270(R.3) 24-Aug 23-Sep 6-Sep 6 PLATE 18 x 2250 x 12000 SM490B sh 8 30,520.00 192 F CFR 9-Sep 15-Oct 31-Oct 18-Nov 22-Nov L/C $

S172 M1-4270(R.3) 24-Aug 23-Sep 6-Sep 7 PLATE 20 x 2250 x 6096 SM490B sh 8 17,220.00 192 F CFR 9-Sep 15-Oct 31-Oct 18-Nov 22-Nov L/C $

S172 M1-4270(R.3) 24-Aug 23-Sep 6-Sep 8 PLATE 25 x 2250 x 6096 SM490B sh 2 5,380.00 192 F CFR 9-Sep 15-Oct 31-Oct 18-Nov 22-Nov L/C $

S172 M1-4270(R.3) 24-Aug 23-Sep 6-Sep 9 PLATE 30 x 1524 x 6096 SM490B sh 2 4,380.00 192 F CFR 9-Sep 15-Oct 31-Oct 18-Nov 22-Nov L/C $

S172 M1-4270(R.3) 24-Aug 23-Sep 6-Sep 1 CHK'D PLATE 6 x 1219 x 2438 SS400 sh 6 870.00 189 F FOB 10-Sep 17-Sep 22-Sep 29-Sep 4-Oct 100% $

S172 M1-4270(R.3) 23-Sep 6-Sep 1a PLATE 6 x 1524 x 6096 SS400 sh 4 1,752.00 189 F FOB 10-Sep 17-Sep 22-Sep 29-Sep 4-Oct 100% $

S172 M1-4270(R.3) 23-Sep 6-Sep 1b PLATE 6 x 1524 x 6096 SS400 sh 4 1,752.00 189 F FOB 10-Sep 17-Sep 22-Sep 29-Sep 4-Oct 100% $

DINH VU3/S174

S174 M1-5347(R.1) 29-Sep 25-Oct 3-Oct 1 PLATE 5 x 1524 x 6096 SS400 sh 3 1,094.00 227 F CFR 4-Oct 30-Nov 4-Dec 27-Dec 29-Dec 10-Jan 100% $

S174 M1-5347(R.1) 29-Sep 25-Oct 3-Oct 2 PLATE 8 x 2250 x 6096 SS400 sh 2 1,723.00 227 F CFR 4-Oct 30-Nov 4-Dec 27-Dec 29-Dec 10-Jan 100% $

S174 M1-5347(R.1) 29-Sep 25-Oct 3-Oct 3 PLATE 10 x 2250 x 6096 SS400 sh 1 1,077.00 227 F CFR 4-Oct 30-Nov 4-Dec 27-Dec 29-Dec 10-Jan 100% $

S174 M1-5347(R.1) 29-Sep 25-Oct 3-Oct 4 PLATE 8 x 2250 x 6096 SM490B sh 2 1,723.00 227 F CFR 4-Oct 30-Nov 4-Dec 27-Dec 29-Dec 10-Jan 100% $

S174 M1-5347(R.1) 29-Sep 25-Oct 3-Oct 5 PLATE 10 x 2250 x 12000 SM490B sh 7 14,840.00 227 F CFR 4-Oct 30-Nov 4-Dec 27-Dec 29-Dec 10-Jan 100% $

S174 M1-5347(R.1) 29-Sep 25-Oct 3-Oct 6 PLATE 12 x 2250 x 12000 SM490B sh 4 10,174.00 227 F CFR 4-Oct 30-Nov 4-Dec 27-Dec 29-Dec 10-Jan 100% $

S174 M1-5347(R.1) 29-Sep 25-Oct 3-Oct 7 PLATE 15 x 2250 x 12000 SM490B sh 7 22,255.00 227 F CFR 4-Oct 30-Nov 4-Dec 27-Dec 29-Dec 10-Jan 100% $

S174 M1-5347(R.1) 29-Sep 25-Oct 3-Oct 8 PLATE 18 x 2000 x 10000 SM490B sh 9 25,434.00 227 F CFR 4-Oct 30-Nov 4-Dec 27-Dec 29-Dec 10-Jan 100% $

S174 M1-5347(R.1) 29-Sep 25-Oct 3-Oct 9 PLATE 19 x 1219 x 6500 SM490B sh 2 2,364.00 227 F CFR 4-Oct 30-Nov 4-Dec 27-Dec 29-Dec 10-Jan 100% $

S174 M1-5347(R.1) 29-Sep 25-Oct 3-Oct 10 PLATE 20 x 2250 x 12000 SM490B sh 5 21,195.00 227 F CFR 4-Oct 30-Nov 4-Dec 27-Dec 29-Dec 10-Jan 100% $

S174 M1-5347(R.1) 29-Sep 25-Oct 3-Oct 11 PLATE 25 x 2250 x 6096 SM490B sh 3 8,075.00 227 F CFR 4-Oct 30-Nov 4-Dec 27-Dec 29-Dec 10-Jan 100% $

S174 M1-5347(R.1) 25-Oct 3-Oct 12 PLATE 9 x 1219 x 12000 SM490B sh 1 1,033.00 227 F CFR 4-Oct 30-Nov 4-Dec 27-Dec 29-Dec 10-Jan 100% $

S174 M1-5345 29-Sep 27-Oct 1 W/D PIPE 20A S/40(OD26.7xt2.87) A53-B pc 35 355.00 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S174 M1-5345 29-Sep 27-Oct 2 W/D PIPE 32A S/40(OD42.2x3.56)- A53-B pc 50 1,017.00 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S174 M1-5345 29-Sep 27-Oct 3 W/D PIPE 40A S/80 (OD48.3x5.08) A53-B pc 1 32.00 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S174 M1-5345 29-Sep 27-Oct 4 W/D PIPE 65A S/80 (OD73x7.01) - A53-B pc 1 62.00 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S174 M1-5345 29-Sep 27-Oct 5 W/D PIPE 4" S/40(OD114.3xt6.02)-6M A53-B pc 4 129.00 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S174 M1-5345 29-Sep 27-Oct 6 W/D PIPE 4" S/80(OD114.3x8.56)- A53-B pc 7 937.00 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S174 M1-5345 29-Sep 27-Oct 7 W/D PIPE 8" S/40(OD219.1 x8.18)- A53-B pc 1 200.00 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S174 M1-5345 29-Sep 27-Oct 10 SQ.PIPE 60 x 30 x 3.2 - 6M STKR400 pc 4 96.00 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S174 M1-5345 29-Sep 27-Oct 8 W/D PIPE 250A S/60(OD273.1x12.7) S355J2H pc 2 1,912.00 224 F CFR 1-Oct 8-Oct 8-Oct 19-Oct 27-Oct a 9-Nov 100% $/T

S174 M1-5345 29-Sep 27-Oct 9 W/D PIPE 400A S/40(OD406.4x12.7) S355J2H pc 2 2,890.00 224 F CFR 1-Oct 8-Oct 8-Oct 19-Oct 27-Oct a 9-Nov 100% $/T

Page 12: Hvc PlatePipe Update)

HVC-PUR 12 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

S174 M1-4278(R.1) 26-Aug 28-Sep 6-Oct 3 PLATE 6 x 1524 x 6096 SS400 sh 6 2,625.00 209 F CFR 11-Oct 1-Dec 14-Dec 28-Dec 31-Dec 100% $

S174 M1-4278(R.1) 26-Aug 28-Sep 6-Oct 4 PLATE 10 x 2260 x 12000 SM490B sh 4 8,520.00 209 F CFR 11-Oct 1-Dec 14-Dec 28-Dec 31-Dec 100% $

S174 M1-4278(R.1) 26-Aug 28-Sep 6-Oct 5 PLATE 12 x 2250 x 6096 SM490B sh 3 3,880.00 209 F CFR 11-Oct 1-Dec 14-Dec 28-Dec 31-Dec 100% $

S174 M1-4278(R.1) 26-Aug 28-Sep 6-Oct 6 PLATE 15 x 2250 x 12000 SM490B sh 6 19,080.00 209 F CFR 11-Oct 1-Dec 14-Dec 28-Dec 31-Dec 100% $

S174 M1-4278(R.1) 26-Aug 28-Sep 6-Oct 7 PLATE 16 x 1219 x 12000 SM490B sh 2 3,670.00 209 F CFR 11-Oct 1-Dec 14-Dec 28-Dec 31-Dec 100% $

S174 M1-4278(R.1) 26-Aug 28-Sep 6-Oct 8 PLATE 18 x 2250 x 12000 SM490B sh 8 30,520.00 209 F CFR 11-Oct 1-Dec 14-Dec 28-Dec 31-Dec 100% $

S174 M1-4278(R.1) 26-Aug 28-Sep 6-Oct 9 PLATE 20 x 2250 x 6096 SM490B sh 7 15,070.00 209 F CFR 11-Oct 1-Dec 14-Dec 28-Dec 31-Dec 100% $

S174 M1-4278(R.1) 26-Aug 28-Sep 6-Oct 10a PLATE 25 x 2250 x 6096 SM490B sh 1 2,692.00 209 F CFR 11-Oct 1-Dec 14-Dec 28-Dec 31-Dec 100% $

S174 M1-4278(R.1) 26-Aug 28-Sep 6-Oct 10b PLATE 25 x 2250 x 12000 SM490B sh 2 10,598.00 209 F CFR 11-Oct 1-Dec 14-Dec 28-Dec 31-Dec 100% $

S174 M1-4278(R.1) 26-Aug 28-Sep 6-Oct 11 PLATE 30 x 1524 x 6096 SM490B sh 2 4,380.00 209 F CFR 11-Oct 1-Dec 14-Dec 28-Dec 31-Dec 100% $

S174 M1-4278(R.1) 26-Aug 28-Sep 6-Oct 1 CHK'D PLATE 6 x 1219 x 2438 SS400 sh 6 870.00 211 F FOB 12-Oct 1-Nov 2-Dec 10-Dec 12-Dec 100% $

S174 M1-4278(R.1) 26-Aug 28-Sep 6-Oct 2 PLATE 6 x 1524 x 6096 SS400 sh 4 1,750.00 211 F FOB 12-Oct 1-Nov 2-Dec 10-Dec 12-Dec 100% $

Cat Lai/S147

S147 M1-3766 5-Feb 30-Mar 1 PLATE 45 x 1400 x 4200 S355J2G3 sh 1 2,077.00 29 F CIF 12-Feb 30-Mar 21-Apr 100% EUR

S147 M1-3766 5-Feb 30-Mar 2 PLATE 50 x 2200 x 3500 S355J2G3 sh 2 6,045.00 29 F CIF 12-Feb 30-Mar 21-Apr 100% EUR

S147 M1-3766 5-Feb 30-Mar 3 PLATE 60 x 1400 x 3000 S355J2G3 sh 1 1,978.00 29 F CIF 12-Feb 30-Mar 21-Apr 100% EUR

S147 M1-3766 5-Feb 30-Mar 4 PLATE 70 x 2100 x 5400 S355J2G3 sh 1 6,231.00 29 F CIF 12-Feb 30-Mar 21-Apr 100% EUR

S147 M1-3473(R.4) 15-Oct 14-Nov 19-Nov 2 PLATE 100 x 2200 x 4100 S355J2G3 sh 1 7,081.00 9 F CIF 1-Dec 25-Feb 9-Mar 2-Apr 100% EUR

S147 M1-3473(R.4) 7-Nov 14-Nov 19-Nov 3 PLATE 160 x 1700 x 1900 S355J2G3 sh 1 4,057.00 9 F CIF 1-Dec 25-Feb 9-Mar 2-Apr 100% EUR

S147 M1-3455(R.9) 27-Oct 5-Dec 26-Nov 6 PLATE 8 x 2438 x 6096 SM490B sh 127 118,618.00 57 F Ex-W 16-Mar 17-Mar 17-Mar 26-Mar 2-Apr 100% $

Dinh Vu, C.V, HP port/S154

S154 M1-3834 2-Mar 15-Feb 1 PLATE 5 x 1500 x 6000 CT3 sh 3 1,060.00 58 L DDP 3-Mar 6-Mar 6-Mar 19-Mar 100% VND

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 18 PLATE 10 x 1525 x 6096 SM490B sh 33 24,082.00 46 F FOB 4-Mar 24-Mar 14-Apr 19-Apr 24-Apr 10-May 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 11 W/D PIPE 20A S/40(OD26.7xt2.87) A53-B pc 84 852.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 12 W/D PIPE 32A S/40(OD42.2x3.56)- A53-B pc 146 2,970.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 13 W/D PIPE 40A S/80(OD48.3 x 5.08) A53-B pc 1 33.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 14 W/D PIPE 65A S/40(OD73x5.16)-6 A53-B pc 1 52.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 15 W/D PIPE 65A S/80(OD73 x 7.01)- A53-B pc 1 69.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 16 W/D PIPE 4" S/40(OD114.3xt6.02)-6M A53-B pc 11 1,061.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 17 W/D PIPE 4" S/80(OD114.3x8.56)- A53-B pc 20 2,678.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 18 W/D PIPE 6" S/80(OD168.3 x10.97) A53-B pc 1 255.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 19 W/D PIPE 8" S/40(OD219.1 x8.18)- A53-B pc 4 1,021.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 20 W/D PIPE 250A S/40(OD273.1x 9.2 A53-B pc 1 181.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 21 SMLS PIPE 250A S/80(OD273.1 x 15 A53-B pc 1 192.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 22 W/D PIPE 400A S/60(OD406.4x16.6 A53-B pc 4 3,843.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 22 W/D PIPE 400A (OD406.4 x 16.66) A53-B pc 3 5,284.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3676(R.2) 29-Dec 20-Feb 2-Mar 23 W/D PIPE 400A S/40(OD406.4 x 12 A53-B pc 10 4,932.00 47 F FOB 4-Mar 19-Mar 19-Mar 24-Mar 31-Mar 100% $

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 1 CHK'D PLATE 5 x 1500 x 6000 CT3 sh 4 1,521.00 58 L DDP 1-Mar 4-Mar 6-Mar 19-Mar 100% VND

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 3 PLATE 2.95 x 1520 x 6000 CT3 sh 1 211.00 60 L DDP 1-Mar 7-Mar 3-Mar 29-Mar 100% VND

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 4 PLATE 4.05 x 1510 x 6000 CT3 sh 1 288.00 60 L DDP 1-Mar 7-Mar 3-Mar 29-Mar 100% VND

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 5 PLATE 5 x 1500x 6000 CT3 sh 11 3,886.00 58 L DDP 1-Mar 4-Mar 6-Mar 19-Mar 100% VND

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 6 PLATE 6 x 1524 x 6096 SS400 sh 17 7,439.00 41 F FOB 25-Feb 5-Mar 17-Mar 26-Mar 30-Mar 100% $

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 7 PLATE 9 x 2500 x 6100 SM490A sh 22 23,703.00 41 F FOB 25-Feb 5-Mar 17-Mar 26-Mar 30-Mar 100% $

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 8 PLATE 10 x 1500 x 5960 CT3 sh 3 2,120.00 58 L DDP 1-Mar 4-Mar 22-Mar 29-Mar 100% VND

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 10 PLATE 16 x 2500 x 6100 SM490A sh 34 65,124.00 41 F FOB 25-Feb 5-Mar 17-Mar 26-Mar 30-Mar 100% $

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 11 PLATE 19 x 2500 x 6100 SM490A sh 52 118,276.00 41 F FOB 25-Feb 5-Mar 17-Mar 26-Mar 30-Mar 100% $

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 12 PLATE 20 x 2500 x 6100 SM490A sh 24 57,462.00 41 F FOB 25-Feb 5-Mar 17-Mar 26-Mar 30-Mar 100% $

Page 13: Hvc PlatePipe Update)

HVC-PUR 13 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 13 PLATE 28.3 x 2955 x 4160 CT3 sh 1 2,734.00 60 L DDP 1-Mar 7-Mar 3-Mar 29-Mar 100% VND

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 13 PLATE 27.8 x 2780 x 10000 CT3 sh 1 6,067.00 60 L DDP 1-Mar 7-Mar 3-Mar 29-Mar 100% VND

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 14 PLATE 25 x 2500 x 6100 SM490A sh 11 32,921.00 41 F FOB 25-Feb 5-Mar 17-Mar 26-Mar 30-Mar 100% $

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 15 PLATE 30 x 1570 x 6096 SM490A sh 6 13,523.00 41 F FOB 25-Feb 5-Mar 17-Mar 26-Mar 30-Mar 100% $

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 19 PLATE 12 x 2500 x 6100 SM490A sh 15 21,548.00 41 F FOB 25-Feb 5-Mar 17-Mar 26-Mar 30-Mar 100% $

S154 M1-3631(R.2) 12-Dec 20-Feb 25-Feb 23 PLATE 22 x 2500 x 6100 SM490A sh 2 5,267.00 41 F FOB 25-Feb 5-Mar 17-Mar 26-Mar 30-Mar 100% $

CAT LAI NEW/S168

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 7 W/D PIPE 5" S/80(OD141.3x9.52)- A53-B pc 8 2,970.00 204 F FOB 4-Oct 3-Dec 23-Dec 31-Dec 5-Jan 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 9 W/D PIPE 8" S/40(OD219.1x8.18)- A53-B pc 12 6,127.00 204 F FOB 4-Oct 3-Dec 23-Dec 31-Dec 5-Jan 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 12a SMLS PIPE 300A S/80 (OD323.9xt17 A53-B pc 16 12,680.00 204 F FOB 4-Oct 3-Dec 23-Dec 31-Dec 5-Jan 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 13 W/D PIPE 500A STD(OD508x9.52)- A53-B pc 9 12,638.00 204 F FOB 4-Oct 3-Dec 23-Dec 31-Dec 5-Jan 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 14 W/D PIPE 24" STD(OD609.6x9.52) A53-B pc 12 20,287.00 204 F FOB 4-Oct 3-Dec 23-Dec 31-Dec 5-Jan 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 15 W/D PIPE A53-B pc 3 9,189.00 204 F FOB 4-Oct 3-Dec 23-Dec 31-Dec 5-Jan 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 12b SMLS PIPE 300A S/80 (OD323.8xt17 API5L-B pc 32 25,352.00 451 L Ex-w 20-Dec 27-Dec 8-Jan 8-Jan 100% VND

S168 M1-4381 19-Oct 25-Nov 1 W/D PIPE 6" S/40(OD168.3xt7.11)- A53-B pc 19 3,221.00 218 F FOB 27-Oct 11-Nov 2-Dec 10-Dec 21-Dec OK 100% $

S168 M1-4381 19-Oct 25-Nov 2 W/D PIPE 6" S/80(OD168.3x10.97) A53-B pc 16 8,172.00 218 F FOB 27-Oct 11-Nov 2-Dec 10-Dec 21-Dec OK 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 1 W/D PIPE 20A S/40(OD26.7x2.87)- API5L-B pc 270 2,738.00 201 F FOB 1-Oct 31-Oct 20-Oct 30-Oct 3-Nov 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 2 W/D PIPE 32A S/40(OD42.2x3.56)- API5L-B pc 250 5,085.00 201 F FOB 1-Oct 31-Oct 20-Oct 30-Oct 3-Nov 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 3 W/D PIPE 50A S/40(OD60.3x3.9)-6 API5L-B pc 10 326.00 201 F FOB 1-Oct 31-Oct 20-Oct 30-Oct 3-Nov 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 4 W/D PIPE 65A S/80(OD73 x 7.01)- API5L-B pc 2 137.00 201 F FOB 1-Oct 31-Oct 20-Oct 30-Oct 3-Nov 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 5 W/D PIPE 80A S/80(OD88.9x7.62)- API5L-B pc 2 183.00 201 F FOB 1-Oct 31-Oct 20-Oct 30-Oct 3-Nov 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 6 W/D PIPE 100A S/80(OD114.3x8.56 API5L-B pc 3 402.00 201 F FOB 1-Oct 31-Oct 20-Oct 30-Oct 3-Nov 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 8 W/D PIPE 150A S/40(OD168.3x7.11 API5L-B pc 3 509.00 201 F FOB 1-Oct 31-Oct 20-Oct 30-Oct 3-Nov 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 10 W/D PIPE 200A S/80(OD219.1x12.7 API5L-B pc 2 776.00 201 F FOB 1-Oct 31-Oct 20-Oct 30-Oct 3-Nov 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 11 W/D PIPE 250A S/40(OD273.1x 9.2 API5L-B pc 1 362.00 201 F FOB 1-Oct 31-Oct 20-Oct 30-Oct 3-Nov 100% $

S168 M1-4332(R.1) 22-Sep 22-Oct 23-Sep 16 SQ.Pipe 75 x 75 x 4.5-6M STK490 pc 25 1,433.00 201 F FOB 1-Oct 31-Oct 20-Oct 30-Oct 3-Nov 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 1 PLATE 5 x 1524 x 6096 SS400 sh 31 11,315.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 2 PLATE 8 x 2438 x 6096 SS400 sh 23 21,459.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 3 PLATE 10 x 2438 x 6096 SS400 sh 4 4,668.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 4 PLATE 12 x 2438 x 6096 SS400 sh 4 5,600.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 5 PLATE 8 x 2438 x 6096 SM490B sh 2 1,866.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 6 PLATE 8 x 2438 x 6096 SM490B sh 127 118,491.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 7 PLATE 10 x 2438 x 12192 SM490B sh 106 247,298.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 8 PLATE 10 x 2438 x 6096 SM490B sh 22 25,674.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 9 PLATE 12 x 2438 x 6096 SM490B sh 48 67,200.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 10 PLATE 12 x 1524 x 12192 SM490B sh 48 84,000.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 11 PLATE 15 x 2438 x 6096 SM490B sh 76 133,000.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 2 PLATE 18 x 2438 x 6096 SM490B sh 6 12,600.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 3 PLATE 20 x 2438 x 6096 SM490B sh 10 23,330.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 4 PLATE 21 x1829 x12192 SM490B sh 20 73,520.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 5 PLATE 23 x 2438 x 6096 SM490B sh 4 10,732.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 6 PLATE 25 x 2438 x 6096 SM490B sh 4 11,668.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 7 PLATE 30 x 2438 x 6096 SM490B sh 4 14,000.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 8 PLATE 35 x 2438 x 6096 SM490B sh 4 16,332.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 9 PLATE 40 x1700 x12192 SM490B sh 8 52,064.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

S168 M1-4034(R.1) 3-Jun 25-Jul 15-Jun 10 PLATE 45 x1400 x4200 SM490B sh 3 6,231.00 135 F FOB 6-Jul 1-Sep 21-Sep 30-Sep 3-Oct 100% $

Aramco/A169

600A S/40(OD609.6x17.48)

Page 14: Hvc PlatePipe Update)

HVC-PUR 14 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A169 M1-4446 30-Nov 30-Dec 1 PLATE 6 x 1524 x 6096 SS400 sh 40 17,500.00 237 F CFR 6-Dec 5-Jan 23-Dec 29-Sep 5-Jan 100% $

A169 M1-4482 14-Dec 10-Jan 1 W/D PIPE 40A (OD48.6x5.1)-6M STPG370 pc 50 1,641.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $/pc

A169 M1-4482 14-Dec 10-Jan 2 W/D PIPE 40A (OD48.6x3.7)-6M STPG370 pc 40 983.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $/pc

A169 M1-4482 14-Dec 10-Jan 3 W/D PIPE 32A (OD42.7x3.6)-6M STPG370 pc 15 312.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $/pc

A169 M1-4362 6-Oct 15-Nov 1 PLATE 15 x 2250 x 12000 SS400 sh 3 9,538.00 209 F CFR 11-Oct 1-Dec 14-Dec 28-Dec 31-Dec 100% $

A169 M1-4362 6-Oct 15-Nov 2 PLATE 25 x 2250 x 12000 SM490B sh 1 5,299.00 209 F CFR 11-Oct 1-Dec 14-Dec 28-Dec 31-Dec 100% $

A169 M1-4392 26-Oct 25-Nov 1 W/D PIPE 25A S/40(OD34.0x3.4)-6 A53-B pc 5 77.00 224 F FOB 1-Nov 26-Nov 3-Dec 8-Dec 10-Dec 100% $

A169 M1-4392 26-Oct 25-Nov 2 W/D Pipe 32A S/40(OD42.2 x3.6)- A53-B pc 15 308.00 224 F FOB 1-Nov 26-Nov 3-Dec 8-Dec 10-Dec 100% $

A169 M1-4392 26-Oct 25-Nov 3 SMLS PIPE 32A S/40(OD42.2x3.68t) A312-304 pc 4 97.00 224 F FOB 1-Nov 26-Nov 3-Dec 8-Dec 10-Dec 100% $

A169 M1-4392 26-Oct 25-Nov 4 W/D PIPE 40A S/40(OD48.3x3.68)- A53-B pc 220 5,345.00 224 F FOB 1-Nov 26-Nov 3-Dec 8-Dec 10-Dec 100% $

A169 M1-4392 26-Oct 25-Nov 5 W/D PIPE 40A S/80(OD48.3 x 5.08) A53-B pc 230 7,472.00 224 F FOB 1-Nov 26-Nov 3-Dec 8-Dec 10-Dec 100% $

A169 M1-4392 26-Oct 25-Nov 6 W/D PIPE 50A S/60(OD60.3x5.0)-5 A53-B pc 72 2,455.00 224 F FOB 1-Nov 26-Nov 3-Dec 8-Dec 10-Dec 100% $

A169 M1-4392 26-Oct 25-Nov 7 SMLS PIPE 50A S/40(OD60.3xt3.9)- A312-304 pc 2 65.00 224 F FOB 1-Nov 26-Nov 3-Dec 8-Dec 10-Dec 100% $

A169 M1-4392 26-Oct 25-Nov 8 W/D PIPE 125A (OD139.7x4.5)-6M SPP pc 34 1,530.00 224 F FOB 1-Nov 26-Nov 3-Dec 8-Dec 10-Dec 100% $

A169 M1-4392 26-Oct 25-Nov 9 W/D PIPE 6" S/40(OD168.3xt7.11)- A53-B pc 16 1,357.00 224 F FOB 1-Nov 26-Nov 3-Dec 8-Dec 10-Dec 100% $

A169 M1-4305 10-Sep 20-Oct 1 W/D PIPE 40A S/40(OD48.3x3.68)- A53-B pc 240 5,832.00 182 F FOB 15-Sep 15-Oct 2-Dec 25-Mar 21-Dec 100% $

A169 M1-4305 10-Sep 20-Oct 2 W/D PIPE 40A S/80(OD48.3 x 5.08) A53-B pc 80 2,597.00 182 F FOB 15-Sep 15-Oct 2-Dec 25-Mar 21-Dec 100% $

A169 M1-4305 10-Sep 20-Oct 3 W/D PIPE 5" S/40(OD139.8x6.55)- A53-B pc 8 2,090.00 182 F FOB 15-Sep 15-Oct 2-Dec 25-Mar 21-Dec 100% $

A169 M1-4305 10-Sep 20-Oct 4 W/D PIPE 6" S/40(OD165.2x7.1)-1 A53-B pc 40 10,416.00 182 F FOB 15-Sep 15-Oct 2-Dec 25-Mar 21-Dec 100% $

A169 M1-4438 25-Nov 27-Nov 1 W/D PIPE OD168.3 x 4.78t-6M A53-B pc 20 2,313.00 427 L Ex-w 25-Nov 27-Nov 100% VND

A169 M1-4303 10-Sep 30-Oct 1 PLATE 6 x 1524 x 6096 SS400 sh 115 50,370.00 192 F CFR 9-Sep 15-Oct 31-Oct 18-Nov 22-Nov L/C $

A169 M1-4303 10-Sep 30-Oct 2 PLATE 15 x 1950 x 12000 SS400 sh 3 8,265.00 192 F CFR 9-Sep 15-Oct 31-Oct 18-Nov 22-Nov L/C $

A169 M1-4391 26-Oct 25-Nov 1 PLATE 3 x 1250 x 6000 SS400 sh 15 2,649.00 400 F FOB 27-Oct 1-Nov 30-Oct 100% VND

A169 M1-4391 26-Oct 25-Nov 2 PLATE 6 x 1500 x 6000 SS400 sh 15 6,359.00 400 F FOB 27-Oct 1-Nov 30-Oct 100% VND

A169 M1-4391 26-Oct 25-Nov 3 PLATE 10 x 2000 x 6000 SS400 sh 8 7,536.00 400 F FOB 27-Oct 1-Nov 30-Oct 100% VND

A169 M1-4160(R.1) 12-Jul 15-Aug 1 PLATE 2.3 x 1250 x 6000 CT3 sh 2 271.00 360 L DDP 16-Sep 21-Sep 23-Sep 100% VND

A169 M1-4225(R.1) 10-Aug 9-Sep 11-Aug 3 W/D PIPE 40A S/40(OD48.3x3.68)- A53-B pc 420 10,206.00 169 F FOB 16-Aug 3-Sep 22-Sep 29-Sep 4-Oct 100% $

A169 M1-4225(R.1) 10-Aug 9-Sep 11-Aug 4 W/D PIPE 40A S/80(OD48.3 x 5.08) A53-B pc 380 12,335.00 169 F FOB 16-Aug 3-Sep 22-Sep 29-Sep 4-Oct 100% $

A169 M1-4225(R.1) 10-Aug 9-Sep 11-Aug 7 W/D PIPE 5" S/40(OD139.8x6.55)- A53-B pc 32 4,180.00 169 F FOB 16-Aug 3-Sep 22-Sep 29-Sep 4-Oct 100% $

A169 M1-4225(R.1) 10-Aug 9-Sep 11-Aug 1 SMLS PIPE 32A S/40(OD42.2x3.56t) A106-B pc 4 81.00 169 F FOB 16-Aug 3-Sep 3-Sep #REF! 13-Sep 100% $

A169 M1-4225(R.1) 10-Aug 9-Sep 11-Aug 2 W/D PIPE 32A S/40(OD42.2x3.56)- A312-304 pc 11 224.00 169 F FOB 16-Aug 3-Sep 3-Sep 13-Sep 100% $

A169 M1-4225(R.1) 10-Aug 9-Sep 11-Aug 5 SMLS PIPE 50A S/40(OD60.3xt3.9)- A106-B pc 1 33.00 169 F FOB 16-Aug 3-Sep 3-Sep #REF! 13-Sep 100% $

A169 M1-4225(R.1) 10-Aug 9-Sep 11-Aug 6 W/D PIPE 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 2 135.00 169 F FOB 16-Aug 3-Sep 3-Sep 13-Sep 100% $

A169 M1-4160(R.1) 12-Jul 15-Aug 2 PLATE 3 x 1219 x 2438 SS400 sh 5 350.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 3 PLATE 5 x 1219 x 6096 SS400 sh 2 583.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 4 PLATE 6 x 1524 x 6096 SS400 sh 392 171,700.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 5 PLATE 10 x 2438 x 6096 SS400 sh 1 1,167.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 6 PLATE 10 x 2438 x 6096 SS400 sh 10 11,667.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 7 PLATE 12 x 2438 x 12192 SS400 sh 8 22,400.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 8 PLATE 12 x 2438 x 12192 SS400 sh 11 30,800.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 9 PLATE 15 x 2500 x 12192 SS400 sh 30 107,671.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 10 PLATE 15 x 2500 x 12192 SS400 sh 17 61,013.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 11 PLATE 20 x 2438 x 12192 SS400 sh 22 102,667.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 12 PLATE 20 x 2438 x 6096 SS400 sh 13 30,333.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 13 PLATE 25 x 2438 x 12192 SS400 sh 20 116,667.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 14 PLATE 25 x 2438 x 12192 SS400 sh 7 40,834.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 15 PLATE 26 x 2438 x 6096 SS400 sh 4 12,130.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

Page 15: Hvc PlatePipe Update)

HVC-PUR 15 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A169 M1-4160(R.1) 12-Jul 15-Aug 16 PLATE 30 x 1524 x 6096 SS400 sh 2 4,380.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 17 PLATE 40 x 1524 x 6096 SS400 sh 2 5,830.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A169 M1-4160(R.1) 12-Jul 15-Aug 18 PLATE 40 x 2438 x 6096 SS400 sh 4 18,670.00 155 F FOB 22-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

PINJARRA/A170

A170 M1-4341 29-Sep 15-Oct 2 SQ.Pipe 150 x 150 x 9 - 6M STK400 pc 2 458.00 196 F FOB 4-Oct 8-Oct 8-Oct 15-Oct 20-Oct 100% $

A170 M1-4326 21-Sep 10-Oct 1 W/D PIPE 40A S/40(OD48.3x3.68)- A53-B pc 5 122.00 196 F FOB 21-Sep 21-Oct 8-Oct 15-Oct 20-Oct 100% $

A170 M1-4341 29-Sep 15-Oct 1 W/D PIPE 125A S/80(OD141.3x9.5) API5L-B pc 4 742.00 202 F FOB 4-Oct 8-Oct 8-Oct 15-Oct 20-Oct 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 1 Perforated Plate 3 x 1200 x 1560 SS400 sh 1 27.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 2 Perforated Plate 3 x 1200 x 1560 SS400 sh 3 80.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 3 Perforated Plate 3 x 1150 x 1560 SS400 sh 1 25.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 4 Perforated Plate 3 x 1200 x 1400 SS400 sh 6 184.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 5 Perforated Plate 3 x 1200 x 1400 SS400 sh 18 551.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 6 Perforated Plate 3 x 1150 x 1400 SS400 sh 6 180.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 7 Perforated Plate 3 x 125 x 1480 SS400 sh 6 21.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 8 Perforated Plate 3 x 1200 x 1900 SS400 sh 2 83.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 9 Perforated Plate 3 x 1200 x 1900 SS400 sh 6 249.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 10 Perforated Plate 3 x 1150 x 1900 SS400 sh 2 80.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 11 Perforated Plate 3 x 125 x 1980 SS400 sh 2 9.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 12 Perforated Plate 3 x 1200 x 1900 SS400 sh 2 83.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 13 Perforated Plate 3 x 1200 x 1900 SS400 sh 2 83.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 14 Perforated Plate 3 x 1200 x 1900 SS400 sh 4 166.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 15 Perforated Plate 3 x 770 x 1900 SS400 sh 2 53.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 16 Perforated Plate 3 x 125 x 1980 SS400 sh 2 9.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 17 Perforated Plate 3 x 1200 x 1500 SS400 sh 4 131.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 18 Perforated Plate 3 x 1200 x 1500 SS400 sh 2 66.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 19 Perforated Plate 3 x 1200 x 1500 SS400 sh 2 66.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 20 Perforated Plate 3 x 770 x 1500 SS400 sh 2 42.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 21 Perforated Plate 3 x 125 x 1580 SS400 sh 2 7.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 22 Perforated Plate 3 x 1200 x 1600 SS400 sh 4 140.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 23 Perforated Plate 3 x 1200 x 1882 SS400 sh 4 160.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 24 Perforated Plate 3 x 1200 x 1900 SS400 sh 4 166.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 25 Perforated Plate 3 x 1200 x 1823 SS400 sh 4 160.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 26 Perforated Plate 3 x 770 x 1406 SS400 sh 4 78.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4266(R.2) 23-Aug 20-Sep 6-Sep 27 Perforated Plate 3 x 125 x 980 SS400 sh 4 9.00 184 F CFR 1-Sep 16-Sep 17-Sep 25-Sep 3-Oct OK 100% $

A170 M1-4258 20-Aug 15-Sep 2 W/D PIPE 4" S/80(OD114.3x8.56)- A53-B pc 21 2,812.00 177 F FOB 27-Aug 11-Sep 22-Sep 29-Sep 4-Oct 100% $/pc

A170 M1-4258 20-Aug 15-Sep 3 SQ.Pipe 50 x 50 x 4.5-6M STK400 pc 14 591.00 177 F FOB 9-Sep 24-Sep 22-Sep 29-Sep 4-Oct 100% $

A170 M1-4258 20-Aug 15-Sep 1 W/D PIPE 25A S/40(OD33.4x3.38)- A53-B pc 2 30.00 177 F FOB 27-Aug 11-Sep 3-Sep 9-Sep 13-Sep 100% $/pc

A170 M1-4187 26-Jul 25-Aug 1 PLATE 8 x 2438 x 6096 SS400 sh 4 3,730.00 155 F FOB 27-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A170 M1-4187 26-Jul 25-Aug 2 PLATE 12 x 1524 x 6096 SS400 sh 7 6,130.00 155 F FOB 27-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A170 M1-4187 26-Jul 25-Aug 3 PLATE 12 x 2438 x 6096 SS400 sh 28 39,200.00 155 F FOB 27-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A170 M1-4187 26-Jul 25-Aug 4 PLATE 12 x 2438 x 6500 SS400 sh 21 31,350.00 155 F FOB 27-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A170 M1-4187 26-Jul 25-Aug 5 PLATE 15 x 2438 x 5000 SS400 sh 54 77,490.00 155 F FOB 27-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A170 M1-4187 26-Jul 25-Aug 6 PLATE 20 x 2438 x 6096 SS400 sh 2 4,666.00 155 F FOB 27-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A170 M1-4187 26-Jul 25-Aug 7 PLATE 25 x 2438 x 6096 SS400 sh 2 5,834.00 155 F FOB 27-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

A170 M1-4187 26-Jul 25-Aug 8 PLATE 32 x 2438 x 6096 SS400 sh 2 7,466.00 155 F FOB 27-Jul 7-Sep 21-Sep 30-Sep 3-Oct L/C $

SMK-1/A177

A177 M1-4478 13-Dec 15-Jan 1 SMLS PIPE 200A S/40 (OD216.3 x t8 SUS316L pc 1 128.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $

Page 16: Hvc PlatePipe Update)

HVC-PUR 16 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A177 M1-4478 13-Dec 15-Jan 2 W/D PIPE 300A (OD318.5x7)-3M SGP pc 1 161.00 240 F FOB 20-Dec 4-Jan 31-Dec 5-Jan 10-Jan 100% $/pc

BAHAMAS/A162

A162 M1-4119 29-Jun 4-Jul 1 PLATE 30 x 1530 x 6050 SS400 sh 1 2,180.00 252 L DDP 12-Jul 15-Jul 14-Jul 100% VND

SMAG II/K153

K153 M1-4112 29-Jun 5-Jul 1 PLATE 3 x 2000 x 2700 SUS304 sh 2 261.00 205 L DDP 30-Jun 3-Jul 4-Jul 17-Apr 100% VND

K153 M1-3585(R.5) 14-Feb 30-Apr 19-Mar 1 PLATE 12 x 2438 x 5100 A516-70 sh 7 8,199.00 67 F Ex-W 20-Mar 12-Jun 14-Apr 19-Apr 24-Apr 100% $

K153 M1-3585(R.5) 14-Feb 30-Apr 19-Mar 2 PLATE 23 x 2438 x 7300 A516-70 sh 6 19,279.90 67 F Ex-W 20-Mar 12-Jun 14-Apr 19-Apr 24-Apr 100% $

K153 M1-3585(R.5) 14-Feb 30-Apr 19-Mar 2 PLATE 23 x 2438 x 7300 A516-70 sh 6 19,279.90 67 F Ex-W 20-Mar 12-Jun 19-Apr 24-Apr 100% $

K153 M1-3585(R.5) 14-Feb 30-Apr 19-Mar 2a PLATE 23 x 1800 x 7300 A516-70 sh 6 14,234.56 67 F Ex-W 20-Mar 12-Jun 14-Apr 19-Apr 24-Apr 100% $

K153 M1-3585(R.5) 14-Feb 30-Apr 19-Mar 3 PLATE 14 x 2438 x 6096 A516-70 sh 2 3,266.70 67 F Ex-W 20-Mar 12-Jun 3-May 11-May 12-May 19-May 100% $

K153 M1-3585(R.5) 14-Feb 30-Apr 19-Mar 4 PLATE 20 x 2438 x 5700 A516-70 sh 10 21,817.64 67 F Ex-W 20-Mar 12-Jun 29-Apr 12-May 12-May 19-May 100% $

K153 M1-3585(R.5) 14-Feb 30-Apr 19-Mar 4 PLATE 20 x 2438 x 5700 A516-70 sh 4 8,727.06 67 F Ex-W 20-Mar 12-Jun 14-Apr 19-Apr 24-Apr 100% $

K153 M1-3585(R.5) 14-Feb 30-Apr 19-Mar 5 PLATE 22 x 2438 x 6096 A516-70 sh 4 10,266.70 67 F Ex-W 20-Mar 12-Jun 3-May 11-May 12-May 19-May 100% $

K153 M1-3585(R.5) 14-Feb 30-Apr 19-Mar 6 PLATE 28 x 1219 x 3048 A516-70 sh 1 816.70 67 F Ex-W 20-Mar 12-Jun 3-May 11-May 12-May 19-May 100% $

K153 M1-3585(R.5) 14-Feb 30-Apr 19-Mar 11 Plate 25 x 1300 x 1500 A516-70 sh 16 3,061.40 67 F Ex-W 20-Mar 12-Jun 3-May 11-May 12-May 19-May 100% $

K153 M1-3886 20-Mar 15-Apr 1 Perforated Plate 9 x 950 x 1900 A240-304 sh 2 143.20 73 F CFR 29-Mar 16-Apr 24-Apr 30-Apr OK 14-Jul 100% $

K153 M1-3901 29-Mar 20-Apr 1 CHK'D PLATE 5 x 1500 x 6000 CT3 sh 9 3,422.00 104 L DDP 31-Mar 4-Apr 12-May 11-Jun 100% VND

K153 M1-3901 29-Mar 20-Apr 3 PLATE 6 x 1500 x 6000 CT3 sh 2 848.00 104 L DDP 31-Mar 4-Apr 12-May 11-Jun 100% VND

K153 M1-3845 5-Mar 20-Mar add SMLS PIPE 40A S/160(OD48.3xt7.1) A106-B pc 2 86.50 33 F FOB 20-Feb 26-Mar 2-Apr 8-Apr 12-Apr 25-May 100% $

K153 M1-3797 18-Feb 10-Mar 1 SMLS PIPE 300A S/40 (OD323.9 x t1 A106-B pc 1 159.40 33 F FOB 20-Feb 26-Mar 2-Apr 8-Apr 12-Apr 25-May 100% $

K153 M1-3797 18-Feb 10-Mar 2 SMLS PIPE 80A S/160 (OD88.9 x t11 A106-B pc 1 42.30 33 F FOB 20-Feb 26-Mar 2-Apr 8-Apr 12-Apr 25-May 100% $

K153 M1-3797 18-Feb 10-Mar 3 SMLS PIPE 80A S/80 (OD88.9 x t7.6 A106-B pc 1 30.40 33 F FOB 20-Feb 26-Mar 2-Apr 8-Apr 12-Apr 25-May 100% $

K153 M1-3797 18-Feb 10-Mar 4 SMLS PIPE 50A S/160 (OD60.3 x t8. A106-B pc 1 22.20 33 F FOB 20-Feb 26-Mar 2-Apr 8-Apr 12-Apr 25-May 100% $

K153 M1-3900 29-Mar 20-Apr 5 W/D PIPE 25A S/40(OD34.0x3.4)-6 API5L-B pc 23 347.80 76 F FOB 2-Apr 17-Apr 16-Apr 22-Apr 28-Apr 100% $

K153 M1-3885 20-Mar 15-Apr 1 SMLS PIPE 40A S/160(OD48.3xt7.1) A106-B pc 2 86.40 76 F FOB 2-Apr 17-Apr 16-Apr 22-Apr 28-Apr 100% $

K153 M1-3583(R.5) 2-Dec 10-Jan 26-Jan 1 PLATE 8 x 1524 x 6096 A36 sh 4 2,333.72 21 F FOB 30-Jan 7-Mar 14-Mar 17-Mar 29-Mar 100% $

K153 M1-3583(R.5) 2-Dec 10-Jan 26-Jan 2 PLATE 9 x 1524 x 6096 A36 sh 1 656.36 21 F FOB 30-Jan 7-Mar 14-Mar 17-Mar 29-Mar 100% $

K153 M1-3583(R.5) 2-Dec 10-Jan 26-Jan 3 PLATE 12 x 1524 x 6096 A36 sh 1 875.15 21 F FOB 30-Jan 7-Mar 14-Mar 17-Mar 29-Mar 100% $

K153 M1-3583(R.5) 2-Dec 10-Jan 26-Jan 4 PLATE 16 x 2300 x 6096 A36 sh 3 5,283.04 21 F FOB 30-Jan 7-Mar 14-Mar 17-Mar 29-Mar 100% $

K153 M1-3583(R.5) 2-Dec 10-Jan 26-Jan 4 PLATE 16 x 138 x 6096 A36 sh 3 316.98 21 F FOB 30-Jan 7-Mar 14-Mar 17-Mar 29-Mar 100% $

K153 M1-3583(R.5) 2-Dec 10-Jan 26-Jan 5 PLATE 25 x 1524 x 6096 A36 sh 1 1,823.22 21 F FOB 30-Jan 7-Mar 14-Mar 17-Mar 29-Mar 100% $

K153 M1-3583(R.5) 2-Dec 10-Jan 6-Feb 6 PLATE 9.525 x 1828.8 x 5300 sh 1 724.73 21 F FOB 30-Jan 7-Mar 14-Mar 17-Mar 29-Mar 100% $

K153 M1-3749(R.1) 2-Feb 29-Feb 1 SMLS PIPE 25A S/160 (OD33.4 x t6. A106-B pc 12 309.60 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 5-Apr 100% $

K153 M1-3749(R.1) 2-Feb 29-Feb 2 SMLS PIPE 40A S/80 (OD48.3 x t5.1 A106-B pc 1 32.40 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 5-Apr 100% $

K153 M1-3749(R.1) 2-Feb 29-Feb 3 SMLS PIPE 40A S/160(OD48.3xt7.1) A106-B pc 2 86.40 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 5-Apr 100% $

K153 M1-3749(R.1) 2-Feb 29-Feb 4 SMLS PIPE 50A S/40 (OD60.3 x t3.9 A106-B pc 1 10.80 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 5-Apr 100% $

K153 M1-3749(R.1) 2-Feb 29-Feb 5 SMLS PIPE 50A S/80 (OD60.3 x t5.5 A106-B pc 1 44.40 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 5-Apr 100% $

K153 M1-3749(R.1) 2-Feb 29-Feb 6 SMLS PIPE 50A S/160 (OD60.3 x t8. A106-B pc 1 22.20 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 5-Apr 100% $

K153 M1-3749(R.1) 2-Feb 29-Feb 7 SMLS PIPE 65A S/40 (OD73 x t5.2)- A106-B pc 1 17.40 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 5-Apr 100% $

K153 M1-3749(R.1) 2-Feb 29-Feb 8 SMLS PIPE 65A S/80 (OD73 x t7)-2M A106-B pc 1 22.80 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 5-Apr 100% $

K153 M1-3749(R.1) 2-Feb 29-Feb 9 SMLS PIPE 65A S/160 (OD73 x t9.5) A106-B pc 6 420.18 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 5-Apr 100% $

K153 M1-3749(R.1) 2-Feb 29-Feb 10 SMLS PIPE 80A S/80 (OD88.9 x t7.6 A106-B pc 1 30.40 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 5-Apr 100% $

K153 M1-3749(R.1) 2-Feb 29-Feb 11 SMLS PIPE 100A S/80(OD114.3 x 8. A106-B pc 1 44.80 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 5-Apr 100% $

K153 M1-3749(R.1) 2-Feb 29-Feb 12 SMLS PIPE 150A S/80 (OD168.3 x t1 A106-B pc 1 85.40 23 F FOB 7-Feb 15-Feb 13-Feb 20-Feb 27-Feb 5-Apr 100% $

M.A.B.Buckstay/A156

A156 M1-3822(R.1) 27-Feb 30-Apr 5-Mar 12 PLATE 12 x 2438 x 6096 SS400 sh 3 4,200.01 60 F FOB 16-Mar 10-Apr 8-Jun 22-Jun 2/7~3/7 15-Jul 100% W/kg

A156 M1-3822(R.1) 27-Feb 30-Apr 5-Mar 15 PLATE 19 x 2438 x 6096 SS400 sh 1 2,216.67 60 F FOB 16-Mar 10-Apr 8-Jun 22-Jun 2/7~3/7 15-Jul 100% W/kg

A516-70

Page 17: Hvc PlatePipe Update)

HVC-PUR 17 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A156 M1-3822(R.1) 27-Feb 30-Apr 5-Mar 8 PLATE 3.2 x 1219 x 2438 SS400 sh 3 224.00 51 F FOB 6-Mar 5-Apr 17-Mar 26-Mar 30-Mar 100% $

A156 M1-3822(R.1) 27-Feb 30-Apr 5-Mar 9 PLATE 4.5 x 1219 x 2438 SS400 sh 3 315.00 51 F FOB 6-Mar 5-Apr 17-Mar 26-Mar 30-Mar 100% $

A156 M1-3822(R.1) 27-Feb 30-Apr 5-Mar 10 PLATE 6 x 1219 x 2438 SS400 sh 53 7,419.00 51 F FOB 6-Mar 5-Apr 17-Mar 26-Mar 30-Mar 100% $

A156 M1-3822(R.1) 27-Feb 30-Apr 5-Mar 11 PLATE 9 x 2500 x 6100/SM490A SS400 sh 9 9,697.00 51 F FOB 6-Mar 5-Apr 17-Mar 26-Mar 30-Mar 100% $

A156 M1-3822(R.1) 12 PLATE 12 x 2438 x 6096 SS400 sh 5 7,000.00 61 F FOB 16-Mar 17-Mar 14-Apr 19-Apr 24-Apr 100% $

A156 M1-3822(R.1) 27-Feb 30-Apr 5-Mar 12 PLATE 12 x 2500 x 6100/SM490 SS400 sh 12 17,239.00 51 F FOB 6-Mar 5-Apr 17-Mar 26-Mar 30-Mar 100% $

A156 M1-3822(R.1) 27-Feb 30-Apr 5-Mar 13 PLATE 14 x 2438 x 6096 SS400 sh 2 3,267.00 51 F FOB 6-Mar 5-Apr 17-Mar 26-Mar 30-Mar 100% $

A156 M1-3822(R.1) 27-Feb 30-Apr 5-Mar 14 PLATE 16 x 2438 x 6096 SS400 sh 2 3,733.00 51 F FOB 6-Mar 5-Apr 17-Mar 26-Mar 30-Mar 100% $

A156 M1-3822(R.1) 15 PLATE 19 x 2438 x 6096 SS400 sh 5 11,085.00 61 F FOB 16-Mar 17-Mar 14-Apr 19-Apr 24-Apr 100% $

A156 M1-3822(R.1) 27-Feb 30-Apr 5-Mar 16 PLATE 22 x 2438 x 6096 SS400 sh 1 2,567.00 51 F FOB 6-Mar 5-Apr 17-Mar 26-Mar 30-Mar 100% $

A156 M1-3822(R.1) 27-Feb 30-Apr 5-Mar 17 PLATE 25 x 2500 x 6100/SM490 SS400 sh 2 5,986.00 51 F FOB 6-Mar 5-Apr 17-Mar 26-Mar 30-Mar 100% $

A156 M1-3824(R.1) 27-Feb 30-Apr 6-Mar 2 SMLS PIPE 200A S/120(OD216.3xt18 STPG370 pc 1 533.40 53 F FOB 11-Mar 31-Mar 19-Mar 24-Mar 31-Mar 100% $

A156 M1-3824(R.1) 27-Feb 30-Apr 6-Mar 3 SMLS PIPE 100A S/80(OD114.3xt8.6 STPG370 pc 2 268.80 53 F FOB 11-Mar 31-Mar 19-Mar 24-Mar 31-Mar 100% $

A156 M1-3824(R.1) 27-Feb 30-Apr 6-Mar 5 SMLS PIPE 80A S/160(OD88.9x11.13 SA/A106C pc 14 1,793.00 66 F FOB 18-Mar 28-Mar 26-Mar 31-Mar 12-Apr 100% $

A156 M1-3824(R.1) 27-Feb 30-Apr 6-Mar 6 SMLS PIPE 50A S/80(OD60.5xt5.5)-6 STPG370 pc 3 134.30 53 F FOB 11-Mar 31-Mar 19-Mar 24-Mar 31-Mar 100% $

A156 M1-3824(R.1) 27-Feb 30-Apr 6-Mar 7 SMLS PIPE 50A S/40(OD60.5xt3.9)-6 STPG370 pc 12 391.70 53 F FOB 11-Mar 31-Mar 19-Mar 24-Mar 31-Mar 100% $

Phu My 2-1 HRSG/A157

A157 M1-4177(R.1) 22-Jul 20-Aug 29-Jul 1 PLATE 2.3 x 1250 x 6000 CT3 sh 7 947.89 360 L DDP 16-Sep 21-Sep 23-Sep 100% VND

A157 M1-4113 29-Jun 30-Jul 1 PLATE 2.3 x 1250 x 6000 CT3 sh 16 2,166.60 360 L DDP 16-Sep 21-Sep 23-Sep 100% VND

A157 M1-4113 29-Jun 30-Jul 2 PLATE 3 x 1230 x 6000 CT3 sh 30 5,213.97 360 L DDP 16-Sep 21-Sep 23-Sep 100% VND

A157 M1-4178(R.1) 22-Jul 20-Aug 29-Jul 2 W/D PIPE 90A S/40(OD101.6x5.7)- A106-B /STPG370 pc 12 971.00 159 F FOB 30-Jul 14-Aug 1-Sep 9-Sep 13-Sep OK 100% $/pc

A157 M1-4178(R.1) 22-Jul 20-Aug 29-Jul 3 W/D PIPE 100A S/40(OD114.3 x 6. A106-B /STPG370 pc 2 193.00 159 F FOB 30-Jul 14-Aug 1-Sep 9-Sep 13-Sep OK 100% $/pc

A157 M1-4177(R.1) 22-Jul 20-Aug 29-Jul 2 PLATE 10 x 2438 x 6096 SS400 sh 8 9,333.00 159 F FOB 30-Jul 14-Aug 1-Sep 9-Sep 13-Sep OK 100% $

A157 M1-4177(R.1) 22-Jul 20-Aug 29-Jul 3 PLATE 20 x 2438 x 6096 SS400 sh 1 2,333.00 159 F FOB 30-Jul 14-Aug 1-Sep 9-Sep 13-Sep OK 100% $

A157 M1-4115(R.1) 29-Jun 31-Jul 1 PLATE 3 x 1219 x 2438 A240-409 sh 110 7,600.69 143 F FOB 8-Jul 28-Jul 31-Jul 8-Aug 17-Aug 21-Aug 100% $

A157 M1-4115(R.1) 29-Jun 31-Jul 2 PLATE 6 x 1219 x 6096 A240-409 sh 4 1,382.17 143 F FOB 8-Jul 28-Jul 1-Sep 9-Sep 13-Sep OK 100% $

A157 M1-4113 29-Jun 30-Jul 4 PLATE 6 x 1219 x 6096 SS400 sh 16 5,600.00 143 F FOB 8-Jul 28-Jul 31-Jul 8-Aug 17-Aug 21-Aug 100% $

A157 M1-4215 5-Aug 20-Aug 1 PLATE 1.6 x 1219 x 2438 A36 sh 25 933.00 175 F FOB 20-Aug 30-Aug 1-Sep 9-Sep 13-Sep 100% $

A157 M1-4113 29-Jun 30-Jul 6 PLATE 35 x 2438 x 6096 A572-50 sh 3 12,249.00 142 F FOB 8-Jul 7-Aug 1-Sep 9-Sep 13-Sep 100% $

A157 M1-4177(R.1) 22-Jul 20-Aug 29-Jul 4 PLATE 6 x 1219 x 3048 A240-409 sh 12 2,073.00 165 F FOB 6-Aug 26-Aug 1-Sep 9-Sep 13-Sep 100% $

A157 M1-4115(R.1) 29-Jun 31-Jul 5 PLATE 20 x 1219 x 2438 A240-304 sh 2 943.00 165 F FOB 6-Aug 26-Aug 1-Sep 9-Sep 13-Sep 100% $

A157 M1-4115(R.1) 29-Jun 31-Jul 3 PLATE 10 x 1219 x 2438 A240-304 sh 2 480.00 141 F FOB 12-Jul 6-Aug 31-Jul 8-Aug 12-Aug 21-Aug 100% $

A157 M1-4115(R.1) 29-Jun 31-Jul 4 PLATE 15 x 1219 x 2438 A240-304 sh 2 720.00 141 F FOB 12-Jul 6-Aug 31-Jul 8-Aug 12-Aug 21-Aug 100% $

A157 M1-4113 29-Jun 30-Jul 5 PLATE 20 x 2438 x 6096 A36 sh 4 9,333.00 141 F FOB 12-Jul 2-Aug 31-Jul 8-Aug 12-Aug 21-Aug 100% $

A157 M1-4015 28-May 30-Jun 5 PLATE 15.7 x 1500 x 6000 SUS304 sh 2 2,241.02 186 L 3-Jun 20-Jun 25-Jun 15-Jul 100% VND

A157 M1-4015 28-May 30-Jun 5 PLATE 15.35 x 1500 x 6000 SUS304 sh 1 1,095.53 186 L 3-Jun 20-Jun 25-Jun 15-Jul 100% VND

A157 M1-4114 29-Jun 30-Jul 1 W/D PIPE 40A S/40(OD48.3x3.7)-6 A53-B pc 210 5,166.00 136 F FOB 1-Jul 21-Jul 31-Jul 8-Aug 17-Aug 21-Aug 100% $/pc

A157 M1-4114 29-Jun 30-Jul 2 SMLS PIPE 65A S/40(OD76.3x5.2t)- A106-B pc 1 54.70 136 F FOB 1-Jul 21-Jul 31-Jul 8-Aug 17-Aug 21-Aug 100% $

A157 M1-4114 29-Jun 30-Jul 3 SMLS PIPE 50A S/40(OD60.3xt3.9)- A106-B pc 2 65.30 136 F FOB 1-Jul 21-Jul 31-Jul 8-Aug 17-Aug 21-Aug 100% $

A157 M1-4016 28-May 25-Jun 1 W/D PIPE 32A S/80(OD42.2x4.85)- A53-B pc 20 536.40 121 F FOB 12-Jun 2-Jul 31-Jul 8-Aug 17-Aug 100% $/pc

A157 M1-4024 29-May 30-Jun 1 W/D PIPE 40A S/40(OD48.3x3.7)-6 A53-B pc 390 9,594.00 122 F FOB 15-Jun 20-Jul 31-Jul 8-Aug 17-Aug 21-Aug 100% $/pc

A157 M1-4024 29-May 30-Jun 4 W/D PIPE 3" S/40(OD88.9x5.5)-12 A53-B pc 20 2,709.60 122 F FOB 15-Jun 20-Jul 31-Jul 8-Aug 17-Aug 21-Aug 100% $/pc

A157 M1-4024 29-May 30-Jun 5 W/D PIPE 90A S/40(OD101.6x5.7)- A53-B pc 16 1,302.72 122 F FOB 15-Jun 20-Jul 31-Jul 8-Aug 17-Aug 21-Aug 100% $/pc

A157 M1-4016 28-May 25-Jun 2 W/D PIPE 40A S/40(OD48.3x3.7)-6 A53-B pc 75 1,822.50 122 F FOB 15-Jun 20-Jul 31-Jul 8-Aug 17-Aug 21-Aug 100% $/pc

A157 M1-4016 28-May 25-Jun 3 W/D PIPE 50A S/40(OD60.3x3.91)- SUS304 pc 7 228.50 117 F FOB 7-Jun 27-Jun 23-Jun 1-Jul 12-Jul 100% $/pc

A157 M1-4016 28-May 25-Jun 4 SMLS PIPE 50A S/160(OD60.3x8.74) SUS304 pc 4 266.60 117 F FOB 7-Jun 27-Jun 23-Jun 1-Jul 12-Jul 100% $

A157 M1-4016 28-May 25-Jun 5 W/D PIPE 65A S/40(OD73.0x5.16)- SUS304 pc 1 51.80 117 F FOB 7-Jun 27-Jun 23-Jun 1-Jul 12-Jul 100% $/pc

Page 18: Hvc PlatePipe Update)

HVC-PUR 18 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A157 M1-4016 28-May 25-Jun 6 W/D PIPE 100A S/40(OD114.3 x 6. SUS304 pc 1 96.40 117 F FOB 7-Jun 27-Jun 23-Jun 1-Jul 12-Jul 100% $/pc

A157 M1-4015 28-May 30-Jun 8 PLATE 45 x 2438 x 6096 SM490A sh 1 5,250.00 117 F FOB 7-Jun 27-Jun 23-Jun 1-Jul 12-Jul 100% $

A157 M1-4024 29-May 30-Jun 2 W/D PIPE 50A S/40(OD60.3x3.9)-6 A53-B pc 4 130.60 121 F FOB 12-Jun 2-Jul 25-Jun 6-Jul 17-Jul 100% $/pc

A157 M1-4024 29-May 30-Jun 3 W/D PIPE 65A S/40(OD73x5.2)-6M A53-B pc 32 1,657.00 121 F FOB 12-Jun 2-Jul 25-Jun 6-Jul 17-Jul 100% $/pc

A157 M1-4024 29-May 30-Jun 5 W/D PIPE 90A S/40(OD101.6x5.7)- A53-B pc 48 8,141.98

121 F FOB 12-Jun 2-Jul 25-Jun 6-Jul 17-Jul 100% $/pc

A157 M1-4024 29-May 30-Jun 5 W/D PIPE 90A S/40(OD101.6x5.7)- A53-B pc 4 121 F FOB 12-Jun 2-Jul 25-Jun 6-Jul 17-Jul 100% $/pc

A157 M1-4015 28-May 30-Jun 1 PLATE 3 x 1219 x 2438 A240-409 sh 15 1,037.00 110 F FOB 10-Jun 5-Jul 8-Jun 22-Jun 2/7~6/7 15-Jul 100% $

A157 M1-4015 28-May 30-Jun 2 PLATE 8 x 2438 x 6096 A36 sh 3 2,800.00 110 F FOB 10-Jun 5-Jul 8-Jun 22-Jun 2/7~6/7 15-Jul 100% $

A157 M1-4015 28-May 30-Jun 3 PLATE 10 x 2438 x 6096 A36 sh 3 3,500.00 110 F FOB 10-Jun 5-Jul 8-Jun 22-Jun 2/7~6/7 15-Jul 100% $

A157 M1-4015 28-May 30-Jun 4 PLATE 12 x 2438 x 6096 A36 sh 8 11,200.00 110 F FOB 10-Jun 5-Jul 8-Jun 22-Jun 2/7~6/7 15-Jul 100% $

A157 M1-4015 28-May 30-Jun 6 PLATE 16 x 2438 x 6096 A36 sh 2 3,733.00 110 F FOB 10-Jun 5-Jul 8-Jun 22-Jun 2/7~6/7 15-Jul 100% $

A157 M1-4015 28-May 30-Jun 7 PLATE 20 x 2438 x 6096 A36 sh 2 4,667.00 110 F FOB 10-Jun 5-Jul 8-Jun 22-Jun 2/7~6/7 15-Jul 100% $

A157 M1-3821 27-Feb 25-Mar 2-Mar 12 PLATE 2 x 1219 x 6096 A240-409 sh 300 35,357.00 64 F FOB 17-Mar 5-May 3-May 11-May 14-May 21-May 100% $

A157 M1-3821 27-Feb 25-Mar 2-Mar 13 PLATE 3 x 1219 x 6096 A240-409 sh 60 10,607.00 64 F FOB 17-Mar 5-May 3-May 11-May 14-May 21-May 100% $

A157 M1-3821 27-Feb 25-Mar 2-Mar 14 PLATE 6 x 1219 x 6096 A240-409 sh 20 7,071.00 64 F FOB 17-Mar 5-May 3-May 11-May 14-May 21-May 100% $

A157 M1-3819(R.2) 27-Feb 25-Apr 16-Apr 1 PLATE 2 x 1219 x 2438 A36 sh 393 18,333.45 97 F CFR 6-May 26-May 4-Jun 10-Jun 16-Jun 15-Jul L/C $/sh

A157 M1-3819(R.2) 27-Feb 25-Apr 16-Apr 2 PLATE 3 x 1524 x 6096 A36 sh 18 3,938.04 97 F CFR 6-May 26-May 4-Jun 10-Jun 16-Jun 15-Jul L/C $/sh

A157 M1-3819(R.2) 27-Feb 25-Apr 16-Apr 3 PLATE 6 x 1829 x 6096 A36 sh 262 137,586.68 97 F CFR 6-May 26-May 4-Jun 10-Jun 16-Jun 15-Jul L/C $/sh

A157 M1-3819(R.2) 27-Feb 25-Apr 16-Apr 1 PLATE 20 x 1900 x 10500 A572-50 sh 25 78,303.75 91 F FOB 28-Apr 25-Jun 6-Jun 16-Jun 22-Jun 14-Jul 100% $

A157 M1-3819(R.2) 27-Feb 25-Apr 16-Apr 2 PLATE 20 x 2250 x 8000 A572-50 sh 5 14,130.00 91 F FOB 28-Apr 25-Jun 6-Jun 16-Jun 22-Jun 14-Jul 100% $

A157 M1-3819(R.2) 27-Feb 25-Apr 16-Apr 3 PLATE 35 x 2150 x 10500 A572-50 sh 15 93,037.22 91 F FOB 28-Apr 25-Jun 6-Jun 16-Jun 22-Jun 14-Jul 100% $

A157 M1-3819(R.2) 27-Feb 25-Apr 16-Apr 4 PLATE 35 x 2250 x 8000 A572-50 sh 8 39,564.00 91 F FOB 28-Apr 25-Jun 6-Jun 16-Jun 22-Jun 14-Jul 100% $

A157 M1-3819(R.2) 27-Feb 25-Apr 16-Apr 5 PLATE 40 x 2250 x 6096 A572-50 sh 1 4,306.82 91 F FOB 28-Apr 25-Jun 6-Jun 16-Jun 22-Jun 14-Jul 100% $

A157 M1-3819(R.2) 27-Feb 25-Apr 16-Apr 6 PLATE 45 x 2250 x 8000 A572-50 sh 3 19,075.50 91 F FOB 28-Apr 25-Jun 6-Jun 16-Jun 22-Jun 14-Jul 100% $

A157 M1-3819(R.2) 27-Feb 25-Apr 16-Apr 5 PLATE 10 x 2438 x 6096 SS400 sh 4 4,667.00 93 F FOB 29-Apr 5-Jun 8-Jun 22-Jun 2/7~3/7 15-Jul 100% $

A157 M1-3819(R.2) 27-Feb 25-Apr 16-Apr 6 PLATE 12 x 2438 x 6096 SS400 sh 4 5,600.00 93 F FOB 29-Apr 5-Jun 8-Jun 22-Jun 2/7~3/7 15-Jul 100% $

A157 M1-3819(R.2) 27-Feb 25-Apr 16-Apr 7 PLATE 20 x 2438 x 6096 SS400 sh 4 9,333.00 93 F FOB 29-Apr 5-Jun 8-Jun 22-Jun 2/7~3/7 15-Jul 100% $

A157 M1-3820(R.1) 27-Feb 25-Apr 16-Apr 2 PLATE 8 x 2438 x 6096 SS400 sh 21 19,600.00 93 F FOB 29-Apr 5-Jun 8-Jun 22-Jun 2/7~3/7 15-Jul 100% $

A157 M1-3820(R.1) 27-Feb 25-Apr 16-Apr 3 PLATE 9 x 2500 x 6100 SM490A sh 25 26,935.00 93 F FOB 29-Apr 5-Jun 8-Jun 22-Jun 2/7~3/7 15-Jul 100% $

A157 M1-3820(R.1) 27-Feb 25-Apr 16-Apr 4 PLATE 10 x 2438 x 6096 SS400 sh 46 53,666.86 93 F FOB 29-Apr 5-Jun 8-Jun 22-Jun 2/7~3/7 15-Jul 100% $

A157 M1-3820(R.1) 27-Feb 25-Apr 16-Apr 5 PLATE 10 x 2438 x 6096 SS400 sh 10 11,667.00 93 F FOB 29-Apr 5-Jun 8-Jun 22-Jun 2/7~3/7 15-Jul 100% $

A157 M1-3820(R.1) 27-Feb 25-Apr 16-Apr 6 PLATE 12 x 2438 x 6096 SS400 sh 21 29,400.00 93 F FOB 29-Apr 5-Jun 8-Jun 22-Jun 2/7~3/7 15-Jul 100% $

A157 M1-3820(R.1) 27-Feb 25-Apr 16-Apr 7 PLATE 12 x 2438 x 6096 SS400 sh 3 4,200.00 93 F FOB 29-Apr 5-Jun 8-Jun 22-Jun 2/7~3/7 15-Jul 100% $

A157 M1-3820(R.1) 27-Feb 25-Apr 16-Apr 9 PLATE 15 x 2438 x 6096 SS400 sh 13 22,750.00 93 F FOB 29-Apr 5-Jun 8-Jun 22-Jun 2/7~3/7 15-Jul 100% $

A157 M1-3820(R.1) 27-Feb 25-Apr 16-Apr 10 PLATE 30 x 2438 x 6096 SS400 sh 1 3,500.00 93 F FOB 29-Apr 5-Jun 8-Jun 22-Jun 2/7~3/7 15-Jul 100% $

A157 M1-3820(R.1) 27-Feb 25-Apr 16-Apr 11 PLATE 40 x 2438 x 6096 SS400 sh 1 4,666.68 93 F FOB 29-Apr 5-Jun 8-Jun 22-Jun 2/7~3/7 15-Jul 100% $

SMK-1/A167

A167 M1-4720 22-Mar 4-Apr 1 SQ.Pipe 200 x 200 x 6-10M STK400 pc 4 859.20 48 F FOB 24-Mar 10-Apr 22-Apr 27-Apr 29-Apr 19-May 100% $

A167 M1-4386 22-Oct 18-Nov 1 SQ.Pipe 200 x 200 x 6-10M STK400 pc 6 2,148.00 219 F FOB 25-Oct 24-Nov 2-Dec 10-Dec 21-Dec OK 100% $

A167 M1-4317 16-Sep 20-Oct 1 PLATE 9 x 2438 x 6096 SS400 sh 7 7,350.00 200 F FOB 30-Sep 10-Oct 2-Dec 10-Dec 12-Dec 100% $

A167 M1-4317 16-Sep 20-Oct 2 PLATE 14 x 2438 x 6096 SS400 sh 6 9,800.00 200 F FOB 30-Sep 10-Oct 2-Dec 10-Dec 12-Dec 100% $

A167 M1-4318 16-Sep 20-Oct 1 SQ.Pipe 150 x 150 x 4.5-12M STKR400 pc 24 5,788.80 196 F FOB 21-Sep 21-Oct 2-Dec 10-Dec 21-Dec 100% $

A167 M1-4017(R.1) 27-May 30-Jun 3-Jun 1 SQ.Pipe 150 x 150 x 4.5-12M STK400 pc 136 32,885.00 116 F FOB 7-Jun 7-Jul 25-Jun 6-Jul 17-Jul OK 100% $

A167 M1-4017(R.1) 27-May 30-Jun 3-Jun 2 SQ.Pipe 200 x 200 x 6-12M STK400 pc 89 38,234.40 116 F FOB 7-Jun 7-Jul 31-Jul 8-Aug 17-Aug 21-Aug 100% $

A167 M1-4018(R.1) 27-May 30-Jun 3-Jun 5 PLATE 40 x 2210 x 6030 SM490A sh 1 4,184.00 126 F FOB 16-Jun 6-Jul 23-Jun 1-Jul 12-Jul 100% $

A167 M1-4018(R.1) 27-May 30-Jun 3-Jun 1 PLATE 6 x 1219 x 6096 SS400 sh 20 7,000.00 117 F FOB 7-Jun 27-Jun 23-Jun 1-Jul 12-Jul 100% $

A167 M1-4018(R.1) 27-May 30-Jun 3-Jun 2 PLATE 9 x 2438 x 6096 SS400 sh 14 14,700.00 117 F FOB 7-Jun 27-Jun 23-Jun 1-Jul 12-Jul 100% $

Page 19: Hvc PlatePipe Update)

HVC-PUR 19 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A167 M1-4018(R.1) 27-May 30-Jun 3-Jun 3 PLATE 14 x 2438 x 6096 SS400 sh 5 8,166.70 117 F FOB 7-Jun 27-Jun 23-Jun 1-Jul 12-Jul 100% $

A167 M1-4018(R.1) 27-May 30-Jun 3-Jun 4 PLATE 22 x 2438 x 6096 SS400 sh 4 10,267.00 117 F FOB 7-Jun 27-Jun 23-Jun 1-Jul 12-Jul 100% $

Sabiya/U179

U179 M1-5086 1-Jul 20-Jul 1 W/D PIPE 150A S/10(OD168.3x3.4) A312-316L pc 9 754.40 157 F CFR 8-Jul 18-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U179 M1-4711(R.1) 17-Mar 10-May 22-Mar 1 W/D PIPE 100A S/10(OD114.3x3.05 A312-316L pc 9 456.30 46 F FOB 23-Mar 25-Apr 25-Apr 28-Apr 29-Apr 100% $/pc

U179 M1-4711(R.1) 17-Mar 10-May 22-Mar 2 W/D PIPE 400A S/10(OD406.4x4.78 A312-316L pc 14 4,016.90 46 F FOB 23-Mar 25-Apr 25-Apr 28-Apr 29-Apr 100% $/pc

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 7 W/D PIPE 400A S/10(OD406.4x4.78 A312-316L pc 88 25,412.66 3 F CFR 10-Jan 26-Mar 21-Mar 24-Mar 5-Apr a 11-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 9 W/D PIPE 500A S/10(OD508x5.54) A312-316L pc 3 1,256.20 3 F CFR 10-Jan 26-Mar 27-Apr 30-Apr 10-May 3RD L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 10 W/D PIPE 600A S/10(OD609.6x6.3 A312-316L pc 13 7,490.34 3 F CFR 10-Jan 26-Mar 27-Apr 30-Apr 10-May 3RD L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 1 W/D PIPE 80A S/10(OD88.9x3.05) A312-316L pc 97 3,817.90 3 F CFR 10-Jan 26-Mar 21-Mar 24-Mar 5-Apr 11-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 2 W/D PIPE 100A S/10(OD114.3x3.05 A312-316L pc 62 3,165.75 3 F CFR 10-Jan 26-Mar 21-Mar 24-Mar 5-Apr 11-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 4 W/D PIPE 200A S/10(OD219.1x3.76 A312-316L pc 3 365.40 3 F CFR 10-Jan 26-Mar 21-Mar 24-Mar 5-Apr 11-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 5 W/D PIPE 300A S/10(OD323.9x4.57 A312-316L pc 4 878.20 3 F CFR 10-Jan 26-Mar 21-Mar 24-Mar 5-Apr 11-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 6 W/D PIPE 350A S/10(OD355.6x4.78 A312-316L pc 4 1,009.00 3 F CFR 10-Jan 26-Mar 21-Mar 24-Mar 5-Apr 11-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 10 W/D PIPE 600A S/10(OD609.6x6.3 A312-316L pc 14 8,066.52 3 F CFR 10-Jan 26-Mar 21-Mar 24-Mar 5-Apr 11-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 1 W/D PIPE 80A S/10(OD88.9x3.05) A312-316L pc 10 393.60 3 F CFR 10-Jan 26-Mar 4-Apr 7-Apr 2ND 20-Apr 10-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 2 W/D PIPE 100A S/10(OD114.3x3.05 A312-316L pc 29 1,480.75 3 F CFR 10-Jan 26-Mar 4-Apr 7-Apr 2ND 20-Apr 10-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 3 W/D PIPE 125A S/10(OD141.3x3.4) A312-316L pc 1 70.50 3 F CFR 10-Jan 26-Mar 4-Apr 7-Apr 2ND 20-Apr 10-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 3a W/D PIPE 150A S/10(OD168.3x3.4) A312-316L pc 6 506.20 3 F CFR 10-Jan 26-Mar 4-Apr 7-Apr 2ND 20-Apr 10-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 7 W/D PIPE 400A S/10(OD406.4x4.78 A312-316L pc 3 866.34 3 F CFR 10-Jan 26-Mar 4-Apr 7-Apr 2ND 20-Apr 10-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 8 W/D PIPE 450A S/10(OD457.2x4.78 A312-316L pc 12 3,903.80 3 F CFR 10-Jan 26-Mar 4-Apr 7-Apr 2ND 20-Apr 10-May L/C $/M

U179 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 10 W/D PIPE 600A S/10(OD609.6x6.3 A312-316L pc 13 7,490.34 3 F CFR 10-Jan 26-Mar 4-Apr 7-Apr 2ND 20-Apr 10-May L/C $/M

U179 M1-4450(R.5) 30-Dec 16-Dec add PLATE 8 x 1524 x 5200 A240-316L sh 5 2,529.60 39 F CFR 16-Mar 26-Mar 28-Mar 1-Apr 11-Apr OK 100% $

U179 M1-4450(R.5) 30-Dec 16-Dec add PLATE 8 x 1524 x 5300 A240-316L sh 2 1,031.30 39 F CFR 16-Mar 26-Mar 28-Mar 1-Apr 11-Apr OK 100% $

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 4 PLATE 9 x 1524 x 3200 A240-316L sh 12 4,203.02 238 F CFR 10-Dec Jan/Feb 28-Mar 1-Apr 11-Apr 4th 21-Apr 100% $

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 5 PLATE 9 x 1524 x 3300 A240-316L sh 1 361.00 238 F CFR 10-Dec Jan/Feb 28-Mar 1-Apr 11-Apr 4th 21-Apr 100% $

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 7 PLATE 11 x 1524 x 3900 A240-316L sh 1 522.00 238 F CFR 10-Dec Jan/Feb 28-Mar 1-Apr 11-Apr 4th 21-Apr 100% $

U179 M1-4450(R.5) add 15-Jan 27-Dec 10 PLATE 15 x 1524 x 6096 A240-316L sh 4 4,448.20 10 F CFR 10-Jan 26-Mar 28-Mar 1-Apr 11-Apr 21-Apr L/C $

U179 M1-4526(R.1) 4-Jan 15-Feb 19-Jan 1 PLATE 8 x 1524 x 5200 A240-316L sh 24 12,142.00 10 F CFR 10-Jan 26-Mar 28-Mar 1-Apr 11-Apr 21-Apr L/C $

U179 M1-4526(R.1) 4-Jan 15-Feb 19-Jan 2 PLATE 8 x 1524 x 5300 A240-316L sh 6 3,093.90 10 F CFR 10-Jan 26-Mar 28-Mar 1-Apr 11-Apr 21-Apr L/C $

U179 M1-4526(R.1) 4-Jan 15-Feb 19-Jan 3 PLATE 9 x 1524 x 6096 A240-316L sh 2 1,334.50 10 F CFR 10-Jan 26-Mar 28-Mar 1-Apr 11-Apr 21-Apr L/C $

U179 M1-4586(R.1) 25-Jan 28-Feb 1 W/D PIPE 80A S/10(OD88.9x3.05) A312-316L pc 25 984.00 25 F CFR 4-Feb 31-Mar 17-Mar 23-Mar 30-Mar 5-Apr 100% $/pc

U179 M1-4586(R.1) 25-Jan 28-Feb 2 W/D PIPE 100A S/10(OD114.3x3.05 A312-316L pc 20 1,021.20 25 F CFR 4-Feb 31-Mar 17-Mar 23-Mar 30-Mar 5-Apr 100% $/pc

U179 M1-4586(R.1) 25-Jan 28-Feb 3 W/D PIPE 150A S/10(OD168.3x3.4) A312-316L pc 38 3,205.70 25 F CFR 4-Feb 31-Mar 17-Mar 23-Mar 30-Mar 5-Apr 100% $/pc

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 3 PLATE 8 x 1524 x 5500 A240-316L sh 33 17,660.50 238 F CFR 10-Dec Jan/Feb 28-Feb 13-Mar 17-Mar 3rd L/C $

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 4 PLATE 9 x 1524 x 3200 A240-316L sh 352 123,290.00 238 F CFR 10-Dec Jan/Feb 28-Feb 13-Mar 17-Mar 3rd L/C $

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 5 PLATE 9 x 1524 x 3300 A240-316L sh 33 11,918.82 238 F CFR 10-Dec Jan/Feb 28-Feb 13-Mar 17-Mar 3rd L/C $

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 2 PLATE 8 x 1524 x 5300 A240-316L sh 1 515.65 238 F CFR 10-Dec Jan/Feb 26-Feb 8-Mar 15-Mar 2nd 4-Apr L/C $

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 3 PLATE 8 x 1524 x 5500 A240-316L sh 27 14,449.50 238 F CFR 10-Dec Jan/Feb 26-Feb 8-Mar 15-Mar 2nd 4-Apr L/C $

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 4 PLATE 9 x 1524 x 3200 A240-316L sh 322 112,782.33 238 F CFR 10-Dec Jan/Feb 26-Feb 8-Mar 15-Mar 2nd 4-Apr L/C $

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 7 PLATE 11 x 1524 x 3900 A240-316L sh 36 18,778.38 238 F CFR 10-Dec Jan/Feb 26-Feb 8-Mar 15-Mar 2nd 4-Apr L/C $

U179 M1-4458(R.1) 6-Dec 4-Jan 17-Dec 7 W/D PIPE 400A S/10(OD406.4x4.78 A312-316L pc 106 30,413.72 235 F CFR 3-Dec Jan/Feb 28-Feb 3-Mar 11-Mar 4-Apr L/C $/M

U179 M1-4458(R.1) 6-Dec 4-Jan 17-Dec 9 W/D PIPE 500A S/10(OD508x5.54) A312-316L pc 9 3,744.40 235 F CFR 3-Dec Jan/Feb 28-Feb 3-Mar 11-Mar 4-Apr L/C $/M

U179 M1-4458(R.1) 6-Dec 4-Jan 17-Dec 7 W/D PIPE 400A S/10(OD406.4x4.78 A312-316L pc 27 7,796.73 235 F CFR 3-Dec Jan/Feb 21-Feb 26-Feb 4-Mar 11-Apr L/C $/M

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 4 PLATE 9 x 1524 x 3200 A240-316L sh 2 693.00 238 F CFR 10-Dec Jan/Feb 17-Feb 21-Feb 8-Mar 1st 14-Mar L/C $

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 6 PLATE 10 x 1524 x 3200 A240-316L sh 20 7,780.00 238 F CFR 10-Dec Jan/Feb 17-Feb 21-Feb 8-Mar 1st 14-Mar L/C $

U179 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 8 PLATE 12 x 1524 x 3900 A240-316L sh 8 4,550.00 238 F CFR 10-Dec Jan/Feb 17-Feb 21-Feb 8-Mar 1st 14-Mar L/C $

U179 M1-4458(R.1) 6-Dec 4-Jan 18-Dec 1 W/D PIPE 80A S/10(OD88.9x3.05) A312-316L pc 127 4,968.20 235 F CFR 3-Dec Jan/Feb 1-Feb 4-Feb 17-Feb 2-Mar L/C $/M

Page 20: Hvc PlatePipe Update)

HVC-PUR 20 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

U179 M1-4458(R.1) 6-Dec 4-Jan 18-Dec 2 W/D PIPE 100A S/10(OD114.3x3.05 A312-316L pc 28 1,419.60 235 F CFR 3-Dec Jan/Feb 1-Feb 4-Feb 17-Feb 2-Mar L/C $/M

U179 M1-4458(R.1) 6-Dec 4-Jan 17-Dec 3 W/D PIPE 150A S/10(OD168.3x3.4) A312-316L pc 2 168.00 235 F CFR 3-Dec Jan/Feb 1-Feb 4-Feb 17-Feb 2-Mar L/C $/M

U179 M1-4458(R.1) 6-Dec 4-Jan 17-Dec 5 W/D PIPE 250A S/10(OD273.1x4.19 A312-316L pc 2 337.00 235 F CFR 3-Dec Jan/Feb 1-Feb 4-Feb 17-Feb 2-Mar L/C $/M

U179 M1-4458(R.1) 6-Dec 4-Jan 17-Dec 7 W/D PIPE 400A S/10(OD406.4x4.78 A312-316L pc 30 8,607.66 235 F CFR 3-Dec Jan/Feb 1-Feb 4-Feb 17-Feb 2-Mar L/C $/M

U179,181 A6-4521 1-Jan 25-Jan 1 Plastic Cap for Pipe 80A Plastic ea 690 4 F FOB 5-Jan 20-Jan 21-Jan 27-Jan 31-Jan 100% $

U179,181 A6-4521 1-Jan 25-Jan 2 Plastic Cap for Pipe 100A Plastic ea 950 4 F FOB 5-Jan 20-Jan 21-Jan 27-Jan 31-Jan 100% $

U179,181 A6-4521 1-Jan 25-Jan 3 Plastic Cap for Pipe 150A Plastic ea 30 4 F FOB 5-Jan 20-Jan 21-Jan 27-Jan 31-Jan 100% $

U179,181 A6-4521 1-Jan 25-Jan 4 Plastic Cap for Pipe 200A Plastic ea 1810 4 F FOB 5-Jan 20-Jan 21-Jan 27-Jan 31-Jan 100% $

U179,181 A6-4521 1-Jan 25-Jan 5 Plastic Cap for Pipe 250A Plastic ea 600 4 F FOB 5-Jan 20-Jan 21-Jan 27-Jan 31-Jan 100% $

U179,181 A6-4521 1-Jan 25-Jan 6 Plastic Cap for Pipe 300A Plastic ea 430 4 F FOB 5-Jan 20-Jan 21-Jan 27-Jan 31-Jan 100% $

U179,181 A6-4521 1-Jan 25-Jan 7 Plastic Cap for Pipe 350A Plastic ea 5 4 F FOB 5-Jan 20-Jan 21-Jan 27-Jan 31-Jan 100% $

U179,181 A6-4521 1-Jan 25-Jan 8 Plastic Cap for Pipe 400A Plastic ea 900 4 F FOB 5-Jan 20-Jan 21-Jan 27-Jan 31-Jan 100% $

U179,181 A6-4521 1-Jan 25-Jan 9 Plastic Cap for Pipe 450A Plastic ea 20 4 F FOB 5-Jan 20-Jan 21-Jan 27-Jan 31-Jan 100% $

U179,181 A6-4521 1-Jan 25-Jan 10 Plastic Cap for Pipe 500A Plastic ea 10 4 F FOB 5-Jan 20-Jan 21-Jan 27-Jan 31-Jan 100% $

Sabiya/U181

U181 M1-4779 5-Apr 25-May 1 W/D PIPE 8" S/20(OD219.1x6.35)- A53-B pc 74 14,791.74 95 F CFR 18-May 3-Jun 30-May 2-Jun 10-Jun 21-Jun 100% $/pc

U181 M1-4854 27-Apr 29-May 1 SMLS PIPE 3" S/40(OD88.9xt5.5)-6M A53-B pc 11 745.00 79 F CFR 28-Apr 18-May 13-May 19-May 27-May 7-Jun 100% $/pc

U181 M1-4779 5-Apr 25-May 1 W/D PIPE 8" S/30(OD219.1x7.04)- A53-B pc 14 3,300.00 90 F CFR 13-May 15-May 16-May 24-May 27-May 7-Jun 100% $/pc

U181 M1-4632 18-Feb 5-Apr 1 PLATE 20.5 x 2438 x 7800 A283-D sh 2 6,120.00 31 F FOB 23-Feb 14-Apr 16-May 24-May 27-May 7-Jun 100% $

U181 M1-4886 10-May 10-Jun 1 SMLS PIPE 65A S/40(OD73.0xt5.16) A53-B pc 20 1,035.60 184 L Ex-w 10-May 13-May 12-May 19-May 100% VND

U181 M1-4779 5-Apr 25-May 1 W/D PIPE 8" S/20(OD219.1x6.35)- A53-B pc 15 3,000.00 138 L DDP 11-Apr 7-May 27-May 7-Jun 100% VND

U181 M1-4737 28-Mar 5-Apr 1 W/D PIPE 50A S/80(OD60.3x5.54)- A53-B pc 5 224.40 114 L Ex-w 30-Mar 2-Apr 31-Mar 100% VND

U181 M1-4665(R.1) 8-Mar 20-Apr 1 PLATE 13 x 2250 x 5200 A516-70 sh 12 14,327.82 38 F FOB 16-Mar 4-May 6-May 20-May 26-May 7-Jun 100% $

U181 M1-4498(R.2) 20-Dec 20-Jan 18-Jan 4 SMLS PIPE 300A S/20 (OD323.9xt6. A106-B pc 208 62,060.00 2 F FOB 3-Jan 30-Mar L/C $/pc

U181 M1-4498(R.2) 4 SMLS PIPE 300A S/20(OD323.9x6.35 A106-B M 920.96 45,797.16 2 F FOB 19-Apr 30-Apr 6-May 19-May 100%

U181 M1-4498(R.2) 4 SMLS PIPE 300A S/20 (OD323.9xt6. A106-B pc 57 2 F FOB 16-May 24-May 27-May 100%

U181 M1-4690 14-Mar 12-Apr 1 SMLS PIPE 3" S/40(OD88.9xt5.5)-6M A53-B pc 223 15,106.00 36 F FOB 14-Mar 15-Mar 17-Mar 28-Mar 30-Mar 100% $/pc

U181 M1-4690 14-Mar 12-Apr 2 SMLS PIPE 4" S/40(OD114.3xt6.02)-6M A53-B pc 118 11,380.00 36 F FOB 14-Mar 15-Mar 17-Mar 28-Mar 30-Mar 100% $/pc

U181 M1-4690 14-Mar 12-Apr 3 SMLS PIPE 6" S/40 (OD168.3xt7.11) A53-B pc 47 15,769.10 36 F FOB 14-Mar 15-Mar 17-Mar 28-Mar 30-Mar 100% $/pc

U181 M1-4497(R.2) 20-Dec 20-Jan 18-Jan 1 W/D PIPE 8" S/20(OD219.1x6.35)- A53-B pc 638.8 127,670.60 248 F FOB 31-Dec 31-Mar 8-Apr 15-Apr 17-Apr 10-May L/C $/pc

U181 M1-4497(R.2) 20-Dec 20-Jan 18-Jan 3 W/D PIPE 300A S/20(OD323.9x6.35 A53-B pc 7 4,209.00 248 F FOB 31-Dec 31-Mar 8-Apr 15-Apr 17-Apr 10-May L/C $/pc

U181 M1-4497(R.2) 20-Dec 20-Jan 18-Jan 5 W/D PIPE 400A S/20(OD406.4x7.92 A53-B pc 210 98,066.00 248 F FOB 31-Dec 31-Mar 8-Apr 15-Apr 17-Apr 10-May L/C $/pc

U181 M1-4497(R.2) 20-Dec 20-Jan 18-Jan 7 W/D PIPE 600A S/20(OD609.6x9.52 A53-B pc 1 850.00 248 F FOB 31-Dec 31-Mar 8-Apr 15-Apr 17-Apr 10-May L/C $/pc

U181 M1-4498(R.2) 20-Dec 20-Jan 18-Jan 5 SMLS PIPE 100A S/40(OD114.3 x 6. A106-C pc 74 7,140.00 2 F FOB 3-Jan 30-Mar 17-Mar 28-Mar 30-Mar 21-Apr L/C $/pc

U181 M1-4497(R.2) 20-Dec 20-Jan 18-Jan 2 W/D PIPE 250A S/20(OD273.1x6.35 A53-B pc 417 104,510.00 248 F FOB 31-Dec 31-Mar 17-Mar 28-Mar 30-Mar 21-Apr L/C $/pc

U181 M1-4498(R.2) 20-Dec 20-Jan 18-Jan 1 SMLS PIPE 100A S/40(OD114.3 x 6. A106-B pc 7.9 761.70 2 F FOB 3-Jan 30-Jan 6-Feb 14-Feb 22-Feb 2-Mar L/C $/pc

U181 M1-4498(R.2) 20-Dec 20-Jan 18-Jan 2 SMLS PIPE 150A S/40 (OD168.3xt7. A106-B pc 35 5,934.60 2 F FOB 3-Jan 30-Jan 6-Feb 14-Feb 22-Feb 2-Mar L/C $/pc

U181 M1-4498(R.2) 20-Dec 20-Jan 18-Jan 6 SMLS PIPE 3" S/40(OD88.9xt5.5)-6M A53-B pc 127 8,600.00 2 F FOB 3-Jan 30-Jan 6-Feb 14-Feb 22-Feb 2-Mar L/C $/pc

U181 M1-4498(R.2) 20-Dec 20-Jan 18-Jan 7 SMLS PIPE 4" S/40(OD114.3xt6.02)-6M A53-B pc 258 24,880.00 2 F FOB 3-Jan 30-Jan 6-Feb 14-Feb 22-Feb 2-Mar L/C $/pc

U181 M1-4498(R.2) 20-Dec 20-Jan 18-Jan 8 SMLS PIPE 6" S/40(OD168.3xt7.11)- A53-B pc 24 4,070.00 2 F FOB 3-Jan 30-Jan 6-Feb 14-Feb 22-Feb 2-Mar L/C $/pc

U181 M1-4498(R.2) 20-Dec 20-Jan 18-Jan 3 SMLS PIPE 200A S/20(OD219.1x6.35 A106-B M2240

61,743.80 2 F FOB 3-Jan 25-Feb 3-Feb 14-Feb 22-Feb a 4-Apr L/C $

U186 M1-4498(R.2) 20-Dec 20-Jan 18-Jan 3 SMLS PIPE 200A S/20(OD219.1x6.35 A106-B M 15,984.20 2 F FOB 3-Jan 25-Feb 3-Feb 14-Feb 22-Feb a 4-Apr L/C $

Sabiya/U186

U186 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 10 W/D PIPE 600A S/10(OD609.6x6.3 A312-316L pc 40 23,047.20 3 F CFR 10-Jan 26-Mar 27-Apr 30-Apr 10-May 3RD L/C $/M

U186 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 4 W/D PIPE 200A S/10(OD219.1x3.76 A312-316L pc 21 2,557.80 3 F CFR 10-Jan 26-Mar 21-Mar 24-Mar 5-Apr 11-May L/C $/M

U186 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 5 W/D PIPE 300A S/10(OD323.9x4.57 A312-316L pc 10 2,195.40 3 F CFR 10-Jan 26-Mar 21-Mar 24-Mar 5-Apr 11-May L/C $/M

U186 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 6 W/D PIPE 350A S/10(OD355.6x4.78 A312-316L pc 1 252.20 3 F CFR 10-Jan 26-Mar 21-Mar 24-Mar 5-Apr 11-May L/C $/M

Page 21: Hvc PlatePipe Update)

HVC-PUR 21 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

U186 M1-4527(R.1) 4-Jan 15-Feb 11-Jan 8 W/D PIPE 450A S/10(OD457.2x4.78 A312-316L pc 1 325.30 3 F CFR 10-Jan 26-Mar 21-Mar 24-Mar 5-Apr 11-May L/C $/M

U186 M1-4497(R.2) 20-Dec 20-Jan 18-Jan 1 W/D PIPE 8" S/20(OD219.1x6.35)- A53-B pc 0.2 40.00 248 F FOB 31-Dec 31-Mar 8-Apr 15-Apr 17-Apr 10-May L/C $/pc

U186 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 4 PLATE 9 x 1524 x 3200 A240-316L sh 8 2,802.01 238 F CFR 10-Dec Jan/Feb 28-Mar 1-Apr 11-Apr 4th 21-Apr 100% $

U186 M1-4526(R.1) 4-Jan 15-Feb 19-Jan 1 PLATE 8 x 1524 x 5200 A240-316L sh 15 7,588.80 10 F CFR 10-Jan 23-Feb 28-Mar 1-Apr 11-Apr 21-Apr L/C $

U186 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 1 PLATE 8 x 1524 x 5200 A240-316L sh 16 8,092.90 238 F CFR 10-Dec Jan/Feb 26-Feb 8-Mar 15-Mar 2nd 4-Apr L/C $

U186 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 2 PLATE 8 x 1524 x 5300 A240-316L sh 5 2,578.20 238 F CFR 10-Dec Jan/Feb 26-Feb 8-Mar 15-Mar 2nd 4-Apr L/C $

U186 M1-4458(R.1) 6-Dec 4-Jan 17-Dec 7 W/D PIPE 400A S/10(OD406.4x4.78 A312-316L pc 93 26,683.60 235 F CFR 3-Dec Jan/Feb 21-Feb 26-Feb 4-Mar 11-Apr L/C $/M

U186 M1-4458(R.1) 6-Dec 4-Jan 17-Dec 10 W/D PIPE 600A S/10(OD609.6x6.3 A312-316L pc 9 5,152.61 235 F CFR 3-Dec Jan/Feb 21-Feb 26-Feb 4-Mar 11-Apr L/C $/M

U186 M1-4458(R.1) 6-Dec 4-Jan 18-Dec 1 W/D PIPE 80A S/10(OD88.9x3.05) A312-316L pc 101 3,951.10 235 F CFR 3-Dec Jan/Feb 1-Feb 4-Feb 17-Feb 2-Mar L/C $/M

U186 M1-4458(R.1) 6-Dec 18-Dec 2 W/D PIPE 100A S/10(OD114.3x3.05 A312-316L pc 72 3,650.40 235 F CFR 3-Dec Jan/Feb 1-Feb 4-Feb 17-Feb 2-Mar L/C $/M

U186 M1-4458(R.1) 6-Dec 4-Jan 17-Dec 6 W/D PIPE 350A S/10(OD355.6x4.78 A312-316L pc 5 1,253.00 235 F CFR 3-Dec Jan/Feb 1-Feb 4-Feb 17-Feb 2-Mar L/C $/M

U186 M1-4498(R.2) 20-Dec 20-Jan 18-Jan 1 SMLS PIPE 100A S/40(OD114.3 x 6. A106-B pc 0.1 9.60 2 F FOB 3-Jan 30-Jan 6-Feb 14-Feb 22-Feb 2-Mar L/C $/pc

U186 M1-4498(R.2) 20-Dec 20-Jan 18-Jan 2 SMLS PIPE 150A S/40 (OD168.3xt7. A106-B pc 10 1,695.60 2 F FOB 3-Jan 30-Jan 6-Feb 14-Feb 22-Feb 2-Mar L/C $/pc

U186 M1-4498(R.2) 20-Dec 20-Jan 18-Jan 3 SMLS PIPE 200A S/20(OD219.1xt6.3 A106-B pc 33 6,600.00 2 F FOB 3-Jan 25-Feb 17-Mar 28-Mar 30-Mar 21-Apr L/C $/T

U186 M1-4450(R.5) 6-Dec 30-Dec 16-Dec 1 PLATE 8 x 1524 x 5200 A240-316L sh 15 7,535.00 238 F CFR 10-Dec Jan/Feb 17-Feb 21-Feb 8-Mar 1st 14-Mar L/C $

U186 M1-4587 25-Jan 28-Feb 1 W/D PIPE 125A S/10(OD141.3x3.4) A312-316L pc 1 70.50 25 F CFR 4-Feb 20-Feb 20-Feb 23-Feb 2-Mar OK 100% $/pc

U186 M1-4587 25-Jan 28-Feb 2 W/D PIPE 200A S/10(OD219.1x3.76 A312-316L pc 3 365.40 25 F CFR 4-Feb 20-Feb 20-Feb 23-Feb 2-Mar OK 100% $/pc

U186 M1-4587 25-Jan 28-Feb 3 W/D PIPE 300A S/10(OD323.9x4.57 A312-316L pc 4 878.20 25 F CFR 4-Feb 20-Feb 20-Feb 23-Feb 2-Mar OK 100% $/pc

U186 M1-4587 25-Jan 28-Feb 4 W/D PIPE 450A S/10(OD457.2x4.78 A312-316L pc 2 650.60 25 F CFR 4-Feb 20-Feb 20-Feb 23-Feb 2-Mar OK 100% $/pc

U186 M1-4458(R.1) 6-Dec 4-Jan 17-Dec 9 W/D PIPE 500A S/10(OD508x5.54) A312-316L pc 1 416.00 235 F CFR 3-Dec Jan/Feb 28-Feb 3-Mar 11-Mar 4-Apr L/C $/M

U186 M1-4458(R.1) 6-Dec 4-Jan 17-Dec 10 W/D PIPE 600A S/10(OD609.6x6.3 A312-316L pc 32 18,320.39 235 F CFR 3-Dec Jan/Feb 28-Feb 3-Mar 11-Mar 4-Apr L/C $/M

FAM-Spence/K188

K188 M1-5246 18-Aug 25-Aug 1 PLATE 3 x 1250 x 6000 CT3 sh 3 530.00 343 L DDP 20-Aug 25-Aug 25-Aug 6-Sep 100% VND

K188 M1-5245 18-Aug 25-Aug 2 PLATE 4 x 1500 x 6000 CT3 sh 2 565.00 343 L DDP 20-Aug 25-Aug 25-Aug 6-Sep 100% VND

K188 M1-5245 18-Aug 25-Aug 1 W/D PIPE OD26.7 x 2.5t-6M STK400 pc 5 50.70 341 L DDP 19-Aug 22-Aug 25-Aug 6-Sep 100% VND

K188 M1-5119 12-Jul 30-Jul 1 W/D PIPE 40A S/40(OD48.3x3.7)-6 A53-B pc 110 2,673.00 158 F CFR 13-Jul 23-Jul 26-Jul 2-Aug 3-Aug 100% $/pc

K188 M1-5119 12-Jul 30-Jul 2 SMLS PIPE 6" S/160(OD165.2x18.2t) A53-B pc 1 395.90 158 F CFR 13-Jul 23-Jul 26-Jul 2-Aug 3-Aug 100% $

K188 M1-5077 27-Jun 15-Jul 1 W/D PIPE 6" S/160(OD165.2x18.2) A53-B pc 1 395.90 143 F CFR 30-Jun 15-Jul 15-Jul 26-Jul OK OK 100% $/T

K188 M1-5118 12-Jul 30-Jul 1 PLATE 6 x 1500 x 6000 CT3 pc 7 3,063.00 299 L DDP 23-Jul 25-Jul 25-Jul 3-Aug 100% VND

K188 M1-5118 12-Jul 30-Jul 2 PLATE 8 x 1500 x 6000 CT3 pc 22 12,835.50 299 L DDP 23-Jul 25-Jul 25-Jul 3-Aug 100% VND

K188 M1-5118 12-Jul 30-Jul 3 PLATE 10 x 1500 x 6000 CT3 pc 5 3,646.40 299 L DDP 23-Jul 25-Jul 25-Jul 3-Aug 100% VND

K188 M1-5130 15-Jul 30-Jul 1 W/D PIPE 40A S/40(OD48.1x3.5)-6 A53-B pc 120 2,916.00 287 L DDP 15-Jul 20-Jul 18-Jul 25-Jul 100% VND

K188 M1-4936 25-May 20-Jun 1 PLATE 1 x 1219 x 2438 SS400 sh 1 25.20 212 L DDP 2-Jun 7-Jun 4-Jun 21-Jun 100% VND

K188 M1-4936 25-May 20-Jun 2 PLATE 2 x 1219 x 2438 SS400 sh 2 100.80 212 L DDP 2-Jun 7-Jun 4-Jun 21-Jun 100% VND

K188 M1-4936 25-May 20-Jun 3 PLATE 4 x 1000 x 6000 SS400 sh 3 472.60 212 L DDP 2-Jun 7-Jun 20-Jun 28-Jun 100% VND

K188 M1-4936 25-May 20-Jun 4 PLATE 5 x 1524 x 3048 SS400 sh 2 393.80 212 L DDP 2-Jun 7-Jun 4-Jun 21-Jun 100% VND

K188 M1-4936 25-May 20-Jun 6 CHK'D PLATE 3 x 1500 x 6000 SS400 sh 2 610.40 212 L DDP 2-Jun 7-Jun 4-Jun 21-Jun 100% VND

K188 M1-4922 20-May 19-Jun 1 SMLS PIPE 5" S/160(OD139.8 x 15.9 A53-B pc 3 874.40 102 F CFR 25-May 10-Jun 3-Jun 8-Jun 15-Jun 21-Jun 100% $

K188 M1-4922 20-May 19-Jun 2 SMLS PIPE 6" S/160(OD165.2x18.2t) A53-B pc 2 791.80 102 F CFR 25-May 10-Jun 3-Jun 8-Jun 15-Jun 21-Jun 100% $

K188 M1-4922 20-May 19-Jun 3 SQ.Pipe 40 x 40 x 2.3 - 6M SPSR400 pc 20 314.00 102 F CFR 25-May 10-Jun 3-Jun 8-Jun 15-Jun 21-Jun 100% $

K188 M1-4922 20-May 19-Jun 4 Rec.Pipe 100 x 50 x 3.2-6M SPSR400 pc 27 1,208.50 102 F CFR 25-May 10-Jun 3-Jun 8-Jun 15-Jun 21-Jun 100% $

K188 M1-4922 20-May 19-Jun 5 Rec.Pipe 100 x 50 x 4.5-6M SPSR400 pc 2 158.40 102 F CFR 25-May 10-Jun 3-Jun 8-Jun 15-Jun 21-Jun 100% $

K188 M1-4922 20-May 19-Jun 6 Rec.Pipe 300 x 200 x 12-6M SPSR400 pc 1 527.70 102 F CFR 25-May 10-Jun 3-Jun 8-Jun 15-Jun 21-Jun 100% $

K188 M1-4681(R.2) 14-Mar 3 PLATE 8 x 1524 x 6096 SM490A sh 2 1,166.00 44 F CFR 23-Mar 10-May 15-May 25-May 27-May 13-Jun 100% $

K188 M1-4681(R.2) 14-Mar 5 PLATE 8 x 1524 x 6096 SM490A sh 2 1,166.00 44 F CFR 23-Mar 10-May 15-May 25-May 27-May 13-Jun 100% $

K188 M1-4681(R.2) 14-Mar 6 PLATE 8 x 1524 x 6096 SS400 sh 131 76,373.00 44 F CFR 23-Mar 10-May 15-May 25-May 27-May 13-Jun 100% $

K188 M1-4681(R.2) 14-Mar 7 PLATE 8 x 1524 x 6096 SM490A sh 20 11,660.00 44 F CFR 23-Mar 10-May 15-May 25-May 27-May 13-Jun 100% $

Page 22: Hvc PlatePipe Update)

HVC-PUR 22 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K188 M1-4681(R.2) 14-Mar 8 PLATE 10 x 2438 x 6096 SS400 sh 6 7,000.00 44 F CFR 23-Mar 10-May 15-May 25-May 27-May 13-Jun 100% $

K188 M1-4681(R.2) 14-Mar 10 PLATE 12 x 2438 x 6096 SS400 sh 6 8,400.00 44 F CFR 23-Mar 10-May 15-May 25-May 27-May 13-Jun 100% $

K188 M1-4681(R.2) 14-Mar 11 PLATE 12 x 2438 x 6096 SM490A sh 3 4,200.00 44 F CFR 23-Mar 10-May 15-May 25-May 27-May 13-Jun 100% $

K188 M1-4681(R.2) 14-Mar 12 PLATE 15 x 2438 x 6096 SS400 sh 5 8,750.00 44 F CFR 23-Mar 10-May 15-May 25-May 27-May 13-Jun 100% $

K188 M1-4681(R.2) 14-Mar 8 PLATE 10 x 2438 x 6096 SS400 sh 27 31,500.11 44 F CFR 23-Mar 4-May 28-May 14-Jun 20-Jun 29-Jun 100% $

K188 M1-4681(R.2) 14-Mar 9 PLATE 10 x 2438 x 6096 SM490A sh 5 5,835.00 44 F CFR 23-Mar 4-May 28-May 14-Jun 20-Jun 29-Jun 100% $

K188 M1-4681(R.2) 14-Mar 10 PLATE 12 x 2438 x 6096 SS400 sh 46 64,400.00 44 F CFR 23-Mar 4-May 28-May 14-Jun 20-Jun 29-Jun 100% $

K188 M1-4681(R.2) 14-Mar 11 PLATE 12 x 2438 x 6096 SM490A sh 6 8,400.00 44 F CFR 23-Mar 4-May 28-May 14-Jun 20-Jun 29-Jun 100% $

K188 M1-4681(R.2) 14-Mar 12 PLATE 15 x 2438 x 6096 SS400 sh 31 54,250.19 44 F CFR 23-Mar 4-May 28-May 14-Jun 20-Jun 29-Jun 100% $

K188 M1-4681(R.2) 14-Mar 13 PLATE 15 x 2438 x 6096 SM490A sh 7 12,250.04 44 F CFR 23-Mar 4-May 28-May 14-Jun 20-Jun 29-Jun 100% $

K188 M1-4681(R.2) 14-Mar 17 PLATE 30 x 2438 x 6096 SS400 sh 3 10,500.00 44 F CFR 23-Mar 4-May 28-May 14-Jun 20-Jun 29-Jun 100% $

K188 M1-4865 29-Apr 19-May 4 W/D PIPE OD26.7x2.9t-6M A53-B pc 33 334.60 82 F CFR 6-May 21-May 13-May 19-May 27-May 7-Jun 100% $/pc

K188 M1-4865 29-Apr 19-May 5 W/D PIPE OD42.2x3.6t-6M A53-B pc 4 81.36 82 F CFR 6-May 21-May 13-May 19-May 27-May 7-Jun 100% $/pc

K188 M1-4865 29-Apr 19-May 6 W/D PIPE OD60.3x3.9t-6M A53-B pc 3 97.92 82 F CFR 6-May 21-May 13-May 19-May 27-May 7-Jun 100% $/pc

K188 M1-4865 29-Apr 19-May 7 W/D PIPE OD76.3x5.2t-6M A53-B pc 4 218.88 82 F CFR 6-May 21-May 13-May 19-May 27-May 7-Jun 100% $/pc

K188 M1-4865 29-Apr 19-May 8 SMLS PIPE OD76.3x9.5t-2M A53-B pc 1 31.30 82 F CFR 6-May 21-May 13-May 19-May 27-May 7-Jun 100% $

K188 M1-4865 29-Apr 19-May 9 W/D PIPE OD88.9x5.5t-6M A53-B pc 2 135.48 82 F CFR 6-May 21-May 13-May 19-May 27-May 7-Jun 100% $/pc

K188 M1-4865 29-Apr 19-May 10 W/D PIPE OD165.2x11.0t -6M A53-B pc 1 250.98 82 F CFR 6-May 21-May 13-May 19-May 27-May 7-Jun 100% $/pc

K188 M1-4865 29-Apr 19-May 11 SQ.Pipe 40 x 40 x 2.3 - 6M STK400 pc 21 330.12 82 F CFR 6-May 21-May 13-May 19-May 27-May 7-Jun 100% $

K188 M1-4865 29-Apr 19-May 12 Rec.Pipe 100 x 50 x 3.2-6M STKR400 pc 28 1,177.68 82 F CFR 6-May 21-May 13-May 19-May 27-May 7-Jun 100% $

K188 M1-4865 29-Apr 19-May 1 W/D PIPE OD88.9x5.0t-6.4M S355J2H pc 9 593.00 81 F CFR 6-May 18-May 13-May 15-May 27-May 7-Jun 100% $/T

K188 M1-4865 29-Apr 19-May 2 W/D PIPE OD114.3x6.3t-10M S355J2H pc 5 840.00 81 F CFR 6-May 18-May 13-May 15-May 27-May 7-Jun 100% $/T

K188 M1-4865 29-Apr 19-May 3 W/D PIPE OD139.7x8t -6.4M S355J2H pc 1 166.50 81 F CFR 6-May 18-May 13-May 15-May 27-May 7-Jun 100% $/T

K188 M1-4865 29-Apr 19-May 13 W/D PIPE OD139.7x8t -6.4M S355J2H pc 1 166.50 81 F CFR 6-May 18-May 13-May 15-May 27-May 7-Jun 100% $/T

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 4 W/D PIPE 40A S/40(OD48.3x3.7)-6 A53-B pc 1280 31,099.80 53 F CFR 31-Mar 5-May 19-Apr 30-Apr 6-May 19-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 6 W/D PIPE 65A S/40(OD76.3x5.2) - A53-B pc 1 54.70 53 F CFR 31-Mar 5-May 19-Apr 30-Apr 6-May 19-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 7 W/D PIPE 3" S/40(OD88.9xt5.5)-6M A53-B pc 11 745.34 53 F CFR 31-Mar 5-May 19-Apr 30-Apr 6-May 19-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 9 W/D PIPE 5" S/40(OD139.8x6.55)- A53-B pc 2 260.20 53 F CFR 31-Mar 5-May 19-Apr 30-Apr 6-May 19-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 11 W/D PIPE 6" S/80(OD165.2x11.0) - A53-B pc 2 501.97 53 F CFR 31-Mar 5-May 19-Apr 30-Apr 6-May 19-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 12 SMLS PIPE 6" S/160(OD165.2x18.2t) A53-B pc 1 396.00 53 F CFR 31-Mar 5-May 19-Apr 30-Apr 6-May 19-May 100% $

K188 M1-4681(R.2) 14-Mar 1 PLATE 3.2 x 1219 x 2438 SS400 sh 86 6,450.00 43 F FOB 23-Mar 15-Apr 8-Apr 15-Apr 19-Apr 19-May 100% $

K188 M1-4681(R.2) 14-Mar 2 PLATE 5 x 1219 x 2438 SS400 sh 6 702.00 43 F FOB 23-Mar 15-Apr 8-Apr 15-Apr 19-Apr 19-May 100% $

K188 M1-4681(R.2) 14-Mar 4 PLATE 6 x 1524 x 6096 SS400 sh 12 5,256.00 43 F FOB 23-Mar 15-Apr 8-Apr 15-Apr 19-Apr 19-May 100% $

K188 M1-4681(R.2) 14-Mar 15 PLATE 25 x 2438 x 6096 SS400 sh 3 8,751.00 43 F FOB 23-Mar 15-Apr 8-Apr 15-Apr 19-Apr 19-May 100% $

K188 M1-4681(R.2) 14-Mar 19 PLATE 35 x 2438 x 6096 SS400 sh 1 4,083.35 43 F FOB 23-Mar 15-Apr 8-Apr 15-Apr 19-Apr 19-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 1 W/D PIPE 1/2" S/40(OD21.3x2.77)-6M A53-B pc 1 8.00 53 F CFR 31-Mar 5-May 15-Apr 20-Apr 26-Apr 10-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 3 W/D Pipe 32A S/40(OD42.2 x3.6)- A53-B pc 735 14,961.00 53 F CFR 31-Mar 5-May 15-Apr 20-Apr 26-Apr 10-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 5 W/D PIPE 50A S/40(OD60.3x3.9)-6 A53-B pc 25 815.60 53 F CFR 31-Mar 5-May 15-Apr 20-Apr 26-Apr 10-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 13 SQ.Pipe 100 x 100 x 6 - 6M STK400 pc 7 714.00 53 F CFR 31-Mar 5-May 15-Apr 20-Apr 26-Apr 10-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 15 SQ.Pipe 100 x 100 x 6 - 6M STK400 pc 3 306.00 53 F CFR 31-Mar 5-May 15-Apr 20-Apr 26-Apr 10-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 16 SQ.Pipe 150 x 150 x 9 - 6M STK400 pc 1 229.00 53 F CFR 31-Mar 5-May 15-Apr 20-Apr 26-Apr 10-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 17 SQ.Pipe 175 x 175 x 6 - 6M STK400 pc 1 187.00 53 F CFR 31-Mar 5-May 15-Apr 20-Apr 26-Apr 10-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 19 SQ.Pipe 200 x 200 x 9-6M STK400 pc 1 314.00 53 F CFR 31-Mar 5-May 15-Apr 20-Apr 26-Apr 10-May 100% $

K188 M1-4683(R.1) 14-Mar 20-Apr 22-Mar 20 Rec.Pipe 250 x 150 x 12 - 6M STKR400 pc 1 407.00 53 F CFR 31-Mar 5-May 15-Apr 20-Apr 26-Apr 10-May 100% $

FAM-Escondida/K191

K191 M1-5302 8-Sep 9-Sep 1 W/D PIPE OD26.65 x 2.3t-6M STK400 pc 10 82.86 371 L DDP 8-Sep 12-Sep 13-Sep 17-Sep 100% VND

K191 M1-5302 8-Sep 9-Sep 2 W/D PIPE OD42.2 x 3.5t-6M STK400 pc 15 300.62 371 L DDP 8-Sep 12-Sep 13-Sep 17-Sep 100% VND

Page 23: Hvc PlatePipe Update)

HVC-PUR 23 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K191 M1-5302 8-Sep 9-Sep 3 W/D PIPE OD48.4 x 3.5t-6M STK400 pc 15 348.78 371 L DDP 8-Sep 12-Sep 13-Sep 17-Sep 100% VND

K191 M1-5079 27-Jun 27-Jul 1 PLATE 5 x 1829 x 6096 SS400 sh 2 876.00 143 F CFR 30-Jun 15-Jul 15-Jul 26-Jul OK OK 100% $

K191 M1-5079 27-Jun 27-Jul 2 PLATE 10 x 2438 x 6096 SS400 sh 14 16,338.00 143 F CFR 30-Jun 15-Jul 15-Jul 26-Jul OK OK 100% $

K191 M1-5079 27-Jun 27-Jul 3 PLATE 15 x 2438 x 6096 SS400 sh 3 5,250.00 143 F CFR 30-Jun 15-Jul 15-Jul 26-Jul OK OK 100% $

K191 M1-5079 27-Jun 27-Jul 4 PLATE 16 x 2438 x 6096 SS400 sh 2 3,734.00 143 F CFR 30-Jun 15-Jul 15-Jul 26-Jul OK OK 100% $

K191 M1-5041 20-Jun 20-Jul 1 W/D PIPE OD88.9 x 7.62t-6M A53-B pc 2 183.20 135 F CFR 22-Jun 1-Jul 26-Jun 2-Jul 8-Jul 18-Jul 100% $/pc

K191 M1-5041 20-Jun 20-Jul 2 W/D PIPE OD139.8 x 15.9t-6M A53-B pc 1 291.50 135 F CFR 22-Jun 1-Jul 26-Jun 2-Jul 8-Jul 18-Jul 100% $/pc

K191 M1-4685 14-Mar 6 PLATE 10 x 2438 x 6096 SS400 sh 8 9,336.00 44 F CFR 23-Mar 4-May 28-May 14-Jun 20-Jun 29-Jun 100% $

K191 M1-4685 14-Mar 7 PLATE 12 x 2438 x 6096 SS400 sh 11 15,400.00 44 F CFR 23-Mar 4-May 28-May 14-Jun 20-Jun 29-Jun 100% $

K191 M1-4685 14-Mar 8 PLATE 15 x 2438 x 6096 SS400 sh 2 3,500.00 44 F CFR 23-Mar 4-May 28-May 14-Jun 20-Jun 29-Jun 100% $

K191 M1-4685 14-Mar 5 PLATE 8 x 1524 x 6096 SS400 sh 10 5,830.00 44 F CFR 23-Mar 10-May 15-May 25-May 27-May 13-Jun 100% $

K191 M1-4687(R.1) 14-Mar 20-Apr 22-Mar 3 W/D PIPE 40A S/40(OD48.3x3.7)-6 A53-B pc 7 170.08 53 F CFR 31-Mar 5-May 19-Apr 30-Apr 6-May 19-May 100% $/pc

K191 M1-4687(R.1) 14-Mar 20-Apr 22-Mar 5 W/D PIPE 3" S/40(OD88.9xt5.5)-6M A53-B pc 16 1,084.13 53 F CFR 31-Mar 5-May 19-Apr 30-Apr 6-May 19-May 100% $/pc

K191 M1-4687(R.1) 14-Mar 20-Apr 22-Mar 1 W/D PIPE 20A S/40(OD26.7x2.9)-6 A53-B pc 45 455.40 53 F CFR 31-Mar 5-May 15-Apr 20-Apr 26-Apr 10-May 100% $

K191 M1-4687(R.1) 14-Mar 20-Apr 22-Mar 2 W/D Pipe 32A S/40(OD42.2 x3.6)- A53-B pc 105 2,137.00 53 F CFR 31-Mar 5-May 15-Apr 20-Apr 26-Apr 10-May 100% $

K191 M1-4685 14-Mar 1 PLATE 3.2 x 1219 x 2438 SS400 sh 3 225.00 43 F FOB 23-Mar 15-Apr 8-Apr 15-Apr 19-Apr 19-May 100% $

K191 M1-4685 14-Mar 2 PLATE 4.5 x 1219 x 2438 SS400 sh 3 315.00 43 F FOB 23-Mar 15-Apr 8-Apr 15-Apr 19-Apr 19-May 100% $

K191 M1-4685 14-Mar 3 PLATE 5 x 1219 x 2438 SS400 sh 3 351.00 43 F FOB 23-Mar 15-Apr 8-Apr 15-Apr 19-Apr 19-May 100% $

K191 M1-4685 14-Mar 4 PLATE 6 x 1524 x 6096 SS400 sh 2 876.00 43 F FOB 23-Mar 15-Apr 8-Apr 15-Apr 19-Apr 19-May 100% $

K191 M1-4685 14-Mar 9 PLATE 16 x 2438 x 6096 SS400 sh 1 1,867.00 43 F FOB 23-Mar 15-Apr 8-Apr 15-Apr 19-Apr 19-May 100% $

Ras Laffan/U193

U193 M1-6195 2-Jun 20-Jul 1 SMLS Pipe 250 PE STD-6M A106-B pc 12 4,342.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

U193 W4-5273 1 Plate 0.48 x 1.2M x 17M Galv steel M2 20.4 373 L DDP 14-Sep 16-Sep 15-Sep 23-Sep 100% VND

U193 M1-5189 2-Aug 20-Aug 1 SMLS PIPE 200A STD(OD219.1xt8.1 A106-B pc 1 255.30 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $

U193 M1-5170 27-Jul 15-Aug 1 PLATE 15 x 1648 x 9080 A285-C sh 1 1,762.00 180 F CFR 29-Jul 8-Aug 10-Aug 18-Aug 24-Aug 13-Sep 100% $

U193 M1-5170 27-Jul 15-Aug 1 PLATE 15 x 1400 x 9080 A285-C sh 1 1,497.00 180 F CFR 29-Jul 8-Aug 10-Aug 18-Aug 24-Aug 13-Sep 100% $

U193 M1-5170 27-Jul 15-Aug 1 PLATE 16 x 1829 x 8710 V49JAB1 sh 2 4,002.00 180 F CFR 29-Jul 8-Aug 10-Aug 18-Aug 24-Aug 13-Sep 100% $

U193 M1-5031 17-Jun 20-Jul 1 SMLS PIPE 80A S/40(OD88.9xt5.49) A106-B pc 28 1,896.70 126 F CFR 17-Jun 17-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $

U193 M1-5031 17-Jun 20-Jul 2 SMLS PIPE 150A S/40(OD168.3xt7.1 A106-B pc 11 1,865.20 126 F CFR 17-Jun 17-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U193 M1-5031 17-Jun 20-Jul 3 SMLS PIPE 300A STD (OD323.9xt9. A106-B pc 1 443.30 126 F CFR 17-Jun 17-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $

U193 M1-4795(R.1) 7-Apr 26-May 1 SMLS PIPE 80A S/10(OD88.9xt3.05) A312-304L pc 169 6,632.00 69 F CFR 11-Apr 10-Jun 1-Jul 15-Jul 28-Jul 100% $/pc

U193 M1-4790(R.5) 5 SMLS PIPE 300A STD (OD323.9xt9.5 A106-B pc 1 442.83 67 F CFR resupply for NCR 10-Aug 18-Aug 19-Aug 29-Aug 100%

U193 M1-4790(R.5) 8 W/D PIPE 450A STD(OD457.2x9.52 A53-B pc 2 1,261.19 67 F CFR resupply for NCR 10-Aug 18-Aug 19-Aug 29-Aug 100%

U193 M1-4770 4-Apr 20-May 1 SMLS PIPE 250A STD (OD273.1xt9.2 A53-B pc 1 361.90 67 F CFR 11-Apr 22-Apr 16-May 24-May 27-May OK 100% $/pc

U193 M1-4770 4-Apr 20-May 2 W/D PIPE 600A STD(OD609.6x9.52 A53-B pc 1 1,411.20 67 F CFR 11-Apr 22-Apr 16-May 24-May 27-May OK 100% $/pc

U193 M1-4790(R.5) 7-Apr 26-May 25-Apr 1 SMLS PIPE 80A STD (OD88.9xt5.49) A106-B pc 77 5,216.00 67 F CFR 11-Apr 10-Jun 6-Jun 14-Jun 17-Jun 4-Jul 100% $/pc

U193 M1-4790(R.5) 7-Apr 26-May 25-Apr 2 SMLS PIPE 150A S/40 (OD168.3xt7. A106-B pc 31 5,256.40 67 F CFR 11-Apr 10-Jun 6-Jun 14-Jun 17-Jun 4-Jul 100% $/pc

U193 M1-4790(R.5) 7-Apr 26-May 25-Apr 3 SMLS PIPE 200A STD (OD219.1x8.18 A106-B M 612 26,040.60 67 F CFR 11-Apr 10-Jun 6-Jun 14-Jun 17-Jun 4-Jul 100% $/M

U193 M1-4790(R.5) 7-Apr 26-May 25-Apr 4 SMLS PIPE 250A STD (OD273.1x9.27 A106-B M 360 21,711.60 67 F CFR 11-Apr 10-Jun 6-Jun 14-Jun 17-Jun 4-Jul 100% $/M

U193 M1-4790(R.5) 7-Apr 26-May 25-Apr 5 SMLS PIPE 300A STD (OD323.9x9.52 A106-B M 69.87 5,161.99 67 F CFR 11-Apr 10-Jun 16-May 24-May 27-May OK 100% $/M

U193 M1-4790(R.5) 7-Apr 26-May 25-Apr 6 W/D PIPE 350A STD(OD355.6x9.52 A53-B pc 20 9,759.60 67 F CFR 11-Apr 11-May 16-May 24-May 27-May OK 100% $/pc

U193 M1-4790(R.5) 7-Apr 26-May 25-Apr 7 W/D PIPE 400A STD(OD406.4x9.52 A53-B pc 7 3,917.30 67 F CFR 11-Apr 11-May 16-May 24-May 27-May OK 100% $/pc

U193 M1-4790(R.5) 7-Apr 26-May 25-Apr 8 W/D PIPE 450A STD(OD457.2x9.52 A53-B M 150 15,774.00 67 F CFR 11-Apr 11-May 16-May 24-May 27-May OK 100% $/M

U193 M1-4790(R.5) 7-Apr 26-May 25-Apr 9 W/D PIPE 600A STD(OD609.6x9.52 A53-B pc 1 1,411.20 67 F CFR 11-Apr 11-May 16-May 24-May 27-May OK 100% $/pc

U193 M1-5159 25-Jul ASAP 1 Plate 0.58 x 1.2M x 12M (7SH) Galv steel M2 100.8 458.94 302 L DDP 25-Jul 28-Jul 27-Jul 3-Aug 100% VND

U193 M1-5151 23-Jul 31-Jul 1 SMLS PIPE 50A STD (OD60.3xt3.91) API5L-B pc 56 1,827.80 304 L DDP 25-Jul 28-Jul 3-Aug 100% VND

U193 M1-4815 PLATE 10 x 2100 x 4800 A285-C sh 3 2,373.83 73 F CFR 16-Apr 10-Jun 14-Jul 27-Jul OK 3-Aug 100% $

Page 24: Hvc PlatePipe Update)

HVC-PUR 24 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

U193 M1-4815 PLATE 10 x 3048 x 4800 A285-C sh 4 4,593.95 73 F CFR 16-Apr 10-Jun 14-Jul 27-Jul OK 3-Aug 100% $

U193 M1-4815 PLATE 11 x 3048 x 3900 A285-C sh 6 6,158.76 73 F CFR 16-Apr 10-Jun 14-Jul 27-Jul OK 3-Aug 100% $

U193 M1-4815 PLATE 11 x 3048 x 5800 A285-C sh 2 3,053.06 73 F CFR 16-Apr 10-Jun 14-Jul 27-Jul OK 3-Aug 100% $

U193 M1-4815 PLATE 13 x 2100 x 3900 A285-C sh 1 835.79 73 F CFR 16-Apr 10-Jun 14-Jul 27-Jul OK 3-Aug 100% $

U193 M1-4815 PLATE 13 x 2700 x 6100 A285-C sh 1 1,680.76 73 F CFR 16-Apr 10-Jun 14-Jul 27-Jul OK 3-Aug 100% $

U193 M1-4815 PLATE 13 x 3048 x 7300 A285-C sh 1 2,270.65 73 F CFR 16-Apr 10-Jun 14-Jul 27-Jul OK 3-Aug 100% $

U193 M1-4814 PLATE 10 x 3048 x 4500 A285-C sh 1 1,076.70 73 F CFR 16-Apr 10-Jun 14-Jul 27-Jul OK 3-Aug 100% $

U193 M1-4798(R.3) 7-Apr 26-May 25-Apr 2 W/D PIPE 150A S/10(OD168.3x3.4) A312-316L pc 7 588.00 69 F CFR 11-Apr 10-Jun 13-Jun 16-Jun 27-Jun 5-Jul 100% $/pc

U193 M1-4798(R.3) 7-Apr 26-May 25-Apr 3 W/D PIPE 450A S/10(OD457.2x4.78 A312-316L pc 8 2,592.48 69 F CFR 11-Apr 10-Jun 13-Jun 16-Jun 27-Jun 5-Jul 100% $/pc

U193 M1-4798(R.3) 7-Apr 26-May 25-Apr 4 W/D PIPE 500A S/10(OD508x5.54) A312-316L pc 8 3,337.00 69 F CFR 11-Apr 10-Jun 13-Jun 16-Jun 27-Jun 5-Jul 100% $/pc

U193 M1-4798(R.3) 26-May 25-Apr 5 W/D PIPE 200A S/10(OD219.1x3.76 A312-316L pc 9 1,091.90 69 F CFR 18-Apr 10-Jun 13-Jun 16-Jun 27-Jun 5-Jul 100% $/pc

U193 M1-4798(R.3) 26-May 25-Apr 6 W/D PIPE 300A S/10(OD323.9x4.57 A312-316L pc 20 4,374.00 69 F CFR 18-Apr 10-Jun 13-Jun 16-Jun 27-Jun 5-Jul 100% $/pc

U193 M1-4950 1-Jun 30-Jul 1 PLATE 20 x 2700 x 6100 A285-C sh 8 20,686.30 109 F CFR 3-Jun 15-Jul 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4950 1-Jun 30-Jul 2 PLATE 20 x 3048 x 6100 A285-C sh 21 61,300.50 109 F CFR 3-Jun 15-Jul 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4950 1-Jun 30-Jul 3 PLATE 20 x 3048 x 7300 A285-C sh 4 13,973.30 109 F CFR 3-Jun 15-Jul 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4815 13-Apr 2-Jun 2 PLATE 10 x 2100 x 4800 A285-C sh 33 26,112.17 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4815 13-Apr 2-Jun 3 PLATE 10 x 3048 x 4800 A285-C sh 41 47,087.94 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4815 13-Apr 2-Jun 4 PLATE 11 x 3048 x 3900 A285-C sh 54 55,428.82 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4815 13-Apr 2-Jun 5 PLATE 11 x 3048 x 5800 A285-C sh 41 62,587.72 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4815 13-Apr 2-Jun 6 PLATE 13 x 2100 x 3900 A285-C sh 11 9,193.68 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4815 13-Apr 2-Jun 7 PLATE 13 x 2700 x 6100 A285-C sh 19 31,934.51 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4815 13-Apr 2-Jun 8 PLATE 13 x 3048 x 6100 A285-C sh 42 79,690.60 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4815 13-Apr 2-Jun 9 PLATE 13 x 3048 x 7300 A285-C sh 3 6,811.96 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4814 13-Apr 2-Jun 1 PLATE 10 x 3048 x 3900 A285-C sh 9 8,398.31 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4814 13-Apr 2-Jun 2 PLATE 10 x 3048 x 5800 A285-C sh 3 4,163.26 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4814 13-Apr 2-Jun 4 PLATE 10 x 3048 x 4500 A285-C sh 20 21,534.10 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4814 13-Apr 2-Jun 5 PLATE 13 x 3048 x 5300 A285-C sh 4 6,594.23 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4814 13-Apr 2-Jun 6 PLATE 13 x 1900 x 6100 A285-C sh 24 28,386.23 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 M1-4814 13-Apr 2-Jun 7 PLATE 13 x 3048 x 6100 A285-C sh 40 75,895.81 73 F CFR 16-Apr 10-Jun 17-Jun 6-Jul 7-Jul 18-Jul 100% $

U193 W4-4959 6-Jun 7-Jun 1 PLATE 45 x 2670 x 4200 CT3 sh 1 3,881.00 221 L DDP 7-Jun 8-Jun 9-Jun 21-Jun 100% VND

U193 W4-4959 6-Jun 7-Jun 2 PLATE 60 x 2595 x 4400 CT3 sh 1 5,388.00 221 L DDP 7-Jun 8-Jun 9-Jun 21-Jun 100% VND

U193 W4-4959 6-Jun 7-Jun 3 PLATE 65 x 2770 x 2650 CT3 sh 1 3,745.00 221 L DDP 7-Jun 8-Jun 9-Jun 21-Jun 100% VND

U193 M1-4942 26-May 5-Jun 1 W/D PIPE 40A S/40(OD48.3x3.7)-6 A53-B pc 4 97.20 102 F CFR 31-May 3-Jun 3-Jun 8-Jun 15-Jun 21-Jun 100% $/pc

U193 M1-4876 5-Jun 20-May 1 PLATE 11 x 2250 x 5800 A285-C sh 2 2,253.70 58 F CFR buy more (fr over 16-May 27-May 28-May 13-Jun 100% $

U193 M1-4754 1-Apr 20-May 1 PLATE 11 x 2100 x 5800 A285-C sh 8 8,414.00 58 F CFR 4-Apr 10-May 16-May 27-May 28-May 13-Jun 100% $

U193 M1-4754 1-Apr 20-May 2 PLATE 11 x 2100 x 5800 A285-C sh 16 16,828.00 58 F CFR 4-Apr 10-May 16-May 27-May 28-May 13-Jun 100% $

U193 M1-4754 1-Apr 20-May 3 PLATE 11 x 2250 x 5800 A285-C sh 105 118,321.00 58 F CFR 4-Apr 10-May 16-May 27-May 28-May 13-Jun 100% $

U193 M1-4753 1-Apr 20-May 1 PLATE 15 x 2000 x 5800 A285-C sh 4 5,464.00 58 F CFR 4-Apr 10-May 16-May 27-May 28-May 13-Jun 100% $

U193 M1-4753 1-Apr 20-May 2 PLATE 15 x 1900 x 8100 A285-C sh 4 7,249.00 58 F CFR 4-Apr 10-May 16-May 27-May 28-May 13-Jun 100% $

U193 M1-4753 1-Apr 20-May 3 PLATE 15 x 2250 x 8100 A285-C sh 21 45,066.00 58 F CFR 4-Apr 10-May 16-May 27-May 28-May 13-Jun 100% $

U193 M1-4753 1-Apr 20-May 4 PLATE 22 x 2250 x 6096 A285-C sh 2 4,738.00 58 F CFR 4-Apr 10-May 16-May 27-May 28-May 13-Jun 100% $

U193 M1-4813 13-Apr 26-May 1 SMLS PIPE 100A S/10(OD114.3x3.05 A312-316L pc 1 50.80 69 F CFR 11-Apr 10-Jun 16-May 24-May 27-May 7-Jun 100% $/pc

U193 M1-4798(R.3) 7-Apr 26-May 25-Apr 1 SMLS PIPE 100A S/10(OD114.3x3.05 A312-316L pc 22 1,118.00 69 F CFR 11-Apr 10-Jun 16-May 24-May 27-May 7-Jun 100% $/pc

U193 M1-4909 17-May 16-Jun 1 SMLS PIPE 50A STD (OD60.3xt3.91) A53-B pc 44 1,436.20 199 L Ex-w 24-May 27-May 27-May 7-Jun 100% VND

U193 M1-4866 29-Apr 15-May PLATE 14 x 2000 x 6000 CT3 sh 3 3,956.00 172 L DDP 11-May 16-May 12-May 100% VND

Anpha LPG/K197

K197 M1-5397 7-Oct 5-Nov 1 SMLS PIPE 3/4" S/160 (OD26.7 x 5.6 A106-B pc 1 17.40 235 F CFR 13-Oct 2-Nov 30-Oct 5-Nov 8-Nov 23-Nov 100% $/kg

Page 25: Hvc PlatePipe Update)

HVC-PUR 25 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K197 W4-5494 9-Nov 10-Nov 1 Plate 0.35 x 1.2M x 62.5M Hard type-Galv steel M2 75.0 448 L DDP 10-Nov 12-Nov 11-Nov 26-Nov 100% VND

K197 W4-5465 28-Oct 30-Oct 1 Plate 0.35 x 1.2M x 175M Hard type-Galv steel M2 210.0 431 L DDP 31-Oct 1-Nov 1-Nov 3-Nov 100% VND

K197 M1-5339 21-Sep 20-Oct 1 W/D PIPE 40A (OD48.6x3.25)-6M SGP pc 2 43.60 FOR L DDP 22-Jun 27-Sep 100% VND

K197 M1-5339 21-Sep 20-Oct 2 R.Bar CT3 pc 2 29.60 FOR L DDP 22-Jun 27-Sep 100% VND

K197 M1-5323 16-Sep 20-Oct 1 SMLS PIPE 25A S/160 (OD33.4 x t6. A106-B pc 2 51.60 214 F CFR 23-Sep 3-Oct 7-Oct 15-Oct 20-Oct 100% $

K197 M1-5323 16-Sep 20-Oct 2 SMLS PIPE 50A S/160(OD60.3xt8.7) A106-B pc 1 66.60 214 F CFR 23-Sep 3-Oct 7-Oct 15-Oct 20-Oct 100% $

K197 M1-5323 16-Sep 20-Oct 3 SMLS PIPE 80A S/160 (OD88.9x11.1 A106-B pc 2 255.60 214 F CFR 23-Sep 3-Oct 7-Oct 15-Oct 20-Oct 100% $

K197 M1-5323 16-Sep 20-Oct 4 SMLS PIPE 100A S/80(OD114.3xt8.6 A106-B pc 1 134.40 214 F CFR 23-Sep 3-Oct 7-Oct 15-Oct 20-Oct 100% $

K197 M1-4827(R.1) 22-Jun 30-Aug 1 PLATE 23 x 2438 x 5000 A516-70 sh 1 220.90 74 F DDP 27-Jun 25-Aug To subvendor 19-Aug 100% $

K197 M1-4827(R.1) 22-Jun 30-Aug 2 PLATE 23 x 2650 x 7800 A516-70 sh 8 29,855.70 74 F DDP 27-Jun 25-Aug To subvendor 19-Aug 100% $

K197 M1-4827(R.1) 22-Jun 30-Aug 3 PLATE 37 x 2250 x 9750 A516-70 sh 15 95,576.20 144 F CFR 28-Jun 7-Aug 30-Jul 13-Aug 15-Aug 23-Aug 100% $

Tran Hong Quan LPG/K209

K209 M1-5180 1-Aug 20-Sep 1 PLATE 21 x 2438 x 5000 A516-70 sh 3 6,029.00 184 F DDP 4-Aug 8-Sep To subvendor 10-Sep 100% $

K209 M1-5180 1-Aug 20-Sep 2 PLATE 21 x 3048 x 5200 A516-70 sh 18 47,031.00 184 F DDP 4-Aug 8-Sep To subvendor 10-Sep 100% $

Sohar/U194

U194 M1-5463 27-Oct 30-Nov 1 SMLS PIPE 50A S/40 (OD60.3x3.91) A53-B pc 6 198.00 249 F CFR 1-Nov 6-Nov 5-Nov 10-Nov 17-Nov 1-Dec 100% $

U194 M1-4801(R.1) 7-Apr 26-Apr 1 SMLS PIPE 25A S/40(OD33.4xt3.38) A53-B pc 1 15.00 67 F CFR 11-Apr 22-Apr 16-May 24-May 27-May OK 100% $/pc

U194 M1-4801(R.1) 7-Apr 26-Apr 2 SMLS PIPE 50A S/40 (OD60.3xt3.91) A53-B pc 35 1,142.40 67 F CFR 11-Apr 22-Apr 16-May 24-May 27-May OK 100% $/pc

U194 M1-4801(R.1) 7-Apr 26-Apr 3 SMLS PIPE 20A S/40(OD26.7xt2.87) A53-B pc 7 71.00 67 F CFR 11-Apr 10-Jun 16-May 24-May 27-May OK 100% $/pc

U194 M1-4773(R.1) 4-Apr 20-May 1 W/D PIPE 500A STD(OD508x9.52)- A53-B pc 1 702.15 67 F CFR 11-Apr 11-May 16-May 24-May 27-May OK 100% $/pc

U194 M1-4773(R.1) 20-May 25-Apr 2 W/D PIPE 3" S/40(OD88.9xt5.5)-6M A53-B pc 3 203.20 67 F CFR 11-Apr 11-May 16-May 24-May 27-May OK 100% $/pc

U194 M1-4755 1-Apr 20-May 1 PLATE 12 x 2250 x 4600 A283-C sh 4 3,900.00 58 F CFR 4-Apr 10-May 16-May 27-May 28-May 13-Jun 100% $

U194 M1-4755 1-Apr 20-May 3 PLATE 12 x 2250 x 4500 A283-C sh 21 20,029.00 58 F CFR 4-Apr 10-May 16-May 27-May 28-May 13-Jun 100% $

U194 M1-4755 1-Apr 20-May 4 PLATE 12 x 2250 x 5200 A283-C sh 9 9,923.00 58 F CFR 4-Apr 10-May 16-May 27-May 28-May 13-Jun 100% $

U194 M1-4755 1-Apr 20-May 5 PLATE 12 x 2250 x 5800 A283-C sh 11 13,522.00 58 F CFR 4-Apr 10-May 16-May 27-May 28-May 13-Jun 100% $

U194 M1-4867 29-Apr 15-May 1 PLATE 10 x 1500 x 6000 CT3 sh 5 3,533.00 172 L DDP 11-May 16-May 12-May 100% VND

U194 M1-4867 29-Apr 15-May 2 PLATE 14 x 2000 x 6000 CT3 sh 3 3,956.00 172 L DDP 11-May 16-May 12-May 100% VND

U194 M1-4867 29-Apr 15-May 3 PLATE 12 x 1500 x 6000 CT3 sh 5 4,239.00 172 L DDP 11-May 16-May 12-May 100% VND

Sabiya Recarbonation/U201

U201 M1-4970(R.1) 6-Jun 15-Jul 1 PLATE 8 x 1524 x 4600 A240-316L sh 7 3,136.00 112 F CFR 8-Jun 18-Jun 14-Jun 20-Jun 27-Jun 18-Jul 100% $

U201 M1-4970(R.1) 6-Jun 15-Jul 2 PLATE 8 x 1524 x 5200 A240-316L sh 58 29,348.00 112 F CFR 8-Jun 18-Jun 14-Jun 20-Jun 27-Jun 18-Jul 100% $

U201 M1-4970(R.1) 6-Jun 26-Jun 3 PLATE 9 x 1524 x 3300 A240-316L sh 1 361.00 112 F CFR 8-Jun 18-Jun 14-Jun 20-Jun 27-Jun 18-Jul 100% $

U201 M1-4970(R.1) 6-Jun 26-Jun 4 PLATE 12 x 1524 x 3900 A240-316L sh 68 38,703.00 112 F CFR 8-Jun 18-Jun 14-Jun 20-Jun 27-Jun 18-Jul 100% $

U201 M1-4963 6-Jun 26-Jun 1 PLATE 20.5 x 2438 x 7000 A283-D sh 2 5,493.00 129 F CFR 16-Jun 25-Jun 26-Jun 2-Jul 8-Jul 18-Jul 100% $

U201 M1-4963 6-Jun 26-Jun 2 PLATE 22 x 2590 x 11810 SM490B sh 1 5,283.00 129 F CFR 16-Jun 25-Jun 26-Jun 2-Jul 8-Jul 18-Jul 100% $

U201 M1-4963 6-Jun 26-Jun 3 PLATE 22 x 3010 x 9350 SM490A sh 1 4,860.00 129 F CFR 16-Jun 25-Jun 26-Jun 2-Jul 8-Jul 18-Jul 100% $

U201 M1-4963 6-Jun 26-Jun 4 PLATE 22 x 2430 x 9548 SM490B sh 1 4,007.00 129 F CFR 16-Jun 25-Jun 26-Jun 2-Jul 8-Jul 18-Jul 100% $

U201 M1-4967(R.2) 6-Jun 15-Jul 25-Jun 1 W/D PIPE 80A S/10(OD88.9x3.05) A312-316L pc 22 866.50 113 F CFR 10-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U201 M1-4967(R.2) 6-Jun 15-Jul 25-Jun 2 W/D PIPE 100A S/10(OD114.3x3.05 A312-316L pc 29 1,313.70 113 F CFR 10-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U201 M1-4967(R.2) 6-Jun 15-Jul 25-Jun 3 W/D PIPE 150A S/10(OD168.3x3.4) A312-316L pc 47 3,589.86 113 F CFR 10-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U201 M1-4967(R.2) 6-Jun 15-Jul 25-Jun 4 W/D PIPE 200A S/10(OD219.1x3.76 A312-316L pc 13 1,469.52 113 F CFR 10-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U201 M1-4967(R.2) 6-Jun 15-Jul 25-Jun 5 W/D PIPE 250A S/10(OD273.1x4.19 A312-316L pc 1 157.80 113 F CFR 10-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U201 M1-4967(R.2) 6-Jun 15-Jul 25-Jun 6 W/D PIPE 300A S/10(OD323.9x4.57 A312-316L pc 56 12,290.60 113 F CFR 10-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U201 M1-4967(R.2) 6-Jun 15-Jul 25-Jun 7 W/D PIPE 350A S/10(OD355.6x4.78 A312-316L pc 9 2,275.56 113 F CFR 10-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U201 M1-4967(R.2) 6-Jun 15-Jul 25-Jun 8 W/D PIPE 400A S/10(OD406.4x4.78 A312-316L pc 8 2,315.52 113 F CFR 10-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U201 M1-4967(R.2) 6-Jun 15-Jul 25-Jun 9 W/D PIPE 450A S/10(OD457.2x4.78 A312-316L pc 3 978.12 113 F CFR 10-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U201 M1-4967(R.2) 6-Jun 15-Jul 25-Jun 10 W/D PIPE 500A S/10(OD508x5.54) A312-316L pc 4 1,678.80 113 F CFR 10-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

F20-6M

Page 26: Hvc PlatePipe Update)

HVC-PUR 26 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

U201 M1-4967(R.2) 6-Jun 15-Jul 25-Jun 11 W/D PIPE 600A S/10(OD609.6x6.35 A312-316L pc 9 5,198.04 113 F CFR 10-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U201 M1-4964 6-Jun 15-Jul 1 SMLS PIPE 6" S/40 (OD168.3xt7.11) A53-B pc 16 2,713.00 113 F CFR 10-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

Shuaiba Piping/U203

U203 M1-6656 8-Sep 30-Oct 1 Plate 16 x 2250 x 6400 A516-70 sh 10 18,086.00 334 F FOB 14-Sep 29-Oct 17-Nov 29-Nov 31-Dec 29-Jan 100% $

U203 M1-6656 8-Sep 30-Oct 2 SMLS Pipe 200A BE STD-6M A106-B pc 1 256.00 334 F FOB 14-Sep 24-Sep 2-Oct 11-Oct 27-Oct 29-Jan 100% $

U203 M1-6656 8-Sep 30-Oct 3 SMLS PIPE 500A BE STD-6M A106-B pc 3 2,106.50 340 F FOB 22-Sep 7-Oct 2-Oct 11-Oct 13-Oct 4-Dec 100% $

U203 M1-5787 6-Mar 31-Mar 3 PLATE 23 x 2250 x 5200 A285-C sh 4 8,449.70 54 F CFR 10-Mar 9-Apr 28-Apr 4-May 18-May v 100% $

U203 M1-5787 6-Mar 31-Mar 1 PLATE 12.7 x 2250 x 5800 A516-70 sh 8 10,408.20 54 F CFR 10-Mar 9-Apr 28-Apr 4-May 18-May 5-Jun 100% $

U203 M1-5787 6-Mar 31-Mar 2 PLATE 15.9 x 2250 x 6400 A516-70 sh 2 3,594.70 54 F CFR 10-Mar 9-Apr 28-Apr 4-May 18-May 5-Jun 100% $

U203 M1-5787 6-Mar 31-Mar 4 PLATE 32 x 2250 x 5000 A36 sh 1 2,826.00 54 F CFR 10-Mar 9-Apr 28-Apr 4-May 18-May 5-Jun 100% $

U203 M1-5787 6-Mar 31-Mar 5 PLATE 36 x 1524 x 3048 A36 sh 1 1,312.70 54 F CFR 10-Mar 9-Apr 28-Apr 4-May 18-May 5-Jun 100% $

U203 M1-5466 23-Oct 20-Dec 1 PLATE 10.3 x 2250 x 4500 A516-70 sh 14 11,470.00 255 F CFR 16-Nov 10-Jan 18-Jan 2-Feb 100% $

U203 M1-5466 23-Oct 20-Dec 2 PLATE 10.3 x 2250 x 3200 A516-70 sh 48 27,943.50 255 F CFR 16-Nov 10-Jan 18-Jan 2-Feb 100% $

U203 M1-5466 23-Oct 20-Dec 3 PLATE 12.7 x 2250 x 5800 A516-70 sh 9 11,709.20 255 F CFR 16-Nov 10-Jan 18-Jan 2-Feb 100% $

U203 W4-5368 1-Oct 2-Oct 1 Plate 0.48 x 1.2M x 25M Galv steel M2 30.0 392 L DDP 1-Oct 2-Oct 1-Oct 19-Oct 100% VND

U203 W4-5176 29-Jul 1-Aug 1 PLATE 50 x 1840 x 4120 CT3 sh 1 2,975.00 313 L DDP 2-Aug 4-Aug 6-Aug 19-Aug 100% VND

U203 W4-5176 29-Jul 1-Aug 2 PLATE 50 x 1550 x 3200 CT3 sh 1 1,947.00 313 L DDP 2-Aug 4-Aug 4-Aug 19-Aug 100% VND

U203 W4-5176 29-Jul 1-Aug 3 PLATE 68.5 x 2660 x 4770 CT3 sh 1 6,823.00 313 L DDP 2-Aug 4-Aug 4-Aug 19-Aug 100% VND

U203 W4-5217 11-Aug 13-Aug 1 Color Corrugated ir 0.4 x 1070 x 12M Steel sh 31 330 L DDP 11-Aug 13-Aug 12-Aug 19-Aug 100% VND

U203 W4-5217 11-Aug 13-Aug 2 Screw 4.5L Steel ea 600 330 L DDP 11-Aug 13-Aug 12-Aug 19-Aug 100% VND

U203 M1-5377 3-Oct 20-Oct 1 SMLS PIPE 500A BE STD(OD508 x 9 A106-B M 66.88 7,826.62 232 F CFR 7-Oct 20-Oct 13-Oct 22-Oct 27-Oct 3-Nov 100% $/M

U203 M1-5283 1-Sep 20-Sep 1 SMLS PIPE 200A STD(OD219.1xt8.1 A106-B pc 1 255.30 197 F CFR 6-Sep 21-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $/M

U203 M1-5283 1-Sep 20-Sep 2 SMLS PIPE 500A BE STD(OD508 x 9 A106-B M 22.99 2,690.40 197 F CFR 6-Sep 21-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $/M

U203 M1-5283 1-Sep 20-Sep 3 SMLS PIPE 600A BE STD(OD609.6 x A106-B M 11.41 1,607.40 197 F CFR 6-Sep 21-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $/M

U203 M1-5018 14-Jun 30-Sep 1 PLATE 8.7 x 2250 x 5200 A516-70 sh 2 1,598.00 144 F CFR 28-Jun 7-Aug 30-Jul 13-Aug 15-Aug 23-Aug 100% $

U203 M1-5018 14-Jun 30-Sep 2 PLATE 9.5 x 2250 x 6500 A516-70 sh 20 21,813.19 144 F CFR 28-Jun 7-Aug 30-Jul 13-Aug 15-Aug 23-Aug 100% $

U203 M1-5018 14-Jun 30-Sep 3 PLATE 10.3 x 2250 x 4500 A516-70 sh 29 23,741.05 144 F CFR 28-Jun 7-Aug 30-Jul 13-Aug 15-Aug 23-Aug 100% $

U203 M1-5018 14-Jun 30-Sep 4 PLATE 12.7 x 2250 x 5800 A516-70 sh 106 137,908.09 144 F CFR 28-Jun 7-Aug 30-Jul 13-Aug 15-Aug 23-Aug 100% $

U203 M1-5018 14-Jun 30-Sep 5 PLATE 15.9 x 2250 x 6400 A516-70 sh 20 35,946.72 144 F CFR 28-Jun 7-Aug 30-Jul 13-Aug 15-Aug 23-Aug 100% $

U203 M1-4986 9-Jun 28-Jul 1 PLATE 9.5 x 2250 x 6500 A516-70 sh 2 2,180.00 123 F CFR 14-Jun 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

U203 M1-4986 9-Jun 28-Jul 2 PLATE 15.9 x 2250 x 5800 A516-70 sh 79 128,690.00 123 F CFR 14-Jun 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

U203 M1-5017 14-Jun 30-Sep 1 W/D PIPE 100A BE (OD114.3x6.0)- API5L-B pc 1 68.70 151 F CFR 1-Jul 26-Jul 15-Jul 26-Jul OK 3-Aug 100% $/pc

U203 M1-5017 14-Jun 30-Sep 2 W/D PIPE 150A BE (OD168.3x7.11) API5L-B pc 7 966.84 151 F CFR 1-Jul 26-Jul 15-Jul 26-Jul OK 3-Aug 100% $/pc

U203 M1-5017 14-Jun 30-Sep 3 W/D PIPE 200A BE (OD219.1x7.0)- API5L-B pc 3 930.90 151 F CFR 1-Jul 26-Jul 15-Jul 26-Jul OK 3-Aug 100% $/pc

U203 M1-5017 14-Jun 30-Sep 4 W/D PIPE 250A BE (OD273.1x9.3)- API5L-B pc 26 12,180.48 151 F CFR 1-Jul 26-Jul 15-Jul 26-Jul OK 3-Aug 100% $/pc

U203 M1-5017 14-Jun 30-Sep 5 W/D PIPE 300A BE (OD323.9x6.4)- API5L-B pc 2 564.60 151 F CFR 1-Jul 26-Jul 15-Jul 26-Jul OK 3-Aug 100% $/pc

U203 M1-4977 7-Jun 26-Jun PLATE 9 x 2438 x 6096 A516-70 sh 1 1,050.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 10 x 1829 x 5675 A516-70 sh 2 1,630.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 10 x 2700 x 3500 A516-70 sh 1 742.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 12.7 x 2880 x 4800 A516-70 sh 1 1,378.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 12.7 x 2438 x 4825 A516-70 sh 1 1,172.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 12.8 x 2438 x 8900 A516-70 sh 1 2,180.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 13 x 2438 x 3000 A516-70 sh 1 746.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 13 x 2800 x 10200 A516-70 sh 1 2,915.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 16 x 3048 x 6900 A516-70 sh 1 2,642.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 18 x 1650 x 5990 A516-70 sh 1 1,396.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 18 x 2130 x 7930 A516-70 sh 1 2,387.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 18 x 2130 x 8330 A516-70 sh 1 2,507.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

Page 27: Hvc PlatePipe Update)

HVC-PUR 27 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

U203 M1-4977 7-Jun 26-Jun PLATE 18 x 2550 x 5680 A516-70 sh 1 2,047.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 18 x 3048 x 10010 A516-70 sh 1 4,311.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 19 x 2600 x 6340 A516-70 sh 3 7,377.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 11 x 1559 x 5300 A516-65 sh 1 714.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 12.7 x 2800 x 6100 A516-65 sh 1 1,703.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 12.7 x 2800 x 8600 A516-65 sh 1 2,400.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 12.7 x 2800 x 8900 A516-65 sh 1 2,484.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 11 x 1900 x 6380 A516-60 sh 1 1,047.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 12.7 x 2530 x 5300 A516-60 sh 1 1,337.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 12.7 x 1660 x 5100 A516-60 sh 2 1,688.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 14 x 3048 x 11350 A516-60 sh 1 3,801.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 18 x 1830 x 6096 A516-60 sh 1 1,577.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 19 x 2880 x 5700 A516-60 sh 1 2,449.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 19 x 1830 x 6000 A516-60 sh 1 1,638.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 19 x 3048 x 8092 A516-60 sh 1 3,679.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun PLATE 19 x 2360 x 3800 A516-60 sh 1 1,338.00 117 F CFR 6-Sep 25-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun 1 PLATE 10 x 3048 x 4016 A516-70 sh 1 961.00 128 F CFR 15-Jun 20-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun 1 PLATE 10 x 3048 x 6940 A516-70 sh 1 1,661.00 128 F CFR 15-Jun 20-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun 1 PLATE 10.5 x 2017 x 11620 A516-70 sh 1 1,933.00 128 F CFR 15-Jun 20-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun 1 PLATE 11 x 2438 x 7931 A516-70 sh 1 1,670.00 128 F CFR 15-Jun 20-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun 1 PLATE 11 x 3048 x 6096 A516-70 sh 1 1,604.00 128 F CFR 15-Jun 20-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4977 7-Jun 26-Jun 1 PLATE 11 x 2880 x 10000 A516-60 sh 1 2,487.00 128 F CFR 15-Jun 20-Jun 26-Jun 2-Jul 8-Jul 100% $

U203 M1-4992 9-Jun 26-Jun 1 W/D PIPE 200A BE (OD219.1 x 6.4 API5L-B pc 1 186.20 122 F CFR 15-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U203 M1-4992 9-Jun 26-Jun 2 W/D PIPE 500A BE (OD508 x 7.1)- API5L-B pc 19 9,988.70 122 F CFR 15-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U203 M1-4976 7-Jun 26-Jun 1 W/D PIPE 500A BE (OD508 x 7.1)- API5L-B pc 1 525.70 122 F CFR 15-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U203 M1-4976 7-Jun 26-Jun 2 W/D PIPE 600A BE (OD609.6 x 7.9 API5L-B pc 2 1,405.30 122 F CFR 15-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

U203 M1-4976 7-Jun 26-Jun 3 W/D PIPE 600A BE (OD609.6 x 7.1 API5L-B pc 2 858.20 122 F CFR 15-Jun 25-Jun 26-Jun 2-Jul 5-Jul 18-Jul 100% $/pc

Sohar/U204

U204 M1-5342 22-Sep 5-Oct 1 SMLS PIPE 300A STD(OD323.9 x 9.5 A106-B M 23.55 1,738.00 214 F CFR 23-Sep 3-Oct 7-Oct 15-Oct 20-Oct 100% $/M

U204 M1-5342 22-Sep 5-Oct SMLS PIPE 300A PE STD(OD323.9 x A106-B pc 1 214 F FOB 18-Nov 23-Nov 30-Nov 100%

U204 M1-5281 31-Aug 25-Sep 1 SMLS PIPE 150A S/40 (OD168.3xt7. A106-B pc 9 1,526.00 197 F CFR 6-Sep 21-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $/M

U204 M1-5361 29-Sep 6-Oct 1 PLATE 20 x 3200 x 6000 A285-C sh 1 3,014.40 212 F CFR 29-Sep 4-Oct 7-Oct 15-Oct 20-Oct 29-Oct 100% $

U204 M1-5332 17-Sep 3-Oct 1 PLATE 14 x 2600 x 6000 A516-60 sh 1 1,714.00 212 F CFR 22-Sep 4-Oct 7-Oct 15-Oct 20-Oct 29-Oct 100% $

U204 M1-5332 17-Sep 3-Oct 2 PLATE 14 x 2600 x 6050 A516-60 sh 1 1,729.00 212 F CFR 22-Sep 4-Oct 7-Oct 15-Oct 20-Oct 29-Oct 100% $

U204 M1-5332 17-Sep 3-Oct 3 PLATE 15 x 2250 x 5651 A516-60 sh 1 1,497.00 212 F CFR 22-Sep 4-Oct 7-Oct 15-Oct 20-Oct 29-Oct 100% $

U204 M1-5332 17-Sep 3-Oct 4 PLATE 16 x 2080 x 6096 A516-60 sh 1 1,593.00 212 F CFR 22-Sep 4-Oct 7-Oct 15-Oct 20-Oct 29-Oct 100% $

U204 M1-5332 17-Sep 3-Oct 5 PLATE 16 x 2080 x 7690 A516-60 sh 1 2,010.00 212 F CFR 22-Sep 4-Oct 7-Oct 15-Oct 20-Oct 29-Oct 100% $

U204 M1-5332 17-Sep 3-Oct 6 PLATE 15 x 2438 x 6096 A516-60 sh 1 1,750.00 212 F CFR 22-Sep 4-Oct 7-Oct 15-Oct 20-Oct 29-Oct 100% $

U204 M1-5332 17-Sep 3-Oct 7 PLATE 15 x 3048 x 7878 A283-C sh 1 2,828.00 212 F CFR 22-Sep 4-Oct 7-Oct 15-Oct 20-Oct 29-Oct 100% $

U204 M1-5332 17-Sep 3-Oct 8 PLATE 15 x 3052 x 6000 A516-70 sh 1 2,157.00 212 F CFR 22-Sep 4-Oct 7-Oct 15-Oct 20-Oct 29-Oct 100% $

U204 M1-5331 17-Sep 3-Oct 1 PLATE 11.1 x 2750 x 3850 A516-70 sh 1 923.00 212 F CFR 22-Sep 4-Oct 7-Oct 15-Oct 20-Oct 29-Oct 100% $

U204 M1-5331 17-Sep 3-Oct 2 PLATE 11.9 x 3000 x 9600 A516-70 sh 1 2,692.00 212 F CFR 22-Sep 4-Oct 7-Oct 15-Oct 20-Oct 29-Oct 100% $

U204 M1-5331 17-Sep 3-Oct 3 PLATE 20 x 2438 x 6600 A516-60 sh 2 5,053.00 212 F CFR 22-Sep 4-Oct 7-Oct 15-Oct 20-Oct 29-Oct 100% $

U204 M1-5264 25-Aug 25-Sep 1-Sep 1 PLATE 20 x 2250 x 4000 A285-C sh 16 22,608.00 198 F CFR 1-Sep 30-Sep 2-Oct 13-Oct 15-Oct 24-Oct 100% $

U204 M1-5007 13-Jun 30-Jul 1 W/D PIPE 300A STD(OD323.9x9.52 A53-B pc 2 886.56 126 F CFR 17-Jun 17-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U204 M1-5007 13-Jun 30-Jul 2 W/D PIPE 350A STD(OD355.6x9.52 A53-B pc 100 48,798.00 126 F CFR 17-Jun 17-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U204 M1-5007 13-Jun 30-Jul 3 W/D PIPE 400A STD(OD406.4x9.52 A53-B pc 36 20,146.32 126 F CFR 17-Jun 17-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

Page 28: Hvc PlatePipe Update)

HVC-PUR 28 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

U204 M1-5007 13-Jun 30-Jul 4 W/D PIPE 450A STD(OD457x9.52)- A53-B pc 17 10,731.42 126 F CFR 17-Jun 17-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U204 M1-5007 13-Jun 30-Jul 5 W/D PIPE 500A STD(OD508x9.52)- A53-B pc 5 3,514.50 126 F CFR 17-Jun 17-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U204 M1-5007 13-Jun 30-Jul 6 W/D PIPE 600A STD(OD609.6x9.5 A53-B pc 7 5,923.26 126 F CFR 17-Jun 17-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U204 M1-5006(R.1) 13-Jun 30-Jul 14-Jun 1 PLATE 10 x 2438 x 5100 A283-C sh 8 7,808.43 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5006(R.1) 13-Jun 30-Jul 14-Jun 2 PLATE 10 x 2438 x 5800 A283-C sh 2 2,220.04 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5006(R.1) 13-Jun 30-Jul 14-Jun 3 PLATE 10 x 3048 x 4500 A283-C sh 11 11,843.77 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5006(R.1) 13-Jun 30-Jul 14-Jun 4 PLATE 10 x 3048 x 5200 A283-C sh 50 62,209.68 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5006(R.1) 13-Jun 30-Jul 14-Jun 5 PLATE 10 x 3048 x 5800 A283-C sh 7 9,714.28 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5006(R.1) 13-Jun 30-Jul 14-Jun 6 PLATE 12 x 2250 x 3900 A283-C sh 6 4,959.63 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5006(R.1) 13-Jun 30-Jul 14-Jun 8 PLATE 12 x 3048 x 3900 A283-C sh 53 59,348.00 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5006(R.1) 13-Jun 30-Jul 14-Jun 9 PLATE 12 x 3048 x 6400 A283-C sh 4 7,350.31 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5006(R.1) 13-Jun 30-Jul 14-Jun 10 PLATE 14 x 2250 x 3900 A283-C sh 8 7,714.98 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5006(R.1) 13-Jun 30-Jul 14-Jun 11 PLATE 14 x 2438 x 4500 A283-C sh 8 9,645.70 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5006(R.1) 13-Jun 30-Jul 14-Jun 12 PLATE 14 x 3048 x 4500 A283-C sh 31 46,729.04 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5006(R.1) 13-Jun 30-Jul 14-Jun 13 PLATE 14 x 3048 x 6100 A283-C sh 24 49,040.37 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5000(R.1) 10-Jun 30-Jul 14-Jun 1 PLATE 10 x 2438 x 5800 A285-C sh 9 9,990.19 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5000(R.1) 10-Jun 30-Jul 14-Jun 2 PLATE 10 x 3048 x 4500 A285-C sh 1 1,076.71 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5000(R.1) 10-Jun 30-Jul 14-Jun 3 PLATE 10 x 3048 x 5800 A285-C sh 9 12,489.79 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5000(R.1) 10-Jun 30-Jul 14-Jun 4 PLATE 10 x 3048 x 6400 A285-C sh 6 9,187.89 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5000(R.1) 10-Jun 30-Jul 14-Jun 5 PLATE 10 x 3048 x 7100 A285-C sh 10 16,988.03 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5000(R.1) 10-Jun 30-Jul 14-Jun 7 PLATE 12 x 2438 x 6400 A285-C sh 3 4,409.46 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5000(R.1) 10-Jun 30-Jul 14-Jun 9 PLATE 12 x 3048 x 6400 A285-C sh 24 44,101.90 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5000(R.1) 10-Jun 30-Jul 14-Jun 10 PLATE 20 x 2438 x 4000 A285-C sh 12 18,372.77 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5000(R.1) 10-Jun 30-Jul 14-Jun 11 PLATE 20 x 2438 x 5800 A285-C sh 1 2,220.04 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5000(R.1) 10-Jun 30-Jul 14-Jun 12 PLATE 20 x 3048 x 4000 A285-C sh 18 34,454.59 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

U204 M1-5001 10-Jun 30-Jul 1 SMLS PIPE 80A S/40(OD88.9xt5.49) A106-B pc 293 19,847.82 119 F CFR 14-Jun 23-Jun 24-Jun 29-Jun 1-Jul 18-Jul 100% $/pc

U204 M1-5001 10-Jun 30-Jul 2 SMLS PIPE 150A S/40(OD168.3xt7.1 A106-B pc 13 2,204.28 119 F CFR 14-Jun 23-Jun 24-Jun 29-Jun 1-Jul 18-Jul 100% $/pc

U204 M1-5001 10-Jun 30-Jul 3 SMLS PIPE 200A STD (OD219.1xt8. A106-B pc 109 27,827.70 119 F CFR 14-Jun 23-Jun 24-Jun 29-Jun 1-Jul 18-Jul 100% $/pc

U204 M1-5001 10-Jun 30-Jul 4 SMLS PIPE 250A STD (OD273.1xt9.2 A106-B pc 10 3,618.60 119 F CFR 14-Jun 23-Jun 24-Jun 29-Jun 1-Jul 18-Jul 100% $/pc

U204 M1-5001 10-Jun 30-Jul 5 SMLS PIPE 350A STD (OD355.6xt9. A106-B pc 17 8,295.66 119 F CFR 14-Jun 23-Jun 24-Jun 29-Jun 1-Jul 18-Jul 100% $/pc

U204 M1-5001 10-Jun 30-Jul 6 W/D PIPE 3" S/40(OD88.9xt5.5)-6M A53-B pc 8 541.92 119 F CFR 14-Jun 23-Jun 24-Jun 29-Jun 1-Jul 18-Jul 100% $/pc

U204 M1-5001 10-Jun 30-Jul 7 W/D PIPE 600A STD(OD609.6x9.5 A53-B pc 1 846.18 119 F CFR 14-Jun 23-Jun 24-Jun 29-Jun 1-Jul 18-Jul 100% $/pc

Plana Del Vent/A202

A202 M1-5436 20-Oct 15-Nov 1 SMLS PIPE 80A S/80(OD88.9 x 7.69) SUS304 pc 2 183.30 249 F CFR 1-Nov 6-Nov 5-Nov 10-Nov 17-Nov 1-Dec 100% $/pc

A202 M1-5267 29-Aug 20-Sep 1 SMLS PIPE 80A S/80(OD88.9xt7.6)- A106-B pc 8 733.20 197 F CFR 6-Sep 21-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $/M

A202 M1-5267 29-Aug 20-Sep 2 SMLS PIPE 100A S/40(OD114.3x6.0t A106-B pc 1 96.50 197 F CFR 6-Sep 21-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $/M

A202 M1-5267 29-Aug 20-Sep 3 W/D PIPE 150A S/40(OD168.3 x7.1 SUS316 pc 1 57.40 197 F CFR 6-Sep 21-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $/M

A202 W4-5371 1 Tensile/Bend Test Plate 395 L Ex-w OK 100% VND

A202 M1-5208 10-Aug 1 SMLS PIPE 25A S/40(OD33.4x3.4t)- A106-B pc 2 30.19 187 F CFR 17-Aug 26-Aug 2-Sep 13-Sep 19-Sep 23-Sep 100% $

A202 M1-5208 10-Aug 2 SMLS PIPE 40A (OD48.6x3.3t)-6M A106-B pc 12 261.71 187 F CFR 17-Aug 26-Aug 2-Sep 13-Sep 19-Sep 23-Sep 100% $

A202 M1-5208 10-Aug 3 SMLS PIPE 50A S/40(OD60.3xt3.9)- A106-B pc 2 65.25 187 F CFR 17-Aug 26-Aug 2-Sep 13-Sep 19-Sep 23-Sep 100% $

A202 M1-5208 10-Aug 4 SMLS PIPE 80A S/80(OD88.9xt7.6)- A106-B pc 12 1,099.74 187 F CFR 17-Aug 26-Aug 2-Sep 13-Sep 19-Sep 23-Sep 100% $

A202 M1-5208 10-Aug 5 SMLS PIPE 100A S/40(OD114.3x6.0t A106-B pc 6 576.90 187 F CFR 17-Aug 26-Aug 2-Sep 13-Sep 19-Sep 23-Sep 100% $

A202 M1-5208 10-Aug 6 SMLS PIPE 125A S/40(OD141.3x6.6t A106-B pc 12 1,578.57 187 F CFR 17-Aug 26-Aug 2-Sep 13-Sep 19-Sep 23-Sep 100% $

A202 M1-5208 10-Aug 7 SMLS PIPE 200A S/80(OD219.1x12.7 A106-B pc 12 5,818.02 187 F CFR 17-Aug 26-Aug 2-Sep 13-Sep 19-Sep 23-Sep 100% $

A202 M1-5206 10-Aug 1 PLATE 6 x 1524 x 6096 SS400 sh 10 4,376.00 186 F CFR 17-Aug 14-Sep 26-Aug 12-Sep 16-Sep 23-Sep 100% $

A202 M1-5206 10-Aug 2 PLATE 10 x 1524 x 6096 SS400 sh 5 3,646.00 186 F CFR 17-Aug 14-Sep 26-Aug 12-Sep 16-Sep 23-Sep 100% $

Page 29: Hvc PlatePipe Update)

HVC-PUR 29 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A202 M1-5206 10-Aug 3 PLATE 12 x 1524 x 6096 SS400 sh 8 7,001.00 186 F CFR 17-Aug 14-Sep 26-Aug 12-Sep 16-Sep 23-Sep 100% $

A202 M1-5206 10-Aug 4 PLATE 15 x 1524 x 6096 SS400 sh 8 8,752.00 186 F CFR 17-Aug 14-Sep 26-Aug 12-Sep 16-Sep 23-Sep 100% $

A202 M1-5206 10-Aug 5 PLATE 20 x 2250 x 7200 SS400 sh 4 10,170.00 186 F CFR 17-Aug 14-Sep 30-Sep 22-Oct 26-Oct 4-Nov 100% $

A202 M1-5206 10-Aug 6 PLATE 25 x 1524 x 6096 SS400 sh 2 3,646.00 186 F CFR 17-Aug 14-Sep 30-Sep 22-Oct 26-Oct 4-Nov 100% $

A202 M1-5206 10-Aug 7 PLATE 70 x 2250 x 7600 SS400 sh 3 28,190.00 186 F CFR 17-Aug 14-Sep 30-Sep 22-Oct 26-Oct 4-Nov 100% $

A202 M1-4978 8-Jun 20-Jul 1 PLATE 6 x 1524 x 6096 SS400 sh 58 25,404.00 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

A202 M1-4978 8-Jun 20-Jul 2 PLATE 8 x 2438 x 7400 SS400 sh 6 6,797.90 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

A202 M1-4978 8-Jun 20-Jul 3 PLATE 8 x 3048 x 7400 SS400 sh 36 50,992.80 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

A202 M1-4978 8-Jun 20-Jul 4 PLATE 12 x 2438 x 7400 SS400 sh 6 10,196.90 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

A202 M1-4978 8-Jun 20-Jul 5 PLATE 12 x 3048 x 7400 SS400 sh 36 76,489.20 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

A202 M1-4978 8-Jun 20-Jul 6 PLATE 15 x 3048 x 7400 SS400 sh 24 63,741.00 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

A202 M1-4978 8-Jun 20-Jul 7 PLATE 18 x 2438 x 7400 SS400 sh 6 15,295.30 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

A202 M1-4978 8-Jun 20-Jul 8 PLATE 18 x 3048 x 7400 SS400 sh 30 95,611.50 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

A202 M1-4978 8-Jun 20-Jul 9 PLATE 22 x 3048 x 7400 SS400 sh 42 163,601.90 134 F CFR 17-Jun 30-Jul 30-Jul 13-Aug 15-Aug 24-Oct 100% $

A202 M1-5054 22-Jun 15-Jul 1 PLATE 6 x 1524 x 6096 SS400 sh 15 6,564.00 139 F CFR 23-Jun 3-Jul 26-Jun 2-Jul 8-Jul 21-Jul 100% $

A202 M1-5054 22-Jun 15-Jul 2 PLATE 10 x 2438 x 6096 SS400 sh 2 2,333.00 139 F CFR 23-Jun 3-Jul 26-Jun 2-Jul 8-Jul 21-Jul 100% $

A202 M1-5054 22-Jun 15-Jul 3 PLATE 15 x 2438 x 6096 SS400 sh 3 5,250.00 139 F CFR 23-Jun 3-Jul 26-Jun 2-Jul 8-Jul 21-Jul 100% $

Hadeed/K200

K200 M1-6216 8-Jun 14-Jun 1 W/D Pipe OD48.3x3.6t-6M A53-B pc 20 500.00 363 L DDP 19-Jun 22-Jun 23-Jun 100% VND

K200 M1-5814 18-Mar 22-Mar 1 PLATE 8x1500x6000 CT3 sh 7 3,956.00 125 L DDP 18-Mar 25-Mar 22-Mar 29-Mar 100% vnd

K200 M1-5814 18-Mar 22-Mar 2 PLATE 10 x 1500 x 6000 CT3 sh 3 2,120.00 125 L DDP 18-Mar 25-Mar 30-Mar 100% vnd

K200 M1-5814 18-Mar 22-Mar 3 PLATE 10 x 1500 x 6000 CT3 sh 12 8,478.00 125 L DDP 18-Mar 25-Mar 22-Mar 29-Mar 100% vnd

K200 M1-5814 18-Mar 22-Mar 4 PLATE 12 x 1500 x 6000 CT3 sh 3 2,543.00 125 L DDP 18-Mar 25-Mar 22-Mar 29-Mar 100% vnd

K200 M1-5814 18-Mar 22-Mar 5 PLATE 15.5 x 1800 x 9400 CT3 sh 2 4,118.00 125 L DDP 18-Mar 25-Mar 22-Mar 29-Mar 100% vnd

K200 M1-5806 10-Mar 15-Mar 5 CHK'D PLATE 6 x 1500 x 6000 CT3 sh 1 1,353.00 125 L DDP 18-Mar 25-Mar 22-Mar 29-Mar 100% vnd

K200 M1-5570(r.1) 19-Dec 10-Jan 5-Jan 1 PLATE 10 x 1500 x 6000 A36 sh 10 7,065.00 2 L DDP 4-Jan 11-Jan 7-Jan 24-Jan 100% vnd

K200 M1-5570(r.1) 19-Dec 10-Jan 5-Jan 2 PLATE 12 x 1500 x 6000 A36 sh 17 14,412.60 2 L DDP 4-Jan 11-Jan 7-Jan 24-Jan 100% vnd

K200 M1-5570(r.1) 19-Dec 10-Jan 5-Jan 3 PLATE 26 x 2000 x 6000 A36 sh 4 9,796.80 2 L DDP 4-Jan 11-Jan 7-Jan 24-Jan 100% vnd

K200 M1-5570(r.1) 19-Dec 10-Jan 5-Jan 4 PLATE 40 x 2000 x 6000 A36 sh 1 3,768.00 2 L DDP 4-Jan 11-Jan 19-Jan 24-Jan 100% vnd

K200 M1-5570(r.1) 19-Dec 10-Jan 5-Jan 5 PLATE 50x2000x6000 A36 sh 2 9,420.00 2 L DDP 4-Jan 11-Jan 19-Jan 24-Jan 100% vnd

K200 M1-5756 24-Feb 28-Feb 4 PLATE 40 x 2000 x 6000 Q235 sh 1 3,768.00 82 L DDP 27-Feb 6-Mar 3-Mar 9-Mar 100% vnd

K200 M1-5488 4-Nov 10-Dec 1 PLATE 10 x 2438 x 6096 SS400 sh 14 16,338.00 258 F CFR 9-Nov 29-Nov 5-Dec 13-Dec 16-Dec 100% $

K200 M1-5488 4-Nov 10-Dec 2 PLATE 15 x 2438 x 6096 SS400 sh 1 1,750.00 258 F CFR 9-Nov 29-Nov 5-Dec 13-Dec 16-Dec 100% $

K200 M1-5488 4-Nov 10-Dec 3 PLATE 20 x 2438 x 6096 SS400 sh 3 7,000.00 258 F CFR 9-Nov 29-Nov 5-Dec 13-Dec 16-Dec 100% $

K200 M1-5488 4-Nov 10-Dec 4 PLATE 30 x 2438 x 6096 SS400 sh 1 3,500.00 258 F CFR 9-Nov 29-Nov 5-Dec 13-Dec 16-Dec 100% $

K200 M1-5351 26-Sep 5-Nov 1 PLATE 6 x 1524 x 6096 SS400 sh 5 2,188.00 223 F CFR 30-Sep 20-Oct 7-Oct 15-Oct 20-Oct 8-Nov 100% $

K200 M1-5351 26-Sep 5-Nov 2 PLATE 8 x 2438 x 6096 A36 sh 8 7,467.00 223 F CFR 30-Sep 20-Oct 7-Oct 15-Oct 20-Oct 8-Nov 100% $

K200 M1-5351 26-Sep 5-Nov 3 PLATE 10 x 2438 x 6096 A36 sh 8 9,333.00 223 F CFR 30-Sep 20-Oct 7-Oct 15-Oct 20-Oct 8-Nov 100% $

K200 M1-5351 26-Sep 5-Nov 4 PLATE 15 x 2438 x 6096 A36 sh 6 10,500.00 223 F CFR 30-Sep 20-Oct 7-Oct 15-Oct 20-Oct 8-Nov 100% $

K200 M1-5351 26-Sep 5-Nov 5 PLATE 20 x 2438 x 6096 A36 sh 2 4,667.00 223 F CFR 30-Sep 20-Oct 7-Oct 15-Oct 20-Oct 8-Nov 100% $

K200 M1-5351 26-Sep 5-Nov 6 PLATE 25 x 2438 x 6096 A36 sh 1 2,917.00 223 F CFR 30-Sep 20-Oct 7-Oct 15-Oct 20-Oct 8-Nov 100% $

K200 M1-5351 26-Sep 5-Nov 7 PLATE 30 x 2438 x 6096 A36 sh 1 3,500.00 223 F CFR 30-Sep 20-Oct 7-Oct 15-Oct 20-Oct 8-Nov 100% $

K200 M1-5351 26-Sep 5-Nov 8 PLATE 35 x 2438 x 6096 A36 sh 1 4,083.00 223 F CFR 30-Sep 20-Oct 7-Oct 15-Oct 20-Oct 8-Nov 100% $

K200 M1-5351 26-Sep 5-Nov 9 PLATE 45 x 2438 x 6096 A36 sh 1 5,250.00 223 F CFR 30-Sep 20-Oct 7-Oct 15-Oct 20-Oct 8-Nov 100% $

K200 M1-5353 26-Sep 5-Nov 1 W/D PIPE 25A (OD33.7 x 2.8) -6M STK400 pc 100 1,280.00 384 L DDP 29-Sep 2-Oct 29-Sep 19-Oct 100% VND

K200 M1-5353 26-Sep 5-Nov 2 W/D PIPE 40A (OD48.3 x 2.8) -6M STK400 pc 150 2,828.00 384 L DDP 29-Sep 2-Oct 29-Sep 19-Oct 100% VND

K200 M1-5353 26-Sep 5-Nov 3 SQ.Pipe 200 x 200 x 9-6M STK400 pc 51 16,003.80 220 F CFR 29-Sep 9-Oct 13-Oct 22-Oct 27-Oct 100% $

K200 M1-5012 13-Jun 30-Jul 1 W/D PIPE 1/2" x 2.4t -6M A53-B pc 10 64.80 158 F CFR 9-Jul 21-Jul 26-Jul 2-Aug 3-Aug 100% $/pc

Page 30: Hvc PlatePipe Update)

HVC-PUR 30 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K200 M1-5012 13-Jun 30-Jul 2 W/D PIPE 20A x 2.4t -6M A53-B pc 5 42.00 158 F CFR 9-Jul 21-Jul 26-Jul 2-Aug 3-Aug 100% $/pc

K200 M1-5012 13-Jun 30-Jul 3 W/D PIPE 25A(OD34 x 2.9) -6M A53-B pc 360 4,298.40 158 F CFR 9-Jul 21-Jul 26-Jul 2-Aug 3-Aug 100% $/pc

K200 M1-5012 13-Jun 30-Jul 4 W/D PIPE 40A x 2.6t -6M A53-B pc 360 6,328.80 158 F CFR 9-Jul 21-Jul 26-Jul 2-Aug 3-Aug 100% $/pc

K200 M1-5012 13-Jun 30-Jul 5 W/D PIPE 50A x S/40 -6M A53-B pc 20 666.00 158 F CFR 9-Jul 21-Jul 26-Jul 2-Aug 3-Aug 100% $/pc

K200 M1-5012 13-Jun 30-Jul 6 Rec.Pipe 150 x 100 x 6.3 - 6M STKR400 pc 4 537.60 158 F CFR 9-Jul 21-Jul 26-Jul 2-Aug 3-Aug 100% $

K200 M1-5010(R.1) 13-Jun 30-Jul 29-Jun 1 PLATE 6 x 1524 x 6096 A36 sh 8 3,500.60 152 F CFR 1-Jul 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

K200 M1-5010(R.1) 13-Jun 30-Jul 29-Jun 2 PLATE 8 x 1524 x 6096 A36 sh 7 4,084.00 152 F CFR 1-Jul 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

K200 M1-5010(R.1) 13-Jun 30-Jul 29-Jun 3 PLATE 10 x 2250 x 6096 A36 sh 5 5,383.50 152 F CFR 1-Jul 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

K200 M1-5010(R.1) 13-Jun 30-Jul 29-Jun 4 PLATE 12 x 2250 x 6096 A36 sh 2 2,584.10 152 F CFR 1-Jul 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

K200 M1-5010(R.1) 13-Jun 30-Jul 29-Jun 5 PLATE 15 x 2250 x 6096 A36 sh 5 8,075.30 152 F CFR 1-Jul 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

K200 M1-5010(R.1) 13-Jun 30-Jul 29-Jun 6 PLATE 20 x 2270 x 11900 A36 sh 23 97,543.94 152 F CFR 1-Jul 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

K200 M1-5010(R.1) 13-Jun 30-Jul 29-Jun 7 PLATE 25 x 1650 x 11900 A36 sh 4 15,413.40 152 F CFR 1-Jul 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

K200 M1-5010(R.1) 13-Jun 30-Jul 29-Jun 8 PLATE 30 x 1829 x 11900 A36 sh 21 107,639.30 152 F CFR 1-Jul 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

K200 M1-5010(R.1) 13-Jun 30-Jul 29-Jun 9 PLATE 40 x 2270 x 11900 A36 sh 1 8,482.08 152 F CFR 1-Jul 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

K200 M1-5010(R.1) 13-Jun 30-Jul 29-Jun 10 PLATE 40 x 2270 x 11900 A36 sh 1 8,482.08 152 F CFR 1-Jul 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

K200 M1-5010(R.1) 13-Jun 30-Jul 29-Jun 11 PLATE 40 x 2270 x 11900 A36 sh 4 33,928.33 152 F CFR 1-Jul 31-Jul 30-Jul 13-Aug 15-Aug 23-Aug 100% $

K200 M1-5010(R.1) 13-Jun 30-Jul 29-Jun 12 CHK'D PLATE 6 x 1219 x 6096 Poscheck-30 sh 19 6,900.00 154 F CFR 5-Jul 31-Jul 26-Jul 30-Jul 3-Aug OK 100% $

Ha Long Crane/W210

W210 M1-5209 10-Aug 15-Aug 1 SMLS PIPE 250A S/40 (OD267.4x9.3t API5L-B pc 4 1,420.00 331 L DDP 11-Aug 15-Aug 16-Aug 23-Aug 100% VND

Sohar/U208

U208 M1-5359 29-Sep 8-Oct 1 SMLS PIPE 25A S/40-6M A312-316L pc 1 50.00 214 F CFR 30-Sep 10-Oct 7-Oct 15-Oct 20-Oct 100% $/M

U208 M1-5359 29-Sep 8-Oct 2 SMLS PIPE 50A S/40-6M A312-316L pc 1 108.00 214 F CFR 30-Sep 10-Oct 7-Oct 15-Oct 20-Oct 100% $/M

U208 M1-5047 21-Jun 10-Aug 1 SMLS PIPE 80A S/10(OD88.9x3.05) A312-316L pc 193 7,573.32 142 F CFR 27-Jun 27-Jul 30-Aug 13-Sep 19-May 27-Sep 100% $

U208 M1-5047 21-Jun 10-Aug 2 SMLS PIPE 100A S/10(OD114.3x3.05 A312-316L pc 21 1,067.22 142 F CFR 27-Jun 27-Jul 30-Aug 13-Sep 19-May 27-Sep 100% $

U208 M1-5047 21-Jun 10-Aug 3 W/D PIPE 200A S/10(OD219.1x3.76 A312-316L pc 12 1,455.84 142 F CFR 27-Jun 27-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U208 M1-5047 21-Jun 10-Aug 4 W/D PIPE 250A S/10(OD273.1x4.19 A312-316L pc 1 168.84 142 F CFR 27-Jun 27-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U208 M1-5047 21-Jun 10-Aug 5 W/D PIPE 300A BE S/10(OD323.9x4 A312-316L pc 46 10,060.20 142 F CFR 27-Jun 27-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U208 M1-5047 21-Jun 10-Aug 6 W/D PIPE 350A BE S/10(OD355.6x4 A312-316L pc 32 8,040.96 142 F CFR 27-Jun 27-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U208 M1-5047 21-Jun 10-Aug 7 W/D PIPE 400A BE S/10(OD406.4x4 A312-316L pc 6 1,726.20 142 F CFR 27-Jun 27-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U208 M1-5047 21-Jun 10-Aug 8 W/D PIPE 450A BE S/10(OD457.2x4 A312-316L pc 13 4,212.78 142 F CFR 27-Jun 27-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

U208 M1-5047 21-Jun 10-Aug 9 W/D PIPE 500A BE S/10(OD508.0x5 A312-316L pc 16 6,673.92 142 F CFR 27-Jun 27-Jul 10-Aug 18-Aug 19-Aug 29-Aug 100% $/pc

Cat Lai LPG/K195

K195 M1-4933 24-May 1-Aug 1 PLATE 14 x 3048 x 9144 SPV 490Q sh 3 9,189.04 108 F CFR 2-Jun 8-Oct 31-Oct 7-Nov DaiLian L/C $

K195 M1-4933 24-May 1-Aug 2 PLATE 39 x 3200 x 9340 SPV 490Q sh 2 18,300.42 108 F CFR 2-Jun 8-Oct 31-Oct 7-Nov DaiLian L/C $

K195 M1-4933 24-May 1-Aug 3 PLATE 39 x 3200 x 9480 SPV 490Q sh 1 9,287.37 108 F CFR 2-Jun 8-Oct 31-Oct 7-Nov DaiLian L/C $

K195 M1-4933 24-May 1-Aug 4 PLATE 39 x 3200 x 10120 SPV 490Q sh 4 39,657.45 108 F CFR 2-Jun 8-Oct 31-Oct 7-Nov DaiLian L/C $

K195 M1-4933 24-May 1-Aug 5 PLATE 40 x 3200 x 9630 SPV 490Q sh 16 154,819.58 108 F CFR 2-Jun 8-Oct 31-Oct 7-Nov DaiLian L/C $

K195 M1-4933 24-May 1-Aug 6 PLATE 40.2 x 3200 x 10120 SPV 490Q sh 4 40,877.68 108 F CFR 2-Jun 8-Oct 31-Oct 7-Nov DaiLian L/C $

K195 M1-4933 24-May 1-Aug 7 PLATE 40.4 x 3200 x 9340 SPV 490Q sh 2 18,957.36 108 F CFR 2-Jun 8-Oct 31-Oct 7-Nov DaiLian L/C $

K195 M1-4933 24-May 1-Aug 8 PLATE 40.4 x 3200 x 10500 SPV 490Q sh 1 10,655.90 108 F CFR 2-Jun 8-Oct 31-Oct 7-Nov DaiLian L/C $

K195 M1-5385 4-Oct 20-Oct 1 W/D PIPE 65A(OD76.3x4.2)-6M SPP pc 5 225.00 232 F CFR 7-Oct 20-Oct 13-Oct 22-Oct 27-Oct 3-Nov 100% $/pc

K195 M1-5142 20-Jul 19-Aug 1 W/D PIPE 32A (OD42.7x3.25)-6M SGP pc 15 284.40 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $/pc

K195 M1-5142 20-Jul 19-Aug 2 W/D PIPE 40A (OD48.6x3.5)-6M SGP pc 3 70.20 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $/pc

K195 M1-5142 20-Jul 19-Aug 3 W/D PIPE 50A (OD60.5x3.8)-6M SGP pc 4 127.20 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $/pc

K195 M1-5142 20-Jul 19-Aug 4 W/D PIPE 65A (OD76.3xt4.2)-6M SGP pc 2 90.00 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $/pc

K195 M1-5142 20-Jul 19-Aug 5 W/D PIPE 80A (OD89.1x4.2)-6M SGP pc 42 2,217.60 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $/pc

K195 M1-5142 20-Jul 19-Aug 6 W/D PIPE 100A (OD114.3x4.5)-6M SGP pc 1 73.08 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $/pc

Page 31: Hvc PlatePipe Update)

HVC-PUR 31 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K195 M1-5142 20-Jul 19-Aug 7 W/D PIPE 150A (OD165.2x4.85)-6M SGP pc 2 230.16 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $/pc

K195 M1-5142 20-Jul 19-Aug 8 W/D PIPE 250A (OD267.4x6.4)-6M SGP pc 2 494.28 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $/pc

K195 M1-5142 20-Jul 19-Aug 9 SMLS PIPE 40A S/160(OD48.3xt7.1) A53-B pc 4 172.80 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $

K195 M1-5142 20-Jul 19-Aug 10 SMLS PIPE 50A S/40(OD60.3xt3.9)- A53-B pc 4 129.60 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $

K195 M1-5142 20-Jul 19-Aug 11 W/D PIPE 50A S/80(OD60.3xt5.5)- A53-B pc 23 1,021.20 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $/pc

K195 M1-5142 20-Jul 19-Aug 12 SMLS PIPE 3" S/40(OD88.9xt5.5)-6M A53-B pc 3 203.40 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $

K195 M1-5142 20-Jul 19-Aug 13 SMLS PIPE 4" S/40(OD114.3xt6.02)-6M A53-B pc 3 153.00 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $

K195 M1-5142 20-Jul 19-Aug 14 W/D PIPE 600A S/30(OD609.6x14.2 A53-B pc 8 10,056.00 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $/pc

K195 M1-5142 20-Jul 19-Aug 15 SMLS PIPE 50A S/160(OD60.3xt8.7) A106-B pc 1 66.42 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $

K195 M1-5142 20-Jul 19-Aug 16 SMLS PIPE 80A S/80(OD88.9xt7.6)- A106-B pc 1 91.20 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $

K195 M1-5142 20-Jul 19-Aug 17 SMLS PIPE 100A S/80(OD114.3xt8.6 A106-B pc 1 134.40 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $

K195 M1-5142 20-Jul 19-Aug 18 SMLS PIPE 150A S/80(OD168.3xt11) A106-B pc 2 512.03 175 F CFR 28-Jul 7-Aug 21-Aug 1-Sep 20-Sep 27-Sep 100% $

FAM-Elm Road/A212

A212 M1-5382 4-Oct 30-Oct 1 PLATE 8 x 2250 x 6096 SS400 sh 1 861.40 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5382 4-Oct 30-Oct 2 PLATE 8 x 2250 x 6096 SM490A sh 1 861.40 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5382 4-Oct 30-Oct 3 PLATE 10 x 2250 x 6096 SS400 sh 2 2,153.40 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5382 4-Oct 30-Oct 4 PLATE 12 x 2250 x 6096 SM490A sh 1 1,292.00 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5382 4-Oct 30-Oct 5 PLATE 30 x 2250 x 6096 SM490A sh 1 3,230.10 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 1 PLATE 6 x 1524 x 6096 SS400 sh 3 1,312.72 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 2 PLATE 8 x 2250 x 6096 SS400 sh 3 2,584.09 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 3 PLATE 8 x 2250 x 6096 SM490A sh 2 1,722.73 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 4 PLATE 10 x 2250 x 6096 SS400 sh 4 4,306.82 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 5 PLATE 10 x 2250 x 6096 SM490A sh 3 3,230.12 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 6 PLATE 12 x 2250 x 6096 SS400 sh 15 19,380.71 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 7 PLATE 12 x 2250 x 6096 SM490A sh 3 3,876.14 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 8 PLATE 15 x 2250 x 6096 SS400 sh 8 12,920.47 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 9 PLATE 15 x 2250 x 6096 SM490A sh 60 96,903.54 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 10 PLATE 20 x 2250 x 6096 SS400 sh 2 4,306.82 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 11 PLATE 20 x 2250 x 6096 SM490A sh 10 21,534.12 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 12 PLATE 25 x 2250 x 6096 SM490A sh 28 75,369.42 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 13 PLATE 30 x 2250 x 6096 SS400 sh 1 3,230.12 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 14 PLATE 30 x 2250 x 6096 SM490A sh 4 12,920.47 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 15 PLATE 35 x 1524 x 3048 SM490A sh 1 1,276.26 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 16 PLATE 40 x 1524 x 3048 SM490A sh 1 1,458.58 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5303 9-Sep 20-Oct 17 PLATE 45 x 2250 x 6096 SM490A sh 1 4,845.18 205 F CFR 12-Sep 24-Oct 24-Oct 5-Nov 7-Nov 23-Nov 100% $

A212 M1-5381 4-Oct 30-Oct 1 W/D PIPE 40A (OD48.3 x 3.3)-6M STK400 pc 50 1,099.00 398 L DDP 5-Oct 10-Oct 6-Oct 19-Oct 100% VND

A212 M1-5381 4-Oct 30-Oct 2 W/D PIPE 32A (OD42.2 x 3.5)-6M STK400 pc 5 100.00 398 L DDP 5-Oct 10-Oct 6-Oct 19-Oct 100% VND

A212 M1-5305(R.1) 9-Sep 20-Oct 12-Sep 3 W/D PIPE 80A (OD88.9x5.5t)-11.9M S355J2H pc 4 538.43 224 F CFR 1-Oct 8-Oct 8-Oct 19-Oct 27-Oct a 9-Nov 100% $/T

A212 M1-5305(R.1) 9-Sep 20-Oct 12-Sep 5 W/D PIPE 125A S/40(OD139.8x6.3) S355J2H pc 1 124.44 224 F CFR 1-Oct 8-Oct 8-Oct 19-Oct 27-Oct a 9-Nov 100% $/T

A212 M1-5305(R.1) 9-Sep 20-Oct 12-Sep 1 W/D PIPE 40A (OD48.3x3.2)-6M STK400 pc 55 1,174.52 210 F CFR 16-Sep 26-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $

A212 M1-5305(R.1) 9-Sep 20-Oct 12-Sep 7 Rec.Pipe 150 x 80 x 4.5-6M STKR400 pc 14 1,276.80 210 F CFR 16-Sep 26-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $

A212 M1-5305(R.1) 9-Sep 20-Oct 12-Sep 8 Rec.Pipe 150 x 80 x 6.0-6M STKR400 pc 4 475.20 210 F CFR 16-Sep 26-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $

A212 M1-5305(R.1) 9-Sep 20-Oct 12-Sep 9 Rec.Pipe 200 x 100 x 10-6M STKR400 pc 1 255.00 210 F CFR 16-Sep 26-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $

A212 M1-5305(R.1) 9-Sep 20-Oct 12-Sep 10 Rec.Pipe 250 x 150 x 9-6M STKR400 pc 2 543.60 210 F CFR 16-Sep 26-Sep 7-Oct 15-Oct 20-Oct 29-Oct 100% $

Thanh Hoa/S214

S214 M1-5390 5-Oct 20-Nov 2 PLATE 10 x 2250 x 12000 SM490B sh 4 8,478.00 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 1 PLATE 5 x 1524 x 6096 SS400 sh 3 1,093.93 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

Page 32: Hvc PlatePipe Update)

HVC-PUR 32 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 2 PLATE 8 x 2250 x 6096 SS400 sh 2 1,722.73 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 3 PLATE 10 x 2250 x 6096 SS400 sh 1 1,076.71 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 4 PLATE 8 x 2250 x 6096 SM490B sh 3 2,584.09 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 5 PLATE 10 x 2250 x 12000 SM490B sh 3 6,358.50 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 6 PLATE 12 x 2250 x 12000 SM490B sh 2 5,086.80 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 7 PLATE 15 x 2250 x 12000 SM490B sh 7 22,254.75 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 8 PLATE 16 x 1219 x 12000 SM490B sh 1 1,837.28 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 9 PLATE 18 x 2000 x 10000 SM490B sh 9 25,434.00 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 10 PLATE 18 x 2250 x 6096 SM490B sh 1 1,938.07 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 11 PLATE 20 x 2250 x 12000 SM490B sh 5 21,195.00 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 12 PLATE 25 x 2250 x 6096 SM490B sh 3 8,075.30 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5354(R.1) 29-Sep 25-Oct 25-Oct 13 PLATE 30 x 1524 x 3048 SM490B sh 1 1,093.93 227 F CFR 4-Oct 30-Nov 4-Dec 17-Dec 100% $

S214 M1-5356(R.1) 29-Sep 27-Oct 1 W/D PIPE 20A S/40(OD26.7xt2.87) A53-B pc 35 354.90 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S214 M1-5356(R.1) 29-Sep 27-Oct 2 W/D PIPE 32A S/40(OD42.2x3.56)- A53-B pc 50 1,017.00 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S214 M1-5356(R.1) 29-Sep 27-Oct 3 W/D PIPE 40A S/80 (OD48.3x5.08) A53-B pc 1 32.46 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S214 M1-5356(R.1) 29-Sep 27-Oct 4 W/D PIPE 65A S/40 (OD73x5.16) - A53-B pc 1 51.78 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S214 M1-5356(R.1) 29-Sep 27-Oct 5 W/D PIPE 65A S/80 (OD73x7.01) - A53-B pc 1 68.46 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S214 M1-5356(R.1) 29-Sep 27-Oct 6 W/D PIPE 4" S/40(OD114.3xt6.02)-6M A53-B pc 4 128.56 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S214 M1-5356(R.1) 29-Sep 27-Oct 7 W/D PIPE 4" S/80(OD114.3x8.56)- A53-B pc 8 1,071.36 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S214 M1-5356(R.1) 29-Sep 27-Oct 10 SQ.PIPE 50 x 50 x t3.2-6M STKR400 pc 2 54.00 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S214 M1-5356(R.1) 29-Sep 27-Oct 11 SQ.PIPE 60 x 30 x 3.2 - 6M STKR400 pc 4 95.76 226 F CFR 4-Oct 24-Oct 18-Nov 23-Nov 30-Nov 8-Dec 100% $

S214 M1-5390 5-Oct 20-Nov 1 CHK'D PLATE 6/8 x 1219 x 2438 SS400 sh 4 1,450.00 235 F CFR 13-Oct 2-Nov 30-Oct 5-Nov 8-Nov 23-Nov 100% $

S214 M1-5356(R.1) 29-Sep 27-Oct 8 W/D PIPE 250A S/60(OD273.1x12.5) S355J2H pc 2 1,911.85 224 F CFR 1-Oct 8-Oct 8-Oct 19-Oct 27-Oct a 9-Nov 100% $/T

S214 M1-5356(R.1) 29-Sep 27-Oct 9 W/D PIPE 400A S/40(OD406.4x12.5 S355J2H pc 2 1,457.04 224 F CFR 1-Oct 8-Oct 8-Oct 19-Oct 27-Oct a 9-Nov 100% $/T

S214 M1-5356(R.1) 10-May 10 SQ.Pipe 50 x 50 x 3.2-6M STK400 pc 2 54.00 232 F CFR 7-Oct 20-Oct 13-Oct 22-Oct 27-Oct 3-Nov 100% $

IHI-Buckstay/A215

A215 M1-5421 17-Oct 1 PLATE 4.5 x 1524 x 6096 SS400 sh 6 1,969.08 238 F CFR 15-Oct 4-Nov 3-Nov 13-Nov 17-Nov 1-Dec 100% $

A215 M1-5389 5-Oct 5-Nov 1 W/D PIPE 6A S/40(OD10.3 x 1.73)- SUS304 pc 4 8.80 232 F CFR 7-Oct 20-Oct 13-Oct 22-Oct 27-Oct 3-Nov 100% $

A215 M1-5389 5-Oct 5-Nov 2 W/D PIPE 90A S/40(OD101.6x5.7)- STPG370 pc 13 1,051.43 232 F CFR 7-Oct 20-Oct 13-Oct 22-Oct 27-Oct 3-Nov 100% $

A215 M1-5389 5-Oct 5-Nov 3 W/D PIPE 125A S/40(OD139.8 x 6. STPG370 pc 3 390.22 232 F CFR 7-Oct 20-Oct 13-Oct 22-Oct 27-Oct 3-Nov 100% $

A-Vuong/C216

C216 W-5479 3-Nov ASAP 1 Tension/Bend test SM570 sh 18 439 L 4-Nov OK 100% VND

ELM ROAD-BUCKSTAY/A219

A219 M1-6158 26-May 20-Jul 1 SMLS Pipe 4" S/120 (OD114.3xt11.1 A53-B pc 11 1,869.00 174 F FOB 31-May 7-Jun 11-Jun 18-Jun 20-Jun 25-Jul 100% $

A219 M1-5541 1-Dec 10-Feb 3 PLATE 60 x 1524 x 6096 SS400 sh 1 4,376.00 281 F CFR 12-Dec 1-Jan 6-Jan 100% $

A219 M1-5648 11-Jan 20-Jan 7 SMLS PIPE 4" (OD114.3x t11.1)-6M A53-B pc 7 1,189.30 1 F CFR 6-Jan 16-Jan 23-Jan 30-Jan 18-Feb 28-Feb 100% $

A219 M1-5598 23-Dec 15-Feb 30-Dec 3 PLATE 9 x 2438 x 6096 SS400 sh 4 4,200.00 6 F CFR 13-Jan 12-Feb 27-Jan 6-Feb 18-Feb 28-Feb 100% $

A219 M1-5598 23-Dec 15-Feb 30-Dec 4 PLATE 12 x 2438 x 6096 SS400 sh 5 7,000.00 6 F CFR 13-Jan 12-Feb 27-Jan 6-Feb 18-Feb 28-Feb 100% $

A219 M1-5598 23-Dec 15-Feb 30-Dec 5 PLATE 14 x 1524 x 3048 SS400 sh 1 510.50 6 F CFR 13-Jan 12-Feb 27-Jan 6-Feb 18-Feb 28-Feb 100% $

A219 M1-5598 23-Dec 15-Feb 30-Dec 7 PLATE 19 x 2250 x 6096 SS400 sh 2 4,433.30 6 F CFR 13-Jan 12-Feb 27-Jan 6-Feb 18-Feb 28-Feb 100% $

A219 M1-5598 23-Dec 15-Feb 30-Dec 8 PLATE 25 x 2250 x 6096 SS400 sh 1 2,916.70 6 F CFR 13-Jan 12-Feb 27-Jan 6-Feb 18-Feb 28-Feb 100% $

A219 M1-5598 23-Dec 15-Feb 30-Dec 9 PLATE 28 x 1524 x 3048 SS400 sh 1 1,021.00 6 F CFR 13-Jan 12-Feb 27-Jan 6-Feb 18-Feb 28-Feb 100% $

A219 M1-5598 23-Dec 15-Feb 30-Dec 10 PLATE 36 x 1524 x 3048 SS400 sh 1 1,312.70 6 F CFR 13-Jan 12-Feb 27-Jan 6-Feb 18-Feb 28-Feb 100% $

A219 M1-5598 23-Dec 15-Feb 30-Dec 10 PLATE 15 x 1524 x 6096 SS400 sh 1 1,093.90 6 F CFR 13-Jan 12-Feb 27-Jan 6-Feb 18-Feb 28-Feb 100% $

A219 M1-5598 O/Freight 100%

A219 M1-5542 1-Dec 10-Jan 1 SMLS PIPE 50A S/80(OD60.5 x t5.5) A106-C pc 9 402.80 280 F CFR 10-Dec 10-Feb 10-Feb 15-Feb a 100% $

A219 M1-5542 1-Dec 10-Jan 2 SMLS PIPE 100A S/40(OD114.3 x t6. A106-C pc 7 672.80 280 F CFR 10-Dec 10-Feb 10-Feb 15-Feb a 100% $

A219 M1-5541 1-Dec 10-Feb 1 PLATE 19 x 2250 x 6096 SS400 sh 34 69,555.00 279 F CFR 9-Dec 28-Feb 29-Jan 16-Feb 16-Feb 28-Feb 100% $

A219 M1-5541 1-Dec 10-Feb 2 PLATE 25 x 2250 x 6096 SS400 sh 5 13,459.00 279 F CFR 9-Dec 28-Feb 29-Jan 16-Feb 16-Feb 28-Feb 100% $

Page 33: Hvc PlatePipe Update)

HVC-PUR 33 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A219 M1-5541 1-Dec 10-Feb 4 PLATE 3 x 1500 x 6000 SUS304 sh 2 428.00 474 L DDP 6-Dec 13-Dec 100% VND

A219 M1-5541 1-Dec 10-Feb 5 PLATE 6 x 1545 x 6000 SUS304 sh 1 441.00 474 L DDP 6-Dec 13-Dec 100% VND

Sabiya phase III-recarbonation vessels/U225

U225 M1-5590 21-Dec 15-Apr 1 2:1 Ellip Head t10(8.5)xID2400xSF40 A516-70 ea 4 2,272.00 11 F CFR 19-Jan 9-Apr 2-May 9-May 17-May 10-Jun 100% $

U225 M1-5590 21-Dec 15-Apr 2 2:1 Ellip Head t18(15.3)xID5200xSF40 A516-70 ea 9 41,864.40 11 F CFR 19-Jan 9-Apr 2-May 9-May 17-May 10-Jun 100% $

U225 M1-5590 21-Dec 15-Apr 2 2:1 Ellip Head t18(15.3)xID5200xSF40 A516-70 ea 9 41,864.40 11 F CFR 19-Jan 9-Apr 9-Jun 19-Jun 100% $

U225 M1-5590 21-Dec 15-Apr 3 2:1 Ellip Head t8(6)xID2800xSF40 A516-70 ea 2 1,067.40 11 F CFR 19-Jan 9-Apr 2-May 9-May 17-May 10-Jun 100% $

U225 M1-5590 21-Dec 15-Apr 4 2:1 Ellip Head t8(6.8)xID1800xSF36 A240-316L ea 2 525.80 11 F CFR 19-Jan 9-Apr 9-Jun 19-Jun 100% $

U225 W4-6044 1 PLATE 15 x 3000 x 12000 CT3 sh 4 16,956.00 244 L DDP 8-May 13-May OK 25-May 100% VND

U225 M1-5579 3-Feb 15-Mar 23 PLATE 55 x 2650 x 8750 SA516-70 sh 1 10,012.00 40 F CFR 20-Feb 6-Apr 100%

U225 M1-5579 3-Feb 15-Mar O/Freight 1 1.00 40 F CFR 20-Feb 6-Apr 100%

U225 M1-5579 21-Dec 25-Feb 27-Jan 1 PLATE 7 x 3048 x 8000 A516-60 sh 6 8,039.40 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 2 PLATE 7 x 2250 x 8000 A516-60 sh 4 3,956.40 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 3 PLATE 7 x 3048 x 7100 A516-60 sh 3 3,567.49 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 4 PLATE 7 x 3048 x 4700 A516-60 sh 1 787.19 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 5 PLATE 7 x 2250 x 7100 A516-60 sh 3 2,633.48 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 6 PLATE 7 x 2250 x 8900 A516-60 sh 3 3,301.12 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 7 PLATE 8 x 3048 x 5500 A516-60 sh 2 2,105.56 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 8 PLATE 10 x 3048 x 7700 A516-60 sh 6 11,054.18 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 9 PLATE 10 x 2250 x 7700 A516-60 sh 2 2,720.03 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 10 PLATE 10 x 3048 x 7100 A516-60 sh 3 5,096.41 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 11 PLATE 16 x 2250 x 4000 A516-60 sh 1 1,130.40 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 12 PLATE 20 x 2250 x 8000 A516-60 sh 1 2,826.00 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 13 PLATE 25 x 1500 x 4000 A516-60 sh 1 1,177.50 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 14 PLATE 30 x 1524 x 4000 A516-60 sh 1 1,435.61 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 15 PLATE 18 x 2250 x 8300 A516-70 sh 21 55,414.33 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 16 PLATE 18 x 1829 x 8300 A516-70 sh 18 38,610.59 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 17 PLATE 20 x 2250 x 5800 A516-70 sh 13 26,635.05 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 18 PLATE 6 x 2250 x 6000 A285-C sh 3 1,907.55 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 19 PLATE 10 x 2250 x 5500 A285-C sh 3 2,914.31 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 20 PLATE 40 x 1500 x 4000 A285-C sh 1 1,884.00 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 21 PLATE 20 x 2250 x 7200 A36 sh 12 30,520.80 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5579 21-Dec 25-Feb 27-Jan 22 PLATE 20 x 2250 x 6200 A36 sh 3 6,570.45 18 F CFR 26-Jan 10-Mar 30-Mar 9-Apr 11-Apr 21-Apr L/C $

U225 M1-5792 7-Mar 15-Apr 1 SMLS Pipe 15A S/80(OD21.3x3.7t)- A312-316L ea 1 9.90 57 F CFR 13-Mar 20-Mar 17-Mar 27-Mar 4-Apr 100% $

U225 M1-5792 7-Mar 15-Apr 2 SMLS Pipe 20A S/80(OD26.7x3.9t)- A312-316L ea 1 13.40 57 F CFR 13-Mar 20-Mar 17-Mar 27-Mar 4-Apr 100% $

U225 M1-5792 7-Mar 15-Apr 3 SMLS Pipe 25A S/80(OD33.4x4.6t)- A312-316L ea 1 19.80 57 F CFR 13-Mar 20-Mar 17-Mar 27-Mar 4-Apr 100% $

U225 M1-5792 7-Mar 15-Apr 4 SMLS Pipe 40A S/80S(OD48.3x5.1t) A312-316L ea 9 272.30 57 F CFR 13-Mar 20-Mar 17-Mar 27-Mar 4-Apr 100% $

U225 M1-5792 7-Mar 15-Apr 5 SMLS Pipe 50A S/80S(OD60.3x5.5t) A312-316L ea 1 45.60 57 F CFR 13-Mar 20-Mar 17-Mar 27-Mar 4-Apr 100% $

U225 M1-5792 7-Mar 15-Apr 6 SMLS Pipe 80A S/40(OD88.9x5.5t)- A312-316L pc 1 68.90 57 F CFR 13-Mar 20-Mar 17-Mar 27-Mar 4-Apr 100% $

U225 M1-5792 7-Mar 15-Apr 7 SMLS Pipe 100A S/40(OD114.3x6t)- A312-316L ea 2 196.10 57 F CFR 13-Mar 20-Mar 17-Mar 27-Mar 4-Apr 100% $

U225 M1-5792 7-Mar 15-Apr 8 SMLS Pipe 150A S/40(OD168.3x7.1t A312-316L ea 3 517.10 57 F CFR 13-Mar 20-Mar 17-Mar 27-Mar 4-Apr 100% $

U225 M1-5792 7-Mar 15-Apr 9 SMLS Pipe 200A S/40(OD219.1x8.2t A312-316L ea 1 86.50 57 F CFR 13-Mar 20-Mar 17-Mar 27-Mar 4-Apr 100% $

U225 M1-5792 7-Mar 15-Apr 10 SMLS Pipe 300A S/40S(323.9x10.3t) A312-316L ea 1 162.30 57 F CFR 13-Mar 20-Mar 17-Mar 27-Mar 4-Apr 100% $

U225 M1-5792 7-Mar 15-Apr 11 SMLS Pipe 40A S/40(OD48.3x3.7t)- A53-B ea 3 72.90 57 F CFR 13-Mar 20-Mar 17-Mar 27-Mar 4-Apr 100% $

U225 M1-5580 21-Dec 25-Feb 17-Jan 1 PLATE 4 x 1219 x 6096 A240-316L sh 1 237.20 13 F CFR 25-Jan 4-Feb 10-Feb 15-Feb 6-Mar 21-Mar 100% $

U225 M1-5580 21-Dec 25-Feb 17-Jan 2 PLATE 7 x 1524 x 6000 A240-316L sh 1 510.80 13 F CFR 25-Jan 4-Feb 10-Feb 15-Feb 6-Mar 21-Mar 100% $

U225 M1-5580 21-Dec 25-Feb 17-Jan 3 PLATE 7 x 1219 x 4000 A240-316L sh 1 272.40 13 F CFR 25-Jan 4-Feb 10-Feb 15-Feb 6-Mar 21-Mar 100% $

U225 M1-5580 21-Dec 25-Feb 17-Jan 4 PLATE 8 x 1524 x 8000 A240-316L sh 2 1,128.60 13 F CFR 25-Jan 4-Feb 10-Feb 15-Feb 6-Mar 21-Mar 100% $

U225 M1-5580 21-Dec 25-Feb 17-Jan 5 PLATE 10 x 1524 x 6000 A240-316L sh 4 2,918.80 13 F CFR 25-Jan 4-Feb 10-Feb 15-Feb 6-Mar 21-Mar 100% $

U225 M1-5580 21-Dec 25-Feb 17-Jan 6 PLATE 14 x 1219 x 3300 A240-316L sh 1 449.40 13 F CFR 25-Jan 4-Feb 10-Feb 15-Feb 6-Mar 21-Mar 100% $

U225 M1-5580 21-Dec 25-Feb 17-Jan 7 PLATE 16 x 1219 x 3000 A240-316L sh 1 466.90 13 F CFR 25-Jan 4-Feb 10-Feb 15-Feb 6-Mar 21-Mar 100% $

Sohar Fertiliser/ K229

Page 34: Hvc PlatePipe Update)

HVC-PUR 34 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K229 M1-6345 28-Jun 3-Jul 1 SQ.Pipe 90 x 90 x t4-6M STKR400 pc 4 257.00 443 L DDP 18-Jul 21-Jul 27-Jul 19-Aug VND

K229 M1-6009 24-Apr 10-May 1 SQ.PIPE 60 x 60 x t4-6M STKR400 pc 2 82.80 132 F FOB 10-May 25-May 11-Jun 18-Jun 22-Jun 25-Jul 100% $

K229 M1-6009 24-Apr 10-May 2 W/D Pipe OD48.3 x 5.1t-6M A53-B pc 60 1,947.60 132 F FOB 10-May 25-May 11-Jun 18-Jun 22-Jun 25-Jul 100% $

K229 M1-6009 24-Apr 10-May 3 W/D Pipe OD48.3 x 3.6t-6M A53-B pc 20 489.60 132 F FOB 10-May 25-May 11-Jun 18-Jun 22-Jun 25-Jul 100% $

K229 M1-6175 29-May 5-Jun 1 W/D PIPE OD48.3 x 3.5t-6M STK400 pc 10 243.00 305 L DDP 31-May 5-Jun 31-May 10-Jun 100% VND

K229 M1-6175 29-May 5-Jun 2 W/D PIPE OD42.5 x 3.5t-6M STK400 pc 2 40.40 305 L DDP 31-May 5-Jun 31-May 10-Jun 100% VND

K229 M1-6175 29-May 5-Jun 3 SQ.Pipe 90 x 90 x 4-6M STKR400 pc 13 834.00 305 L DDP 31-May 5-Jun 5-Jun 13-Jun 100% VND

K229 M1-6175 29-May 5-Jun 4 SQ.Pipe 60 x 60 x 3.5t-6M STKR400 pc 15 551.00 305 L DDP 31-May 5-Jun 31-May 10-Jun 100% VND

K229 M1-6098 15-May 17-May 1 Plate 10 x 1500 x 6000 CT3 sh 2 1,413.00 270 L DDP 15-May 20-May 19-May 10-Jun 100% VND

K229 M1-5892 27-Mar 15-Apr 1 W/D Pipe 32A S/40(OD42.5x3.6)-6 A53-B pc 4 81.10 91 F CFR 4-Apr 19-Apr 2-May 12-May 18-May 1-Jun 100% $

K229 M1-5892 27-Mar 15-Apr 2 W/D Pipe 40A STD (OD48.3x3.7t)- A53-B pc 17 396.80 91 F CFR 4-Apr 19-Apr 2-May 12-May 18-May 1-Jun 100% $

K229 M1-5892 27-Mar 15-Apr 3 SMLS Pipe 2" STD (OD60.3x3.9t)-6M A106-B pc 1 32.50 91 F CFR 4-Apr 19-Apr 2-May 12-May 18-May 1-Jun 100% $

K229 M1-5892 27-Mar 15-Apr 4 W/D Pipe 2" STD (OD60.3x3.9t)-6M A312-304 pc 22 714.10 91 F CFR 4-Apr 19-Apr 2-May 12-May 18-May 1-Jun 100% $

K229 M1-5892 27-Mar 15-Apr 5 W/D Pipe 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 1 52.70 91 F CFR 4-Apr 19-Apr 2-May 12-May 18-May 1-Jun 100% $

K229 M1-5892 27-Mar 15-Apr 6 SMLS Pipe 4" STD (OD114.3x6.0t)- A106-B pc 1 96.00 91 F CFR 4-Apr 19-Apr 2-May 12-May 18-May 1-Jun 100% $

K229 M1-5892 27-Mar 15-Apr 7 SQ.Pipe 90 x 90 x 4-6M STKR400 pc 33 2,119.00 161 L DDP 3-Apr 4-Apr 4-Apr 100% VND

K229 M1-5670 19-Jan 28-Feb 1 Plate 6 x 2438 x 6096 SS400 sh 68 47,600.17 32 F CFR 7-Feb 27-Feb 6-Mar 12-Mar 17-Mar 100% $

K229 M1-5670 19-Jan 28-Feb 2 Plate 10 x 1524 x 6096 SS400 sh 3 2,187.87 32 F CFR 7-Feb 27-Feb 6-Mar 12-Mar 17-Mar 100% $

K229 M1-5670 19-Jan 28-Feb 3 Plate 15 x 1524 x 6096 SS400 sh 6 6,563.60 32 F CFR 7-Feb 27-Feb 6-Mar 12-Mar 17-Mar 100% $

K229 M1-5670 19-Jan 28-Feb 4 Plate 20 x 1524 x 6096 SS400 sh 1 1,458.58 32 F CFR 7-Feb 27-Feb 6-Mar 12-Mar 17-Mar 100% $

K229 M1-5670 19-Jan 28-Feb 5 Plate 25 x 1524 x 6096 SS400 sh 1 1,823.22 32 F CFR 7-Feb 27-Feb 6-Mar 12-Mar 17-Mar 100% $

K229 M1-5670 19-Jan 28-Feb 6 Plate 30 x 1219 x 2438 SS400 sh 1 699.89 32 F CFR 7-Feb 27-Feb 6-Mar 12-Mar 17-Mar 100% $

K229 M1-5670 19-Jan 28-Feb 7 O/freight ea 1 1.00 32 F CFR 7-Feb 27-Feb 6-Mar 12-Mar 17-Mar 100% $

K229 M1-5734 14-Feb 10-Mar 1 W/D PIPE OD48.3x3.7t-6M A53-B pc 40 972.00 43 F CFR 22-Feb 24-Mar 10-Mar 17-Mar 23-Mar 4-Apr 100% $

K229 M1-5734 14-Feb 10-Mar 2 W/D PIPE OD48.3x5.1t-6M A53-B pc 20 649.20 43 F CFR 22-Feb 24-Mar 10-Mar 17-Mar 23-Mar 4-Apr 100% $

K229 M1-5734 14-Feb 10-Mar 3 W/D pipe OD60.3x3.9t-6M A312-316 pc 2 65.30 43 F CFR 22-Feb 24-Mar 10-Mar 17-Mar 23-Mar 4-Apr 100% $

K229 M1-5671 26-Jan 28-Feb 6 SQ.Pipe 90 x 90 x 4-6M STKR400 pc 75 4,816.50 50 L DDP 8-Feb 15-Feb 15-Feb 15-Feb 100% VND

K229 M1-5735 15-Feb 30-Mar 1 Plate 8 x 3048 x 9000 SS400 sh 10 17,227.30 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 2 Plate 8 x 3350 x 7500 SS400 sh 5 7,889.25 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 3 Plate 10 x 4000 x 9000 SS400 sh 7 19,782.00 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 4 Plate 12 x 3048 x 9000 SS400 sh 6 15,504.57 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 5 Plate 14 x 4000 x 7500 SS400 sh 2 6,594.00 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 6 Plate 14 x 3048 x 9000 SS400 sh 4 12,059.11 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 7 Plate 15 x 2250 x 6096 SS400 sh 2 3,230.12 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 8 Plate 16 x 3048 x 9000 SS400 sh 4 13,781.84 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 9 Plate 18 x 4000 x 9000 SS400 sh 2 10,173.60 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 10 Plate 20 x 4000 x 9000 SS400 sh 3 16,956.00 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 11 Plate 22 x 4000 x 9000 SS400 sh 2 12,434.40 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 12 Plate 24 x 4000 x 9000 SS400 sh 1 6,782.40 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 13 Plate 30 x 2250 x 6096 SS400 sh 3 9,690.35 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 14 Plate 35 x 2250 x 6096 SS400 sh 1 3,768.47 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 15 Plate 35 x 2250 x 6096 S355J2 sh 3 11,305.41 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5735 15-Feb 30-Mar 16 Plate 40 x 2250 x 6096 S355J2 sh 2 8,613.65 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K229 M1-5671 26-Jan 28-Feb 1 W/D PIPE OD48.3x3.7t-6000 A53-B pc 200 4,860.00 27 F CFR 3-Feb 13-Feb 19-Feb 26-Feb 4-Mar 9-Mar 100% $

K229 M1-5671 26-Jan 28-Feb 2 W/D PIPE 1-1/2" XS(OD48.3xt5.1) A53-B pc 130 4,219.80 27 F CFR 3-Feb 13-Feb 19-Feb 26-Feb 4-Mar 9-Mar 100% $

K229 M1-5671 26-Jan 28-Feb 3 W/D PIPE OD88.9x5.5t-6M A53-B pc 5 338.70 27 F CFR 3-Feb 13-Feb 19-Feb 26-Feb 4-Mar 9-Mar 100% $

K229 M1-5671 26-Jan 28-Feb 4 W/D PIPE OD141.3x6.6t-6000 A53-B pc 54 7,024.32 27 F CFR 3-Feb 13-Feb 19-Feb 26-Feb 4-Mar 9-Mar 100% $

K229 M1-5671 26-Jan 28-Feb 5 W/D PIPE OD60.3x3.91t - 6M A312-304 pc 22 718.08 27 F CFR 3-Feb 13-Feb 19-Feb 26-Feb 4-Mar 9-Mar 100% $

FAM Sohar/ K231

K231 M1-5873 22-Mar 15-Apr 1 Plate 12 x 2438 x 6096 SS400 sh 2 2,800.00 93 F CFR 7-Apr 30-Apr 23-May 2-Jun 7-Jun 19-Jun 100% $

K231 M1-5873 22-Mar 15-Apr 2 Plate 15 x 2438 x 6096 SS400 sh 2 3,500.00 93 F CFR 7-Apr 30-Apr 23-May 2-Jun 7-Jun 19-Jun 100% $

K231 M1-5977 13-Apr 12-May 1 W/D PIPE OD26.7 x 2.9t-6M A53-B pc 25 278.00 194 L DDP 14-Apr 17-Apr 18-Apr 28-Apr 100% VND

K231 M1-5977 13-Apr 12-May 2 W/D PIPE OD42.2 x 3.6t-6M A53-B pc 25 501.00 194 L DDP 14-Apr 17-Apr 18-Apr 28-Apr 100% VND

Page 35: Hvc PlatePipe Update)

HVC-PUR 35 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K231 M1-5977 13-Apr 12-May 3 W/D PIPE OD48.3 x 3.7t-6M A53-B pc 20 500.00 194 L DDP 14-Apr 17-Apr 18-Apr 28-Apr 100% VND

K231 M1-5978 13-Apr 12-May 1 Plate 3 x 1500 x 6000 CT3 sh 1 212.00 147 L DDP 15-Apr 18-Apr 20-Apr 28-Apr 100% VND

K231 M1-5978 13-Apr 12-May 2 Plate 4 x 1500 x 6000 CT3 sh 1 283.00 147 L DDP 15-Apr 18-Apr 20-Apr 28-Apr 100% VND

K231 M1-5899 28-Mar 5-Apr 1 Plate 10 x 1500 x 6000 CT3 sh 3 2,119.50 147 L DDP 30-Mar 6-Apr 20-Apr 28-Apr 100% VND

K231 M1-5747 20-Feb 20-Mar 3 Plate 10 x 2250 x 6096 SS400 sh 30 32,301.18 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K231 M1-5747 20-Feb 20-Mar 4 Plate 12 x 2250 x 6096 SS400 sh 23 29,717.09 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K231 M1-5747 20-Feb 20-Mar 5 Plate 15 x 2250 x 6096 SS400 sh 24 38,761.42 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K231 M1-5747 20-Feb 20-Mar 6 Plate 15 x 2250 x 6096 SM490A sh 1 1,615.06 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K231 M1-5747 20-Feb 20-Mar 7 Plate 20 x 2250 x 6096 SS400 sh 18 38,761.42 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K231 M1-5747 20-Feb 20-Mar 8 Plate 20 x 2250 x 6096 SM490A sh 1 2,153.41 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

K231 M1-5747 20-Feb 20-Mar 9 Plate 25 x 2250 x 6096 SS400 sh 2 5,383.53 42 F CFR 21-Feb 5-Apr 30-Mar 9-Apr 11-Apr L/C $

ELM ROAD-Sling Bolt/A226

A226 M1-5647 11-Jan 15-Feb 1 Plate 12 x 1524 x 6096 A36 sh 4 3,500.60 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5647 11-Jan 15-Feb 2 Plate 16 x 1524 x 6096 A36 sh 3 3,500.60 2 F CFR 5-Jan 4-Feb 17-Feb 27-Feb 4-Mar 100% $

A226 M1-5604 21-Dec 15-Jan 1 W/D PIPE OD34.0x3.4t-6M A53-B pc 2 30.60 1 F CFR 5-Jan 15-Jan 23-Jan 6-Feb 18-Feb 28-Feb 100% $

A226 M1-5604 21-Dec 15-Jan 2 W/D PIPE OD48.3x3.7t-6000 A53-B pc 8 195.70 1 F CFR 5-Jan 15-Jan 23-Jan 6-Feb 18-Feb 28-Feb 100% $

A226 M1-5604 21-Dec 15-Jan 3 W/D PIPE 2" S/40(OD60.3xt3.9)-6M A53-B pc 29 1,178.70 1 F CFR 5-Jan 15-Jan 23-Jan 6-Feb 18-Feb 28-Feb 100% $

A226 M1-5604 21-Dec 15-Jan 4 SMLS PIPE 3" S/40(OD88.9xt11.1)-6 A53-B pc 12 2,054.50 1 F CFR 5-Jan 15-Jan 23-Jan 6-Feb 18-Feb 28-Feb 100% $

A226 M1-5604 21-Dec 15-Jan 5 W/D PIPE OD101.6x8.1t-6000 A53-B pc 31 4,025.20 1 F CFR 5-Jan 15-Jan 23-Jan 6-Feb 18-Feb 28-Feb 100% $

A226 M1-5604 21-Dec 15-Jan 6 W/D PIPE OD114.3x6.0t-6000 A53-B pc 50 2,893.60 1 F CFR 5-Jan 15-Jan 23-Jan 6-Feb 18-Feb 28-Feb 100% $

A226 M1-5604 21-Dec 15-Jan 7 SMLS PIPE 4" (OD114.3x t11.1)-6M A53-B pc 4 1,019.50 1 F CFR 5-Jan 15-Jan 23-Jan 6-Feb 18-Feb 28-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 1 Plate 4.5 x 1219 x 2438 A36 sh 1 104.98 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 2 Plate 6 x 1524 x 6096 A36 sh 1 437.57 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 3 Plate 9 x 1524 x 6096 A36 sh 5 3,281.80 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 4 Plate 12 x 1524 x 6096 A36 sh 1 875.15 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 5 Plate 15 x 1524 x 6096 A36 sh 14 15,315.07 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 6 Plate 20 x 1524 x 6096 A36 sh 8 11,668.62 2 F CFR 5-Jan 4-Feb 17-Feb 27-Feb 4-Mar 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 7 Plate 19 x 1524 x 6096 A36 sh 1 1,385.65 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 8 Plate 22 x 1219 x 2438 A36 sh 1 513.25 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 9 Plate 25 x 1524 x 6096 A36 sh 4 7,292.89 2 F CFR 5-Jan 4-Feb 17-Feb 27-Feb 4-Mar 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 10 Plate 28 x 1219 x 2438 A36 sh 2 1,306.46 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 11 Plate 32 x 1219 x 2438 A36 sh 1 746.55 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 12 Plate 38 x 1219 x 2438 A36 sh 1 886.52 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 13 Plate 40 x 2438 x 6096 A36 sh 2 9,333.37 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 14 Plate 45 x 2438 x 4876 A36 sh 1 4,199.33 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 15 Plate 50 x 2438 x 4876 A36 sh 1 4,665.92 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 16 Plate 60 x 2438 x 4876 A36 sh 1 5,599.10 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 17 Plate 70 x 2438 x 4876 A36 sh 1 6,532.28 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 18 Plate 100 x 1815 x 3048 A36 sh 1 4,342.71 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

A226 M1-5603 21-Dec 25-Jan 4-Jan 18 O/Freight shpt 1 1.00 2 F CFR 5-Jan 4-Feb 27-Jan 6-Feb 18-Feb 100% $

IHI-Buckstay/ A220

A220 M1-5755 24-Feb 24-Mar 1 Plate 3 x 1219 x 2438 A240-304 sh 1 70.70 53 F CFR 9-Mar 24-Mar 2-May 12-May 18-May 24-May 100% $

A220 M1-5755 24-Feb 24-Mar 2 Plate 4.5 x 1524 x 6096 SS400 sh 2 656.00 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

A220 M1-5755 24-Feb 24-Mar 3 Plate 9 x 1524 x 6096 SS400 sh 15 9,845.00 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

A220 M1-5755 24-Feb 24-Mar 4 Plate 12 x 1524 x 6096 SS400 sh 4 3,501.00 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

A220 M1-5755 24-Feb 24-Mar 5 Plate 19 x 1524 x 6096 SS400 sh 4 5,544.00 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

A220 M1-5755 24-Feb 24-Mar 6 Plate 22 x 1524 x 6096 SS400 sh 1 1,604.00 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

A220 M1-5755 24-Feb 24-Mar O/Freight ea 1 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

A220 M1-5584 21-Dec 20-Jan 1 Plate 4.5 x 1524 x 6096 SS400/A36 sh 4 1,312.70 287 F CFR 26-Dec 10-Jan 6-Jan 16-Jan 18-Jan 2-Feb 100% $

A220 M1-5584 21-Dec 20-Jan 2 Plate 16 x 1524 x 6096 SS400/A36 sh 2 2,333.70 287 F CFR 26-Dec 10-Jan 6-Jan 16-Jan 18-Jan 2-Feb 100% $

A220 M1-5584 21-Dec 20-Jan 3 Plate 22 x 1524 x 6096 SS400/A36 sh 3 4,813.30 287 F CFR 26-Dec 10-Jan 6-Jan 16-Jan 18-Jan 2-Feb 100% $

IHI-Buckstay/ A218

A218 M1-5772 2-Mar 20-Mar 1 Plate 3.2 x 1524 x 3048 SS400 sh 18 2,100.00 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

Page 36: Hvc PlatePipe Update)

HVC-PUR 36 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A218 M1-5772 2-Mar 20-Mar 2 Plate 12 x 1524 x 6096 SS400 sh 7 6,126.00 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

A218 M1-5772 2-Mar 20-Mar 3 Plate 16 x 1524 x 6096 SS400 sh 3 3,501.00 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

A218 M1-5772 2-Mar 20-Mar O/Freight ea 1 1.00 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

A218 M1-5585 21-Dec 20-Jan 1 Plate 3.2 x 1524 x 6096 SS400 sh 2 466.70 287 F CFR 26-Dec 10-Jan 6-Jan 16-Jan 18-Jan 2-Feb 100% $

A218 M1-5585 21-Dec 20-Jan 2 Plate 4.5 x 1524 x 6096 SS400 sh 1 328.20 287 F CFR 26-Dec 10-Jan 6-Jan 16-Jan 18-Jan 2-Feb 100% $

A218 M1-5585 21-Dec 20-Jan 3 Plate 16 x 1524 x 6096 SS400 sh 1 1,166.90 287 F CFR 26-Dec 10-Jan 6-Jan 16-Jan 18-Jan 2-Feb 100% $

A218 M1-5585 21-Dec 20-Jan 3 O/Freight 1 1.00 287 F CFR 26-Dec 10-Jan 6-Jan 16-Jan 18-Jan 2-Feb 100% $

Sabiya 1 & 2

U248 M1-6420 14-Jul 3-Aug 1 W/D Pipe 350A BE S/20-6M A53-B pc 4 1,629.80 247 F CFR 28-Jul 2-Aug 28-Jul 3-Aug 18-Aug 27-Sep 100% $

Sabiya phase III-piping/U228

U228 M1-6583 21-Aug 20-Sep 1 W/D Pipe 350A BE S/20-6M A53-B pc 4 1,629.80 304 F FOB 4-Sep 15-Sep 15-Sep 20-Sep 27-Sep 26-Oct 100% $

U228 W4-6342 27-Jun 30-Jun Plate 6 x 1524 x 3048 SS400 sh 7 1,533.00 L 100%

U228 M1-5681 1 W/D Pipe 80A S/10(OD88.9x3.05) A312-316L pc 1 resupply 20 F 23-Jul 1-Aug 10-Aug 19-Aug 100%

U228 M1-5681 2 W/D Pipe 200A S/10(OD219.1x3.76 A312-316L pc 1 resupply 20 F 23-Jul 1-Aug 10-Aug 19-Aug 100%

U228 M1-5681 3 W/D Pipe 400 S/10S-6M A312-316L pc 3 resupply 20 F 23-Jul 1-Aug 10-Aug 19-Aug 100%

U228 M1-5675 1 W/D Pipe 8" S/20-6M A53-B pc 4 resupply 26 F 23-Jul 1-Aug 10-Aug 19-Aug 100%

U228 M1-5675 2 W/D Pipe 250A S/20-6M A53-B pc 3 resupply 26 F 23-Jul 1-Aug 10-Aug 19-Aug 100%

U228 M1-5675 3 W/D Pipe 350A S/20-6M A53-B pc 5 resupply 26 F 23-Jul 1-Aug 10-Aug 19-Aug 100%

U228 M1-5678 19-Jan 25-Mar 27-Jan 7 SMLS PIPE 250 3T-3.4M B466-C70600 pc 46 3,564.36 19 F CFR 27-Jan 10-Mar 27-Oct 1-Nov 8-Nov 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 7 SMLS PIPE 250 3T-RL (165.1M) B466-C70600 pc 47 3,762.64 19 F CFR 27-Jan 10-Mar 3-Nov 8-Nov 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 7 SMLS PIPE 250 3T-6M B466-C70600 pc 21 2,871.54 19 F CFR 27-Jan 10-Mar 13-Oct 19-Oct 25-Oct 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 7 SMLS Pipe 250 3T-6M B466-C70600 pc 15 2,051.10 19 F CFR 27-Jan 10-Mar 23-Jul 27-Jul 3-Aug 100% $

U228 M1-5675 20-Jan 25-Mar 4 SMLS Pipe 6" S/40-6M A53-B pc 3 508.68 26 F CFR 2-Feb 19-Mar 10-Jun 21-Jun 29-Jun 13-Jul 100% $

U228 M1-5675 20-Jan 25-Mar 11 SMLS Pipe 150 S/40-6M A106-B pc 36 6,104.16 26 F CFR 2-Feb 19-Mar 10-Jun 21-Jun 29-Jun 13-Jul 100% $

U228 M1-5813 13-Mar 15-Apr 1 SMLS Pipe 80 2.5T-6M B466-C70600 pc 2 73.00 69 F CFR 21-Mar 20-Apr 7-Jul 14-Jul 18-Jul 24-Aug 100% $

U228 M1-5813 13-Mar 15-Apr 2 SMLS Pipe 100A 2.5T-6M B466-C70600 pc 9 424.40 69 F CFR 21-Mar 20-Apr 7-Jul 14-Jul 18-Jul 24-Aug 100% $

U228 M1-5813 13-Mar 15-Apr 3 SMLS Pipe 200 3T-6M B466-C70600 pc 1 109.40 69 F CFR 21-Mar 20-Apr 7-Jul 14-Jul 18-Jul S 24-Aug 100% $

U228 M1-5675 20-Jan 25-Mar 1 SMLS Pipe 50 S/80-6M A53-B pc 2 89.76 26 F CFR 2-Feb 19-Mar 11-Jun 18-Jun 20-Jun a impact cost100% $

U228 M1-5675 20-Jan 25-Mar 4 SMLS Pipe 6" S/40-6M A53-B pc 14 2,374.00 26 F CFR 2-Feb 19-Mar 19-May 24-May 25-May a impact cost100% $

U228 M1-5675 20-Jan 25-Mar 5 W/D Pipe 8" S/20-6M A53-B pc 210 41,983.20 26 F CFR 2-Feb 19-Mar 12-Apr 26-Apr 12-May a impact cost100% $

U228 M1-5675 20-Jan 25-Mar 6 W/D Pipe 250A S/20-6M A53-B pc 67 16,791.54 26 F CFR 2-Feb 19-Mar 12-Apr 26-Apr 12-May a impact cost100% $

U228 M1-5675 20-Jan 25-Mar 7 W/D PIPE 300A S/20-6M A53-B pc 9 2,685.42 26 F CFR 2-Feb 19-Mar 12-Apr 26-Apr 12-May a reject 100% $

U228 M1-5675 20-Jan 25-Mar 8 W/D Pipe 350A S/20-6M A53-B pc 69 28,114.74 26 F CFR 2-Feb 19-Mar 12-Apr 26-Apr 12-May a impact cost100% $

U228 M1-5675 20-Jan 25-Mar 9 W/D Pipe 400 S/20-6M A53-B pc 60 28,018.80 26 F CFR 2-Feb 19-Mar 12-Apr 26-Apr 12-May a impact cost100% $

U228 M1-5675 20-Jan 25-Mar 12 SMLS Pipe 200 S/20-6M A106-B pc 91 18,192.72 26 F CFR 2-Feb 19-Mar 30-Jun 7-Jul from China 14-Aug 100% $

U228 M1-5675 20-Jan 25-Mar 13 SMLS Pipe 300 S/20-6M A106-B pc 2 596.80 26 F CFR 2-Feb 19-Mar 11-Jun 18-Jun 20-Jun a impact cost100% $

U228 M1-5675 20-Jan 25-Mar 13 SMLS Pipe 300 S/20-6M A106-B pc 50 14,920.00 26 F CFR 2-Feb 19-Mar 19-May 24-May 25-May a impact cost100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 1 SMLS Pipe 40 2T-5M B466-C70600 pc 3 39.00 19 F CFR 27-Jan 10-Mar 2-May 12-May 19-May 5-Jun 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 2 SMLS Pipe 50 2T-6M B466-C70600 pc 1 19.68 19 F CFR 27-Jan 10-Mar 2-May 12-May 19-May 5-Jun 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 3 SMLS Pipe 80 2.5T-6M B466-C70600 pc 55 2,006.40 19 F CFR 27-Jan 10-Mar 2-May 12-May 19-May 5-Jun 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 4 SMLS Pipe 100A 2.5T-6M B466-C70600 pc 318 14,996.88 19 F CFR 27-Jan 10-Mar 2-May 12-May 19-May 5-Jun 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 5 SMLS Pipe 150A 2.5T-6M B466-C70600 pc 40 2,798.40 19 F CFR 27-Jan 10-Mar 2-May 12-May 19-May 5-Jun 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 6 SMLS Pipe 200 3T-6M B466-C70600 pc 98 10,725.13 19 F CFR 27-Jan 10-Mar 2-May 12-May 19-May 5-Jun 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 8 W/D Pipe 300 4T-6M B467-C70600 pc 3 475.07 19 F CFR 27-Jan 10-Mar 29-May 24-Jun 1-Jul a 20-Jul 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 9 W/D Pipe 350 4T-6M B467-C70600 pc 2 474.72 19 F CFR 27-Jan 10-Mar 15-May 23-Jun 23-Jun a 20-Jul 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 10 W/D Pipe 450 4T-6M B467-C70600 pc 2 407.92 19 F CFR 27-Jan 10-Mar 15-May 23-Jun 23-Jun a 20-Jul 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 11 W/D Pipe 500 5T-6M B467-C70600 pc 3 955.13 19 F CFR 27-Jan 10-Mar 29-May 24-Jun 1-Jul a 20-Jul 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 6 SMLS Pipe 200 3T-6M B466-C70600 pc 50 5,472.01 19 F CFR 27-Jan 10-Mar 7-Jul 14-Jul 18-Jul 25-Jul 100% $

U228 M1-5678 19-Jan 25-Mar 27-Jan 6 SMLS Pipe 200 3T-6M B466-C70600 pc 19 2,079.36 19 F CFR 27-Jan 10-Mar 7-Jul 14-Jul 18-Jul 25-Jul 100% $

U228 M1-5675 20-Jan 25-Mar 2 SMLS Pipe 80 S/40-6M A53-B pc 447 30,279.78 26 F CFR 2-Feb 19-Mar 26-Apr 5-May 16-May NCR U228-Int- 100% $

U228 M1-5675 20-Jan 25-Mar 3 SMLS Pipe 4" S/40(OD114.3xt6.02)-6M A53-B pc 325 31,356.00 26 F CFR 2-Feb 19-Mar 26-Apr 5-May 16-May NCR U228-Int- 100% $

U228 M1-5675 20-Jan 25-Mar 10 SMLS Pipe 4" S/40-6M A106-B pc 14 1,350.72 26 F CFR 2-Feb 19-Mar 26-Apr 5-May 16-May NCR U228-Int- 100% $

U228 M1-5681 19-Jan 25-Mar 1 SMLS Pipe 40 S/40S-6M A312-316L pc 1 24.60 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

Page 37: Hvc PlatePipe Update)

HVC-PUR 37 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

U228 M1-5681 19-Jan 25-Mar 2 W/D Pipe 80A S/10(OD88.9x3.05) A312-316L pc 225 8,829.00 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

U228 M1-5681 19-Jan 25-Mar 3 W/D Pipe 100A S/10(OD114.3x3.05 A312-316L pc 139 7,063.98 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

U228 M1-5681 19-Jan 25-Mar 4 W/D PIPE 125A S/10(OD141.3x3.4) A312-316L pc 1 70.26 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

U228 M1-5681 19-Jan 25-Mar 5 W/D Pipe 150A S/10(OD168.3x3.4) A312-316L pc 50 4,200.00 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

U228 M1-5681 19-Jan 25-Mar 6 W/D Pipe 200A S/10(OD219.1x3.76 A312-316L pc 24 2,911.68 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

U228 M1-5681 19-Jan 25-Mar 7 W/D Pipe 250A S/10(OD273.1x4.19 A312-316L pc 3 506.52 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

U228 M1-5681 19-Jan 25-Mar 8 W/D Pipe 300 S/10S-6M A312-316L pc 13 2,843.10 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

U228 M1-5681 19-Jan 25-Mar 9 W/D Pipe 350 S/10S-6M A312-316L pc 84 21,107.52 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

U228 M1-5681 19-Jan 25-Mar 10 W/D Pipe 400 S/10S-6M A312-316L pc 193 55,526.10 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

U228 M1-5681 19-Jan 25-Mar 11 W/D Pipe 450 BE S/10S-6M A312-316L pc 12 3,888.72 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

U228 M1-5681 19-Jan 25-Mar 12 W/D Pipe 500 BE S/10S-6M A312-316L pc 8 3,336.96 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

U228 M1-5681 19-Jan 25-Mar 13 W/D Pipe 600A S/10(O.D609.6xt6. A312-316L pc 68 39,033.36 20 F CFR 26-Jan 12-Mar 2-May 12-May 18-May 7-Jun 100% $

U228 M1-5757 24-Feb 15-Mar 1 Plate 12.7 x 2000 x 6096 A240-316L sh 1 1,235.60 53 F CFR 9-Mar 24-Mar 2-May 12-May 18-May 24-May 100% $

U228 M1-5757 24-Feb 15-Mar 2 W/D Pipe 80A S/10(OD88.9x3.05) A312-316L pc 3 117.70 53 F CFR 9-Mar 24-Mar 2-May 12-May 18-May 24-May 100% $

U228 M1-5732 13-Feb 30-Apr 1 SMLS Pipe 80 2.5T-6M B466-C70600 pc 1 36.50 43 F CFR 22-Feb 24-Mar 2-May 12-May 18-May 6-Jul 100% $

U228 M1-5732 13-Feb 30-Apr 2 SMLS Pipe 100A 2.5T-6M B466-C70600 pc 1 47.20 43 F CFR 22-Feb 24-Mar 2-May 12-May 18-May 6-Jul 100% $

U228 M1-6047 5-May 15-Jun W/D Pipe 250A S/20(OD273.1 x t6. A53-B pc 20 5,012.40 261 L DDP 11-May 16-May OK 1-Jun 100% VND

U228 W4-6005 Tensile test Plate sh 217 L Ex-W 100% VND

U228 M1-5769 28-Feb 31-Mar 1 Plate 12 x 1524 x 6096 SS400 sh 12 10,502.00 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

U228 M1-5769 28-Feb 31-Mar 2 Plate 14 x 2438 x 6096 SS400 sh 2 3,267.00 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

U228 M1-5769 28-Feb 31-Mar O/Freight ea 1 1.00 47 F CFR 28-Feb 20-Mar 6-Mar 12-Mar 17-Mar 100% $

U228 M1-5674 20-Jan 5-Apr 1 Plate 6 x 1524 x 4000 A240-316L sh 9 2,626.90 21 F CFR 26-Jan 27-Mar 28-Mar 6-Apr 12-May L/C $

U228 M1-5674 20-Jan 5-Apr 2 Plate 8 x 1524 x 2600 A240-316L sh 164 41,485.40 21 F CFR 26-Jan 27-Mar 28-Mar 6-Apr 12-May L/C $

U228 M1-5674 20-Jan 5-Apr 3 Plate 8 x 1524 x 2750 A240-316L sh 123 32,909.10 21 F CFR 26-Jan 27-Mar 28-Mar 6-Apr 12-May L/C $

U228 M1-5674 20-Jan 5-Apr 4 Plate 9 x 1524 x 3200 A240-316L sh 292 102,273.50 21 F CFR 26-Jan 27-Mar 28-Mar 6-Apr 12-May L/C $

U228 M1-5674 20-Jan 5-Apr 5 Plate 10 x 1524 x 3200 A240-316L sh 6 2,335.00 21 F CFR 26-Jan 27-Mar 28-Mar 6-Apr 12-May L/C $

U228 M1-5673 20-Jan 5-Apr 1 Plate 10 x 2250 x 4000 A515-60 sh 3 2,119.50 24 F CFR 27-Jan 10-Mar 30-Mar 9-Apr 11-Apr 12-May L/C $

U228 M1-5673 20-Jan 5-Apr 2 Plate 12 x 1524 x 4000 A515-60 sh 3 1,722.73 24 F CFR 27-Jan 10-Mar 30-Mar 9-Apr 11-Apr 12-May L/C $

U228 M1-5673 20-Jan 5-Apr 3 Plate 12 x 1800 x 4300 A515-60 sh 4 2,916.43 24 F CFR 27-Jan 10-Mar 30-Mar 9-Apr 11-Apr 12-May L/C $

U228 M1-5673 20-Jan 5-Apr 4 Plate 12 x 1900 x 4000 A515-60 sh 9 6,443.28 24 F CFR 27-Jan 10-Mar 30-Mar 9-Apr 11-Apr 12-May L/C $

U228 M1-5673 20-Jan 5-Apr 5 Plate 12 x 2438 x 4500 A515-60 sh 10 10,334.68 24 F CFR 27-Jan 10-Mar 30-Mar 9-Apr 11-Apr 12-May L/C $

U228 M1-5673 20-Jan 5-Apr 6 Plate 12 x 3048 x 4000 A515-60 sh 58 66,612.21 24 F CFR 27-Jan 10-Mar 30-Mar 9-Apr 11-Apr 12-May L/C $

U228 M1-5673 20-Jan 5-Apr 7 Plate 12 x 3048 x 4500 A515-60 sh 81 104,655.82 24 F CFR 27-Jan 10-Mar 30-Mar 9-Apr 11-Apr 12-May L/C $

U228 M1-5673 20-Jan 5-Apr 8 Plate 13 x 2000 x 4500 A515-60 sh 2 1,836.90 24 F CFR 27-Jan 10-Mar 30-Mar 9-Apr 11-Apr 12-May L/C $

U228 M1-5673 20-Jan 5-Apr 9 Plate 13 x 3048 x 5200 A515-60 sh 77 124,543.78 24 F CFR 27-Jan 10-Mar 30-Mar 9-Apr 11-Apr 12-May L/C $

U228 M1-5673 20-Jan 5-Apr 10 Plate 18 x 2250 x 4000 A515-60 sh 4 5,086.80 24 F CFR 27-Jan 10-Mar 30-Mar 9-Apr 11-Apr 12-May L/C $

U228 M1-5673 20-Jan 5-Apr 11 Plate 18 x 3048 x 4500 A515-60 sh 4 7,752.28 24 F CFR 27-Jan 10-Mar 30-Mar 9-Apr 11-Apr 12-May L/C $

U228 M1-5673 20-Jan 5-Apr 12 Plate 19 x 3048 x 4000 A515-60 sh 3 5,455.31 24 F CFR 27-Jan 10-Mar 30-Mar 9-Apr 11-Apr 12-May L/C $

Castellon/A239

A239 M1-6617 31-Aug 1 Plate 10 x 1500 x 6000 SS400 sh 3 2,120.00 505 L DDP 31-Aug 4-Sep 4-Sep 25-Sep 100% VND

A239 M1-6351 29-Jun 25-Jul 1 Plate 40 x 1524 x 6096 A572-50 sh 3 8,752.00 233 F FOB 5-Jul 4-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A239 M1-6501 2-Aug 10-Aug 1 Plate 0.5 x 1219 x 2438 SUS304 sh 2 23.60 469 L DDP 2-Aug 5-Aug 9-Aug 100% VND

A239 M1-6426 17-Jul 2-Aug 2 W/D Pipe 1-1/4" (OD42.6x3.56t)-6M A312-304 pc 1 20.60 247 F CFR 28-Jul 2-Aug 28-Jul 3-Aug 18-Aug 27-Sep 100% $

A239 M1-6545 11-Aug 25-Aug 1 SMLS PIPE 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 1 97.40 281 F FOB 18-Aug 28-Aug 25-Aug 30-Aug 31-Aug 25-Sep 100% $

A239 M1-6146 25-May 20-Jun 9 Plate 65 x 1524 x 6096 SM490A sh 2 9,482.00 184 F FOB 6-Jun 10-Jul 13-Aug 19-Aug 23-Aug 20-Sep 100% $

A239 M1-6351 29-Jun 25-Jul 2 Plate 2 x 1219 x 2438 A240-409 sh 130 5,988.42 238 F FOB 8-Jul 30-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A239 M1-6351 29-Jun 25-Jul 3 Plate 3 x 1219 x 2438 A240-409 sh 30 2,073.00 238 F FOB 8-Jul 30-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A239 M1-6423 1 SQ.Pipe 50 x 50 x 1.5-6M STK400 pc 8 114.00 443 L DDP 18-Jul 21-Jul 27-Jul 19-Aug 100% VND

A239 M1-6426 17-Jul 2-Aug 1 W/D Pipe 40A (OD48.3x3.8t)-6M A53-B pc 50 1,254.00 443 L DDP 18-Jul 21-Jul 27-Jul 19-Aug 100% VND

A239 M1-6146 25-May 20-Jun 1 Plate 2 x 1219 x 2438 SS400 sh 3 140.10 184 F FOB 6-Jun 10-Jul 23-Jul 1-Aug 9-Aug 30-Aug 100% $

A239 M1-6146 25-May 20-Jun 2 Plate 3 x 1219 x 2438 SS400 sh 2 141.40 184 F FOB 6-Jun 10-Jul 23-Jul 1-Aug 9-Aug 30-Aug 100% $

A239 M1-6146 25-May 20-Jun 4 Plate 20 x 2438 x 6096 SS400 sh 4 9,333.37 184 F FOB 6-Jun 10-Jul 23-Jul 1-Aug 9-Aug 30-Aug 100% $

A239 M1-6146 25-May 20-Jun 5 Plate 35 x 2438 x 6096 SS400 sh 2 8,166.70 184 F FOB 6-Jun 10-Jul 23-Jul 1-Aug 9-Aug 30-Aug 100% $

Page 38: Hvc PlatePipe Update)

HVC-PUR 38 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A239 M1-6146 25-May 20-Jun 6 Plate 45 x 2438 x 6096 SS400 sh 2 10,500.00 184 F FOB 6-Jun 10-Jul 23-Jul 1-Aug 9-Aug 30-Aug 100% $

A239 M1-6146 25-May 20-Jun 7 Plate 20 x 1524 x 6096 SM490A sh 2 2,917.16 184 F FOB 6-Jun 10-Jul 23-Jul 1-Aug 9-Aug 30-Aug 100% $

A239 M1-6146 25-May 20-Jun 8 Plate 40 x 1524 x 6096 SM490A sh 4 11,668.00 184 F FOB 6-Jun 10-Jul 23-Jul 1-Aug 9-Aug 30-Aug 100% $

A239 M1-6146 25-May 20-Jun 9 Plate 65 x 1524 x 6096 SM490A sh 1 4,741.00 184 F FOB 6-Jun 10-Jul 23-Jul 1-Aug 9-Aug 30-Aug 100% $

A239 M1-5925 3-Apr 20-May 1 Plate 2 x 1219 x 2438 A240-409 sh 665 30,633.09 98 F CFR 10-Apr 20-May 11-Jun 18-Jun 20-Jun 100% $

A239 M1-5925 3-Apr 20-May 2 Plate 3 x 1219 x 2438 A240-409 sh 250 17,274.30 98 F CFR 10-Apr 20-May 11-Jun 18-Jun 20-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 4 Plate 6 x 1524 x 6096 A240-409 sh 53 18,314.00 104 F CFR 14-Apr 14-May 2-May 12-May 18-May Mill S 24-Aug 100% $

A239 M1-5924 3-Apr 25-Apr 1 Plate 3 x 1219 x 2438 A240-409 sh 58 4,007.65 98 F CFR 10-Apr 25-Apr 11-Jun 18-Jun 20-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 2 Plate 6 x 1524 x 6096 A240-409 sh 12 4,147.00 104 F CFR 14-Apr 14-May 2-May 12-May 18-May Mill S 24-Aug 100% $

A239 M1-5921 3-Apr 20-May 1 W/D Pipe 40A S/40(OD48.3x3.68t) A53-B pc 170 4,131.00 106 F CFR 13-Apr 10-May 7-Jul 14-Jul 18-Jul 14-Aug 100% $

A239 M1-5920 3-Apr 20-May 1 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 615 14,354.10 106 F CFR 13-Apr 10-May 7-Jul 14-Jul 18-Jul 14-Aug 100% $

A239 M1-5861 29-Mar 20-May 1 Plate 3 x 1219 x 2438 A240-409 sh 535 36,966.99 98 F CFR 10-Apr 10-May 11-Jun 18-Jun 20-Jun 100% $

A239 M1-6146 25-May 20-Jun 10 Plate 2 x 1308 x 2500 A240-304 sh 3 156 310 L DDP 5-Jun 25-Jun 8-Jul 100% VND

A239 M1-6146 25-May 20-Jun 11 Plate 3 x 1250 x 2438 A240-304 sh 3 218 310 L DDP 5-Jun 25-Jun 8-Jul 100% VND

A239 M1-6146 25-May 20-Jun 18 Plate 20 x 1500 x 6000 A240-304 sh 3 4,282 310 L DDP 5-Jun 25-Jun 8-Jul 100% VND

A239 M1-6148 25-May 22-Jun 3 W/D Pipe 25A S/40(OD33.4xt3.38) A312-304 pc 2 30 173 F FOB 31-May 15-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A239 M1-6148 25-May 22-Jun 4 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 4 132.00 173 F FOB 31-May 15-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A239 M1-6146 25-May 20-Jun 12 Plate 5 x 1219 x 2438 A240-304 sh 3 354 173 F FOB 31-May 15-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A239 M1-6146 25-May 20-Jun 13 Plate 6 x 1524 x 6096 A240-304 sh 3 1,326 173 F FOB 31-May 15-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A239 M1-6059 5-May 20-Jun 1 W/D Pipe 25A S/40(OD33.4xt3.38) A312-304 pc 1 15.00 173 F FOB 31-May 15-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A239 M1-6059 5-May 20-Jun 3 W/D Pipe 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 2 136.90 173 F FOB 31-May 15-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A239 M1-6059 5-May 20-Jun 5 W/D Pipe 6" S/40 (OD168.3 x t7.11 A312-304 pc 1 171.30 173 F FOB 31-May 15-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A239 M1-6061 5-May 20-Jun 1 Plate 12 x 2250(2438) x 609 A36 sh 2 2,800.00 173 F FOB 31-May 23-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A239 M1-6061 5-May 20-Jun 2 Plate 18 x 2250(2438) x 609 A36 sh 2 4,200.00 173 F FOB 31-May 23-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A239 M1-5924 3-Apr 25-Apr 1b Plate 3 x 1219 x 2438 A240-409 sh 137 9,466.35 98 F CFR 10-Apr 25-Apr 2-May 12-May 18-May 5/24/2006,8/14100% $

A239 M1-5860 22-Mar 10-Apr 1 Plate 3 x 1219 x 2438 A240-409 sh 85 5,873.30 98 F CFR 10-Apr 25-Apr 2-May 12-May 18-May 5/24/2006,8/14100% $

A239 M1-6146 25-May 20-Jun 14 Plate 9 x 1524 x 6096 A240-304 sh 24 15,910 178 F CFR 2-Jun 22-Jun 17-Jun 20-Jun 30-Jun 25-Jul L/C $

A239 M1-6146 25-May 20-Jun 15 Plate 10 x 1219 x 2438 A240-304 sh 1 240 178 F CFR 2-Jun 22-Jun 17-Jun 20-Jun 30-Jun 25-Jul L/C $

A239 M1-6146 25-May 20-Jun 16 Plate 13 x 1219 x 3048 A240-304 sh 2 770 178 F CFR 2-Jun 22-Jun 17-Jun 20-Jun 30-Jun 25-Jul L/C $

A239 M1-6146 25-May 20-Jun 17 Plate 15 x 1524 x 6096 A240-304 sh 8 8,840 178 F CFR 2-Jun 22-Jun 17-Jun 20-Jun 30-Jun 25-Jul L/C $

A239 M1-6270 1 SQ.Pipe 50 x 50 x 1.5-6M STK400 pc 15 214 363 L DDP 19-Jun 22-Jun 23-Jun 100% VND

A239 M1-6271 16-Jun 10-Jul 1 W/D PIPE OD48.3 x 3.68t-6M A53-B pc 120 3,002 363 L DDP 19-Jun 22-Jun 23-Jun 100% VND

A239 M1-6271 16-Jun 10-Jul 2 W/D PIPE OD114.3 x 4.5t-6M STK400 pc 8 584 363 L DDP 19-Jun 22-Jun 23-Jun 100% VND

A239 M1-5920 3-Apr 20-May 3 W/D Pipe OD101.6x5.0t - 6M STK400 pc 100 7,140.00 152 F FOB 16-May 5-Jun 11-Jun 18-Jun 20-Jun 11-Jul 100% $

A239 M1-5925 3-Apr 20-May 3 Plate 6 x 1524 x 6096 SS400 sh 255 111,690.00 86 F FOB 1-Apr 30-May 11-Jun 18-Jun 20-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 1 Plate 6 x 1524 x 6096 SS400 sh 70 30,660.00 86 F FOB 1-Apr 30-May 11-Jun 18-Jun 20-Jun 100% $

A239 M1-5918 3-Apr 20-May 1 Plate 6 x 1524 x 6096 SS400 sh 15 6,570.00 86 F FOB 1-Apr 30-May 11-Jun 18-Jun 20-Jun 100% $

A239 M1-5861 29-Mar 20-May 2 Plate 6 x 1219 x 6096 A36/SS400 sh 100 35,000.00 86 F FOB 1-Apr 30-May 11-Jun 18-Jun 20-Jun 100% $

A239 M1-5861 29-Mar 20-May 3 Plate 6 x 1524 x 6096 SS400 sh 65 28,470.00 86 F FOB 1-Apr 30-May 11-Jun 18-Jun 20-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 5 Plate 10 x 1600 x 6096 A36 sh 6 4,596.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 6 Plate 18 x 1950 x 11500 SM490A sh 4 12,676.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 7 Plate 18 x 2940 x 11500 SM490A sh 2 9,554.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 8 Plate 18 x 2300 x 14050 SM490A sh 12 54,792.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 9 Plate 18 x 2300 x 13550 SM490A sh 12 52,848.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 11 Plate 20 x 2438 x 6096 A36 sh 7 16,331.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 12 Plate 30 x 2438 x 6096 A36 sh 4 14,000.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 13 Plate 30 x 2900 x 11500 SM490A sh 4 31,416.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 14 Plate 30 x 1650 x 11500 SM490A sh 8 35,752.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 15 Plate 30 x 1650 x 14050 SM490A sh 12 65,508.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 16 Plate 30 x 1650 x 13550 SM490A sh 12 63,180.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 17 Plate 40 x 2438 x 6096 A36 sh 7 32,669.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 18 Plate 45 x 1650 x 11500 SM490A sh 4 26,812.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 19 Plate 50 x 2438 x 6096 A36 sh 1 5,833.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

Page 39: Hvc PlatePipe Update)

HVC-PUR 39 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 20 Plate 55 x 1525 x 6096 A36 sh 4 16,056.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 3 Plate 8 x 2350 x 7350 A36 sh 48 52,080.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 4 Plate 10 x 2350 x 7350 A36 sh 66 89,496.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 5 Plate 12 x 2350 x 7350 A36 sh 39 63,453.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 6a Plate 14 x 2350 x 5500 A36 sh 1 1,420.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 6b Plate 14 x 2350 x 11000 A36 sh 6 17,046.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 7 Plate 14 x 2350 x 7350 A36 sh 24 45,552.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 9 Plate 16 x 2150 x 7500 A36 sh 29 58,725.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 10 Plate 25 x 1525 x 6096 A36 sh 2 3,648.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 11 Plate 30 x 2250 x 6500 A36 sh 5 17,220.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 12 Plate 50 x 1700 x 6500 A36 sh 12 52,044.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 13 Plate 50 x 2350 x 11000 A36 sh 1 10,146.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5922(R.1) 3-Apr 20-May 7-Apr 14 Plate 70 x 2350 x 11000 A36 sh 1 14,205.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5918 3-Apr 20-May 2 Plate 10 x 1600 x 6096 A36 sh 8 6,128.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5918 3-Apr 20-May 3 Plate 15 x 1525 x 6096 A36 sh 3 3,285.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5918 3-Apr 20-May 4 Plate 20 x 1525 x 6096 A36 sh 4 5,840.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5918 3-Apr 20-May 5 Plate 35 x 1525 x 6096 A36 sh 2 5,108.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5861 29-Mar 20-May 4 Plate 30 x 1524 x 6096 A36 sh 1 2,187.87 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A239 M1-5861 29-Mar 20-May 5 Plate 40 x 1524 x 6096 A36 sh 1 2,917.16 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A239 M1-6148 25-May 22-Jun 5 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 2 194.88 322 L DDP 7-Jun 14-Jun 9-Jun 19-Jun 100% $

A239 M1-6059 5-May 20-Jun 2 W/D Pipe 3" S/10 (OD88.9 x t3.05)-6M A312-304 pc 1 39.10 322 L DDP 7-Jun 14-Jun 9-Jun 19-Jun 100% $

A239 M1-6059 5-May 20-Jun 4 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 1 97.40 322 L DDP 7-Jun 14-Jun 9-Jun 19-Jun 100% $

A239 M1-5925(R.1) 3-Apr 20-May 7-Apr 10 Plate 20 x 1524 x 6096 A240-304 sh 1 1,440.00 322 L DDP 7-Jun 14-Jun 9-Jun 19-Jun 100% $

A239 M1-5920 3-Apr 20-May 2 W/D PIPE OD89.1x4.0t - 6M STK400 pc 8 402.72 245 L DDP 8-May 13-May 25-May 100% VND

A239 M1-6148 25-May 22-Jun 1 W/D PIPE OD89.1x4.0t - 6M STK400 pc 33 1,662 305 L DDP 31-May 5-Jun 31-May 10-Jun 100% VND

A239 M1-6148 25-May 22-Jun 2 W/D PIPE OD114.3x4.5t - 6000 STK400 pc 16 1,170 305 L DDP 31-May 5-Jun 31-May 10-Jun 100% VND

Sabiya 3/U237

U237 M1-5854 21-Mar 30-Apr 1 W/D Pipe 1" S/40 (OD33.4x3.4t)-6 A120/A53B sh 11 165.00 132 F FOB 10-May 25-May 11-Jun 18-Jun 22-Jun 25-Jul 100% $

U237 M1-5854 21-Mar 30-Apr 2 W/D Pipe 32A S/40(OD42.2 x3.6)- A53-B sh 21 428.40 132 F FOB 10-May 25-May 11-Jun 18-Jun 22-Jun 25-Jul 100% $

U237 M1-5855 21-Mar 30-Apr 1 Plate 12 x 2438 x 6096 A516-70 sh 14 19,600.00 93 F CFR 7-Apr 30-Apr 23-May 2-Jun 7-Jun 19-Jun 100% $

U237 M1-5854 21-Mar 30-Apr 3 SMLS Pipe 1" S/80(OD33.4x4.55t)-6M A106-B sh 1 19.40 106 F CFR 13-Apr 25-Apr 2-May 12-May 18-May 1-Jun 100% $

U237 M1-5854 21-Mar 30-Apr 4 SMLS Pipe 2" S/80 (OD60.3x5.5t)-6 A106-B sh 1 44.40 106 F CFR 13-Apr 25-Apr 2-May 12-May 18-May 1-Jun 100% $

Sohar Fertiliser/ K233

K233 M1-6072 8-May 13-May Plate 1.2 x 1000 x 2000 Aluminium sh 5 32.10 258 L DDP 10-May 12-May 11-May 25-May 100% VND

K233 M1-5944 5-Apr 25-Apr 1 W/D Pipe OD139.7 x t5.6-6M A53-B pc 4 405.60 106 F CFR 13-Apr 25-Apr 2-May 12-May 18-May 1-Jun 100% $

K233 M1-5944 5-Apr 25-Apr 2 W/D Pipe OD88.9 x t5.6-6M A53-B pc 2 135.60 106 F CFR 13-Apr 25-Apr 2-May 12-May 18-May 1-Jun 100% $

K233 M1-5944 5-Apr 25-Apr 3 W/D Pipe OD48.6 x t3.6-6M A53-B pc 30 745.20 106 F CFR 13-Apr 25-Apr 2-May 12-May 18-May 1-Jun 100% $

K233 M1-5944 5-Apr 25-Apr 4 W/D Pipe OD48.6 x t5.1-6M A53-B pc 25 829.50 106 F CFR 13-Apr 25-Apr 2-May 12-May 18-May 1-Jun 100% $

Tukuyama/A234

A234 M1-7215 28-Feb 10-Mar 2 Plate 6 x1524 x6096 SS400 sh 1 438.00 66 F FOB 19-Mar 3-Apr 21-Apr 28-Apr 11-May 4-Jun 100% $

A234 M1-7327 4-Apr 15-Apr 1 Plate 3 x 1250 x 2500 SS400 sh 5 368.00 174 L DDP 6-Apr 8-Apr 10-Apr 13-Apr 100% VND

A234 M1-7310 1 CHK'D PLATE 5 x 1500 x 6000 SS400 sh 5 1,901.00 174 L DDP 6-Apr 8-Apr 10-Apr 13-Apr 100% VND

A234 M1-7215 28-Feb 10-Mar 1 Plate 3.0 x 1250 x 2500 SS400 sh 10 736.00 128 L DDP 5-Mar 15-Mar 26-Mar 100% VND

A234 M1-7214 28-Feb 10-Mar 1 W/D Pipe 32A(OD42.7x3.5t)-6M SGP pc 35 711.00 128 L DDP 5-Mar 15-Mar 26-Mar 100% VND

A234 M1-6625 31-Aug 1-Oct 10 Plate 18 x 1524 x 6096 SM490A sh 3 3,938.16 327 F FOB 11-Sep 30-Sep 20-Oct 25-Oct OK hold 100% $

A234 M1-6625 31-Aug 1-Oct 11 Plate 32 x 1524 x 6096 SM490A sh 2 4,667.45 327 F FOB 11-Sep 30-Sep 20-Oct 25-Oct OK hold 100% $

A234 M1-6625 31-Aug 1-Oct 10 Plate 18 x 1524 x 6096 SS400 sh 3 3,938.16 327 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct hold 26-Oct 100% $

A234 M1-6625 31-Aug 1-Oct 11 Plate 32 x 1524 x 6096 SS400 sh 2 4,667.45 327 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct hold 26-Oct 100% $

A234 M1-6877 11-Nov 20-Dec 8 Plate 28 x 1645 x5710 SS400 sh 1 2,065.00 759 L DDP 12-Dec 15-Dec 19-Dec 29-Dec 100% VND

A234 M1-6877 11-Nov 20-Dec 1 CHK'D PLATE 5 x 1500 x 6000 SS400 sh 18 6,845.00 709 L DDP 15-Nov 20-Nov 16-Nov 28-Nov 100% VND

A234 M1-6877 11-Nov 20-Dec 2 Plate 1.6 x 1230 x 2500 SS400 sh 1 38.62 709 L DDP 15-Nov 20-Nov 16-Nov 2-Jan 100% VND

A234 M1-6877 11-Nov 20-Dec 3 Plate 2.3 x 1240 x 2500 SS400 sh 1 55.97 709 L DDP 15-Nov 20-Nov 1-Dec 2-Jan 100% VND

A234 M1-6877 11-Nov 20-Dec 4 Plate 3.2 x 1250 x 2500 SS400 sh 1 78.50 709 L DDP 15-Nov 20-Nov 16-Nov 2-Jan 100% VND

Page 40: Hvc PlatePipe Update)

HVC-PUR 40 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A234 M1-6877 11-Nov 20-Dec 5 Plate 5 x 1500 x 6000 SS400 sh 4 1,413.00 709 L DDP 15-Nov 20-Nov 16-Nov 2-Jan 100% VND

A234 M1-6877 11-Nov 20-Dec 6 Plate 12 x 1500 x 6000 SS400 sh 1 847.80 709 L DDP 15-Nov 20-Nov 16-Nov 2-Jan 100% VND

A234 M1-6877 11-Nov 20-Dec 7 Plate 20 x 2000 x 6000 SS400 sh 1 1,884.00 709 L DDP 15-Nov 20-Nov 16-Nov 2-Jan 100% VND

A234 M1-6876 11-Nov 20-Dec 1 W/D Pipe 32A (OD42.7x3.5t)-6M SGP pc 75 1,521.00 709 L DDP 15-Nov 20-Nov 16-Nov 2-Jan 100% VND

A234 M1-6739 5-Oct 20-Oct 1 Plate 32 x 1524 x 6096 SM490A sh 1 2,334.00 355 F FOB 13-Oct 20-Nov 17-Nov 29-Nov 31-Dec 16-Jan 100% $

A234 M1-6625 31-Aug 1-Oct 5 Plate 9 x 2438 x 6096 SS400 sh 6 6,300.02 327 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6625 31-Aug 1-Oct 6 Plate 12 x 1524 x 6096 SS400 sh 2 1,750.29 327 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6625 31-Aug 1-Oct 7 Plate 16 x 2438 x 6096 SS400 sh 4 7,466.69 327 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6625 31-Aug 1-Oct 8 Plate 18 x 1524 x 6096 SS400 sh 1 1,312.72 327 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6625 31-Aug 1-Oct 9 Plate 19 x 2438 x 6096 SS400 sh 1 2,216.67 327 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6625 31-Aug 1-Oct 12 Plate 6 x 1524 x 6096 SUS304 sh 3 1,326.10 327 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6689 1 W/D Pipe OD48.6xt2.3-6M STK400 pc 3 43.00 FOR L DDP 16-Oct 17-Oct 100% VND

A234 M1-6687 19-Sep 30-Sep 1 Plate 6 x 2438 x 6096 SS400 sh 3 2,100.00 592 L DDP 21-Sep 26-Sep 26-Sep 26-Oct 100% VND

A234 M1-6687 19-Sep 30-Sep 2 Plate 3.2 x 1219 x 6096 SS400 sh 1 187.00 592 L DDP 21-Sep 26-Sep 26-Sep 26-Oct 100% VND

A234 M1-6624 31-Aug 1-Oct 2 W/D Pipe 32A(OD42.4x3.5t)-6M SGP pc 60 1,216.80 505 L DDP 7-Sep 10-Sep 25-Sep OK 100% VND

A234 M1-6624 31-Aug 1-Oct 3 W/D Pipe 100A(OD114.0x4.5t)-6M SGP pc 1 73.20 505 L DDP 7-Sep 10-Sep 25-Sep OK 100% VND

A234 M1-6624 31-Aug 1-Oct 1 W/D Pipe 15A(OD21.7x3.7t)-6M STPG370 pc 1 9.84 326 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6624 31-Aug 1-Oct 4 W/D Pipe 600A(OD609.6x12t)-6M STK400 pc 1 1,062.00 326 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6625 31-Aug 1-Oct 1 Plate 2.3 x 1219 x 6096 SS400 sh 4 536.67 326 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6625 31-Aug 1-Oct 2 Plate 3.2 x 1524 x 6096 SS400 sh 2 466.74 326 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6625 31-Aug 1-Oct 3 Plate 4.5 x 1524 x 6096 SS400 sh 6 1,969.08 326 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6625 31-Aug 1-Oct 4 Plate 6 x 1524 x 6096 SS400 sh 5 2,187.87 326 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6625 31-Aug 1-Oct 13 CHK'D PLATE 4.5 x 1219 x 6096 SS400 sh 14 3,675.00 326 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A234 M1-6430 17-Jul 14-Aug 1 SQ.Pipe 250 x 250 x 6t-5.8M STKR400 pc 5 1,338.00 247 F CFR 28-Jul 2-Aug 18-Aug 23-Aug 6-Sep 27-Sep 100% $

A234 M1-6430 17-Jul 14-Aug 2 SQ.Pipe 250 x 250 x 9t-6M STKR400 pc 2 795.00 247 F CFR 28-Jul 2-Aug 28-Jul 3-Aug 18-Aug 27-Sep 100% $

A234 M1-6165 29-May 29-Jun CHK'D PLATE 6 x 1524 x 6096 SS400 sh 3 1,359.00 173 F FOB 31-May 23-Jun 23-Jul 1-Aug 9-Aug 24-Aug 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 19 Plate 22 x 1829 x 6096 SM490B sh 1 1,925.53 158 F FOB 22-May 1-Jul 23-Jul 1-Aug 9-Aug 20-Sep 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 20 Plate 22 x 1829 x 12000 SM490B sh 3 11,371.26 158 F FOB 22-May 1-Jul 23-Jul 1-Aug 9-Aug 20-Sep 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 21 Plate 28 x 1829 x 12000 SM490B sh 4 19,296.68 158 F FOB 22-May 1-Jul 23-Jul 1-Aug 9-Aug 20-Sep 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 22 Plate 28 x 1829 x 6096 SM490B sh 1 2,450.68 158 F FOB 22-May 1-Jul 23-Jul 1-Aug 9-Aug 20-Sep 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 9 Plate 9 x 2600 x 8500 SS400 sh 6 9,370.00 157 F FOB 22-May 1-Jul 23-Jul 1-Aug 7-Aug 20-Sep 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 10 Plate 12 x 1524 x 8500 SS400 sh 3 3,660.00 157 F FOB 22-May 1-Jul 23-Jul 1-Aug 7-Aug 20-Sep 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 11 Plate 12 x 2438 x 8500 SS400 sh 6 11,710.00 157 F FOB 22-May 1-Jul 23-Jul 1-Aug 7-Aug 20-Sep 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 17 Plate 36 x 1524 x 3048 SS400 sh 1 1,310.00 157 F FOB 22-May 1-Jun 23-Jul 1-Aug 7-Aug 20-Sep 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 23 CHK'D PLATE 4.5x1524x6096 SS400 sh 65 20,620.00 157 F FOB 22-May 1-Jul 23-Jul 1-Aug 7-Aug 20-Sep 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 23 CHK'D PLATE 4.5x1219x2438 SS400 sh 20 3,780.00 157 F FOB 22-May 1-Jul 23-Jul 1-Aug 7-Aug 20-Sep 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 24 CHK'D PLATE 6 x 1524 x 6096 SS400 sh 6 2,720.00 157 F FOB 22-May 1-Jul 23-Jul 1-Aug 7-Aug 20-Sep 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 4 Plate 3.2 x 1524 x 6096 SS400 sh 3 700.00 157 F FOB 22-May 1-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 5 Plate 4.5 x 1524 x 6096 SS400 sh 20 6,560.00 157 F FOB 22-May 1-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 6 Plate 6 x 1524 x 6096 SS400 sh 3 1,313.18 157 F FOB 22-May 1-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 6 Plate 6 x 1524 x 6096 SS400 sh 19 8,316.82 157 F FOB 22-May 1-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 7 Plate 6 x 2438 x 8500 SS400 sh 6 5,860.00 157 F FOB 22-May 1-Jul 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 8 Plate 9 x 2438 x 6096 SS400 sh 13 13,650.00 157 F FOB 22-May 1-Jul 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 12 Plate 16 x 2438 x 6096 SS400 sh 10 18,667.00 157 F FOB 22-May 1-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 13 Plate 19 x 2438 x 6096 SS400 sh 1 2,220.00 157 F FOB 22-May 1-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 14 Plate 25 x 2438 x 6096 SS400 sh 14 40,830.00 157 F FOB 22-May 1-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 15 Plate 32 x 2438 x 6096 SS400 sh 2 7,470.00 157 F FOB 22-May 1-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 16 Plate 35 x 1524 x 6096 SS400 sh 1 2,550.00 157 F FOB 22-May 1-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 18 Plate 38 x 2438 x 6096 SS400 sh 2 8,870.00 157 F FOB 22-May 1-Jul 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 25 Plate 28 x 1219 x 2438 SS400 sh 1 650.00 157 F FOB 22-May 1-Jun 11-Jun 18-Jun 21-Jun 25-Jul 100% $

A234 M1-6035(R.1) 29-Apr 5-Jun 5-May 1 W/D Pipe 10A (OD17.3xt2.3)-6M SGP sh 1 5.11 152 F FOB 16-May 5-Jun 11-Jun 18-Jun 20-Jun 11-Jul 100% $

A234 M1-6035(R.1) 29-Apr 5-Jun 5-May 4 W/D Pipe 80A (OD89.1xt4.2)-6M SGP sh 1 105.50 152 F FOB 16-May 5-Jun 11-Jun 18-Jun 20-Jun 11-Jul 100% $

A234 M1-6035(R.1) 29-Apr 5-Jun 5-May 3 W/D Pipe 150A (OD165.2xt11)-1M STPG370 sh 1 41.80 152 F FOB 16-May 5-Jun 11-Jun 18-Jun 20-Jun 11-Jul 100% $

Page 41: Hvc PlatePipe Update)

HVC-PUR 41 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A234 M1-6035(R.1) 29-Apr 5-Jun 5-May 5 W/D Pipe 600A (OD609.6xt12)-12M STK400 sh 4 8,496.00 152 F FOB 16-May 5-Jun 11-Jun 18-Jun 20-Jun 11-Jul 100% $

A234 M1-6035(R.1) 29-Apr 5-Jun 5-May 6 SQ.PIPE 150 x 150 x t6-6M STKR400 pc 1 157.80 152 F FOB 16-May 5-Jun 11-Jun 18-Jun 20-Jun 11-Jul 100% $

A234 M1-6035(R.1) 29-Apr 5-Jun 5-May 6 SQ.PIPE 300 x 300 x t12-6M STKR400 pc 3 1,872.00 152 F FOB 16-May 5-Jun 11-Jun 18-Jun 20-Jun 11-Jul 100% $

A234 M1-6035(R.1) 29-Apr 5-Jun 5-May 2 W/D PIPE 32A (OD42.7xt3.5)-6M SGP pc 254 5,156.00 271 L DDP 16-May 21-May 19-May 10-Jun 100% VND

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 1 Plate 3 x 1532 x 3048 SUS304 sh 1 111.00 266 L DDP 12-May 19-May 10-Jun 100% VND

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 2 Plate 4 x 1500 x 3048 SUS304 sh 2 290.00 266 L DDP 12-May 19-May 10-Jun 100% VND

A234 M1-6036(R.1) 29-Apr 5-Jun 5-May 3 Plate 6 x 1524 x 6096 SUS304 sh 6 2,652.00 266 L DDP 12-May 19-May 10-Jun 100% VND

AL TAWEELAH/ A236

A236 M1-7017 1 Punching Plate 60x242x778 A240-316L sh 2 1 F FOB 6-Jan 10-Jan 100% $

A236 M1-7017 2 Punching Plate 60x282x731 A240-316L sh 8 1 F FOB 6-Jan 10-Jan 100% $

A236 M1-6654 7-Sep 15-Oct 1 Plate 2 x 1219 x 2438 A240-321 sh 18 848.40 330 F FOB 14-Sep 24-Sep 20-Sep 30-Sep 4-Oct 16-Oct 100% $

A236 M1-6381 6-Jul 25-Jul 1 W/D PIPE 3/4" S/80 (OD26.7x3.91t) SUS304 pc 1 13.20 247 F CFR 28-Jul 2-Aug 28-Jul 3-Aug 18-Aug 27-Sep 100% $

A236 M1-6381 6-Jul 25-Jul 2 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 13 428.00 247 F CFR 28-Jul 2-Aug 28-Jul 3-Aug 18-Aug 27-Sep 100% $

A236 M1-6381 6-Jul 25-Jul 3 W/D PIPE 2" S/160(OD60.3xt8.74)-6M A312-304L pc 3 199.98 247 F CFR 28-Jul 2-Aug 28-Jul 3-Aug 18-Aug 27-Sep 100% $

A236 M1-6381 6-Jul 25-Jul 7 SMLS PIPE 1" S/40 (OD33.4xt3.38)- A106-B pc 1 15.00 247 F CFR 28-Jul 2-Aug 28-Jul 3-Aug 18-Aug 27-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 11 Plate 6 x 1524 x 6096 A240-304 sh 2 884.07 247 F CFR 28-Jul 2-Aug 28-Jul 3-Aug 18-Aug 27-Sep 100% $

A236 M1-6473 27-Jul 20-Aug 1 SMLS PIPE 2" S/160 (OD60.5x8.7t) - SUS304 pc 2 133.00 271 F FOB 18-Aug 23-Aug 18-Aug 7-May 6-Sep 25-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 13 Plate 30 x 1219 x 2438 A240-304 sh 1 707.00 246 F FOB 13-Jul 25-Jul 25-Aug 30-Aug 31-Aug 25-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 17 Plate 15 x 1524 x 6096 A240-316L sh 3 3,336.00 246 F FOB 13-Jul 25-Jul 25-Aug 30-Aug 31-Aug 25-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 17 Plate 15 x 2000 x 6096 A240-316L sh 1 1,459.00 246 F FOB 13-Jul 25-Jul 25-Aug 30-Aug 31-Aug 25-Sep 100% $

A236 M1-6381 6-Jul 25-Jul 8 SMLS PIPE 8" S/40 (OD219.1x8.18t) API-5L pc 4 1,021.20 514 L DDP 19-Aug 24-Aug 29-Aug 16-Sep 100% VND

A236 M1-6381 6-Jul 25-Jul 5 W/D PIPE 8" S/80(OD219.1xt12.7)-6M A312-304 pc 2 780.00 245 F FOB 13-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A236 M1-6381 6-Jul 25-Jul 6 W/D PIPE 1" S/40(OD33.4xt3.38)-6M A312-304 pc 2 30.00 245 F FOB 13-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 3 Plate 2 x 1219 x 2438 A240-321 sh 70 3,299.00 245 F FOB 13-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 4 Plate 3 x 1219 x 2438 A240-321 sh 40 2,828.00 245 F FOB 13-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 5 Plate 6 x 1219 x 2438 A240-321 sh 15 2,121.00 245 F FOB 13-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 9 Plate 3 x 1219 x 2438 A240-304 sh 6 424.00 245 F FOB 13-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 10 Plate 5 x 1219 x 2438 A240-304 sh 4 471.00 245 F FOB 13-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 19 Plate 30 x 2438 x 6096 SM490A sh 1 3,500.00 245 F FOB 13-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 20 Plate 30 x 1524 x 6096 SM490A sh 1 2,188.00 245 F FOB 13-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 21 Plate 35 x 2438 x 6096 SM490A sh 1 4,083.00 245 F FOB 13-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 22 Plate 45 x 1524 x 6096 SM490A sh 1 3,282.00 245 F FOB 13-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A236 M1-6386 6-Jul 25-Jul 2 Plate 3 x 1219 x 6000 SS400 sh 10 1,722.00 440 L DDP 13-Jul 18-Jul 26-Jul 16-Sep 100% VND

A236 M1-6386 6-Jul 25-Jul 23 Plate 12 x 2855 x 11810,20,30 SS400 sh 3 9,537.00 440 L DDP 13-Jul 18-Jul 26-Jul 16-Sep 100% VND

A236 M1-6386 6-Jul 25-Jul 23 Plate 12 x 1500 x 6000 SS400 sh 27 22,891.00 440 L DDP 13-Jul 18-Jul 26-Jul 16-Sep 100% VND

A236 M1-6386 6-Jul 25-Jul 24 Plate 16 x2000 x 12000 SS400 sh 4 12,058.00 440 L DDP 13-Jul 18-Jul 26-Jul 16-Sep 100% VND

A236 M1-6386 6-Jul 25-Jul 25 Plate 20 x 1730 x 7000 SS400 sh 1 1,901.00 440 L DDP 13-Jul 18-Jul 26-Jul 16-Sep 100% VND

A236 M1-6386 6-Jul 25-Jul 26 Plate 30 x 2245 x 3320 SS400 sh 1 1,755.00 440 L DDP 13-Jul 18-Jul 26-Jul 16-Sep 100% VND

A236 M1-6386 6-Jul 25-Jul 1 Plate 2 x 1250 x 6096 SS400 sh 60 7,000.00 476 L DDP 2-Aug 7-Aug 3-Aug 11-Sep 100% VND

A236 M1-6386 6-Jul 25-Jul 2 Plate 3 x 1500 x 6000 SS400 sh 2 424.00 476 L DDP 2-Aug 7-Aug 3-Aug 11-Sep 100% VND

A236 M1-6381 6-Jul 25-Jul 4 W/D PIPE 2_1/2" S/40 (OD73x5.16t) A312-304 pc 3 160.00 441 L Ex-w 13-Jul 18-Jul 18-Jul 14-Aug 100% $

A236 M1-6386 6-Jul 25-Jul 8 Plate 2 x 1219 x 2438 A240-304 sh 5 236.00 441 L Ex-w 13-Jul 18-Jul 18-Jul 14-Aug 100% $

A236 M1-6386 6-Jul 25-Jul 12 Plate 12 x 1524 x 6096 A240-304 sh 1 884.00 441 L Ex-w 13-Jul 18-Jul 18-Jul 14-Aug 100% $

A236 M1-6386 6-Jul 25-Jul 14 Plate 2 x 1219 x 2438 A240-316 sh 1 47.00 441 L Ex-w 13-Jul 18-Jul 18-Jul 14-Aug 100% $

A236 M1-6386 6-Jul 25-Jul 15 Plate 3 x 1219 x 2438 A240-316 sh 1 71.00 441 L Ex-w 13-Jul 18-Jul 18-Jul 14-Aug 100% $

A236 M1-6225 9-Jun 2-Jul 1 Plate 7 x 1524 x 6096 A36 sh 4 2,042.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

A236 M1-6225 9-Jun 2-Jul 2 Plate 8 x 1524 x 6096 A36 sh 2 1,167.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

A236 M1-6225 9-Jun 2-Jul 3 Plate 15 x 1524 x 6096 A36 sh 2 2,188.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

A236 M1-6225 9-Jun 2-Jul 4 Plate 16 x 1524 x 6096 A36 sh 15 17,503.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

A236 M1-6225 9-Jun 2-Jul 5 Plate 20 x 1524 x 6096 A36 sh 8 11,669.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

A236 M1-6225 9-Jun 2-Jul 6 Plate 30 x 1524 x 6096 A36 sh 2 4,376.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

A236 M1-6225 9-Jun 2-Jul 7 Plate 35 x 2438 x 6096 A36 sh 1 4,083.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

A236 M1-6225 9-Jun 2-Jul 8 Plate 45 x 1524 x 3048 A36 sh 1 1,641.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

Page 42: Hvc PlatePipe Update)

HVC-PUR 42 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A236 M1-6225 9-Jun 2-Jul 9 Plate 20 x 1524 x 6096 A240-304 sh 3 4,420.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

A236 M1-6225 9-Jun 2-Jul 10 Plate 30 x 2438 x 6096 A572-50/SM490A sh 1 3,500.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

A236 M1-6225 9-Jun 2-Jul 11 Plate 35 x 2438 x 6096 A572-50/SM490A sh 1 4,083.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

A236 M1-6223 9-Jun 2-Jul 1 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 2 66.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

A236 M1-6223 9-Jun 2-Jul 2 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 2 195.00 201 F FOB 15-Jun 5-Jul 23-Jul 1-Aug 9-Aug 16-Sep 100% $

A236 M1-5868 29-Mar 10-May 4 Plate 2 x 1219 x 2438 A240-321 sh 105 4,949.16 104 F CFR 14-Apr 3-Jun 7-Jul 14-Jul 19-Jul 24-Aug 100% $

A236 M1-5865 23-Mar 10-Apr 1 Plate 2 x 1219 x 2438 A240-409 sh 11 506.71 98 F CFR 10-Apr 30-Apr 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5865 23-Mar 10-Apr 2 Plate 2 x 1219 x 2438 A240-321 sh 155 7,305.90 104 F CFR 14-Apr 3-Jun 7-Jul 14-Jul 19-Jul 24-Aug 100% $

A236 M1-5931 4-Apr 5-Jun 1 Plate 2 x 1219 x 2438 A240-321 sh 60 2,828.08 104 F CFR 14-Apr 3-Jun 7-Jul 14-Jul 19-Jul 24-Aug 100% $

A236 M1-5931 4-Apr 5-Jun 2 Plate 2 x 1219 x 2438 A240-409 sh 45 2,072.92 104 F CFR 14-Apr 14-May 11-Jun 18-Jun 20-Jun 24-Aug 100% $

A236 M1-5931 4-Apr 5-Jun 5 Plate 6 x 1524 x 6096 A240-321 sh 10 4,420.33 104 F CFR 14-Apr 14-May 2-May 12-May 18-May Mill S 24-Aug 100% $

A236 M1-5931 4-Apr 5-Jun 15 Plate 30 x 1219 x 2438 A240-316 sh 3 2,121.06 104 F CFR 14-Apr 14-May 2-May 12-May 18-May Mill S 24-Aug 100% $

A236 M1-5931 4-Apr 5-Jun 17 Plate 60 x 1219 x 2438 A240-304 sh 1 1,414.04 104 F CFR 14-Apr 14-May 2-May 12-May 18-May Mill S 24-Aug 100% $

A236 M1-5812 13-Mar 10-May 3 Plate 2 x 1219 x 2438 A240-409 sh 500 23,032.40 98 F CFR 10-Apr 10-May 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5812 13-Mar 10-May 4 Plate 2 x 1219 x 2438 A240-321 sh 435 20,503.59 104 F CFR 14-Apr 3-Jun 7-Jul 14-Jul 19-Jul 24-Aug 100% $

A236 M1-5868 21-Mar 20-May 4-Apr 2 Plate 2 x 1219 x 2438 A240-321 sh 110 5,184.84 98 F CFR 10-Apr 10-May 2-May 12-May 18-May 5/24/2006,8/14100% $

A236 M1-5868 29-Mar 10-May 3 Plate 2 x 1219 x 2438 A240-409 sh 250 11,516.20 98 F CFR 10-Apr 25-Apr 2-May 12-May 18-May 5/24/2006,8/14100% $

A236 M1-5868 29-Mar 10-May 6 Plate 3 x 1219 x 2438 A240-409 sh 55 3,800.35 98 F CFR 10-Apr 25-Apr 2-May 12-May 18-May 5/24/2006,8/14100% $

A236 M1-5868 29-Mar 10-May 7 Plate 3 x 1219 x 2438 A240-321 sh 40 2,828.08 98 F CFR 10-Apr 25-Apr 2-May 12-May 18-May 5/24/2006,8/14100% $

A236 M1-5865 23-Mar 10-Apr 1b Plate 2 x 1219 x 2438 A240-409 sh 99 4,560.39 98 F CFR 10-Apr 30-Apr 2-May 12-May 18-May 5/24/2006,8/14100% $

A236 M1-5812 13-Mar 10-May 6 Plate 3 x 1219 x 2438 A240-409 sh 115 7,946.18 98 F CFR 10-Apr 25-Apr 2-May 12-May 18-May 5/24/2006,8/14100% $

A236 M1-5812 13-Mar 10-May 7 Plate 3 x 1219 x 2438 A240-321 sh 80 5,656.16 98 F CFR 10-Apr 25-Apr 2-May 12-May 18-May 5/24/2006,8/14100% $

A236 M1-5931 4-Apr 5-Jun 9 Plate 15 x 1524 x 6096 A240-304 sh 15 16,576.22 103 F CFR 14-Apr 10-Jun 10-Jun 13-Jun 26-Jun 20-Jul L/C $

A236 M1-6253 15-Jun ASAP 1 Plate 11.8 x 1500 x 6000 SS400 sh 40 33,346.80 350 L DDP 15-Jun 20-Jun 16-Jun 20-Jul 100% VND

A236 M1-5868 29-Mar 10-May 8 Plate 6 x 1219 x 6096 A36/SS400 sh 350 122,500.00 86 F FOB 1-Apr 30-May 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5931 4-Apr 5-Jun 6 Plate 6 x 1524 x 6096 SS400 sh 15 6,563.60 86 F FOB 1-Apr 30-May 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5812 13-Mar 10-May 8 Plate 6 x 1524 x 6096 SS400 sh 310 135,780.00 86 F FOB 1-Apr 30-May 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5868 29-Mar 10-May 1 Plate 1.6 x 1219 x 2438 SS400 sh 165 6,159.01 76 F FOB 28-Mar 7-May 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5868 29-Mar 10-May 2 Plate 2 x 1219 x 2438 SS400 sh 220 10,265.00 76 F FOB 28-Mar 7-May 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5868 29-Mar 10-May 5 Plate 3 x 1219 x 2438 SS400 sh 40 2,800.00 76 F FOB 28-Mar 7-May 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5931 4-Apr 5-Jun 3 Plate 2 x 1219 x 2438 SS400 sh 130 6,066.00 76 F FOB 28-Mar 7-May 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5931 4-Apr 5-Jun 4 Plate 3 x 1219 x 2438 SS400 sh 60 4,199.00 76 F FOB 28-Mar 7-May 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5812 13-Mar 10-May 1 Plate 1.6 x 1219 x 2438 SS400 sh 330 12,318.02 76 F FOB 28-Mar 7-May 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5812 13-Mar 10-May 2 Plate 2 x 1219 x 2438 SS400 sh 445 20,763.00 76 F FOB 28-Mar 7-May 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5812 13-Mar 10-May 5 Plate 3 x 1219 x 2438 SS400 sh 80 5,599.00 76 F FOB 28-Mar 7-May 11-Jun 18-Jun 20-Jun 100% $

A236 M1-5931 4-Apr 5-Jun 12 Plate 20 x 1525 x 6096 SM490A sh 2 2,920.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5931 4-Apr 5-Jun 13 Plate 20 x 1525 x 6096 A36 sh 2 2,920.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5931 4-Apr 5-Jun 16 Plate 40 x 1525 x 6096 A36 sh 4 11,676.00 114 F FOB 25-Apr 31-May 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5868 29-Mar 10-May 9 Plate 20 x 1500 x 9600 A572-50 sh 4 9,043.20 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5868 29-Mar 10-May 10 Plate 20 x 1900 x 9600 A572-50 sh 20 57,273.60 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5868 29-Mar 10-May 11 Plate 20 x 1950 x 9600 A572-50 sh 2 5,878.08 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5868 29-Mar 10-May 12 Plate 25 x 1250 x 9600 A572-50 sh 1 2,355.00 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5868 29-Mar 10-May 13 Plate 30 x 1850 x 10000 A572-50 sh 5 21,783.75 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5868 29-Mar 10-May 14 Plate 30 x 1850 x 9100 A572-50 sh 4 15,858.57 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5868 29-Mar 10-May 15 Plate 30 x 1850 x 9600 A572-50 sh 4 16,729.92 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5868 29-Mar 10-May 16 Plate 35 x 1850 x 10000 A572-50 sh 4 20,331.50 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5868 29-Mar 10-May 17 Plate 35 x 1850 x 8800 A572-50 sh 2 8,945.86 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5868 29-Mar 10-May 18 Plate 40 x 2438 x 6096 A572-50 sh 1 4,666.70 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5868 29-Mar 10-May 19 Plate 45 x 1850 x 9600 A572-50 sh 1 6,273.72 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5812 13-Mar 10-May 9 Plate 20 x 1500 x 9600 A572-50 sh 8 18,086.40 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5812 13-Mar 10-May 10 Plate 20 x 1900 x 9600 A572-50 sh 40 114,547.20 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5812 13-Mar 10-May 11 Plate 20 x 1950 x 9600 A572-50 sh 5 14,695.20 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5812 13-Mar 10-May 12 Plate 25 x 1250 x 9600 A572-50 sh 1 2,355.00 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

Page 43: Hvc PlatePipe Update)

HVC-PUR 43 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A236 M1-5812 13-Mar 10-May 13 Plate 30 x 1850 x 10000 A572-50 sh 11 47,924.25 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5812 13-Mar 10-May 14 Plate 30 x 1850 x 9100 A572-50 sh 9 35,681.78 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5812 13-Mar 10-May 15 Plate 30 x 1850 x 9600 A572-50 sh 6 25,094.88 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5812 13-Mar 10-May 16 Plate 35 x 1850 x 10000 A572-50 sh 9 45,745.88 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5812 13-Mar 10-May 17 Plate 35 x 1850 x 8800 A572-50 sh 4 17,891.72 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5812 13-Mar 10-May 18 Plate 40 x 1850 x 8800 A572-50 sh 1 5,111.92 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5812 13-Mar 10-May 19 Plate 45 x 1850 x 9600 A572-50 sh 2 12,547.44 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A236 M1-5931 4-Apr 5-Jun 7 Plate 8 x 1524 x 6096 A240-304 sh 22 12,966.00 103 F CFR 14-Apr 30-May 27-May 30-May 13-Jun 23-Jun 100% $

A236 M1-5931 4-Apr 5-Jun 8 Plate 12 x 1524 x 6096 A240-304 sh 4 3,536.26 103 F CFR 14-Apr 30-May 27-May 30-May 13-Jun 23-Jun 100% $

A236 M1-5931 4-Apr 5-Jun 10 Plate 15 x 1524 x 6096 A240-316 sh 1 1,105.08 103 F CFR 14-Apr 30-May 27-May 30-May 13-Jun 23-Jun 100% $

A236 M1-5931 4-Apr 5-Jun 11 Plate 20 x 1524 x 6096 A240-304 sh 1 1,473.44 103 F CFR 14-Apr 30-May 27-May 30-May 13-Jun 23-Jun 100% $

A236 M1-5931 4-Apr 5-Jun 14 Plate 30 x 1219 x 2438 A240-304 sh 1 707.02 103 F CFR 14-Apr 30-May 27-May 30-May 13-Jun 23-Jun 100% $

A236 M1-5931 4-Apr 5-Jun 18 Plate 60.5 x 1219 x 2300 A240-316 sh 2 2,707.00 103 F CFR 14-Apr 30-May 27-May 30-May 13-Jun 23-Jun 100% $

Camau/A238

A238 M1-6832 1-Nov 7-Nov 2 W/D Pipe OD219.1xt8.18-6M A312-304 pc 1 257.87 378 F CFR 10-Nov 1-Dec 24-Nov 30-Nov 7-Dec 16-Jan 100% $

A238 M1-6832 1-Nov 7-Nov 2 W/D Pipe OD219.1xt8.18-6.1M A312-304 pc 2 524.33 682 L DDP 1-Nov 4-Nov 3-Nov 28-Nov 100% $

A238 M1-6509 4-Aug 4-Sep 7 Plate 25 x 1524 x 3048 A240-304 sh 1 921.00 277 F FOB 14-Aug 25-Aug 2-Oct 11-Oct 14-Oct 100% $

A238 M1-6832 1-Nov 7-Nov 1 SMLS Pipe 8" S/40(OD219.1x8.18t)- API-5L pc 5 1,276.40 677 L DDP 1-Nov 8-Nov 9-Nov 28-Nov 100% VND

A238 M1-6647 7-Sep 18-Sep 1 Plate 10 x 1250 x 6000 SS400 sh 4 2,355.00 570 L DDP 13-Sep 18-Sep 26-Oct 100% VND

A238 M1-6509 4-Aug 4-Sep 1 Plate 0.5 x 1219 x 2438 A240-304 sh 1 12.00 277 F FOB 14-Aug 25-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6509 4-Aug 4-Sep 4 Plate 5 x 1524 x 3048 A240-304 sh 1 184.18 277 F FOB 14-Aug 25-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6509 4-Aug 4-Sep 5 Plate 10 x 1524 x 3048 A240-304 sh 1 368.36 277 F FOB 14-Aug 25-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6509 4-Aug 4-Sep 6 Plate 15 x 1524 x 6096 A240-304 sh 2 1,105.08 277 F FOB 14-Aug 25-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6509 4-Aug 4-Sep 7 Plate 25 x 1524 x 6096 A240-304 sh 1 1,842.00 277 F FOB 14-Aug 25-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6509 4-Aug 4-Sep 8 Plate 6 x 1219 x 6096 A240-321 sh 1 353.57 277 F FOB 14-Aug 25-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6509 4-Aug 4-Sep 12 Plate 2 x 1219 x 2438 A36 sh 22 1,026.50 277 F FOB 14-Aug 25-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6509 4-Aug 4-Sep 13 Plate 6 x 1219 x 6096 A36 sh 40 14,000.00 277 F FOB 14-Aug 25-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6509 4-Aug 4-Sep 14 Plate 13 x 1524 x 3048 A36 sh 1 474.04 277 F FOB 14-Aug 25-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6509 4-Aug 4-Sep 16 Plate 23 x 1524 x 6096 A36 sh 2 3,354.70 277 F FOB 14-Aug 25-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6509 4-Aug 4-Sep 16 Plate 23 x 1524 x 6096 A36 sh 1 5,032.09 277 F FOB 14-Aug 25-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6312 24-Jun 30-Jul 1 Plate 50 x 1524 x 11200 A572-50 sh 1 6,699.50 233 F FOB 5-Jul 4-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6312 24-Jun 30-Jul 2 Plate 50 x 2438 x 6096 A572-50 sh 1 5,833.35 233 F FOB 5-Jul 4-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6312 24-Jun 30-Jul 3 Plate 45 x 1524 x 6096 A572-50 sh 2 6,563.60 233 F FOB 5-Jul 4-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6312 24-Jun 30-Jul 4 Plate 40 x 2840 x 11200 A572-50 sh 1 9,987.70 233 F FOB 5-Jul 4-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6312 24-Jun 30-Jul 5 Plate 35 x 2438 x 6096 A572-50 sh 4 16,333.39 233 F FOB 5-Jul 4-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6312 24-Jun 30-Jul 6 Plate A572-50 sh 1 2,187.87 233 F FOB 5-Jul 4-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6312 24-Jun 30-Jul 8 Plate 23 x 1524 x 3048 SS400 sh 5 4,193.41 233 F FOB 5-Jul 4-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6312 24-Jun 30-Jul 10 Plate 20 x 1524 x 6096 A572-50 sh 2 2,917.16 233 F FOB 5-Jul 4-Aug 20-Sep 30-Sep 4-Oct 10-Nov 100% $

A238 M1-6509 4-Aug 4-Sep 2 Plate 2 x 1219 x 2438 A240-409 sh 15 691.00 278 F FOB 14-Aug 3-Sep 20-Sep 30-Sep 4-Oct 26-Oct 100% $

A238 M1-6509 4-Aug 4-Sep 3 Plate 6 x 1219 x 6096 A240-409 sh 20 6,911.00 278 F FOB 14-Aug 3-Sep 20-Sep 30-Sep 4-Oct 26-Oct 100% $

A238 M1-6509 4-Aug 4-Sep 15 Plate 20 x 2438 x 6096 A36 sh 1 2,333.00 278 F FOB 14-Aug 3-Sep 20-Sep 30-Sep 4-Oct 26-Oct 100% $

A238 M1-6633 1-Sep 1-Oct 1 Plate 3 x 1219 x 2438 A240-409 sh 50 3,454.90 326 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A238 M1-6509 4-Aug 4-Sep 10 Plate 7 x 1219 x 6096 A387-11 sh 3 1,225.00 286 F FOB 18-Aug 28-Aug 20-Sep 30-Sep 4-Oct 16-Oct 100% $

A238 M1-6509 4-Aug 4-Sep 11 Plate 13 x 2438 x 6096 A387-11 sh 1 1,517.00 286 F FOB 18-Aug 28-Aug 20-Sep 30-Sep 4-Oct 16-Oct 100% $

A238 M1-6508 4-Aug 4-Sep 2 SMLS PIPE 2-1/2" S/40(OD73x5.16t) A106-B sh 1 34.50 281 F FOB 18-Aug 28-Aug 25-Aug 30-Aug 31-Aug 25-Sep 100% $

A238 M1-6508 4-Aug 4-Sep 1 SMLS PIPE 1-1/2" S/40(OD48.3x3.68 A106-B sh 1 12.20 271 F FOB 18-Aug 23-Aug 18-Aug 23-Aug 6-Sep 25-Sep 100% $

A238 M1-6378 6-Jul 7-Aug 5 Plate 2 x 1219 x 2438 SS400 sh 110 5,132.50 233 F FOB 5-Jul 4-Aug 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A238 M1-6312 24-Jun 30-Jul 9 Plate 20 x 1524 x 6096 SS400 sh 3 4,375.70 233 F FOB 5-Jul 4-Aug 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A238 M1-6312 24-Jun 30-Jul 12 Plate 12 x 1524 x 6096 SS400 sh 2 1,750.29 233 F FOB 5-Jul 4-Aug 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A238 M1-6312 24-Jun 30-Jul 13 Plate SS400 sh 32 16,804.65 233 F FOB 5-Jul 4-Aug 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A238 M1-6312 24-Jun 30-Jul 14 Plate 2 x 1219 x 2438 SS400 sh 210 9,798.43 233 F FOB 5-Jul 4-Aug 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A238 M1-6312 24-Jun 30-Jul 7 Plate 25 x 1524 x 3048 A240-304 sh 5 4,605.00 238 F FOB 8-Jul 30-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A238 M1-6312 24-Jun 30-Jul 11 Plate 15 x 1524 x 6096 A240-304 sh 3 3,315.24 238 F FOB 8-Jul 30-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

30 x 1524 x 6096

6 x 1829 x 6096

Page 44: Hvc PlatePipe Update)

HVC-PUR 44 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A238 M1-6378 6-Jul 7-Aug 1 Plate 35 x 1219 x 6096 SM490A sh 1 2,041.70 248 F FOB 15-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A238 M1-6378 6-Jul 7-Aug 2 Plate 16 x 1524 x 3048 SS400 sh 3 1,750.00 248 F FOB 15-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A238 M1-6378 6-Jul 7-Aug 3 Plate 10 x 1524 x 3048 SS400 sh 1 365.00 248 F FOB 15-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A238 M1-6378 6-Jul 7-Aug 4 Plate 6 x 1524 x 6096 A36 sh 22 9,627.00 248 F FOB 15-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A238 M1-6378 6-Jul 7-Aug 6 Plate 2 x 1219 x 2438 A240-409 sh 55 2,534.00 248 F FOB 15-Jul 25-Jul 13-Aug 19-Aug 23-Aug 16-Sep 100% $

A238 M1-5863 21-Mar 10-Apr 4-Apr 1 Plate 2 x 1219 x 2438 A240-321 sh 30 1,414.00 104 F CFR 14-Apr 3-Jun 7-Jul 14-Jul 19-Jul 24-Aug 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 2 Plate 2 x 1219 x 2438 A240-409 sh 245 11,285.98 98 F CFR 10-Apr 30-May 7-Jul 14-Jul 18-Jul 14-Aug 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 2 Plate 2 x 1219 x 2438 A240-409 sh 215 9,904.02 98 F CFR 10-Apr 30-May 11-Jun 18-Jun 20-Jun 100% $

A238 M1-5863 21-Mar 10-Apr 4-Apr 1 Plate 3 x 1219 x 2438 A240-321 sh 80 5,656.20 98 F CFR 10-Apr 30-Apr 2-May 12-May 18-May 5/24/2006,8/14100% $

A238 M1-5862 21-Mar 20-May 4-Apr 4 Plate 3 x 1219 x 2438 A240-321 sh 66 4,666.33 98 F CFR 10-Apr 10-May 2-May 12-May 18-May 5/24/2006,8/14100% $

A238 M1-5862 21-Mar 20-May 4-Apr 5 Plate 6 x 1219 x 6096 A36/SS400 sh 100 35,000.00 86 F FOB 1-Apr 30-May 11-Jun 18-Jun 20-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 6 Plate 6 x 1524 x 6096 SS400 sh 95 41,610.00 86 F FOB 1-Apr 30-May 11-Jun 18-Jun 20-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 1 Plate 2 x 1219 x 2438 SS400 sh 430 20,063.45 76 F FOB 28-Mar 7-May 11-Jun 18-Jun 20-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 3 Plate 3 x 1219 x 2438 SS400 sh 165 11,548.15 76 F FOB 28-Mar 7-May 11-Jun 18-Jun 20-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 9 Plate 15 x 1524 x 6096 A36 sh 1 1,094.00 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 10 Plate 20 x 1524 x 6096 A36 sh 1 1,459.00 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 11 Plate 20 x 1900 x 9600 A572-50 sh 12 34,364.16 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 12 Plate 20 x 1950 x 11200 A572-50 sh 4 13,715.52 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 13 Plate 24 x 1524 x 6096 A36 sh 1 1,750.00 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 14 Plate 30 x 1524 x 6096 A36 sh 1 2,188.00 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 15 Plate 35 x 1524 x 6096 A36 sh 1 2,553.00 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 16 Plate 30 x 1850 x 9600 A572-50 sh 24 100,379.52 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 17 Plate 35 x 1850 x 11200 A572-50 sh 6 34,156.92 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 18 Plate 35 x 1850 x 8800 A572-50 sh 6 26,837.58 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 19 Plate 40 x 2840 x 11200 A572-50 sh 5 49,938.56 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 20 Plate 40 x 1850 x 10000 A572-50 sh 11 63,899.00 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 21 Plate 40 x 1850 x 8800 A572-50 sh 5 25,559.60 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

A238 M1-5862 21-Mar 20-May 4-Apr 22 Plate 50 x 1524 x 11200 A572-50 sh 4 26,798.02 81 F CIF 29-Mar 10-Jun 12-Jun 18-Jun 18-Jun 100% $

New CATLAI/S242

S242 M1-6153 25-May 10-Jul 1 Pipe (Din 2448) OD159x7.1-12M S355J2H pc 1 319.20 167 F CFR 2-Jun 15-Aug 28-Aug 26-Sep 29-Sep 5-Oct 100% $

S242 M1-6153 25-May 10-Jul 3 Pipe (Din 2448) OD323.9x16-11.8M S355J2H pc 10 14,396.00 216 F CFR 27-Jun 20-Jul 26-Jul 27-Aug 31-Aug 25-Sep 100% EUR

S242 M1-6483 31-Jul 5-Sep 1 W/D Pipe 400A S/40 (OD406.4xt12 A53-B pc 1 792.00 271 F FOB 18-Aug 23-Aug 25-Aug 30-Aug 31-Aug 25-Sep 100% $

S242 M1-6483 31-Jul 5-Sep 2 W/D Pipe 500A XS (OD508xt12.7)- A53-B pc 1 1,241.00 271 F FOB 18-Aug 23-Aug 25-Aug 30-Aug 31-Aug 25-Sep 100% $

S242 M1-6153 25-May 10-Jul 3 Pipe (Din 2448) OD323.9x16-50.6M (7pc) E355 pc 7 6,147.00 365 F CFR 27-Jun 9-Aug 11-Jul 18-Aug 24-Aug 20-Sep L/C $

S242 M1-6153 25-May 10-Jul 3 Pipe (Din 2448) OD323.9x16-10M S355J2H pc 1 1,215.00 365 F CFR 27-Jun 9-Aug 11-Jul 18-Aug 24-Aug 20-Sep L/C $

S242 M1-6153 25-May 10-Jul 5 Pipe (Din 2458 ) OD610x6.3-13M S355J2H pc 11 13,412.00 365 F CFR 27-Jun 9-Aug 11-Jul 18-Aug 24-Aug 20-Sep L/C $

S242 M1-6153 25-May 10-Jul 6 Pipe (Din 2458 ) OD609.6x12.5-12M S355J2H pc 6 13,261.00 365 F CFR 27-Jun 9-Aug 11-Jul 18-Aug 24-Aug 20-Sep L/C $

S242 M1-6153 25-May 10-Jul 2 Pipe (Din 2448) OD219.1x8t-12M S355J2H pc 6 2,998.50 167 F CFR 2-Jun 15-Aug 11-Jul 18-Aug 24-Aug 100% $

S242 M1-6153 25-May 10-Jul 3b Pipe (Din 2448) OD323.9x16-12M S355J2H pc 8 11,662.56 167 F CFR 2-Jun 15-Aug 11-Jul 18-Aug 24-Aug 100% $

S242 M1-6153 25-May 10-Jul 4 Pipe (Din 2458 ) OD508x6.3-12M S355J2H pc 7 6,543.60 167 F CFR 2-Jun 15-Aug 11-Jul 18-Aug 24-Aug 100% $

S242 M1-5980(R.2) 25-Apr 30-Jun 1 W/D Pipe 20A S/40(OD26.7xt2.87) A53-B pc 270 2,737.80 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S242 M1-5980(R.2) 25-Apr 30-Jun 2 W/D Pipe 32A S/40(OD42.2 x3.6)- A53-B pc 250 5,085.00 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S242 M1-5980(R.2) 25-Apr 30-Jun 3 W/D Pipe 50A S/40 (OD60.3x3.91t) A53-B pc 10 326.40 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S242 M1-5980(R.2) 25-Apr 30-Jun 4 W/D Pipe 65A S/80 (OD73xt7.01) - A53-B pc 2 136.92 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S242 M1-5980(R.2) 25-Apr 30-Jun 5 W/D Pipe 3" S/80 (OD88.9xt7.62-6 A53-B pc 2 183.24 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S242 M1-5980(R.2) 25-Apr 30-Jun 6 W/D Pipe 4" S/80(OD114.3x8.56)- A53-B pc 3 401.76 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S242 M1-6122 17-May 5-Jul 1 W/D Pipe 4" S/80(OD114.3x8.56)- A53-B pc 18 2,410.56 132 F FOB 10-May 25-May 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S242 M1-5980(R.2) 25-Apr 30-Jun 18 SQ.Pipe 75 x 75 x t4.5-6M STKR400 pc 29 1,661.70 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S242 M1-5980(R.2) 25-Apr 30-Jun 20 SQ.Pipe 80 x 80 x t4.5-5.8M STKR400 pc 10 618.00 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S242 M1-5980(R.2) 25-Apr 30-Jun 21 SQ.Pipe 100 x 100 x t4-6M STKR400 pc 3 210.60 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 2 Plate 8 x 2438 x 6096 SS400 sh 23 21,466.70 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 3 Plate 10 x 2438 x 6096 SS400 sh 2 2,333.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 4 Plate 12 x 2438 x 6096 SS400 sh 4 5,600.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

Page 45: Hvc PlatePipe Update)

HVC-PUR 45 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

S242 M1-5981(R.1) 25-Apr 30-Jun 5 Plate 6 x 1524 x 6096 SM490B sh 47 20,590.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 6 Plate 8 x 2438 x 6096 SM490B sh 128 119,420.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 7 Plate 10 x 2438 x 12192 SM490B sh 116 270,668.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 9 Plate 12 x 2438 x 12192 SM490B sh 27 75,600.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 10 Plate 12 x 1524 x 12192 SM490B sh 43 75,263.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 11 Plate 15 x 2438 x 12192 SM490B sh 38 133,000.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 12 Plate 18 x 2438 x 12192 SM490B sh 3 12,600.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 13 Plate 20 x 2438 x 12192 SM490B sh 5 23,333.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 14 Plate 21 x 1829 x 12192 SM490B sh 20 73,520.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 15 Plate 23 x 1829 x 12192 SM490B sh 2 8,050.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 16 Plate 25 x 2438 x 6096 SM490B sh 3 8,750.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 17 Plate 30 x 2438 x 6096 SM490B sh 4 14,000.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 18 Plate 35 x 2438 x 6096 SM490B sh 4 16,333.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 19 Plate 40 x 1700 x 12192 SM490B sh 8 52,065.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 20 Plate 45 x 1524 x 6096 SM490B sh 2 6,564.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-5981(R.1) 25-Apr 30-Jun 21 Plate 4 x 1219 x 6096 SS400 sh 4 930.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S242 M1-6122 17-May 5-Jul 2 W/D Pipe 5" S/80 (OD141.3xt9.52 A53-B or API5L-B pc 16 2,970.24 164 F CFR 26-May 23-Jun 16-Jun 22-Jun 30-Jun 25-Jul 100% $

S242 M1-6122 17-May 5-Jul 3 W/D Pipe 6" S/40 (OD168.3xt7.11 A53-B or API5L-B pc 3 508.68 164 F CFR 26-May 23-Jun 16-Jun 22-Jun 30-Jun 25-Jul 100% $

S242 M1-6122 17-May 5-Jul 4 W/D Pipe 6" S/80 (OD168.3x10.97 A53-B or API5L-B pc 32 8,171.52 164 F CFR 26-May 23-Jun 16-Jun 22-Jun 30-Jun 25-Jul 100% $

S242 M1-6122 17-May 5-Jul 5 W/D Pipe 8" S/40 (OD219.1xt8.18 A53-B or API5L-B pc 12 3,063.60 164 F CFR 26-May 23-Jun 16-Jun 22-Jun 30-Jun 25-Jul 100% $

S242 M1-6122 17-May 5-Jul 6 W/D Pipe 10" S/40 (OD273xt9.27- A53-B or API5L-B pc 1 361.74 164 F CFR 26-May 23-Jun 16-Jun 22-Jun 30-Jun 25-Jul 100% $

S242 M1-6122 17-May 5-Jul 7 W/D Pipe 16" S/40 (OD406.4xt12. A53-B or API5L-B pc 1 739.80 164 F CFR 26-May 23-Jun 16-Jun 22-Jun 30-Jun 25-Jul 100% $

S242 M1-6122 17-May 5-Jul 8 W/D Pipe 20" STD (OD508xt9.52- A53-B or API5L-B pc 3 2,106.36 164 F CFR 26-May 23-Jun 16-Jun 22-Jun 30-Jun 25-Jul 100% $

S242 M1-5980(R.2) 25-Apr 30-Jun 19 SQ.Pipe 50 x 50 x t3.2-6M STKR400 pc 2 54.00 245 L DDP 8-May 13-May 25-May 100% VND

HP II CHUA VE II/S243

S243 M1-6154 25-May 10-Jul 2 Pipe (Din 2448) OD406.4xt12.5 - 12M S355J2H pc 3 4,356.00 167 F CFR 2-Jun 15-Aug 28-Aug 26-Sep 29-Sep 5-Oct 100% $

S243 M1-6484 31-Jul 5-Sep 1 SMLS PIPE 10" S/80(OD273xt15.09) A53-B pc 1 576.00 271 F FOB 18-Aug 23-Aug 25-Aug 30-Aug 31-Aug 25-Sep 100% $

S243 M1-6154 25-May 10-Jul 1 Pipe (Din 2448) OD368xt12.5 -8.9M,9.2M E355 pc 4 4,087.00 365 F CFR 27-Jun 9-Aug 11-Jul 18-Aug 24-Aug 20-Sep L/C $

S243 M1-6027 26-Apr 26-Jun 1 W/D Pipe 20A S/40(OD26.7xt2.87) A53-B pc 40 405.60 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S243 M1-6027 26-Apr 26-Jun 2 W/D Pipe 32A S/40(OD42.2 x3.6)- A53-B pc 100 2,034.00 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S243 M1-6027 26-Apr 26-Jun 3 W/D Pipe 40A S/80 (OD48.3xt5.08) A53-B pc 2 64.92 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S243 M1-6027 26-Apr 26-Jun 4 W/D Pipe 50A S/80 (OD60.3xt5.54) A53-B pc 1 44.88 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S243 M1-6027 26-Apr 26-Jun 5 W/D Pipe 65A S/80 (OD73xt7.01) - A53-B pc 2 136.92 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S243 M1-6027 26-Apr 26-Jun 6 W/D Pipe 4" S/80(OD114.3x8.56)- A53-B pc 12 1,607.04 132 F FOB 10-May 20-Jun 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S243 M1-6121 17-May 5-Jul 1 W/D Pipe 20A S/40(OD26.7xt2.87) A53-B pc 5 50.70 132 F FOB 10-May 25-May 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S243 M1-6121 17-May 5-Jul 2 W/D Pipe 32A S/40(OD42.2 x3.6)- A53-B pc 10 203.40 132 F FOB 10-May 25-May 23-Jul 1-Aug 10-Aug 25-Sep 100% $

S243 M1-6020 25-Apr 25-Jun 2 Plate 8 x 2438 x 6096 SS400 sh 4 3,733.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 3 Plate 10 x 2438 x 6096 SS400 sh 3 3,500.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 4 Plate 8 x 2438 x 6096 SM490B sh 1 930.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 5 Plate 9 x 2438 x 12192 SM490B sh 1 2,100.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 6 Plate 10 x 2438 x 12192 SM490B sh 8 18,667.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 7 Plate 12 x 2438 x 12192 SM490B sh 5 14,000.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 8 Plate 15 x 2438 x 12192 SM490B sh 11 38,500.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 9 Plate 16 x 2438 x 12192 SM490B sh 2 7,470.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 10 Plate 18 x 2438 x 12192 SM490B sh 16 67,200.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 11 Plate 20 x 2438 x 12192 SM490B sh 8 37,333.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 12 Plate 25 x 2438 x 6096 SM490B sh 6 17,500.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 13 Plate 28 x 2438 x 9000 SM490B sh 2 9,650.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 14 Plate 30 x 2438 x 6096 SM490B sh 2 7,000.00 122 F CFR 27-Apr 30-Jul 1-Jul 13-Jul 18-Jul 14-Aug 100% $

S243 M1-6020 25-Apr 25-Jun 1 CHK'D PLATE 6x1500x6000 CT3 sh 3 1,353.00 304 L DDP 30-May 6-Jun 19-Jun 100% VND

S243 M1-6121 17-May 5-Jul 3 W/D Pipe 6" S/80 (OD168.3xt10.97) A53-B or API5L-B pc 1 255.36 164 F CFR 26-May 23-Jun 16-Jun 22-Jun 30-Jun 25-Jul 100% $

S243 M1-6121 17-May 5-Jul 4 W/D Pipe 8" S/40 (OD219.1xt8.18) A53-B or API5L-B pc 2 510.60 164 F CFR 26-May 23-Jun 16-Jun 22-Jun 30-Jun 25-Jul 100% $

S243 M1-6121 17-May 5-Jul 5 W/D Pipe 10" S/80 (OD273.1xt15.09 A53-B or API5L-B pc 1 576.06 164 F CFR 26-May 23-Jun 16-Jun 22-Jun 30-Jun 25-Jul 100% $

Page 46: Hvc PlatePipe Update)

HVC-PUR 46 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

S243 M1-6027 26-Apr 26-Jun 12 SQ.Pipe 50 x 50 x t3.2-6M STKR400 pc 4 108.00 245 L DDP 8-May 13-May 25-May 100% VND

S243 M1-6027 26-Apr 26-Jun 13 SQ.Pipe 60 x 30 x t3.2-6M STKR400 pc 8 191.52 245 L DDP 8-May 13-May 25-May 100% VND

Sabiya 3-Recarbonation/U244

U244 M1-6086 9-May 30-Jun 7 Plate 20.5 x 3048 x 7800 A283-D sh 4 15,300.00 144 F CFR 12-May 11-Jun 23-Jul 1-Aug 9-Aug 24-Aug 100% $

U244 M1-6086 9-May 30-Jun 7 Plate 20.5 x 3048 x 11700 A283-D sh 1 5,740.00 144 F CFR 12-May 11-Jun 23-Jul 1-Aug 9-Aug 24-Aug 100% $

U244 M1-6085(R.1) 9-May 30-Jun 1 SMLS Pipe 80A S/40(OD88.9x5.5t)- A312-316L pc 1 36.00 136 F FOB 9-May 23-Jun 23-Jul 1-Aug 10-Aug 16-Sep 100% $

U244 M1-6085(R.1) 9-May 30-Jun 2 W/D Pipe 80A S/10(OD88.9x3.05) A312-316L pc 31 1,116.00 136 F FOB 9-May 23-Jun 23-Jul 1-Aug 10-Aug 16-Sep 100% $

U244 M1-6085(R.1) 9-May 30-Jun 3 W/D Pipe 100A S/10(OD114.3x3.05 A312-316L pc 26 1,177.80 136 F FOB 9-May 23-Jun 23-Jul 1-Aug 10-Aug 16-Sep 100% $

U244 M1-6085(R.1) 9-May 30-Jun 4 W/D Pipe 150A S/10(OD168.3x3.4) A312-316L pc 48 3,666.24 136 F FOB 9-May 23-Jun 23-Jul 1-Aug 10-Aug 16-Sep 100% $

U244 M1-6085(R.1) 9-May 30-Jun 5 W/D Pipe 200A S/10(OD219.1x3.76 A312-316L pc 6 678.24 136 F FOB 9-May 23-Jun 23-Jul 1-Aug 10-Aug 16-Sep 100% $

U244 M1-6085(R.1) 9-May 30-Jun 6 W/D Pipe 250A S/10(OD273.1x4.19 A312-316L pc 2 315.60 136 F FOB 9-May 23-Jun 23-Jul 1-Aug 10-Aug 16-Sep 100% $

U244 M1-6085(R.1) 9-May 30-Jun 7 W/D Pipe 300 S/10S-6M A312-316L pc 54 11,171.52 136 F FOB 9-May 23-Jun 23-Jul 1-Aug 10-Aug 16-Sep 100% $

U244 M1-6085(R.1) 9-May 30-Jun 8 W/D Pipe 350 S/10S-6M A312-316L pc 9 2,275.56 136 F FOB 9-May 23-Jun 23-Jul 1-Aug 10-Aug 16-Sep 100% $

U244 M1-6085(R.1) 9-May 30-Jun 9 W/D Pipe 400 S/10S-6M A312-316L pc 8 2,315.52 136 F FOB 9-May 23-Jun 23-Jul 1-Aug 10-Aug 16-Sep 100% $

U244 M1-6085(R.1) 9-May 30-Jun 10 W/D Pipe 450 S/10S-6M A312-316L pc 4 1,304.16 136 F FOB 9-May 23-Jun 23-Jul 1-Aug 10-Aug 16-Sep 100% $

U244 M1-6085(R.1) 9-May 30-Jun 11 W/D Pipe 500 S/10S-6M A312-316L pc 3 1,259.10 136 F FOB 9-May 23-Jun 23-Jul 1-Aug 10-Aug 16-Sep 100% $

U244 M1-6085(R.1) 9-May 30-Jun 12 W/D Pipe 600A S/10(O.D609.6xt6. A312-316L pc 11 6,353.16 136 F FOB 9-May 23-Jun 23-Jul 1-Aug 10-Aug 16-Sep 100% $

U244 M1-6086(R.1) 9-May 30-Jun 1 Plate 5 x 1219 x 3000 A240-316L sh 1 145.91 137 F CFR 9-May 8-Jul 1-Jul 6-Jul 20-Jul 19-Aug L/C $

U244 M1-6086(R.1) 9-May 30-Jun 2 Plate 8 x 1524 x 2300 A240-316L sh 14 3,132.81 137 F CFR 9-May 8-Jul 1-Jul 6-Jul 20-Jul 19-Aug L/C $

U244 M1-6086(R.1) 9-May 30-Jun 3 Plate 8 x 1524 x 2600 A240-316L sh 131 33,137.71 137 F CFR 9-May 8-Jul 1-Jul 6-Jul 20-Jul 19-Aug L/C $

U244 M1-6086(R.1) 9-May 30-Jun 4 Plate 9 x 1219 x 3200 A240-316L sh 1 280.16 137 F CFR 9-May 8-Jul 1-Jul 6-Jul 20-Jul 19-Aug L/C $

U244 M1-6086(R.1) 9-May 30-Jun 5 Plate 11 x 1524 x 3900 A240-316L sh 83 43,303.52 137 F CFR 9-May 8-Jul 1-Jul 6-Jul 20-Jul 19-Aug L/C $

U244 M1-6086(R.1) 9-May 30-Jun 6 Plate 15 x 1219 x 1500 A240-316L sh 1 218.87 137 F CFR 9-May 8-Jul 1-Jul 6-Jul 20-Jul 19-Aug L/C $

Shuaibah IWPP/U246

U246 M1-8328 19-Oct 9-Nov 1 Plate 13 x 3048 x 6700 A285-C sh 14 29,162.00 340 F FOB 2-Nov 25-Dec 17-Jan 24-Jan 30-Jan 18-Feb L/C $

U246 M1-8327 19-Oct 9-Nov 2 W/D Pipe 100A S/10(OD114.3x3.05 A312-316L pc 2 102.00 330 F FOB 24-Oct 2-Nov 9-Nov 16-Nov 27-Nov 19-Dec 100% $

U246 M1-8327 19-Oct 9-Nov 3 W/D Pipe 250 STD(OD273.1x9.27) A53-B pc 1 362.00 330 F FOB 24-Oct 2-Nov 9-Nov 16-Nov 27-Nov 19-Dec 100% $

U246 M1-7200 14-Feb 15-Mar 1 W/D Pipe 3" STD(OD88.9x 5.49)-6 A53-B pc 2 135.50 36 F FOB 23-Feb 16-Mar 21-Mar 29-Mar 14-Jun a 29-Jun 100% $

U246 M1-7604 30-May 20-Jun 1 W/D Pipe 4" STD (OD114.3x6.02)- A53-B pc 1 96.00 109 F FOB 1-Jun 30-Jun 17-Jun 22-Jun 29-Jun 11-Jul 100% $

U246 M1-7604 30-May 20-Jun 2 W/D Pipe 16" STD (OD406.4x9.52) A53-B pc 1 560.00 109 F FOB 1-Jun 30-Jun 17-Jun 22-Jun 29-Jun 11-Jul 100% $

U246 M1-6335 1 Plate 11 x 3048 x 7100 A285-C sh 4 7,475.00 31 F FOB 15-Feb 20-Apr 13-May 24-May 29-May 21-Jun 100% $

U246 M1-7332 4-Apr 20-Apr 1 W/D Pipe 3" S/40(OD88.9xt5.5)-6M A53-B pc 8 542.00 79 F FOB 11-Apr 13-Apr 16-Apr 19-Apr 7-May 17-May 100% $

U246 M1-7361 10-Apr 1 SMLS Pipe 600 STD(OD610xt9.52)-6 A106-B pc 1 859.92 89 F CFR 16-Apr 20-Apr 21-Apr 28-Apr 7-May 4-Jun 100% $

U246 M1-7332 4-Apr 20-Apr 2 W/D Pipe 100A S/10(OD114.3x3.05 A312-316L pc 9 459.00 191 L DDP 10-Apr 12-Apr 12-Apr 26-Apr 100% $

U246 M1-7129 1 SMLS Pipe 1" S/80(OD33.4 x t4.55)- A53-B/A106-B pc 15 292.00 15 F FOB 20-Jan 23-Feb 9-Feb 14-Feb 16-Mar 9-Apr 100% $

U246 M1-7129 2 SMLS Pipe 2" S/80(OD60.3 x t5.54)- A53-B/A106-B pc 4 180.00 15 F FOB 20-Jan 23-Feb 9-Feb 14-Feb 16-Mar 9-Apr 100% $

U246 M1-6720 27-Sep 20-Nov 1 W/D Pipe 450 BE S/10(OD457.2x4. B466-C70600 pc 2 572.03 363 F CFR 30-Oct 1-Jan 11-Dec 17-Jan 19-Jan 29-Jan 100% $

U246 M1-7125 1 W/D Pipe 100A S/10(OD114.3 x 3.0 A312-304L pc 1 51.00 85 L DDP 31-Jan 2-Feb 2-Feb 10-Feb 100% $

U246 M1-6992 19-Dec 30-Jan 1 SMLS Pipe 80 S/10(OD88.9 x t3.05) B466-C70600 pc 1 44.40 397 F CFR 26-Dec 20-Jan 26-Jan 31-Jan 2-Feb 15-Feb 100% $

U246 M1-6926(R.1) 1-Dec 30-Dec 1 SMLS Pipe 100 S/10(OD114.3 x t3.0 B466-C70600 pc 3 171.00 397 F CFR 13-Dec 20-Jan 26-Jan 31-Jan 2-Feb 15-Feb 100% $

U246 M1-6926(R.1) 30-Nov 30-Dec 2 SMLS Pipe 250 S/10(OD273.1 x t4.1 B466-C70600 pc 2 380.30 397 F CFR 13-Dec 20-Jan 26-Jan 31-Jan 2-Feb 15-Feb 100% $

U246 M1-6926(R.1) 30-Nov 30-Dec 3 SMLS Pipe 300 S/10(OD323.9 x t4.0 B466-C70600 pc 1 123.20 397 F CFR 13-Dec 20-Jan 26-Jan 31-Jan 2-Feb 15-Feb 100% $

U246 M1-6604(R.1) 28-Aug 15-Nov 4-Sep 1 PLATE 8 x 3048 x 7800 A285-C sh 3 4,479.10 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 100% $

U246 M1-6604(R.1) 28-Aug 15-Nov 4-Sep 2 PLATE 9 x 3048 x 6500 A285-C sh 7 9,798.02 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 100% $

U246 M1-6604(R.1) 28-Aug 15-Nov 4-Sep 3 PLATE 10 x 3048 x 6400 A285-C sh 3 4,593.95 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 100% $

U246 M1-6604(R.1) 28-Aug 15-Nov 4-Sep 4 PLATE 13 x 2438 x 7800 A285-C sh 19 36,871.85 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6604(R.1) 28-Aug 15-Nov 4-Sep 5 PLATE 15 x 3048 x 6800 A285-C sh 3 7,321.60 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6604(R.1) 28-Aug 15-Nov 4-Sep 6 PLATE 20 x 3048 x 6800 A285-C sh 10 32,540.40 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 1 PLATE 9 x 3048 x 6500 A285-C sh 2 2,799.44 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 2 PLATE 10 x 3048 x 6000 A285-C sh 21 30,147.77 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 3 PLATE 10 x 3048 x 6400 A285-C sh 2 3,062.63 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 4 PLATE 11 x 3048 x 6800 A285-C sh 19 34,004.77 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 5 PLATE 11 x 3048 x 7100 A285-C sh 62 115,858.40 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

Page 47: Hvc PlatePipe Update)

HVC-PUR 47 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 6 PLATE 11 x 3048 x 9000 A285-C sh 17 40,268.80 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 7 PLATE 11 x 3048 x 9600 A285-C sh 22 55,586.70 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 8 PLATE 13 x 3048 x 5200 A285-C sh 12 19,409.42 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 9 PLATE 13 x 3048 x 6100 A285-C sh 108 204,918.70 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 10 PLATE 13 x 3048 x 7200 A285-C sh 7 15,676.84 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 11 PLATE 13 x 3048 x 8000 A285-C sh 8 19,907.10 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 12 PLATE 13 x 2438 x 6100 A285-C sh 36 54,636.00 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6341(R.1) 28-Aug 15-Nov 4-Sep 13 PLATE 13 x 2438 x 7800 A285-C sh 5 9,703.12 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 1 PLATE 10 x 3048 x 6000 A285-C sh 5 7,178.00 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 2 PLATE 11 x 1700 x 6600 A285-C sh 6 5,813.10 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep add PLATE 11 x 1900 x 8400 A285-C sh 10 13,781.50 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep add PLATE 11 x 2000 x 9600 A285-C sh 6 9,950.00 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 3 PLATE 11 x 2100 x 9600 A285-C sh 12 20,889.79 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 4 PLATE 11 x 2600 x 6400 A285-C sh 36 51,727.10 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 5 PLATE 11 x 2800 x 7100 A285-C sh 18 30,899.48 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 6 PLATE 11 x 3048 x 6400 A285-C sh 87 146,546.90 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 7 PLATE 11 x 3048 x 7100 A285-C sh 64 119,595.70 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-JanNCR(shortage 4sh)6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 8 PLATE 11 x 3048 x 8400 A285-C sh 18 39,795.10 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 9 PLATE 11 x 3048 x 9600 A285-C sh 48 121,280.20 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 10 PLATE 13 x 2300 x 5100 A285-C sh 20 23,940.93 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep add PLATE 13 x 2438 x 5500 A285-C sh 9 12,315.50 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 11 PLATE 13 x 2700 x 6100 A285-C sh 10 16,807.64 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 12 PLATE 13 x 2700 x 6700 A285-C sh 2 3,692.17 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 13 PLATE 13 x 3048 x 5100 A285-C sh 53 84,076.38 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep add PLATE 13 x 3048 x 5500 A285-C sh 35 59,876.80 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Janactual 36sh6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 14 PLATE 13 x 3048 x 6100 A285-C sh 35 66,408.83 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 15 PLATE 13 x 3048 x 6700 A285-C sh 198 412,636.80 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 17 PLATE 18 x 2250 x 9000 A285-C sh 3 8,583.97 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 18 PLATE 18 x 2438 x 5500 A285-C sh 3 5,684.10 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 19 PLATE 18 x 2438 x 6400 A285-C sh 12 26,456.80 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 20 PLATE 18 x 2600 x 9600 A285-C sh 6 21,161.09 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 22 PLATE 18 x 3048 x 6700 A285-C sh 9 25,970.10 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 23 PLATE 18 x 3048 x 7100 A285-C sh 3 9,173.50 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6335(R.3) 28-Aug 15-Nov 6-Sep 25 PLATE 18 x 3048 x 9600 A285-C sh 27 111,632.90 308 F CFR 4-Sep 15-Nov 30-Nov 10-Jan 10-Jan 6-Feb 100% $

U246 M1-6333(R.2) 28-Aug 20-Oct 4-Sep 6 W/D Pipe 12" STD(OD323.8xt9.52) A53-B pc 113 50,024.00 310 F CFR 7-Sep 15-Nov 24-Dec 12-Jan 23-Jan 100% $

U246 M1-6908 23-Nov 30-Dec 1 W/D Pipe 80A S/10 (OD88.9 x t3.0 A312-316L pc 7 275.50 726 L DDP 29-Nov 4-Dec 1-Dec OK 100% $

U246 M1-6908 23-Nov 30-Dec 2 W/D Pipe 200 S/10(OD219.1x3.76) A312-316L pc 1 121.80 726 L DDP 29-Nov 4-Dec 1-Dec OK 100% $

U246 M1-6812 26-Oct 30-Nov 1 W/D Pipe 200 S/10(OD219.1x3.76) A312-316L pc 1 123.82 686 L DDP 2-Nov 4-Nov 3-Nov 23-Nov 100% $

U246 M1-6812 26-Oct 30-Nov 2 W/D Pipe 300 BE S/10(OD323.9x4. A312-316L pc 3 669.52 686 L DDP 2-Nov 4-Nov 3-Nov 23-Nov 100% $

U246 M1-6812 26-Oct 30-Nov 2 W/D Pipe 300 BE S/10(OD323.9x4. A312-316L pc 21 4,610.00 686 L DDP 2-Nov 12-Dec 24-Nov 4-Dec 100% $

U246 M1-6340(R.2) 28-Aug 20-Oct 4-Sep 3 W/D Pipe 3" S/40(OD88.9xt5.5)-6M A53-B pc 165 11,177.10 310 F CFR 7-Sep 15-Nov 14-Nov 18-Nov 4-Dec 2-Jan L/C $

U246 M1-6340(R.2) 28-Aug 20-Oct 4-Sep 4 W/D Pipe 4" S/40(OD114.3xt6.02)-6M A53-B pc 1 96.48 310 F CFR 7-Sep 15-Nov 14-Nov 18-Nov 4-Dec 2-Jan L/C $

U246 M1-6340(R.2) 28-Aug 20-Oct 4-Sep 5 W/D Pipe 8" STD(OD219.1xt8.18)- A53-B pc 1 255.30 310 F CFR 7-Sep 15-Nov 14-Nov 18-Nov 4-Dec 2-Jan L/C $

U246 M1-6340(R.2) 28-Aug 20-Oct 4-Sep 7 W/D Pipe 450 BE STD(OD457.2xt9 A53-B pc 1 631.26 310 F CFR 7-Sep 15-Nov 14-Nov 18-Nov 4-Dec 2-Jan L/C $

U246 M1-6333(R.2) 28-Aug 20-Oct 4-Sep 1 W/D Pipe 3" STD(OD88.9xt5.49)-6 A53-B pc 768 52,024.30 310 F CFR 7-Sep 15-Nov 14-Nov 18-Nov 4-Dec 2-Jan L/C $

U246 M1-6333(R.2) 28-Aug 20-Oct 4-Sep 2 W/D Pipe 4" S/40(OD114.3xt6.02)-6M A53-B pc 75 7,236.00 310 F CFR 7-Sep 15-Nov 14-Nov 18-Nov 4-Dec 2-Jan L/C $

U246 M1-6333(R.2) 28-Aug 20-Oct 4-Sep 4 W/D Pipe 8" STD(OD219.1xt8.18)- A53-B pc 200 51,060.00 310 F CFR 7-Sep 15-Nov 14-Nov 18-Nov 4-Dec 2-Jan L/C $

U246 M1-6333(R.2) 28-Aug 20-Oct 4-Sep 5 W/D Pipe 10" STD(OD273.1xt9.27) A53-B pc 368 133,164.48 310 F CFR 7-Sep 15-Nov 14-Nov 18-Nov 4-Dec 2-Jan L/C $

U246 M1-6333(R.2) 28-Aug 20-Oct 4-Sep 9 W/D Pipe 450 BE STD(OD457.2xt9 A53-B pc 18 11,362.68 310 F CFR 7-Sep 15-Nov 14-Nov 18-Nov 4-Dec 2-Jan L/C $

U246 M1-6333(R.2) 28-Aug 20-Oct 4-Sep 10 W/D Pipe 500 BE STD(OD508xt9.5 A53-B pc 79 55,529.10 310 F CFR 7-Sep 15-Nov 14-Nov 18-Nov 4-Dec 2-Jan L/C $

U246 M1-6333(R.2) 28-Aug 20-Oct 4-Sep 7 W/D Pipe 350A BE STD(OD355.6xt A53-B pc 26 12,675.00 310 F CFR 7-Sep 15-Nov 29-Nov 4-Dec 27-Dec 23-Jan 100% $

U246 M1-6333(R.2) W/D Pipe 350A BE (OD355.6xt7.9 A53-B pc 26 12,675.00 310 CNF 14-Oct 22-Oct 9-Nov mistake 100% $

U246 M1-6787(R.1) 20-Oct 1 SMLS PIPE 150 S/10S(O.D168.3xt3. B466-C70600 pc 1 94.80 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

Page 48: Hvc PlatePipe Update)

HVC-PUR 48 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

U246 M1-6787(R.1) 20-Oct 2 SMLS PIPE 200 S/10S(O.D219.1xt3. B466-C70600 pc 1 121.02 301 F CFR 31-Aug 19-Nov 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6338(R.3) 28-Aug 20-Oct 1 SMLS PIPE 80 S/10S(O.D88.9xt3.05 B466-C70600 pc 35 1,554.00 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6338(R.3) 28-Aug 20-Oct 2 SMLS PIPE 100 S/10S(O.D114.3xt3. B466-C70600 pc 340 19,380.00 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6338(R.3) 28-Aug 20-Oct 2 SMLS PIPE 100 S/10S(O.D114.3xt3. B466-C70600 pc 272 15,504.00 301 F CFR 31-Aug 30-Oct 27-Oct 1-Nov 8-Nov 23-Jan 100% $

U246 M1-6338(R.3) 28-Aug 20-Oct 3 SMLS PIPE 150 S/10S(O.D168.3xt3. B466-C70600 pc 2 189.60 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6339 28-Aug 20-Oct 1 SMLS PIPE 100 S/10S(O.D114.3xt3. B466-C70600 pc 1 57.00 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6339 28-Aug 20-Oct 3 SMLS PIPE 250 PE S/10S(OD273.1x B466-C70600 pc 1 168.40 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6336(R.2) 28-Aug 20-Oct 4-Sep 1 W/D Pipe 80A S/10(OD88.9xt3.05) A312-304L pc 127 4,968.24 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6336(R.2) 28-Aug 20-Oct 4-Sep 2 W/D Pipe 100A S/10(O.D114.3xt3. A312-304L pc 111 5,627.70 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6635 28-Aug 20-Oct 4-Sep 3 W/D Pipe 80A S/10(OD88.9x3.05) A312-316L pc 244 9,603.80 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6635 28-Aug 20-Oct 4-Sep 4 W/D Pipe 100A S/10(OD114.3x3.05 A312-316L pc 93 4,748.60 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6635 28-Aug 20-Oct 4-Sep 5 W/D Pipe 150A S/10(OD168.3x3.4) A312-316L pc 39 3,290.04 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6635 28-Aug 20-Oct 4-Sep 6 W/D Pipe 200A S/10(OD219.1x3.76 A312-316L pc 40 4,872.00 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6635 28-Aug 20-Oct 4-Sep 7 W/D Pipe 250A S/10(OD273.1x4.19 A312-316L pc 9 1,525.50 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6635 28-Aug 20-Oct 4-Sep 8 W/D Pipe 400 BE S/10S(O.D406.4x A312-316L pc 48 13,861.40 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6635 28-Aug 20-Oct 4-Sep 9 W/D Pipe 450 BE S/10S(O.D457.2x A312-316L pc 28 9,109.00 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6635 28-Aug 20-Oct 4-Sep 10 W/D Pipe 600A S/10(O.D609.6xt6. A312-316L pc 7 4,033.30 301 F CFR 31-Aug 30-Oct 17-Nov 29-Nov 7-Dec 29-Jan 100% $

U246 M1-6340(R.2) 28-Aug 20-Oct 4-Sep 1 SMLS PIPE 25 S/80(OD33.4xt4.55)- A53-B pc 1 19.00 340 F FOB 22-Sep 7-Oct 2-Oct 11-Oct 13-Oct 4-Dec 100% $

U246 M1-6340(R.2) 28-Aug 20-Oct 4-Sep 6 W/D Pipe 400 BE STD(OD406.4xt9 A53-B pc 1 559.62 310 F CFR 7-Sep 15-Nov 14-Oct 22-Oct 9-Nov 28-Nov L/C $

U246 M1-6340(R.2) 28-Aug 20-Oct 4-Sep 8 W/D Pipe 600 BE STD(OD610xt9.5 A53-B pc 5 4,230.90 310 F CFR 7-Sep 15-Nov 14-Oct 22-Oct 9-Nov 28-Nov L/C $

U246 M1-6333(R.2) 28-Aug 20-Oct 4-Sep 3 W/D Pipe 6" STD(OD168.3xt7.11)- A53-B pc 11 1,865.20 310 F CFR 7-Sep 15-Nov 14-Oct 22-Oct 9-Nov 28-Nov L/C $

U246 M1-6333(R.2) 28-Aug 20-Oct 4-Sep 8 W/D Pipe 400 BE STD(OD406.4xt9 A53-B pc 212 118,639.44 310 F CFR 7-Sep 15-Nov 14-Oct 22-Oct 9-Nov 28-Nov L/C $

U246 M1-6333(R.2) 28-Aug 20-Oct 4-Sep 11 W/D Pipe 600 BE STD(OD610xt9.5 A53-B pc 7 5,923.26 310 F CFR 7-Sep 15-Nov 14-Oct 22-Oct 9-Nov 28-Nov L/C $

U246 M1-6337 28-Aug 15-Nov 1 PLATE 7 x 1524 x 7200 A240-316L sh 30 18,388.00 317 F FOB 7-Sep 30-Sep 20-Sep 30-Sep 4-Oct 26-Oct 100% $

Camau/A247-Duct

A247 M1-6537(R.1) 9-Aug 10-Oct 14-Aug 2 Plate 12 x 2438 x 6096 A36 sh 6 8,400.03 293 F FOB 23-Aug 2-Sep 20-Sep 30-Sep 4-Oct 28-Nov 100% $

A247 M1-6537(R.1) 9-Aug 10-Oct 14-Aug 4 Plate 6 x 1219 x 6096 A36 sh 157 54,950.00 293 F FOB 23-Aug 2-Sep 20-Sep 30-Sep 4-Oct 28-Nov 100% $

A247 M1-6537(R.1) 9-Aug 10-Oct 14-Aug 5 Plate 2 x 1219 x 6096 A36 sh 6 700.00 293 F FOB 23-Aug 2-Sep 20-Sep 30-Sep 4-Oct 28-Nov 100% $

A247 M1-6537(R.1) 9-Aug 10-Oct 14-Aug 6 Plate 2 x 1219 x 6096 A36 sh 190 22,167.00 293 F FOB 23-Aug 2-Sep 20-Sep 30-Sep 4-Oct 28-Nov 100% $

A247 M1-6537(R.1) 9-Aug 10-Oct 14-Aug 1 Plate 15 x 2438 x 6096 A36 sh 5 8,750.00 294 F FOB 23-Aug 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A247 M1-6537(R.1) 9-Aug 10-Oct 14-Aug 3 Plate 9 x 1524 x 6096 A36/SS400 sh 2 1,313.00 294 F FOB 23-Aug 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A247 M1-6537(R.1) 9-Aug 10-Oct 14-Aug 8 Plate 2 x 1219 x 3048 A240-409 sh 28 1,613.00 294 F FOB 23-Aug 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A247 M1-6537(R.1) 9-Aug 10-Oct 14-Aug 9 Plate 2 x 1219 x 2438 A240-409 sh 510 23,493.00 294 F FOB 23-Aug 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A247 M1-6530 9-Aug 10-Oct 1 SMLS PIPE 4" S/80(OD114.3 x t8.56)-6M A312-304 pc 4 541.20 281 F FOB 18-Aug 28-Aug 25-Aug 30-Aug 31-Aug 25-Sep 100% $

A247 M1-6530 9-Aug 10-Oct 2 SMLS PIPE 5"S/80(OD141.3x9.52t)- A312-304 pc 2 375.00 281 F FOB 18-Aug 28-Aug 25-Aug 30-Aug 31-Aug 25-Sep 100% $

Dinh Vu/K266

K266 C5- 1 Plate 6 x 1500 x 6096 SS400 sh 5 2,120.00 801 L DDP 21-Dec 24-Dec 24-Dec 26-Dec 100% VND

K266 C5-8394 2 Plate 1.6 x 1250 x coil roll kg 5,960.00 724 L DDP 14-Nov 17-Nov 20-Nov 19-Dec 100% VND

K266 C5-8575 2 Plate 2 x 1250 x coil roll kg 7,090.00 724 L DDP 14-Nov 17-Nov 20-Nov 19-Dec 100% VND

K266 C5-8575 1 Plate 12 x 1500 x 6000 SS400 sh 9 7,630.00 700 L DDP 5-Nov 7-Nov 12-Nov 14-Nov 100% VND

K266 C5-8394 1 Plate 6 x 1500 x 6000 SS400 sh 8 3,391.00 723 L DDP 14-Nov 17-Nov 15-Nov 19-Dec 100% VND

K266 C5-8394 2 Plate 6 x 1480 x 6000 SS400 sh 4 1,673.00 723 L DDP 14-Nov 17-Nov 15-Nov 19-Dec 100% VND

K266 C5-8338 1 W/D Pipe OD21.4 x 2.5-6M BPE-BSM pc 25 175.00 669 L DDP 25-Oct 27-Oct 27-Oct 8-Nov 100% VND

K266 C5-8338 2 W/D Pipe OD33.8 x 3.1-6M BPE-BSM pc 270 3,802.00 669 L DDP 25-Oct 27-Oct 27-Oct 8-Nov 100% VND

K266 M1-7881 27-Jul 10-Aug 1 SMLS Pipe 2" S/40(OD60.3xt3.91)-6 A106-B pc 4 131.00 223 F FOB 27-Jul 17-Aug 17-Aug 24-Aug 31-Aug 20-Sep 100% $

K266 M1-7881 27-Jul 10-Aug 2 W/D Pipe 1-1/4" (OD42.7x3.25)-6M SGP pc 2 38.00 223 F FOB 27-Jul 17-Aug 17-Aug 24-Aug 31-Aug 20-Sep 100% $

K266 M1-7165 8-Feb 15-Apr 1 Plate 46 x 2900 x 8490 SPV490 sh 2 17,780.00 28 F CFR 10-Feb 10-Aug 23-Aug Dalian 25/8 L/C $

K266 M1-7165 8-Feb 15-Apr 2 Plate 46 x 2900 x 8410 SPV490 sh 4 35,228.00 28 F CFR 10-Feb 10-Aug 23-Aug Dalian 25/8 L/C $

K266 M1-7165 8-Feb 15-Apr 3 Plate 46 x 2900 x 9490 SPV490 sh 8 79,496.00 28 F CFR 10-Feb 10-Aug 23-Aug Dalian 25/8 L/C $

K266 M1-7165 8-Feb 15-Apr 4 Plate 47.2 x 3360 x 6590 SPV490 sh 36 295,308.00 28 F CFR 10-Feb 10-Aug 23-Aug Dalian 25/8 L/C $

K266 M1-7165 8-Feb 15-Apr 5 Plate 47.5 x 3060 x 9390 SPV490 sh 40 428,520.00 28 F CFR 10-Feb 10-Aug 23-Aug Dalian 25/8 L/C $

K266 M1-7165 8-Feb 15-Apr 6 Plate 48 x 2900 x 8490 SPV490 sh 2 18,554.00 28 F CFR 10-Feb 10-Aug 23-Aug Dalian 25/8 L/C $

K266 M1-7165 8-Feb 15-Apr 7 Plate 48 x 2900 x 8410 SPV490 sh 4 36,760.00 28 F CFR 10-Feb 10-Aug 23-Aug Dalian 25/8 L/C $

Page 49: Hvc PlatePipe Update)

HVC-PUR 49 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K266 M1-7165 8-Feb 15-Apr 8 Plate 48 x 2900 x 9490 SPV490 sh 8 82,960.00 28 F CFR 10-Feb 10-Aug 23-Aug Dalian 25/8 L/C $

K266 M1-7165 8-Feb 15-Apr 9 Plate 14 x 3048 x 6096 SPV490 sh 10 20,420.00 28 F CFR 10-Feb 10-Aug 23-Aug Dalian 25/8 L/C $

K266 M1-7425 25-Apr 10-Jun 1 Plate 14 x 2900 x 6096 SS400 sh 30 58,286.00 123 F FOB 9-May 25-Jun 22-Jun 1-Jul 5-Jul 21-Jul L/C $

K266 M1-7425 25-Apr 10-Jun 2 Plate 40 x 2438 x 6096 SS400 sh 4 18,667.00 124 F FOB 9-May 25-Jun 12-Jun 19-Jun 26-Jun 11-Jul 100% $

K266 M1-7465(R.1) 7-May 20-Jun 9-May 2 SMLS Pipe 6" S/40 (O.D168.3xt7.11 A106-B pc 12 2,034.72 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

K266 M1-7465(R.1) 7-May 20-Jun 9-May 3 SMLS Pipe 8" S/40(OD219.1xt8.18)- A106-B pc 2 510.60 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

K266 M1-7465(R.1) 7-May 20-Jun 9-May 4 SMLS Pipe 1/2" S/80(O.D21.3xt3.73 A53-B pc 38 369.36 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

K266 M1-7465(R.1) 7-May 20-Jun 9-May 5 SMLS Pipe 3/4" S/160(O.D26.7xt5.5 A53-B pc 1 5.80 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

K266 M1-7465(R.1) 7-May 20-Jun 9-May 6 W/D Pipe 2" S/40(O.D60.3xt3.91)- A53-B pc 5 163.20 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

K266 M1-7465(R.1) 7-May 20-Jun 9-May 7 W/D Pipe 2 1/2" S/40(O.D73.0xt5.1 A53-B pc 16 828.48 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

K266 M1-7465(R.1) 7-May 20-Jun 9-May 8 W/D Pipe 3" S/40(O.D88.9xt5.49)- A53-B pc 22 1,490.00 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

K266 M1-7465(R.1) 7-May 20-Jun 9-May 9 W/D Pipe 4" S/40(OD114.3xt6.02)-6M A53-B pc 1 96.42 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

K266 M1-7465(R.1) 7-May 20-Jun 9-May 10 W/D Pipe 6" S/40(OD168.3xt7.11)- A53-B pc 8 1,356.48 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

K266 M1-7465(R.1) 7-May 20-Jun 9-May 11 W/D Pipe 10" S/30(O.D273 x t7.8)- A53-B pc 4 1,224.72 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

K266 M1-7465(R.1) 7-May 20-Jun 9-May 12 W/D Pipe 10A-2M SGP pc 1 1.74 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

K266 M1-7465(R.1) 7-May 20-Jun 9-May 13 W/D Pipe 32A-6M SGP pc 32 606.72 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

K266 M1-7527 18-May 20-Jun 1 SMLS Pipe 3" S/40(OD88.9 xt5.49)- A106-B pc 7 474.20 148 F FOB 28-May 8-Jun 17-Jun 22-Jun 29-Jun 9-Jul 100% $

K266 M1-7527 18-May 20-Jun 2 W/D Pipe 3" S/40(OD88.9 xt5.49)- A53-B pc 26 1,761.20 148 F FOB 28-May 8-Jun 17-Jun 22-Jun 29-Jun 9-Jul 100% $

Dung Quat/ K235

K235 SQ.Pipe 198 L DDP VND

K235 PR08042 1 SQ.Pipe 75x75x2.5-6M STK400 pc 122 4,135.00 234 L DDP 14-Apr 17-Apr 15-Apr OK 100% VND

K235 M1-6901 21-Nov 30-Dec 3 Plate 5 x 1524 x 6096 A36 sh 4 1,460.00 187 F FOB 25-Jun 25-Jul 4-Aug 15-Aug 17-Aug 6-Sep 100% $

K235 M1-7740 25-Jun 21-Jul 1 SMLS Pipe 3" S/40(OD88.9 xt5.49)- A106-B pc 25 1,694.00 200 F FOB 4-Jul 20-Jul 4-Aug 15-Aug 17-Aug 23-Aug 100% $

K235 M1-7740 25-Jun 21-Jul 2 SMLS Pipe 4" S/40(OD114.3x6.02)- A106-B pc 22 2,121.00 200 F FOB 4-Jul 20-Jul 4-Aug 15-Aug 17-Aug 23-Aug 100% $

K235 M1-7740 25-Jun 21-Jul 3 SMLS Pipe 5" S/40(OD141.3xt6.55)- A106-B pc 8 1,045.00 200 F FOB 4-Jul 20-Jul 4-Aug 15-Aug 17-Aug 23-Aug 100% $

K235 M1-7740 25-Jun 21-Jul 4 SMLS Pipe 6" S/40 (O.D168.3xt7.11 A106-B pc 3 509.00 200 F FOB 4-Jul 20-Jul 4-Aug 15-Aug 17-Aug 23-Aug 100% $

K235 M1-7740 25-Jun 21-Jul 5 SMLS Pipe 6" S/80(OD168.3xt10.97) A106-B pc 3 766.00 200 F FOB 4-Jul 20-Jul 4-Aug 15-Aug 17-Aug 23-Aug 100% $

K235 M1-7499(R.1) 14-May 28-Jun 15-May 1 Plate 8.5 x 2100 x 9800 A36 sh 1 1,373.00 123 F FOB 9-May 25-Jun 6-Jul 11-Jul 20-Jul 24-Jul L/C $

K235 M1-7499(R.1) 14-May 28-Jun 15-May 2 Plate 10 x 1829 x 9144 A36 sh 8 10,503.00 123 F FOB 9-May 25-Jun 22-Jun 1-Jul 5-Jul 21-Jul L/C $

K235 M1-7579 26-May 2-Jul 1 SMLS Pipe 3" S/40(OD88.9 xt5.49)- A106-B pc 80 5,420.00 109 F FOB 1-Jun 30-Jun 17-Jun 22-Jun 29-Jun 11-Jul 100% $

K235 M1-7579 26-May 2-Jul 2 SMLS Pipe 6" S/80(OD168.3xt10.97) A106-B pc 17 4,341.00 109 F FOB 1-Jun 30-Jun 17-Jun 22-Jun 29-Jun 11-Jul 100% $

K235 M1-7526(R.1) 18-May 2-Jul 1 SMLS Pipe 4" S/40(O.D114.3xt6.02) A106-B pc 8 771.40 148 F FOB 28-May 8-Jun 17-Jun 22-Jun 29-Jun 9-Jul 100% $

K235 M1-7526(R.1) 18-May 2-Jul 2 W/D Pipe 12" S/40 (OD323.9x9.52) A106-B pc 1 450.20 148 F FOB 28-May 8-Jun 17-Jun 22-Jun 29-Jun 9-Jul 100% $

K235 M1-7196 13-Feb 28-Mar 2 SMLS Pipe 3" S/40(OD88.9 xt5.49)- A106-B pc 20 1,354.80 43 F FOB 27-Feb 15-Mar 21-Mar 29-Mar 17-Apr a 100% $

K235 M1-7196 13-Feb 28-Mar 5 SMLS Pipe 6" S/40 (O.D168.3xt7.11 A106-B pc 20 3,391.20 43 F FOB 27-Feb 15-Mar 21-Mar 29-Mar 17-Apr a 100% $

K235 M1-7162 7-Feb 20-Mar 3 SMLS Pipe 3" S/40(OD88.9 xt5.49)- A106-B pc 60 4,064.40 43 F FOB 27-Feb 15-Mar 21-Mar 29-Mar 17-Apr a 100% $

K235 M1-7162 7-Feb 20-Mar 5 SMLS Pipe 6" S/40 (O.D168.3xt7.11 A106-B pc 69 11,699.64 43 F FOB 27-Feb 15-Mar 21-Mar 29-Mar 17-Apr a 100% $

K235 M1-7074(R.1) 11-Jan 8-Mar 1 Plate 5 x 1524 x 6096 A36 sh 77 28,077.00 8 F FOB 1-Feb 10-Mar 21-Apr 28-Apr Dungquat 14-Jun 100% $

K235 M1-7074(R.1) 11-Jan 8-Mar 2 Plate 9 x 1829 x 7500 A36 sh 26 25,198.00 8 F FOB 1-Feb 10-Mar 21-Apr 28-Apr Dungquat 14-Jun 100% $

K235 M1-7308 27-Mar 27-Apr 1 SMLS Pipe 4" S/40(OD114.3xt6.02)-6M A53-B pc 7 674.90 79 F FOB 9-Apr 13-Apr 16-Apr 19-Apr 7-May 17-May 100% $

K235 M1-7308 27-Mar 27-Apr 2 SMLS Pipe 6" S/40(OD168.3x7.11t)- A53-B pc 38 6,443.30 79 F FOB 9-Apr 13-Apr 16-Apr 19-Apr 7-May 17-May 100% $

K235 M1-7323 1 SMLS Pipe 3" S/40(OD88.9 xt5.49)- A106-B pc 36 2,438.60 79 F FOB 9-Apr 13-Apr 16-Apr 19-Apr 7-May 17-May 100% $

K235 M1-7323 2 SMLS Pipe 4" S/40(O.D114.3xt6.02) A106-B pc 23 2,217.70 79 F FOB 9-Apr 13-Apr 16-Apr 19-Apr 7-May 17-May 100% $

K235 M1-7196 13-Feb 28-Mar 1 SMLS Pipe 2" S/40(OD60.3xt3.91)-6 A106-B pc 6 195.84 43 F FOB 27-Feb 15-Mar 21-Mar 29-Mar 17-Apr 100% $

K235 M1-7196 13-Feb 28-Mar 3 SMLS Pipe 4" S/40(O.D114.3xt6.02) A106-B pc 180 17,355.60 43 F FOB 27-Feb 15-Mar 21-Mar 29-Mar 17-Apr 100% $

K235 M1-7196 13-Feb 28-Mar 4 SMLS Pipe 5" S/40(OD141.3xt6.55)- A106-B pc 118 15,413.16 43 F FOB 27-Feb 15-Mar 21-Mar 29-Mar 17-Apr 100% $

K235 M1-7196 13-Feb 28-Mar 6 SMLS Pipe 8" S/40(OD219.1xt8.18)- A106-B pc 8 2,042.40 43 F FOB 27-Feb 15-Mar 21-Mar 29-Mar 17-Apr 100% $

K235 M1-7162 7-Feb 20-Mar 1 SMLS Pipe 2" S/40(OD60.3xt3.91)-6 A106-B pc 21 685.44 43 F FOB 27-Feb 15-Mar 21-Mar 29-Mar 17-Apr 100% $

K235 M1-7162 7-Feb 20-Mar 2 SMLS Pipe 2 1/2" S/40(OD73.0xt5.1 A106-B pc 2 103.56 43 F FOB 27-Feb 15-Mar 21-Mar 29-Mar 17-Apr 100% $

K235 M1-7162 7-Feb 20-Mar 4 SMLS Pipe 4" S/40(O.D114.3xt6.02) A106-B pc 194 18,705.48 43 F FOB 27-Feb 15-Mar 21-Mar 29-Mar 17-Apr 100% $

K235 M1-7162 7-Feb 20-Mar 6 SMLS Pipe 8" S/40(OD219.1xt8.18)- A106-B pc 7 1,787.10 43 F FOB 27-Feb 15-Mar 21-Mar 29-Mar 17-Apr 100% $

K235 M1-6901 12-Feb 9-Mar 1 Plate 3 x 600 x 1900 Brass(C2801P) sh 1 30.00 50 F FOB 3-Mar 14-Mar 23-Mar 29-Mar 30-Mar 13-Apr 100% $

K235 M1-7145(R.2) 31-Jan 2-Mar 1 W/D Pipe 14" S/20 (OD355.6 x t7.9 A53-B pc 12 4,889.00 25 F CFR 3-Feb 3-Mar 21-Mar 29-Mar 6-Apr 12-Apr 100% $

Page 50: Hvc PlatePipe Update)

HVC-PUR 50 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K235 M1-7145(R.2) 31-Jan 2-Mar 2 W/D Pipe 16" S/20 (OD406.4 x t7.9 A53-B pc 4 3,736.00 25 F CFR 3-Feb 3-Mar 21-Mar 29-Mar 6-Apr 12-Apr 100% $

K235 M1-7091(R.1) 15-Jan 22-Feb 1 SMLS Pipe 1 1/2" S/40(OD48.3x3.68 A106-B pc 7 170.10 15 F FOB 20-Jan 23-Feb 9-Feb 14-Feb 23-Mar 29-Mar 100% $

K235 M1-7091(R.1) 15-Jan 22-Feb 2 SMLS Pipe 2" S/40(OD60.3xt3.91)-6 A106-B pc 7 228.48 15 F FOB 20-Jan 23-Feb 9-Feb 14-Feb 23-Mar 29-Mar 100% $

K235 M1-7091(R.1) 15-Jan 22-Feb 3 SMLS Pipe 3" S/40(OD88.9 xt5.49)- A106-B pc 100 6,774.00 15 F FOB 20-Jan 23-Feb 23-Feb 28-Feb 23-Mar 29-Mar 100% $

K235 M1-7091(R.1) 15-Jan 22-Feb 4 SMLS Pipe 4" S/40(O.D114.3xt6.02) A106-B pc 96 9,256.32 15 F FOB 20-Jan 23-Feb 23-Feb 28-Feb 23-Mar 29-Mar 100% $

K235 M1-7091(R.1) 15-Jan 22-Feb 5 SMLS Pipe 6" S/40 (O.D168.3xt7.11 A106-B pc 24 4,069.44 15 F FOB 20-Jan 23-Feb 23-Feb 28-Feb 23-Mar 29-Mar 100% $

K235 M1-7091(R.1) 15-Jan 22-Feb 6 SMLS Pipe 8" S/40(OD219.1xt8.18)- A106-B pc 9 2,297.70 15 F FOB 20-Jan 23-Feb 23-Feb 28-Feb 23-Mar 29-Mar 100% $

K235 M1-7091(R.1) 15-Jan 22-Feb 7 W/D Pipe 2 1/2" S/40(OD73.0x5.16 A106-B pc 19 620.20 15 F FOB 20-Jan 23-Feb 9-Feb 14-Feb 23-Mar 29-Mar 100% $

K235 M1-7091(R.1) 15-Jan 22-Feb 8 W/D Pipe 10" S/40(OD273.1x 9.27)-6 A312-304 pc 2 731.04 15 F FOB 20-Jan 23-Feb 9-Feb 14-Feb 23-Mar 29-Mar 100% $

K235 M1-7089 15-Jan 29-Jan 1 SMLS Pipe 3" S/40(OD88.9 xt5.49)- A106-B pc 35 2,370.90 15 F FOB 20-Jan 29-Jan 2-Feb 7-Feb 13-Feb 22-Feb 100% $

K235 M1-7089 15-Jan 29-Jan 2 SMLS Pipe 5" S/40(OD141.3xt6.55)- A106-B pc 90 11,755.80 15 F FOB 20-Jan 29-Jan 2-Feb 7-Feb 13-Feb 22-Feb 100% $

K235 M1-7194 13-Feb 15-Mar 1 W/D Pipe OD42.7x2.3-6M STK400 pc 120 1,650.00 98 L DDP 15-Feb 25-Feb 28-Feb 30-Mar 100% VND

K235 M1-7194 13-Feb 15-Mar 2 W/D Pipe OD60.5x4-6.5M STK400 pc 60 2,176.00 98 L DDP 15-Feb 25-Feb 28/2,1/3 30-Mar 100% VND

K235 M1-7161 7-Feb 20-Mar 1 W/D Pipe OD42.7x2.3-6M STK400 pc 295 4,056.00 98 L DDP 15-Feb 25-Feb 28-Feb 30-Mar 100% VND

K235 M1-7161 7-Feb 20-Mar 2 W/D Pipe OD60.5x4-6.5M STK400 pc 120 4,344.00 98 L DDP 15-Feb 25-Feb 28-Feb 30-Mar 100% VND

K235 M1-6885 15-Nov 29-Dec 1 Plate 16 x 2020 x 9290 A36 sh 16 37,710.00 388 F FOB 30-Nov 15-Jan 12-Feb 19-Feb 23-Mar 29-Mar 100% $

K235 M1-6901 21-Nov 30-Dec 5 Plate 9 x 2000 x 9144 A36 sh 6 7,752.00 399 F FOB 8-Dec 20-Jan 12-Feb 19-Feb 23-Mar 29-Mar 100% $

K235 M1-6901 21-Nov 30-Dec 6 Plate 10 x 2000 x 9144 A36 sh 1 1,436.00 399 F FOB 8-Dec 20-Jan 12-Feb 19-Feb 23-Mar 29-Mar 100% $

K235 M1-6901 21-Nov 30-Dec 7 Plate 12 x 2220 x 9144 A36 sh 19 36,332.00 399 F FOB 8-Dec 20-Jan 12-Feb 19-Feb 23-Mar 29-Mar 100% $

K235 M1-6901 21-Nov 30-Dec 8 Plate 14 x 2000 x 6096 A36 sh 2 2,680.00 399 F FOB 8-Dec 20-Jan 12-Feb 19-Feb 23-Mar 29-Mar 100% $

K235 M1-6901 21-Nov 30-Dec 9 Plate 25 x 2000 x 4000 A36 sh 1 1,570.00 399 F FOB 8-Dec 20-Jan 12-Feb 19-Feb 23-Mar 29-Mar 100% $

K235 M1-7034 3-Jan 8-Jan 1 W/D Pipe OD42.7 x t2.3-6M STK400 pc 782 10,753.00 16 L DDP 4-Jan 8-Jan 8-Jan 16-Jan 100% VND

K235 M1-7034 3-Jan 8-Jan 2 W/D Pipe OD60.5 x t4-6.5M STK400 pc 317 11,485.00 16 L DDP 4-Jan 8-Jan 8-Jan 16-Jan 100% VND

K235 M1-6819 27-Oct 6-Nov 1 W/D Pipe OD42.5 x t2.3-6M BPE-BSA pc 337 4,610.00 681 L DDP 1-Nov 3-Nov 2-Nov 20-Nov 100% VND

K235 M1-6819 27-Oct 6-Nov 2 W/D Pipe OD60.5 x t4-6M BPE-BSH pc 137 4,579.00 681 L DDP 1-Nov 3-Nov 2-Nov 20-Nov 100% VND

K235 M1-6298(R.3) 22-Jun 25-Oct 2 SMLS PIPE 1" S/40 (OD33.4xt3.38)- A106-B pc 3 45.00 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 4 SMLS PIPE 1-1/2" S/160 (OD48.3xt7 A106-B pc 51 2,217.62 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 5 W/D PIPE 3" S/80 (OD88.9xt7.62)- A53-B pc 20 1,893.50 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 6 W/D PIPE 3" S/80 (OD88.9xt7.62)- A53-B pc 22 2,284.40 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 6 W/D PIPE 3" S/80 (OD88.9xt7.62)- A53-B pc 240 21,989.00 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 7 W/D PIPE 4" S/80 (OD114.3xt8.56) A53-B pc 102 13,659.80 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 11 SMLS PIPE 2" S/40(OD60.3xt3.91)-6 A106-B pc 59 1,925.76 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 12 SMLS PIPE 2" S/80 (OD60.3xt5.54)- A106-B pc 1 44.90 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 13 SMLS PIPE 2" S/160(OD60.3x8.7t)-6 A106-B pc 114 7,599.24 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 14 SMLS PIPE 3" S/80 (OD88.9xt7.62)- A106-B pc 198 18,745.45 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 15 SMLS PIPE 4"S/80(OD114.3x8.56t)- A106-B pc 15 2,008.80 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 16 SMLS PIPE 6" S/40 (O.D168.3xt7.11 A106-B pc 59 10,004.04 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 17 SMLS PIPE 6" S/80(OD168.3xt10.97) A106-B pc 3 766.10 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 18 SMLS PIPE 8" S/40(OD219.1xt8.18)- A106-B pc 14 3,574.20 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 19 SMLS PIPE 8" S/80 (OD219.1xt12.7) A106-B pc 8 3,102.70 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 20 SMLS PIPE 10" S/XS (OD273.1xt12.7 A106-B pc 2 978.60 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 21 SMLS PIPE 12" S/40 (OD323.9xt10.3 A106-B pc 33 15,786.54 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 22 SMLS PIPE 12" S/80 (OD323.9xt17.4 A106-B pc 1 132.08 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 23 SMLS PIPE 10" S/80 (OD273.1xt15.0 A106-B pc 2 1,152.10 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 24 SMLS PIPE 10" S/80 (OD273.1xt15.0 A106-B pc 1 288.03 232 F FOB 7-May 30-Sep 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6159 27-May 10-Jul 5 W/D Pipe 10" S/30(OD273.1xt7.8)- A53-B pc 6 4,161.46 189 F FOB 8-Jun 7-Aug 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6159 27-May 10-Jul 6 W/D Pipe 12" S/30 (OD323.9xt8.38 A53-B pc 26 19,495.54 189 F FOB 8-Jun 7-Aug 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6159 27-May 10-Jul 7 W/D Pipe 14" S/20 (OD355.6xt7.92 A53-B pc 74 57,786.65 189 F FOB 8-Jun 7-Aug 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6159 27-May 10-Jul 8 W/D Pipe 16" S/20 (OD406.4xt7.92 A53-B pc 8 3,735.84 189 F FOB 8-Jun 7-Aug 20-Sep 30-Sep 4-Oct 100% $

K235 M1-6159 27-May 10-Jul 1 W/D Pipe 1" S/40(OD33.4xt3.38)-6M A53-B pc 1 15.00 189 F FOB 8-Jun 7-Aug 13-Aug 19-Aug 23-Aug 27-Sep 100% $

K235 M1-6159 27-May 10-Jul 2 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 2 48.60 189 F FOB 8-Jun 7-Aug 13-Aug 19-Aug 23-Aug 27-Sep 100% $

K235 M1-6159 27-May 10-Jul 3 W/D Pipe 3" S/80 (OD88.9xt7.62)- A53-B pc 29 2,656.98 189 F FOB 8-Jun 7-Aug 13-Aug 19-Aug 23-Aug 27-Sep 100% $

K235 M1-6159 27-May 10-Jul 4 W/D Pipe 4" S/80 (OD114.3xt8.56) A53-B pc 10 1,339.20 189 F FOB 8-Jun 7-Aug 13-Aug 19-Aug 23-Aug 27-Sep 100% $

Page 51: Hvc PlatePipe Update)

HVC-PUR 51 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K235 M1-6159 27-May 10-Jul 23 W/D Pipe 8" S/40(OD219.1xt8.18)-6M A312-304 pc 5 1,289.40 189 F FOB 8-Jun 7-Aug 13-Aug 19-Aug 23-Aug 27-Sep 100% $

K235 M1-6159 27-May 10-Jul 24 W/D Pipe 10" S/40(OD273.1x 9.27)-6 A312-304 pc 9 3,289.68 189 F FOB 8-Jun 7-Aug 13-Aug 19-Aug 23-Aug 27-Sep 100% $

K235 M1-6159 27-May 10-Jul 25 W/D Pipe 12" S/40(OD323.9xt9.52) A312-304 pc 4 1,789.20 189 F FOB 8-Jun 7-Aug 13-Aug 19-Aug 23-Aug 27-Sep 100% $

K235 M1-6298(R.3) 22-Jun 25-Oct 1 W/D PIPE 1/2" S/40(OD21.3x2.77)-6M A53-B pc 22 167.64 235 F CFR 7-Jul 20-Oct 5-Sep 10-Sep 19-Sep 27-Sep L/C $

K235 M1-6298(R.3) 22-Jun 25-Oct 3 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 11 267.30 235 F CFR 7-Jul 20-Oct 5-Sep 10-Sep 19-Sep 27-Sep L/C $

K235 M1-6298(R.3) 22-Jun 25-Oct 8 W/D PIPE 12" S/30 (OD323.9xt8.38 A53-B pc 40 31,286.40 235 F CFR 7-Jul 20-Oct 5-Sep 10-Sep 19-Sep 27-Sep L/C $

K235 M1-6298(R.3) 22-Jun 25-Oct 9 W/D PIPE 14" S/20 (OD355.6xt7.92 A53-B pc 56 45,628.80 235 F CFR 7-Jul 20-Oct 5-Sep 10-Sep 19-Sep 27-Sep L/C $

K235 M1-6298(R.3) 22-Jun 25-Oct 10 W/D PIPE 16" S/20 (OD406.4xt8.90 A53-B pc 2 2,093.78 235 F CFR 7-Jul 20-Oct 5-Sep 10-Sep 19-Sep 27-Sep L/C $

K235 M1-6298(R.3) 22-Jun 25-Oct 23 W/D PIPE 8" S/40(OD219.1xt8.18)-6M A312-304 pc 4 1,031.50 235 F CFR 7-Jul 5-Sep 21-Aug 25-Aug 5-Sep 27-Sep L/C $

K235 M1-6298(R.3) 22-Jun 25-Oct 24 W/D PIPE 10" S/40(OD273.1x 9.27)-6 A312-304 pc 10 3,655.20 235 F CFR 7-Jul 5-Sep 21-Aug 25-Aug 5-Sep 27-Sep L/C $

K235 M1-6298(R.3) 22-Jun 25-Oct 25 W/D PIPE 12" S/40(OD323.9xt9.52) A312-304 pc 6 2,683.80 235 F CFR 7-Jul 5-Sep 21-Aug 25-Aug 5-Sep 27-Sep L/C $

K235 M1-6193 1-Jun 15-Aug 1 Plate 6 x 1219 x 6096 A36 sh 34 11,900.04 184 F FOB 6-Jun 10-Jul 23-Jul 1-Aug HP-Dung Quat OK 100% $

K235 M1-6194 1-Jun 15-Aug 1 SMLS Pipe 1-1/2" S/160 (OD48.3xt7 A106-B pc 26 1,131.00 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 9 SMLS Pipe 2" S/40(OD60.3xt3.91)-6 A106-B pc 25 816.00 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 10 SMLS Pipe 2" S/80 (OD60.3xt5.54)- A106-B pc 1 44.88 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 11 SMLS Pipe 2" S/160(OD60.3x8.7t)-6 A106-B pc 34 2,266.40 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 12 SMLS Pipe 4" S/40(O.D114.3xt6.02) A106-B pc 27 2,603.34 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 13 SMLS Pipe 4"S/80(OD114.3x8.56t)- A106-B pc 7 937.44 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 14 SMLS Pipe 6" S/40 (O.D168.3xt7.11 A106-B pc 25 4,239.00 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 15 SMLS Pipe 6" S/80(OD168.3xt10.97) A106-B pc 7 1,787.52 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 16 SMLS Pipe 8" S/40(OD219.1xt8.18)- A106-B pc 1 255.30 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 17 SMLS Pipe 8" S/80 (OD219.1xt12.7) A106-B pc 3 1,163.52 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 18 SMLS Pipe 10" S/40 (OD273.1xt9.27 A106-B pc 1 361.86 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 19 SMLS Pipe 10" S/XS (OD273.1xt12.7 A106-B pc 1 489.30 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 20 SMLS Pipe 12" S/40 (OD323.9xt10.3 A106-B pc 5 2,391.90 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 21 SMLS Pipe 12" SCH.XS (OD323.9xt1 A106-B pc 1 584.76 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-6159 27-May 10-Jul 22 SMLS Pipe 14" S/40 (OD355.6xt11.1 A106-B pc 1 567.30 189 F FOB 8-Jun 18-Jun 20-Jun 27-Jun Da nang port 100% $

K235 M1-5988(R.2) 14-Apr 14-Jun 1 Plate 6.5 x 1829 x 8400 A36 sh 16 12,544.00 139 F FOB 10-May 30-Jun 12-Jun 20-Jun Dung Quat 100% $

K235 M1-5988(R.2) 14-Apr 14-Jun 2 Plate 6.5 x 1829 x 9144 A36 sh 2 1,706.00 139 F FOB 10-May 30-Jun 12-Jun 20-Jun Dung Quat 100% $

K235 M1-6087(R.1) 9-May 1-Mar Plate 6.5 x 1829 x 9144 A36 sh 6 5,118.00 139 F FOB 10-May 30-Jun 12-Jun 20-Jun Dung Quat 100% $

K235 M1-6010(R.2) 8-May 2 Plate 6.5 x 1829 x 6096 A36 sh 19 10,811.00 139 F FOB 10-May 30-Jun 12-Jun 20-Jun Dung Quat 100% $

K235 M1-6010(R.2) 8-May 3 Plate 6.5 x 1829 x 9144 A36 sh 6 5,118.00 139 F FOB 10-May 30-Jun 12-Jun 20-Jun Dung Quat 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 1 Plate 6.5 x 1829 x 10200 A36 sh 54 51,403.30 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 2 Plate 6.5 x 1829 x 5900 A36 sh 156 85,896.10 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 3 Plate 6.5 x 1829 x 9500 A36 sh 20 17,731.70 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 3 Plate 6.5 x 1829 x 9500 A36 sh 42 37,236.60 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 4 Plate 6.5 x 1829 x 9250 A36 sh 18 15,538.60 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 5 Plate 6.5 x 1829 x 8750 A36 sh 10 8,165.90 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 6 Plate 6.5 x 1829 x 9300 A36 sh 6 5,207.50 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 6 Plate 6.5 x 1829 x 9300 A36 sh 7 6,075.40 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 7 Plate 6.5 x 1829 x 8400 A36 sh 5 3,919.60 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 8 Plate 6.5 x 1829 x 9000 A36 sh 9 7,559.30 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 9 Plate 6.5 x 1829 x 8900 A36 sh 8 6,644.70 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 10 Plate 6.5 x 1829 x 9700 A36 sh 11 9,957.70 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 11 Plate 6.5 x 1829 x 9144 A36 sh 319 272,222.30 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 11 Plate 6.5 x 1829 x 9144 A36 sh 269 229,554.20 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 11 Plate 6.5 x 1829 x 9144 A36 sh 164 139,951.30 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 12 Plate 6.5 x 1829 x 10100 A36 sh 9 8,483.20 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 13 Plate 6.5 x 1829 x 9800 A36 sh 105 96,031.10 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 15 Plate 8.5 x 1829 x 9144 A36 sh 318 354,867.00 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 15 Plate 8.5 x 1829 x 9144 A36 sh 185 206,447.80 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 15 Plate 8.5 x 1829 x 9144 A36 sh 257 286,795.00 97 F FOB 7-Apr 30-May 12-Jun 20-Jun Dung Quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 1 Plate 6.5 x 1829 x 9660 A36 SH 9 8,113.70 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

Page 52: Hvc PlatePipe Update)

HVC-PUR 52 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K235 M1-5849(R.2) 20-Mar 20-May 2 Plate 6.5 x 1829 x 4930 A36 SH 18 8,281.60 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 3 Plate 6.5 x 1829 x 9144 A36 SH 404 344,758.00 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 4 Plate 8.5 x 2200 x 4600 A36 SH 28 18,907.20 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 5 Plate 8.5 x 2200 x 4650 A36 SH 20 13,651.90 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 6 Plate 8.5 x 2200 x 4800 A36 SH 9 6,341.50 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 7 Plate 8.5 x 2200 x 5150 A36 SH 12 9,071.90 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 8 Plate 8.5 x 1829 x 9144 A36 SH 389 434,098.30 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 9 Plate 8.5 x 1870 x 9450 A36 SH 9 10,612.00 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 10 Plate 8.5 x 1880 x 9140 A36 SH 20 22,931.00 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 11 Plate 8.5 x 2095 x 9800 A36 SH 18 24,658.00 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 12 Plate 8.5 x 2130 x 10110 A36 SH 12 17,243.00 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 13 Plate 8.5 x 2270 x 10110 A36 SH 24 36,751.60 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 14 Plate 8.5 x 2100 x 9115 A36 SH 28 35,762.00 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 15 Plate 8.5 x 2360 x 9115 A36 SH 28 40,189.70 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 16 Plate 8.5 x 2438 x 9140 A36 SH 40 59,474.20 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 17 Plate 8.5 x 2438 x 9450 A36 SH 27 41,506.70 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 18 Plate 8.5 x 2438 x 9800 A36 SH 18 28,696.00 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 19 Plate 9 x 2200 x 4950 A36 SH 9 6,924.40 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 20 Plate 9 x 2360 x 9115 A36 SH 28 42,553.90 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 21 Plate 9 x 2438 x 9140 A36 SH 20 31,486.30 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 22 Plate 10 x 2270 x 10110 A36 SH 12 21,618.60 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 23 Plate 10 x 2438 x 9450 A36 SH 9 16,277.10 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 24 Plate 10 x 2438 x 9800 A36 SH 9 16,880.00 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 25 Plate 11 x 2360 x 9115 A36 SH 28 52,010.30 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 26 Plate 11 x 2438 x 9140 A36 SH 20 38,483.30 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 27 Plate 11 x 2438 x 9450 A36 SH 9 17,904.80 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 28 Plate 12 x 2438 x 9140 A36 SH 20 41,981.80 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 29 Plate 12 x 2438 x 9800 A36 SH 9 20,256.00 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 30 Plate 13 x 2270 x 10110 A36 SH 12 28,104.20 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 31 Plate 13 x 2438 x 9450 A36 SH 10 23,511.40 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 32 Plate 14 x 2360 x 9115 A36 SH 28 66,194.90 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 33 Plate 14 x 2438 x 9140 A36 SH 20 48,978.70 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 34 Plate 14 x 2438 x 9800 A36 SH 9 23,632.00 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 35 Plate 15 x 2270 x 10110 A36 SH 12 32,427.90 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 36 Plate 16 x 2360 x 9115 A36 SH 28 75,651.30 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 37 Plate 16 x 2438 x 9140 A36 SH 22 61,573.30 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 38 Plate 16 x 2438 x 9800 A36 SH 10 30,008.90 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 39 Plate 17 x 2270 x 10110 A36 SH 12 36,751.60 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 40 Plate 19 x 2360 x 9115 A36 SH 28 89,835.90 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 41 Plate 20 x 2270 x 10110 A36 SH 12 43,237.20 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 42 Plate 22 x 2270 x 10110 A36 SH 13 51,524.40 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 43 Plate 22 x 2360 x 9115 A36 SH 28 104,020.50 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-5849(R.2) 20-Mar 20-May 44 Plate 25 x 2360 x 9115 A36 SH 30 126,648.40 73 F CFR 20-Mar 30-May 12-Jun 20-Jun Dung quat L/C $

K235 M1-6010(R.2) 8-May 1 Plate 5 x 1524 x 6096 A36 sh 4 1,458.58 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6010(R.2) 8-May 4 Plate 9 x 2000 x 7500 A36 sh 2 2,119.50 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6010(R.2) 8-May 5 Plate 9 x 2000 x 9144 A36 sh 6 7,752.28 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6010(R.2) 8-May 6 Plate 10 x 2000 x 9144 A36 sh 5 7,178.04 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6010(R.2) 8-May 7 Plate 12 x 2000 x 6096 A36 sh 3 3,445.46 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6010(R.2) 8-May 8 Plate 12 x 2000 x 9144 A36 sh 8 13,781.84 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6010(R.2) 8-May 9 Plate 14 x 2000 x 6096 A36 sh 1 1,339.90 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6010(R.2) 8-May 10 Plate 14 x 2000 x 6400 A36 sh 1 1,406.72 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6010(R.2) 8-May 11 Plate 14 x 2000 x 8000 A36 sh 1 1,758.40 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6010(R.2) 8-May 12 Plate 19 x 2000 x 6096 A36 sh 1 1,818.44 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

Page 53: Hvc PlatePipe Update)

HVC-PUR 53 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K235 M1-6010(R.2) 8-May 13 Plate 19 x 2000 x 8000 A36 sh 3 7,159.20 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6010(R.2) 8-May 14 Plate 23 x 2000 x 8000 A36 sh 4 11,555.20 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6010(R.2) 8-May 15 Plate 26 x 2000 x 5000 A36 sh 1 2,041.00 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 14 Plate 8.5 x 2000 x 9144 A36 sh 28 34,167.50 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 16 Plate 8.5 x 2000 x 9800 A36 sh 36 47,081.20 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 17 Plate 8.5 x 2000 x 9320 A36 sh 24 29,850.00 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 18 Plate 8.5 x 2000 x 9800 A36 sh 36 47,081.20 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 13-Apr 18a Plate 8.5 x 2000 x 9290 A36 sh 16 19,836.00 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 19 Plate 8.5 x 2000 x 9450 A36 sh 24 30,266.50 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 20 Plate 8.5 x 2000 x 10080 A36 sh 30 40,355.30 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 21 Plate 8.5 x 2000 x 9320 A36 sh 36 44,775.10 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 22 Plate 8.5 x 2000 x 9100 A36 sh 9 10,929.60 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 23 Plate 8.5 x 2100 x 8610 A36 sh 12 14,477.50 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 24 Plate 8.5 x 2100 x 9450 A36 sh 72 95,339.30 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 25 Plate 8.5 x 2100 x 9710 A36 sh 24 32,654.10 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 26 Plate 8.5 x 2100 x 9790 A36 sh 14 19,205.20 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 27 Plate 8.5 x 2000 x 4350 A36 sh 12 6,966.10 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 28 Plate 8.5 x 2000 x 4650 A36 sh 9 5,584.90 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 29 Plate 8.5 x 2000 x 4750 A36 sh 16 10,142.20 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 30 Plate 8.5 x 2100 x 4950 A36 sh 12 8,323.30 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 31 Plate 8.5 x 2100 x 5000 A36 sh 14 9,808.60 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 32 Plate 8.5 x 2000 x 5150 A36 sh 10 6,872.70 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 33 Plate 8.5 x 2438 x 9100 A36 sh 36 53,292.50 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 34 Plate 8.5 x 2438 x 9790 A36 sh 14 22,296.30 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 35 Plate 8.5 x 2438 x 9020 A36 sh 32 46,954.70 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 36 Plate 8.5 x 2438 x 8610 A36 sh 24 33,615.28 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 37 Plate 8.5 x 2438 x 9020 A36 sh 32 46,954.67 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 38 Plate 8.5 x 2438 x 9290 A36 sh 48 72,540.30 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 39 Plate 8.5 x 2438 x 9320 A36 sh 48 72,774.53 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 40 Plate 8.5 x 2438 x 9800 A36 sh 18 28,695.97 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 41 Plate 8.5 x 2438 x 10080 A36 sh 10 16,397.70 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 42 Plate 9 x 2000 x 4600 A36 sh 16 10,399.70 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 43 Plate 9 x 2000 x 4800 A36 sh 24 16,277.80 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 44 Plate 9 x 2100 x 4800 A36 sh 24 17,091.60 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 28-May 13-Apr 44a Plate 9 x 2000 x 4750 A36 sh 12 8,054.10 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 28-May 13-Apr 44b Plate 9 x 2000 x 5000 A36 sh 18 12,717.00 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 45 Plate 9 x 2438 x 9790 A36 sh 14 23,607.90 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 46 Plate 9 x 2438 x 8610 A36 sh 12 17,796.32 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 47 Plate 9 x 2438 x 9710 A36 sh 12 20,070.00 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 48 Plate 10 x 2000 x 9320 A36 sh 12 17,558.90 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 49 Plate 10 x 2438 x 9100 A36 sh 9 15,674.30 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 50 Plate 10 x 2438 x 8610 A36 sh 12 19,773.69 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 51 Plate 10 x 2438 x 9020 A36 sh 16 27,620.39 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 53 Plate 10 x 2438 x 9320 A36 sh 24 42,808.50 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 53 Plate 10 x 2438 x 9320 A36 sh 16 28,539.00 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 54 Plate 10 x 2438 x 9800 A36 sh 18 33,759.96 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 55 Plate 10 x 2438 x 10080 A36 sh 10 19,291.41 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 56 Plate 11 x 2438 x 8610 A36 sh 13 23,563.65 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 57 Plate 11 x 2438 x 9020 A36 sh 16 30,382.43 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 58 Plate 11 x 2438 x 9290 A36 sh 16 31,291.89 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 59 Plate 11 x 2438 x 9450 A36 sh 24 47,746.23 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 60 Plate 11 x 2438 x 9710 A36 sh 12 24,529.94 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 61 Plate 12 x 2220 x 9100 A36 sh 9 17,127.26 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

Page 54: Hvc PlatePipe Update)

HVC-PUR 54 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 62 Plate 12 x 2320 x 9790 A36 sh 14 29,953.64 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 63 Plate 12 x 2438 x 9320 A36 sh 24 51,370.26 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 64 Plate 12 x 2438 x 9800 A36 sh 18 40,511.95 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 65 Plate 12 x 2438 x 10080 A36 sh 10 23,149.69 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 66 Plate 13 x 2220 x 9100 A36 sh 10 20,616.14 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 67 Plate 13 x 2438 x 9020 A36 sh 18 40,394.83 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 68 Plate 13 x 2438 x 9290 A36 sh 16 36,981.32 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 69 Plate 13 x 2438 x 9450 A36 sh 12 28,213.70 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 70 Plate 13 x 2438 x 9450 A36 sh 24 56,427.36 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 71 Plate 14 x 2438 x 9290 A36 sh 17 42,315.16 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 72 Plate 14 x 2438 x 9800 A36 sh 12 31,509.30 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 73 Plate 14 x 2438 x 9800 A36 sh 18 47,263.95 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 74 Plate 15 x 2320 x 9790 A36 sh 14 37,442.05 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 75 Plate 15 x 2438 x 9320 A36 sh 36 96,319.24 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 76 Plate 15 x 2438 x 10080 A36 sh 10 28,937.11 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 77 Plate 16 x 2438 x 9450 A36 sh 24 69,449.06 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 78 Plate 16 x 2438 x 9800 A36 sh 12 36,010.60 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 79 Plate 16 x 2438 x 9800 A36 sh 20 60,017.71 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 80 Plate 17 x 2320 x 9790 A36 sh 14 42,434.32 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 81 Plate 17 x 2438 x 9320 A36 sh 24 72,774.53 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 82 Plate 17 x 2438 x 10080 A36 sh 10 32,795.39 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 83 Plate 18 x 2438 x 9450 A36 sh 12 39,065.10 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 84 Plate 18 x 2438 x 9450 A36 sh 24 78,130.20 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 85 Plate 19 x 2438 x 9710 A36 sh 12 42,369.90 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 86 Plate 19 x 2438 x 10080 A36 sh 11 40,319.04 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 87 Plate 20 x 2320 x 9790 A36 sh 14 49,922.73 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 88 Plate 20 x 2438 x 9320 A36 sh 26 92,751.86 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 89 Plate 21 x 2438 x 9450 A36 sh 12 45,575.90 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 90 Plate 21 x 2438 x 9450 A36 sh 26 98,747.89 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 91 Plate 21 x 2438 x 9710 A36 sh 13 50,732.38 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 92 Plate 23 x 2320 x 9790 A36 sh 14 57,411.14 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6011(R.1) 29-Mar 28-May 13-Apr 93 Plate 23 x 2438 x 9320 A36 sh 13 53,332.32 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-5898(R.4) 29-Mar 28-May 13-Apr 94 Plate 26 x 1550 x 8650 A36 sh 4 10,945.88 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6012(R.1) 29-Mar 28-May 13-Apr 95 Plate 26 x 2320 x 9790 A36 sh 15 69,535.24 130 F CFR 8-May 15-Sep 20-Sep 4-Oct KyHa port 100% $

K235 M1-6576 19-Aug 31-Oct 1 SMLS PIPE 1" S/40 (OD33.4xt3.38)- A106-B pc 2 30.00 304 F FOB 4-Sep 15-Sep 15-Sep 20-Sep 27-Sep 26-Oct 100% $

K235 M1-6576 19-Aug 31-Oct 2 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 4 97.00 304 F FOB 4-Sep 15-Sep 15-Sep 20-Sep 27-Sep 26-Oct 100% $

K235 M1-6576 19-Aug 31-Oct 3 W/D PIPE 10" S/40(OD273.1xt9.27) A53-B pc 2 724.00 304 F FOB 4-Sep 15-Sep 15-Sep 20-Sep 27-Sep 26-Oct 100% $

K235 M1-6576 19-Aug 31-Oct 4 W/D PIPE 10" S/40(OD273.1x 9.27)-6 A312-304 pc 2 731.00 304 F FOB 4-Sep 15-Sep 15-Sep 20-Sep 27-Sep 26-Oct 100% $

K235 M1-6576 19-Aug 31-Oct 5 W/D PIPE 12" S/40(OD323.9xt9.52) A312-304 pc 3 1,342.00 304 F FOB 4-Sep 15-Sep 15-Sep 20-Sep 27-Sep 26-Oct 100% $

Dung Quat/K290

K290 M1-8335 23-Oct 1 Plate 6 x 1524 x 8900 A36 sh 5 3,194.23 335 F FOB 29-Oct 30-Nov 20-Nov 10-Dec 13-Dec 19-Dec 100% $

K290 M1-8335 23-Oct 2 Plate 8 x 1524 x 6400 A36 sh 26 15,925.68 335 F FOB 29-Oct 30-Nov 20-Nov 10-Dec 13-Dec 19-Dec 100% $

K290 M1-8335 23-Oct 3 Plate 8 x 1524 x 8600 A36 sh 10 8,230.82 335 F FOB 29-Oct 30-Nov 20-Nov 10-Dec 13-Dec 19-Dec 100% $

K290 M1-8335 23-Oct 4 Plate 9 x 1219 x 2438 A36 sh 1 209.97 335 F FOB 29-Oct 30-Nov 20-Nov 10-Dec 13-Dec 19-Dec 100% $

K290 M1-8335 23-Oct 5 Plate 10 x 2438 x 6096 A36 sh 1 1,166.67 335 F FOB 29-Oct 30-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

K290 M1-8335 23-Oct 6 Plate 14 x 2438 x 6096 A36 sh 1 1,633.34 335 F FOB 29-Oct 30-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

K290 M1-8335 23-Oct 7 Plate 15 x 1219 x 2438 A36 sh 1 349.94 335 F FOB 29-Oct 30-Nov 20-Nov 10-Dec 13-Dec 19-Dec 100% $

K290 M1-8335 23-Oct 8 Plate 18 x 2438 x 6096 A36 sh 1 2,100.00 335 F FOB 29-Oct 30-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

K290 M1-8335 23-Oct 9 Plate 20 x 1219 x 2438 A36 sh 1 466.59 335 F FOB 29-Oct 30-Nov 20-Nov 10-Dec 13-Dec 19-Dec 100% $

K290 M1-8337 23-Oct 1 Plate 5 x 1500 x 6000 A240-304 sh 1 357.00 677 L DDP 29-Oct 8-Nov 7-Nov 28-Dec 100% VND

K290 M1-8337 23-Oct 2 Plate 6 x 1500 x 6000 A240-304 sh 6 2,569.00 677 L DDP 29-Oct 8-Nov 7-Nov 28-Dec 100% VND

K290 M1-8337 23-Oct 3 Plate 12 x 1500 x 3000 A240-304L sh 1 428.00 677 L DDP 29-Oct 8-Nov 7-Nov 28-Dec 100% VND

K290 M1-8355 31-Oct 24-Nov 1 SMLS Pipe 2" S/40(OD60.3x3.91t)-3 A53-B/A106-B pc 1 16.00 341 F FOB 5-Nov 23-Nov 20-Nov 10-Dec 13-Dec 18-Dec 100% $

Page 55: Hvc PlatePipe Update)

HVC-PUR 55 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K290 M1-8355 31-Oct 24-Nov 2 W/D Pipe OD42.7xt3.56-6M A53-B pc 26 536.00 341 F FOB 5-Nov 23-Nov 20-Nov 10-Dec 13-Dec 18-Dec 100% $

K290 M1-8355 31-Oct 24-Nov 3 W/D Pipe OD60.3xt3.91-6M A53-B pc 15 486.00 341 F FOB 5-Nov 23-Nov 20-Nov 10-Dec 13-Dec 18-Dec 100% $

K290 M1-8355 31-Oct 24-Nov 4 SMLS Pipe 3" S/80(OD88.9x7.62t)-6 A106-B pc 1 92.00 341 F FOB 5-Nov 23-Nov 20-Nov 10-Dec 13-Dec 18-Dec 100% $

K290 M1-8355 31-Oct 24-Nov 5 SMLS Pipe 4" S/80(OD114.3x8.56t)- A106-B pc 1 67.00 341 F FOB 5-Nov 23-Nov 20-Nov 10-Dec 13-Dec 18-Dec 100% $

K290 M1-8355 31-Oct 24-Nov 6 SMLS Pipe 1" S/80(OD33.4x4.55t)-6 A312-304L pc 3 59.00 341 F FOB 5-Nov 23-Nov 20-Nov 10-Dec 13-Dec 18-Dec 100% $

K290 M1-8355 31-Oct 24-Nov 7 SMLS Pipe 3" S/80(OD88.9xt7.62)-6M A312-304L pc 1 93.00 341 F FOB 5-Nov 23-Nov 20-Nov 10-Dec 13-Dec 18-Dec 100% $

K290 M1-8355 31-Oct 24-Nov 8 SMLS Pipe 1 1/2" S/80S(OD48.3x5.0 A312-304L pc 1 33.00 341 F FOB 5-Nov 23-Nov 20-Nov 10-Dec 13-Dec 18-Dec 100% $

K290 M1-8355 31-Oct 24-Nov 9 SMLS Pipe 2" S/80 (OD60.3x5.54t) - 6M A312-304L pc 1 45.00 341 F FOB 5-Nov 23-Nov 20-Nov 10-Dec 13-Dec 18-Dec 100% $

K290 M1-8355 31-Oct 24-Nov 10 SMLS Pipe 2" S/80S(OD60.3x5.54t)- A312-316L pc 3 23.00 341 F FOB 5-Nov 23-Nov 20-Nov 10-Dec 13-Dec 18-Dec 100% $

K290 M1-8336 23-Oct 1 Plate 6.35 x 1829 x 6096 A516-70 sh 8 4,446.23 336 F CFR 29-Oct 30-Nov 18-Nov 21-Nov 29-Nov 100% $

K290 M1-8336 23-Oct 2 Plate 6.35 x 2438 x 9144 A516-70 sh 3 3,333.76 336 F CFR 29-Oct 30-Nov 18-Nov 21-Nov 29-Nov 100% $

K290 M1-8336 23-Oct 3 Plate 7.94 x 2438 x 9144 A516-70 sh 11 15,284.55 336 F CFR 29-Oct 30-Nov 18-Nov 21-Nov 29-Nov 100% $

K290 M1-8336 23-Oct 4 Plate 9.53 x 2438 x 6096 A516-70 sh 1 1,111.84 336 F CFR 29-Oct 30-Nov 18-Nov 21-Nov 29-Nov 100% $

K290 M1-8336 23-Oct 5 Plate 15.88 x 1829 x 6096 A516-70 sh 1 1,389.88 336 F CFR 29-Oct 30-Nov 18-Nov 21-Nov 29-Nov 100% $

K290 M1-8336 23-Oct 6 Plate 19.05 x 1829 x 6096 A516-70 sh 1 1,667.34 336 F CFR 29-Oct 30-Nov 18-Nov 21-Nov 29-Nov 100% $

Dung Quat(TK5804,5824)/ K278

K278 M1-7953 13-Aug 5-Sep 1 SMLS Pipe 1" S/40 (OD33.4xt3.38)- A106-B pc 1 15.00 228 F FOB 18-Aug 28-Aug 31-Aug 5-Sep 21-Sep 15-Oct 100% $

K278 M1-7953 13-Aug 5-Sep 2 SMLS Pipe 6" S/80(OD168.3xt10.97) A106-B pc 1 255.00 228 F FOB 18-Aug 28-Aug 31-Aug 5-Sep 21-Sep 15-Oct 100% $

K278 M1-7953 13-Aug 5-Sep 3 SMLS Pipe 10" S/XS (O.D273.1xt12. A106-B pc 1 489.00 228 F FOB 18-Aug 28-Aug 31-Aug 5-Sep 21-Sep 15-Oct 100% $

K278 M1-7953 13-Aug 5-Sep 4 W/D Pipe 3" S/80 (O.D88.9 x 7.62) A53-B (Type E) pc 9 825.00 228 F FOB 18-Aug 28-Aug 31-Aug 5-Sep 21-Sep 15-Oct 100% $

K278 M1-7953 13-Aug 5-Sep 5 W/D Pipe 10" S/40(OD273.1x 9.27) A53-B (Type E) pc 1 362.00 228 F FOB 18-Aug 28-Aug 31-Aug 5-Sep 21-Sep 15-Oct 100% $

K278 M1-7953 13-Aug 5-Sep 6 W/D Pipe 3/4" S/40(OD26.7 x 2.87 STK or EQ. pc 1 10.00 228 F FOB 18-Aug 28-Aug 31-Aug 5-Sep 21-Sep 15-Oct 100% $

K278 M1-7953 13-Aug 5-Sep 7 W/D Pipe OD34 x 3.2-6M SPP pc 6 88.00 228 F FOB 18-Aug 28-Aug 31-Aug 5-Sep 21-Sep 15-Oct 100% $

K278 M1-7953 13-Aug 5-Sep 8 W/D Pipe OD42.7 x 3.5-6M SPP pc 112 2,274.00 228 F FOB 18-Aug 28-Aug 31-Aug 5-Sep 21-Sep 15-Oct 100% $

K278 M1-7953 13-Aug 5-Sep 9 W/D Pipe OD60.5 x 3.9-6M A53-B (Type E) pc 47 1,535.00 228 F FOB 18-Aug 28-Aug 31-Aug 5-Sep 21-Sep 15-Oct 100% $

K278 M1-8013 22-Aug 15-Sep 1 SMLS Pipe 4" S/40 (O.D114.3xt6.02 A106-B pc 7 675.00 256 F FOB 29-Aug 10-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

K278 M1-8013 22-Aug 15-Sep 2 SMLS Pipe 6" S/40 (O.D168.3xt7.11 A106-B pc 5 848.00 256 F FOB 29-Aug 10-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

K278 M1-8013 22-Aug 15-Sep 3 SMLS Pipe 12" S/40 (O.D323.9xt10. A106-B pc 4 1,914.00 256 F FOB 29-Aug 10-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

K235 M1-7149 2-Feb 5-Apr 12 Plate 7.01 x 2438 x 8400 A36 sh 13 14,650.00 32 F FOB 14-Feb 20-Apr 13-May 24-May 29-May 7-Jun 100% $

K235 M1-7149 2-Feb 5-Apr 9 Plate 8.01 x 2439 x 9600 A36 sh 9 13,250.00 32 F FOB 14-Feb 20-Apr 21-Apr 28-Apr 17-May OK 100% $

K235 M1-7149 2-Feb 5-Apr 10 Plate 8 x 1829 x 10000 A36 sh 9 10,338.00 32 F FOB 14-Feb 20-Apr 21-Apr 28-Apr 17-May OK 100% $

K235 M1-7149 2-Feb 5-Apr 11 Plate 8 x 1829 x 9144 A36 sh 31 32,559.00 32 F FOB 14-Feb 20-Apr 21-Apr 28-Apr 17-May OK 100% $

K235 M1-7149 2-Feb 5-Apr 13 Plate 7.01 x 2300 x 8400 A36 sh 3 3,189.00 32 F FOB 14-Feb 20-Apr 21-Apr 28-Apr 17-May OK 100% $

K235 M1-7149 2-Feb 5-Apr 14 Plate 7 x 1829 x 9000 A36 sh 9 8,141.00 32 F FOB 14-Feb 20-Apr 21-Apr 28-Apr 17-May OK 100% $

K235 M1-7149 2-Feb 5-Apr 15 Plate 7 x 1829 x 8000 A36 sh 2 1,608.00 32 F FOB 14-Feb 20-Apr 21-Apr 28-Apr 17-May OK 100% $

K235 M1-7149 2-Feb 5-Apr 16 Plate 7 x 1829 x 7000 A36 sh 2 1,407.00 32 F FOB 14-Feb 20-Apr 21-Apr 28-Apr 17-May OK 100% $

K235 M1-7149 2-Feb 5-Apr 17 Plate 7 x 1829 x 6096 A36 sh 17 10,415.00 32 F FOB 14-Feb 20-Apr 21-Apr 28-Apr 17-May OK 100% $

K235 M1-7149 2-Feb 5-Apr 18 Plate 7 x 1829 x 6096 A36 sh 17 10,415.00 32 F FOB 14-Feb 20-Apr 21-Apr 28-Apr 17-May OK 100% $

K235 M1-7149 2-Feb 5-Apr 19 Plate 5 x 1524 x 6096 A36 sh 16 5,834.00 32 F FOB 14-Feb 20-Apr 21-Apr 28-Apr 17-May OK 100% $

K235 M1-7149 2-Feb 5-Apr 1 Plate 17 x 2438 x 9600 A36 sh 10 31,234.00 29 F CFR 10-Feb 20-Apr 21-Apr 28-Apr 17-May 100% $

K235 M1-7149 2-Feb 5-Apr 2 Plate 15 x 2438 x 9600 A36 sh 9 24,803.00 29 F CFR 10-Feb 20-Apr 21-Apr 28-Apr 17-May 100% $

K235 M1-7149 2-Feb 5-Apr 3 Plate 13 x 2438 x 9600 A36 sh 9 21,496.00 29 F CFR 10-Feb 20-Apr 21-Apr 28-Apr 17-May 100% $

K235 M1-7149 2-Feb 5-Apr 4 Plate 13 x 2050 x 4850 A36 sh 9 9,132.00 29 F CFR 10-Feb 20-Apr 21-Apr 28-Apr 17-May 100% $

K235 M1-7149 2-Feb 5-Apr 5 Plate 13 x 1524 x 8000 A36 sh 3 3,733.00 29 F CFR 10-Feb 20-Apr 21-Apr 28-Apr 17-May 100% $

K235 M1-7149 2-Feb 5-Apr 6 Plate 11 x 2438 x 9600 A36 sh 9 18,189.00 29 F CFR 10-Feb 20-Apr 21-Apr 28-Apr 17-May 100% $

K235 M1-7149 2-Feb 5-Apr 7 Plate 9 x 2438 x 9600 A36 sh 9 14,882.00 29 F CFR 10-Feb 20-Apr 21-Apr 28-Apr 17-May 100% $

K235 M1-7149 2-Feb 5-Apr 8 Plate 9 x 1829 x 9144 A36 sh 38 44,900.00 29 F CFR 10-Feb 20-Apr 21-Apr 28-Apr 17-May 100% $

OPPD/A249

A249 M1-6584(R.1) 22-Aug 15-Oct 24-Aug 6 Plate 6 x 1524 x 3048 A36 sh 9 1,969.08 326 F FOB 11-Sep 30-Sep 2-Oct 11-Oct 13-Oct 26-Oct 100% $

A249 M1-6584(R.1) 22-Aug 15-Oct 24-Aug 1 W/D Pipe 25A S/40 (OD33.4xt3.38) A53-B pc 21 315.00 304 F FOB 4-Sep 15-Sep 15-Sep 20-Sep 27-Sep 26-Oct 100% $

A249 M1-6584(R.1) 22-Aug 15-Oct 24-Aug 2 W/D Pipe 50A S/160 (OD60.3xt8.74 A53-B pc 134 6,699.33 304 F FOB 4-Sep 15-Sep 15-Sep 20-Sep 27-Sep 26-Oct 100% $

A249 M1-6584(R.1) 22-Aug 15-Oct 24-Aug 3 W/D Pipe 65A S/40 (OD73.0xt5.16) A53-B pc 60 3,106.80 304 F FOB 4-Sep 15-Sep 15-Sep 20-Sep 27-Sep 26-Oct 100% $

A249 M1-6584(R.1) 22-Aug 15-Oct 24-Aug 4 W/D Pipe 3" S/40(OD88.9xt5.5)-6M A53-B pc 13 880.60 304 F FOB 4-Sep 15-Sep 15-Sep 20-Sep 27-Sep 26-Oct 100% $

Page 56: Hvc PlatePipe Update)

HVC-PUR 56 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A249 M1-6584(R.1) 22-Aug 15-Oct 24-Aug 5 W/D Pipe 18" x STD (Ø457.2xt9.52 SA53B pc 1 105.10 304 F FOB 4-Sep 15-Sep 15-Sep 20-Sep 27-Sep 26-Oct 100% $

A249 M1-6584(R.1) 22-Aug 15-Oct 24-Aug 7 W/D Pipe 5" S/40(OD141.3x6.55)- A53-B pc 1 130.60 304 F FOB 4-Sep 15-Sep 15-Sep 20-Sep 27-Sep 26-Oct 100% $

IG-2/A253

A253 M1-6785 19-Oct 18-Nov 1 Plate 6 x 1500 x 6000 SS400 sh 5 2,120.00 665 L DDP 30-Oct 9-Nov 3-Nov 23-Dec 100% VND

A253 M1-6784 19-Oct 18-Nov 1 W/D PIPE 125A (OD139.8xt4.5)-6M SGP pc 1 90.00 362 F CFR 27-Oct 17-Nov 17-Nov 29-Nov 7-Dec 6-Feb 100% $

A253 M1-6784 19-Oct 18-Nov 2 W/D PIPE 90A S/40(OD101.6xt5.7) STPG370 pc 16 1,294.00 362 F CFR 27-Oct 17-Nov 17-Nov 29-Nov 7-Dec 6-Feb 100% $

A253 M1-6784 19-Oct 18-Nov 3 W/D PIPE 80A S/40(OD89.1xt5.5)- STPG370 pc 64 4,354.00 362 F CFR 27-Oct 17-Nov 17-Nov 29-Nov 7-Dec 6-Feb 100% $

A253 M1-6784 19-Oct 18-Nov 4 W/D PIPE 65A S/80(OD76.3xt7.0)- STPG370 pc 2 144.00 362 F CFR 27-Oct 17-Nov 17-Nov 29-Nov 7-Dec 6-Feb 100% $

A253 M1-6784 19-Oct 18-Nov 5 W/D PIPE 50A S/40(OD60.5xt3.9)- STPG370 pc 120 3,919.00 362 F CFR 27-Oct 17-Nov 17-Nov 29-Nov 7-Dec 6-Feb 100% $

A253 M1-6784 19-Oct 18-Nov 7 W/D PIPE 25A S/40(OD34.0xt3.4)- STPG370 pc 23 354.00 362 F CFR 27-Oct 17-Nov 17-Nov 29-Nov 7-Dec 6-Feb 100% $

Stacking Crane/S251

S251 M1-7174 13-Feb 28-Feb 3 SQ.Pipe 150 x 150 x 9-6M STKR400 pc 1 226 36 F FOB 23-Feb 16-Mar 21-Mar 29-Mar 17-Apr 100% $

S251 M1-7174 13-Feb 28-Feb 4 SQ.Pipe 100 x 100 x 6-6M STKR400 pc 2 200 36 F FOB 23-Feb 16-Mar 21-Mar 29-Mar 17-Apr 100% $

S251 M1-7174 13-Feb 28-Feb 5 Rec.Pipe 200 x 100 x 9.0-6M STKR400 pc 8 1,808 36 F FOB 23-Feb 16-Mar 21-Mar 29-Mar 17-Apr 100% $

S251 M1-6993(R.1) 26-Dec 30-Mar 1 Plate 12 x 1524 x 9100 SM490B sh 16 20,902 2 F FOB 2-Jan 15-Mar 21-Mar 29-Mar 4-Apr 12-Apr 100% $

S251 M1-6993(R.1) 26-Dec 30-Mar 2 Plate 15 x 1524 x 6096 SM490B sh 3 3,282 2 F FOB 2-Jan 15-Mar 21-Mar 29-Mar 4-Apr 12-Apr 100% $

S251 M1-6993(R.1) 26-Dec 30-Mar 3 Plate 20 x 1524 x 6096 SM490B sh 3 4,376 2 F FOB 2-Jan 15-Mar 21-Mar 29-Mar 4-Apr 12-Apr 100% $

S251 M1-6993(R.1) 26-Dec 30-Mar 4 Plate 25 x 1500 x 6096 SM490B sh 1 1,795 2 F FOB 2-Jan 15-Mar 21-Mar 29-Mar 4-Apr 12-Apr 100% $

S251 M1-6993(R.1) 26-Dec 30-Mar 5 Plate 40 x 1524 x 6096 SM490B sh 13 37,923 2 F FOB 2-Jan 15-Mar 21-Mar 29-Mar 4-Apr 12-Apr 100% $

S251 M1-6993(R.1) 26-Dec 30-Mar 6 Plate 45 x 1524 x 6096 SM490B sh 1 3,282 2 F FOB 2-Jan 15-Mar 21-Mar 29-Mar 4-Apr 12-Apr 100% $

S251 M1-6993(R.1) 26-Dec 30-Mar 7 Plate 50 x 2438 x 6096 SM490B sh 3 17,500 2 F FOB 2-Jan 15-Mar 21-Mar 29-Mar 4-Apr 12-Apr 100% $

S251 M1-6993(R.1) 26-Dec 30-Mar 8 Plate 50 x 1500 x 6096 SM490B sh 1 3,589 2 F FOB 2-Jan 15-Mar 21-Mar 29-Mar 4-Apr 12-Apr 100% $

S251 M1-6777 19-Oct 25-Dec 1 Plate 9 x 3048 x 12192 SM490B sh 102 267,800 364 F FOB 17-Nov 15-Jan 21-Mar 29-Mar 4-Apr 12-Apr 100% $

S251 M1-6777 19-Oct 25-Dec 2 Plate 10 x 2250 x 12192 SM490B sh 6 12,920 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S251 M1-6777 19-Oct 25-Dec 3 Plate 10 x 2800 x 12192 SM490B sh 50 133,990 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S251 M1-6777 19-Oct 25-Dec 4 Plate 12 x 2800 x 12192 SM490B sh 4 12,860 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S251 M1-6777 19-Oct 25-Dec 5 Plate 15 x 2350 x 12192 SM490B sh 15 50,610 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S251 M1-6777 19-Oct 25-Dec 6 Plate 20 x 2250 x 12192 SM490B sh 7 30,150 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S251 M1-6777 19-Oct 25-Dec 7 Plate 22 x 2550 x 12192 SM490B sh 6 32,220 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S251 M1-7095 15-Jan 20-Feb 1 W/D Pipe 1-1/4 S/40(OD42.2x3.56) A53-B pc 65 1,322 15 F FOB 20-Jan 23-Feb 9-Feb 14-Feb 16-Mar 9-Apr 100% $

S251 M1-7244 5-Mar 20-Mar 1 W/D Pipe 1-1/4 S/40(OD42.2x3.56) A53-B pc 40 814.00 128 L DDP 5-Mar 15-Mar 26-Mar 100% VND

S251 M1-7174 13-Feb 28-Feb 1 SQ.Pipe 20 x 20 x 2-6M STKR400 pc 1 7.00 98 L DDP 15-Feb 25-Feb 1-Mar 30-Mar 100% VND

S251 M1-7174 13-Feb 28-Feb 2 SQ.Pipe 40 x 40 x 3-6M STKR400 pc 2 41.00 98 L DDP 15-Feb 25-Feb 1-Mar 30-Mar 100% VND

S251 M1-6779 19-Oct 25-Dec 1 W/D Pipe 24" (OD609.6x8t)-12M S355J2H pc 8 11,394.00 380 F CFR 11-Nov 25-Dec 20-Nov 22-Dec 28-Dec 2-Feb 100% $

NN3/A252

A252 M1-6780 19-Oct 18-Nov 1 W/D PIPE 80A S/40 (OD89.1xt5.5)- STPG370 pc 4 272.00 362 F CFR 27-Oct 17-Nov 17-Nov 29-Nov 7-Dec 6-Feb 100% $

A252 M1-6780 19-Oct 18-Nov 2 W/D PIPE 65A S/40 (OD76.3xt5.2)- STPG370 pc 16 875.00 362 F CFR 27-Oct 17-Nov 17-Nov 29-Nov 7-Dec 6-Feb 100% $

A252 M1-6780 19-Oct 18-Nov 3 SMLS PIPE 50A S/160 (OD60.5xt8.7) STPG370 pc 6 400.00 362 F CFR 27-Oct 17-Nov 17-Nov 29-Nov 7-Dec 6-Feb 100% $

A252 M1-6780 19-Oct 18-Nov 4 W/D PIPE 50A S/80 (OD60.5xt5.5)- STPG370 pc 24 1,074.00 362 F CFR 27-Oct 17-Nov 17-Nov 29-Nov 7-Dec 6-Feb 100% $

A252 M1-6780 19-Oct 18-Nov 5 W/D PIPE 25A S/40 (OD34.0xt3.4)- STPG370 pc 8 123.00 362 F CFR 27-Oct 17-Nov 17-Nov 29-Nov 7-Dec 6-Feb 100% $

PPP/A254

A254 M1-7634 4-Jun 4-Sep 1 W/D Pipe OD610 x 12.7-6M SA53-B pc 92 103.26 178 F FOB 14-Jun 4-Sep 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A254 M1-6902 22-Nov 30-Dec 1 W/D Pipe OD610 x t12.7-6M SA53B pc 72 80,810.00 392 F CFR 1-Dec 30-Dec 21-Jan 24-Jan 2-Feb 15-Feb 100% $

Vung Tau Crane/S255

S255 M1-6846(R.1) 2-Nov 25-Dec 1 CHK'D PLATE 6 x 1219 x 2438 SS400 sh 4 570.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S255 M1-6846(R.1) 2-Nov 25-Dec 2 Plate 8 x 2438 x 6096 SS400 sh 1 930.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S255 M1-6846(R.1) 2-Nov 25-Dec 3 Plate 10 x 2438 x 12192 SM490B sh 4 9,333.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S255 M1-6846(R.1) 25-Dec 3a Plate 12 x 2438 x 6096 SM490B sh 1 1,400.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S255 M1-6846(R.1) 2-Nov 25-Dec 4 Plate 15 x 2438 x 12192 SM490B sh 5 17,500.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S255 M1-6846(R.1) 2-Nov 25-Dec 5 Plate 16 x 1500 x 12192 SM490B sh 1 2,300.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S255 M1-6846(R.1) 2-Nov 25-Dec 6 Plate 18 x 2000 x 9700 SM490B sh 5 13,710.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S255 M1-6846(R.1) 2-Nov 25-Dec 7 Plate 18 x 2438 x 12192 SM490B sh 1 4,200.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S255 M1-6846(R.1) 2-Nov 25-Dec 8 Plate 19 x 1500 x 9700 SM490B sh 1 2,170.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

Page 57: Hvc PlatePipe Update)

HVC-PUR 57 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

S255 M1-6846(R.1) 2-Nov 25-Dec 9 Plate 20 x 2438 x 9900 SM490B sh 4 15,160.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S255 M1-6846(R.1) 2-Nov 25-Dec 10 Plate 25 x 1524 x 6096 SM490B sh 1 1,820.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S255 M1-6846(R.1) 2-Nov 25-Dec 11 Plate 28 x 1500 x 9000 SM490B sh 1 2,970.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S255 M1-6846(R.1) 2-Nov 25-Dec 12 Plate 30 x 1500 x 6096 SM490B sh 1 2,150.00 364 F FOB 17-Nov 15-Jan 12-Feb 19-Feb 16-Mar 12-Apr 100% $

S255 M1-7004 22-Dec 25-Jan 1 W/D Pipe 3/4" S/40(OD26.7x2.87)- STK400 pc 20 202.80 799 L DDP 28-Dec 31-Dec 28-Dec 16-Jan 100% VND

S255 M1-7004 22-Dec 25-Jan 2 W/D Pipe 1-1/4" S/40(OD42.2x3.56 STK400 pc 30 610.20 799 L DDP 28-Dec 31-Dec 28-Dec 16-Jan 100% VND

S255 M1-6847 2-Nov 25-Dec 5 SMLS Pipe OD273.0xt10.0-6~7M (27 DIN 2448 S355J2H pc 4 1,557.60 380 F CFR 11-Nov 25-Dec 27-Dec 20-Jan 31-Jan 10-Feb 100% $

S255 M1-6847 2-Nov 25-Dec 6 SMLS Pipe OD406.4xt12.5-6~7M (19 DIN 2448 S355J2H pc 3 2,420.00 380 F CFR 11-Nov 25-Dec 27-Nov 29-Dec 11-Jan 2-Feb 100% $

S255 M1-6847 2-Nov 25-Dec 1 W/D Pipe 20A S/40(OD26.7xt2.87) A53-B pc 25 253.50 378 F CFR 10-Nov 1-Dec 1-Dec 7-Dec 12-Dec 16-Jan 100% $

S255 M1-6847 2-Nov 25-Dec 2 W/D Pipe 32A S/40(OD42.2x3.56)- A53-B pc 34 691.56 378 F CFR 10-Nov 1-Dec 1-Dec 7-Dec 12-Dec 16-Jan 100% $

S255 M1-6847 2-Nov 25-Dec 3 W/D Pipe 4" S/40(OD114.3xt6.02)-6M A53-B pc 4 385.68 378 F CFR 10-Nov 1-Dec 1-Dec 7-Dec 12-Dec 16-Jan 100% $

S255 M1-6847 2-Nov 25-Dec 4 W/D Pipe 4" S/80(OD114.3x8.56)- A53-B pc 5 669.60 378 F CFR 10-Nov 1-Dec 1-Dec 7-Dec 12-Dec 16-Jan 100% $

S255 M1-6847 2-Nov 25-Dec 7 SQ.PIPE 50 x 50 x t3.2-6M STKR400 pc 2 54.00 378 F CFR 10-Nov 1-Dec 1-Dec 7-Dec 12-Dec 100% $

S255 M1-6847 2-Nov 25-Dec 8 SQ.PIPE 60 x 60 x t3.2-6M STKR400 pc 3 99.00 378 F CFR 10-Nov 1-Dec 1-Dec 7-Dec 12-Dec 100% $

S255 M1-6847 2-Nov 25-Dec 9 SQ.PIPE 80 x 80 x t4.5-6M STKR400 pc 2 123.60 378 F CFR 10-Nov 1-Dec 1-Dec 7-Dec 12-Dec 100% $

Hai Phong/S257

S257 M1-7281 17-Mar 17-Apr 1 Plate 4.5 x 1524 x 6096 SS400 pc 1 328.00 66 F FOB 21-Mar 3-Apr 21-Apr 28-Apr 9-May 4-Jun 100% $

S257 M1-7281 17-Mar 17-Apr 2 Plate 5 x 1524 x 6096 SS400 pc 8 2,917.00 66 F FOB 21-Mar 3-Apr 21-Apr 28-Apr 11-May 4-Jun 100% $

S257 M1-7281 17-Mar 17-Apr 3 Plate 6 x 1524 x 6096 SS400 pc 12 5,251.00 66 F FOB 21-Mar 3-Apr 21-Apr 28-Apr 11-May 4-Jun 100% $

S257 M1-7281 17-Mar 17-Apr 4 Plate 6 x 1219 x 2438 SS400 pc 8 1,120.00 66 F FOB 21-Mar 3-Apr 21-Apr 28-Apr 11-May 4-Jun 100% $

S257 M1-7281 17-Mar 17-Apr 4 CHK'D PLATE 6 x 1219 x 2438 SS400 pc 8 1,160.00 66 F FOB 21-Mar 3-Apr 27-Apr 3-May 14-May 4-Jun 100% $

S257 M1-7280 17-Mar 17-Apr 1 W/D Pipe 3/4" S/40(OD26.7xt2.87)-6M A53-B pc 60 608.40 71 F FOB 21-Mar 3-Apr 6-Apr 11-Apr 20-Apr 26-Apr 100% $

S257 M1-7280 17-Mar 17-Apr 2 W/D Pipe 1-1/4 S/40(OD42.2x3.56)-6 A53-B pc 110 2,237.40 71 F FOB 21-Mar 3-Apr 6-Apr 11-Apr 20-Apr 26-Apr 100% $

S257 M1-7280 17-Mar 17-Apr 3 W/D Pipe 4" S/40(OD114.3xt6.02)-6M A53-B pc 5 482.00 71 F FOB 21-Mar 3-Apr 6-Apr 11-Apr 20-Apr 26-Apr 100% $

S257 M1-7280 17-Mar 17-Apr 4 W/D Pipe 4" S/80(OD114.3xt8.56)-6M A53-B pc 11 1,473.00 71 F FOB 21-Mar 3-Apr 6-Apr 11-Apr 20-Apr 26-Apr 100% $

S257 M1-7280 17-Mar 17-Apr 5 W/D Pipe 6" S/80(OD168.3xt10.97)-6 A53-B pc 1 255.00 71 F FOB 21-Mar 3-Apr 6-Apr 11-Apr 20-Apr 26-Apr 100% $

S257 M1-7280 17-Mar 17-Apr 6 W/D Pipe 8" S/40(OD219.1xt8.18)-6M A53-B pc 2 510.60 71 F FOB 21-Mar 3-Apr 6-Apr 11-Apr 20-Apr 26-Apr 100% $

S257 M1-7280 17-Mar 17-Apr 7 SQ.Pipe 40 x 40 x 4(3.2t)-6M STKR400 pc 4 107.00 71 F FOB 21-Mar 3-Apr 6-Apr 11-Apr 20-Apr 26-Apr 100% $

S257 M1-7280 17-Mar 17-Apr 8 Rec.Pipe 60 x 40 x 3.2-6M STKR400 pc 8 224.00 71 F FOB 21-Mar 3-Apr 6-Apr 11-Apr 20-Apr 26-Apr 100% $

S257 M1-6880 13-Nov 25-Feb 1 Plate 8 x 1524 x 6096 SM490B sh 15 8,750.00 384 F CFR 21-Nov 1-Mar 1-Mar 9-Mar 24-Mar 29-Mar L/C $

S257 M1-6880 13-Nov 25-Feb 3 Plate 10 x 2250 x 11900 SM490B sh 10 21,020.00 384 F CFR 21-Nov 1-Mar 1-Mar 9-Mar 24-Mar 29-Mar L/C $

S257 M1-6880 13-Nov 25-Feb 4 Plate 12 x 2250 x 11900 SM490B sh 4 10,090.00 384 F CFR 21-Nov 1-Mar 1-Mar 9-Mar 24-Mar 29-Mar L/C $

S257 M1-6880 13-Nov 25-Feb 5 Plate 15 x 2250 x 11900 SM490B sh 11 34,680.00 384 F CFR 21-Nov 1-Mar 1-Mar 9-Mar 24-Mar 29-Mar L/C $

S257 M1-6880 13-Nov 25-Feb 6 Plate 16 x 2250 x 9000 SM490B sh 2 5,090.00 384 F CFR 21-Nov 1-Mar 1-Mar 9-Mar 24-Mar 29-Mar L/C $

S257 M1-6880 13-Nov 25-Feb 7 Plate 18 x 2250 x 11900 SM490B sh 16 60,530.00 384 F CFR 21-Nov 1-Mar 1-Mar 9-Mar 24-Mar 29-Mar L/C $

S257 M1-6880 13-Nov 25-Feb 8 Plate 19 x 1524 x 6096 SM490B sh 3 4,160.00 384 F CFR 21-Nov 1-Mar 1-Mar 9-Mar 24-Mar 29-Mar L/C $

S257 M1-6880 13-Nov 25-Feb 9 Plate 20 x 2250 x 11900 SM490B sh 8 33,630.00 384 F CFR 21-Nov 1-Mar 1-Mar 9-Mar 24-Mar 29-Mar L/C $

S257 M1-6880 13-Nov 25-Feb 10 Plate 25 x 2250 x 6096 SM490B sh 6 16,150.00 384 F CFR 21-Nov 1-Mar 1-Mar 9-Mar 24-Mar 29-Mar L/C $

S257 M1-6880 13-Nov 25-Feb 11 Plate 28 x 1524 x 9000 SM490B sh 2 6,030.00 384 F CFR 21-Nov 1-Mar 1-Mar 9-Mar 24-Mar 29-Mar L/C $

S257 M1-6880 13-Nov 25-Feb 12 Plate 30 x 2250 x 6096 SM490B sh 4 12,920.00 384 F CFR 21-Nov 1-Mar 1-Mar 9-Mar 24-Mar 29-Mar L/C $

S257 M1-6879 13-Nov 25-Feb 1 SMLS Pipe OD368xt12.5-11~11.5M (33 DIN 2448 S355J2H pc 3 3,616.00 380 F CFR 22-Nov 25-Jan 24-Dec 20-Jan 1-Feb 10-Feb 100% $

S257 M1-6879 13-Nov 25-Feb 2 SMLS Pipe OD406.4xt12.5-4.75~9.03M DIN 2448 S355J2H pc 6 4,613.95 380 F CFR 22-Nov 25-Jan 24-Dec 20-Jan 1-Feb 10-Feb 100% $

NN3/A258

A258 M1-7014 1 Plate 6x1524x1975, 2010, 2190 SUS304 sh 3 448.00 801 L DDP 27-Dec 29-Dec 28-Dec OK 100% VND

A258 M1-7002 2 Plate 4.5 x 758 x 6000 SS400 sh 4 643.00 796 L DDP 26-Dec 29-Dec 4-Jan 29-Jan 100% VND

A258 M1-7002 3 Plate 6 x 1500 x 6000 SS400 sh 8 3,391.20 796 L DDP 26-Dec 29-Dec 2-Jan 29-Jan 100% VND

A258 M1-7002 1 Plate 2.3 x 1219 x 4000 SS400 sh 5 440.00 784 L DDP 22-Dec 25-Dec 27-Dec 16-Jan 100% VND

TS-6 Casing/A259

A259 M1-6979 14-Dec 20-Dec 3 Plate 4.5 x 758 x 6000 SS400 sh 8 1,285.00 796 L DDP 26-Dec 29-Dec 4-Jan 29-Jan 100% VND

A259 M1-6979 14-Dec 20-Dec 4 Plate 6 x 1500 x 6000 SS400 sh 3 1,271.70 796 L DDP 26-Dec 29-Dec 2-Jan 29-Jan 100% VND

A259 M1-6979 14-Dec 20-Dec 5 Plate 10 x 1500 x 6000 SS400 sh 1 707.00 796 L DDP 26-Dec 29-Dec 2-Jan 29-Jan 100% VND

A259 M1-6979 14-Dec 20-Dec 7 Plate 3 x 1220 x 2500 SUS304 sh 11 798.00 783 L DDP 19-Dec 23-Dec 26-Dec 16-Jan 100% VND

A259 M1-6979 14-Dec 20-Dec 8 Plate 6 x 1524/20/35/75 x 3480/0 SUS304 sh 4 930.81 783 L DDP 19-Dec 23-Dec 26-Dec 16-Jan 100% VND

Page 58: Hvc PlatePipe Update)

HVC-PUR 58 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A259 M1-6979 14-Dec 20-Dec 1 Plate 2.3x 1219 x 4000 SS400 sh 25 2,200.00 799 L DDP 28-Dec 31-Dec 28-Dec 16-Jan 100% VND

A259 M1-6979 14-Dec 20-Dec 1 Plate 2.3 x 1219 x 4000 SS400 sh 105 9,244.00 784 L DDP 22-Dec 25-Dec 27-Dec 16-Jan 100% VND

A259 M1-6979 14-Dec 20-Dec 2 Plate 3.2 x 1219 x 6000 SS400 sh 120 22,047.00 784 L DDP 22-Dec 25-Dec 27-Dec 16-Jan 100% VND

NN3/A260

A260 M1-7045 1 Plate SS400 sh 10 1,097.00 799 L DDP 5-Jan 8-Jan 1-Feb 10-Feb 100% VND

A260 M1-7169 1 Plate 3 x 1219 x 6000 SS400 sh 5 861.00 98 L DDP 15-Feb 25-Feb 28-Feb 30-Mar 100% VND

A260 M1-7045 2 Plate 3 x 1219 x 6000 SS400 sh 20 3,445.00 799 L DDP 5-Jan 2-Jan 8-Jan 16-Jan 100% VND

A260 M1-6975 14-Dec 20-Dec 1 Plate 2.3 x 1219 x 4000 SS400 sh 20 1,761.00 784 L DDP 22-Dec 25-Dec 27-Dec 16-Jan 100% VND

A260 M1-6975 14-Dec 20-Dec 2 Plate 3 x 1219 x 6000 SS400 sh 69 11,885.00 784 L DDP 22-Dec 25-Dec 28-Dec 16-Jan 100% VND

NN3/A261

A261 M1-7025 1 Plate 2.3 x 1219 x 5000 SS400 sh 66 7,260.00 799 L DDP 5-Jan 10-Jan 28/12,8/1 16-Jan 100% VND

TOSO PS Unit 6/A279

A279 M1-7629 4-Jun 10-Jul 1 Plate 5 x 1500 x 6000 SS400 sh 2 706.50 298 L DDP 18-Jun 18-Jun 18-Jun 21-Jul 100% VND

A279 M1-7628 4-Jun 15-Jun 1 SQ.Pipe 75 x 75 x 2.3-6M STKR400 pc 3 92.58 148 F FOB 6-Jun 15-Jun 17-Jun 22-Jun 29-Jun 9-Jul 100% $

A279 M1-7629 4-Jun 10-Jul 1 Plate 5 x 1500 x 6000 SS400 sh 12 4,239.00 306 L DDP 11-Jun 13-Jun 13-Jun 9-Jul 100% VND

ISOGO PS Unit 2/A280

A280 M1-8760 28-Jan 14-Feb 1 SQ.Pipe 50 x 50 x 2.3-6M STKR400 pc 8 114.00 36 F FOB 28-Jan 20-Feb 1-Mar 7-Mar 18-Mar 28-Mar 100% $

A280 M1-7630 4-Jun 15-Jul 1 W/D Pipe OD60.5 x 5.54-6M STGP370 pc 1 45.00 148 F FOB 6-Jun 15-Jun 17-Jun 22-Jun 29-Jun 9-Jul 100% $

ECC/K262

K262 M1-7462 7-May 15-Jun 1 CHK'D PLATE 3.2 x 1219 x 6096 SS400 sh 9 1,792.00 139 F FOB 18-May 2-Jun 12-Jun 19-Jun 28-Jun 21-Jul 100% $

K262 M1-7352(R.2) 6-Apr 20-May 17-Apr 5 Plate 6 x 1829 x 6096 A283-C sh 4 2,100.00 87 F FOB 16-Apr 20-Jun 6-Jul 11-Jul 20-Jul 24-Jul 100% $

K262 M1-7352(R.2) 6-Apr 20-May 17-Apr 6 Plate 8 x 1829 x 12000 A283-C sh 13 17,915.00 87 F FOB 16-Apr 20-Jun 22-Jun 1-Jul 5-Jul 24-Jul 100% $

K262 M1-7352(R.2) 6-Apr 20-May 17-Apr 7 Plate 10 x 1829 x 6096 A283-C sh 7 6,130.00 87 F FOB 16-Apr 20-Jun 6-Jul 11-Jul 20-Jul 24-Jul 100% $

K262 M1-7352(R.2) 6-Apr 20-May 17-Apr 9 Plate 15 x 1829 x 6096 A283-C sh 4 5,250.00 87 F FOB 16-Apr 20-Jun 22-Jun 1-Jul 5-Jul 24-Jul 100% $

K262 M1-7198 14-Feb 25-Mar 1 Plate 5 x1524 x6096 SS400 sh 7 1,256.16 50 F FOB 3-Mar 20-Apr 13-May 24-May 29-May 22-Jun 100% $

K262 M1-7198 14-Feb 25-Mar 4 Plate 15 x1524 x6096 SS400 sh 3 3,279.99 50 F FOB 3-Mar 20-Apr 18-May 23-May 30-May 29-Jun 100% $

K262 M1-7198 14-Feb 25-Mar 6 Plate 6 x3150 x6096 A285-C sh 3 2,710.00 50 F FOB 3-Mar 20-Apr 13-May 24-May 29-May 22-Jun 100% $

K262 M1-7198 14-Feb 25-Mar 7 Plate 12 x1219 x6096 A285-C sh 2 1,400.00 50 F FOB 3-Mar 20-Apr 18-May 23-May 30-May 29-Jun 100% $

K262 M1-7198 14-Feb 25-Mar 8 Plate 20 x1380 x6096 A285-C/SM490A sh 1 1,321.00 50 F FOB 3-Mar 20-Apr 18-May 23-May 30-May 29-Jun 100% $

K262 M1-7352(R.2) 6-Apr 20-May 17-Apr 6 Plate 8 x 1829 x 12000 A283-C sh 13 17,915.00 87 F FOB 16-Apr 20-Jun 12-Jun 19-Jun 23-Jun 9-Jul 100% $

K262 M1-7352(R.2) 6-Apr 20-May 17-Apr 8 Plate 12 x 2438 x 6096 A283-C sh 1 1,400.00 87 F FOB 16-Apr 20-Jun 12-Jun 19-Jun 23-Jun 9-Jul 100% $

K262 M1-7352(R.2) 6-Apr 20-May 17-Apr 10 Plate 20 x 1600 x 4000 A283-C sh 2 2,010.00 87 F FOB 16-Apr 20-Jun 12-Jun 19-Jun 23-Jun 9-Jul 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 9 Plate 6 x 1524 x 6096 A285-C sh 17 7,439.00 31 F FOB 15-Feb 20-Apr 13-May 24-May 29-May 21-Jun 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 9 Plate 8 x 2438 x 6096 A285-C sh 1 933.00 31 F FOB 15-Feb 20-Apr 13-May 24-May 29-May 21-Jun 100% $

K262 M1-7352(R.2) 6-Apr 20-May 17-Apr 1 Plate 6 x 1219 x 6096 A240-316L sh 15 5,340.00 94 F CFR 17-Apr 16-May 13-May 24-May 29-May 21-Jun 100% $

K262 M1-7352(R.2) 6-Apr 20-May 17-Apr 2 Plate 6 x 1524 x 6096 A240-316L sh 3 1,335.00 94 F CFR 17-Apr 16-May 13-May 24-May 29-May 21-Jun 100% $

K262 M1-7352(R.2) 6-Apr 20-May 17-Apr 3 Plate 8 x 1219 x 6096 A240-316L sh 6 2,844.00 94 F CFR 17-Apr 16-May 13-May 24-May 29-May 21-Jun 100% $

K262 M1-7352(R.2) 6-Apr 20-May 17-Apr 4 Plate 12 x 1219 x 3048 A240-316L sh 1 360.00 94 F CFR 17-Apr 16-May 13-May 24-May 29-May 21-Jun 100% $

K262 M1-7230(R.1) 3-Mar 2-Apr 1 Plate 5 x1524 x6096 SS400 sh 2 729.00 66 F FOB 19-Mar 3-Apr 21-Apr 28-Apr 11-May 4-Jun 100% $

K262 M1-7230(R.1) 3-Mar 2-Apr 2 Plate 6 x1524 x6096 SS400 sh 21 9,189.00 66 F FOB 19-Mar 3-Apr 21-Apr 28-Apr 11-May 4-Jun 100% $

K262 M1-7230(R.1) 3-Mar 2-Apr 3 Plate 10 x1524 x6096 SS400 sh 15 10,939.00 66 F FOB 19-Mar 3-Apr 21-Apr 28-Apr 11-May 4-Jun 100% $

K262 M1-7230(R.1) 3-Mar 2-Apr 4 Plate 15 x1524 x6096 SS400 sh 3 3,282.00 66 F FOB 19-Mar 3-Apr 21-Apr 28-Apr 11-May 4-Jun 100% $

K262 M1-7354 6-Apr 20-May 1 W/D Pipe 10" S/40(OD273.1xt9.27)-6 A53-B pc 12 4,261.83 89 F CFR 16-Apr 11-May 21-Apr 28-Apr 7-May 4-Jun 100% $

K262 M1-7198 14-Feb 25-Mar 3 Plate 10 x2438 x6096 SS400 sh 3 3,500.01 50 F FOB 3-Mar 20-Apr 21-Apr 27-Apr 16-May 29-May 100% $

K262 M1-7198 14-Feb 25-Mar 5 Plate 20 x2439 x6096 SS400 sh 6 13,999.80 50 F FOB 3-Mar 20-Apr 21-Apr 27-Apr 16-May 29-May 100% $

K262 M1-7198 14-Feb 25-Mar 9 Plate 30 x1525 x6096 A285-C sh 1 2,190.00 50 F FOB 3-Mar 20-Apr 21-Apr 27-Apr 16-May 29-May 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 9 Plate 8 x 2438 x 6096 A285-C sh 3 2,800.00 6 F FOB 16-Jan 28-Feb 21-Apr 28-Apr 16-May 29-May 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 9 Plate 15 x 2438 x 7000 A285-C sh 1 2,010.00 6 F FOB 16-Jan 28-Feb 21-Apr 28-Apr 16-May 29-May 100% $

K262 M1-7198 14-Feb 25-Mar 2 Plate 6 x2438 x6096 SS400 sh 15 10,500.04 50 F FOB 3-Mar 14-Mar 21-Mar 29-Mar 6-Apr 13-Apr 100% $

K262 M1-7231 3-Mar 2-Apr 1 W/D Pipe 1-1/2" S/80(OD48.3xt5.08)- A53-B sh 1 32.50 65 F CFR 14-Mar 23-Mar 23-Mar 28-Mar 4-Apr 12-Apr 100% $

K262 M1-7231 3-Mar 2-Apr 4 W/D Pipe OD139.7xt4.5-6M SPG sh 5 450.00 65 F CFR 14-Mar 23-Mar 23-Mar 28-Mar 4-Apr 12-Apr 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 10 Plate 6 x 1524 x 7000 A285-C sh 30 15,060.00 6 F FOB 16-Jan 28-Feb 21-Mar 29-Mar 6-Apr 12-Apr 100% $

K262 M1-7093 15-Jan 28-Feb 1 W/D Pipe 3" S/40(OD88.9x5.49)-6M A53-B pc 90 6,097.00 15 F FOB 20-Jan 23-Feb 23-Feb 28-Feb 16-Mar 9-Apr 100% $

2.3 x 1215(1235) x 5000

Page 59: Hvc PlatePipe Update)

HVC-PUR 59 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

K262 M1-7093 15-Jan 28-Feb 2 W/D Pipe 4" S/40(OD114.3xt6.02)-6M A53-B pc 3 289.00 15 F FOB 20-Jan 23-Feb 23-Feb 28-Feb 16-Mar 9-Apr 100% $

K262 M1-7231 3-Mar 2-Apr 3 W/D Pipe OD89.1xt4.5-6M STK400 sh 47 2,647.00 128 L DDP 5-Mar 15-Mar 26-Mar 100% VND

K262 M1-7171(R.1) 14-Feb 15-Mar 1 W/D Pipe OD89.1 x 4.5t-6M STK400 pc 120 6,759.00 98 L DDP 15-Feb 25-Feb 1-Mar 30-Mar 100% VND

K262 M1-7171(R.1) 14-Feb 15-Mar 2 W/D Pipe OD114.3 x 4.5t-6M STK400 pc 10 731.00 98 L DDP 15-Feb 25-Feb 1-Mar 30-Mar 100% VND

K262 M1-7171(R.1) 14-Feb 15-Mar 3 W/D Pipe 1-1/2" S/40(OD48.3x3.8)-6M STK400 pc 20 500.00 98 L DDP 15-Feb 25-Feb 1-Mar 30-Mar 100% VND

K262 M1-7060(R.1) 9-Jan 1-Feb 7 Plate 10 x 1500 x 2500 SUS304 sh 1 297.38 34 L DDP 12-Jan 16-Jan 16-Jan 29-Jan 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 1 Plate 5 x 1524 x 3048 SS400 sh 16 2,917.00 6 F FOB 16-Jan 30-Jan 12-Feb 19-Feb 20-Mar 28-Mar 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 2 Plate 6 x 1524 x 6096 SS400 sh 90 39,380.00 6 F FOB 16-Jan 30-Jan 12-Feb 19-Feb 20-Mar 28-Mar 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 3 Plate 6 x 1829 x 8000 SS400 sh 55 37,900.00 6 F FOB 16-Jan 30-Jan 12-Feb 19-Feb 20-Mar 28-Mar 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 4 Plate 10 x 2438 x 6096 SS400 sh 10 11,670.00 6 F FOB 16-Jan 30-Jan 12-Feb 19-Feb 20-Mar 28-Mar 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 5 Plate 12 x 1524 x 6096 SS400 sh 2 1,750.00 6 F FOB 16-Jan 30-Jan 12-Feb 19-Feb 20-Mar 28-Mar 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 6 Plate 15 x 1524 x 6096 SS400 sh 5 5,470.00 6 F FOB 16-Jan 30-Jan 12-Feb 19-Feb 20-Mar 28-Mar 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 8 Plate 20 x 2438 x 6096 SS400 sh 4 9,333.00 6 F FOB 16-Jan 30-Jan 12-Feb 19-Feb 20-Mar 28-Mar 100% $

K262 M1-7060(R.1) 9-Jan 28-Feb 11 Plate 30 x 1524 x 6096 SS400 sh 1 2,190.00 6 F FOB 16-Jan 30-Jan 12-Feb 19-Feb 20-Mar 28-Mar 100% $

ButSon/L263

L263 M1-7497 10-May 20-Jun 1 W/D Pipe 125A (OD139.8 x 4.85t)-9M SGP pc 6 872.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

L263 M1-7233 2-Mar 15-Jul 1 Plate 25 x 2470 x 14500 SS400 sh 4 28,114.77 51 F CFR 6-Mar 30-May 12-Jun 19-Jun 28-Jun 9-Jul L/C $

L263 M1-7233 2-Mar 15-Jul 2 Plate 25 x 2470 x 7250 SS400 sh 1 3,514.35 51 F CFR 6-Mar 30-May 12-Jun 19-Jun 28-Jun 9-Jul L/C $

L263 M1-7233 2-Mar 15-Jul 3 Plate 32 x 3000 x 14500 SS400 sh 8 87,417.60 51 F CFR 6-Mar 30-May 12-Jun 19-Jun 28-Jun 9-Jul L/C $

L263 M1-7233 2-Mar 15-Jul 4 Plate 35 x 2650 x 14500 SS400 sh 8 84,458.15 51 F CFR 6-Mar 30-May 12-Jun 19-Jun 28-Jun 9-Jul L/C $

L263 M1-7233 2-Mar 15-Jul 5 Plate 35 x 2650 x 7250 SS400 sh 1 5,278.63 51 F CFR 6-Mar 30-May 12-Jun 19-Jun 28-Jun 9-Jul L/C $

Mesaieed/A265

A265 M1-8362 31-Oct 25-Apr 1 Plate 10 x 1524 x 6096 SM490YA sh 1 729.00 5 F FOB 7-Jan 10-Mar 3-Jun 8-Jun 18-Jun 26-Jun 100% $

A265 M1-8362 31-Oct 25-Apr 2 Plate 15 x 1524 x 6096 SM490YA sh 1 1,094.00 5 F FOB 7-Jan 10-Mar 3-Jun 8-Jun 18-Jun 26-Jun 100% $

A265 M1-8362 31-Oct 25-Apr 4 Plate 25 x 1524 x 4000 SM490YA sh 1 1,196.00 5 F FOB 7-Jan 10-Mar 3-Jun 8-Jun 18-Jun 26-Jun 100% $

A265 M1-8363 31-Oct 5-May 1 SMLS Pipe 1" S/80(OD33.4x4.55t)-6M A106-B pc 10 194.40 347 F CFR 9-Nov 15-Apr 21-Apr 29-Apr 9-May 19-May 65% $

A265 M1-8363 31-Oct 5-May 2 SMLS Pipe 1-1/2" S/40 (OD48.3x3.68t) A106-B pc 12 291.60 347 F CFR 9-Nov 15-Apr 21-Apr 29-Apr 9-May 19-May 65% $

A265 M1-8363 31-Oct 5-May 3 SMLS Pipe 1-1/2" S/80 (OD48.3x5.08t) A106-B pc 9 292.14 347 F CFR 9-Nov 15-Apr 21-Apr 29-Apr 9-May 19-May 65% $

A265 M1-8363 31-Oct 5-May 4 SMLS Pipe 2" S/80 (OD60.3x5.54t) - 6M A106-B pc 1 44.88 347 F CFR 9-Nov 15-Apr 21-Apr 29-Apr 9-May 19-May 65% $

A265 M1-8363 31-Oct 5-May 5 SMLS Pipe 4" S/40 (OD114.3x6.02t) - 6 A106-B pc 7 674.94 347 F CFR 9-Nov 15-Apr 21-Apr 29-Apr 9-May 19-May 65% $

A265 M1-8363 31-Oct 5-May 6 SMLS Pipe 4" S/80 (OD114.3x8.56t) - 6 A106-B pc 1 133.92 347 F CFR 9-Nov 15-Apr 21-Apr 29-Apr 9-May 19-May 65% $

A265 M1-8363 31-Oct 5-May 7 W/D Pipe 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 600 14,580.00 347 F CFR 9-Nov 15-Apr 21-Apr 29-Apr 9-May 19-May 65% $

A265 M1-8363 31-Oct 5-May 8 W/D Pipe 1-1/2" S/80 (OD48.3x5.08t) A53-B pc 360 11,685.60 347 F CFR 9-Nov 15-Apr 21-Apr 29-Apr 9-May 19-May 65% $

A265 M1-8363 31-Oct 5-May 9 W/D Pipe 2-1/2" S/80 (OD73x7.01t) - A53-B pc 4 273.84 347 F CFR 9-Nov 15-Apr 21-Apr 29-Apr 9-May 19-May 65% $

A265 M1-8363 31-Oct 5-May 10 W/D Pipe 5" S/40 (OD141.3x6.55t) - 6 A53-B pc 50 6,531.00 347 F CFR 9-Nov 15-Apr 21-Apr 29-Apr 9-May 19-May 65% $

A265 M1-8363 31-Oct 5-May 11 W/D Pipe 6" S/40 (OD168.3x7.1t) - 6M A53-B pc 24 4,069.44 347 F CFR 9-Nov 15-Apr 21-Apr 29-Apr 9-May 19-May 65% $

A265 M1-8363 31-Oct 5-May 12 W/D Pipe 3" S/40 (OD88.9xt5.49)-6M A312-316 pc 19 1,308.72 347 F CFR 9-Nov 15-Apr 21-Apr 29-Apr 9-May 19-May 65% $

A265 M1-8362 31-Oct 25-Apr 6 Plate 6 x 1524 x 6096 SS400 sh 110 48,180.00 414 F CNF 27-Dec 10-Apr 2-Apr 9-Apr 28-Apr 21-May L/C $

A265 M1-8362 31-Oct 25-Apr 7 Plate 8 x 1524 x 6096 SS400 sh 11 6,410.00 414 F CNF 27-Dec 10-Apr 2-Apr 9-Apr 28-Apr 21-May L/C $

A265 M1-8362 31-Oct 25-Apr 8 Plate 10 x 1524 x 6096 SS400 sh 13 9,480.00 414 F CNF 27-Dec 10-Apr 2-Apr 9-Apr 28-Apr 21-May L/C $

A265 M1-8362 31-Oct 25-Apr 9 Plate 12 x 1524 x 6096 SS400 sh 6 5,250.00 414 F CNF 27-Dec 10-Apr 2-Apr 9-Apr 28-Apr 21-May L/C $

A265 M1-8362 31-Oct 25-Apr 10 Plate 15 x 2438 x 6096 SS400 sh 14 24,500.00 414 F CNF 27-Dec 10-Apr 2-Apr 9-Apr 28-Apr 21-May L/C $

A265 M1-8362 31-Oct 25-Apr 11 Plate 20 x 2438 x 6096 SS400 sh 2 4,670.00 414 F CNF 27-Dec 10-Apr 2-Apr 9-Apr 28-Apr 21-May L/C $

A265 M1-8918 1 Plate 10 x 1219 x 2438 A240-316L sh 1 235.70 82 F FOB 10-Mar 20-Apr 20-Apr 24-Apr 28-Apr 12-May 100% $

A265 M1-8915 2 Plate 10 x 1500 x 6000 SS400 sh 20 14,130.00 120 L DDP 27-Feb 1-Mar 7-Mar 22-Apr 100% VND

A265 M1-8915 27-Feb 25-May 1 Plate 8 x 1500 x 6000 SS400 sh 4 2,261.00 100 L DDP 10-Mar 13-Mar 13-Mar 25-Mar VND

A265 M1-8915 27-Feb 25-May 3 Plate 15 x 1500 x 6000 SS400 sh 2 2,120.00 100 L DDP 10-Mar 13-Mar 21-Mar 21-Apr VND

A265 M1-8918 27-Feb 25-May 2 Plate 15 x 1500 x 6000 SS400 sh 1 1,060.00 100 L DDP 10-Mar 13-Mar 21-Mar 21-Apr VND

A265 M1-8917 1 SMLS Pipe 1" S/40(OD33.4xt3.38)-6M A53-B pc 5 75.00 76 F FOB 6-Mar 15-Mar 16-Mar 22-Mar 31-Mar 21-Apr 100% $

A265 M1-8362 31-Oct 25-Apr 3 Plate 20 x 2438 x 6096 S355JR sh 2 4,667.00 4 F FOB 7-Jan 17-Jan 22-Mar 29-Mar 3-Apr 12-Apr 100% $

A265 M1-8362 31-Oct 25-Apr 5 Plate 3.2 x 1219 x 2438 SS400 sh 17 1,269.00 4 F FOB 7-Jan 17-Jan 22-Mar 29-Mar 3-Apr 12-Apr 100% $

A265 M1-8362 31-Oct 25-Apr 12 Plate 40 x 2410 x 6100 SS400 sh 1 4,616.11 4 F FOB 7-Jan 17-Jan 22-Mar 29-Mar 3-Apr 12-Apr 100% $

A265 W4-8576 19-Dec 22-Dec 1 Plate 10 x 1500 x 6000 SS400 sh 6 4,239.00 801 L DDP 21-Dec 24-Dec 24-Dec 26-Dec 100% VND

Page 60: Hvc PlatePipe Update)

HVC-PUR 60 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A265 M5-8619 2-Jan 4-Jan 1 Plate 10 x 1500 x 6000 SS400 sh 2 1,413.00 6 L DDP 4-Jan 4-Jan 5-Jan 5-Feb 100% VND

A265 M1-8696 1 SMLS Pipe 4" S/40 (OD114.3x6.02t) - 6 API 5L pc 3 289.20 38 L DDP 16-Jan 16-Jan 16-Jan 23-Jan 100% VND

A265 W4-8485 26-Nov 28-Nov 1 Plate 10 x 1500 x 6000 SS400 sh 2 1,413.00 751 L DDP 27-Nov 29-Nov 5-Dec 19-Dec 100% VND

A265 M1-8098 7-Sep 30-Nov 1 Plate 15 x 1219 x 2438 A240-316L sh 1 356.00 287 F FOB 18-Sep 30-Nov 28-Nov 4-Dec 10-Dec 26-Dec 100% $

A265 M1-8098 7-Sep 30-Nov 2 Plate 25 x 1219 x 2438 A240-316L sh 1 593.00 287 F FOB 18-Sep 30-Nov 28-Nov 4-Dec 10-Dec 26-Dec 100% $

A265 M1-8098 7-Sep 30-Nov 3 Plate 6 x 1219 x 2438 A240-304 sh 1 141.00 287 F FOB 18-Sep 30-Nov 28-Nov 4-Dec 10-Dec 26-Dec 100% $

A265 M1-8098 7-Sep 30-Nov 5 Plate 25 x 1219 x 2438 A240-304 sh 1 589.00 287 F FOB 18-Sep 30-Nov 28-Nov 4-Dec 10-Dec 26-Dec 100% $

A265 M1-8098 7-Sep 30-Nov 6 Plate 15 x 2438 x 6096 SS400-China sh 1 1,750.00 287 F FOB 18-Sep 30-Nov 28-Nov 4-Dec 10-Dec 26-Dec 100% $

A265 M1-8267 5-Oct 1-Nov 1 Plate 10 x 1524 x 6096 SS400 sh 2 1,458.60 318 F FOB 12-Oct 1-Nov 24-Oct 30-Oct 13-Nov 100% $

A265 M1-7912 3-Aug 25-Aug 1 Plate 8 x 2000 x 8000 SS400 sh 6 6,029.00 233 F FOB 8-Aug 23-Aug 19-Sep 26-Sep 1-Oct 10-Nov 100% $

A265 M1-7912 3-Aug 25-Aug 2 Plate 20 x 2438 x 6096 SS400 sh 2 4,667.00 233 F FOB 8-Aug 23-Aug 19-Sep 26-Sep 1-Oct 10-Nov 100% $

A265 M1-7912 3-Aug 25-Aug 3 Plate 30 x 2438 x 6096 SS400 sh 2 7,000.00 233 F FOB 8-Aug 23-Aug 19-Sep 26-Sep 1-Oct 10-Nov 100% $

A265 M1-8098 7-Sep 30-Nov 4 Plate 15 x 1219 x 6096 A240-304 sh 1 884.00 287 F FOB 18-Sep 10-Oct 14-Oct 21-Oct 27-Oct 10-Nov 100% $

A265 M1-8340 31-Oct 1 Plate 10 x 1500 x 6000 SS400 sh 10 7,065.00 663 L DDP 23-Oct 24-Oct 25-Oct 8-Nov 100% VND

A265 M1-7913 3-Aug 25-Aug 1 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 100 2,430.00 232 F FOB 8-Aug 17-Aug 17-Aug 24-Aug 31-Aug 13-Sep 100% $

A265 M1-7913 3-Aug 25-Aug 2 W/D Pipe 1-1/2" S/80(OD48.3xt5.08)- A53-B pc 50 1,623.00 232 F FOB 8-Aug 17-Aug 17-Aug 24-Aug 31-Aug 13-Sep 100% $

A265 M1-7913 3-Aug 25-Aug 3 W/D Pipe 1" S/40(OD33.4xt3.38)-6M A53-B pc 10 150.00 232 F FOB 8-Aug 17-Aug 17-Aug 24-Aug 31-Aug 13-Sep 100% $

A265 M1-7913 3-Aug 25-Aug 4 W/D Pipe 2-1/2" S/80(OD73x7.01) - 6 A53-B pc 20 1,369.00 232 F FOB 8-Aug 17-Aug 17-Aug 24-Aug 31/8, 25/9 a 2-Oct 100% $

A265 M1-8240 29-Sep 29-Sep 1 Plate 8 x 1500 x 6000 SS400 sh 10 5,652.00 607 L DDP 1-Oct 3-Oct 3-Oct 15-Oct 100% VND

A265 M1-8058 1 Plate 10 x 1500 x 6000 SS400 sh 20 14,130.00 519 L DDP 4-Sep 6-Sep 5-Sep 13-Oct 100% VND

A265 M1-8058 2 Plate 14.7 x 685 x 6000 SS400 sh 7 3,318.00 519 L DDP 4-Sep 6-Sep 5-Sep 13-Oct 100% VND

A265 M1-7982 17-Aug 1 Plate 10 x 1500 x 6000 SS400 sh 10 7,065.00 470 L DDP 17-Aug 24-Aug 21-Aug 13-Oct 100% VND

A265 M1-7892 26-Jul 1-Sep 1 W/D Pipe 8" S/80(OD219.1 x 12.5)-6M S355J2H pc 1 382.00 227 F CFR 6-Aug 20-Aug 29-Sep 6-Oct 9-Oct 13-Oct 100% EUR

A265 M1-7891 26-Jul 1-Sep 4 Plate 40 x 1250 x 2500 with impact S355J2 sh 1 981.00 227 F CFR 6-Aug 20-Aug 29-Sep 6-Oct 9-Oct 13-Oct 100% EUR

A265 M1-7854 16-Jul 15-Aug 1 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 145 3,524.00 216 F FOB 23-Jul 17-Aug 17-Aug 24-Aug 31-Aug 8-Oct 100% $

A265 M1-7854 16-Jul 15-Aug 2 W/D Pipe 1-1/2" S/80(OD48.3xt5.08)- A53-B pc 80 2,597.00 216 F FOB 23-Jul 17-Aug 17-Aug 24-Aug 31-Aug 8-Oct 100% $

A265 M1-7856 16-Jul 20-Aug 1 W/D Pipe 3" S/40 (OD88.9xt5.49)-6M A312-316L pc 40 2,755.00 216 F FOB 23-Jul 17-Aug 17-Aug 24-Aug 31-Aug 8-Oct 100% $

A265 M1-8016 22-Aug 23-Aug 1 Plate 40 x 880 x 2490 A240-304 sh 1 695.00 499 L DDP 23-Aug 24-Aug 25-Aug 6-Sep 100% VND

A265 M1-7722 21-Jun 30-Jul 2 Plate 16 x 1524 x 6096 SS400 sh 5 5,835.00 187 F FOB 25-Jun 25-Jul 4-Aug 15-Aug 17-Aug 6-Sep 100% $

A265 M1-7457 4-May 15-Jun 7 Plate 15 x 1524 x 6096 SS400 sh 7 7,658.00 139 F FOB 18-May 2-Jun 4-Aug 15-Aug 17-Aug 13-Nov 100% $

A265 M1-7785 4-Jul 15-Aug 1 Plate 15 x2438 x 6096 SS400 sh 7 12,250.00 203 F FOB 11-Jul 26-Jul 4-Aug 15-Aug 17-Aug 6-Sep 100% $

A265 M1-7785 4-Jul 15-Aug 2 Plate 20 x2438 x 6096 SS400 sh 1 2,333.00 203 F FOB 11-Jul 26-Jul 4-Aug 15-Aug 17-Aug 6-Sep 100% $

A265 M1-7723 21-Jun 30-Jul 1 Rec.Pipe 200 x 100 x 9-6M STKR400 pc 3 688.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7721 21-Jun 30-Jul 1 SMLS Pipe 2" S/80(OD60.3x5.54t)-6M A106-B pc 2 90.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7721 21-Jun 30-Jul 2 SMLS Pipe 6" S/120(OD168.3x14.27t)- A106-B pc 1 325.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7721 21-Jun 30-Jul 4 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 240 5,832.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7721 21-Jun 30-Jul 5 W/D Pipe 1-1/2" S/80(OD48.3xt5.08)- A53-B pc 135 4,382.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7721 21-Jun 30-Jul 6 W/D Pipe 5" S/40 (OD141.3x6.55t) - A53-B pc 14 3,657.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7721 21-Jun 30-Jul 7 W/D Pipe 6" S/40 (OD168.3x7.1t) -12 A53-B pc 5 1,693.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7670 11-Jun 10-Jul 1 SMLS Pipe 1" S/80(OD33.4x4.55t)-6M A106-B pc 12 233.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7670 11-Jun 10-Jul 2 SMLS Pipe 2" S/40(OD60.3xt3.91)-6M A106-B pc 30 996.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7670 11-Jun 10-Jul 3 SMLS Pipe 4" S/80 (OD114.3x8.56t)-6M A106-B pc 1 134.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7670 11-Jun 10-Jul 4 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 13 428.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7670 11-Jun 10-Jul 5 W/D Pipe 2" S/40(OD60.3x3.9t)-6M A312-316 pc 1 33.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7786 4-Jul 15-Aug 1 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 380 9,234.00 205 F FOB 11-Jul 26-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7786 4-Jul 15-Aug 2 W/D Pipe 1-1/2" S/80(OD48.3xt5.08)- A53-B pc 210 6,817.00 205 F FOB 11-Jul 26-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 1 Plate 10 x 2438 x 6096 SM490YA sh 5 5,840.00 118 F FOB 4-May 30-Jun 4-Aug 15-Aug 16-Aug 23-Aug 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 2 Plate 15 x 1524 x 6096 SM490YA sh 1 1,094.00 118 F FOB 4-May 30-Jun 4-Aug 15-Aug 16-Aug 23-Aug 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 3 Plate 20 x 2438 x 6096 SM490YA sh 9 21,000.00 118 F FOB 4-May 30-Jun 4-Aug 15-Aug 16-Aug 23-Aug 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 4 Plate 25 x 2438 x 6096 SM490YA sh 4 11,666.00 118 F FOB 4-May 30-Jun 4-Aug 15-Aug 16-Aug 23-Aug 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 5 Plate 30 x 2438 x 6096 SM490YA sh 15 52,500.00 118 F FOB 4-May 30-Jun 4-Aug 15-Aug 16-Aug 23-Aug 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 6 Plate 40 x 1524 x 6096 SM490YA sh 3 8,751.00 118 F FOB 4-May 30-Jun 4-Aug 15-Aug 16-Aug 23-Aug 100% $

A265 M1-7337(R.5) 1 Plate 10 x 2100 x 6096 SM490YA sh 1 1,010.00 118 F FOB 4-May 30-Jun 6-Jul 11-Jul 20-Jul 7-Aug 100% $

Page 61: Hvc PlatePipe Update)

HVC-PUR 61 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A265 M1-7337(R.5) 1 Plate 10 x 338 x 6096 SM490YA sh 1 160.00 118 F FOB 4-May 30-Jun 6-Jul 11-Jul 20-Jul 7-Aug 100% $

A265 M1-7429 25-Apr 30-May 4 Plate 15 x 1524 x 6096 A36 sh 5 5,470.00 99 F CIF 26-Apr 10-Jul 25-Jul 1-Aug 9-Aug 16-Aug L/C $

A265 M1-7359(R.1) 10-Apr 30-May 24-Apr 1 Plate 8 x 3048 x 7400 A36 sh 2 2,832.93 99 F CIF 26-Apr 10-Jul 25-Jul 1-Aug 9-Aug 16-Aug L/C $

A265 M1-7359(R.1) 10-Apr 30-May 24-Apr 3 Plate 12 x 3048 x 7400 A36 sh 60 127,500.00 99 F CIF 26-Apr 10-Jul 19-Jul 25-Jul 27-Jul 7-Aug L/C $

A265 M1-7359(R.1) 10-Apr 30-May 24-Apr 4 Plate 15 x 3048 x 7400 A36 sh 54 143,420.00 99 F CIF 26-Apr 10-Jul 19-Jul 25-Jul 27-Jul 7-Aug L/C $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 9 Plate 10 x 2438 x 6096 A36 sh 16 18,670.00 99 F CIF 26-Apr 10-Jul 19-Jul 25-Jul 27-Jul 7-Aug L/C $

A265 M1-7722 21-Jun 30-Jul 1 Plate 15 x 1524 x 6096 SS400 sh 5 5,470.00 187 F FOB 25-Jun 25-Jul 6-Jul 11-Jul 20-Jul 27-Jul 100% $

A265 M1-7586 26-May 30-Jun 7 Plate 6 x 1524 x 6096 A36 sh 4 1,750.00 167 F FOB 7-Jun 30-Jun 22-Jun 1-Jul 5-Jul 23-Jul 100% $

A265 M1-7586 26-May 30-Jun 8 Plate 15 x 1524 x 6096 A36 sh 2 2,188.00 167 F FOB 7-Jun 30-Jun 6-Jul 11-Jul 20-Jul 24-Jul 100% $

A265 M1-7457 4-May 15-Jun 3 Plate 3.2 x 1219 x 2438 SS400 sh 6 448.00 139 F FOB 18-May 2-Jun 12-Jun 19-Jun 28-Jun 21-Jul 100% $

A265 M1-7605 30-May 10-Jul 1 Plate 15 x 1524 x 6096 SS400 sh 20 21,880.00 171 F FOB 9-Jun 25-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A265 M1-7605 30-May 10-Jul 2 Plate 25 x 2438 x 6096 SS400 sh 2 5,834.00 171 F FOB 9-Jun 25-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A265 M1-7586 26-May 30-Jun 9 Plate 25 x 2438 x 6096 SS400 sh 1 2,917.00 171 F FOB 9-Jun 25-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 2 Plate 15 x 1524 x 6096 SM490YA sh 1 1,094.00 118 F FOB 4-May 30-Jun 2-Jul 7-Jul 13-Jul 21-Jul 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 3 Plate 20 x 2438 x 6096 SM490YA sh 2 4,666.73 118 F FOB 4-May 30-Jun 2-Jul 7-Jul 13-Jul 21-Jul 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 4 Plate 25 x 2438 x 6096 SM490YA sh 1 2,916.60 118 F FOB 4-May 30-Jun 2-Jul 7-Jul 13-Jul 21-Jul 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 5 Plate 30 x 2438 x 6096 SM490YA sh 5 17,500.00 118 F FOB 4-May 30-Jun 2-Jul 7-Jul 13-Jul 21-Jul 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 6 Plate 40 x 1524 x 6096 SM490YA sh 1 2,917.16 118 F FOB 4-May 30-Jun 2-Jul 7-Jul 13-Jul 21-Jul 100% $

A265 W4-7831 11-Jul 14-Jul 1 Plate 10 x 1500 x 6000 SS400 sh 2 1,413.00 396 L DDP 16-Jul 19-Jul 19-Jul 7-Aug 100% VND

A265 M1-7768 29-Jun 25-Jul 1 Plate 12 x 1525 x 1500 SUS316L sh 1 282.80 389 L DDP 11-Jul 14-Jul 16-Jul 23-Jul 100% $

A265 M1-7650 6-Jun 15-Jul 1 SMLS Pipe 1" S/40 (OD33.4xt3.38)-6M A106-B sh 12 180.00 180 F CFR 18-Jun 18-Jul 7-Jul 15-Jul 21-Jul 24-Jul 100% $

A265 M1-7650 6-Jun 15-Jul 2 SMLS Pipe 1-1/2" S/40(OD48.3x3.68t)- A106-B sh 24 583.20 180 F CFR 18-Jun 18-Jul 7-Jul 15-Jul 21-Jul 24-Jul 100% $

A265 M1-7650 6-Jun 15-Jul 3 SMLS Pipe 2" S/40(OD60.3xt3.91)-6M A106-B sh 8 261.12 180 F CFR 18-Jun 18-Jul 7-Jul 15-Jul 21-Jul 24-Jul 100% $

A265 M1-7650 6-Jun 15-Jul 4 SMLS Pipe 2" S/160(OD60.3x8.7t)-6M A106-B sh 3 199.98 180 F CFR 18-Jun 18-Jul 7-Jul 15-Jul 21-Jul 24-Jul 100% $

A265 M1-7650 6-Jun 15-Jul 5 SMLS Pipe 3"S/40 (OD88.9x5.49t)-6M A106-B sh 38 2,574.12 180 F CFR 18-Jun 18-Jul 7-Jul 15-Jul 21-Jul 24-Jul 100% $

A265 M1-7650 6-Jun 15-Jul 6 SMLS Pipe 4" S/40(O.D114.3xt6.02)-6M A106-B sh 15 1,446.30 180 F CFR 18-Jun 18-Jul 7-Jul 15-Jul 21-Jul 24-Jul 100% $

A265 M1-7650 6-Jun 15-Jul 7 SMLS Pipe 5" S/40(OD141.3xt6.55)- A106-B sh 24 3,134.88 180 F CFR 18-Jun 18-Jul 7-Jul 15-Jul 21-Jul 24-Jul 100% $

A265 M1-7650 6-Jun 15-Jul 8 SMLS Pipe 8" S/80 (OD219.1xt12.7)-6M A106-B sh 30 11,635.20 180 F CFR 18-Jun 18-Jul 7-Jul 15-Jul 21-Jul 24-Jul 100% $

A265 M1-7650 6-Jun 15-Jul 9 SMLS Pipe 12" S/XS (OD323.9x12.7t)- A106-B sh 1 584.76 180 F CFR 18-Jun 18-Jul 7-Jul 15-Jul 21-Jul 24-Jul 100% $

A265 M1-7586 26-May 30-Jun 1 Plate 6 x 1219 x 6096 A240-316L sh 2 712.00 119 F FOB 6-Jun 30-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A265 M1-7586 26-May 30-Jun 3 Plate 25 x 1524 x 3048 A240-316L sh 1 927.00 119 F FOB 6-Jun 30-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A265 M1-7586 26-May 30-Jun 4 Plate 6 x 1219 x 6096 A240-304 sh 2 707.00 119 F FOB 6-Jun 30-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A265 M1-7586 26-May 30-Jun 5 Plate 15 x 1524 x 6096 A240-304 sh 1 1,105.00 119 F FOB 6-Jun 30-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A265 M1-7457(R.2) 4-May 15-Jun 1 Plate 3 x 1219 x 2438 A240-304 sh 2 142.00 137 F FOB 4-May 30-Jun 22-Jun 1-Jul 5-Jul 24-Jul 100% $

A265 M1-7457(R.2) 4-May 15-Jun 2 Plate 3 x 1219 x 2438 A240-316L sh 1 71.00 137 F FOB 4-May 30-Jun 22-Jun 1-Jul 5-Jul 24-Jul 100% $

A265 M1-7457(R.2) 4-May 15-Jun 4 Plate 10 x 1524 x 3048 A240-316L sh 4 1,484.00 137 F FOB 4-May 30-Jun 22-Jun 1-Jul 5-Jul 24-Jul 100% $

A265 M1-7457(R.2) 4-May 15-Jun 6 Plate 15 x 1524 x 6096 A240-304 sh 2 2,210.00 137 F FOB 4-May 30-Jun 22-Jun 1-Jul 5-Jul 24-Jul 100% $

A265 M1-7429 25-Apr 30-May 1 Plate 8 x 1524 x 6096 A36 sh 19 11,080.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A265 M1-7429 25-Apr 30-May 2 Plate 10 x 1524 x 6096 A36 sh 5 3,650.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A265 M1-7429 25-Apr 30-May 3 Plate 12 x 1524 x 6096 A36 sh 31 27,130.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A265 M1-7426 25-Apr 30-May 1 Plate 6 x 1524 x 6096 A36 sh 135 59,130.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A265 M1-7426 25-Apr 30-May 2 Plate 40 x 2438 x 6096 A36 sh 3 14,280.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A265 M1-7359(R.1) 10-Apr 30-May 24-Apr 1 Plate 8 x 3048 x 7400 A36 sh 184 260,629.85 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A265 M1-7359(R.1) 10-Apr 30-May 24-Apr 2 Plate 10 x 3048 x 7400 A36 sh 66 116,890.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A265 M1-7359(R.1) 10-Apr 30-May 24-Apr 5 Plate 20 x 3048 x 7400 A36 sh 6 21,250.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A265 M1-7586 26-May 30-Jun 2 Plate 15 x 1524 x 6096 (14.63t) A240-316L sh 1 1,115.00 297 L DDP 6-Jun 12-Jun 12-Jun 13-Jul 100% $

A265 M1-7586 26-May 30-Jun 6 Plate 25 x 1500 x 3000 A240-304 sh 1 929.00 297 L DDP 6-Jun 12-Jun 12-Jun 13-Jul 100% $

A265 M1-7587(R.1) 26-May 30-Jun 31-May 1 SMLS Pipe 2" S/40(OD60.3xt3.91)-6M A106-B pc 8 260.00 109 F FOB 1-Jun 30-Jun 17-Jun 22-Jun 29-Jun 11-Jul 100% $

A265 M1-7587(R.1) 26-May 30-Jun 31-May 2 SMLS Pipe 2"S/80(OD60.3x5.54t)-6M A106-B pc 3 135.00 109 F FOB 1-Jun 30-Jun 17-Jun 22-Jun 29-Jun 11-Jul 100% $

A265 M1-7587(R.1) 26-May 30-Jun 31-May 3 W/D Pipe 4"S/40(OD114.3x6.02t)-6M A312-316 pc 1 98.00 109 F FOB 1-Jun 30-Jun 17-Jun 22-Jun 29-Jun 11-Jul 100% $

A265 M1-7587(R.1) 26-May 30-Jun 31-May 4 W/D Pipe 6"S/40(OD168.3x7.11t)-6M A312-316 pc 1 172.00 109 F FOB 1-Jun 30-Jun 17-Jun 22-Jun 29-Jun 11-Jul 100% $

A265 M1-7587(R.1) 26-May 30-Jun 31-May 6 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 3 99.00 109 F FOB 1-Jun 30-Jun 17-Jun 22-Jun 29-Jun 11-Jul 100% $

A265 M1-7507 15-May 20-Jun 1 W/D Pipe 1" S/40(OD33.4xt3.38)-6M A53-B pc 4 60.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

Page 62: Hvc PlatePipe Update)

HVC-PUR 62 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A265 M1-7507 15-May 20-Jun 2 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 182 4,422.60 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7507 15-May 20-Jun 3 W/D Pipe 1-1/2" S/80(OD48.3xt5.08)- A53-B pc 80 2,596.80 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7507 15-May 20-Jun 4 W/D Pipe 2-1/2" S/80 (OD73 x 7.01t)- A53-B pc 10 684.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7507 15-May 20-Jun 5 SMLS Pipe 1" S/80(OD33.4x4.55t)-6M A106-B pc 8 155.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7507 15-May 20-Jun 6 SMLS Pipe 1-1/2" S/80 (OD48.3 x 5.08t A106-B pc 16 520.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7458 4-May 15-Jun 1 W/D Pipe 1"S/80(OD33.4x4.55t)-6M A312-316L pc 1 20.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7458 4-May 15-Jun 2 W/D Pipe 2" S/40(OD60.3x3.9t)-6M A312-316L pc 1 33.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7458 4-May 15-Jun 3 SMLS Pipe 4" S/40(O.D114.3xt6.02)-6M A106-B pc 3 289.34 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7458 4-May 15-Jun 4 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 1 97.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7458 4-May 15-Jun 5 SMLS Pipe 4"S/80(OD114.3x8.56t)-6M A106-B pc 1 133.92 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7458 4-May 15-Jun 6 SMLS Pipe 5"S/80(OD141.3x9.52t)-6M A106-B pc 7 1,299.36 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7458 4-May 15-Jun 6 SMLS Pipe 5"S/80(OD141.3x9.52t)-6M A106-B pc 3 557.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7458 4-May 15-Jun 7 SMLS Pipe 5"S/80(OD141.3x9.52t)-6M A312-316L pc 11 2,063.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7458 4-May 15-Jun 8 SMLS Pipe 6" S/80(OD168.3xt10.97) A106-B pc 3 766.10 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7458 4-May 15-Jun 8 SMLS Pipe 6" S/80(OD168.3xt10.97) A106-B pc 1 255.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7458 4-May 15-Jun 9 SMLS Pipe 6"S/80(OD168.3x10.97t)-6M A312-316L pc 4 1,032.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7455 4-May 15-Jun 1 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 240 5,832.00 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7455 4-May 15-Jun 2 W/D Pipe 1-1/2" S/80(OD48.3xt5.08)- A53-B pc 150 4,869.00 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7455 4-May 15-Jun 3 W/D Pipe 5" S/40(OD141.3x6.55)-6M A53-B pc 85 11,102.70 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7455 4-May 15-Jun 4 W/D Pipe 6" S/40(OD168.3xt7.11)- A53-B pc 33 5,596.00 130 F FOB 16-May 15-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 7 Plate 2 x 1219 x 2438 SS400 sh 28 1,320.00 87 F FOB 16-Apr 10-May 13-May 24-May 29-May 9-Jun 100% $

A265 M1-7337(R.5) 4-Apr 30-May 11-Apr 8 Plate 3 x 1219 x 2438 SS400 sh 28 1,960.00 87 F FOB 16-Apr 10-May 13-May 24-May 29-May 9-Jun 100% $

A265 M1-7206 26-Feb 10-May 1 Plate 6 x 1524 x 6096 A36 sh 1,250 547,500.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 2 Plate 10 x 2438 x 6096 A36 sh 5 5,840.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 3 Plate 20 x 2438 x 6096 A36 sh 2 4,670.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 4 Plate 15 x 1800 x 10500 S355JR or SM490YA sh 8 17,800.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 5 Plate 15 x 1800 x 9150 S355JR or SM490YA sh 4 7,760.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 6 Plate 15 x 1900 x 9350 S355JR or SM490YA sh 15 31,380.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 7 Plate 20 x 2300 x 14250 S355JR or SM490YA sh 72 370,510.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 8 Plate 20 x 2920 x 9350 S355JR or SM490YA sh 19 81,430.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 9 Plate 30 x 2200 x 14250 S355JR or SM490YA sh 24 177,190.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 10 Plate 30 x 1950 x 14250 S355JR or SM490YA sh 12 78,530.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 11 Plate 30 x 1850 x 11000 S355JR or SM490YA sh 10 47,920.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 12 Plate 30 x 2200 x 9350 S355JR or SM490YA sh 16 77,500.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 13 Plate 30 x 1850 x 9350 S355JR or SM490YA sh 10 40,740.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7206 26-Feb 10-May 14 Plate 40 x 1650 x 14250 S355JR or SM490YA sh 24 177,190.00 60 F CFR 9-Mar 15-May 31-May 8-Jun 10-Jun 19-Jun L/C $

A265 M1-7204 26-Feb 20-Mar 1 Plate 10 x 2438 x 6096 SS400 sh 4 4,667.00 66 F FOB 19-Mar 3-Apr 21-Apr 28-Apr 9-May 4-Jun 100% $

A265 M1-7363 11-Apr 20-May 1 W/D Pipe 1" S/80 (OD33.4x4.55)-6M SUS304 pc 1 19.40 89 F CFR 16-Apr 20-Apr 21-Apr 28-Apr 7-May 4-Jun 100% $

A265 M1-7363 11-Apr 20-May 2 SMLS Pipe 5" S/80 (OD141.3x9.52)-3M SUS304 pc 2 185.60 89 F CFR 16-Apr 20-Apr 21-Apr 28-Apr 7-May 4-Jun 100% $

A265 M1-7363 11-Apr 20-May 3 SMLS Pipe 1" S/80(OD33.4x4.55t)-6M A106-B pc 2 38.90 89 F CFR 16-Apr 20-Apr 21-Apr 28-Apr 7-May 4-Jun 100% $

A265 M1-7363 11-Apr 20-May 4 SMLS Pipe 1-1/2" S/80 (OD48.3x5.08)- A106-B pc 2 64.90 89 F CFR 16-Apr 20-Apr 21-Apr 28-Apr 7-May 4-Jun 100% $

QATAR GAS/A273

A273 M1-8019 22-Aug 15-Sep 1 Plate 10 x 1219 x 6096 SS400 sh 10 5,833.00 258 F FOB 1-Sep 7-Sep 7-Sep 13-Sep 19-Sep 14-Nov 100% $

A273 M1-8019 22-Aug 15-Sep 2 Plate 12 x 1219 x 6096 SS400 sh 4 2,800.00 258 F FOB 1-Sep 7-Sep 7-Sep 13-Sep 19-Sep 14-Nov 100% $

A273 M1-8191 21-Sep 25-Sep 1 Plate 10 x 1500 x 6000 SS400 sh 15 10,598.00 581 L DDP 25-Sep 26-Sep 26-Sep 13-Oct 100% VND

A273 M1-8191 21-Sep 25-Sep 2 Plate 15 x 1500 x 6000 SS400 sh 1 1,060.00 580 L DDP 26-Sep 27-Sep 27-Sep 13-Oct 100% VND

A273 M1-7846 16-Jul 20-Aug 1 SMLS Pipe 1" S/80(OD33.4x4.55t)-6M A106-B pc 2 39.00 216 F FOB 23-Jul 17-Aug 17-Aug 24-Aug 31-Aug 8-Oct 100% $

A273 M1-7846 16-Jul 20-Aug 2 SMLS Pipe 3/4" S/40(OD26.7x2.87t)-6M A312-321 pc 1 10.00 216 F FOB 23-Jul 17-Aug 17-Aug 24-Aug 31-Aug 8-Oct 100% $

A273 M1-7846 16-Jul 20-Aug 3 SMLS Pipe 1-1/2" S/10(OD48.3x2.77t)- A312-321 pc 1 19.00 216 F FOB 23-Jul 17-Aug 17-Aug 24-Aug 31-Aug 8-Oct 100% $

A273 M1-7846 16-Jul 20-Aug 4 SMLS Pipe 2" S/40(OD60.3x3.91t)-6M A312-321 pc 3 99.00 216 F FOB 23-Jul 17-Aug 17-Aug 24-Aug 31-Aug 8-Oct 100% $

A273 M1-7708 18-Jun 30-Jul 1 Plate 6 x 1524 x 6096 SS400 sh 10 4,380.00 187 F FOB 25-Jun 25-Jul 4-Aug 15-Aug 17-Aug 6-Sep 100% $

A273 M1-7708 18-Jun 30-Jul 2 Plate 8 x 2438 x 6096 SS400 sh 6 5,598.00 187 F FOB 25-Jun 25-Jul 4-Aug 15-Aug 17-Aug 6-Sep 100% $

A273 M1-7708 18-Jun 30-Jul 3 Plate 10 x2438 x6096 SS400 sh 3 3,501.00 187 F FOB 25-Jun 25-Jul 4-Aug 15-Aug 17-Aug 6-Sep 100% $

Page 63: Hvc PlatePipe Update)

HVC-PUR 63 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A273 M1-7708 18-Jun 30-Jul 4 Plate 12 x2438 x6096 A36/SS400 sh 1 1,400.00 187 F FOB 25-Jun 25-Jul 4-Aug 15-Aug 17-Aug 6-Sep 100% $

A273 M1-7708 18-Jun 30-Jul 5 Plate 15 x2438 x 6096 A36/SS400 sh 1 1,750.00 187 F FOB 25-Jun 25-Jul 4-Aug 15-Aug 17-Aug 6-Sep 100% $

A273 M1-7708 18-Jun 30-Jul 6 Plate 16 x2438 x6096 A36/SS400 sh 1 1,867.00 187 F FOB 25-Jun 25-Jul 4-Aug 15-Aug 17-Aug 6-Sep 100% $

A273 M1-7706 18-Jun 30-Jul 1 W/D Pipe 1" S/40(OD33.4xt3.38)-6M A53-B pc 9 135.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A273 M1-7706 18-Jun 30-Jul 2 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 70 1,701.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A273 M1-7706 18-Jun 30-Jul 3 W/D Pipe 1-1/2" S/80(OD48.3xt5.08)- A53-B pc 3 97.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A273 M1-7706 18-Jun 30-Jul 4 W/D Pipe 5" S/40 (OD141.3x6.5t) - 6M A53-B pc 48 6,223.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A273 M1-7706 18-Jun 30-Jul 4 W/D Pipe 5" S/40 (OD141.3x6.5t) - 12 A53-B pc 9 2,334.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A273 M1-7706 18-Jun 30-Jul 5 W/D Pipe 6" S/40(OD168.3xt7.11)- A53-B pc 26 4,403.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A273 M1-7706 18-Jun 30-Jul 5 W/D Pipe 6" S/40 (OD168.3x7.1t) - 12 A53-B pc 4 1,355.00 186 F FOB 28-Jun 15-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A273 M1-7731 25-Jun 15-Jul 1 Plate 2 x1200 x 2400 SUS304 sh 9 428.00 367 L DDP 3-Jul 10-Jul 11-Jul 6-Aug 100% VND

A273 M1-7731 25-Jun 15-Jul 2 Plate 3 x1200 x 2400 SUS304 sh 9 642.00 367 L DDP 3-Jul 10-Jul 11-Jul 6-Aug 100% VND

A273 M1-7731 25-Jun 15-Jul 3 Plate 5 x1524 x 6096 SUS304 sh 3 1,105.00 367 L DDP 3-Jul 10-Jul 11-Jul 6-Aug 100% VND

A273 M1-7341 10-Apr 10-Jun 1 W/D Pipe 3" S/80(OD88.9x7.62)-6M A53-B pc 32 2,931.80 95 F FOB 18-Apr 20-Jun 12-Jun 19-Jun 26-Jun 29-Jun 100% $

A273 M1-7341 10-Apr 10-Jun 2 W/D Pipe 4" S/40(OD114.3xt6.02)-6M A53-B pc 2 192.80 95 F FOB 18-Apr 20-Jun 12-Jun 19-Jun 26-Jun 29-Jun 100% $

A273 M1-7341 10-Apr 10-Jun 3 W/D Pipe 20" S/40(OD508x15.09)-6.2 A53-B pc 16 18,195.00 95 F FOB 18-Apr 20-Jun 12-Jun 19-Jun 26-Jun 29-Jun 100% $

A273 M1-7408 19-Apr 25-May 2 Plate 10 x 2438 x 6096 A36 sh 13 15,166.72 99 F CIF 26-Apr 10-Jul 19-Jul 25-Jul 27-Jul 7-Aug L/C $

A273 M1-7339 10-Apr 15-Jun 1 Plate 10 x 2650 x 8500 A36 sh 86 152,066.28 99 F CIF 26-Apr 10-Jul 19-Jul 25-Jul 27-Jul 7-Aug L/C $

A273 M1-7339 10-Apr 15-Jun 2 Plate 14 x 3048 x 12000 A36 sh 41 164,807.80 99 F CIF 26-Apr 10-Jul 19-Jul 25-Jul 27-Jul 7-Aug L/C $

A273 M1-7622 4-Jun 10-Jul 1 Plate 2 x 1219 x 2438 SS400 sh 8 373.00 167 F FOB 7-Jun 30-Jun 22-Jun 1-Jul 5-Jul 23-Jul 100% $

A273 M1-7622 4-Jun 10-Jul 2 Plate 3 x 1219 x 2438 SS400 sh 8 560.00 167 F FOB 7-Jun 30-Jun 22-Jun 1-Jul 5-Jul 23-Jul 100% $

A273 M1-7622 4-Jun 10-Jul 3 Plate 5 x 1219 x 2438 SS400 sh 8 933.00 167 F FOB 7-Jun 30-Jun 22-Jun 1-Jul 5-Jul 23-Jul 100% $

A273 M1-7480 9-May 10-Jul 1 Plate 50 x 1524 x 6096 A36 sh 2 7,292.89 123 F FOB 9-May 25-Jun 22-Jun 1-Jul 5-Jul 21-Jul L/C $

A273 M1-7480 9-May 10-Jul 2 Plate 50 x 1524 x 6096 A36 sh 1 3,646.44 123 F FOB 9-May 25-Jun 6-Jul 11-Jul 20-Jul 24-Jul L/C $

A273 M1-7408 19-Apr 25-May 1 Plate 6 x 1524 x 6096 A36 sh 185 81,030.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A273 M1-7408 19-Apr 25-May 3 Plate 20 x 1525 x 6096 A36 sh 1 1,460.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A273 M1-7339 10-Apr 15-Jun 3 Plate 15 x 2438 x 6096 A36 sh 2 3,500.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A273 M1-7339 10-Apr 15-Jun 4 Plate 16 x 2438 x 6096 A36 sh 8 14,940.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A273 M1-7357 10-Apr 25-May 5 Plate 15 x 2438 x 6096 A36 sh 3 5,250.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A273 M1-7357 10-Apr 25-May 6 Plate 20 x 1525 x 6096 A36 sh 10 14,590.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A273 M1-7357 10-Apr 25-May 7 Plate 40 x 1525 x 6096 A36 sh 3 8,930.00 99 F CIF 26-Apr 10-Jul 2-Jul 7-Jul 16-Jul 21-Jul L/C $

A273 M1-7409 19-Apr 25-May 1 W/D Pipe 6" S/40(OD168.3xt7.11)- A53-B pc 8 1,356.48 121 F FOB 7-May 18-May 18-May 23-May 30-May 8-Jun 100% $

Bluewaters/A274

A274 M1-7390 16-Apr 30-May 2 Plate 3.2 x 1524 x 6096 SS400 sh 6 1,400.00 124 F FOB 9-May 25-Jun 12-Jun 19-Jun 28-Jun 11-Jul 100% $

A274 M1-7390 16-Apr 30-May 1 Plate 3 x 1219 x 2438 A240-304 sh 6 424.00 100 F FOB 20-Apr 20-May 13-May 24-May 29-May 8-Jun 100% $

Bluewaters/A281

A281 M1-7437(R.3) 2-May 15-Jun 16-May 1 Plate 4.5 x 1524 x 6096 SS400 ea 30 9,845.00 124 F FOB 9-May 25-Jun 12-Jun 19-Jun 28-Jun 11-Jul 100% $

A281 M1-7437(R.3) 2-May 15-Jun 16-May 2 Plate 19 x 2438 x 6096 SS400 ea 1 2,216.67 124 F FOB 9-May 25-Jun 12-Jun 19-Jun 28-Jun 11-Jul 100% $

A281 M1-7437(R.3) 2-May 15-Jun 16-May 3 Plate 12 x 2438 x 6096 SM490A ea 1 1,400.00 124 F FOB 9-May 25-Jun 12-Jun 19-Jun 28-Jun 11-Jul 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 1 Plate 9 x 1829 x 9144 SS400 sh 4 4,726.00 87 F FOB 16-Apr 30-May 12-Jun 19-Jun 23-Jun 9-Jul 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 6 Plate 14 x 1829 x 8000 SS400 sh 7 11,257.00 87 F FOB 16-Apr 30-May 12-Jun 19-Jun 23-Jun 9-Jul 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 10 Plate 14 x 1524 x 8000 SS400 sh 6 8,039.00 87 F FOB 16-Apr 30-May 12-Jun 19-Jun 23-Jun 9-Jul 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 12 Plate 19 x 2438 x 6096 SS400 sh 4 8,867.00 87 F FOB 16-Apr 30-May 12-Jun 19-Jun 23-Jun 9-Jul 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 13 Plate 22 x 2438 x 6096 SS400 sh 4 10,267.00 87 F FOB 16-Apr 30-May 12-Jun 19-Jun 23-Jun 9-Jul 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 1 Plate 9 x 1829 x 9144 SS400 sh 7 8,274.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 2 Plate 9 x 1829 x 8000 SS400 sh 8 8,270.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 3 Plate 9 x 1524 x 9144 SS400 sh 28 27,567.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 4 Plate 9 x 1219 x 9144 SS400 sh 26 20,475.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 5 Plate 12 x 1219 x 6096 SS400 sh 8 5,600.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 6 Plate 14 x 1829 x 8000 SS400 sh 4 6,432.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 7 Plate 14 x 1829 x 7000 SS400 sh 6 8,442.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 8 Plate 14 x 1524 x 9144 SS400 sh 30 45,945.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 9 Plate 14 x 1524 x 9000 SS400 sh 18 27,133.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

Page 64: Hvc PlatePipe Update)

HVC-PUR 64 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A281 M1-7351(R.3) 6-Apr 15-Jun 16-May 11 Plate 14 x 1219 x 9144 SS400 sh 43 52,675.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A281 M1-7438(R.2) 2-May 15-Jun 16-May 2 W/D Pipe 2" S/40(OD60.3 x t3.91)-6M A53-B ea 9 293.80 121 F FOB 7-May 18-May 18-May 23-May 30-May 8-Jun 100% $

A281 M1-7438(R.2) 2-May 15-Jun 16-May 3 W/D Pipe 80A S/40(OD89.1 x t5.5)-6M SUS304 ea 1 68.50 121 F FOB 7-May 18-May 18-May 23-May 30-May 8-Jun 100% $

A281 M1-7438(R.2) 2-May 15-Jun 16-May 4 W/D Pipe 100A S/40(OD114.3 x t6.0) SUS304 ea 1 97.40 121 F FOB 7-May 18-May 18-May 23-May 30-May 8-Jun 100% $

A281 M1-7438(R.2) 2-May 15-Jun 16-May 5 W/D Pipe OD318.5 xt7-6M SGP ea 1 322.60 121 F FOB 7-May 18-May 18-May 23-May 30-May 8-Jun 100% $

A281 M1-7394(R.2) 16-Apr 15-Jun 16-May 1 Plate 3 x 1219 x 6096 A240-304 sh 128 22,625.00 100 F FOB 20-Apr 20-May 13-May 24-May 29-May 8-Jun 100% $

Bluewaters/A282

A282 M1-7517 16-May 15-Jun 1 Plate 4.5 x 1524 x 6096 SS400 ea 29 9,517.00 124 F FOB 9-May 25-Jun 12-Jun 19-Jun 28-Jun 11-Jul 100% $

A282 M1-7517 16-May 15-Jun 2 Plate 19 x 2438 x 6096 SS400 ea 1 2,216.67 124 F FOB 9-May 25-Jun 12-Jun 19-Jun 28-Jun 11-Jul 100% $

A282 M1-7517 16-May 15-Jun 3 Plate 12 x 2438 x 6096 SM490A ea 1 1,400.00 124 F FOB 9-May 25-Jun 12-Jun 19-Jun 28-Jun 11-Jul 100% $

A282 M1-7516 16-May 15-Jun 9 Plate 14 x 1524 x 9000 SS400 sh 1 1,507.00 87 F FOB 16-Apr 30-May 12-Jun 19-Jun 23-Jun 9-Jul 100% $

A282 M1-7516 16-May 15-Jun 10 Plate 14 x 1524 x 8000 SS400 sh 6 8,039.00 87 F FOB 16-Apr 30-May 12-Jun 19-Jun 23-Jun 9-Jul 100% $

A282 M1-7516 16-May 15-Jun 12 Plate 19 x 2438 x 6096 SS400 sh 4 8,867.00 87 F FOB 16-Apr 30-May 12-Jun 19-Jun 23-Jun 9-Jul 100% $

A282 M1-7516 16-May 15-Jun 13 Plate 22 x 2438 x 6096 SS400 sh 4 10,267.00 87 F FOB 16-Apr 30-May 12-Jun 19-Jun 23-Jun 9-Jul 100% $

A282 M1-7518 16-May 15-Jun 1 Plate 3 x 1219 x 6096 A240-304 sh 127 22,455.00 100 F FOB 20-Apr 20-May 13-May 24-May 29-May 8-Jun 100% $

A282 M1-7514 16-May 15-Jun 1 W/D Pipe 2" S/40(OD60.3 x t3.91)-6M A53-B ea 8 261.00 121 F FOB 7-May 18-May 18-May 23-May 30-May 8-Jun 100% $

A282 M1-7514 16-May 15-Jun 2 W/D Pipe 80A S/40(OD89.1 x t5.5)-6M SUS304 ea 1 68.50 121 F FOB 7-May 18-May 18-May 23-May 30-May 8-Jun 100% $

A282 M1-7514 16-May 15-Jun 3 W/D Pipe 100A S/40(OD114.3 x t6.0) SUS304 ea 1 97.40 121 F FOB 7-May 18-May 18-May 23-May 30-May 8-Jun 100% $

A282 M1-7514 16-May 15-Jun 4 W/D Pipe OD318.5 xt7-6M SGP ea 1 322.60 121 F FOB 7-May 18-May 18-May 23-May 30-May 8-Jun 100% $

A282 M1-7516 16-May 15-Jun 1 Plate 9 x 1829 x 9144 SS400 sh 11 12,997.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A282 M1-7516 16-May 15-Jun 2 Plate 9 x 1829 x 8000 SS400 sh 8 8,270.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A282 M1-7516 16-May 15-Jun 3 Plate 9 x 1524 x 9144 SS400 sh 28 27,567.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A282 M1-7516 16-May 15-Jun 4 Plate 9 x 1219 x 9144 SS400 sh 26 20,475.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A282 M1-7516 16-May 15-Jun 5 Plate 12 x 1219 x 6096 SS400 sh 8 5,600.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A282 M1-7516 16-May 15-Jun 6 Plate 14 x 1829 x 8000 SS400 sh 11 17,688.60 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A282 M1-7516 16-May 15-Jun 7 Plate 14 x 1829 x 7000 SS400 sh 6 8,442.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A282 M1-7516 16-May 15-Jun 8 Plate 14 x 1524 x 9144 SS400 sh 30 45,945.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A282 M1-7516 16-May 15-Jun 9 Plate 14 x 1524 x 9000 SS400 sh 17 25,626.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

A282 M1-7516 16-May 15-Jun 11 Plate 14 x 1219 x 9144 SS400 sh 43 52,680.00 87 F FOB 16-Apr 30-May 13-May 24-May 29-May 9-Jun 100% $

Marafiq/A286

A286 W4-9354 17-Jun 17-Jul 3 SMAW W/D electrodE309L-16 (SFA 5.4) Dia 2.0 box 200 1,000.00 207 F CFR 23-Jun 20-Jul 30-Aug 4-Sep 10-Sep 22-Sep 100% $

A286 W4-9354 17-Jun 17-Jul 1 SMAW W/D electrodE7016 (SFA 5.1) Dia 3.2 box 400 2,000.00 208 F CFR 23-Jun 20-Jul 31-Jul 7-Aug 21-Aug 9-Sep 100% $

A286 W4-9354 17-Jun 17-Jul 2 SMAW W/D electrodE7016 (SFA 5.1) Dia 4.0 box 400 2,000.00 208 F CFR 23-Jun 20-Jul 31-Jul 7-Aug 21-Aug 9-Sep 100% $

A286 W4-9354 17-Jun 17-Jul 4 SMAW W/D electrodE309L-16 (SFA 5.4) Dia 3.2 box 200 1,000.00 207 F CFR 23-Jun 20-Jul 18-Jul 24-Jul 10-Aug 26-Aug 100% $

A286 W4-9354 17-Jun 17-Jul 5 SMAW W/D electrodE308L-16 (SFA 5.4) Dia 2.0 box 200 1,000.00 207 F CFR 23-Jun 20-Jul 18-Jul 24-Jul 10-Aug 26-Aug 100% $

A286 W4-9354 17-Jun 17-Jul 6 SMAW W/D electrodE308L-16 (SFA 5.4) Dia 3.2 box 200 1,000.00 207 F CFR 23-Jun 20-Jul 18-Jul 24-Jul 10-Aug 26-Aug 100% $

A286 W4-9354 17-Jun 17-Jul 7 FCAW W/D wire E308LT1-1 (SFA 5.22) Dia 1.6 spool 160 2,000.00 207 F CFR 23-Jun 20-Jul 31-Jul 7-Aug 21-Aug 9-Sep 100% $

A286 W4-9354 17-Jun 17-Jul 8 FCAW W/D wire E309LT1-1 (SFA 5.22) Dia 1.6 spool 240 3,000.00 207 F CFR 23-Jun 20-Jul 31-Jul 7-Aug 21-Aug 9-Sep 100% $

A286 M1-8488(was) 27-Nov 25-Mar 2 Plate 6 x 1829 x 6096 A36 sh 185 97,150.00 380 F FOB 30-Nov 30-Jan 4-Aug 10-Aug 15-Aug 21-Aug 100% $

A286 M1-8085(was) 6-Sep 20-Mar 1 Plate 6 x 1829 x 6096 A36 sh 25 13,128.64 293 F FOB 24-Sep 30-Jan 4-Aug 10-Aug 15-Aug 21-Aug 100% $

A286 M1-9160 29-Apr 20-Jun 1 Plate 20 x 2438 x 6096 A36/SS400 sh 1 2,333.00 182 F FOB 30-May 15-Jun 14-Jul 21-Jul 31-Jul 8-Aug 100% $

A286 M1-9154 1 Plate 5 x 1500 x 2438 sus304 sh 2 290.00 284 L DDP 13-May 16-May OK

A286 M1-9053 2-Apr 5-May 1 W/D Pipe 8" S/40(OD219.1xt8.18)-6M A312-304 pc 1 257.90 138 F FOB 24-Apr 15-May 17-Jun 22-Jun 27-Jun 2-Jul 100% $

A286 M1-8754 28-Jan 15-Apr 3 W/D Pipe 10" S/80(OD273.1xt15.09)- A312-304 pc 5 2,909.40 62 F FOB 22-Feb 23-May 31-May 5-Jun 9-Jun 7-Jul 100% $

A286 M1-8754 28-Jan 15-Apr 4 W/D Pipe 14" S/80S(OD355.6xt19.05) A312-304 pc 8 7,666.00 62 F FOB 22-Feb 23-May 31-May 5-Jun 9-Jun 7-Jul 100% $

A286 M1-8754 28-Jan 15-Apr 5 W/D Pipe 16" S/80S(OD406.4xt21.44) A312-304 pc 8 9,869.00 62 F FOB 22-Feb 23-May 31-May 5-Jun 9-Jun 7-Jul 100% $

A286 M1-8753 28-Jan 10-Apr 6 Plate 20 x 1219 x 6096 A240-304 sh 1 1,178.56 41 F FOB 31-Jan 10-Apr 17-Jun 22-Jun 25-Jun 1-Jul 100% $

A286 M1-9051 2-Apr 5-May 1 Plate 2 x 1219 x 2438 A240-409 sh 271 12,483.56 101 F FOB 19-Mar May/Jun 9-Jun 16-Jun 20-Jun 25-Jun L/C $

A286 M1-9051 2-Apr 5-May 2 SUS Plate 10 x 1219 x 6096 A240-304 sh 3 1,768.00 152 F CNF 6-May 30-May 1-Jun 4-Jun 17-Jun 21-Jun L/C $

A286 M1-9051 2-Apr 5-May 3 SUS Plate 12 x 1219 x 6096 A240-304 sh 2 1,414.00 152 F CNF 6-May 30-May 1-Jun 4-Jun 17-Jun 21-Jun L/C $

A286 M1-9051 2-Apr 5-May 4 SUS Plate 15 x 1219 x 6096 A240-304 sh 3 2,652.00 152 F CNF 6-May 30-May 1-Jun 4-Jun 17-Jun 21-Jun L/C $

A286 M1-9254 27-May 2-Jun 1 Plate 10 x 1500 x 6000 SS400 sh 1 707.00 377 L DDP 4-Jun 10-Jun 7-Jun 26-Jun 100% VND

A286 M1-9254 27-May 2-Jun 2 Plate 16 x 1500 x 6000 SS400 sh 1 1,130.00 377 L DDP 4-Jun 10-Jun 7-Jun 26-Jun 100% VND

Page 65: Hvc PlatePipe Update)

HVC-PUR 65 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A286 M1-8713(R.1) 22-Jan 20-Apr 25-Jan 1 Plate 2 x 1219 x 2438 A240-409 sh 1,150 52,974.51 42 L DDU 31-Jan 10-Apr 14-May 18,19/5 27-May 100% $

A286 M1-8713(R.1) 22-Jan 20-Apr 21-May 3 Plate 6 x 1530 x Coil SS400 kg 147,000.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 20-May 6-Jun L/C $

A286 M1-8488 27-Nov 25-Mar 21-May 2 Plate 6 x 1530 x Coil SS400 kg 97,150.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 20-May 6-Jun L/C $

A286 M1-8085 6-Sep 20-Mar 21-May 1 Plate 6 x 1530 x Coil SS400 kg 13,950.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 20-May 6-Jun L/C $

A286 M1-8713(R.1) 22-Jan 20-Apr 25-Jan 4 Plate 8 x 2438 x 6096 A36 sh 7 6,533.36 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

A286 M1-8713(R.1) 22-Jan 20-Apr 25-Jan 5 Plate 12 x 2438 x 6096 A36 sh 9 12,600.04 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

A286 M1-8713(R.1) 22-Jan 20-Apr 25-Jan 6 Plate 14 x 2438 x 6096 A36 sh 5 8,166.70 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

A286 M1-8713(R.1) 22-Jan 20-Apr 25-Jan 7 Plate 20 x 2438 x 6096 A36 sh 4 9,333.37 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

A286 M1-8713(R.1) 22-Jan 20-Apr 25-Jan 8 Plate 25 x 2438 x 6096 A36 sh 2 5,833.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

A286 M1-8713(R.1) 22-Jan 20-Apr 25-Jan 9 Plate 30 x 2438 x 6096 A36 sh 1 3,500.01 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

A286 M1-8713(R.1) 22-Jan 20-Apr 25-Jan 10 Plate 35 x 2438 x 6096 A36 sh 1 4,083.35 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

A286 M1-8713(R.1) 22-Jan 20-Apr 25-Jan 11 Plate 45 x 2438 x 6096 A36 sh 2 10,500.04 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

A286 M1-8753 28-Jan 10-Apr 1 Plate 2 x 1219 x 2438 A240-304 sh 4 188.54 41 F FOB 31-Jan 10-Apr 27-Apr 2-May 8-May 14-May 100% $

A286 M1-8753 28-Jan 10-Apr 2 Plate 5 x 1219 x 2438 A240-304 sh 4 471.35 41 F FOB 31-Jan 10-Apr 27-Apr 2-May 8-May 14-May 100% $

A286 M1-8753 28-Jan 10-Apr 3 Plate 6 x 1219 x 6096 A240-304 sh 4 1,414.27 41 F FOB 31-Jan 10-Apr 27-Apr 2-May 8-May 14-May 100% $

A286 M1-8753 28-Jan 10-Apr 4 Plate 12 x 1219 x 6096 A240-304 sh 9 6,364.23 41 F FOB 31-Jan 10-Apr 27-Apr 2-May 8-May 14-May 100% $

A286 M1-8753 28-Jan 10-Apr 5 Plate 15 x 1219 x 6096 A240-304 sh 5 4,419.60 41 F FOB 31-Jan 10-Apr 27-Apr 2-May 8-May 14-May 100% $

A286 M1-8753 28-Jan 10-Apr 6 Plate 20 x 1219 x 6096 A240-304 sh 4 4,714.24 41 F FOB 31-Jan 10-Apr 27-Apr 2-May 8-May 14-May 100% $

A286 M1-8753 28-Jan 10-Apr 7 Plate 3 x 1219 x 2438 A240-409 sh 40 2,763.89 42 L DDU 31-Jan 10-Apr 28-Apr 2-May 6-May 12-May 100% $

A286 M1-8713(R.1) 22-Jan 20-Apr 25-Jan 2 Plate 3 x 1219 x 2438 A240-409 sh 300 20,729.16 42 L DDU 31-Jan 10-Apr 28-Apr 2-May 6-May 12-May 100% $

A286 M1-8927 1-Mar 20-Apr 1 Plate 2 x 1219 x 2438 A240-409 sh 175 8,061.30 82 F FOB 10-Mar 20-Apr 20-Apr 24-Apr 28-Apr 12-May 100% $

A286 M1-8712 22-Jan 20-Apr 1 Plate 16 x 2350 x 15100 A572-50 sh 40 176,005.60 73 F CNF 29-Feb 15-May 21-Apr 29-Apr 8-May 12-May L/C $

A286 M1-8712 22-Jan 20-Apr 2 Plate 20 x 2350 x 7600 A572-50 sh 3 8,412.06 73 F CNF 29-Feb 15-May 21-Apr 29-Apr 8-May 12-May L/C $

A286 M1-8712 22-Jan 20-Apr 3 Plate 24 x 2438 x 6096 A572-50 sh 3 8,400.03 73 F CNF 29-Feb 15-May 21-Apr 29-Apr 8-May 12-May L/C $

A286 M1-8712 22-Jan 20-Apr 4 Plate 28 x 2450 x 15300 A572-50 sh 24 197,740.87 73 F CNF 29-Feb 15-May 21-Apr 29-Apr 8-May 12-May L/C $

A286 M1-8712 22-Jan 20-Apr 5 Plate 35 x 2438 x 6096 A572-50 sh 4 16,333.39 73 F CNF 29-Feb 15-May 21-Apr 29-Apr 8-May 12-May L/C $

A286 M1-8712 22-Jan 20-Apr 6 Plate 45 x 2450 x 7600 A572-50 sh 3 19,732.55 73 F CNF 29-Feb 15-May 21-Apr 29-Apr 8-May 12-May L/C $

A286 M1-8886 21-Feb 15-Mar 1 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 3 98.80 65 F FOB 13-Mar 21-Mar 23-Mar 28-Mar 8-Apr 21-Apr 100% $

A286 M1-8868 1 W/D Pipe 3/4" S/40(OD26.7 x 2.87)-6 A312-304 pc 1 10.20 65 F FOB 13-Mar 21-Mar 23-Mar 28-Mar 8-Apr 21-Apr 100% $

A286 M1-8909 26-Feb 20-Apr 1 Plate 10 x 1500 x 6000 SS400 sh 15 10,598.00 120 L DDP 27-Feb 1-Mar 7-Mar 22-Apr 100% VND

A286 M1-8927 1-Mar 20-Apr 2 Plate 10 x 1500 x 6000 SS400 sh 3 2,120.00 100 L DDP 10-Mar 13-Mar 13-Mar 25-Mar VND

A286 M1-8753 28-Jan 10-Apr 8 Plate 6 x 1219 x 6096 A240-409 sh 40 13,821.00 46 F FOB 12-Feb 14-Mar 16-Mar 22-Mar 27-Mar 21-Apr 100% $

A286 M1-8718 2 Plate 12 x 1219 x 6096 A240-409 sh 1 691.00 29 F FOB 23-Jan 29-Feb 16-Mar 22-Mar 27-Mar 28-Apr 100% $

A286 M1-8754 28-Jan 15-Apr 1 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304L pc 30 988.00 48 F FOB 15-Feb 29-Feb 1-Mar 7-Mar 18-Mar 21-Apr 100% $

A286 M1-8754 28-Jan 15-Apr 2 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304L pc 4 390.00 48 F FOB 15-Feb 29-Feb 1-Mar 7-Mar 18-Mar 21-Apr 100% $

A286 M1-8745 25-Jan 20-Feb 1 SMLS Pipe 1/2" S/40(OD21.3xt2.77)-6M A106-B/A53-B pc 7 53.00 48 F FOB 15-Feb 29-Feb 1-Mar 7-Mar 18-Mar 21-Apr 100% $

A286 M1-8928 1-Mar 20-Apr 1 SMLS Pipe 1/2" S/40(OD21.3x2.77)-6M A53-B pc 4 30.00 76 F FOB 6-Mar 15-Mar 16-Mar 22-Mar 31-Mar 21-Apr 100% $

A286 M1-8928 1-Mar 20-Apr 2 W/D Pipe 3/4" S/40(OD26.7 x 2.87)-6 A312-304 pc 1 10.00 76 F FOB 6-Mar 15-Mar 16-Mar 22-Mar 31-Mar 21-Apr 100% $

A286 M1-8928 1-Mar 20-Apr 3 W/D Pipe 1" S/40(OD33.4xt3.38)-6M A312-304 pc 1 15.00 76 F FOB 6-Mar 15-Mar 16-Mar 22-Mar 31-Mar 21-Apr 100% $

A286 M1-8928 1-Mar 20-Apr 4 W/D Pipe 2 1/2" S/40(OD73.0xt5.16)- A312-304 pc 2 104.00 76 F FOB 6-Mar 15-Mar 16-Mar 22-Mar 31-Mar 21-Apr 100% $

A286 M1-8928 1-Mar 20-Apr 5 W/D Pipe 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 20 1,369.00 76 F FOB 6-Mar 15-Mar 16-Mar 22-Mar 31-Mar 21-Apr 100% $

A286 M1-8928 1-Mar 20-Apr 6 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 5 487.20 76 F FOB 6-Mar 15-Mar 16-Mar 22-Mar 31-Mar 21-Apr 100% $

A286 M1-8085 6-Sep 20-Mar 1 Plate 6 x 1829 x 6096 A36 sh 94 49,350.00 293 F FOB 24-Sep 30-Jan 22-Mar 29-Mar 3-Apr 12-Apr 100% $

A286 M1-8085 6-Sep 20-Mar 1 Plate 6 x 1829 x 6096 A36 sh 96 50,400.00 293 F FOB 24-Sep 30-Jan 22-Mar 29-Mar 3-Apr 12-Apr 100% $

A286 M1-8085 6-Sep 20-Mar 1 Plate 6 x 1829 x 6096 A36 sh 27 14,175.00 293 F FOB 24-Sep 30-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

A286 M1-8084(R.3) 6-Sep 20-Feb 4-Oct 1 Plate 6 x 1829 x 6096 A36 sh 56 29,408.00 293 F FOB 24-Sep 30-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

A286 M1-8718 1 Plate 12 x 1219 x 2438 A240-409 sh 9 2,484.00 29 F FOB 23-Jan 26-Jan 26-Jan 1-Feb 4-Feb 25-Mar 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 7 Plate 20 x 2000 x 6000 SS400 sh 2 3,768.00 801 L DDP 21-Dec 24-Dec 2-Jan 28-Mar 100% VND

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 9 Plate 25 x 2000 x 6000 SS400 sh 2 4,710.00 801 L DDP 21-Dec 24-Dec 16-Jan 28-Mar 100% VND

A286 M1-8292(R.3) 11-Oct 25-Nov 25-Oct 4 W/D Pipe 10" S/60(OD273.1xt12.7)-6 A312-304 pc 12 5,931.36 326 F FOB 19-Oct 25-Nov 18-Jan 26-Jan 4-Feb 19-Mar 100% $

A286 M1-8292(R.3) 11-Oct 25-Nov 25-Oct 5 W/D Pipe 14" S/60S(OD355.6 x 15.09 A312-304 pc 12 12,288.00 326 F FOB 19-Oct 31-Dec 18-Jan 26-Jan 4-Feb 19-Mar OK $

A286 M1-8292(R.3) 11-Oct 25-Nov 25-Oct 6 W/D Pipe 16"S/60(OD406.4xt16.66)-8 A312-304 pc 12 15,528.00 326 F FOB 19-Oct 31-Dec 18-Jan 26-Jan 4-Feb 19-Mar OK $

A286 M1-8501 30-Nov 20-Jan 4 W/D Pipe 10" S/60(OD273.1xt12.7)-6 A312-304 pc 4 1,977.12 389 F FOB 12-Dec 20-Jan 17-Feb 22-Feb 29-Feb 12-Mar 100% $

Page 66: Hvc PlatePipe Update)

HVC-PUR 66 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A286 M1-8488 27-Nov 25-Mar 3 Plate 15 x 2438 x 6096 SS400 sh 3 5,250.00 380 F FOB 30-Nov 30-Jan 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A286 M1-8488 27-Nov 25-Mar 4 Plate 30 x 1524 x 6096 SS400 sh 2 4,380.00 380 F FOB 30-Nov 30-Jan 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A286 M1-8391 7-Nov 5-Dec 5 Plate 12 x 1524 x 6096 SS400 sh 5 4,380.00 380 F FOB 30-Nov 30-Dec 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A286 M1-8391 7-Nov 30-Dec 7 Plate 20 x 2438 x 6096 SS400 sh 1 2,330.00 380 F FOB 30-Nov 30-Dec 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A286 M1-8391 7-Nov 30-Dec 8 Plate 22 x 2438 x 6096 SS400 sh 2 5,130.00 380 F FOB 30-Nov 30-Dec 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A286 M1-8391 7-Nov 30-Dec 9 Plate 25 x 2438 x 6096 SS400 sh 1 2,920.00 380 F FOB 30-Nov 30-Dec 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A286 M1-8502 30-Nov 2-Jan 3 Plate 5 x 1219 x 2438 A36 sh 3 349.94 387 F FOB 10-Dec 30-Dec 17-Jan 24-Jan 30-Jan 7-Mar 100% $

A286 M1-8502 30-Nov 2-Jan 4 Plate 6 x 1829 x 6096 A36 sh 52 27,307.56 387 F FOB 10-Dec 30-Dec 17-Jan 24-Jan 30-Jan 7-Mar 100% $

A286 M1-8502 30-Nov 2-Jan 5 Plate 10 x 1829 x 6096 A36 sh 5 4,376.21 387 F FOB 10-Dec 30-Dec 17-Jan 24-Jan 30-Jan 7-Mar 100% $

A286 M1-8502 30-Nov 2-Jan 6 Plate 12 x 1829 x 6096 A36 sh 1 1,050.29 387 F FOB 10-Dec 30-Dec 17-Jan 24-Jan 30-Jan 7-Mar 100% $

A286 M1-8502 30-Nov 2-Jan 7 Plate 12 x 1829 x 6096 A36 sh 10 10,502.91 387 F FOB 10-Dec 30-Dec 17-Jan 24-Jan 30-Jan 7-Mar 100% $

A286 M1-8502 30-Nov 2-Jan 8 Plate 13 x 1219 x 6096 A36 sh 5 3,791.68 387 F FOB 10-Dec 30-Dec 17-Jan 24-Jan 30-Jan 7-Mar 100% $

A286 M1-8502 30-Nov 2-Jan 9 Plate 14 x 1219 x 6096 A36 sh 14 11,433.37 387 F FOB 10-Dec 30-Dec 17-Jan 24-Jan 30-Jan 7-Mar 100% $

A286 M1-8502 30-Nov 2-Jan 10 Plate 20 x 2438 x 6096 A36 sh 14 32,666.78 387 F FOB 10-Dec 30-Dec 17-Jan 24-Jan 30-Jan 7-Mar 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 8 Plate 22 x 2438 x 6096 A36 sh 1 2,567.00 411 F FOB 26-Dec 4-Jan 17-Jan 24-Jan 2-Feb 7-Mar 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 10 Plate 35 x 2438 x 6096 A36 sh 1 4,083.00 411 F FOB 26-Dec 4-Jan 17-Jan 24-Jan 2-Feb 7-Mar 100% $

A286 M1-8501 30-Nov 20-Jan 1 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 21 691.74 390 F FOB 12-Dec 20-Jan 26-Jan 1-Feb 21-Feb 28-Feb 100% $

A286 M1-8501 30-Nov 20-Jan 2 W/D Pipe 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 15 1,026.90 390 F FOB 12-Dec 20-Jan 26-Jan 1-Feb 21-Feb 28-Feb 100% $

A286 M1-8501 30-Nov 20-Jan 3 W/D Pipe 8" S/40(OD219.1xt8.18)-6M A312-304 pc 1 257.88 390 F FOB 12-Dec 20-Jan 26-Jan 1-Feb 21-Feb 28-Feb 100% $

A286 M1-8501 30-Nov 20-Jan 5 SMLS Pipe 1/2" S/40(OD21.3x2.77)-6M A53-B pc 1 7.62 390 F FOB 12-Dec 20-Jan 26-Jan 1-Feb 21-Feb 28-Feb 100% $

A286 M1-8685 14-Jan 20-Jan 1 Plate 10 x 1500 x 6000 SS400 sh 14 9,891.00 43 L DDP 17-Jan 20-Jan 20-Jan 5-Feb 100% VND

A286 M1-8391 7-Nov 5-Dec 4 Plate 6 x 1829 x 6096 SS400 sh 150 78,750.00 373 F FOB 29-Nov 15-Dec 17-Jan 24-Jan 30-Jan 19-Feb 100% $

A286 M1-8391 7-Nov 5-Dec 1 Plate 6 x 1219 x 6096 A240-304 sh 1 350.00 363 F FOB 23-Nov 30-Dec 17-Jan 24-Jan 30-Jan 18-Feb 100% $

A286 M1-8391 7-Nov 5-Dec 2 Plate 10 x 1219 x 6096 A240-304 sh 1 590.00 363 F FOB 23-Nov 30-Dec 17-Jan 24-Jan 30-Jan 18-Feb 100% $

A286 M1-8391 7-Nov 5-Dec 3 Plate 12 x 1219 x 6096 A240-304 sh 2 1,410.00 363 F FOB 23-Nov 30-Dec 17-Jan 24-Jan 30-Jan 18-Feb 100% $

A286 M1-8081 6-Sep 2-Jan 1 Plate 6 x 1829 x 6096 A36 sh 526 276,150.00 293 F FOB 24-Sep 15-Dec 17-Jan 24-Jan 30-Jan 18-Feb 100% $

A286 M1-8482(R.1) 26-Nov 22-Dec 30-Nov 3 Plate 12 x 1219 x 6096 A240-304 pc 5 3,535.68 392 F FOB 12-Dec 10-Jan 17-Jan 24-Jan 1-Feb 18-Feb L/C $

A286 M1-8482(R.1) 26-Nov 22-Dec 30-Nov 4 Plate 15 x 1219 x 6096 A240-304 pc 14 12,374.88 392 F FOB 12-Dec 10-Jan 17-Jan 24-Jan 1-Feb 18-Feb L/C $

A286 M1-8482(R.1) 26-Nov 22-Dec 30-Nov 5 Plate 20 x 1524 x 6096 A240-304 pc 7 10,314.10 392 F FOB 12-Dec 10-Jan 17-Jan 24-Jan 1-Feb 18-Feb L/C $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 11 Plate 20 x 2438 x 6096 A36 sh 4 9,332.00 340 F FOB 2-Nov 25-Dec 17-Jan 24-Jan 30-Jan 18-Feb L/C $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 12 Plate 40 x 2438 x 6096 A36 sh 3 13,998.00 340 F FOB 2-Nov 25-Dec 17-Jan 24-Jan 30-Jan 18-Feb L/C $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 13 Plate 45 x 2438 x 8200 A572-50 sh 1 7,060.00 340 F FOB 2-Nov 25-Dec 17-Jan 24-Jan 30-Jan 18-Feb L/C $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 15 Plate 16 x 2350 x 8200 A572-50 sh 4 9,680.00 340 F FOB 2-Nov 25-Dec 17-Jan 24-Jan 30-Jan 18-Feb L/C $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 14 Plate 28 x 2438 x 8200 A572-50 sh 8 35,152.00 340 F FOB 2-Nov 25-Dec 17-Jan 24-Jan 30-Jan 18-Feb L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 6 Plate 16 x 2350 x 6400 A572-50 sh 37 69,893.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 3 Plate 16 x 2350 x 8200 A572-50 sh 6 14,520.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 4 Plate 16 x 2350 x 8950 A572-50 sh 6 15,852.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 5 Plate 16 x 2350 x 12000 A572-50 sh 72 255,024.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 7 Plate 20 x 2438 x 6096 A572-50 sh 7 16,331.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 7a Plate 22 x 2438 x 6096 A572-50 sh 3 7,701.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 8 Plate 24 x 2438 x 6096 A572-50 sh 6 16,800.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 9 Plate 28 x 2438 x 8200 A572-50 sh 9 39,546.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 10 Plate 28 x 2438 x 8950 A572-50 sh 7 33,572.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 11 Plate 28 x 2438 x 12000 A572-50 sh 46 295,780.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 13 Plate 35 x 2438 x 6096 A572-50 sh 8 32,664.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 14 Plate 40 x 2438 x 6096 A572-50 sh 6 28,002.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 15 Plate 45 x 2438 x 8200 A572-50 sh 4 28,248.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 7 Plate 20 x 2438 x 6096 A36 sh 3 7,000.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 7 Plate 24 x 2438 x 6096 A36 sh 2 5,600.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 7 Plate 28 x 2438 x 8950 A36 sh 5 23,980.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 7 Plate 35 x 2438 x 6096 A36 sh 3 12,249.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8209 6-Sep 25-Nov 2 Plate 8 x 1524 x 6096 A36 sh 3 1,749.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8209 6-Sep 25-Nov 3 Plate 10 x 1524 x 6096 A36 sh 3 2,187.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

Page 67: Hvc PlatePipe Update)

HVC-PUR 67 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A286 M1-8209 6-Sep 25-Nov 5 Plate 12 x 1524 x 6096 A36 sh 6 5,250.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8209 6-Sep 25-Nov 6 Plate 15 x 2500 x 6096 A36 sh 16 28,720.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8209 6-Sep 25-Nov 7 Plate 18 x 2500 x 6096 A36 sh 4 8,612.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8209 6-Sep 25-Nov 8 Plate 20 x 2500 x 6096 A36 sh 4 9,572.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8209 6-Sep 25-Nov 9 Plate 30 x 2500 x 6096 A36 sh 4 14,356.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A286 M1-8447 1 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 3 203.00 360 F FOB 23-Nov 21-Dec 28-Dec 3-Jan 11-Jan 25-Jan 100% $

A286 M1-8447 2 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 1 97.00 360 F FOB 23-Nov 21-Dec 28-Dec 3-Jan 11-Jan 25-Jan 100% $

A286 M1-8389 7-Nov 30-Dec 1 W/D Pipe 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 8 547.68 360 F FOB 23-Nov 21-Dec 28-Dec 3-Jan 11-Jan 25-Jan 100% $

A286 M1-8488 27-Nov 25-Mar 1 Plate 3 x 1219 x 2438 A240-409 sh 735 50,786.40 391 L DDU 12-Nov 20-Jan 9-Jan 16-Jan 25-Jan 100% $

A286 M1-8391 7-Nov 30-Dec 6 Plate 14 x 1829 x 6096 SS400 sh 2 2,450.00 380 F FOB 30-Nov 30-Dec 14-Dec 19-Dec 31-Dec 23-Jan 100% $

A286 M1-8293(R.2) 11-Oct 25-Nov 30-Nov 8 Plate 12 x 1219 x 6096 A240-409(Unanneal/Unpsh 8 5,530.00 363 F FOB 23-Nov 30-Dec 6-Jan 11-Jan 18-Jan 23-Jan 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 4 Plate 15 x 1219 x 6096 A36 sh 2 1,750.00 331 F FOB 29-Oct 30-Nov 14-Dec 19-Dec 31-Dec 23-Jan 100% $

A286 M1-8292(R.3) 11-Oct 25-Nov 25-Oct 1 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 13 428.20 326 F FOB 19-Oct 25-Nov 14-Dec 22-Dec 31-Dec 23-Jan 100% $

A286 M1-8292(R.3) 11-Oct 25-Nov 25-Oct 1 W/D Pipe 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 13 890.00 326 F FOB 19-Oct 25-Nov 14-Dec 22-Dec 31-Dec 23-Jan 100% $

A286 M1-8292(R.3) 11-Oct 25-Nov 25-Oct 2 W/D Pipe 2 1/2" S/40(OD73.0xt5.16)- A312-304 pc 4 207.12 326 F FOB 19-Oct 25-Nov 14-Dec 22-Dec 31-Dec 23-Jan 100% $

A286 M1-8292(R.3) 11-Oct 25-Nov 25-Oct 3 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 8 779.52 326 F FOB 19-Oct 25-Nov 14-Dec 22-Dec 31-Dec 23-Jan 100% $

A286 M1-8482(R.1) 26-Nov 22-Dec 30-Nov 2 Plate 5 x 1219 x 2438 A240-304 pc 7 824.86 346 F FOB 12-Nov 20-Jan 21-Dec 27-Dec 4-Jan 23-Jan 100% $

A286 M1-8293(R.2) 11-Oct 25-Nov 30-Nov 5 Plate 15 x 1219 x 6096 A240-304 sh 3 2,652.00 346 F FOB 9-Nov 31-Dec 21-Dec 27-Dec 4-Jan 23-Jan 100% $

A286 M1-8293(R.2) 11-Oct 25-Nov 30-Nov 6 Plate 20 x 1219 x 6096 A240-304 sh 4 4,714.00 346 F FOB 9-Nov 31-Dec 21-Dec 27-Dec 4-Jan 23-Jan 100% $

A286 M1-8293(R.2) 11-Oct 25-Nov 30-Nov 9 Plate 12 x 1219 x 6096 A240-304 sh 3 2,121.00 346 F FOB 9-Nov 31-Dec 21-Dec 27-Dec 4-Jan 23-Jan 100% $

A286 M1-8293(R.2) 11-Oct 25-Nov 30-Nov 7 Plate 6 x 1219 x 6096 A240-409 sh 2 691.00 339 F FOB 2-Nov 20-Dec 21-Dec 27-Dec 4-Jan 23-Jan 100% $

A286 M1-8265(R.2) 18-Oct 30-Nov 3 Plate 6 x 1219 x 6096 A240-409 sh 72 24,879.00 339 F FOB 2-Nov 20-Dec 21-Dec 27-Dec 4-Jan 23-Jan 100% $

A286 M1-8502 30-Nov 2-Jan 1 Plate 2 x 1219 x 2438 A240-409 sh 245 11,285.87 392 F FOB 12-Dec 10-Jan 6-Jan 11-Jan 18-Jan 23-Jan L/C $

A286 M1-8482(R.1) 26-Nov 22-Dec 30-Nov 1 Plate 2 x 1219 x 2438 A240-304 pc 7 329.94 392 F FOB 12-Dec 10-Jan 6-Jan 11-Jan 18-Jan 23-Jan L/C $

A286 M1-8181(R.1) 24-Sep 31-Jan 1 Plate 2 x 1219 x 2438 A240-409 sh 1,128 51,961.00 307 F FOB 9-Oct 20-Dec 6-Jan 11-Jan 18-Jan 1127SH 23-Jan L/C $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 2 Plate 12 x 1219 x 6096 A572-50 sh 1 700.00 310 F CIF 9-Oct 5-Jan 7-Jan 11-Jan 17-Jan 23-Jan L/C $

A286 M1-8234 28-Sep 25-Nov 1 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 sh 2 195.00 223 F FOB 1-Oct 25-Nov 30-Nov 6-Dec 14-Dec 3-Jan 100% $

A286 M1-8502 30-Nov 2-Jan 2 Plate 1 x 1219 x Coil SPCC coil 5,600.00 325 F CFR 18-Oct 30-Nov 29-Nov 13-Dec 22-Dec 3-Jan L/C $

A286 M1-8491(R.2) 2 Plate 1 x 1219 x Coil SPCC coil 4,690.00 325 F CFR 18-Oct 30-Nov 29-Nov 13-Dec 22-Dec 3-Jan L/C $

A286 M1-8201(R.1) 24-Sep 25-Nov 1 Plate 1 x 1219 x Coil SPCC coil 6,400.00 325 F CFR 18-Oct 30-Nov 29-Nov 13-Dec 22-Dec 3-Jan L/C $

A286 M1-8231(R.1) 28-Sep 25-Nov 1 Plate 1 x 1219 x Coil SPCC coil 27,000.00 325 F CFR 18-Oct 30-Nov 29-Nov 13-Dec 22-Dec 3-Jan L/C $

A286 M1-8187(R.2) 21-Sep 31-Jan 1 Plate 1 x 1219 x Coil SPCC coil 71,000.00 325 F CFR 18-Oct 30-Nov 29-Nov 13-Dec 22-Dec 3-Jan L/C $

A286 M1-8265(R.2) 5-Oct 25-Nov 30-Nov 2 Plate 3 x 1219 x 6096 A240-409L sh 90 15,549.00 306 L FOB 10-Oct 15-Dec 15-Dec by truck 18-Dec 100% $

A286 M1-8225(R.1) 26-Sep 25-Nov 1 Plate 3 x 1219 x 2438 A240-409L sh 920 63,569.00 306 L FOB 10-Oct 15-Dec 17-Dec by sea 3-Jan 100% $

A286 M1-8224(R.1) 26-Sep 5-Nov 2 Plate 3 x 1219 x 2438 A240-409L sh 120 8,292.00 306 L FOB 10-Oct 15-Dec 17-Dec by sea 3-Jan 100% $

A286 M1-8180(R.1) 24-Sep 25-Nov 2 Plate 3 x 1219 x 2438 A240-409L sh 477 32,959.00 306 L FOB 10-Oct 15-Dec 15-Dec by truck 18-Dec 100% $

A286 M1-8183(R.1) 20-Sep 31-Jan 1 Plate 3 x 1219 x 2438 A240-409L sh 770 53,205.00 306 L FOB 10-Oct 15-Dec 15-Dec by truck 18-Dec 100% $

A286 M1-8182(R.1) 20-Sep 25-Feb 1 Plate 3 x 1219 x 2438 A240-409L sh 650 44,913.31 306 L FOB 10-Oct 15-Dec 19-Dec by truck 22-Dec 100% $

A286 M1-8182(R.1) 20-Sep 25-Feb 1 Plate 3 x 1219 x 2438 A240-409L sh 120 8,292.00 306 L FOB 10-Oct 15-Dec 17-Dec by sea 3-Jan 100% $

A286 M1-8181(R.1) 24-Sep 31-Jan 2 Plate 3 x 1219 x 2438 A240-409L sh 477 32,959.00 306 L FOB 10-Oct 15-Dec 19-Dec by truck 22-Dec 100% $

A286 M1-8265(R.2) 18-Oct 30-Nov 1 Plate 2 x 1219 x 2438 A240-409 sh 216 9,950.00 339 F FOB 2-Nov 30-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

A286 M1-8224(R.1) 18-Oct 1 Plate 2 x 1219 x 2438 A240-409 sh 168 7,739.00 339 F FOB 2-Nov 30-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 1 Plate 8 x 1524 x 6096 A36 sh 5 2,917.00 331 F FOB 29-Oct 30-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 2 Plate 12 x 1524 x 6096 A36 sh 9 7,876.00 331 F FOB 29-Oct 30-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 3 Plate 14 x 1219 x 6096 A36 sh 2 1,633.00 331 F FOB 29-Oct 30-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 5 Plate 16 x 2438 x 6096 A36 sh 1 1,867.00 331 F FOB 29-Oct 30-Nov 28-Nov 4-Dec missing 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 6 Plate 18 x 1219 x 2438 A36 sh 1 420.00 331 F FOB 29-Oct 30-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 7 Plate 20 x 2438 x 6096 A36 sh 2 4,667.00 331 F FOB 29-Oct 30-Nov 28-Nov 4-Dec missing 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 8 Plate 22 x 2438 x 6096 A36 sh 1 2,567.00 331 F FOB 29-Oct 30-Nov 28-Nov 4-Dec missing 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 9 Plate 25 x 2438 x 6096 A36 sh 2 5,833.00 331 F FOB 29-Oct 30-Nov 28-Nov 4-Dec missing 100% $

A286 M1-8316(R.1) 18-Oct 30-Nov 25-Oct 10 Plate 35 x 2438 x 6096 A36 sh 1 4,083.00 331 F FOB 29-Oct 30-Nov 28-Nov 4-Dec missing 100% $

A286 M1-8080(R.3) 6-Sep 25-Nov 3-Oct 1 Plate 6 x 1829 x 6096 A36 sh 526 276,150.00 293 F FOB 24-Sep 15-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

A286 M1-8209(R.2) 6-Sep 25-Nov 4-Oct 1 Plate 6 x 1829 x 6096 A36 sh 186 97,677.00 293 F FOB 24-Sep 15-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

Page 68: Hvc PlatePipe Update)

HVC-PUR 68 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A286 M1-8265(R.2) 5-Oct 25-Nov 30-Nov 1 Plate 2 x 1219 x 2438 A240-409 sh 216 9,950.00 307 F FOB 9-Oct 5-Nov 28-Nov 4-Dec 10-Dec 19-Dec L/C $

A286 M1-8265(R.2) 5-Oct 25-Nov 30-Nov 3 Plate 6 x 1219 x 6096 A240-409 sh 72 24,879.00 307 F FOB 9-Oct 5-Nov 28-Nov 4-Dec 10-Dec 19-Dec L/C $

A286 M1-8224(R.1) 26-Sep 5-Nov 1 Plate 2 x 1219 x 2438 A240-409 sh 168 7,739.00 307 F FOB 9-Oct 5-Nov 28-Nov 4-Dec 10-Dec 19-Dec L/C $

A286 M1-8180(R.1) 24-Sep 25-Nov 1 Plate 2 x 1219 x 2438 A240-409 sh 1,128 51,961.00 307 F FOB 9-Oct 5-Nov 28-Nov 4-Dec 10-Dec 19-Dec L/C $

Dung Quat/K287

K287 M1-8440 1 W/D Pipe 3" S/40 (OD88.9x5.49)-6M A53-B pc 3 203.20 360 F FOB 23-Nov 21-Dec 28-Dec 3-Jan 11-Jan 25-Jan 100% $

K287 M1-8440 2 W/D Pipe 6" S/40(OD168.3xt7.11)- A53-B pc 6 1,017.40 360 F FOB 23-Nov 21-Dec 28-Dec 3-Jan 11-Jan 25-Jan 100% $

JEBEL ALI/A289

A289 M1-9208 14-May 15-Jul 1 Plate 12 x 2438 x 6096 A36 sh 2 2,800.00 172 F FOB 20-May 30-May 9-Jun 16-Jun 20-Jun 25-Jun 100% $

A289 W4-9279 4-Jun 4-Jul 1 FCAW W/D wire E71T-1 (SFA 5.20) Dia 1.6 box 16,200.00 197 F CFR 16-Jun 13-Jul 6-Jul 12-Jul 15-Jul 19-Jul 100% $

A289 W4-9279 4-Jun 4-Jul 1 FCAW W/D wire E71T-1 (SFA 5.20) Dia 1.6 box 16,200.00 197 F CFR 16-Jun 21-Jul 13-Jul 19-Jul 23-Jul 12-Aug 100% $

A289 W4-9118 21-Apr 21-Apr 1 SAW welding wire EM12K (SFA 5.17) Dia 4.0 spool 400 10,000.00 181 F CFR 30-May 27-Jun 6-Jul 12-Jul 18-Jul 12-Aug 100% $

A289 M1-8460(R.1) 29-Nov 5 Plate 2 x 1524 x 2438 A240-321 sh 225 13,258.80 375B L DDU 3-Dec Jun 23-Jul 26-Jul 27-Jul 6-Aug 100% $

A289 M1-8491(R.2) 10-Nov 1-Feb 20-Nov 8 Plate 3 x 1524 x 2438 A240-321 sh 2 176.78 375B L DDU 3-Dec Jun 23-Jul 26-Jul 27-Jul 6-Aug 100% $

A289 M1-9209 14-May 15-Jul 1 SMLS Pipe 1/2" S/40(OD21.3x2.77)-6M A53-B pc 2 15.20 177 F FOB 26-May 5-Jul 6-Jul 12-Jul 18-Jul 30-Jul 100% $

A289 W4-9211 15-May 15-Jun 1 SMAW W/D electrodE309L-16 (SFA 5.4) Dia 3.2 box 400 2,000.00 176 F CFR 23-May 22-Jun 30-Jun 6-Jul 9-Jul 19-Jul 100% $

A289 W4-9211 15-May 15-Jun 2 FCAW W/D wire E309LMoT1-1 (SFA 5.22) Dia 1.6 spool 160 2,000.00 176 F CFR 23-May 22-Jun 30-Jun 6-Jul 9-Jul 19-Jul 100% $

A289 W4-9211 15-May 15-Jun 3 FCAW W/D wire E316LT1-1 (SFA 5.22) Dia 1.6 spool 160 2,000.00 176 F CFR 23-May 22-Jun 30-Jun 6-Jul 9-Jul 19-Jul 100% $

A289 M1-9182(R.1) 5-May 25-Jun 9-May 1 SUS Plate 3 x 1219 x 2438 A240-321 sh 82 5,797.57 169 F CIF 19-May 25-Jun 17-Jun 22-Jun 25-Jun 1-Jul 100% $

A289 M1-9182(R.1) 5-May 25-Jun 9-May 2 SUS Plate 6 x 1219 x 6096 A240-316L sh 2 711.59 169 F CIF 19-May 25-Jun 17-Jun 22-Jun 25-Jun 1-Jul 100% $

A289 W4-9280 1 SAW welding wire SFA 5.17 EM12K Dia 4.0 kg 1,000.00 378 F DDP 4-Jun 9-Jun 6-Jun 27-Jun 100% VND

A289 W4-9118 21-Apr 21-Apr 2 Flux F7A6-EM12K kg 8,000.00 144 F CFR 24-Apr 18-May 3-Jun 8-Jun 16-Jun 27-Jun 100% $

A289 M1-9146 25-Apr 1 Plate 8 x 1500 x 6000 SS400 sh 1 565.00 377 L DDP 4-Jun 10-Jun 7-Jun 26-Jun 100% VND

A289 M1-9146 25-Apr 2 Plate 12 x 1500 x 6000 SS400 sh 7 5,935.00 377 L DDP 4-Jun 10-Jun 7-Jun 26-Jun 100% VND

A289 M1-9146 25-Apr 4 Plate 20 x 1500 x 6000 SS400 sh 1 1,413.00 377 L DDP 4-Jun 10-Jun 7-Jun 26-Jun 100% VND

A289 M1-9146 25-Apr 5 Plate 25 x 1500 x 6000 SS400 sh 1 1,766.00 377 L DDP 4-Jun 10-Jun 7-Jun 26-Jun 100% VND

A289 M1-9146 25-Apr 3 Plate 15 x 1500 x 6000 SS400 sh 2 2,119.00 282 L DDP 28-Apr 29-Apr 8-May 6-Jun 100% VND

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 32 Plate 35 x 2438 x 6096 SM490A sh 2 8,167.00 123 F FOB 12-Apr 19-Apr 3-May 10-May 14-May 21-May 100% $

A289 M1-8990 14-Mar 20-Mar 1 Plate 12 x 1500 x 6000 SS400 sh 7 5,935.00 205 L DDP 3-Apr 7-Apr 7-Apr 19-May 100% VND

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 24 Plate 18 x 2300 x 15000 A572-50 TP1 sh 4 19,499.40 345 F CNF 12-Nov 5-Feb 7-Apr 17-Apr 14-May 30-May L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 26 Plate 18 x 2300 x 14000 A572-50 TP1 sh 1 4,549.86 345 F CNF 12-Nov 5-Feb 7-Apr 17-Apr 14-May 30-May L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 31 Plate 30 x 2438 x 14500 A572-50 TP1 sh 1 8,325.16 345 F CNF 12-Nov 5-Feb 7-Apr 17-Apr 14-May 30-May L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 32 Plate 35 x 2870 x 11000 A572-50 TP1 sh 2 17,347.72 345 F CNF 12-Nov 5-Feb 7-Apr 17-Apr 14-May 30-May L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 33 Plate 35 x 2438 x 14500 A572-50 TP1 sh 1 9,712.69 345 F CNF 12-Nov 5-Feb 7-Apr 17-Apr 14-May 30-May L/C $

A289 M1-8861 16-Feb 15-Mar W/D Pipe 2 1/2" S/40 (OD73xt5.16)-6 A312-316 pc 6 315.80 65 F FOB 13-Mar 21-Mar 23-Mar 28-Mar 8-Apr 21-Apr 100% $

A289 M1-8859 16-Feb 15-Mar 6 Plate SS400 sh 1 995.69 120 L DDP 27-Feb 1-Mar 7-Mar 22-Apr 100% VND

A289 M1-8859 16-Feb 15-Mar 4 Plate 10 x 2438 x 6096 SS400 sh 15 17,500.06 61 F FOB 20-Feb 7-Mar 22-Mar 29-Mar 3-Apr 5-May 100% $

A289 M1-8859 16-Feb 15-Mar 5 Plate 12 x 2438 x 6096 SS400 sh 3 4,200.01 61 F FOB 20-Feb 7-Mar 22-Mar 29-Mar 3-Apr 5-May 100% $

A289 M1-8859 16-Feb 15-Mar 7 Plate 15 x 2438 x 6096 SS400 sh 3 5,250.02 61 F FOB 20-Feb 7-Mar 22-Mar 29-Mar 3-Apr 5-May 100% $

A289 M1-8859 16-Feb 15-Mar 8 Plate 20 x 2438 x 6096 SS400/Q235 sh 2 4,666.68 61 F FOB 20-Feb 7-Mar 22-Mar 29-Mar 3-Apr 5-May 100% $

A289 M1-8667 9-Jan 5-Feb 4 Plate 12 x 1219 x 6096 A240-409 sh 1 691.00 29 F FOB 23-Jan 29-Feb 16-Mar 22-Mar 27-Mar 28-Apr 100% $

A289 M1-8763 28-Jan 5-Mar 1 W/D Pipe 1/2" S/40(OD21.3x2.77)-6M A53-B pc 3 23.00 48 F FOB 15-Feb 29-Feb 1-Mar 7-Mar 18-Mar 21-Apr 100% $

A289 M1-8763 28-Jan 5-Mar 2 W/D Pipe 2" S/40(OD60.3x3.9t)-6M A312-316 pc 31 1,028.00 48 F FOB 15-Feb 29-Feb 1-Mar 7-Mar 18-Mar 21-Apr 100% $

A289 M1-8763 28-Jan 5-Mar 3 W/D Pipe A312-316 pc 5 344.00 48 F FOB 15-Feb 29-Feb 1-Mar 7-Mar 18-Mar 21-Apr 100% $

A289 M1-8911 26-Feb 1-Apr 1 SMLS Pipe 1/2" S/40(OD21.3x2.77)-6M A53-B pc 9 68.60 76 F FOB 6-Mar 15-Mar 16-Mar 22-Mar 31-Mar 21-Apr 100% $

A289 M1-8892 26-Feb 1-Apr 1 W/D Pipe 1" S/40 (OD33.4xt3.38)-6M A312-316 pc 1 15.20 76 F FOB 6-Mar 15-Mar 16-Mar 22-Mar 31-Mar 21-Apr 100% $

A289 M1-8460(R.1) 21-Nov 1-Feb 29-Nov 3 Plate 6 x 1829 x 6096 A36 sh 220 115,500.00 373 F FOB 29-Nov 25-Jan 22-Mar 29-Mar 3-Apr 18-Apr 100% $

A289 M1-8398(R.1) 10-Nov 1-Feb 20-Nov 2 Plate 6 x 1829 x 6096 A36 sh 330 173,250.00 373 F FOB 29-Nov 25-Jan 22-Mar 29-Mar 3-Apr 18-Apr 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 4 Plate 6 x 1829 x 6096 A36 sh 855 448,870.00 373 F FOB 29-Nov 25-Jan 22-Mar 29-Mar 3-Apr 18-Apr 100% $

A289 M1-8491(R.2) 1 Plate 2 x 1219 x 2438 A240-321 sh 307 14,470.10 21 F FOB 18-Jan 5-Mar 29-Mar 2-Apr 8-Apr 28-Apr L/C $

A289 M1-8491(R.2) 1 Plate 2 x 1219 x 2438 A240-321 sh 298 14,046.14 21 F FOB 18-Jan 5-Mar 16-Mar 22-Mar 29-Mar 24-Apr L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 21 Plate 3 x 1524 x 2438 A240-321 sh 55 4,861.56 375A F CIF 3-Dec 28-Feb 17-Feb 23-Feb 27-Feb 28-Mar 100% $

A289 M1-8398(R.1) 26-Oct 25-Jan 20-Nov 21 Plate 3 x 1524 x 2438 A240-321 sh 160 14,142.72 375A F CIF 3-Dec 28-Feb 17-Feb 23-Feb 27-Feb 28-Mar 100% $

14 x 1510 x 6000

3" S/40(OD88.9x5.49)-6.09M

Page 69: Hvc PlatePipe Update)

HVC-PUR 69 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 10 Plate 10 x 1219 x 2438 A240-316L sh 3 711.48 375A F CIF 3-Dec 25-Jan 17-Feb 23-Feb 27-Feb 28-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 11 Plate 12 x 1219 x 2438 A240-316L sh 4 1,138.37 375A F CIF 3-Dec 28-Feb 17-Feb 23-Feb 27-Feb 28-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 13 Plate 16 x 1524 x 6096 A240-316L sh 1 1,186.19 375A F CIF 3-Dec 25-Jan 17-Feb 23-Feb 27-Feb 28-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 14 Plate 6 x 1219 x 2438 A240-316L sh 4 569.18 375A F CIF 3-Dec 25-Jan 17-Feb 23-Feb 27-Feb 28-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 15 Plate 3 x 1219 x 2438 A240-316L sh 4 284.59 375A F CIF 3-Dec 25-Jan 17-Feb 23-Feb 27-Feb 28-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 16 Plate 6 x 1219 x 6096 A240-316L sh 42 14,943.50 375A F CIF 3-Dec 28-Feb 17-Feb 23-Feb 27-Feb 28-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 17 Plate 10 x 1219 x 2438 A240-316L sh 3 711.50 375A F CIF 3-Dec 25-Jan 17-Feb 23-Feb 27-Feb 28-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 18 Plate 16 x 1219 x 3048 A240-316L sh 2 948.79 375A F CIF 3-Dec 25-Jan 17-Feb 23-Feb 27-Feb 28-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 19 Plate 25 x 1219 x 3048 A240-316L sh 2 1,482.49 375A F CIF 3-Dec 25-Jan 17-Feb 23-Feb 27-Feb 28-Mar 100% $

A289 M1-8490(R.1) 25-Jan 31-Oct 6 W/D Pipe 16" S/80 (OD406.4xt21.44)- A312-316 pc 12 14,898.00 371 F FOB 27-Nov 25-Feb 7-Mar 13-Mar 17-Mar 25-Mar 100% $

A289 M1-8490(R.1) 25-Jan 31-Oct 6 W/D Pipe 16" S/80 (OD406.4xt21.44)- A312-316 pc 12 9,932.00 371 F FOB 27-Nov 25-Feb 7-Mar 13-Mar 17-Mar 25-Mar 100% $

A289 M1-8859 16-Feb 15-Mar 1 Plate 3 x 1219 x 2438 A240-321 sh 32 2,262.50 60 F FOB 19-Feb 7-Mar 1-Mar 7-Mar 18-Mar 18-Apr 100% $

A289 M1-8859 16-Feb 15-Mar 2 Plate 10 x 2000 x 2438 A240-321 sh 1 386.70 60 F FOB 19-Feb 7-Mar 1-Mar 7-Mar 18-Mar 18-Apr 100% $

A289 M1-8859 16-Feb 15-Mar 3 Plate 6 x 1219 x 6096 A240-316L sh 3 1,067.40 60 F FOB 19-Feb 7-Mar 1-Mar 7-Mar 18-Mar 18-Apr 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 23 Plate 18 x 2000 x 11000 A572-50 TP1 sh 16 49,740.00 345 F CNF 12-Nov 5-Feb 10-Mar 16-Mar 22-Mar 28-Mar L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 24 Plate 18 x 2300 x 15000 A572-50 TP1 sh 32 155,991.11 345 F CNF 12-Nov 5-Feb 10-Mar 16-Mar 22-Mar 28-Mar L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 26 Plate 18 x 2300 x 14000 A572-50 TP1 sh 49 222,940.20 345 F CNF 12-Nov 5-Feb 10-Mar 16-Mar 22-Mar 28-Mar L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 29 Plate 30 x 2438 x 11000 A572-50 TP1 sh 25 157,890.00 345 F CNF 12-Nov 5-Feb 10-Mar 16-Mar 22-Mar 28-Mar L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 30 Plate 30 x 2438 x 13500 A572-50 TP1 sh 8 62,010.00 345 F CNF 12-Nov 5-Feb 10-Mar 16-Mar 22-Mar 28-Mar L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 31 Plate 30 x 2438 x 14500 A572-50 TP1 sh 23 191,475.00 345 F CNF 12-Nov 5-Feb 10-Mar 16-Mar 22-Mar 28-Mar L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 32 Plate 35 x 2870 x 11000 A572-50 TP1 sh 11 95,409.29 345 F CNF 12-Nov 5-Feb 10-Mar 16-Mar 22-Mar 28-Mar L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 33 Plate 35 x 2438 x 14500 A572-50 TP1 sh 23 223,387.50 345 F CNF 12-Nov 5-Feb 10-Mar 16-Mar 22-Mar 28-Mar L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 35 Plate 45 x 2438 x 11000 A572-50 TP1 sh 10 94,730.00 345 F CNF 12-Nov 5-Feb 10-Mar 16-Mar 22-Mar 28-Mar L/C $

A289 M1-8460(R.1) 29-Nov 5 Plate 2 x 1524 x 2438 A240-321 sh 223 13,140.95 375B L DDU 3-Dec 28-Feb 5-Mar 13-Mar 100% $

A289 M1-8398(R.1) 10-Nov 1-Feb 20-Nov 7 Plate 2 x 1524 x 2438 A240-321 sh 1,223 72,068.97 375B L DDU 3-Dec 28-Feb 5-Mar 13-Mar 100% $

A289 M1-8491(R.2) 10-Nov 1-Feb 20-Nov 8 Plate 3 x 1524 x 2438 A240-321 sh 158 13,965.94 375B L DDU 3-Dec 28-Feb 5-Mar 13-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 20 Plate 2 x 1524 x 2438 A240-321 sh 1,623 95,640.18 375B L DDU 3-Dec 28-Feb 5-Mar 13-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 21 Plate 3 x 1524 x 2438 A240-321 sh 110 9,723.13 375B L DDU 3-Dec 28-Feb 5-Mar 13-Mar 100% $

A289 M1-8401 10-Nov 1-Feb 1 W/D Pipe 1"S/80(OD33.4x4.55t)-6M A312-316 (Mo conten pc 1 19.80 366 F FOB 26-Nov 25-Jan 26-Jan 1-Feb 20-Feb 12-Mar 100% $

A289 M1-8401 10-Nov 1-Feb 2 W/D Pipe 2" S/40(OD60.3x3.9t)-6M A312-316 (Mo conten pc 17 564.10 366 F FOB 26-Nov 25-Jan 26-Jan 1-Feb 20-Feb 12-Mar 100% $

A289 M1-8401 10-Nov 1-Feb 3 W/D Pipe 3" S/40 (OD88.9xt5.49)-6M A312-316 (Mo conten pc 6 413.20 366 F FOB 26-Nov 25-Jan 26-Jan 1-Feb 20-Feb 12-Mar 100% $

A289 M1-8490(R.1) 26-Oct 25-Jan 31-Oct 2 SMLS Pipe 8" S/40(OD219.1xt8.18)- A106-B pc 14 3,574.00 366 F FOB 26-Nov 25-Jan 26-Jan 1-Feb 20-Feb 12-Mar 100% $

A289 M1-8490(R.1) 26-Oct 25-Jan 31-Oct 3 W/D Pipe 2" S/40(OD60.3x3.9t)-6M A312-316 pc 8 265.32 366 F FOB 26-Nov 25-Jan 26-Jan 1-Feb 20-Feb 12-Mar 100% $

A289 M1-8490(R.1) 26-Oct 25-Jan 31-Oct 4 W/D Pipe 3" S/40 (OD88.9xt5.49)-6M A312-316 pc 6 413.28 366 F FOB 26-Nov 25-Jan 26-Jan 1-Feb 20-Feb 12-Mar 100% $

A289 M1-8401 10-Nov 1-Feb 4 SMLS Pipe 8" S/80 (OD219.1xt12.7)-6MA312-316 (Mo content(2.5%<Mo<3%)pc 1 394.30 372 F FOB 27-Nov 25-Jan 17-Feb 22-Feb 29-Feb 12-Mar 100% $

A289 M1-8490(R.1) 26-Oct 25-Jan 31-Oct 5 SMLS Pipe 8" S/80 (OD219.1xt12.7)-6M A312-316 pc 7 2,760.04 372 F FOB 27-Nov 25-Jan 17-Feb 22-Feb 29-Feb 12-Mar 100% $

A289 M1-8460(R.1) 29-Nov 4 Plate 16 x 2438 x 6096 SS400 sh 1 1,870.00 380 F FOB 30-Nov 30-Jan 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A289 M1-8398(R.1) 10-Nov 1-Feb 20-Nov 3 Plate 10 x 2438 x 6096 SS400 sh 5 5,830.00 380 F FOB 30-Nov 30-Dec 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A289 M1-8398(R.1) 10-Nov 1-Feb 20-Nov 4 Plate 15 x 2438 x 6096 SS400 sh 5 8,750.00 380 F FOB 30-Nov 30-Dec 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A289 M1-8398(R.1) 10-Nov 1-Feb 20-Nov 5 Plate 20 x 2438 x 6096 SS400 sh 3 7,000.00 380 F FOB 30-Nov 30-Dec 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A289 M1-8398(R.1) 10-Nov 1-Feb 20-Nov 6 Plate 35 x 2438 x 6096 SS400 sh 1 4,080.00 380 F FOB 30-Nov 30-Dec 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 6 Plate 12 x 2438 x 6096 SS400 sh 1 1,400.00 380 F FOB 30-Nov 30-Dec 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 7 Plate 16 x 2438 x 6096 SS400 sh 1 1,870.00 380 F FOB 30-Nov 30-Jan 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 8 Plate 20 x 2438 x 6096 SS400 sh 7 16,330.00 380 F FOB 30-Nov 30-Jan 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 22 Plate 15 x 2438 x 6096 SS400 sh 25 43,750.00 380 F FOB 30-Nov 30-Jan 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 22 Plate 30 x 2438 x 6096 SS400 sh 1 3,500.00 380 F FOB 30-Nov 30-Jan 17-Jan 24-Jan 2-Feb 10-Mar 100% $

A289 M1-8669 9-Jan 10-Mar 1 W/D Pipe 1" S/40(OD33.4xt3.38)-6M A53-B pc 3 45.00 14 F FOB 15-Jan 25-Jan 26-Jan 1-Feb 21-Feb 27-Feb 100% $

A289 M1-8665 9-Jan 15-Feb 1 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 7 230.60 14 F FOB 15-Jan 25-Jan 26-Jan 1-Feb 21-Feb 27-Feb 100% $

A289 M1-8665 9-Jan 15-Feb 2 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 9 877.00 14 F FOB 15-Jan 25-Jan 26-Jan 1-Feb 21-Feb 27-Feb 100% $

A289 M1-8667 9-Jan 5-Feb 1 Plate 10 x 1219 x 6096 A240-304 sh 3 1,767.00 28 F FOB 22-Jan 1-Feb 4-Feb 11-Feb 20-Feb 1-Mar 100% $

A289 M1-8667 9-Jan 5-Feb 2 Plate 12 x 1219 x 6096 A240-304 sh 1 707.00 28 F FOB 22-Jan 1-Feb 4-Feb 11-Feb 20-Feb 1-Mar 100% $

A289 M1-8667 9-Jan 5-Feb 3 Plate 15 x 1219 x 6096 A240-304 sh 8 8,840.00 28 F FOB 22-Jan 1-Feb 4-Feb 11-Feb 20-Feb 1-Mar 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 12 Plate 15 x 1524 x 6096 A240-316L sh 12 13,344.59 375A F CIF 3-Dec 28-Feb 13-Jan 18-Jan 25-Jan 5-Feb 100% $

Page 70: Hvc PlatePipe Update)

HVC-PUR 70 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 13 Plate 20 x 1524 x 6096 A240-316L sh 5 7,413.66 375A F CIF 3-Dec 28-Feb 13-Jan 18-Jan 25-Jan 5-Feb 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 13 Plate 16 x 1524 x 6096 A240-316L sh 2 2,372.37 375A F CIF 3-Dec 25-Jan 13-Jan 18-Jan 25-Jan 5-Feb 100% $

A289 M1-8460(R.1) 21-Nov 1-Feb 29-Nov 2 Plate 2 x 1219 x 2438 SS400 sh 330 15,510.00 373 F FOB 29-Nov 25-Jan 17-Jan 24-Jan 30-Jan 19-Feb 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 1 Plate 2 x 1219 x 2438 SS400 sh 1,140 53,580.00 373 F FOB 29-Nov 25-Jan 17-Jan 24-Jan 30-Jan 19-Feb 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 2 Plate 3 x 1219 x 2438 SS400 sh 400 28,000.00 373 F FOB 29-Nov 25-Jan 17-Jan 24-Jan 30-Jan 19-Feb 100% $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 3 Plate 4 x 1219 x 6096 SS400 sh 2 470.00 373 F FOB 29-Nov 25-Jan 17-Jan 24-Jan 30-Jan 19-Feb 100% $

A289 M1-8460(R.1) 21-Nov 1-Feb 29-Nov 1 Plate 1 x 1219 x coil SPCC Ton 27,040.00 370 F CFR 27-Nov 25-Jan 15-Jan 1-Feb 4-Feb 18-Feb L/C $

A289 M1-8398(R.1) 10-Nov 1-Feb 20-Nov 1 Plate 1 x 1219 x coil SPCC Ton 52,000.00 370 F CFR 27-Nov 25-Jan 15-Jan 1-Feb 4-Feb 18-Feb L/C $

A289 M1-8491(R.2) 25-Jan 20-Nov 1 Plate 1 x 1219 x coil SPCC Ton 30,000.00 370 F CFR 27-Nov 25-Jan 15-Jan 1-Feb 4-Feb 18-Feb L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 5 Plate 10 x 2438 x 6096 A36 sh 4 4,668.00 340 F FOB 2-Nov 25-Dec 17-Jan 24-Jan 30-Jan 18-Feb L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 6 Plate 12 x 2438 x 6096 A36 sh 14 19,600.00 340 F FOB 2-Nov 25-Dec 17-Jan 24-Jan 30-Jan 18-Feb L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 7 Plate 16 x 2438 x 6096 A36 sh 1 1,866.00 340 F FOB 2-Nov 25-Dec 17-Jan 24-Jan 30-Jan 18-Feb L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 8 Plate 20 x 2438 x 6096 A36 sh 4 9,332.00 340 F FOB 2-Nov 25-Dec 17-Jan 24-Jan 30-Jan 18-Feb L/C $

A289 M1-8491(R.2) 26-Oct 25-Jan 20-Nov 9 Plate 50 x 2438 x 6096 A36 sh 4 23,332.00 340 F FOB 2-Nov 25-Dec 17-Jan 24-Jan 30-Jan 18-Feb L/C $

A289 M1-8490(R.1) 26-Oct 25-Jan 31-Oct 1 SMLS Pipe 2" S/40(OD60.3xt3.91)-6M A106-B pc 3 97.92 360 F FOB 23-Nov 21-Dec 28-Dec 3-Jan 11-Jan 25-Jan 100% $

Altaweelah A10/A275

A275 M1-8569 18-Dec 22-Dec 1 Plate 2 x 1219 x 2438 A240-316L sh 2 94.90 798 L DDP 20-Dec 22-Dec 25-Dec 26-Feb 100% $

A275 M1-8569 18-Dec 22-Dec 2 Plate 3 x 1219 x 2438 A240-316L sh 2 142.30 798 L DDP 20-Dec 22-Dec 25-Dec 26-Feb 100% $

A275 M1-8190 21-Sep 5-Nov 1 Plate A36 sh 2 1,750.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A275 M1-8190 21-Sep 5-Nov 2 Plate 14 x 2438 x 6096 A36 sh 2 3,266.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A275 W4-8480 26-Nov ASAP 1 Plate 10 x 1500 x 6000 SS400 sh 4 2,826.00 751 L DDP 27-Nov 29-Nov 5-Dec 19-Dec 100% VND

A275 M1-8507 3-Dec ASAP 1 Plate 2 x 1219 x 2438 A240-316L sh 6 284.59 774 L DDP 6-Dec 10-Dec 7-Dec 19-Dec 100% $

A275 M1-8507 3-Dec ASAP 2 Plate 3 x 1219 x 2438 A240-316L sh 2 142.30 774 L DDP 6-Dec 10-Dec 7-Dec 19-Dec 100% $

A275 M1-8360 31-Oct 15-Nov 1 Plate 2 x 1219 x 2438 A312-316L sh 14 664.00 677 L DDP 6-Nov 16-Nov 14-Nov 11-Dec 100% VND

A275 M1-8112 11-Sep 5-Nov 1 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 1 33.00 283 F FOB 18-Sep 12-Oct 12-Oct 19-Oct 25-Oct 27-Nov 100% $

A275 M1-8112 11-Sep 5-Nov 2 W/D Pipe 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 1 68.00 283 F FOB 18-Sep 12-Oct 12-Oct 19-Oct 25-Oct 27-Nov 100% $

A275 M1-8112 11-Sep 5-Nov 3 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 1 97.00 283 F FOB 18-Sep 12-Oct 12-Oct 19-Oct 25-Oct 27-Nov 100% $

A275 M1-8112 11-Sep 5-Nov 4 SQ.Pipe 50 x 50 x 2.3-6M STKR400 pc 7 139.00 283 F FOB 18-Sep 12-Oct 12-Oct 19-Oct 25-Oct 27-Nov 100% $

A275 M1-7925 8-Aug 30-Oct 1 Plate 2 x 1219 x length A240-409 1,382.00 338 F FOB 27-Jul 15-Oct To Karam 100% $

A275 M1-7832 11-Jul 15-Oct 1 Plate 2 x 1219 x length A240-409 4,238.00 338 F FOB 27-Jul 15-Oct To Karam 100% $

A275 M1-7832 11-Jul 15-Oct 2 Plate 3 x 1219 x length A240-409 5,321.00 338 F FOB 27-Jul 15-Oct To Karam 100% $

A275 M1-7415(R.1) 20-Apr 30-Jun 24-Apr 12 Plate 2 x 1219 x length A240-409 11,263.00 338 F FOB 27-Jul 30-Jun To Karam 100% $

A275 M1-8144 14-Sep 20-Oct 1 Plate 3 x 1219 x 6096 SS400 sh 8 1,400.00 287 F FOB 18-Sep 10-Oct 14-Oct 21-Oct 27-Oct 10-Nov 100% $

A275 M1-8144 14-Sep 20-Oct 2 Plate 8 x 1219 x 6096 SS400 sh 8 3,733.00 287 F FOB 18-Sep 10-Oct 14-Oct 21-Oct 27-Oct 10-Nov 100% $

A275 M1-8144 14-Sep 20-Oct 3 Plate 12 x 2438 x 6096 SS400 sh 1 1,400.00 287 F FOB 18-Sep 10-Oct 14-Oct 21-Oct 27-Oct 10-Nov 100% $

A275 M1-8242 29-Sep 25-Oct 1 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 1 33.00 223 F FOB 2-Oct 12-Oct 12-Oct 19-Oct 25-Oct 6-Nov 100% $

A275 M1-8276 8-Oct 5-Nov 1 Plate 10 x 1524 x 6096 SS400 sh 2 1,459.00 641 L DDP 12-Oct 14-Oct 12-Oct 19-Oct 100% VND

A275 M1-8276 8-Oct 5-Nov 2 Plate 12 x 1524 x 6096 SS400 sh 3 2,625.00 641 L DDP 12-Oct 14-Oct 12-Oct 19-Oct 100% VND

A275 M1-8241 29-Sep 25-Oct 1 Plate 2 x 1130 x 2438 SS400 sh 8 346.00 607 L DDP 1-Oct 3-Oct 3-Oct 15-Oct 100% VND

A275 M1-7849 16-Jul 10-Sep 1 Plate 3 x 1219 x 6096 A240-316L sh 6 1,068.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-7849 16-Jul 10-Sep 2 Plate 10 x 1524 x 6096 A240-304 sh 7 5,159.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-7849 16-Jul 10-Sep 3 Plate 4 x 1524 x 3048 A36 sh 2 292.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-7849 16-Jul 10-Sep 4 Plate 10 x 2438 x 6096 A36 sh 2 2,334.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-7849 16-Jul 10-Sep 5 Plate 12 x 2438 x 6096 A36 sh 9 12,600.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-7849 16-Jul 10-Sep 6 Plate 15 x 1524 x 6096 A36 sh 2 2,188.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-7849 16-Jul 10-Sep 7 Plate 20 x 2438 x 6096 A36 sh 2 4,666.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-7849 16-Jul 10-Sep 8 Plate 23 x 2100 x 4700 A36 sh 1 1,782.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-7849 16-Jul 10-Sep 9 Plate 30 x 2438 x 6096 A36 sh 1 3,500.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-7810(R.2) 9-Jul 20-Aug 11-Jul 6 Plate 10 x 1524 x 6096 A36 sh 2 1,458.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-7810(R.2) 9-Jul 20-Aug 11-Jul 7 Plate 12 x 1524 x 6096 A36 sh 10 8,750.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-7810(R.2) 9-Jul 20-Aug 11-Jul 8 Plate 18 x 2438 x 6096 A36 sh 2 4,200.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-7810(R.2) 9-Jul 20-Aug 11-Jul 9 Plate 30 x 2438 x 6096 A36 sh 1 3,500.00 217 F FOB 23-Jul 20-Aug 19-Sep 26-Sep 1-Oct 8-Oct 100% $

A275 M1-8056 30-Aug 20-Sep 1 Plate 2 x 1219 x 2438 A36 sh 13 611.00 275 F FOB 10-Sep 14-Sep 19-Sep 26-Sep 1-Oct 15-Oct 100% $

12 x 1524 x 6096

Page 71: Hvc PlatePipe Update)

HVC-PUR 71 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A275 M1-8056 30-Aug 20-Sep 2 Plate 10 x 1524 x 3048 A36 sh 4 1,458.00 275 F FOB 10-Sep 14-Sep 19-Sep 26-Sep 1-Oct 15-Oct 100% $

A275 M1-7978 17-Aug 1 Plate 10 x 1500 x 6000 SS400 sh 3 2,119.50 470 L DDP 17-Aug 24-Aug 21-Aug 13-Oct 100% VND

A275 M1-8056 30-Aug 3 Plate 2 x 1219 x 2438 A240-316L sh 15 711.00 268 F FOB 4-Sep 15-Sep 19-Sep 26-Sep 1-Oct 10-Oct 100% $

A275 M1-8055 30-Aug 1 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 1 33.00 268 F FOB 4-Sep 15-Sep 19-Sep 26-Sep 1-Oct 10-Oct 100% $

A275 M1-7832 11-Jul 15-Oct 2 Plate 3 x 1219 x 2438 A240-409 sh 4 258.56 222 F FOB 27-Jul 15-Oct 17-Sep 23-Sep 27-Sep 10-Oct 100% $

A275 M1-7848 16-Jul 10-Sep 1 W/D Pipe 1/2" S/40(OD21.3x2.77)-6M A53-B pc 2 15.00 216 F FOB 23-Jul 24-Aug 24-Aug 30-Aug 15-Sep 8-Oct 100% $

A275 M1-7848 16-Jul 10-Sep 2 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 1 33.00 216 F FOB 23-Jul 24-Aug 24-Aug 30-Aug 15-Sep 8-Oct 100% $

A275 M1-7848 16-Jul 10-Sep 3 W/D Pipe 2-1/2" S/40 (OD73 x 5.16)-3 A312-304 pc 108 3,484.00 216 F FOB 23-Jul 24-Aug 24-Aug 30-Aug 15-Sep 8-Oct 100% $

A275 M1-7848 16-Jul 10-Sep 4 W/D Pipe 2-1/2" S/40 (OD73 x 5.16)-5 A312-304 pc 97 4,652.00 216 F FOB 23-Jul 24-Aug 24-Aug 30-Aug 15-Sep 8-Oct 100% $

A275 M1-7848 16-Jul 10-Sep 5 W/D Pipe 10" S/40(OD273.1x 9.27)-6 A312-304 pc 9 3,290.00 216 F FOB 23-Jul 24-Aug 24-Aug 30-Aug 15-Sep 8-Oct 100% $

A275 M1-7376(R.3) 12-Apr 10-Jun 4-May 4 Plate 6 x 1800 x 6096 A36 sh 350 180,887.00 196 F CFR 28-Jun 25-Aug 27-Jul 2-Sep 11-Sep 29-Sep L/C $

A275 M1-7376(R.3) 12-Apr 10-Jun 4-May 12 Plate 20 x 1900 x 13500 A572-50 TP1 sh 8 32,216.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A275 M1-7376(R.3) 12-Apr 10-Jun 4-May 13 Plate 20 x 1800 x 8100 A572-50 TP1 sh 2 4,578.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A275 M1-7376(R.3) 12-Apr 10-Jun 4-May 14 Plate 20 x 1900 x 12500 A572-50 TP1 sh 8 29,832.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A275 M1-7376(R.3) 12-Apr 10-Jun 4-May 15 Plate 20 x 2200 x 11100 A572-50 TP1 sh 2 7,668.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A275 M1-7376(R.3) 12-Apr 10-Jun 4-May 16 Plate 24 x 1800 x 6096 A572-50 TP1 sh 2 4,134.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A275 M1-7376(R.3) 12-Apr 10-Jun 4-May 17 Plate 25 x 2250 x 8100 A572-50 TP1 sh 2 7,154.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A275 M1-7376(R.3) 12-Apr 10-Jun 4-May 18 Plate 28 x 2470 x 7500 A572-50 TP1 sh 2 8,144.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A275 M1-7376(R.3) 10-Jun 4-May 20 Plate 30 x 2438 x 13000 A572-50 TP1 sh 6 44,784.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A275 M1-7376(R.3) 10-Jun 4-May 21 Plate 35 x 2438 x 13000 A572-50 TP1 sh 2 17,416.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A275 M1-7376(R.3) 10-Jun 4-May 22 Plate 35 x 2438 x 8100 A572-50 TP1 sh 2 10,852.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A275 M1-7376(R.3) 10-Jun 4-May 24 Plate 35 x 2438 x 10600 A572-50 TP1 sh 2 14,200.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A275 M1-7376(R.3) 10-Jun 4-May 25 Plate 45 x 2438 x 8100 A572-50 TP1 sh 2 13,952.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A275 M1-7376(R.3) 10-Jun 4-May 1 Plate 2 x 1219 x 3048 SS400 sh 234 13,690.00 188 F FOB 27-Jun 20-Jul 4-Aug 15-Aug 17-Aug 11-Dec 100% $

A275 M1-7376(R.3) 10-Jun 4-May 2 Plate 3 x 1219 x 3048 SS400 sh 60 5,250.00 188 F FOB 27-Jun 20-Jul 4-Aug 15-Aug 17-Aug 11-Dec 100% $

A275 M1-7376(R.3) 10-Jun 4-May 3 Plate 4 x 1524 x 3048 SS400 sh 2 290.00 188 F FOB 27-Jun 20-Jul 4-Aug 15-Aug 17-Aug 11-Dec 100% $

A275 M1-7809 9-Jul 20-Aug 1 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 130 3,159.00 205 F FOB 11-Jul 26-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A275 M1-7809 9-Jul 20-Aug 2 W/D Pipe 2" S/160(OD60.3xt8.74)-6M A312-304 pc 1 67.00 205 F FOB 11-Jul 26-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A275 M1-7809 9-Jul 20-Aug 3 SMLS Pipe 2-1/2" S/40 (OD73xt5.16)-6 A106-B pc 1 52.00 205 F FOB 11-Jul 26-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A275 M1-7810(R.2) 9-Jul 20-Aug 11-Jul 1 Plate 2 x 1219 x 6096 A240-316L sh 4 474.00 218 F CFR 24-Jul 10-Aug 3-Aug 8-Aug 16-Aug 23-Aug 100% $

A275 M1-7810(R.2) 9-Jul 20-Aug 11-Jul 2 Plate 15 x 1524 x 6096 A240-316L sh 2 2,224.00 218 F CFR 24-Jul 10-Aug 3-Aug 8-Aug 16-Aug 23-Aug 100% $

A275 M1-7810(R.2) 9-Jul 20-Aug 11-Jul 3 Plate 6 x 1524 x 6096 A240-304 sh 1 442.00 218 F CFR 24-Jul 10-Aug 3-Aug 8-Aug 16-Aug 23-Aug 100% $

A275 M1-7810(R.2) 9-Jul 20-Aug 11-Jul 4 Plate 15 x 1524 x 6096 A240-304 sh 4 4,420.00 218 F CFR 24-Jul 10-Aug 3-Aug 8-Aug 16-Aug 23-Aug 100% $

A275 M1-7415(R.1) Add 4 Plate 3 x 1219 x 6096 A240-409 sh 5 864.00 114 F CIF 27-Apr 10-Jul 25-Jun 30-Jun 18-Jul 27-Jul L/C $

A275 M1-7415(R.1) 20-Apr 30-Jun 24-Apr 4 Plate 15 x 1524 x 6096 A240-316L sh 2 2,249.00 114 F CIF 27-Apr 10-Jul 25-Jun 30-Jun 18-Jul 27-Jul L/C $

A275 M1-7415(R.1) 20-Apr 30-Jun 24-Apr 11 Plate 15 x 1524 x 6096 A240-304 sh 6 6,748.00 114 F CIF 27-Apr 10-Jul 25-Jun 30-Jun 18-Jul 27-Jul L/C $

A275 M1-7406 19-Apr 20-Jun 1 Plate 8 x 2438 x 6096 SS400 sh 47 43,851.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A275 M1-7406 19-Apr 20-Jun 2 Plate 10 x 2438 x 6096 SS400 sh 6 7,002.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A275 M1-7406 19-Apr 20-Jun 3 Plate 12 x 2438 x 6096 SS400 sh 32 44,800.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A275 M1-7406 19-Apr 20-Jun 4 Plate 14 x 2438 x 6096 SS400 sh 22 35,926.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A275 M1-7406 19-Apr 20-Jun 5 Plate 16 x 2438 x 6096 SS400 sh 12 22,404.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A275 M1-7376(R.3) 12-Apr 10-Jun 4-May 8 Plate 15 x 1524 x 6096 SS400 sh 4 4,376.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A275 M1-7376(R.3) 10-Jun 4-May 9 Plate 20 x 2438 x 6096 SS400 sh 4 9,332.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A275 M1-7490 10-May 30-Jun 1 W/D Pipe 2 1/2" S/40(OD73.0xt5.16)- A312-304 pc 2 105.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A275 M1-7490 10-May 30-Jun 2 SMLS Pipe 2" S/160(OD60.3xt8.74)-6M A312-304 pc 1 67.00 112 F FOB 18-May 17-Jun 17-Jun 22-Jun 29-Jun 21-Jul 100% $

A275 M1-7415(R.1) 20-Apr 30-Jun 24-Apr 1 Plate 2 x 1219 x 6096 A240-316L sh 103 12,216.00 114 F CIF 27-Apr 31-May 16-May 30-May 9-Jun L/C $

A275 M1-7415(R.1) 20-Apr 30-Jun 24-Apr 2 Plate 3 x 1219 x 6096 A240-316L sh 24 4,270.00 114 F CIF 27-Apr 31-May 16-May 30-May 9-Jun L/C $

A275 M1-7415(R.1) 20-Apr 30-Jun 24-Apr 3 Plate 6 x 1524 x 6096 A240-316L sh 9 4,003.00 114 F CIF 27-Apr 31-May 16-May 30-May 9-Jun L/C $

A275 M1-7415(R.1) 20-Apr 30-Jun 24-Apr 5 Plate 20 x 1219 x 2438 A240-316L sh 1 480.00 114 F CIF 27-Apr 31-May 16-May 30-May 9-Jun L/C $

A275 M1-7415(R.1) 20-Apr 30-Jun 24-Apr 6 Plate 2 x 1219 x 6096 A240-304 sh 1 118.00 114 F CIF 27-Apr 31-May 16-May 30-May 9-Jun L/C $

A275 M1-7415(R.1) 20-Apr 30-Jun 24-Apr 7 Plate 3 x 1219 x 6096 A240-304 sh 1 177.00 114 F CIF 27-Apr 31-May 16-May 30-May 9-Jun L/C $

A275 M1-7415(R.1) 20-Apr 30-Jun 24-Apr 8 Plate 5 x 1219 x 2438 A240-304 sh 2 236.00 114 F CIF 27-Apr 31-May 16-May 30-May 9-Jun L/C $

A275 M1-7415(R.1) 20-Apr 30-Jun 24-Apr 9 Plate 6 x 1524 x 6096 A240-304 sh 7 3,094.00 114 F CIF 27-Apr 31-May 16-May 30-May 9-Jun L/C $

Page 72: Hvc PlatePipe Update)

HVC-PUR 72 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A275 M1-7415(R.1) 20-Apr 30-Jun 24-Apr 10 Plate 12 x 1219 x 6096 A240-304 sh 1 707.00 114 F CIF 27-Apr 31-May 16-May 30-May 9-Jun L/C $

Amman/A276

A276 M1-8599 1 Plate 12 x 2438 x 6096 SS400 sh 1 1,400.00 4 F FOB 7-Jan 17-Jan 22-Mar 29-Mar 3-Apr 12-Apr 100% $

A276 M1-7453 4-May 30-Jun 1 Plate 6 x 1829 x 6096 A36 sh 22 11,553.00 331 F FOB 26-Oct 30-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

A276 M1-8142 14-Sep 1-Oct 2 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 2 66.00 283 F FOB 18-Sep 12-Oct 12-Oct 19-Oct 25-Oct 27-Nov 100% $

A276 M1-8142 14-Sep 1-Oct 3 W/D Pipe 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 1 68.00 283 F FOB 18-Sep 12-Oct 12-Oct 19-Oct 25-Oct 27-Nov 100% $

A276 M1-8142 14-Sep 1-Oct 4 SQ.Pipe 50 x 50 x 2.3-6M STKR400 pc 5 100.00 283 F FOB 18-Sep 12-Oct 12-Oct 19-Oct 25-Oct 27-Nov 100% $

A276 M1-8103 10-Sep 10-Oct 2 SMLS Pipe 5" S/80(OD141.3xt9.52) -6M A312-321 pc 1 188.00 283 F FOB 18-Sep 12-Oct 12-Oct 19-Oct 25-Oct 27-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 14 Plate 1.6 x 1219 x 2438 SS400 sh 2 75.00 258 F FOB 1-Sep 7-Sep 7-Sep 13-Sep 19-Sep 14-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 15 Plate 2 x 1219 x 2438 SS400 sh 5 233.00 258 F FOB 1-Sep 7-Sep 7-Sep 13-Sep 19-Sep 14-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 16 Plate 3 x 1219 x 2438 SS400 sh 45 3,149.00 258 F FOB 1-Sep 7-Sep 7-Sep 13-Sep 19-Sep 14-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 17 Plate 5 x 1524 x 6096 SS400 sh 1 365.00 258 F FOB 1-Sep 7-Sep 7-Sep 13-Sep 19-Sep 14-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 20 Plate 10 x 1524 x 6096 SS400 sh 3 2,188.00 258 F FOB 1-Sep 7-Sep 7-Sep 13-Sep 19-Sep 14-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 22 Plate 14 x 1219 x 6096 SS400 sh 2 1,633.00 258 F FOB 1-Sep 7-Sep 7-Sep 13-Sep 19-Sep 14-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 28 Plate 25 x 1219 x 6096 SS400 sh 2 2,917.00 258 F FOB 1-Sep 7-Sep 7-Sep 13-Sep 19-Sep 14-Nov 100% $

A276 M1-8142 14-Sep 1-Oct 1 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 95 2,309.00 284 F FOB 19-Aug 12-Oct 12-Oct 19-Oct 25-Oct 10-Nov 100% $

A276 M1-8103 10-Sep 10-Oct 1 SMLS Pipe 4" S/80(OD114.3 x t8.56)-6M A312-304 pc 4 541.00 284 F FOB 19-Aug 12-Oct 12-Oct 19-Oct 25-Oct 10-Nov 100% $

A276 M1-8141 14-Sep 1-Oct 1 Plate 6 x 1524 x 6096 A240-304 sh 8 3,536.00 287 F FOB 18-Sep 10-Oct 14-Oct 21-Oct 27-Oct 10-Nov 100% $

A276 M1-8141 14-Sep 1-Oct 2 Plate 12 x 2438 x 6096 SS400 sh 7 9,800.00 287 F FOB 18-Sep 10-Oct 14-Oct 21-Oct 27-Oct 10-Nov 100% $

A276 M1-8104 10-Sep 10-Oct 1 Plate 10 x 2438 x 6096 SS400 sh 1 1,167.00 287 F FOB 18-Sep 10-Oct 14-Oct 21-Oct 27-Oct 10-Nov 100% $

A276 M1-8104 10-Sep 10-Oct 2 Plate 12 x 1524 x 6096 SS400 sh 2 1,750.00 287 F FOB 18-Sep 10-Oct 14-Oct 21-Oct 27-Oct 10-Nov 100% $

A276 M1-8104 10-Sep 10-Oct 3 Plate 12 x 2438 x 6096 SS400 sh 3 4,200.00 287 F FOB 18-Sep 10-Oct 14-Oct 21-Oct 27-Oct 10-Nov 100% $

A276 M1-8104 10-Sep 10-Oct 4 Plate 18 x 1524 x 6096 SS400 sh 2 2,625.00 287 F FOB 18-Sep 10-Oct 14-Oct 21-Oct 27-Oct 10-Nov 100% $

A276 M1-8104 10-Sep 10-Oct 5 Plate 20 x 2438 x 6096 SS400 sh 3 7,000.00 287 F FOB 18-Sep 10-Oct 14-Oct 21-Oct 27-Oct 10-Nov 100% $

A276 M1-8320 1 Plate 10 x 1500 x 6000 SS400 sh 3 2,120.00 663 L DDP 23-Oct 24-Oct 25-Oct 8-Nov 100% VND

A276 M1-8042 27-Aug 15-Sep 18 Plate 8 x 1524 x 6096 SS400 sh 2 1,167.00 265 F FOB 31-Aug 7-Sep 7-Sep 13-Sep 18-Sep 6-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 21 Plate 12 x 2438 x 6096 SS400 sh 10 14,000.00 265 F FOB 31-Aug 7-Sep 14-Sep 19-Sep 25-Sep 6-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 24 Plate 15 x 1524 x 6096 SS400 sh 11 12,033.00 265 F FOB 31-Aug 23-Sep 19-Sep 26-Sep 1-Oct 6-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 25 Plate 16 x 2438 x 6096 SS400 sh 4 7,467.00 265 F FOB 31-Aug 7-Sep 14-Sep 19-Sep 25-Sep 6-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 26 Plate 19 x 1524 x 6096 SS400 sh 2 2,771.00 265 F FOB 31-Aug 7-Sep 7-Sep 13-Sep 18-Sep 6-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 27 Plate 20 x 1524 x 6096 SS400 sh 10 14,586.00 265 F FOB 31-Aug 7-Sep 7-Sep 13-Sep 18-Sep 6-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 29 Plate 30 x 1524 x 6096 SS400 sh 2 4,376.00 265 F FOB 31-Aug 23-Sep 19-Sep 26-Sep 1-Oct 6-Nov 100% $

A276 M1-8042 27-Aug 15-Sep 31 Plate 50 x 1524 x 6096 SS400 sh 1 3,646.00 265 F FOB 31-Aug 23-Sep 19-Sep 26-Sep 1-Oct 6-Nov 100% $

A276 M1-8249 1 Plate 10 x 1500 x 6000 SS400 sh 7 4,946.00 607 L DDP 1-Oct 3-Oct 3-Oct 15-Oct 100% VND

A276 M1-8222 26-Jun 25-Oct 1 Plate 10 x 1500 x 6000 SS400 sh 2 1,413.00 607 L DDP 1-Oct 3-Oct 3-Oct 15-Oct 100% VND

A276 M1-7927 8-Aug 25-Aug 1 Plate 6 x 1524 x 6096 SS400 sh 5 2,188.00 251 F FOB 23-Aug 25-Aug 19-Sep 26-Sep 1-Oct 23-Oct 100% $

A276 M1-7927 8-Aug 25-Aug 2 Plate 12 x 2438 x 6096 SS400 sh 1 1,400.00 251 F FOB 23-Aug 25-Aug 19-Sep 26-Sep 1-Oct 23-Oct 100% $

A276 M1-7929 8-Aug 25-Aug 1 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 120 2,916.00 228 F FOB 18-Aug 28-Aug 31-Aug 5-Sep 21-Sep 15-Oct 100% $

A276 M1-7928 8-Aug 25-Aug 1 SQ.Pipe 50 x 50 x 2.3-6M STKR400 pc 7 140.00 228 F FOB 18-Aug 28-Aug 31-Aug 5-Sep 21-Sep 15-Oct 100% $

A276 M1-8040 27-Aug 15-Sep 1 W/D Pipe 1" S/40(OD33.4xt3.38)-6M A53-B pc 1 15.00 256 F FOB 29-Aug 24-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

A276 M1-8040 27-Aug 15-Sep 2 W/D PIPE 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 90 2,187.00 256 F FOB 29-Aug 10-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

A276 M1-8040 27-Aug 15-Sep 3 SMLS Pipe 8" S/40(OD219.1xt8.18)- A106-B pc 3 765.90 256 F FOB 29-Aug 24-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

A276 M1-8040 27-Aug 15-Sep 4 W/D Pipe 3/4" S/40(OD26.7 x 2.87)-6 A312-304 pc 1 10.24 256 F FOB 29-Aug 24-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

A276 M1-8040 27-Aug 15-Sep 5 W/D Pipe 1" S/40(OD33.4xt3.38)-6M A312-304 pc 1 15.15 256 F FOB 29-Aug 24-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

A276 M1-8040 27-Aug 15-Sep 6 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 2 65.94 256 F FOB 29-Aug 24-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

A276 M1-8040 27-Aug 15-Sep 7 SMLS Pipe 2" S/160(OD60.3xt8.74)-6M A312-304 pc 1 67.34 256 F FOB 29-Aug 24-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

A276 M1-8040 27-Aug 15-Sep 8 W/D Pipe 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 1 68.43 256 F FOB 29-Aug 24-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

A276 M1-8040 27-Aug 15-Sep 9 SMLS Pipe 3" S/80(OD88.9xt7.62)-6M A312-304 pc 1 92.55 256 F FOB 29-Aug 24-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

A276 M1-8040 27-Aug 15-Sep 10 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 1 97.00 256 F FOB 29-Aug 24-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

A276 M1-8040 27-Aug 15-Sep 11 SMLS Pipe 8" S/80(OD219.1xt12.7)-6M A312-304 pc 3 1,175.37 256 F FOB 29-Aug 24-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

A276 M1-8040 27-Aug 15-Sep 12 SQ.Pipe 50 x 50 x 2.3-6M STKR400 pc 7 140.28 256 F FOB 29-Aug 24-Sep 7-Sep 13-Sep 19-Sep 15-Oct 100% $

A276 M1-8195 21-Sep 15-Oct 1 Plate 2 x 1130 x 2438 SS400 sh 27 1,168.00 581 L DDP 25-Sep 26-Sep 26-Sep 13-Oct 100% VND

A276 M1-8139 14-Sep 20-Sep 2 Plate 10 x 1500 x 6000 SS400 sh 2 1,413.00 581 L DDP 25-Sep 26-Sep 26-Sep 13-Oct 100% VND

Page 73: Hvc PlatePipe Update)

HVC-PUR 73 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A276 M1-8139 14-Sep 20-Sep 1 Plate 8 x 1500 x 6000 SS400 sh 1 565.00 580 L DDP 26-Sep 27-Sep 27-Sep 13-Oct 100% VND

A276 M1-8139 14-Sep 20-Sep 3 Plate 12 x 1500 x 6000 SS400 sh 4 3,391.00 580 L DDP 26-Sep 27-Sep 27-Sep 13-Oct 100% VND

A276 M1-8139 14-Sep 20-Sep 4 Plate 20 x 1500 x 6000 SS400 sh 2 2,826.00 580 L DDP 26-Sep 27-Sep 27-Sep 13-Oct 100% VND

A276 M1-8139 14-Sep 20-Sep 5 Plate 25 x 1500 x 6000 SS400 sh 1 1,766.00 580 L DDP 26-Sep 27-Sep 27-Sep 13-Oct 100% VND

A276 W4-8079 1 Plate 10 x 1500 x 6000 SS400 sh 4 2,826.00 519 L DDP 4-Sep 6-Sep 12-Sep 13-Oct 100% VND

A276 M1-8062 15-Sep 1 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 1 97.00 268 F FOB 4-Sep 15-Sep 19-Sep 26-Sep 1-Oct 10-Oct 100% $

A276 M1-8042 27-Aug 15-Sep 1 Plate 2 x 1219 x 2438 A240-304 sh 1 47.00 268 F FOB 4-Sep 15-Sep 19-Sep 26-Sep 1-Oct 10-Oct 100% $

A276 M1-8042 27-Aug 15-Sep 2 Plate 3 x 1219 x 3048 A240-304 sh 1 88.00 268 F FOB 4-Sep 15-Sep 19-Sep 26-Sep 1-Oct 10-Oct 100% $

A276 M1-8042 27-Aug 15-Sep 4 Plate 6 x 1524 x 6096 A240-304 sh 2 884.00 268 F FOB 4-Sep 15-Sep 19-Sep 26-Sep 1-Oct 10-Oct 100% $

A276 M1-8042 27-Aug 15-Sep 5 Plate 10 x 1219 x 6096 A240-304 sh 1 589.00 268 F FOB 4-Sep 15-Sep 19-Sep 26-Sep 1-Oct 10-Oct 100% $

A276 M1-8042 27-Aug 15-Sep 6 Plate 13 x 1524 x 3048 A240-304 sh 1 479.00 268 F FOB 4-Sep 15-Sep 19-Sep 26-Sep 1-Oct 10-Oct 100% $

A276 M1-8042 27-Aug 15-Sep 8 Plate 16 x 1524 x 6096 A240-304 sh 1 1,179.00 268 F FOB 4-Sep 15-Sep 19-Sep 26-Sep 1-Oct 10-Oct 100% $

A276 M1-8042 27-Aug 15-Sep 10 Plate 25 x 1219 x 2438 A240-304 sh 1 589.00 268 F FOB 4-Sep 15-Sep 19-Sep 26-Sep 1-Oct 10-Oct 100% $

A276 M1-8042 27-Aug 15-Sep 13 Plate 6 x 1219 x 6096 A240-409 sh 11 3,801.00 268 F FOB 4-Sep 15-Sep 19-Sep 26-Sep 1-Oct 10-Oct 100% $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 7 Plate 2 x 1219 x 3660 A240-409 sh 955 66,038.00 119 F FOB 4-May 30-Jun 17-Sep 23-Sep 27-Sep 10-Oct 100% $

A276 M1-7525 18-May 30-Jun 2 Plate 8 x 2438 x 6800 A36 sh 48 49,968.00 189 F CIF 27-Jun 31-Aug 13-Sep 17-Sep 19-Sep 2-Oct L/C $

A276 M1-7525 18-May 30-Jun 3 Plate 10 x 2438 x 6800 A36 sh 28 36,428.00 189 F CIF 27-Jun 31-Aug 13-Sep 17-Sep 19-Sep 2-Oct L/C $

A276 M1-7525 18-May 30-Jun 4 Plate 10 x 2438 x 7900 A36 sh 12 18,144.00 189 F CIF 27-Jun 31-Aug 13-Sep 17-Sep 19-Sep 2-Oct L/C $

A276 M1-7525 18-May 30-Jun 5 Plate 10 x 2720 x 7900 A36 sh 6 10,122.00 189 F CIF 27-Jun 31-Aug 13-Sep 17-Sep 19-Sep 2-Oct L/C $

A276 M1-7525 18-May 30-Jun 1 Plate 2 x 1219 x 3660 A240-409 sh 530 36,620.00 149 F FOB 28-May 10-Jul 7-Sep 13-Sep 19-Sep 29-Sep 100% $

A276 M1-7453 4-May 30-Jun 1 Plate 6 x 1800 x 6096 A36 sh 5 2,584.07 196 F CFR 28-Jun 25-Aug 27-Jul 2-Sep 11-Sep 29-Sep L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 1 Plate 6 x 1800 x 6096 A36 sh 275 142,125.00 196 F CFR 28-Jun 25-Aug 27-Jul 2-Sep 11-Sep 29-Sep L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 8 Plate 16 x 2350 x 13500 A572-50 TP1 sh 9 35,865.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 9 Plate 16 x 2000 x 8500 A572-50 TP1 sh 4 8,540.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 10 Plate 20 x 2300 x 13500 A572-50 TP1 sh 12 58,500.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 11 Plate 20 x 2300 x 8500 A572-50 TP1 sh 2 6,138.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 12 Plate 24 x 2438 x 12900 A572-50 TP1 sh 4 23,700.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 13 Plate 24 x 2438 x 8500 A572-50 TP1 sh 3 11,712.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 14 Plate 30 x 2438 x 12900 A572-50 TP1 sh 6 44,442.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 15 Plate 30 x 2438 x 8500 A572-50 TP1 sh 2 9,760.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 16 Plate 40 x 2438 x 8500 A572-50 TP1 sh 2 13,014.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 17 Plate 50 x 2438 x 8500 A572-50 TP1 sh 2 16,268.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A276 M1-7770 5-Aug 5-Aug 1 Plate 10 x 2438 x 6096 A240-304 sh 1 1,179.00 205 F FOB 11-Jul 26-Jul 4-Aug 15-Aug 17-Aug 30-Aug 100% $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 6 Plate 40 x 1524 x 6096 A240-304 sh 1 2,999.00 114 F CIF 27-Apr 10-Jul 25-Jun 30-Jun 18-Jul 27-Jul L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 4 Plate 10 x 1219 x 2438 A240-304 sh 1 236.00 114 F CIF 27-Apr 31-May 16-May 30-May 9-Jun L/C $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 5 Plate 20 x 2438 x 6069 A240-304 sh 1 2,399.00 114 F CIF 27-Apr 31-May 16-May 30-May 9-Jun L/C $

A276 M1-7525 18-May 30-Jun 6 Plate 15 x 2438 x 6096 SS400 sh 1 1,750.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A276 M1-7525 18-May 30-Jun 7 Plate 16 x 2438 x 6096 SS400 sh 7 13,069.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A276 M1-7525 18-May 30-Jun 8 Plate 30 x 2438 x 6096 SS400 sh 4 14,000.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A276 M1-7453 4-May 30-Jun 2 Plate 8 x 2438 x 6096 SS400 sh 51 47,583.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A276 M1-7453 4-May 30-Jun 3 Plate 10 x 2438 x 6096 SS400 sh 26 30,342.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A276 M1-7453 4-May 30-Jun 4 Plate 12 x 2438 x 6096 SS400 sh 30 42,000.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A276 M1-7453 4-May 30-Jun 5 Plate 15 x 2438 x 6096 SS400 sh 6 10,500.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A276 M1-7453 4-May 30-Jun 6 Plate 40 x 2438 x 6096 SS400 sh 2 9,334.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 2 Plate 20 x 2438 x 6096 SS400 sh 2 4,666.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A276 M1-7377(R.4) 12-Apr 10-Jun 4-May 3 Plate 40 x 2438 x 6096 SS400 sh 1 4,667.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

Daharki/A277

A277 M1-8858 15-Feb 25-Feb 2 Plate 14 x 1415 x 6000 SS400 sh 3 2,799.15 100 L DDP 18-Feb 21-Feb 13-Mar 25-Mar VND

A277 M1-8844 14-Feb 25-Feb 2 Plate 12 x 1250 x 6000 SS400 sh 7 4,946.00 100 L DDP 18-Feb 21-Feb 13-Mar 25-Mar VND

A277 M1-8844 14-Feb 25-Feb 1 Plate 2 x 1219 x 2438 A240-409 sh 32 1,474.00 61 F FOB 20-Feb 7-Mar 22-Mar 29-Mar 3-Apr 5-May 100% $

A277 M1-8819 1 SMLS Pipe 4" S/80(OD114.3 x t8.56)-6M A312-304 pc 2 271.00 48 F FOB 15-Feb 29-Feb 1-Mar 7-Mar 18-Mar 21-Apr 100% $

A277 M1-8925 1 W/D Pipe 2" S/80 (OD60.3x5.54t) - 3M A312-304 pc 1 23.00 76 F FOB 6-Mar 15-Mar 16-Mar 22-Mar 31-Mar 21-Apr 100% $

A277 M1-8723 24-Jan 25-Feb 1 W/D Pipe(SMLS) 1 1/2" S/40(OD48.3 x t3.68) A53-B pc 52 1,264.00 36 F FOB 28-Jan 20-Feb 1-Mar 7-Mar 18-Mar 28-Mar 100% $

Page 74: Hvc PlatePipe Update)

HVC-PUR 74 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A277 M1-8723 24-Jan 25-Feb 2 W/D Pipe 1 1/4" S/40S(OD42.2xt3.56) A53-B pc 12 244.00 36 F FOB 28-Jan 20-Feb 1-Mar 7-Mar 18-Mar 28-Mar 100% $

A277 M1-8723 24-Jan 25-Feb 3 SQ.Pipe 50 x 50 x 2.3-6M STK400 pc 5 71.00 36 F FOB 28-Jan 20-Feb 1-Mar 7-Mar 18-Mar 28-Mar 100% $

A277 M1-8716 23-Jan 25-Feb 1 SMLS Pipe 3" S/80(OD88.9xt7.62)-6M A312-304 pc 1 93.00 36 F FOB 28-Jan 20-Feb 1-Mar 7-Mar 18-Mar 28-Mar 100% $

A277 M1-8716 23-Jan 25-Feb 2 SMLS Pipe 4" S/80(OD114.3 x t8.56)-6M A312-304 pc 1 135.00 36 F FOB 28-Jan 20-Feb 1-Mar 7-Mar 18-Mar 28-Mar 100% $

A277 M1-8716 23-Jan 25-Feb 3 SMLS Pipe 5"S/80(OD141.3x9.52t)- A312-304 pc 1 188.00 36 F FOB 28-Jan 20-Feb 1-Mar 7-Mar 18-Mar 28-Mar 100% $

A277 M1-8651 5-Jan 25-Jan 1 Plate 3 x 1219 x 3048 A240-409 sh 9 778.00 11 F FOB 11-Jan 25-Jan 26-Jan 1-Feb 4-Feb 18-Feb 100% $

A277 M1-8651 5-Jan 25-Jan 2 Plate 6 x 1219 x 6400 A240-409 sh 6 2,177.00 11 F FOB 11-Jan 25-Jan 26-Jan 1-Feb 4-Feb 18-Feb 100% $

A277 M1-8651 5-Jan 25-Jan 3 Plate 16 x 1219 x 2438 A240-304 sh 1 377.00 11 F FOB 11-Jan 25-Jan 26-Jan 1-Feb 4-Feb 18-Feb 100% $

A277 M1-8845(R.1) 25-Feb 15-Feb 1 W/D Pipe 1-1/2" S/40(OD48.3x3.6)-6M STK400 pc 76 1,810.00 97 L DDP 18-Feb 19-Feb 19-Feb 100% VND

A277 M1-8845(R.1) 25-Feb 15-Feb 2 W/D Pipe 1-1/4" S/40(OD42.2x3.5)-6M STK400 pc 52 1,042.00 97 L DDP 18-Feb 19-Feb 19-Feb 100% VND

A277 M1-8845(R.1) 25-Feb 15-Feb 3 SQ.Pipe 50 x 50 x 1.5-6M STK400 pc 8 116.00 97 L DDP 18-Feb 19-Feb 19-Feb 100% VND

A277 M1-8809 1 Checked Plate 6 x 1500 x 3000 SS400/CT3 sh 2 451.00 93 L DDP 14-Feb 15-Feb 19-Mar 100% VND

A277 M1-8546 12-Dec 25-Jan 6 Plate 3 x 1219 x 3048 SS400 sh 8 700.00 402 F FOB 21-Dec 15-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

A277 M1-8546 12-Dec 25-Jan 7 Plate 8 x 1219 x 6500 SS400 sh 2 995.19 402 F FOB 21-Dec 15-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

A277 M1-8546 12-Dec 25-Jan 8 Plate 10 x 1219 x 6400 SS400 sh 2 1,224.85 402 F FOB 21-Dec 15-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

A277 M1-8546 12-Dec 25-Jan 9 Plate 12 x 2438 x 6096 SS400 sh 1 1,400.00 402 F FOB 21-Dec 15-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

A277 M1-8546 12-Dec 25-Jan 10 Plate 18 x 2438 x 6096 SS400 sh 1 2,100.01 402 F FOB 21-Dec 15-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

A277 M1-8546 12-Dec 25-Jan 11 Plate 22 x 2438 x 6096 SS400 sh 2 5,133.35 402 F FOB 21-Dec 15-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

A277 M1-8546 12-Dec 25-Jan 12 Plate 25 x 2438 x 6096 SS400 sh 1 2,916.68 402 F FOB 21-Dec 15-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

A277 M1-8546 12-Dec 25-Jan 13 Plate 30 x 2438 x 6096 SS400 sh 1 3,500.01 402 F FOB 21-Dec 15-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

A277 M1-8546 12-Dec 25-Jan 14 Plate 40 x 2438 x 6096 SS400 sh 1 4,666.68 402 F FOB 21-Dec 15-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

A277 M1-8641 4-Jan 5-Feb 1 Plate 15 x 2438 x 6096 SS400 sh 16 28,000.00 2 F FOB 4-Jan 9-Jan 17-Jan 24-Jan 2-Feb 12-Mar 100% $

A277 M1-8651 5-Jan 25-Jan 4 Plate 10 x 1219 x 6096 A36 sh 1 583.00 17 F FOB 16-Jan 30-Jan 25-Feb 3-Mar 6-Mar 12-Mar 100% $

A277 M1-8651 5-Jan 25-Jan 5 Plate 20 x 2438 x 6096 A36 sh 1 2,333.00 17 F FOB 16-Jan 30-Jan 25-Feb 3-Mar 6-Mar 12-Mar 100% $

A277 M1-8652 5-Jan 25-Jan 1 W/D Pipe 3/4" S/40(OD26.7 x 2.87)-6 A312-304 pc 1 10.00 9 F FOB 10-Jan 25-Jan 26-Jan 1-Feb 20-Feb 1-Mar 100% $

A277 M1-8652 5-Jan 25-Jan 2 W/D Pipe 1" S/40(OD33.4xt3.38)-6M A312-304 pc 1 15.00 9 F FOB 10-Jan 25-Jan 26-Jan 1-Feb 20-Feb 1-Mar 100% $

A277 M1-8652 5-Jan 25-Jan 3 W/D Pipe 2"S/40(OD60.3x3.9t)-6M A312-304 pc 2 66.00 9 F FOB 10-Jan 25-Jan 26-Jan 1-Feb 20-Feb 1-Mar 100% $

A277 M1-8652 5-Jan 25-Jan 4 W/D Pipe 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 1 69.00 9 F FOB 10-Jan 25-Jan 26-Jan 1-Feb 20-Feb 1-Mar 100% $

A277 M1-8652 5-Jan 25-Jan 5 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 1 97.00 9 F FOB 10-Jan 25-Jan 26-Jan 1-Feb 20-Feb 1-Mar 100% $

A277 M1-8652 5-Jan 25-Jan 6 W/D Pipe 8" S/40(OD219.1xt8.18)-6M A312-304 pc 1 258.00 9 F FOB 10-Jan 25-Jan 26-Jan 1-Feb 20-Feb 1-Mar 100% $

A277 M1-8652 5-Jan 25-Jan 7 SMLS Pipe 1" SCH40(OD33.4xt3.38)-6 A106-B pc 1 15.00 9 F FOB 10-Jan 25-Jan 26-Jan 1-Feb 20-Feb 1-Mar 100% $

A277 M1-8652 5-Jan 25-Jan 8 SMLS Pipe 8" SCH40(OD219.1xt8.18)- A106-B pc 2 511.00 9 F FOB 10-Jan 25-Jan 26-Jan 1-Feb 20-Feb 1-Mar 100% $

A277 M1-8546 12-Dec 25-Jan 3 Plate 3 x 1219 x 3048 A240-304 sh 6 530.35 401 F FOB 19-Dec 4-Jan 17-Jan 24-Jan 30-Jan 18-Feb 100% $

A277 M1-8546 12-Dec 25-Jan 4 Plate 6 x 1524 x 6200 A240-304 sh 8 3,596.59 401 F FOB 19-Dec 4-Jan 17-Jan 24-Jan 30-Jan 18-Feb 100% $

A277 M1-8546 12-Dec 25-Jan 5 Plate 15 x 1524 x 6096 A240-304 sh 2 2,210.16 401 F FOB 19-Dec 4-Jan 17-Jan 24-Jan 30-Jan 18-Feb 100% $

A277 M1-8217 26-Sep 20-Dec 7 Plate 10 x 2438 x 2438 A240-304 sh 1 461.00 306 F FOB 10-Oct 17-Jan 17-Jan 24-Jan 18-Feb 100% $

A277 M1-8217 26-Sep 20-Dec 4 Plate A36 sh 1 1,750.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A277 M1-8217 26-Sep 20-Dec 6 Plate A36 sh 2 7,178.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A277 M1-8120(R.2) 11-Sep 20-Dec 5 Plate 14 x 2438 x 6096 A36 sh 7 11,431.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A277 M1-8120(R.2) 11-Sep 20-Dec 6 Plate 15 x 2438 x 6096 A36 sh 4 7,000.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A277 M1-8120(R.2) 11-Sep 20-Dec 7 Plate 35 x 2000 x 5200 A36 sh 4 11,428.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A277 M1-8120(R.2) 11-Sep 20-Dec 8 Plate 50 x 2200 x 5200 A36 sh 4 17,960.00 299 F FOB 2-Oct 30-Nov 20-Jan 28-Jan 30-Jan 1-Mar L/C $

A277 M1-8546 12-Dec 25-Jan 1 Plate 2 x 1219 x 2438 A240-409 sh 30 1,381.94 401 F FOB 19-Dec 4-Jan 6-Jan 11-Jan 18-Jan 23-Jan 100% $

A277 M1-8546 12-Dec 25-Jan 2 Plate 2 x 1219 x 2438 A240-304 sh 6 282.81 401 F FOB 19-Dec 4-Jan 6-Jan 11-Jan 18-Jan 23-Jan 100% $

A277 M1-8217 26-Sep 20-Dec 8 Plate 2 x 1219 x 2438 A240-409 sh 195 8,983.00 307 F FOB 9-Oct 20-Dec 6-Jan 11-Jan 18-Jan 23-Jan L/C $

A277 M1-8217 26-Sep 20-Dec 2 Plate 10 x 2438 x 6400 A36 sh 11 13,473.00 310 F CIF 9-Oct 5-Jan 7-Jan 11-Jan 17-Jan 23-Jan L/C $

A277 M1-8217 26-Sep 20-Dec 3 Plate 14 x 3048 x 6096 A36 sh 2 4,084.00 310 F CIF 9-Oct 5-Jan 7-Jan 11-Jan 17-Jan 23-Jan L/C $

A277 M1-8217 26-Sep 20-Dec 5 Plate 16 x 3048 x 6096 A36 sh 2 4,667.00 310 F CIF 9-Oct 5-Jan 7-Jan 11-Jan 17-Jan 23-Jan L/C $

A277 M1-8120(R.2) 11-Sep 20-Dec 3 Plate 10 x 2438 x 6096 A36 sh 6 7,002.00 310 F CIF 9-Oct 5-Jan 7-Jan 11-Jan 17-Jan 23-Jan L/C $

A277 M1-8120(R.2) 11-Sep 20-Dec 3 Plate 10 x 2438 x 12192 A36 sh 3 6,999.00 310 F CIF 9-Oct 5-Jan 7-Jan 11-Jan 17-Jan 23-Jan L/C $

A277 M1-8217 26-Sep 20-Dec 1 Plate 8 x 2438 x 6500 A36 sh 22 21,894.00 310 F CIF 9-Oct 5-Jan 22-Dec 24-Dec 29-Dec 16-Jan L/C $

A277 M1-8120(R.2) 11-Sep 20-Dec 2 Plate 8 x 2438 x 6096 A36 sh 24 22,400.00 310 F CIF 9-Oct 5-Jan 22-Dec 24-Dec 29-Dec 16-Jan L/C $

15 x 2438 x 6096

30 x 2500 x 6096

Page 75: Hvc PlatePipe Update)

HVC-PUR 75 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A277 M1-8120(R.2) 11-Sep 20-Dec 4 Plate 12 x 2438 x 6096 A36 sh 24 33,600.00 310 F CIF 9-Oct 5-Jan 22-Dec 24-Dec 29-Dec 16-Jan L/C $

A277 M1-8120(R.2) 11-Sep 20-Dec 1 Plate 6 x 1829 x 6096 A36 sh 17 8,930.00 293 F FOB 24-Sep 15-Nov 28-Nov 4-Dec 10-Dec 19-Dec 100% $

A277 M1-7449(R.1) 3-May 5-Jul 4-May 1 Plate 2 x 1219 x 3660 A240-409 sh 275 19,016.00 119 F FOB 4-May 30-Jun 17-Sep 23-Sep 27-Sep 10-Oct 100% $

A277 M1-7449(R.1) 3-May 5-Jul 4-May 4 Plate 6 x 1800 x 6096 A36 sh 140 72,354.00 196 F CFR 28-Jun 25-Aug 27-Jul 2-Sep 11-Sep 29-Sep L/C $

A277 M1-7449(R.1) 3-May 5-Jul 4-May 3 Plate 2 x 1219 x 3048 SS400 sh 220 12,870.00 188 F FOB 27-Jun 20-Jul 4-Aug 15-Aug 17-Aug 11-Dec 100% $

A277 M1-7449(R.1) 3-May 5-Jul 4-May 5 Plate 20 x 2438 x 6096 SS400 sh 1 2,333.00 173 F FOB 14-Jun 26-Jun 22-Jun 1-Jul 5-Jul 21-Jul 100% $

A277 M1-7449(R.1) 3-May 5-Jul 4-May 2 Plate 20 x 1219 x 2438 A240-304 sh 1 471.00 137 F FOB 4-May 30-Jun 22-Jun 1-Jul 5-Jul 24-Jul 100% $

A277 M1-7449(R.1) 4-May 5-Jul 4-May 6 Plate 20 x 1800 x 8200 A572-50 TP1 sh 4 9,268.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A277 M1-7449(R.1) 4-May 5-Jul 4-May 7 Plate 20 x 1900 x 12600 A572-50 TP1 sh 4 15,036.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A277 M1-7449(R.1) 4-May 5-Jul 4-May 8 Plate 20 x 1900 x 13600 A572-50 TP1 sh 4 16,228.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

A277 M1-7449(R.1) 4-May 5-Jul 4-May 10 Plate 30 x 1800 x 13100 A572-50 TP1 sh 10 55,530.00 172 F CFR 27-Jun 31-Aug 27-Jul 2-Sep 5-Sep 18-Sep L/C $

Plum Point Power Plant/A288

A288 M1-7870 20-Jul 15-Oct 1 SMLS Pipe 1" S/40(OD33.4xt3.38)-6M A53-B pc 21 315.00 223 F FOB 27-Jul 12-Oct 12-Oct 19-Oct 25-Oct 6-Nov 100% $

A288 M1-7868 20-Jul 25-Nov 1 Plate 6 x 1524 x 6096 SS400 sh 6 2,625.00 233 F FOB 8-Aug 23-Aug 19-Sep 26-Sep 1-Oct 10-Nov 100% $

A288 M1-7871 20-Jul 25-Nov 1 SMLS Pipe 2" S/160(OD60.3xt8.74)-9.2 A53-B pc 67 6,850.00 223 F FOB 27-Jul 25-Nov 30-Nov 6-Dec 14-Dec 3-Jan 100% $

A288 M1-7871 20-Jul 25-Nov 2 SMLS Pipe 2 -1/2" S/40(OD73.0xt5.16) A53-B pc 56 2,905.00 223 F FOB 27-Jul 25-Nov 30-Nov 6-Dec 14-Dec 3-Jan 100% $

A288 M1-7871 20-Jul 25-Nov 3 SMLS Pipe 3" S/40(OD88.9xt5.49)-5M A53-B pc 13 881.00 223 F FOB 27-Jul 25-Nov 30-Nov 6-Dec 14-Dec 3-Jan 100% $

Northern Liquefiel Gas Base Depot/K295

K295 W4-9278 4-Jun 4-Jul 2 Carbon rod Carbon rod Dia 12 ea 3,000 207 F CFR 23-Jun 20-Jul 18-Jul 24-Jul 10-Aug 26-Aug 100% $

K295 W4-9278 4-Jun 4-Jul 3 Carbon rod Carbon rod Dia 9.5 ea 3,000 215 F FOB 27-Jun 4-Jul 14-Jul 20-Jul 30-Jul 26-Aug $

K295 W4-9278 4-Jun 4-Jul 1 SMAW W/D electrodE7016 (SFA 5.1) Dia 3.2 box 200 1,000.00 197 F CFR 16-Jun 13-Jul 13-Jul 19-Jul 23-Jul 12-Aug 100% $

K295 M1-8544 12-Dec 15-Feb 1 Plate 14 x 2900 x 6096 A36 sh 30 58,290.00 414 F CNF 27-Dec 10-Apr 2-Apr 9-Apr 28-Apr 21-May L/C $

K295 M1-8544 12-Dec 15-Feb 2 Plate 40 x 2438 x 6096 SS400 sh 4 18,666.70 402 F FOB 21-Dec 15-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

K295 M1-8544 12-Dec 15-Feb 3 Plate 40 x 2438 x 6096 SS400 sh 1 4,666.68 402 F FOB 21-Dec 15-Jan 25-Feb 3-Mar 6-Mar 28-Mar 100% $

K295 M1-8486 26-Nov 10-May 1 Plate 46 x 2900 x 8490 SPV490 sh 2 17,780.00 367 F CFR 26-Nov 15-Apr 20-Feb 25-Feb Dalian L/C $

K295 M1-8486 26-Nov 10-May 2 Plate 46 x 2900 x 8410 SPV490 sh 4 35,228.00 367 F CFR 26-Nov 15-Apr 20-Feb 25-Feb Dalian L/C $

K295 M1-8486 26-Nov 10-May 3 Plate 46 x 2900 x 9720 SPV490 sh 8 81,432.00 367 F CFR 26-Nov 15-Apr 20-Feb 25-Feb Dalian L/C $

K295 M1-8486 26-Nov 10-May 4 Plate 47.2 x 3360 x 6590 SPV490 sh 36 295,308.00 367 F CFR 26-Nov 15-Apr 20-Feb 25-Feb Dalian L/C $

K295 M1-8486 26-Nov 10-May 5 Plate 47.5 x 3060 x 9390 SPV490 sh 40 428,520.00 367 F CFR 26-Nov 15-Apr 20-Feb 25-Feb Dalian L/C $

K295 M1-8486 26-Nov 10-May 6 Plate 48 x 2900 x 8490 SPV490 sh 2 18,554.00 367 F CFR 26-Nov 15-Apr 20-Feb 25-Feb Dalian L/C $

K295 M1-8486 26-Nov 10-May 7 Plate 48 x 2900 x 8410 SPV490 sh 4 36,760.00 367 F CFR 26-Nov 15-Apr 20-Feb 25-Feb Dalian L/C $

K295 M1-8486 26-Nov 10-May 8 Plate 48 x 2900 x 9720 SPV490 sh 8 84,976.00 367 F CFR 26-Nov 15-Apr 20-Feb 25-Feb Dalian L/C $

K295 M1-8486 26-Nov 10-May 9 Plate 14 x 3048 x 6096 SPV490 sh 10 20,420.00 367 F CFR 26-Nov 15-Apr 20-Feb 25-Feb Dalian L/C $

K295 M1-8735 24-Jan 5-Apr 1 SMLS Pipe 2" S/40(O.D60.3 x t3.91)-6M A106-B pc 7 228.48 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 2 SMLS Pipe 3" S/40(O.D88.9 x t5.49)-6M A106-B pc 7 474.18 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 3 SMLS Pipe 6" S/40(O.D168.3 x t7.11)-6 A106-B pc 12 2,034.72 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 4 SMLS Pipe 8" S/40(OD219.1xt8.18)- A106-B pc 1 255.30 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 5 SMLS Pipe 1/2" S/80(O.D21.3 x t3.73)- A53-B pc 38 369.36 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 6 SMLS Pipe 3/4" S/160(O.D26.7 x t5.56) A53-B pc 1 8.70 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 7 W/D Pipe 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 5 121.50 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 8 W/D Pipe 2 1/2" S/40(O.D73.0 x t5.16 A53-B pc 16 828.48 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 9 W/D Pipe 3" S/40(O.D88.9 x t5.49)-6M A53-B pc 101 6,841.74 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 10 W/D Pipe 4" S/40(O.D114.3 x t6.02)-6 A53-B pc 3 289.26 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 11 W/D Pipe 6" S/40(O.D168.3 x t7.11)-6 A53-B pc 8 1,356.48 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 12 W/D Pipe 10" S/30(O.D273.1.3 x t7.8) A53-B pc 10 3,061.80 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 13 W/D Pipe 3/8"(O.D17.3 x t2.35)-2M SGP pc 1 1.74 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

K295 M1-8735 24-Jan 5-Apr 14 W/D Pipe 1 1/4"(O.D42.7 x t3.25)-6M SGP pc 36 682.56 40 F FOB 25-Oct 4-Apr 6-Apr 12-Apr 2-May 10-May 100% $

For 2008/TBA

TBA M1-8600(R.1) 26-Dec 30-Mar 1 Plate 6 x 1829 x Coil (was: 841T) A36 kg 36 coil 817,260.00 129 F CFR 22-Apr 30-Jun 25-May 30-May 3-Jun 12-Jun L/C $

TBA M1-8600(R.1) 26-Dec 30-Mar 2 Plate 10 x 2438 x 6096 SS400 sh 30 35,000.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

TBA M1-8600(R.1) 26-Dec 30-Mar 3 Plate 12 x 2438 x 6096 SS400 sh 30 42,000.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

TBA M1-8600(R.1) 26-Dec 30-Mar 4 Plate 15 x 2438 x 6096 SS400 sh 20 35,000.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

TBA M1-8600(R.1) 26-Dec 30-Mar 5 Plate 20 x 2438 x 6096 SS400 sh 10 23,333.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

Page 76: Hvc PlatePipe Update)

HVC-PUR 76 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

TBA M1-8600(R.1) 14-May 1 Plate 16 x 2438 x 6096 SM490A sh 40 74,667.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

TBA M1-8600(R.1) 14-May 2 Plate 20 x 2438 x 6096 SM490A sh 3 7,000.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

TBA M1-8600(R.1) 14-May 3 Plate 24 x 2438 x 6096 SM490A sh 3 8,400.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

TBA M1-8600(R.1) 14-May 4 Plate 28 x 2438 x 6096 SM490A sh 24 78,400.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

TBA M1-8600(R.1) 14-May 5 Plate 35 x 2438 x 6096 SM490A sh 4 16,333.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

TBA M1-8600(R.1) 14-May 6 Plate 45 x 2438 x 6096 SM490A sh 3 15,750.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

TBA Add 7 Plate 6 x 1530 x Coil (use for M1 SS400 kg 258,100.00 34 F CNF 5-Mar 20-Apr 11-May 18-May 19-May 6-Jun L/C $

QATARLUM/A300

A300 M1-8969 10-Mar 20-May 1 Plate 2 x 1219 x 2438 A240-321 sh 231 10,888.11 201B F DDU 20-Mar 30-Jul 27-Aug 30-Aug 31-Aug 2-Oct 100% $

A300 M1-8969 10-Mar 20-May 1 Plate 2 x 1219 x 2438 A240-321 sh 350 16,497.14 201B F DDU 20-Mar 30-Jul 25-Aug 28-Aug 29-Aug 2-Oct 100% $

A300 M1-8969 10-Mar 20-May 3 Plate 3 x 1219 x 2438 A240-321 sh 120 8,484.24 201B F DDU 20-Mar 30-Jul 27-Aug 30-Aug 31-Aug 2-Oct 100% $

A300 M1-9526 28-Jul 10-Aug 1 Plate 25tx152x272 (30x152x300) SA182-F22 CL.3 16 555.68 260 F FOB 28-Jul 8-Aug 17-Aug 21-Aug 26-Aug 24-Sep $

A300 M1-9526 28-Jul 10-Aug 2 Plate 25tx242x590 (25x300x590) SA182-F91 32 1,111.36 260 F FOB 28-Jul 8-Aug 17-Aug 21-Aug 26-Aug 24-Sep $

A300 M1-9526 28-Jul 10-Aug 3 Plate 50tx242x1052 (80x260x1052 SA182-F91 16 555.68 260 F FOB 28-Jul 8-Aug 17-Aug 21-Aug 26-Aug 24-Sep $

A300 M1-9526 28-Jul 10-Aug 4 Plate Washer 10tx I.D82xO.D130 SA182-F91 32 25.00 260 F FOB 28-Jul 8-Aug 24-Aug 29-Aug 3-Sep 17-Sep $

A300 M1-9526 28-Jul 10-Aug 5 Plate Washer 10tx I.D82xO.D130 SA182-F91 32 25.00 260 F FOB 28-Jul 8-Aug 24-Aug 29-Aug 3-Sep 17-Sep $

A300 M1-9125(R.7) 22-Apr 5-Jun 19 Plate 25.4 x 1219 x 2438 A387-22-CL2 sh 1 592.57 151 F CFR 6-May 30-Aug 6-Aug 12-Sep 17-Sep 23-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 5 Plate 9.53 x 1219 x 3048 A387-91-CL2 sh 1 277.96 151 F CFR 6-May 30-Aug 6-Aug 12-Sep 17-Sep 23-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 20 Plate 25.4 x 1524 x 3048 A387-91-CL2 sh 2 1,852.39 151 F CFR 6-May 30-Aug 6-Aug 12-Sep 17-Sep 23-Sep L/C $

A300 M1-9399 27-Jun 27-Jul 13 Plate 16 x 1500 x 5000 A240-321 sh 1 951.60 234 F FOB 7-Jul 20-Aug 30-Aug 4-Sep 10-Sep 17-Sep 100% $

A300 M1-9399 27-Jun 27-Jul 14 Plate 2 x 1219 x 2438 A240-321 sh 58 2,734.00 234 F FOB 7-Jul 20-Aug 30-Aug 4-Sep 10-Sep 17-Sep 100% $

A300 M1-9399 27-Jun 27-Jul 17 Plate 50 x 1219 x 2438 A240-304 sh 1 1,199.00 234 F FOB 7-Jul 20-Aug 30-Aug 4-Sep 10-Sep 17-Sep 100% $

A300 M1-9399 27-Jun 27-Jul 18 Plate 12 x 1219 x 6096 A240-409 sh 1 691.00 234 F FOB 7-Jul 31-Jul 10-Aug 15-Aug 20-Aug 27-Aug 100% $

A300 M1-9399 27-Jun 27-Jul 1 Plate 1.6 x 1219 x 2438 SS400 sh 5 186.64 229 F FAS 4-Jul 10-Aug 25-Jul 31-Jul 7-Aug 15-Sep 100% $

A300 M1-9399 27-Jun 27-Jul 2 Plate 2 x 1219 x 2438 SS400 sh 763 35,600.95 229 F FAS 4-Jul 10-Aug 25-Jul 31-Jul 7-Aug 15-Sep 100% $

A300 M1-9399 27-Jun 27-Jul 3 Plate 3 x 1219 x 2438 SS400 sh 107 7,488.80 229 F FAS 4-Jul 10-Aug 25-Jul 31-Jul 7-Aug 15-Sep 100% $

A300 M1-9399 27-Jun 27-Jul 4 Plate 9 x 1219 x 6096 SS400 sh 1 525.00 229 F FAS 4-Jul 10-Aug 25-Jul 31-Jul 7-Aug 15-Sep 100% $

A300 M1-9399 27-Jun 27-Jul 5 Plate 10 x 2438 x 6096 SS400 sh 10 11,666.71 229 F FAS 4-Jul 10-Aug 25-Jul 31-Jul 7-Aug 15-Sep 100% $

A300 M1-9399 27-Jun 27-Jul 6 Plate 12 x 2438 x 6096 SS400 sh 6 8,400.03 229 F FAS 4-Jul 10-Aug 25-Jul 31-Jul 7-Aug 15-Sep 100% $

A300 M1-9399 27-Jun 27-Jul 7 Plate 13 x 1219 x 2438 SS400 sh 1 303.28 229 F FAS 4-Jul 10-Aug 25-Jul 31-Jul 7-Aug 15-Sep 100% $

A300 M1-9399 27-Jun 27-Jul 8 Plate 15 x 2438 x 6096 SS400 sh 8 14,000.05 229 F FAS 4-Jul 10-Aug 25-Jul 31-Jul 7-Aug 15-Sep 100% $

A300 M1-9125(R.7) 22-Apr 5-Jun 12 Plate 18 x 1700 x 10000 A572-50 TP1 sh 10 24,021.00 187 F CIF 6-Jun 30-Jul 29-Aug 7-Sep 8-Sep 17-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 13 Plate 18 x 1700 x 10000 A572-50 TP1 sh 16 38,433.60 187 F CIF 6-Jun 30-Jul 29-Aug 7-Sep 8-Sep 17-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 21 Plate 28 x 2860 x 10000 A572-50 TP1 sh 35 220,019.80 186 F CIF 12-Jun 30-Jul 29-Aug 7-Sep 8-Sep 15-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 22 Plate 30 x 2860 x 10000 A572-50 TP1 sh 44 296,353.20 186 F CIF 12-Jun 30-Jul 29-Aug 7-Sep 8-Sep 15-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 11 Plate 16 x 2310 x 10000 A572-50 TP1 sh 6 17,408.16 161 F CFR 29-May 30-Jul 29-Aug 7-Sep 8-Sep 2-Oct L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 14 Plate 18 x 2310 x 10200 A572-50 TP1 sh 3 9,987.93 161 F CFR 29-May 30-Jul 29-Aug 7-Sep 8-Sep 2-Oct L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 16 Plate 20 x 3080 x 9500 A572-50 TP1 sh 1 4,593.82 161 F CFR 29-May 30-Jul 29-Aug 7-Sep 8-Sep 2-Oct L/C $

A300 M1-9142(R.1) 24-Apr 10-Jun 3 Plate 15 x 2438 x 6096 A36 sh 1 1,750.00 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 7 Plate 14 x 2438 x 12000 A36 sh 1 3,215.00 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 8 Plate 15 x 2438 x 6096 A36 sh 3 5,250.00 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 24 Plate 40 x 2438 x 6096 A36 sh 3 14,000.00 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 25 Plate 50 x 1524 x 6096 A36 sh 1 3,640.00 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 10 Plate 16 x 2550 x 10000 SM490A sh 18 57,650.40 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A300 M1-9514 25-Jul 15-Aug 1 Plate 12 x 1500 x 6000 SS400 sh 6 5,086.80 528 F Ex-w 3-Aug 10-Aug 26-Aug 8-Sep 100% VND

A300 M1-9514 25-Jul 15-Aug 2 Plate 14 x 1500 x 6000 SS400 sh 4 3,956.40 528 F Ex-w 3-Aug 10-Aug 26-Aug 8-Sep 100% VND

A300 M1-9125(R.7) 22-Apr 5-Jun 10 Plate 16 x 850 x 10000 SM490A sh 6 6,410.00 263 F FOB 22-May 30-Jul 7-Aug 21-Aug 8-Sep 100% $

A300 M1-9125(R.7) 22-Apr 5-Jun 10 Plate 16 x 1700 x 10000 SM490A sh 6 12,810.00 263 F FOB 22-May 30-Jul 7-Aug 21-Aug 8-Sep 100% $

A300 M1-8969 10-Mar 20-May 1 Plate 2 x 1219 x 2438 A240-321 sh 199 9,379.80 201 F DDU 20-Mar 30-Jul 9-Aug 12-Aug 13~15/8 22-Aug 100% $

A300 M1-8969 10-Mar 20-May 3 Plate 3 x 1219 x 2438 A240-321 sh 1,130 79,893.29 201 F DDU 20-Mar 30-Jul 9-Aug 12-Aug 13~15/8 22-Aug 100% $

A300 M1-9399 27-Jun 27-Jul 9 Plate 38 x 1219 x 2438 A36 sh 1 887.00 240 F FOB 14-Jul 30-Jul 26-Jul 2-Aug 8-Aug 21-Aug 100% $

A300 M1-9141(R.1) 24-Apr 10-Jun 5-May 9 W/D Pipe 14"S/60(OD355.6xt15.09)-6 A312-304 pc 12 9,216.68 148 F FOB 29-Apr 25-Jul 2-Aug 7-Aug 21-Aug 27-Aug 100% $

A300 M1-9141(R.1) 24-Apr 10-Jun 5-May 10 W/D Pipe 16"S/60(OD406.4xt16.66)-6 A312-304 pc 12 11,646.77 148 F FOB 29-Apr 25-Jul 2-Aug 7-Aug 21-Aug 27-Aug 100% $

Page 77: Hvc PlatePipe Update)

HVC-PUR 77 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A300 M1-9399 27-Jun 27-Jul 11 Plate 30 x 2438 x 6096 SM490A sh 1 3,500.00 253 F FOB 23-Jul 30-Jul 4-Aug 10-Aug 22-Aug 27-Aug 100% $

A300 M1-9142(R.1) 24-Apr 10-Jun 1 Plate 2 x 1219 x 2438 A36/SS400 sh 180 8,396.91 162 F FOB 14-May 10-Jun 9-Jun 16-Jun 20-Jun 21-Aug 100% $

A300 M1-9142(R.1) 24-Apr 10-Jun 1 Plate 2 x 1219 x 2438 A36/SS400 sh 900 41,995.00 162 F FOB 14-May 10-Jun 8-Jun 12-Jun 16-Jun 21-Aug 100% $

A300 M1-9142(R.1) 24-Apr 10-Jun 2 Plate 3 x 1219 x 2438 A36/SS400 sh 220 15,397.53 162 F FOB 14-May 10-Jun 9-Jun 16-Jun 20-Jun 21-Aug 100% $

A300 M1-9125(R.7) 22-Apr 5-Jun 1 Plate 4.5 x 1219 x 2438 SS400 sh 7 730.00 172 F FOB 20-May 30-May 9-Jun 16-Jun 20-Jun 21-Aug 100% $

A300 M1-9125(R.7) 22-Apr 5-Jun 18 Plate 25 x 1524 x 6096 SS400 sh 2 3,646.44 172 F FOB 20-May 30-May 9-Jun 16-Jun 20-Jun 25-Jun 100% $

A300 M1-9399 27-Jun 27-Jul 10 Plate 18 x 2438 x 9144 S355JR sh 1 3,150.00 226 F FOB 2-Jul 31-Jul 4-Aug 10-Aug 15-Aug 21-Aug 100% $

A300 M1-9399 27-Jun 27-Jul 11 Plate 30 x 2438 x 6096 SM490A sh 1 3,500.00 226 F FOB 2-Jul 31-Jul 4-Aug 10-Aug 15-Aug 21-Aug 100% $

A300 M1-9142(R.1) 24-Apr 10-Jun 4 Plate 20 x 2438 x 6096 A36/SS400 sh 11 25,666.76 182 F FOB 30-May 15-Jun 14-Jul 21-Jul 31-Jul 8-Aug 100% $

A300 M1-9125(R.7) 22-Apr 5-Jun 15 Plate 20 x 2438 x 6096 A36/SS400 sh 9 21,000.07 182 F FOB 30-May 15-Jun 14-Jul 21-Jul 31-Jul 8-Aug 100% $

A300 M1-9399 27-Jun 27-Jul 12 Plate 10 x 1219 x 2438 A240-316L sh 1 237.00 232 F CFR 7-Jul 31-Jul 27-Jul 30-Jul 11-Aug 19-Aug 100% $

A300 M1-9399 27-Jun 27-Jul 15 Plate 15 x 1524 x 6096 A240-304 sh 2 2,210.00 232 F CFR 7-Jul 31-Jul 27-Jul 30-Jul 11-Aug 19-Aug 100% $

A300 M1-9399 27-Jun 27-Jul 16 Plate 20 x 1524 x 6096 A240-304 sh 3 4,419.00 232 F CFR 7-Jul 31-Jul 27-Jul 30-Jul 11-Aug 19-Aug 100% $

A300 M1-9397 27-Jun 27-Jul 1 W/D Pipe 1"S/40(OD33.4x3.38t) -6M A53-B pc 1 15.00 231 F FOB 7-Jul 20-Jul 26-Jul 2-Aug 7-Aug 16-Aug 100% $

A300 M1-9397 27-Jun 27-Jul 2 W/D Pipe 3"S/40(OD89.1x5.5t)-6M A312-304 pc 16 1,099.20 231 F FOB 7-Jul 20-Jul 26-Jul 2-Aug 7-Aug 16-Aug 100% $

A300 M1-9397 27-Jun 27-Jul 3 W/D Pipe 8"S/80(OD216.3xt12.7t)-6M A312-304 pc 2 772.92 231 F FOB 7-Jul 20-Jul 26-Jul 2-Aug 7-Aug 16-Aug 100% $

A300 M1-9397 27-Jun 27-Jul 4 W/D Pipe 3"S/40(OD89.1x5.5t)-6M A312-316(L) pc 1 68.70 231 F FOB 7-Jul 20-Jul 26-Jul 2-Aug 7-Aug 16-Aug 100% $A300 M1-9397 27-Jun 27-Jul 5 W/D Pipe 4"S/40(OD114.3x6t)-6M A312-316(L) pc 2 194.28 231 F FOB 7-Jul 20-Jul 26-Jul 2-Aug 7-Aug 16-Aug 100% $A300 M1-9397 27-Jun 27-Jul 6 W/D Pipe 10"S/40(OD267.4x9.3t)-6M A312-316(L) pc 1 358.74 231 F FOB 7-Jul 20-Jul 26-Jul 2-Aug 7-Aug 16-Aug 100% $

A300 M1-9125(R.7) 22-Apr 5-Jun 11 Plate 16 x 2310 x 10000 A572-50 TP1 sh 22 63,829.92 161 F CFR 29-May 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 14 Plate 18 x 2310 x 10200 A572-50 TP1 sh 57 189,770.70 161 F CFR 29-May 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 16 Plate 20 x 3080 x 9500 A572-50 TP1 sh 3 13,781.46 161 F CFR 29-May 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 28 Plate 40 x 2860 x 9500 A572-50 TP1 sh 3 25,590.00 161 F CFR 29-May 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 7 Plate 14 x 2438 x 12000 A36 sh 1 3,215.00 160 F FOB 22-May 30-Jul 25-Jul 10-Aug 10-Aug 16-Aug L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 23 Plate 40 x 2438 x 6096 SM490A sh 4 18,670.00 160 F FOB 22-May 30-Jul 25-Jul 10-Aug 10-Aug 16-Aug L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 27 SUS Plate 50 x 1219 x 6096 A240-316L sh 1 2,998.41 158 F FOB 9-May 30-Jul 6-Jul 12-Jul 18-Jul 24-Jul 100% $

A300 M1-8969 10-Mar 20-May 10 Plate 12 x 1524 x 6096 A240-321 sh 5 4,495.00 101 F FOB 24-Mar Jun 6-Jul 12-Jul 18-Jul 24-Jul L/C $

A300 M1-8969 10-Mar 20-May 7 Plate 8 x 1524 x 6096 A240-304 sh 3 1,768.13 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A300 M1-8969 10-Mar 20-May 8 Plate 10 x 1524 x 6096 A240-304 sh 1 736.72 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A300 M1-8969 10-Mar 20-May 9 Plate 10 x 1219 x 2438 A240-316 sh 2 474.00 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A300 M1-8969 10-Mar 20-May 12 Plate 15 x 1524 x 6096 A240-304 sh 7 7,735.57 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A300 M1-8969 10-Mar 20-May 13 Plate 15 x 1219 x 2438 A240-316 sh 2 711.00 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A300 M1-8969 10-Mar 20-May 14 Plate 16 x 1219 x 2438 A240-304 sh 4 1,508.31 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A300 M1-8969 10-Mar 20-May 15 Plate 20 x 1524 x 6096 A240-304 sh 6 8,840.65 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A300 M1-8969 10-Mar 20-May 16 Plate 20 x 1524 x 6096 A240-316 sh 5 7,414.00 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A300 M1-8969 10-Mar 20-May 17 Plate 25 x 1524 x 6096 A240-304 sh 2 3,683.61 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A300 M1-8969 10-Mar 20-May 18 Plate 50 x 1219 x 2438 A240-304 sh 2 2,356.73 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A300 M1-9141(R.1) 24-Apr 10-Jun 5-May 1 W/D Pipe OD60.3x3.91t - 6M A312-304 pc 20 659.15 159 F FOB 10-May 10-Jun 17-Jun 22-Jun 27-Jun 7-Jul 100% $

A300 M1-9141(R.1) 24-Apr 10-Jun 5-May 3 W/D Pipe OD73.0x5.16t - 6M A312-304 pc 2 104.65 159 F FOB 10-May 10-Jun 17-Jun 22-Jun 27-Jun 7-Jul 100% $

A300 M1-9141(R.1) 24-Apr 10-Jun 5-May 4 W/D Pipe OD73.0x5.16t - 6M A312-321 pc 3 156.98 159 F FOB 10-May 10-Jun 17-Jun 22-Jun 27-Jun 7-Jul 100% $

A300 M1-9141(R.1) 24-Apr 10-Jun 5-May 5 W/D Pipe 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 5 342.24 159 F FOB 10-May 10-Jun 17-Jun 22-Jun 27-Jun 7-Jul 100% $

A300 M1-9141(R.1) 24-Apr 10-Jun 5-May 7 W/D Pipe OD88.9x5.49t - 6M A106-B pc 6 406.50 159 F FOB 10-May 10-Jun 17-Jun 22-Jun 27-Jun 7-Jul 100% $

A300 M1-9141(R.1) 24-Apr 10-Jun 5-May 8 W/D Pipe OD114.3x6.02t - 6M A312-321 pc 2 194.85 159 F FOB 10-May 10-Jun 17-Jun 22-Jun 27-Jun 7-Jul 100% $

A300 M1-9141(R.1) 24-Apr 10-Jun 5-May 8 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 4 389.70 159 F FOB 10-May 10-Jun 17-Jun 22-Jun 27-Jun 7-Jul 100% $

A300 M1-9141(R.1) 24-Apr 10-Jun 5-May 11 SMLS Pipe OD219.1x8.18t - 6M A106-B pc 10 2,553.00 159 F FOB 10-May 10-Jun 17-Jun 22-Jun 27-Jun 7-Jul 100% $

A300 M1-9141(R.1) 24-Apr 10-Jun 5-May 12 W/D Pipe OD219.1 x t12.70-6M A312-304 pc 3 1,175.50 159 F FOB 10-May 10-Jun 17-Jun 22-Jun 27-Jun 7-Jul 100% $

A300 M1-9141(R.1) 10-Jun 5-May 13 W/D Pipe 3/4" (OD26.7x2.87t) - 6M A312-304 pc 1 10.22 159 F FOB 10-May 10-Jun 17-Jun 22-Jun 27-Jun 7-Jul 100% $

A300 M1-9141(R.1) 10-Jun 5-May 14 W/D Pipe 1-1/2 S/160 (OD48.3x7.14t) A312-304 pc 1 43.92 159 F FOB 10-May 10-Jun 17-Jun 22-Jun 27-Jun 7-Jul 100% $

A300 M1-8969 10-Mar 20-May 4 Plate 3 x 1219 x 2438 A240-409 sh 435 30,057.28 101 F FOB 19-Mar May/Jun 28-Jun 3-Jul 7-Jul 16-Jul L/C $

A300 M1-9142(R.1) 24-Apr 10-Jun 5 SUS Plate 20 x 1524 x 6096 A240-316L sh 5 7,413.66 169 F CIF 19-May 25-Jun 17-Jun 22-Jun 25-Jun 1-Jul 100% $

A300 M1-8969 10-Mar 20-May 6 Plate 6 x 1219 x 6096 A240-409 sh 22 7,601.94 101 F FOB 19-Mar May/Jun 17-Jun 22-Jun 28-Jun 2-Jul L/C $

A300 M1-8969 10-Mar 20-May 2 Plate 2 x 1219 x 2438 A240-409 sh 510 23,493.04 101 F FOB 19-Mar May/Jun 9-Jun 16-Jun 20-Jun 25-Jun L/C $

A300 M1-9125(R.7) 22-Apr 5-Jun 3 SUS Plate 10 x 1524 x 6096 A240-304 sh 1 736.72 152 F CNF 6-May 30-May 1-Jun 4-Jun 17-Jun 21-Jun L/C $

Page 78: Hvc PlatePipe Update)

HVC-PUR 78 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A300 M1-9125(R.7) 22-Apr 5-Jun 17 SUS Plate 25 x 1219 x 6096 A240-304 sh 1 1,473.20 152 F CNF 6-May 30-May 1-Jun 4-Jun 17-Jun 21-Jun L/C $

A300 M1-8600(R.1) 14-May 6 Plate 6 x 1219 x 6096 A240-409 sh 18 6,219.77 103 L DDU 20-Mar 5-Jun 10-Jun 13-Jun 100% $

A300 M1-9125(R.5) 22-Apr 5-Jun 2 Plate 6 x 1829 x Coil (was: 360T) A36 kg 16 coil 369,710.00 129 F CFR 22-Apr 30-Jun 25-May 30-May 3-Jun 12-Jun L/C $

A300 M1-8969 10-Mar 20-May 11 Plate 12 x 1524(1219) x 6096 A240-409 sh 4 (5) 3,455.99 101 F FOB 19-Mar May/Jun 17-May 22-May 30-May 4-Jun L/C $

A300 M1-8600(R.1) 14-May 4 Plate 3 x 1219 x 2438 A240-409 sh 435 30,057.00 103 L DDU 20-Mar Jun 14-May 25-May 12-Jun 100% $

A300 M1-8969 10-Mar 20-May 5 Plate 6 x 1524 x 6096 A240-321 sh 22 9,724.70 103 L DDU 20-Mar Jul 14-May 19-May 30-May 100% $

EMAL/A298

A298 M1-9635 25-Aug 25-Sep 1 Plate 10 x 1500 x 6000 SS400 sh 9 6,358.50 626 L Ex-w 4-Sep 9-Sep 15-Sep 3-Oct 100% VND

A298 M1-9578 12-Aug 5-Oct 3 Plate 5 x 1500 x 6000 SS400 sh 2 525.00 626 L Ex-w 4-Sep 9-Sep 15-Sep 3-Oct 100% VND

A298 M1-9578 12-Aug 5-Oct 4 Plate 8 x 1500 x 6000 SS400 sh 4 2,260.80 626 L Ex-w 4-Sep 9-Sep 15-Sep 3-Oct 100% VND

A298 M1-9413 3-Jul 25-Aug 1 Plate 15 x 1524 x 6096 A240-304 sh 1 1,105.00 267 F FOB 31-Jul 25-Aug 30-Aug 4-Sep 10-Sep 17-Sep 100% $

A298 M1-9413 3-Jul 25-Aug 2 Plate 3 x 1219 x 2438 A240-304 sh 1 70.70 234 F FOB 11-Jul 20-Aug 10-Aug 15-Aug 20-Aug 27-Aug 100% $

A298 M1-9413 3-Jul 25-Aug 3 Plate 2 x 1219 x 2438 A240-409 sh 50 2,303.00 234 F FOB 11-Jul 20-Aug 10-Aug 15-Aug 20-Aug 27-Aug 100% $

A298 M1-9581 12-Aug 5-Oct 1 W/D Pipe 3" S/10(OD88.9xt3.05)-6M A312-304 pc 1 39.12 280 F FOB 13-Aug 30-Aug 30-Aug 4-Sep 10-Sep 17-Sep 100% $

A298 M1-9581 12-Aug 5-Oct 2 W/D Pipe 4" S/40(OD114.3xt6.02)-6M A312-304 pc 2 194.88 280 F FOB 13-Aug 30-Aug 30-Aug 4-Sep 10-Sep 17-Sep 100% $

A298 M1-9581 12-Aug 5-Oct 3 W/D Pipe 1 1/2"S/40(OD48.3xt3.68)-6 A53-B pc 65 1,579.50 280 F FOB 13-Aug 30-Aug 30-Aug 4-Sep 10-Sep 17-Sep 100% $

A298 M1-9581 12-Aug 5-Oct 4 SMLS Pipe 2 1/2"S/40(OD73xt5.16)-6M A106-B pc 1 51.78 280 F FOB 13-Aug 30-Aug 30-Aug 4-Sep 10-Sep 17-Sep 100% $

A298 M1-9581 12-Aug 5-Oct 5 SQ.Pipe SP50x50xt1.6-6M STKR400 pc 7 99.96 280 F FOB 13-Aug 30-Aug 30-Aug 4-Sep 10-Sep 17-Sep 100% $

A298 M1-9139(R.1) 24-Apr 15-Sep 5-May 3 Plate 14 x 1219 x 9000 SS400 sh 44 53,051.37 229 F FAS 4-Jul 15-Sep 25-Jul 31-Jul 7-Aug 15-Sep 100% $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 1 Plate 18 x 1700 x 10200 A572-50 TP1 sh 53 129,857.42 187 F CIF 6-Jun 30-Jul 29-Aug 7-Sep 8-Sep 17-Sep L/C $

A298 M1-9123 22-Apr 15-Sep 1 Plate 14 x 2750 x 9000 A36/SS400 sh 1 2,720.03 161 F CFR 29-May 30-Jul 29-Aug 7-Sep 8-Sep 2-Oct L/C $

A298 M1-9123 22-Apr 15-Sep 3 Plate 12 x 2438 x 9000 A36/SS400 sh 18 37,204.86 161 F CFR 29-May 30-Jul 29-Aug 7-Sep 8-Sep 2-Oct L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 1 Plate 12 x 3048 x 6096 A572-50 TP1 sh 2 3,500.00 161 F CFR 29-May 30-Jul 29-Aug 7-Sep 8-Sep 2-Oct L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 2 Plate 18 x 3100 x 10200 A572-50 TP1 sh 1 4,467.91 161 F CFR 29-May 30-Jul 29-Aug 7-Sep 8-Sep 2-Oct L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 4 Plate 20 x 3100 x 9600 A572-50 TP1 sh 1 4,672.32 161 F CFR 29-May 30-Jul 29-Aug 7-Sep 8-Sep 2-Oct L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 10 Plate 40 x 2860 x 9600 A572-50 TP1 sh 1 8,620.00 161 F CFR 29-May 30-Jul 29-Aug 7-Sep 8-Sep 2-Oct L/C $

A298 M1-9139(R.1) 24-Apr 15-Sep 5-May 4 Plate 16 x 2438 x 6096 A36 sh 3 5,600.00 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9139(R.1) 24-Apr 15-Sep 5-May 4 Plate 16 x 2438 x 6096 A36 sh 1 1,870.00 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9139(R.1) 24-Apr 15-Sep 5-May 7 Plate 25 x 2438 x 6096 A36 sh 3 8,750.00 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9139(R.1) 24-Apr 15-Sep 5-May 8 Plate 40 x 2438 x 6096 A36 sh 3 14,000.00 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9139(R.1) 24-Apr 15-Sep 5-May 9 Plate 50 x 1524 x 6096 A36 sh 1 3,646.44 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9123 22-Apr 15-Sep 4 Plate 10 x 1219 x 9000 A36 sh 74 63,710.00 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9123 22-Apr 15-Sep 5 Plate 8 x 1219 x 9000 A36 sh 188 129,530.00 160 F FOB 22-May 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9029(R.3) 26-Mar 20-May 3-Apr 3 Plate 10 x 1524 x 6096 A36 sh 8 5,834.00 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9029(R.3) 26-Mar 20-May 3-Apr 4 Plate 12 x 1524 x 6096 A36 sh 3 2,625.40 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9029(R.3) 26-Mar 20-May 3-Apr 5 Plate 14 x 2438 x 7300 A36 sh 3 5,867.80 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9029(R.3) 26-Mar 20-May 3-Apr 7 Plate 20 x 2438 x 6096 A36 sh 11 25,667.00 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9028(R.1) 26-Mar 20-May 3-Apr 3 Plate 10 x 1524 x 6096 A36 sh 1 729.29 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9028(R.1) 26-Mar 20-May 3-Apr 4 Plate 12 x 1524 x 6096 A36 sh 10 8,751.47 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9028(R.1) 26-Mar 20-May 3-Apr 8 Plate 25 x 2438 x 6096 A36 sh 1 2,900.00 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9028(R.1) 26-Mar 20-May 3-Apr 9 Plate 30 x 1829 x 5300 A36 sh 1 2,283.00 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 3 Plate 18 x 2300 x 10500 A572-50 TP1 sh 18 61,423.11 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 7 Plate 30 x 2860 x 10200 A572-50 TP1 sh 63 432,810.38 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A298 M1-9026 26-Mar 10-Jun 5 W/D Pipe 14"S/60(OD355.6xt15.09)-6 A312-304 pc 10 7,679.70 117 F FOB 7-Apr 26-Jul 2-Aug 7-Aug 21-Aug 27-Aug 100% $

A298 M1-9139(R.1) 24-Apr 15-Sep 5-May 6 Plate 22 x 1524 x 6096 A36 sh 3 4,813.31 172 F FOB 20-May 30-May 9-Jun 16-Jun 20-Jun 25-Jun 100% $

A298 M1-9029(R.3) 26-Mar 20-May 3-Apr 1 Plate 4.5 x 1524 x 6096 SS400 sh 1 328.18 162 F FOB 14-May 10-Jun 9-Jun 16-Jun 20-Jun 21-Aug 100% $

A298 M1-9028(R.1) 26-Mar 20-May 3-Apr 2 Plate 9 x 1524 x 6096 A36/SS400 sh 1 656.36 162 F FOB 14-May 10-Jun 9-Jun 16-Jun 20-Jun 21-Aug 100% $

A298 M1-9312 9-Jun 15-Jul 2 Plate 9 x 1500 x 6000 SS400 sh 2 1,271.70 418 L DDP 20-Jun 24-Jun 27-Jun 21-Aug 100% VND

A298 M1-9311 9-Jun 5-Aug 3 Plate 4.5 x 1500 x 6000 SS400 sh 2 635.85 418 L DDP 20-Jun 24-Jun 27-Jun 21-Aug 100% VND

A298 M1-9311 9-Jun 5-Aug 5 Plate 14 x 1500 x 6000 SS400 sh 8 7,912.80 418 L DDP 20-Jun 24-Jun 27-Jun 21-Aug 100% VND

A298 M1-9312 9-Jun 15-Jul 3 Plate 15 x 2438 x 6096 A36 sh 2 3,500.00 205 F FOB 20-Jun 30-Jun 14-Jul 21-Jul 31-Jul 19-Aug 100% $

A298 M1-9312 9-Jun 15-Jul 4 Plate 30 x 2438 x 6096 A36 sh 1 3,500.00 205 F FOB 20-Jun 30-Jun 14-Jul 21-Jul 31-Jul 19-Aug 100% $

A298 9366 18-Jun 1-Sep 2 Plate 15 x 1524 x 6096 A240-304 sh 1 1,105.00 192 F CFR 23-Jun 30-Jul 27-Jul 30-Jul 11-Aug 19-Aug 100% $

Page 79: Hvc PlatePipe Update)

HVC-PUR 79 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A298 M1-9311 9-Jun 5-Aug 2 Plate 15 x 1524 x 6096 A240-304 sh 3 3,315.00 192 F CFR 11-Jun 30-Jul 27-Jul 30-Jul 11-Aug 19-Aug 100% $

A298 M1-9139(R.1) 24-Apr 15-Sep 5-May 5 Plate 20 x 2438 x 6096 A36/SS400 sh 9 21,000.00 182 F FOB 30-May 15-Jun 14-Jul 21-Jul 31-Jul 8-Aug 100% $

A298 M1-9026 26-Mar 10-Jun 5 W/D Pipe 14"S/60(OD355.6xt15.09)-6 A312-304 pc 16 12,287.52 117 F FOB 7-Apr 26-Jul 26-Jul 2-Aug 7-Aug 19-Aug 100% $

A298 M1-9139(R.1) 24-Apr 15-Sep 5-May 9 Plate 50 x 1524 x 6096 A36 sh 2 7,290.00 263 F FOB 22-May 30-Jul 29-Jul 9-Aug 15-Aug 21-Aug 100% $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 11 Plate 50 x 2050 x 11000 A572-50 TP1 sh 2 17,701.75 124 F FOB 14-Apr 30-Jul 29-Jul 9-Aug 15-Aug 28-Aug L/C $

A298 M1-8600(R.1) 3-Mar 20-May 7 Plate 15 x 1524 x 6096 A240-304 sh 1 1,105.00 104 F CIF 20-Mar 30-Jun 18-Jul 24-Jul 8-Aug L/C $

A298 M1-9443 8-Jul 30-Jul 1 SMLS Pipe 3" S/160(OD88.9xt11.13)-6 A312-316 pc 2 260.40 241 F FOB 14-Jul 30-Jul 26-Jul 2-Aug 7-Aug 15-Aug 100% $

A298 M1-9184 5-May 15-Sep 1 W/D Pipe 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 200 4,860.00 165 F FOB 15-May 30-Jul 26-Jul 2-Aug 7-Aug 15-Aug 100% $

A298 M1-9184 5-May 15-Sep 2 SMLS Pipe 3" S/40(OD88.9x5.49)-6M A106-B pc 4 271.00 165 F FOB 15-May 30-Jul 26-Jul 2-Aug 7-Aug 15-Aug 100% $

A298 M1-9184 5-May 15-Sep 3 W/D Pipe 1-1/4" S/40(OD42.2x3.56)-6 A312-304 pc 2 41.20 165 F FOB 15-May 30-Jul 26-Jul 2-Aug 7-Aug 15-Aug 100% $

A298 M1-9184 5-May 15-Sep 4 W/D Pipe 4" S/40(OD114.3x6.02)-6M A312-304 pc 3 292.30 165 F FOB 15-May 30-Jul 26-Jul 2-Aug 7-Aug 15-Aug 100% $

A298 M1-9184 5-May 15-Sep 5 W/D Pipe 6" S/40(OD168.3x7.11)-6M A312-304 pc 2 342.60 165 F FOB 15-May 30-Jul 26-Jul 2-Aug 7-Aug 15-Aug 100% $

A298 M1-9123 22-Apr 15-Sep 1 Plate 14 x 2750 x 9000 A36/SS400 sh 9 24,480.23 161 F CFR 29-May 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A298 M1-9123 22-Apr 15-Sep 2 Plate 14 x 2438 x 9000 A36/SS400 sh 34 81,970.00 161 F CFR 29-May 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A298 M1-9123 22-Apr 15-Sep 3 Plate 12 x 2438 x 9000 A36/SS400 sh 14 28,937.11 161 F CFR 29-May 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A298 M1-9029(R.3) 26-Mar 20-May 3-Apr 9 Plate 40 x 2860 x 9600 A572-50 TP1 sh 4 34,480.00 161 F CFR 29-May 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 2 Plate 18 x 3100 x 10200 A572-50 TP1 sh 7 31,275.34 161 F CFR 29-May 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 4 Plate 20 x 3100 x 9600 A572-50 TP1 sh 4 18,689.28 161 F CFR 29-May 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 10 Plate 40 x 2860 x 9600 A572-50 TP1 sh 1 8,620.00 161 F CFR 29-May 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A298 M1-9029(R.3) 26-Mar 20-May 3-Apr 6 Plate 15 x 2438 x 6096 A36 sh 5 8,750.00 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9029(R.3) 26-Mar 20-May 3-Apr 8 Plate 25 x 2438 x 6096 A572-50 TP1 sh 3(4sh act 8,750.00 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9029(R.3) 26-Mar 20-May 3-Apr 10 Plate 16 x 2438 x 7300 A36 sh 1 2,235.40 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9028(R.1) 26-Mar 20-May 3-Apr 5 Plate 15 x 2438 x 6096 A36 sh 6 10,500.00 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9028(R.1) 26-Mar 20-May 3-Apr 6 Plate 18 x 2438 x 6096 A36 sh 1 2,100.01 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9028(R.1) 26-Mar 20-May 3-Apr 7 Plate 20 x 2438 x 6096 A36 sh 1 2,333.34 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9028(R.1) 26-Mar 20-May 3-Apr 8 Plate 25 x 2438 x 6096 A36 sh 1 1,458.34 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 1 Plate 15 x 2438 x 6096 A572-50 TP1 sh 8 14,000.00 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 3 Plate 18 x 2300 x 10500 A572-50 TP1 sh 82 279,816.39 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 5 Plate 30 x 2860 x 9600 A572-50 TP1 sh 6 38,795.33 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 6 Plate 30 x 2860 x 10200 A572-50 TP1 sh 8 54,960.05 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 7 Plate 30 x 2860 x 10200 A572-50 TP1 sh 10 68,700.06 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 8 Plate 35 x 2860 x 10200 A572-50 TP1 sh 2 16,030.00 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9030(R.1) 26-Mar 20-May 3-Apr 9 Plate 35 x 2860 x 10200 A572-50 TP1 sh 2 16,030.00 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A298 M1-9312 9-Jun 15-Jul 1 Plate 0.48 x 1200 x 1500 Steel Galvanized sh 1 1.80 459 L DDP 8-Jul 10-Jul 29-Jul 6-Aug 100% VND

A298 M1-9314 9-Jun 25-Jul 1 W/D Pipe 1" S/40 (OD33.4x3.38t)-6M A312-304 pc 2 30.40 198 F FOB 16-Jun 13-Jul 6-Jul 12-Jul 18-Jul 29-Jul 100% $

A298 M1-9314 9-Jun 25-Jul 2 W/D Pipe 4" S/40 (OD114.3x6.02)-6M A312-304 pc 5 486.90 198 F FOB 16-Jun 13-Jul 6-Jul 12-Jul 18-Jul 29-Jul 100% $

A298 M1-9314 9-Jun 25-Jul 3 SMLS Pipe 1/2" S/40(OD21.3x2.77)-6M A53-B pc 8 61.00 198 F FOB 16-Jun 13-Jul 6-Jul 12-Jul 18-Jul 29-Jul 100% $

A298 M1-9314 9-Jun 25-Jul 4 SMLS Pipe 1-1/2" S/40(OD48.3x3.68)-6 A53-B pc 11 267.30 198 F FOB 16-Jun 13-Jul 6-Jul 12-Jul 18-Jul 29-Jul 100% $

A298 M1-9314 9-Jun 25-Jul 5 W/D Pipe 6" S/40(OD168.3x7.11)-6M A53-B pc 2 339.10 198 F FOB 16-Jun 13-Jul 6-Jul 12-Jul 18-Jul 29-Jul 100% $

A298 M1-9314 9-Jun 25-Jul 6 W/D Pipe 2" S/40 (OD60.3x3.91t)-6M A312-316 pc 4 132.70 198 F FOB 16-Jun 13-Jul 6-Jul 12-Jul 18-Jul 29-Jul 100% $

A298 M1-9314 9-Jun 25-Jul 7 W/D Pipe 2-1/2" S/40(OD73x5.16)-6M A312-316 pc 2 106.40 198 F FOB 16-Jun 13-Jul 6-Jul 12-Jul 18-Jul 29-Jul 100% $

A298 M1-9314 9-Jun 25-Jul 8 W/D Pipe 4" S/40 (OD114.3x6.02)-6M A312-316 pc 6 588.20 198 F FOB 16-Jun 13-Jul 6-Jul 12-Jul 18-Jul 29-Jul 100% $

A298 M1-9311 9-Jun 5-Aug 1 Plate 0.5 x 1219 x 2438 A240-304 sh 1 11.80 206 F FOB 23-Jun 5-Jul 6-Jul 12-Jul 18-Jul 24-Jul 100% $

A298 M1-8938(R.2) 3-Mar 20-May 4-Apr 1 Plate 2 x 1219 x 2438 A240-304 sh 1 47.10 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A298 M1-8600(R.1) 3-Mar 20-May 1 Plate 2 x 1219 x 2438 A240-304 sh 234 11,029.55 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A298 M1-8600(R.1) 3-Mar 20-May 26-Mar 5 Plate 10 x 1524 x 6096 A240-304 sh 3 2,210.16 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A298 M1-8938(R.2) 3-Mar 20-May 4-Apr 6 Plate 12 x 1524 x 6096 A240-304 sh 7 6,188.46 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A298 M1-8938(R.2) 3-Mar 20-May 4-Apr 7 Plate 15 x 1524 x 6096 A240-304 sh 3 3,315.20 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A298 M1-8600(R.1) 3-Mar 20-May 8 Plate 20 x 1524 x 6096 A240-304 sh 6 8,840.65 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A298 M1-9026 26-Mar 10-Jun 1 W/D Pipe 2"S/40(OD60.3xt3.9)-6M A312-304 pc 37 1,221.00 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A298 M1-9026 26-Mar 10-Jun 2 W/D Pipe 2" S/40(OD60.3x3.9t)-6M A312-316 pc 3 99.60 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A298 M1-9026 26-Mar 10-Jun 3 W/D Pipe 3" S/40 (OD88.9 x t5.49)-6M A312-304 pc 6 412.20 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A298 M1-9026 26-Mar 10-Jun 4 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 1 97.14 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

L3785
Ha Thi Hien: 11,667kg
Page 80: Hvc PlatePipe Update)

HVC-PUR 80 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A298 M1-8938(R.2) 3-Mar 20-May 4-Apr 3 Plate 3 x 1219 x 2438 A240-409 sh 1,369 94,594.05 101 F FOB 19-Mar May/Jun 28-Jun 3-Jul 7-Jul 16-Jul L/C $

A298 M1-8600(R.1) 3-Mar 20-May 3 Plate 3 x 1219 x 2438 A240-409 sh 231 15,961.45 101 F FOB 19-Mar May/Jun 28-Jun 3-Jul 7-Jul 16-Jul L/C $

A298 M1-9139(R.1) 15-Sep 5-May 1 SUS Plate 6 x 1524 x 6096 A240-304 sh 16 7,072.52 169 F CIF 19-May 25-Jun 17-Jun 22-Jun 25-Jun 1-Jul 100% $

A298 M1-8600(R.1) 14-May 4 Plate 6 x 1219 x 6096 A240-409 sh 88 30,407.75 101 F FOB 19-Mar May/Jun 17-Jun 22-Jun 28-Jun 2-Jul L/C $

A298 M1-9346 13-Jun 5-Aug 1 Plate 12 x 1500 x 6000 SS400 sh 6 5,086.80 417 L Ex-w 20-Jun 24-Jun 30-Jun 1-Jul 100% VND

A298 M1-9311 9-Jun 5-Aug 4 Plate 12 x 1500 x 6000 SS400 sh 8 6,782.40 417 L Ex-w 20-Jun 24-Jun 30-Jun 1-Jul 100% VND

A298 M1-8938(R.2) 3-Mar 20-May 4-Apr 2 Plate 2 x 1219 x 2438 A240-409 sh 1,720 79,231.44 101 F FOB 19-Mar May/Jun 9-Jun 16-Jun 20-Jun 25-Jun L/C $

A298 M1-8600(R.1) 3-Mar 20-May 2 Plate 2 x 1219 x 2438 A240-409 sh 759 34,963.18 101 F FOB 19-Mar May/Jun 9-Jun 16-Jun 20-Jun 25-Jun L/C $

A298 M1-8938(R.2) 4-Apr 6 SUS Plate 12 x 1524 x 6096 A240-304 sh 13 11,492.85 152 F CNF 6-May 30-May 1-Jun 4-Jun 17-Jun 21-Jun L/C $

A298 M1-8938(R.2) 3-Mar 20-May 4-Apr 4 Plate 6 x 1219 x 6096 A240-409 sh 68 23,496.90 103 L DDU 20-Mar 5-Jun 10-Jun 13-Jun 100% $

A298 M1-8600(R.1) 14-May 4 Plate 6 x 1219 x 6096 A240-409 sh 2 691.09 103 L DDU 20-Mar 5-Jun 10-Jun 13-Jun 100% $

A298 M1-9026 26-Mar 10-Jun 6 W/D Pipe 16"S/60(OD406.4xt16.66)-6 A312-304 pc 26 25,232.00 117 F FOB 7-Apr 26-Jul 26-May 31-May 5-Jun 12-Jun 100% $

A298 M1-8600(R.1) 14-May 3 Plate 3 x 1219 x 2438 A240-409 sh 1,600 110,555.00 103 L DDU 20-Mar Jun 14-May 25-May 12-Jun 100% $

A298 M1-9029(R.3) 26-Mar 20-May 3-Apr 2 Plate 6 x 1829 x Coil (was: 317T) A36 kg 14 coil 320,520.00 129 F CFR 22-Apr 30-Jun 25-May 30-May 3-Jun 12-Jun L/C $

A298 M1-9028(R.1) 26-Mar 20-May 3-Apr 1 Plate 6 x 1829 x Coil (was: 118T) A36 kg 5 coil 113,920.00 129 F CFR 22-Apr 30-Jun 25-May 30-May 3-Jun 12-Jun L/C $

A298 M1-8938(R.2) 4-Apr 9 Plate 12 x 1219 x 6096 A240-409 sh 6 4,146.51 121 F FOB 12-Apr 18-May 17-May 22-May 31-May 4-Jun 100% $

A298 M1-8938(R.2) 4-Apr 10 Plate 6 x 1524 x 6000 A240-304 sh 2 870.14 121 F FOB 12-Apr 18-May 17-May 22-May 31-May 4-Jun 100% $

A298 M1-8938(R.2) 4-Apr 13 Plate 6 x 1219 x 2438 A240-316 sh 1 142.30 121 F FOB 12-Apr 18-May 17-May 22-May 31-May 4-Jun 100% $

Seraya/A299

A299 M1-9527 28-Jul 10-Aug 1 Plate 25tx252x590(25x300x590) SA182-F91 sh 96 3,334.68 260 F FOB 28-Jul 8-Aug 17-Aug 21-Aug 26-Aug 24-Sep $

A299 M1-9527 28-Jul 10-Aug 2 Plate 27tx252x665 (40x340x665) SA182-F91 sh 24 833.52 260 F FOB 28-Jul 8-Aug 17-Aug 21-Aug 26-Aug 24-Sep $

A299 M1-9527 28-Jul 10-Aug 3 Plate 27tx277x677.5 (40x340x677 SA182-F91 sh 73 2,535.29 260 F FOB 28-Jul 8-Aug 17-Aug 21-Aug 26-Aug 24-Sep $

A299 M1-9527 28-Jul 10-Aug 3 Plate 27tx277x677.5 (t55-6sh,t51- SA182-F91 sh 23 798.79 260 F FOB 28-Jul 8-Aug 13-Sep 20-Sep 21-Oct 27-Sep $

A299 M1-9527 28-Jul 10-Aug 4 Plate 80x260x1067 SA182-F91 sh 12 416.76 260 F FOB 28-Jul 8-Aug 17-Aug 21-Aug 26-Aug 24-Sep $

A299 M1-9527 28-Jul 10-Aug 4 Plate SA182-F91 sh 24 2,580.00 260 F FOB 28-Jul 8-Aug 13-Sep 20-Sep 21-Oct 27-Sep $

A299 M1-9527 28-Jul 10-Aug 4 Plate 50.8tx252x1067 SA182-F91 sh 12 1,290.00 260 F FOB 28-Jul 8-Aug 24-Aug 29-Aug 3-Sep 17-Sep $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 19 Plate 25.4 x 1219 x 6096 A387-91-CL2 sh 2 2,963.34 126 F CFR 17-Apr 24-Jul 5-Aug 12-Sep 17-Sep 23-Sep L/C $

A299 M1-9032(R.1) 26-Mar 25-May 3-Apr 7 Plate 14 x 2438 x 7300 A36 sh 18 35,206.82 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A299 M1-9032(R.1) 26-Mar 25-May 3-Apr 11 Plate 20 x 2438 x 6096 A36 sh 3 7,000.02 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A299 M1-9032(R.1) 26-Mar 25-May 3-Apr 12 Plate 30 x 1829 x 5300 A36 sh 3 6,848.60 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A299 M1-9032(R.1) 26-Mar 25-May 3-Apr 13 Plate 45 x 1829 x 5300 A36 sh 4 13,700.00 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 15 Plate 54 x 1524 x 6096 A36 sh 1 3,940.00 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 25 Plate 18 x 1750 x 13000 A572-50 TP1 sh 7 22,502.02 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 26 Plate 18 x 2320 x 10400 A572-50 TP1 sh 12 40,911.44 124 F FOB 14-Apr 30-Jul 28-Aug 6-Sep 7-Sep 15-Sep L/C $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 1 Plate 2 x 1219 x 2438 A240-321 sh 385 18,146.90 201 F DDU 20-Mar 30-Jul 9-Aug 12-Aug 13~15/8 22-Aug 100% $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 3 Plate 3 x 1219 x 2438 A240-321 sh 220 15,554.40 201 F DDU 20-Mar 30-Jul 9-Aug 12-Aug 13~15/8 22-Aug 100% $

A299 M1-9019 24-Mar 20-May 11 W/D Pipe OD457.2 x t29.36-6M A312-304 pc 16 30,027.84 116 F FOB 9-Apr 15-Jul 10-Aug 15-Aug 22-Aug 27-Aug 100% $

A299 M1-9206(R.1) 13-May 5-Jul 5 SUS Plate 2 x 1219 x 2438 A240-321 sh 375 17,675.51 393 F FOB 10-Jun 30-Jul 10-Aug 15-Aug 20-Aug 25-Aug L/C $

A299 M1-9206(R.1) 13-May 5-Jul 9 Plate 25.4 x 1219 x 3048 A387-91-CL2 sh 2 1,482.00 173 F CFR 22-May 10-Sep 8-Jul 17-Aug 25-Aug 27-Aug D/P $

A299 W4-9402 30-Jun 30-Jul 1 FCAW W/D wire E71T-1 (SFA 5.20) Dia 1.6 box 2,160 32,400.00 225 F CFR 3-Jul 1-Aug 19-Jul 30-Jul 11-Aug 26-Aug 100% $

A299 M1-9206(R.1) 13-May 5-Jul 6 Plate 2 x 1219 x 2438 A36/SS400 sh 220 10,265.02 162 F FOB 14-May 10-Jun 9-Jun 16-Jun 20-Jun 21-Aug 100% $

A299 M1-9206(R.1) 13-May 5-Jul 7 Plate 3 x 1219 x 2438 A36/SS400 sh 90 6,298.99 162 F FOB 14-May 10-Jun 9-Jun 16-Jun 20-Jun 21-Aug 100% $

A299 M1-9206(R.1) 13-May 5-Jul 8 Plate 12 x 2438 x 6096 A36 sh 3 4,200.01 172 F FOB 20-May 30-May 9-Jun 16-Jun 20-Jun 25-Jun 100% $

A299 9368 19-Jun 20-Jul 1 Plate 15 x 1524 x 6096 A240-304 sh 3 3,315.00 192 F CFR 23-Jun 30-Jul 27-Jul 30-Jul 11-Aug 19-Aug 100% $

A299 M1-9272 2-Jun 15-Jul 2 Plate 8 x 2438 x 6096 A36 sh 3 2,800.00 194 F FOB 12-Jun 30-Jun 14-Jul 21-Jul 31-Jul 8-Aug 100% $

A299 M1-9206(R.1) 13-May 5-Jul 2 SUS Plate 12 x 1219 x 2438 A240-304 sh 2 565.00 192 F CFR 11-Jun 30-Jul 27-Jul 30-Jul 11-Aug 19-Aug 100% $

A299 M1-9206(R.1) 13-May 5-Jul 3 SUS Plate 13 x 1219 x 2438 A240-304 sh 1 306.00 192 F CFR 11-Jun 30-Jul 27-Jul 30-Jul 11-Aug 19-Aug 100% $

A299 M1-9206(R.1) 13-May 5-Jul 4 SUS Plate 16 x 1219 x 2438 A240-304 sh 2 754.00 192 F CFR 11-Jun 30-Jul 27-Jul 30-Jul 11-Aug 19-Aug 100% $

A299 M1-9032(R.1) 26-Mar 25-May 3-Apr 3 Plate 10 x 1219 x 7300 A36 sh 82 57,280.93 124 F FOB 14-Apr 30-Jul 29-Jul 9-Aug 15-Aug 28-Aug L/C $

A299 M1-9032(R.1) 26-Mar 25-May 3-Apr 5 Plate 12 x 1219 x 7300 A36 sh 70 58,678.03 124 F FOB 14-Apr 30-Jul 29-Jul 9-Aug 15-Aug 28-Aug L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 15 Plate 54 x 1524 x 6096 A36 sh 1 3,940.00 124 F FOB 14-Apr 30-Jul 29-Jul 9-Aug 15-Aug 28-Aug L/C $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 12 Plate 20 x 1524 x 6096 A240-304 sh 1 1,473.00 104 F CIF 20-Mar 30-Jun 18-Jul 24-Jul 8-Aug L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 24 Plate 18 x 3500 x 9500 A572-50 TP1 sh 4 18,792.00 135 F CFR 21-Apr 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

50.8tx252x1067

Page 81: Hvc PlatePipe Update)

HVC-PUR 81 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A299 M1-9015(R.4) 24-Mar 20-May 28-May 28 Plate 20 x 3400 x 13000 A572-50 TP1 sh 4 27,756.00 135 F CFR 21-Apr 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 29 Plate 24 x 2860 x 10000 A572-50 TP1 sh 9 48,492.00 135 F CFR 21-Apr 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 31 Plate 24 x 2860 x 13000 A572-50 TP1 sh 3 21,015.00 135 F CFR 21-Apr 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 32 Plate 30 x 2860 x 13000 A572-50 TP1 sh 18 157,608.00 135 F CFR 21-Apr 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 33 Plate 30 x 3040 x 13000 A572-50 TP1 sh 3 27,921.00 135 F CFR 21-Apr 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 34 Plate 35 x 3040 x 13000 A572-50 TP1 sh 1 10,858.00 135 F CFR 21-Apr 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 36 Plate 50 x 2438 x 6096 A572-50 TP1 sh 1 5,833.00 135 F CFR 21-Apr 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 37 Plate 50 x 2860 x 6500 A572-50 TP1 sh 4 29,188.00 135 F CFR 21-Apr 30-Jul 30-Jul 7-Aug 9-Aug 8-Sep L/C $

A299 M1-9032(R.1) 26-Mar 25-May 3-Apr 7 Plate 14 x 2438 x 7300 A36 sh 4 7,824.00 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9032(R.1) 26-Mar 25-May 3-Apr 8 Plate 14 x 2438 x 7300 A36 sh 8 15,647.47 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9032(R.1) 26-Mar 25-May 3-Apr 9 Plate 16 x 2438 x 7300 A36 sh 13 29,059.59 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9032(R.1) 26-Mar 25-May 3-Apr 10 Plate 18 x 2438 x 6096 A36 sh 2 4,200.01 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9032(R.1) 26-Mar 25-May 3-Apr 11 Plate 20 x 2438 x 6096 A36 sh 7 16,333.39 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 10 Plate 14 x 2438 x 7300 A36 sh 1 1,956.00 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 14 Plate 40 x 2438 x 6096 A36 sh 4 18,670.00 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 23 Plate 15 x 2438 x 6096 A572-50 TP1 sh 4 7,000.02 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 25 Plate 18 x 1750 x 13000 A572-50 TP1 sh 1 3,214.58 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 26 Plate 18 x 2320 x 10400 A572-50 TP1 sh 30 102,278.59 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 27 Plate 20 x 2438 x 6096 A572-50 TP1 sh 2 4,670.00 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 30 Plate 24 x 2438 x 6096 A572-50 TP1 sh 5 14,000.05 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 35 Plate 40 x 2438 x 6096 A572-50 TP1 sh 2 9,333.37 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9016(R.1) 24-Mar 20-May 3-Apr 6 Plate 18 x 2438 x 6096 A36 sh 1 2,100.00 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9016(R.1) 24-Mar 20-May 3-Apr 7 Plate 20 x 2438 x 6096 A36 sh 1 (0sh ac 2,333.00 124 F FOB 14-Apr 30-Jul 25-Jul 10-Aug 10-Aug 28-Aug L/C $

A299 M1-9205(R.1) 13-May 5-Jul 1 SMLS Pipe 8" S/40 (OD219.1x8.18t)-6M A106-B pc 1 255.30 177 F FOB 26-May 5-Jul 6-Jul 12-Jul 18-Jul 30-Jul 100% $

A299 M1-9205(R.1) 13-May 5-Jul 2 W/D Pipe 1" S/40 (OD33.4x3.38t)-6M A312-304 pc 1 15.20 177 F FOB 26-May 5-Jul 6-Jul 12-Jul 18-Jul 30-Jul 100% $

A299 M1-9205(R.1) 13-May 5-Jul 3 W/D Pipe 2" S/40 (OD60.3x3.91t)-6M A312-316 pc 7 230.60 177 F FOB 26-May 5-Jul 6-Jul 12-Jul 18-Jul 30-Jul 100% $

A299 M1-9205(R.1) 13-May 5-Jul 4 W/D Pipe 2 1/2" S/40 (OD73.0x5.16t) A312-316 pc 2 104.60 177 F FOB 26-May 5-Jul 6-Jul 12-Jul 18-Jul 30-Jul 100% $

A299 M1-9271 2-Jun 15-Jul 1 SQ.Pipe 50 x 50 x 1.5-6M STK400 pc 4 57.10 198 F FOB 16-Jun 13-Jul 6-Jul 12-Jul 18-Jul 29-Jul 100% $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 16 Plate 4.78 x 1219 x 2438 A387-22-CL2 sh 1 111.52 126 F CFR 17-Apr 24-Jul 9-Jun 15-Jul 18-Jul 24-Jul L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 17 Plate 25.4 x 1524 x 6096 A387-22-CL2 sh 1 1,852.39 126 F CFR 17-Apr 24-Jul 9-Jun 15-Jul 18-Jul 24-Jul L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 18 Plate 9.53 x 1524 x 6096 A387-91-CL2 sh 1 695.01 126 F CFR 17-Apr 24-Jul 9-Jun 15-Jul 18-Jul 24-Jul L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 22 Plate 57.15 x 1524 x 6096 A387-91-CL2 sh 2 8,335.77 126 F CFR 17-Apr 24-Jul 9-Jun 15-Jul 18-Jul 24-Jul L/C $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 4 Plate 3 x 1219 x 2438 A240-409 sh 73 5,044.09 101 F FOB 19-Mar May/Jun 6-Jul 12-Jul 18-Jul 24-Jul L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 1 Plate 1 x 1250 x Coil SS400 roll 8 40,000.00 137 F CIF 22-Apr Jun/Jul 26-Jun 30-Jun 7-Jul 24-Jul L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 2 Plate 1.6 x 1250 x 2438 SS400 sh 2 80.00 137 F CIF 22-Apr Jun/Jul 26-Jun 30-Jun 7-Jul 24-Jul L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 3 Plate 2 x 1250 x 2438 SS400 sh 590 28,230.00 137 F CIF 22-Apr Jun/Jul 26-Jun 30-Jun 7-Jul 24-Jul L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 4 Plate 3 x 1250 x 2438 SS400 sh 125 8,970.00 137 F CIF 22-Apr Jun/Jul 26-Jun 30-Jun 7-Jul 24-Jul L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 5 Plate 4 x 1250 x 2438 SS400 sh 3 290.00 137 F CIF 22-Apr Jun/Jul 26-Jun 30-Jun 7-Jul 24-Jul L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 9 Plate 14 x 1524 x 2438 A36 sh 1 410.00 137 F CIF 22-Apr Jun/Jul 26-Jun 30-Jun 7-Jul 24-Jul L/C $

A299 M1-9015(R.4) 24-Mar 20-May 28-May 13 Plate 28 x 2438 x 3048 A36 sh 1 1,630.00 137 F CIF 22-Apr Jun/Jul 26-Jun 30-Jun 7-Jul 24-Jul L/C $

A299 M1-9016(R.1) 24-Mar 20-May 3-Apr 1 Plate 1 x 1250 x Coil SS400 roll 6 30,000.00 137 F CIF 22-Apr Jun/Jul 26-Jun 30-Jun 7-Jul 24-Jul L/C $

A299 M1-9016(R.1) 24-Mar 20-May 3-Apr 8 Plate 36 x 2438 x 3048 A36 sh 1 2,100.00 137 F CIF 22-Apr Jun/Jul 26-Jun 30-Jun 7-Jul 24-Jul L/C $

A299 M1-9206(R.1) 13-May 5-Jul 1 SUS Plate 6 x 1542 x 6096 A240-304 sh 3 1,341.76 372 L DDP 3-Jun 10-Jun 16-Jun 11-Jul 100% VND

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 5 Plate 6 x 1524 x 6096 A240-304 sh 3 1,326.10 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 8 Plate 10 x 1219 x 2438 A240-304 sh 1 235.67 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 9 Plate 13 x 1219 x 2438 A240-304 sh 1 306.38 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 10 Plate 15 x 1524 x 6096 A240-304 sh 7 7,735.60 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 11 Plate 16 x 1219 x 2438 A240-304 sh 1 377.08 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 12 Plate 20 x 1524 x 6096 A240-304 sh 3 4,420.33 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 13 Plate 25 x 1219 x 2438 A240-304 sh 1 589.18 104 F CIF 20-Mar Jun 30-Jun 6-Jul 8-Jul 16-Jul L/C $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 4 Plate 3 x 1219 x 2438 A240-409 sh 77 5,320.48 101 F FOB 19-Mar May/Jun 28-Jun 3-Jul 7-Jul 16-Jul L/C $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 7 Plate 6 x 1219 x 6096 A240-409 sh 10 3,455.43 101 F FOB 19-Mar May/Jun 17-Jun 22-Jun 28-Jun 2-Jul L/C $

A299 M1-9351 13-Jun 1-Aug 1 Plate 12 x 1500 x 6000 SS400 sh 5 4,239.00 417 L Ex-w 20-Jun 24-Jun 30-Jun 1-Jul 100% VND

Page 82: Hvc PlatePipe Update)

HVC-PUR 82 STATUS

MPR No. No Item Mat'l desc Mat'l Spec Unit Q'ty W't (kg) L/F PO del. HVC NCR MRS CurMO No.

MPR issue.Date

MPR needDate

MPR rev. date

PO No

Deli. term

Order date

Actual ship.

ETA HPport

Cust.Clear

Pay-ment

A299 M1-9032(R.1) 26-Mar 25-May 3-Apr 1 Plate 6 x 1524 x 6000 A240-304 sh 9 3,915.64 121 F FOB 12-Apr 18-May 17-May 22-May 31-May 4-Jun 100% $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 4 Plate 3 x 1219 x 2438 A240-409 sh 50 3,454.80 103 L DDU 20-Mar Jun 14-May 25-May 12-Jun 100% $

A299 M1-8600(R.1) 14-May 4 Plate 3 x 1219 x 2438 A240-409 sh 100 6,909.70 103 L DDU 20-Mar Jun 14-May 25-May 12-Jun 100% $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 6 Plate 6 x 1524 x 6096 A240-321 sh 17 7,514.60 103 L DDU 20-Mar Jul 14-May 19-May 30-May 100% $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 7 Plate 6 x 1219 x 6096 A240-409 sh 2 691.09 103 L DDU 20-Mar 5-Jun 10-Jun 13-Jun 100% $

A299 M1-8600(R.1) 14-May 7 Plate 6 x 1219 x 6096 A240-409 sh 6 2,073.26 103 L DDU 20-Mar 5-Jun 10-Jun 13-Jun 100% $

A299 M1-8939(R.1) 3-Mar 20-May 21-Mar 2 Plate 2 x 1219 x 2438 A240-409 sh 780 35,930.50 101 F FOB 19-Mar May/Jun 9-Jun 16-Jun 20-Jun 25-Jun L/C $

A299 M1-9031 26-Mar 25-May 1 W/D Pipe OD48.3x3.68t - 6M A53-B pc 130 3,962.40 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A299 M1-9031 26-Mar 25-May 2 W/D Pipe 2"S/40(OD60.3xt3.9)-6M A312-304 pc 2 66.48 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A299 M1-9031 26-Mar 25-May 3 SQ.Pipe 50 x 50 x 1.5-6M STK400 pc 6 82.24 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A299 M1-9019 24-Mar 20-May 1 W/D Pipe OD21.3 x t2.77-6M A312-304 pc 1 7.68 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A299 M1-9019 24-Mar 20-May 2 SMLS Pipe OD60.3 x t3.91-6M A106-B pc 1 32.64 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A299 M1-9019 24-Mar 20-May 3 W/D Pipe 2"S/40(OD60.3xt3.9)-6M A312-304 pc 7 230.58 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A299 M1-9019 24-Mar 20-May 4 W/D Pipe 2" S/40(OD60.3x3.9t)-6M A312-316 pc 4 131.76 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A299 M1-9019 24-Mar 20-May 5 SMLS Pipe OD114.3 x 6.02-6M A106-B pc 1 96.42 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A299 M1-9019 24-Mar 20-May 6 W/D Pipe 4" S/40 (OD114.3x6.02t)-6M A312-304 pc 2 194.88 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A299 M1-9019 24-Mar 20-May 7 W/D Pipe OD73.0 x t5.16-6M A312-316 pc 2 104.64 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A299 M1-9019 24-Mar 20-May 8 W/D Pipe OD168.3 x t7.11-6M A312-316 pc 1 171.30 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A299 M1-9019 24-Mar 20-May 9 SMLS Pipe OD219.1 x t8.18-6M A106-B pc 7 1,787.10 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

A299 M1-9019 24-Mar 20-May 10 W/D Pipe OD219.1 x t12.70-6M A312-304 pc 3 1,175.40 116 F FOB 9-Apr 15-May 17-May 22-May 29-May 7-Jul 100% $

Raslaffan C-Casing/A304-A (Contract am't: U$ 14,820,725.42)

A304-A M1-9572(R.1) 11-Aug 5-Nov 19-Aug 8 Plate 5 x 1500 x 6000 SS400 sh 3 1,059.75 626 L Ex-w 4-Sep 9-Sep 15-Sep 3-Oct 100% VND

Page 83: Hvc PlatePipe Update)

HVC-PUR 83 STATUS

Up dated on 4/8/2023

MV/Voy No Remarks To Acct

190 Steel Pipe

Ptramesco

Chosun Heung-A Singapore 815S

Chosun Heung-A Singapore 815S

Nam vang

Nam vang

Nam vang

Minh Hoa

190 Steel Pipe

Namvang

Daico AMRTA VII

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

Duc Thuan

No.190 Steel

No.190 Steel

No.190 Steel

Namvang

Namvang

Namvang

Namvang

Namvang

Namvang

Namvang

Namvang

Namvang

Namvang

No.190 Steel

VINA PIPE

VINA PIPE

VINA PIPE

VINA PIPE

No.190 Steel

No.190 Steel

VINA PIPE

VINA PIPE

VINA PIPE

VINA PIPE

VINA PIPE

VINA PIPE

Hanchang Heung-A Hongkong 706

Hanchang Heung-A Hongkong 706

Hanchang Heung-A Hongkong 706

No.190 Steel

VINA PIPE

VINA PIPE

VINA PIPE

SupplierName

Page 84: Hvc PlatePipe Update)

HVC-PUR 84 STATUS

MV/Voy No Remarks To AcctSupplier

Name

VINA PIPE

VINA PIPE

No.190 Steel

Duc Thuan advance

No.190 Steel

Namvang

Namvang

Namvang

Namvang

VINA PIPE HDVAT:7/4/04

VINA PIPE HDVAT:9/3/04

Namvang

Hae Sung Marina 415

Hae Sung Marina 415

Hae Sung Marina 415

Hae Sung Marina 415

Hae Sung Marina 415

Hae Sung Marina 415

Hae Sung Marina 415

Hae Sung Marina 415

Hae Sung Marina 415

Hae Sung Marina 415

Hae Sung Marina 415

Hae Sung Marina 415

Hae Sung Marina 415

Samick Vietfracht

Samick Vietfracht

VINA PIPE 90,000 transport fee

E-Pipe Marina 409

Ptramesco

Samick Nadja V-418

Samick Nadja V-418

Dong A-HN HDVAT28/8

E-Pipe Marina V406 181.86

E-Pipe Marina V406 20688.32

E-Pipe Marina V406 2973.69

E-Pipe Marina V406 8535.12

E-Pipe Marina V406 2854.08

E-Pipe Marina V406

E-Pipe Marina V406

E-Pipe Marina V406

E-Pipe Marina V406

E-Pipe Marina V406

E-Pipe Marina V406

E-Pipe Marina V406

Page 85: Hvc PlatePipe Update)

HVC-PUR 85 STATUS

MV/Voy No Remarks To AcctSupplier

Name

E-Pipe Marina V406

E-Pipe Marina V406

E-Pipe Marina V406

E-Pipe Marina V406

Dong Dat

Keystone Vinh

Keystone Vinh

Keystone Vinh

Keystone Vinh

Keystone Vinh

Keystone Vinh

Keystone Vinh

Keystone Vinh

Keystone Seiyo 9 should deduct am't 'cause of delay 2nd shipment

Keystone Vinh

Hae Sung Maria

Hae Sung Maria

Hae Sung Maria

Keystone AION

Keystone AION

Keystone AION

Keystone AION

Keystone AION

Keystone AION

Vinh Xuan

Vinh Xuan

Vinh Xuan

Vinh Xuan

Vinh Xuan

Samick NAD JA 407

Samick NAD JA 407

Samick NAD JA 407

Keystone Xin Min Men

Keystone Xin Min Men

Dong A-HN HDVAT5% 29/4/04

Dong A-HN HDVAT5% 29/4/04

Dong A-HN HDVAT5% 29/4/04

Dong A-HN HDVAT5% 29/4/04

Dong A-HP HDVAT5%

Dong A-HP HDVAT5%

Namvang HDVAT5% 26/3/4

Namvang HDVAT5% 26/3/4

FiCo Vinh Del

Namvang HDVAT5% 26/3/4

Ptramesco

FiCo Vinh

FiCo Vinh

Page 86: Hvc PlatePipe Update)

HVC-PUR 86 STATUS

MV/Voy No Remarks To AcctSupplier

Name

E-Pipe Maria 0402W

E-Pipe Maria 0402W

E-Pipe Maria 0402W

E-Pipe Maria 0402W

E-Pipe MalaysiaV-070E From China

E-Pipe Maria 0402W

E-Pipe Maria 0402W

E-Pipe Maria 0402W

E-Pipe Maria 0402W

E-Pipe Maria 0402W

E-Pipe Maria 0402W

E-Pipe Maria 0402W

E-Pipe Maria 0402W

E-Pipe APL-Japan V.76W From USA

E-Pipe Maria 0402W

E-Pipe APL-Japan V.76W From USA

Namvang HDVAT5% 26/3/4

Namvang HDVAT5% 26/3/4

Ptramesco

Ptramesco

Namvang HDVAT5% 26/3/4

Namvang HDVAT5% 26/3/4

Namvang HDVAT5% 26/3/4

Dong A-HN HDVAT 5%

VINA PIPE

VINA PIPE

Ptramesco

Namvang HDVAT5% 26/3/4

Namvang HDVAT5% 26/3/4

Ptramesco

Samick Maria 404S

Duc Thuan

Dong A-HN HDVAT 5%

Daico AION

Daico AION

Daico AION

Daico Vinh

Corus Jatianom

Corus Jatianom discount 370$ because of demurrage

Samick Nadja 412

Sumiyoshi Hyundai Confidence

Sumiyoshi Hyundai Confidence

Sumiyoshi Hyundai Confidence

Sumiyoshi Hyundai Confidence

Page 87: Hvc PlatePipe Update)

HVC-PUR 87 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Sumiyoshi Hyundai Confidence

Sumiyoshi Hyundai Confidence

Sumiyoshi Hyundai Confidence

Sumiyoshi Hyundai Confidence

Sumiyoshi Hyundai Confidence

Sumiyoshi Hyundai Confidence

Sumiyoshi Hyundai Confidence

Namvang

Namvang

Samick NAD JA 407

Samick NAD JA 407

Samick NAD JA 407

Corus Mekong Swift 417

Corus Mekong Swift 417

Corus Mekong Swift 417

Tin Dat HDVAT 31/3

Namvang HDVAT5% 12/3/4

Daico Xin Min Men

Namvang HDVAT5% 12/3/4

Daico Xin Min Men

Daico Xin Min Men

Daico Xin Min Men

Namvang HDVAT5% 26/3/4

Namvang HDVAT5% 12/3/4

Corus

Corus

Corus

Corus

Corus

Corus

Corus

Corus

Corus

Corus

Corus

Corus 553.354839

Corus

Corus

Corus

Corus

Corus

Corus

Corus

Corus

Corus

Corus

Corus

Page 88: Hvc PlatePipe Update)

HVC-PUR 88 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Corus

Daico Xin Min Men

Daico Xin Min Men

Daico Xin Min Men

Daico Xin Min Men

VINA PIPE HDVAT:9/3/04

Dong A-HP HD VAT 5%

Keystone AION

Keystone AION

Keystone AION

Duc Hau

Duc Thuan

Duc Thuan

Tin Dat HDVAT 19/4

Dong A-HN HDVAT:9/3/04

Dong A-HN HDVAT:9/3/04

Dong A-HN HDVAT:9/3/04

VINA PIPE

VINA PIPE

E-pipe Maria 405 Delivery charge $200

E-pipe Maria 405

E-pipe Maria 405

VINA PIPE

E-pipe Maria 405

E-pipe Maria 405

E-pipe Maria 405

Namvang HDVAT5% 26/3/4

Namvang HDVAT5% 26/3/4

Ptramesco

Namvang HDVAT5% received

Inox Saoviet

Midway

Midway

Vinastar

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Nam Dat

Dong A-HP Invoice OK

Thanh Tung

Samick Nadiza

Samick Nadiza

Keystone Heng De V-001

Page 89: Hvc PlatePipe Update)

HVC-PUR 89 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Keystone Heng De V-001

Hae Sung Heng De V-001

Hae Sung Heng De V-001

Hae Sung Heng De V-001

Hae Sung Heng De V-001

Hae Sung Heng De V-001

Hae Sung Heng De V-001

Samick Marina

Samick Vietfracht

Samick Vietfracht

Samick Vietfracht

Samick Vietfracht

Samick Vietfracht

PT.Gunung Acx Magnolia

PT.Gunung Acx Magnolia

PT.Gunung Acx Magnolia

PT.Gunung Acx Magnolia

PT.Gunung Acx Magnolia

PT.Gunung Acx Magnolia

PT.Gunung Acx Magnolia

PT.Gunung Acx Magnolia

Daico Dai Jiang

Daico Dai Jiang

Daico Dai Jiang

PT.Gunung ACX Hibiscus V.113N & Platinum Jade V.022N

PT.Gunung ACX Hibiscus V.113N & Platinum Jade V.022N

PT.Gunung ACX Hibiscus V.113N & Platinum Jade V.022N

PT.Gunung ACX Hibiscus V.113N & Platinum Jade V.022N

PT.Gunung ACX Hibiscus V.113N & Platinum Jade V.022N

PT.Gunung ACX Hibiscus V.113N & Platinum Jade V.022N

PT.Gunung ACX Hibiscus V.113N & Platinum Jade V.022N

PT.Gunung ACX Hibiscus V.113N & Platinum Jade V.022N

PT.Gunung ACX Hibiscus V.113N & Platinum Jade V.022N

PT.Gunung ACX Hibiscus V.113N & Platinum Jade V.022N

PT.Gunung ACX Hibiscus V.113N & Platinum Jade V.022N

PT.Gunung ACX Hibiscus V.113N & Platinum Jade V.022N

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Corus discount VND1,250,000

Corus

Page 90: Hvc PlatePipe Update)

HVC-PUR 90 STATUS

MV/Voy No Remarks To AcctSupplier

Name

PT.Gunung Marigold ETD Singapore Dec 18th

PT.Gunung Marigold ETD Singapore Dec 18th

PT.Gunung Marigold ETD Singapore Dec 18th

PT.Gunung Marigold ETD Singapore Dec 18th

PT.Gunung Marigold ETD Singapore Dec 18th

PT.Gunung Marigold ETD Singapore Dec 18th

PT.Gunung Marigold ETD Singapore Dec 18th

PT.Gunung Marigold ETD Singapore Dec 18th

PT.Gunung Marigold ETD Singapore Dec 18th

PT.Gunung Marigold ETD Singapore Dec 18th

Hae Sung Vietfracht

Hae Sung Vietfracht

Kranbau Deduct Contract Doan Xa Vicon ship

Kranbau Deduct Contract Doan Xa Vicon ship

Kranbau Deduct Contract Doan Xa Vicon ship

Kranbau Deduct Contract Doan Xa Vicon ship

Kranbau Deduct Contract Doan Xa Vicon ship

Kranbau Deduct Contract Doan Xa Vicon ship

Doosan Xin Min Men

Namvang HDVAT5% 12/3/4

Daico Bright 1

Samick NAD JA 406

Samick NAD JA 406

Samick NAD JA 406

Samick NAD JA 406

Samick NAD JA 406

Samick NAD JA 406

Samick NAD JA 406

Samick NAD JA 406

Samick NAD JA 406

Samick NAD JA 406

Samick NAD JA 406

Samick NAD JA 406

Samick NAD JA 406

Samick NAD JA 406

Namvang HDVAT5% 12/3/4

Tin Dat HDVAT 31/3

Tin Dat HDVAT 31/3

Namvang HDVAT5% 12/3/4

Daico Xin Min Men

Daico Xin Min Men

Namvang HDVAT5% 12/3/4

Daico Xin Min Men

Daico Xin Min Men

Daico Xin Min Men

Page 91: Hvc PlatePipe Update)

HVC-PUR 91 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Tin Dat HDVAT 31/3

Tin Dat HDVAT 31/3

Daico Xin Min Men

Daico Xin Min Men

Daico Xin Min Men

Daico Xin Min Men

Samick Soo Kwang

Samick Soo Kwang

Samick Soo Kwang

Samick Soo Kwang

Samick Soo Kwang

Samick Soo Kwang

Minh Hoa Inland Invoice OK transferred to Ms Oanh 8/1/2005

Myung Jin Vietfracht

Myung Jin Vietfracht

E-Pipe ZIYUN

E-Pipe ZIYUN

E-Pipe ZIYUN

E-Pipe ZIYUN

E-Pipe ZIYUN

E-Pipe ZIYUN

E-Pipe ZIYUN

E-Pipe ZIYUN

E-Pipe ZIYUN

E-Pipe ZIYUN

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

Page 92: Hvc PlatePipe Update)

HVC-PUR 92 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Daico Soo Kwang

Hae Sung Marina 415

Hae Sung Marina 415

Hae Sung Marina 415

PT.Gunung Marigold ETD Singapore Dec 18th

PT.Gunung Marigold ETD Singapore Dec 18th

Samick Marina

Samick Marina

Samick Marina

Samick Marina

Samick Marina

Samick Marina

Samick Marina

Samick Marina

Samick Marina

Samick Vietfracht

Samick Vietfracht

Samick Vietfracht

Samick Vietfracht

Minh Hoa

PT.Gunung Acx Magnolia

PT.Gunung Acx Magnolia

Namvang

Namvang

Namvang

Namvang

Samick Dai Jiang

Samick Dai Jiang

Samick Dai Jiang

Samick Nadja V-418

Samick Nadja V-418

Samick Nadja V-418

Samick Nadja V-418

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

Page 93: Hvc PlatePipe Update)

HVC-PUR 93 STATUS

MV/Voy No Remarks To AcctSupplier

Name

PT.Gunung

PT.Gunung

PT.Gunung

Samick Marina 409

Samick Marina 409

E-Pipe Marina 409

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Hye Wang Nadja V-419

Samick Dai Jiang

Samick Dai Jiang

Samick Nadja V-418

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

Hae Sung Marina 415

Page 94: Hvc PlatePipe Update)

HVC-PUR 94 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Hae Sung Marina 415

Tin Dat HDVAT 14/7

Dong A-HP HDVAT 3/7/04

Doosan Mecatec Bright 1

Doosan Mecatec Bright 1

Doosan Mecatec Nadja

Doosan Mecatec Bright 1

Doosan Mecatec Yong An

Doosan Mecatec Yong An

Doosan Mecatec Nadja

Doosan Mecatec Yong An

Doosan Mecatec Yong An

Doosan Mecatec Yong An

Sumiyoshi Lilium 167

Namvang HDVAT5% received

Namvang HDVAT5% received

Samick NAD JA 407

Samick NAD JA 407

Samick NAD JA 407

Samick NAD JA 407

Samick NAD JA 407

E-Pipe Nad Ja408

E-Pipe Nad Ja408

Sumiyoshi Me Linh

Sumiyoshi Me Linh

Sumiyoshi Me Linh

Sumiyoshi Me Linh

Sumiyoshi Me Linh

Sumiyoshi Me Linh

Sumiyoshi Me Linh

Samick Maria 404S

Samick Maria 404S

Samick Maria 404S

Samick Maria 404S

Samick Maria 404S

Samick Maria 404S

Samick Maria 404S

Samick Maria 404S

Samick Maria 404S

Samick Maria 404S

Samick Maria 404S

Samick Maria 404S

Hae Sung AION

Hae Sung AION

Page 95: Hvc PlatePipe Update)

HVC-PUR 95 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Daico Xin Min Men

Daico Xin Min Men

Daico Xin Min Men

Daico Xin Min Men

Keystone Bright 1

Daico Xin Min Men

Daico Xin Min Men

Daico Xin Min Men

Keystone Bright 1

Daico Xin Min Men

Daico Xin Min Men

Samick NAD JA 406

Samick NAD JA 406

Samick Maria 407

Samick NAD JA 406

Samick NAD JA 406

Namvang

Namvang

Namvang

Keystone Bao Yun Shan discount $45

Keystone Bao Yun Shan discount $45

Keystone Bao Yun Shan

Keystone Bao Yun Shan

Keystone Seiyo 9

Keystone Bao Yun Shan

Keystone Seiyo 9

Daico Bao Yun Shan

Kosteel Bao Yun Shan

Young Nam Bao Yun Shan

Young Nam Bao Yun Shan

Daico Seiyo 9

Daico Seiyo 9

Daico Seiyo 9

Dong A-HN HDVAT5% 30/6/04

Dong A-HN HDVAT5% 30/6/04

Samsun Seiyo 9

Samsun Seiyo 9

Samsun Seiyo 9

Samsun Seiyo 9 resupply

Samick Seiyo 9

Samick Seiyo 9

Samick Seiyo 9

Samick Seiyo 9

Keystone Vinh

Keystone Vinh

Keystone Vinh

Page 96: Hvc PlatePipe Update)

HVC-PUR 96 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Keystone Vinh

Keystone Vinh

Samsun Ducky Spendid

Samsun Ducky Spendid

Samsun Ducky Spendid

Samsun Ducky Spendid

Keystone AION

Keystone AION

Keystone AION

Keystone AION

Keystone AION

Keystone AION

Young Nam Yong An

Young Nam Yong An

Young Nam Yong An

ChyeHin Mekong Swift

ChyeHin Mekong Swift

ChyeHin Mekong Swift

PT.Gunung Rickmers Singapore

PT.Gunung Rickmers Singapore

PT.Gunung Rickmers Singapore

PT.Gunung Rickmers Singapore

PT.Gunung Rickmers Singapore

PT.Gunung Rickmers Singapore

Daico AION

Daico AION

Daico AION

Daico AION

Daico AION

Daico AION

Daico AION

Daico AION

Daico AION

Daico AION

Daico AION

Daico AION

Daico Marina

Daico Vietfracht

Hae Sung Vietfracht

Hae Sung Vietfracht

Samick Vietfracht

Samsun Ducky Spendid

Samsun Seiyo 9

Keystone Vinh

Keystone Vinh

Keystone Vinh

Page 97: Hvc PlatePipe Update)

HVC-PUR 97 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Keystone Vinh

Keystone Vinh

Hanchang Inlaco ASME B36.19

Young nam pearl island 027 $200-transport CNF

Young nam pearl island 027 $500-transpo will deduct U$ 8,802.0 for NCR PO03

Young nam Pearllsiand ASME B36.19 Received fr Bank April 02

Young nam Aksoy Truva 534 ASME B36.19

Young nam Aksoy Truva 534 ASME B36.19

Young nam Pearllsiand ASME B36.19 Received fr Bank April 02

Young nam Pearllsiand ASME B36.19 Received fr Bank April 02

Young nam Pearllsiand ASME B36.19 Received fr Bank April 02

Young nam Pearllsiand ASME B36.19 Received fr Bank April 02

Young nam Pearllsiand ASME B36.19 Received fr Bank April 02

Young nam Pearllsiand ASME B36.19 Received fr Bank April 02

Young nam pearl island 024 ASME B36.19mill sheet 14/4

Young nam pearl island 024 ASME B36.19 mill sheet 14/4

Young nam pearl island 024 ASME B36.19mill sheet 14/4

Young nam pearl island 024 ASME B36.19mill sheet 14/4

Young nam pearl island 024 ASME B36.19 mill sheet 14/4

Young nam pearl island 024 ASME B36.19mill sheet 14/4

Young nam pearl island 024 ASME B36.19mill sheet 14/4

Young nam Tosong V-0508 receipt original doc 4/4/05 Origin Mill Sheet OK

Young nam Tosong V-0508 receipt original doc 4/4/05 Origin Mill Sheet OK

Young nam Tosong V-0508 Origin Mill Sheet 11/4/5

Young nam Tosong V-0508 Origin Mill Sheet 11/4/5

Young nam Tosong V-0508 Origin Mill Sheet 11/4/5

Young nam Tosong V-0508 Origin Mill Sheet OK Origin Shipping docs 08/4

Young nam Tosong V-0508 Origin Mill Sheet OK Origin Shipping docs 08/4

Young nam Tosong V-0508 Origin Mill Sheet OK Origin Shipping docs 08/4

Young nam Tosong V-0508 Origin Mill Sheet OK Origin Shipping docs 08/4

Young nam Platinum jade V.03

Young nam Platinum jade V.03

Young nam Platinum jade V.03

Young nam Aksoy Truva V-0502

Young nam Aksoy Truva V-0502

Young nam Aksoy Truva V-0502

Young nam To Song V-0503

Young nam To Song V-0503

Young nam To Song V-0503

Young nam To Song V-0503

Corus Padma V.S153

Corus Padma V.S153

Corus Padma V.S152

Young nam Aksoy Truva

Young nam Aksoy Truva

Young nam Aksoy Truva

Corus Padma V.S149

Page 98: Hvc PlatePipe Update)

HVC-PUR 98 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Corus Padma V.S149

Corus Padma V.S149

Corus Padma V.S149

Corus Padma V.S149

Pusan Plastic Nad Ja V-0502W

Pusan Plastic Nad Ja V-0502W

Pusan Plastic Nad Ja V-0502W

Pusan Plastic Nad Ja V-0502W

Pusan Plastic Nad Ja V-0502W

Pusan Plastic Nad Ja V-0502W

Pusan Plastic Nad Ja V-0502W

Pusan Plastic Nad Ja V-0502W

Pusan Plastic Nad Ja V-0502W

Pusan Plastic Nad Ja V-0502W

Corus Padma S165 ASME B36.10

E-Pipe Nad Ja V510

Hanchang Bright V035

Hae Sung Bright V035

Minh Hoa Invoice OK

Minh Hoa ASME B36.10

Minh Hoa ASME B36.10

PT.Gunung Pan Star V0.39 ASME B36.19

Hanchang

Hanchang Itha Bhum

Hanchang Bright V035

Hanchang Heng De V-001 ASME B36.19deduct 700$ for import tax PO 02

Hanchang Heng De V-001 ASME B36.19

Hanchang Heng De V-001 ASME B36.19

Asia Steel Splendor Origin Mill sheet 13/4

Asia Steel Splendor Origin Mill sheet 13/4

Asia Steel Splendor Origin Mill sheet 13/4

Asia Steel Splendor Origin Mill sheet 13/4

Hanchang Heng De V-001 receive docs from bank on Mar 23

Asia Steel Heng De V-001 Arrival docs to Bank: 3/22/05 Hanvico's receipt:25/3

Hanchang Inlaco V-008

Hanchang Inlaco V-008

Hanchang Inlaco V-008

Hanchang Inlaco V-008

Hanchang Inlaco V-008

Hanchang ACX Cherry V179

Hanchang ACX Cherry V179

Young nam Aksoy Truva 534 ASME B36.19

Young nam Pearllsiand ASME B36.19 Received fr Bank April 02

Young nam Pearllsiand ASME B36.19 Received fr Bank April 02

Young nam Pearllsiand ASME B36.19 Received fr Bank April 02

Page 99: Hvc PlatePipe Update)

HVC-PUR 99 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Young nam Pearllsiand ASME B36.19 Received fr Bank April 02

Asia Steel Splendor Origin Mill sheet 13/4

Young nam Tosong V-0508 Origin Mill Sheet 11/4/5

Young nam Tosong V-0508 Origin Mill Sheet OK Origin Shipping docs 08/4

Young nam To Song V-0503

Young nam To Song V-0503

Corus Padma V.S152

Corus Padma V.S152

Corus Padma V.S149

Corus Padma V.S149

Corus Padma V.S149

Hanchang Inlaco V-008

Hanchang Inlaco V-008

Hanchang Heng De V-001 NCR (resupply 33pcx6m=198m) Resupply &no commercial

Young nam Aksoy Truva

Young nam Platium diamon

Young nam Platium diamon

Young nam Platium diamon

Young nam Platium diamon

Corus Padma V.S153

Corus Padma V.S153

Namvang

Namvang

No.190 Steel

Samick Seven seas Aurora

Samick Seven seas Aurora

Keystone Lever Star

Namvang

Namvang

Namvang

No.190 Steel

Namvang

Namvang

Namvang

Namvang

Namvang

Samick Marina

Samick Marina

Samick Marina

Samick Marina

Samick Marina

Samick Marina

PT.Gunung Reunion V.056 thieu Mill Sheet

PT.Gunung Reunion V.056

PT.Gunung Reunion V.056

PT.Gunung Reunion V.056

Page 100: Hvc PlatePipe Update)

HVC-PUR 100 STATUS

MV/Voy No Remarks To AcctSupplier

Name

PT.Gunung Reunion V.056

PT.Gunung Reunion V.056

PT.Gunung Reunion V.056

PT.Gunung Reunion V.056

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

Samick Nad Ja V510

Samick Nad Ja V510

Samick Nad Ja V510

Samick Nad Ja V510

Samick Nad Ja V510

Samick Nad Ja V510

Samick Nad Ja V510

Samick Nad Ja V510

Samick Nad Ja V510

Corus Heleconta

Corus Heleconta

Corus Heleconta

Corus Heleconta

Samick Itha Bhum

Samick Itha Bhum

Samick Itha Bhum

Samick Itha Bhum

Samick Itha Bhum

Samick Itha Bhum

Daico Splendor

Daico Splendor

Daico Splendor

Daico Splendor

Daico Splendor

Samick Nadiza

Samick Nadiza

Samick Nadiza

Samick Nadiza

Samick Nadiza

Samick Nadiza

Samick Nadiza

Samick Nadiza

Samick Nadiza

No.190 Steel

No.190 Steel

Page 101: Hvc PlatePipe Update)

HVC-PUR 101 STATUS

MV/Voy No Remarks To AcctSupplier

Name

No.190 Steel

Keystone Lever Star

Keystone Lever Star

Keystone Lever Star

Keystone Lever Star

Hae Sung Genius Mariner

Hae Sung Genius Mariner

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung Reunion V.056

Samick Itha Bhum

Samick Itha Bhum

Samick Nadiza

Samick Nadiza

Daico Splendor

Daico Splendor

Daico Splendor

Daico Splendor

Daico Splendor

Hae Sung Qi Hang

Duc Thuan

Hanchang Wan Hai 202 ASME B36.10Mil Sheet 5/9

Hae Sung Inlaco MS: 15/8

Hae Sung Inlaco

Hae Sung Inlaco MS: 15/8

Hanchang Inlaco ASME B36.10

Hanchang Inlaco ASME B36.10

Hanchang Inlaco ASME B36.10

Hanchang Hunsa Bhum V.S10 ASME B36.19BE

Hanchang Inlaco

Hanchang Inlaco BE

Hanchang Bright V037 ASME B36.10

Hanchang Bright V037 ASME B36.10BE

Hanchang Acx Cherry 185 ASME B36.10

Hanchang Acx Cherry 185 ASME B36.10

Hanchang Acx Cherry 185 ASME B36.10

Hanchang Acx Cherry 185 ASME B36.10

Hanchang Bright V037 ASME B36.10

Hanchang Bright V037 ASME B36.10BE

Hanchang Bright V037 ASME B36.10BE

Hanchang Bright V037 ASME B36.10BE

Hanchang Bright V037 ASME B36.10BE

Duc Thuan

Minh Hoa

PT.Gunung Melinh V.013

Page 102: Hvc PlatePipe Update)

HVC-PUR 102 STATUS

MV/Voy No Remarks To AcctSupplier

Name

PT.Gunung Melinh V.013

PT.Gunung Melinh V.013

PT.Gunung Melinh V.013

PT.Gunung Melinh V.013

PT.Gunung Melinh V.013

PT.Gunung Melinh V.013

PT.Gunung Melinh V.013

Hanchang Padma 167 ASME B36.19BE

Hanchang Padma 167 ASME B36.19BE

Hanchang Padma 167 ASME B36.19BE

Hanchang Padma 167 ASME B36.19BE

Hanchang Padma 167 ASME B36.19BE

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

PT.Gunung Binh Minh

Namvang

Namvang

Namvang

Samick Marina

PT.Gunung Sinar Batam

PT.Gunung Sinar Batam

PT.Gunung Sinar Batam

PT.Gunung Sinar Batam

PT.Gunung Sinar Batam

PT.Gunung Sinar Batam

PT.Gunung Sinar Batam

PT.Gunung Sinar Batam

Hanchang Bright V035 ASME B36.10BE

Hanchang Bright V035 ASME B36.19BE

Minh Hoa Invoice OK

Namvang

Keystone Heung-A Bangkok 5 Mill Sheet OK

Page 103: Hvc PlatePipe Update)

HVC-PUR 103 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Duc Thuan

Duc Thuan

Thanh Tung invoice

Thanh Tung invoice

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Keystone

Keystone

PT.Gunung Hoang Phat 63

Daico

Daico

Hae Sung H-A Hong Kong V.536 Mill Sheet du, thieu invoice

Hanchang Bright V037 ASME B36.10

Hanchang Bright V037 ASME B36.10

Hanchang Bright V037 ASME B36.10

Hanchang Bright V037 ASME B36.10BE

Hanchang Bright V037 ASME B36.10BE

PT.Gunung Sinar Batam

PT.Gunung Sinar Batam

PT.Gunung Sinar Batam

PT.Gunung Sinar Batam

Namvang

Namvang

Namvang

Hae Sung Jitra Bhum 85

Hae Sung Jitra Bhum 85

Hae Sung Jitra Bhum 85

Hae Sung Jitra Bhum 85

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hanchang Genius Mariner ASME B36.19

Hanchang Genius Mariner ASME B36.19

Hanchang Genius Mariner ASME B36.19

Hanchang Genius Mariner ASME B36.19

Hanchang Genius Mariner ASME B36.19

Hanchang Genius Mariner ASME B36.19

Hanchang Genius Mariner ASME B36.19

Hanchang Genius Mariner ASME B36.19

Hanchang Genius Mariner ASME B36.19

Hanchang Genius Mariner ASME B36.19

Page 104: Hvc PlatePipe Update)

HVC-PUR 104 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Hanchang Genius Mariner ASME B36.19

Hanchang Genius Mariner

JungJin Metal Draco

JungJin Metal Sea Dragon

Hanchang Sea Dragon

Jungjin metal Heung-A Bangkok 609

Jungjin metal Heung-A Bangkok 609

Jungjin metal Heung-A Bangkok 609

Jungjin metal Heung-A Bangkok 609

Jungjin metal Heung-A Bangkok 609

PT.Gunung

PT.Gunung

PT.Gunung

Duc Thuan

Namvang

Namvang

Namvang

Duc Thuan

Duc Thuan

Hanchang Vietfracht 1

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

Samick Lever Star

Samick Lever Star

Samick Lever Star

Samick Lever Star

Samick Lever Star

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Page 105: Hvc PlatePipe Update)

HVC-PUR 105 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Hae Sung Genius Mariner

Keystone Genius Mariner

Keystone Genius Mariner

Keystone Genius Mariner

Keystone Genius Mariner

Keystone Genius Mariner

Keystone Genius Mariner

Hanchang Genius Mariner

Hanchang Genius Mariner

Hanchang Genius Mariner

Hanchang Genius Mariner

Hanchang Genius Mariner

Hanchang Andhika Tarunaga

Hanchang H-A HongKong resuply NCR

Hanchang Andhika Tarunaga

Hae Sung Andhika Tarunaga Mill Sheet: OK

Hae Sung Andhika Tarunaga Mill Sheet: OK

Hae Sung Andhika Tarunaga Mill Sheet: OK

Hae Sung Andhika Tarunaga Mill Sheet: OK

Hae Sung Andhika Tarunaga Mill Sheet: OK

Hae Sung Andhika Tarunaga Mill Sheet: OK

Hae Sung Andhika Tarunaga Mill Sheet: OK

Hae Sung Andhika Tarunaga Mill Sheet: OK

Hae Sung Andhika Tarunaga Mill Sheet: OK

Hae Sung Andhika Tarunaga Mill Sheet: OK

Hae Sung Andhika Tarunaga Mill Sheet: OK

Hae Sung Andhika Tarunaga Mill Sheet: OK

PT.Gunung Reunion V.076 & Muara Mas V.473

Hanchang Inlaco ASME B36.10BE

Hanchang Inlaco ASME B36.10BE

Hanchang Inlaco ASME B36.10BE

Page 106: Hvc PlatePipe Update)

HVC-PUR 106 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Hanchang Inlaco ASME B36.10BE

Hanchang Inlaco ASME B36.10BE

Hanchang Inlaco ASME B36.10BE

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

Samick Nadja

Samick Nadja

Samick Nadja

Samick Nadja

Samick Nadja

Samick Nadja BE

Samick Nadja BE

Hae Sung H-A Hong Kong V.536 Mill Sheet du, thieu invoice

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Nam Dat

Hanchang Heng De

Hanchang Heng De

Hanchang Heng De

Hanchang Heng De

Hanchang Heng De

Hanchang Heng De

Hanchang Heng De

PT.Gunung MS:6/9

PT.Gunung MS:6/9

Page 107: Hvc PlatePipe Update)

HVC-PUR 107 STATUS

MV/Voy No Remarks To AcctSupplier

Name

PT.Gunung MS:6/9

PT.Gunung MS:6/9

PT.Gunung Cec Mayflower

PT.Gunung Cec Mayflower

PT.Gunung Cec Mayflower

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

Daico Genius Mariner

Daico Genius Mariner

Daico Genius Mariner

No.190 Steel

Namvang

Namvang

Namvang

Namvang

Namvang

Namvang

Namvang inv.13/02 15-Feb

Namvang inv.13/02 15-Feb

Namvang inv.13/02 15-Feb

Namvang inv.13/02 15-Feb

Namvang inv.13/02 15-Feb

Namvang inv.13/03

Keystone GS Luna V.006 28-Dec

Keystone GS Luna V.006 28-Dec

Keystone GS Luna V.006 28-Dec

Keystone GS Luna V.006 28-Dec

Keystone Andhika Tarunaga deduct U$113 for unloading charge

Keystone Andhika Tarunaga

Keystone Andhika Tarunaga

Keystone Andhika Tarunaga

Keystone Andhika Tarunaga

Keystone Andhika Tarunaga

Keystone Andhika Tarunaga

Keystone Andhika Tarunaga

Keystone Andhika Tarunaga

No.190 Steel

No.190 Steel

Hanchang Vietfracht 1

Samick Seven seas Aurora

Page 108: Hvc PlatePipe Update)

HVC-PUR 108 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Samick Seven seas Aurora

Samick Seven seas Aurora

Samick Seven seas Aurora

Samick Seven seas Aurora

Samick Seven seas Aurora

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

PT.Gunung Hoang Phat 63

Daico Heung A Singapore

Minh Hoa VAT 0080749

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Zhong Jin from Chin ASME B36.19

Hanchang Zhong Jin from Chin ASME B36.19

Hanchang Inlaco ASME B36.10

Hanchang Inlaco ASME B36.19

Hanchang Inlaco

Hanchang Inlaco ASME B36.19

Hanchang Inlaco ASME B36.19

Hanchang Inlaco ASME B36.19

Hanchang Inlaco ASME B36.19

JFE Shoji Tanjung Priok V.237

JFE Shoji Tanjung Priok V.237

JFE Shoji Tanjung Priok V.237

JFE Shoji Tanjung Priok V.237

JFE Shoji Tanjung Priok V.237

JFE Shoji Tanjung Priok V.237

JFE Shoji Tanjung Priok V.237

JFE Shoji Tanjung Priok V.237

Hanchang Vietfracht 1

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Page 109: Hvc PlatePipe Update)

HVC-PUR 109 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

Hanchang Wan Hai 202 Mil Sheet 5/9

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

PT.Gunung Acx Raflesia V.110N & Platinum Jade 019N Mill Sheet OK

No.190 Steel

No.190 Steel

Corus

Corus

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

PT.Gunung ACX Hibiscus V.113N

PT.Gunung ACX Hibiscus V.113N

Page 110: Hvc PlatePipe Update)

HVC-PUR 110 STATUS

MV/Voy No Remarks To AcctSupplier

Name

PT.Gunung ACX Hibiscus V.113N

PT.Gunung ACX Hibiscus V.113N

PT.Gunung ACX Hibiscus V.113N

PT.Gunung ACX Hibiscus V.113N

PT.Gunung ACX Hibiscus V.113N

PT.Gunung ACX Hibiscus V.113N

PT.Gunung ACX Hibiscus V.113N

PT.Gunung ACX Hibiscus V.113N

PT.Gunung ACX Hibiscus V.113N

PT.Gunung ACX Hibiscus V.113N

PT.Gunung ACX Hibiscus V.113N

PT.Gunung ACX Hibiscus V.113

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Hanchang H-A HongKong original doc OK

Keystone Heung-A Bangkok 5 Mill Sheet OK

Corus

Corus

Hanchang Vietfracht 1

Daico Green Spring

Hanchang Vietfracht 1

Hanchang Vietfracht 1

Hanchang Vietfracht 1

Nam Dat invoice 10/11/5

Samick New Ace

Hae Sung Andhika tarunaga

Hanchang Bright Emerald 17-Feb

Hae sung Bright Emerald 3-Mar

Hae sung Bright Emerald 3-Mar

Hae sung Bright Emerald 3-Mar

Hae sung Bright Emerald 3-Mar

Hae sung Bright Emerald 3-Mar

Hae sung Bright Emerald 3-Mar

Hae sung Bright Emerald 3-Mar

Hae sung Bright Emerald 3-Mar

Hae sung

Hanchang

Hanchang

PT.Gunung

PT.Gunung

Page 111: Hvc PlatePipe Update)

HVC-PUR 111 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Dong A-HN

Dong A-HN

Yeong Shin Andhika Tarunaga

Yeong Shin Andhika Tarunaga

Yeong Shin Sea Dragon

Yeong Shin Andhika Tarunaga

Yeong Shin Sea Dragon

Namvang

Hae Sung Mill Sheet on 4/5 QA

Hae Sung Mill Sheet on 4/5 QA

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Jungjin metal

Jungjin metal

Jungjin metal

Jungjin metal

Jungjin metal

Jungjin metal

Jungjin metal

Jungjin metal

Jungjin metal

Jungjin metal

Jungjin metal

Hanchang

Hanchang

Hanchang

Hanchang

Hanchang

Hanchang

Hanchang

Page 112: Hvc PlatePipe Update)

HVC-PUR 112 STATUS

MV/Voy No Remarks To AcctSupplier

Name

No.190 Steel

Hanchang New Ace

Hanchang New Ace

Hanchang New Ace

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

Namvang

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

No.190 Steel

Hae sung Bright Emerald

Hae sung Bright Emerald

Hae sung Bright Emerald

Hae sung Bright Emerald

Hae sung Bright Emerald

Hae sung Bright Emerald

Hae sung Bright Emerald

Hanchang Heung-A Hongkong 0605W

Hanchang Heung-A Hongkong 0605W

Hanchang Heung-A Hongkong 0605W

No.190 Steel inv 16/02

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Hanchang

Hanchang

Hanchang

Hanchang

Hanchang

Jungjin metal Athena

Jungjin metal Athena

No.190 Steel

No.190 Steel

Page 113: Hvc PlatePipe Update)

HVC-PUR 113 STATUS

MV/Voy No Remarks To AcctSupplier

Name

No.190 Steel

Namvang

Namvang

Namvang

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Daico

Daico 13-16/02/06

Hanchang Bright Emerald 17-Feb

Hanchang Bright Emerald 17-Feb

Hanchang Bright Emerald 17-Feb

Hanchang Bright Emerald 17-Feb

Hanchang Bright Emerald 17-Feb

Hanchang Bright Emerald 17-Feb

Hanchang Bright Emerald 17-Feb

Daico

Daico

Daico

Daico

Daico

Daico 13-16/02/06

Daico

Daico

Daico 13-16/02/06

Daico

Daico

Daico

Daico

Daico

Daico

Daico

Daico

Daico

Daico

Hanchang Andhika Tarunaga

Hae sung Bright Emerald

Hae sung Bright Emerald

Hae sung Bright Emerald

Hae sung Bright Emerald

Hae sung Bright Emerald

Hae sung Bright Emerald

Daico

Daico

Daico

Hae Sung Bright Emerald

Page 114: Hvc PlatePipe Update)

HVC-PUR 114 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Hae Sung Bright Emerald

Hae Sung Bright Emerald

Hae Sung Bright Emerald

Daico

Daico

Daico

Daico

Hanchang Heung-A Hongkong 615W

Hanchang Heung-A Bangkok 619

Mr Hai buy

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Heung-A Bankok 62 NCR deducted amount: U$1.596

Hanchang Heung-A Hongkong 622

Hanchang Heung-A Bankok 621

Hanchang Heung-A Bankok 615W

Hanchang Xin Fu Zhou 0045W

Hanchang Xin Fu Zhou 0045W

Hanchang Heung-A Hongkong 614

Hanchang Heung-A Hongkong 614

Hanchang Heung-A Hongkong 614

Hanchang New Ace

Hanchang Heung-A Hongkong 610

Hanchang Seaboxer S020 & Kota Mulia

Hanchang Seaboxer S020 & Kota Mulia

Hanchang Seaboxer S020 & Kota Mulia

Hanchang Seaboxer S020 & Kota Mulia

Hanchang Seaboxer S020 & Kota Mulia

Hanchang Wan hai 306 W051

Hanchang New Ace

Hanchang Heung-A Hongkong 610

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Hanjin Rome 001

Hanchang Hanjin London 001

Hanchang Hanjin London 001

Hanchang Hanjin Rome 001

Hanchang Heung-A Hongkong 614

Hanchang Heung-A Hongkong 614

Hanchang Tianren V.0638

Hanchang Tianren V.0638

Hanchang Tianren V.0638

Hanchang Andhika Tarunaga

Page 115: Hvc PlatePipe Update)

HVC-PUR 115 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga 3pc

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Minh Hoa

Nam Dat

Hae Sung Bright Emerald

Hae Sung Bright Emerald

Hae Sung Bright Emerald

Sammi Lamphun Navee V-LN38W

Sammi Lamphun Navee V-LN38W

Sammi Lamphun Navee V-LN38W

Sammi Lamphun Navee V-LN38W

Sammi Lamphun Navee V-LN38W

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

Ssangyong MS Pioneer

No.190 Steel

Hae Sung Rich Ocean

Dong A-HP

Hanchang Heung-A Hongkong 615W

Hanchang Heung-A Hongkong 617S

Wecan Steel Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

No.190 Steel

No.190 Steel

Wecan Steel Qi Hang

Wecan Steel Qi Hang

Wecan Steel Qi Hang

Wecan Steel Qi Hang

Page 116: Hvc PlatePipe Update)

HVC-PUR 116 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Wecan Steel Qi Hang

Wecan Steel Qi Hang

Wecan Steel Qi Hang

Wecan Steel Qi Hang

Hanchang New Ace

Hanchang New Ace

Hanchang Andhika Tarunaga

Hanchang New Ace

Hanchang Andhika Tarunaga

Hanchang Heung-A Hongkong 614

Hanchang Heung-A Hongkong 614

Hanchang New Ace

Vinastar

Vinastar

Vinastar

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Corus Marvel 009-1

Corus Marvel 009-1

Corus Marvel 009-1

Corus Marvel 009-1

No.190 Steel

No.190 Steel

No.190 Steel

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Page 117: Hvc PlatePipe Update)

HVC-PUR 117 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Corus Hanjani

Corus Hanjani

Midway

Midway

Midway

Midway

No.190 Steel

No.190 Steel

No.190 Steel

Hanchang New Ace

Hanchang New Ace

Jungjin metal Athena

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Duc Thuan

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Daico ESPERANZA

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

Hae Sung Heung-A Hongkong Deduct 750+250NCR

Hae Sung Heung-A Hongkong

Hae Sung Sea Dragon

Hae Sung Sea Dragon

Melindeco

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

Page 118: Hvc PlatePipe Update)

HVC-PUR 118 STATUS

MV/Voy No Remarks To AcctSupplier

Name

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

JungJin Metal Draco

Hae Sung Sea Dragon

Hae Sung Sea Dragon

Hae Sung Sea Dragon

Hae Sung Sea Dragon

Hae Sung Sea Dragon

Hae Sung Sea Dragon

Thanh Tung

Namvang

Namvang

No.190 Steel

No.190 Steel

Wecan Steel Sea Dragon

Wecan Steel Sea Dragon

Wecan Steel Sea Dragon

Wecan Steel Sea Dragon

Wecan Steel Sea Dragon

Wecan Steel Sea Dragon

Wecan Steel Sea Dragon

Hanchang Heung-A Bangkok 617W

Hanchang Heung-A Hongkong 615W

Hae Sung Qi Hang

Wecan Steel Qi Hang

Wecan Steel Qi Hang

Wecan Steel Qi Hang

Wecan Steel Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Hae Sung New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Page 119: Hvc PlatePipe Update)

HVC-PUR 119 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

No.190 Steel

Vinastar

Vinastar

Vinastar

Hae Sung

Hae Sung

Hanchang Rich Ocean

Hanchang Heung-A Hongkong 615W

Hanchang Heung-A Hongkong 615W

Hanchang Heung-A Hongkong 615W

Hanchang Heung-A Hongkong 615W

Hanchang Heung-A Hongkong 615W

Hanchang Heung-A Bangkok 617W

Hanchang Heung-A Hongkong 617S

Hanchang Heung-A Hongkong 617S

Hanchang Heung-A Hongkong 617S

Minh Hoa

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Namvang

Namvang

Namvang

Namvang

Namvang

Namvang

No.190 Steel

No.190 Steel

Midway

Midway

Midway

Midway

Midway

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Page 120: Hvc PlatePipe Update)

HVC-PUR 120 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hae Sung Qi Hang

Hanchang Heung-A Hongkong 614

Hanchang New Ace

Hanchang Heung-A Hongkong 614

Hanchang Heung-A Hongkong 614

Hanchang New Ace

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang New Ace 17-Feb

Hanchang Heung-A Hongkong 614 3-Mar

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga 3-Mar

Hanchang Andhika Tarunaga 3-Mar

Corus Marvel 008-1

Namvang

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Page 121: Hvc PlatePipe Update)

HVC-PUR 121 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Heleconia

Corus Heleconia

Corus Heleconia

Corus Heleconia

Corus Heleconia

Corus Heleconia

Hanchang Heung-A Bankok 624

Midway

Hae Sung Sea Dragon

Minh Hoa

Namvang Mr Hai pay

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Wecan Steel Rich Ocean

Wecan Steel Rich Ocean

Wecan Steel Rich Ocean

Wecan Steel Sea Dragon

Hae Sung Rich Ocean

Hae Sung Rich Ocean

Hanchang Heung-A Hongkong 617S

Hanchang Heung-A Bangkok 617W

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Hae Sung Tian shun

Page 122: Hvc PlatePipe Update)

HVC-PUR 122 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Wecan Steel Tian shun

Wecan Steel Tian shun

Wecan Steel Tian shun

Wecan Steel Tian shun

Wecan Steel Tian shun

Hanchang Heung-A Hongkong 614

Hanchang Heung-A Hongkong 614

Hanchang New Ace

Hanchang Andhika Tarunaga

Hanchang Andhika Tarunaga

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Wecan Steel New Ace

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Corus Hanjani

Igawara SAFMARINE ANTWERP

Corus Yantain

Hanchang Heung-A Hongkong 617S

Hanchang Heung-A Hongkong 617S

Igawara Safmarine Hymalaya

Igawara Safmarine Hymalaya

Igawara Safmarine Hymalaya

Igawara Safmarine Hymalaya

Igawara Safmarine Hymalaya

Igawara Safmarine Hymalaya

Igawara Safmarine Hymalaya

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

Page 123: Hvc PlatePipe Update)

HVC-PUR 123 STATUS

MV/Voy No Remarks To AcctSupplier

Name

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

Igawara Providence V138N

Igawara Providence V138N

Igawara Providence V138N

Igawara Providence V138N

Igawara Providence V138N

Igawara Providence V138N

Igawara Providence V138N

No.190 Steel

Igawara SAFMARINE ANTWERP

Hanchang Heung-A Hongkong 617S

Igawara Safmarine Hymalaya

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

PT.Gunung Hung Thinh 36

Namvang

Igawara Providence V138N

Igawara Providence V138N

Igawara Providence V138N

Page 124: Hvc PlatePipe Update)

HVC-PUR 124 STATUS

MV/Voy No Remarks To AcctSupplier

Name

No.190 Steel

No.190 Steel

Hae Sung Qi Hang

Hae Sung Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Hanchang Qi Hang

Sammi Gemartrans Pioneer 68

Sammi Gemartrans Pioneer 68

Sammi Gemartrans Pioneer 68

Sammi Gemartrans Pioneer 68

Sammi Gemartrans Pioneer 68

Sammi Gemartrans Pioneer 68

Ssangyong VINASHIN RUBY

Dae Yeun Hoheweg 719

Dae Yeun Hoheweg 719

Hanchang JS Leader resupply

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Wecan Steel JS Leader

Wecan Steel

Hanchang ESPERANZA

Midway

Wecan Steel Heung-A Hongkong 703

Wecan Steel Heung-A Hongkong 703

Hanchang Hanjin Washinton

Midway

Hanchang Heung-A Hong kong 702

Hanchang Heung-A Hong kong 702

Hanchang Heung-A Hong kong 702

Hanchang Heung-A Hong kong 702

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

Page 125: Hvc PlatePipe Update)

HVC-PUR 125 STATUS

MV/Voy No Remarks To AcctSupplier

Name

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

PT.Gunung Phu An 46

Corus Sheng Hui V-635

Midway

Midway

Midway

Midway

Midway

Corus Yo Kwang

Corus Yo Kwang

Corus Yo Kwang

Corus Yo Kwang

Corus Yo Kwang

Corus Yo Kwang

Corus Yo Kwang

Corus Yo Kwang

Corus Yo Kwang

Corus Yo Kwang

Corus Hua Rui V0631

Corus Hua Rui

Hanchang Draco

Page 126: Hvc PlatePipe Update)

HVC-PUR 126 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Heung-A Bankok 622

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Sea Dragon ASME B36.10

Corus Hua Rui

Corus Hua Rui

Corus Hua Rui

Corus Hua Rui

Corus Hua Rui

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Wecan Steel Sea Dragon

Wecan Steel Sea Dragon

Wecan Steel Sea Dragon

Wecan Steel Sea Dragon

Hanchang Heung-A Hongkong 617S

Hanchang Heung-A Hongkong 617S

No.190 Steel

No.190 Steel

No.190 Steel

Namvang

Namvang

Namvang

Vina Pipe

Vina Pipe

Dae Yeun EL LOBO 708

Dae Yeun EL LOBO 708

JFE Shoji Yuso No.10

JFE Shoji Yuso No.10

JFE Shoji Yuso No.10

JFE Shoji Yuso No.10

JFE Shoji Yuso No.10

JFE Shoji Yuso No.10

JFE Shoji Yuso No.10

Page 127: Hvc PlatePipe Update)

HVC-PUR 127 STATUS

MV/Voy No Remarks To AcctSupplier

Name

JFE Shoji Yuso No.10

JFE Shoji Yuso No.10

Ssangyong Blue Ribbon

Daico ALAS

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

190 Steel Pipe

190 Steel Pipe

DaiCo Maritime Ace

Hanchang Maritime Ace

Hanchang Maritime Ace

Hanchang Maritime Ace

Hanchang Maritime Ace

Hanchang Maritime Ace

Ssangyong EL LOBO 705S

Ssangyong Blue Ribbon

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S #VALUE!

Dae Yeun Hoheweg 708S

Hanchang JS Leader

Hanchang JS Leader

Hanchang JS Leader

Hanchang JS Leader (- U$3,154 NCR)

Hae Sung ESPERANZA

Hae Sung ESPERANZA

Wecan Steel

Wecan Steel

Wecan Steel

Wecan Steel

Hanchang JS Leader

Hanchang JS Leader

Hanchang JS Leader

Hanchang JS Leader

Hanchang JS Leader

Hanchang JS Leader

Hanchang JS Leader

Hanchang JS Leader

Wecan Steel H-A Hongkong 706

Hanchang JS Leader

Page 128: Hvc PlatePipe Update)

HVC-PUR 128 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Hanchang JS Leader

Wecan Steel Heung-A Hongkong 703

Wecan Steel Heung-A Hongkong 703

Wecan Steel Heung-A Hongkong 704

Wecan Steel Heung-A Hongkong 704

Wecan Steel Heung-A Hongkong 704

Wecan Steel Heung-A Hongkong 704

Wecan Steel Heung-A Hongkong 703

Wecan Steel Heung-A Hongkong 703

Wecan Steel Heung-A Bangkok 703

Wecan Steel Heung-A Bangkok 703

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

DaiCo Pacific Eagle

Daico Pacific Eagle

Daico Pacific Eagle

Daico Pacific Eagle

Daico Pacific Eagle

Daico Pacific Eagle

No.190 Steel

No.190 Steel

VietHan JSC

VietHan JSC

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Hanchang Rich Ocean

Samick Rich Ocean

Samick Rich Ocean

Samick Rich Ocean

Samick Rich Ocean

Samick Tian shun

Samick Tian shun

Samick Tian shun

Samick Tian shun

Page 129: Hvc PlatePipe Update)

HVC-PUR 129 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Samick Tian shun

Samick Tian shun

Samick Tian shun

Corus Hua Rui V-HR0619

Corus Hua Rui V-HR0619

Corus Hua Rui V-HR0619

Corus Hua Rui V-HR0619

Corus Hua Rui V-HR0619

Corus Padma

Corus Padma

Corus Padma

Wecan Steel Qi Hang

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Samick Wanhai 212

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Wecan Steel Hanjani

Dong kuk Hanjani

Page 130: Hvc PlatePipe Update)

HVC-PUR 130 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

Dong kuk Hanjani

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

Page 131: Hvc PlatePipe Update)

HVC-PUR 131 STATUS

MV/Voy No Remarks To AcctSupplier

Name

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

Page 132: Hvc PlatePipe Update)

HVC-PUR 132 STATUS

MV/Voy No Remarks To AcctSupplier

Name

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

PT.Gunung

Hanchang Heung-A Bangkok 619

Hanchang Heung-A Bangkok 619

Hanchang Heung-A Bangkok 619

Hanchang Heung-A Bangkok 619

Hanchang Heung-A Bangkok 619

Daico Wan Hai 211

Daico Wan Hai 211

Daico Wan Hai 211

Daico Wan Hai 211

Daico Ocean Pioneer

Daico Ocean Pioneer

Daico Wan Hai 211

Daico Ocean Pioneer

Daico Wan Hai 211

ThyssenKrupp

ThyssenKrupp

ThyssenKrupp

Hanchang Wan Hai 211

Page 133: Hvc PlatePipe Update)

HVC-PUR 133 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Hanchang Wan Hai 211

Hanchang Wan Hai 211

Hanchang Wan Hai 211

Hanchang Wan Hai 211

Hanchang Wan Hai 211

Hanchang Wan Hai 211

Hanchang Wan Hai 211

Hanchang Wan Hai 211

Hanchang Wan Hai 211

Sumiyoshi

Sumiyoshi

Sumiyoshi

Sumiyoshi

Sumiyoshi

Sumiyoshi

Dong Yeun EL LOBO 709

Dong Yeun EL LOBO 709

Dong Yeun EL LOBO 709

Dong Yeun EL LOBO 709

Dong Yeun EL LOBO 709

Dong Yeun EL LOBO 709

Dong Yeun EL LOBO 709

Dong Yeun EL LOBO 709

Dong Yeun EL LOBO 709

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

Wecan Steel JS Leader

Wecan Steel ESPERANZA

Wecan Steel ESPERANZA

Wecan Steel ESPERANZA

Wecan Steel ESPERANZA

Wecan Steel ESPERANZA

Wecan Steel ESPERANZA

Wecan Steel ESPERANZA

Wecan Steel ESPERANZA

Wecan Steel ESPERANZA

Wecan Steel ESPERANZA

Ssangyong ESPERANZA

Ssangyong ESPERANZA

Ssangyong ESPERANZA

Ssangyong ESPERANZA

Ssangyong ESPERANZA

Ssangyong ESPERANZA

Ssangyong ESPERANZA

Ssangyong ESPERANZA

Wecan Steel Sea Dragon

Hanchang Heung-A Bangkok 619

Hanchang Heung-A Bangkok 619

Hanchang Heung-A Bangkok 619

Hanchang Heung-A Bangkok 619

Deja Bhum V.014N

Deja Bhum V.014N

Deja Bhum V.014N

Deja Bhum V.014N

Deja Bhum V.014N

Deja Bhum V.014N

Page 134: Hvc PlatePipe Update)

HVC-PUR 134 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Hanchang Heung-A Bangkok 619

Hanchang Heung-A Bangkok 619

Namvang

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang JS Leader

Hanchang JS Leader

Hanchang JS Leader

JungJin Metal JS Leader

JungJin Metal JS Leader

JungJin Metal JS Leader

JungJin Metal JS Leader

JungJin Metal JS Leader

JungJin Metal JS Leader

JungJin Metal JS Leader

JungJin Metal JS Leader

JungJin Metal JS Leader

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

Wecan Steel Heung-A Hongkong 703

No.190 Steel

No.190 Steel

No.190 Steel

Igawara Maerk sana 0611

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Hanchang Draco

Daeyang P & T AMRTA VII

Hanchang Resolution 701

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

Page 135: Hvc PlatePipe Update)

HVC-PUR 135 STATUS

MV/Voy No Remarks To AcctSupplier

Name

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

JungJin Metal Pacific Eagle

No.190 Steel

No.190 Steel

Igawara Hyundai Liberty

Igawara Hyundai Singapore

Hanchang Heung-A Hongkong 624

Hanchang Heung-A Hongkong 624

Hanchang Heung-A Hongkong 624

Hanchang Heung-A Hongkong 624

Hanchang Heung-A Hongkong 624

Hanchang Heung-A Hongkong 624

Hanchang Heung-A Hongkong 624

Daico ESPERANZA

Daico ESPERANZA

Daico ESPERANZA

Daico ESPERANZA

Daico HA Bangkok 709

Wecan Steel Heung-A Hongkong 707

Wecan Steel Heung-A Hongkong 707

Wecan Steel Heung-A Hongkong 707

Wecan Steel Heung-A Hongkong 707

Wecan Steel Heung-A Hongkong 707

Wecan Steel Heung-A Hongkong 707

Wecan Steel Heung-A Hongkong 707

Wecan Steel Heung-A Hongkong 707

PT.Gunung Acx cherry V.013N

PT.Gunung Acx cherry V.013N

PT.Gunung Acx cherry V.013N

PT.Gunung Acx cherry V.013N

PT.Gunung Acx cherry V.013N

PT.Gunung Acx cherry V.013N

PT.Gunung Acx cherry V.013N

PT.Gunung Acx cherry V.013N

PT.Gunung Acx cherry V.013N

PT.Gunung Acx cherry V.013N

PT.Gunung Acx cherry V.013N

Igawara Nedlloyd tasman

Igawara Nedlloyd tasman

Dong A-HP

Melindeco

Melindeco

No.190 Steel

Melindeco

Melindeco

Melindeco

Inox Saoviet

Inox Saoviet

Page 136: Hvc PlatePipe Update)

HVC-PUR 136 STATUS

MV/Voy No Remarks To AcctSupplier

Name

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

Namvang

Dae Yeun Hoheweg 708S

No.190 Steel

Dae Yeun Hoheweg 805

Dae Yeun Hoheweg 708S

Daico ALAS

DN Steel EL LOBO 705S

DN Steel Blue Ribbon

DN Steel EL LOBO 705S

DN Steel Blue Ribbon

Wecan Steel JS Leader

Wecan Steel Heung-A Hongkong 710

Wecan Steel JS Leader

Wecan Steel Heung-A Hongkong 710

Wecan Steel Heung-A Hongkong 710

DN Steel ALAS

DN Steel ALAS

DN Steel ALAS

Wecan Steel JS Leader

Wecan Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

Daico ESPERANZA

Daico ESPERANZA

Daico ESPERANZA

Daico ESPERANZA

Hanchang ESPERANZA

Wecan Steel ESPERANZA

Wecan Steel ESPERANZA

Wecan Steel ESPERANZA

DN Steel ESPERANZA

DN Steel ESPERANZA

Wecan Steel JS Leader

Hanchang Heung-A Hongkong 706

Hanchang Heung-A Hongkong 706

DN Steel JS Leader

Wecan Steel Heung-A Hongkong 704

Page 137: Hvc PlatePipe Update)

HVC-PUR 137 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Wecan Steel Heung-A Hongkong 704

No.190 Steel

No.190 Steel

No.190 Steel

No.190 Steel

Midway

DN Steel Pacific Eagle

DN Steel Pacific Eagle

DN Steel Pacific Eagle

DN Steel Pacific Eagle

DN Steel Pacific Eagle

DN Steel Pacific Eagle

DN Steel Pacific Eagle

DN Steel Pacific Eagle

Dae Yeun Hoheweg 708S

Ssangyong ALAS

Ssangyong ALAS

Ssangyong ALAS

Ssangyong ALAS

Ssangyong ALAS

Jungjin H-A Sin 815 DEDUCT $470

Jungjin H-A Sin 815

Jungjin H-A Sin 815

Hanchang Vinashin Ruby

Hanchang Vinashin Ruby

Hanchang Vinashin Ruby

Hanchang Vinashin Ruby

Hanchang Vinashin Ruby

Hanchang Vinashin Ruby

Hanchang Vinashin Ruby

Hanchang Vinashin Ruby

Hanchang Vinashin Ruby

Hanchang Vinashin Ruby

Hanchang Vinashin Ruby

Hanchang Vinashin Ruby

PT.Gunung Huong Phuong Star

PT.Gunung Huong Phuong Star

PT.Gunung Huong Phuong Star

PT.Gunung Huong Phuong Star

PT.Gunung Huong Phuong Star

PT.Gunung Huong Phuong Star

Yoobong Singapore 812

Namvang

Namvang

Namvang

Namvang

Dae Yeun Hoheweg 806

Haesung Lever Star

Haesung Lever Star

Haesung Lever Star

No.190 Steel

Page 138: Hvc PlatePipe Update)

HVC-PUR 138 STATUS

MV/Voy No Remarks To AcctSupplier

Name

No.190 Steel

Minh Hoa

Namvang

Yoobong Ocean Pioneer

Yoobong Ocean Pioneer

Yoobong Ocean Pioneer

Yoobong Ocean Pioneer

Yoobong Ocean Pioneer

Daico Elbravo 704

Daico AMRTA VII

Daico AMRTA VII

Daico AMRTA VII

Yoobong Orchid Pia

No.190 Steel

Hanchang EL LOBO 708

Hanchang EL LOBO 708

Hanchang EL LOBO 708

Hanchang EL LOBO 708 & Hoheweg 714

No.190 Steel

Namvang

Namvang

Namvang

Igawara Stellar Pacific V. 315N

Igawara Stellar Pacific V. 315N

Dae Yeun EL LOBO 708

Dae Yeun EL LOBO 708

Dae Yeun EL LOBO 708

Inox Saoviet

DaiCo Maritime Ace

Daico Maritime Ace

Daico Maritime Ace

Daico Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Hanchang Maritime Ace

Hanchang Maritime Ace

DN Steel Maritime Ace

DN Steel Maritime Ace

DN Steel Maritime Ace

DN Steel Maritime Ace

DN Steel Maritime Ace

DN Steel Maritime Ace

DN Steel EL LOBO 705S

Page 139: Hvc PlatePipe Update)

HVC-PUR 139 STATUS

MV/Voy No Remarks To AcctSupplier

Name

DN Steel EL LOBO 705S

Weigang HUA RUI V-HR0723

Weigang HUA RUI V-HR0723

Weigang To Song V7054

Weigang To Song V7054

Weigang To Song V7054

DaiCo EL LOBO 705S

Daico Blue Ribbon

Daico EL LOBO 705S

Daico ALAS

DN Steel Blue Ribbon

DN Steel Blue Ribbon

DN Steel Blue Ribbon

DN Steel Heung-A Hongkong 713

DN Steel Heung-A Hongkong 713

DN Steel Heung-A Hongkong 713

DN Steel Heung-A Hongkong 713

DN Steel Heung-A Hongkong 713

No.190 Steel

Midway

Samick Stadt Ratzeburg 727W

Samick Stadt Ratzeburg 727W

Samick Stadt Ratzeburg 727W

Samick Stadt Ratzeburg 727W

Samick Stadt Ratzeburg 727W

Samick Stadt Ratzeburg 727W

Samick Stadt Ratzeburg 727W

Samick Stadt Ratzeburg 727W

Samick Stadt Ratzeburg 727W

Yoobong Blue Ribbon

Yoobong Blue Ribbon

Yoobong Blue Ribbon

Yoobong Blue Ribbon

Yoobong Blue Ribbon

Yoobong Blue Ribbon

Yoobong Blue Ribbon

Yoobong Blue Ribbon

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Midway

Midway

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Page 140: Hvc PlatePipe Update)

HVC-PUR 140 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

DN Steel JS Leader

DN Steel JS Leader

PT.Gunung Van Don

PT.Gunung Van Don

PT.Gunung Van Don

PT.Gunung Van Don

PT.Gunung Van Don

PT.Gunung Van Don

PT.Gunung Van Don

PT.Gunung Van Don

PT.Gunung Van Don

PT.Gunung Van Don

PT.Gunung Van Don

PT.Gunung Van Don

PT.Gunung Van Don

PT.Gunung Van Don

Daico ESPERANZA

Hanchang ESPERANZA

Hanchang ESPERANZA

Hanchang ESPERANZA

Hanchang ESPERANZA

Daico Hoheweg V714W

Daico Hoheweg V714W

No.190 Steel

Namvang

Dae Yeun EL LOBO 708

Dae Yeun EL LOBO 708

Dae Yeun EL LOBO 708

Dae Yeun EL LOBO 708

DaiCo Maritime Ace

DaiCo Maritime Ace

DaiCo Maritime Ace

Page 141: Hvc PlatePipe Update)

HVC-PUR 141 STATUS

MV/Voy No Remarks To AcctSupplier

Name

DaiCo Maritime Ace

DaiCo Maritime Ace

DaiCo Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Samick Maritime Ace

Inox Saoviet

Inox Saoviet

Inox Saoviet

Wecan Steel ALAS

Wecan Steel ALAS

Wecan Steel ALAS

Weigang To Song V7054

Weigang To Song V7054

Weigang To Song V7054

Daico Blue Ribbon

Daico Blue Ribbon

Daico Blue Ribbon

Ssangyong Blue Ribbon

Ssangyong EL LOBO 705S

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Weigang Hua Rui V-HR0720

Samick Heung-A Hongkong 710

Daico ALAS

Yoobong JS Leader

Daico ALAS

Daico ALAS

Daico ALAS

DN Steel ALAS

DN Steel ALAS

DN Steel ALAS

DN Steel ALAS

DN Steel ALAS

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

Page 142: Hvc PlatePipe Update)

HVC-PUR 142 STATUS

MV/Voy No Remarks To AcctSupplier

Name

DN Steel JS Leader

Samick Heung-A Hongkong 710

Samick Heung-A Hongkong 710

Samick Heung-A Hongkong 710

Samick Heung-A Hongkong 710

Yoobong JS Leader

Daico ALAS

Daico ALAS

Daico ALAS

DN Steel ALAS

DN Steel ALAS

DN Steel ALAS

DN Steel ALAS

Yoobong JS Leader

Samick Heung-A Hongkong 710

Samick Heung-A Hongkong 710

Samick Heung-A Hongkong 710

Samick Heung-A Hongkong 710

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

DN Steel JS Leader

Chosun Lantau Breeze 11s

Hyundai welding Lantau Breeze 009

Hyundai welding Lantau Breeze 009

Chosun Lantau Breeze 008

Chosun Lantau Breeze 008

Chosun Lantau Breeze 008

Chosun Lantau Breeze 009

Chosun Lantau Breeze 009

DN Steel Tian Xing

DN Steel Tian Xing

Daico BLUE RIBBON

Midway Mr Hai paid

Dong Yeun H-A Sin 816

Dong Yeun Lantau Bay 815

Dong Yeun Lantau Bay 815

Dong Yeun Lantau Bay 815

Young Gwang H-A Sin 816

Yoobong GOLDEN HIGH

Yoobong IceMoon

Yoobong IceMoon

Yoobong IceMoon

Ptramesco

Ptramesco

Page 143: Hvc PlatePipe Update)

HVC-PUR 143 STATUS

MV/Voy No Remarks To AcctSupplier

Name

YGS

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Young Gwang Heung-A Bang kok 809

Young Gwang Heung-A Bang kok 809

Young Gwang Heung-A Bang kok 809

Young Gwang Heung-A Bang kok 809

Young Gwang Heung-A Bang kok 809

Young Gwang Heung-A Bang kok 809

YGS

YGS

Yoobong Singapore 812

Ssang Yong Vinashin Ruby

Ssang Yong Vinashin Ruby

Ssang Yong Vinashin Ruby

Ssang Yong Vinashin Ruby

Ssang Yong Vinashin Ruby

Ssang Yong Vinashin Ruby

Samsun Heung-A Singapore 810

Samsun Heung-A Singapore 810

Namvang

Namvang

Yoobong Hoheweg 806

Yoobong Hoheweg 806

Dong Yeun Hoheweg 805

Dong Yeun Hoheweg 805

Dong Yeun Hoheweg 805

Dae Yeun Hoheweg 806

Dae Yeun Hoheweg 806

Dae Yeun Hoheweg 806

Dae Yeun Hoheweg 806

Dae Yeun Hoheweg 806

Dae Yeun Hoheweg 806

DN Steel Lever Star

DN Steel Lever Star

DN Steel Ocean pioneer

DN Steel Ocean pioneer

Yoobong El Bravo 802

No.190 Steel

No.190 Steel

Dae Yeun Hoheweg 802

Dae Yeun Hoheweg 802will deduct for welding fee $ 2,995

Dae Yeun Hoheweg 802will deduct for welding fee $ 2,995

Dae Yeun Hoheweg 804

Page 144: Hvc PlatePipe Update)

HVC-PUR 144 STATUS

MV/Voy No Remarks To AcctSupplier

Name

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

Dong Yeun El Bravo 802

Dong Yeun El Bravo 802

Dong Yeun El Bravo 802

Dong Yeun El Bravo 802

No.190 Steel

Wecan steel VINASHIN RUBY

Yoobong VINASHIN RUBY

Yoobong VINASHIN RUBY

Yoobong VINASHIN RUBY

DN Steel VINASHIN RUBY

Yoobong VINASHIN RUBY

Yoobong VINASHIN RUBY

Yoobong VINASHIN RUBY

Ssangyong VINASHIN RUBY

Ssangyong VINASHIN RUBY

Ssangyong VINASHIN RUBY

Ssangyong VINASHIN RUBY

Ssangyong VINASHIN RUBY

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

Page 145: Hvc PlatePipe Update)

HVC-PUR 145 STATUS

MV/Voy No Remarks To AcctSupplier

Name

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

Dae Yeun El Bravo 709

Dae Yeun El Bravo 709

Dae Yeun El Bravo 709

YGS 03 conts

DN Steel

Yoobong HoHEWEG V-0801W

DN Steel

Dae Yeun

Dae Yeun

Dae Yeun

Dae Yeun

Young gwang HOHEWEG V-0722W

Young gwang HOHEWEG V-0722W

Young gwang HOHEWEG V-0722W

Young gwang HOHEWEG V-0722W

Yoobong HOHEWEG V-0722 deduct $71 NCR PO307

Yoobong HOHEWEG V-0722W

Yoobong HoHEWEG V-0801W

Yoobong HoHEWEG V-0801W

Yoobong HoHEWEG V-0801W

Weigang Cheng Lu 10-V801

Dae Yeun El Bravo 707

Corus Noble River

Corus Noble River

Corus Noble River

Corus Noble River

Corus Noble River

YGS

YGS

YGS

YGS

YGS

YGS

YGS

YGS

Yoobong Ocean Pioneer

Yoobong Ocean Pioneer

DN Steel Ocean Pioneer

DN Steel Ocean Pioneer

DN Steel Ocean Pioneer

DN Steel Ocean Pioneer

DN Steel Ocean Pioneer

DN Steel Ocean Pioneer

DN Steel Ocean Pioneer

DN Steel Ocean Pioneer

DN Steel Ocean Pioneer

DN Steel Ocean Pioneer

DN Steel Ocean Pioneer

EL BRABO 708S

EL BRABO 708S

EL BRABO 708S

EL BRABO 708S

EL BRABO 708S

EL BRABO 708S

Page 146: Hvc PlatePipe Update)

HVC-PUR 146 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Yoobong Ocean Pioneer

Yoobong Ocean Pioneer

Yoobong Ocean Pioneer

Yoobong Ocean Pioneer

Dae Yeun El Bravo 709

Dae Yeun El Bravo 709

Daico GOLDEN HIGH

Hyundai welding H-A BK 814

Hyundai welding Hoheweg 814

Hyundai welding H-A BK 814

YGS

YGS

Dae Yeun H-A BK 814

Chosun H-A Sin 817

Chosun H-A Sin 817

Chosun H-A Sin 817

Young Gwang H-A Sin 816

Young Gwang H-A Sin 816

Nomura

Chosun Heung-A Singapore 815S

Ptramesco

Ptramesco

Ptramesco

Ptramesco

Nam vang

Hae Sung SangThai Eagle

190 Steel Pipe

HSS Enterprise Long Crow V.111

HSS Enterprise Long Crow V.111

HSS Enterprise Long Crow V.111

HSS Enterprise Long Crow V.111

HSS Enterprise Long Crow V.111

Samsun Heung-A Singapore 810

Namvang

Yoobong Lever Star

Yoobong Lever Star

Yoobong Lever Star

Yoobong Lever Star

Yoobong Hoheweg 806

Dong Yeun Hoheweg 805

Dong Yeun Hoheweg 805

Dong Yeun Hoheweg 805

Dae Yeun Hoheweg 806

Dae Yeun Hoheweg 806

Wecan steel Lever Star

Wecan steel Lever Star

Wecan steel Lever Star

Yoobong Hoheweg 807

Yoobong Hoheweg 806

Young gwang Hoheweg 804

Young gwang Hoheweg 804

Page 147: Hvc PlatePipe Update)

HVC-PUR 147 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Young gwang Hoheweg 804

Young gwang Hoheweg 804

Young gwang Hoheweg 804

Young gwang Hoheweg 804

Young gwang Hoheweg 804

Young gwang Hoheweg 804

Young gwang Hoheweg 804

Young gwang Hoheweg 804

Young gwang Hoheweg 804

Dong Yeun Heung-A singapore 0809

Dong Yeun Heung-A singapore 0809

Young Gwang Hoheweg 805

Young Gwang Hoheweg 805

Young Gwang Hoheweg 805

HSS Enterprise Guang Hua 807

HSS Enterprise Guang Hua 807

HSS Enterprise Guang Hua 807

HSS Enterprise Guang Hua 807

HSS Enterprise Guang Hua 807

HSS Enterprise Guang Hua 807

HSS Enterprise Guang Hua 807

HSS Enterprise Guang Hua 807

HSS Enterprise Guang Hua 807

YGS

YGS

YGS

YGS

YGS

Dong Hae El Bravo 802

Dong Hae El Bravo 802

Dong Hae El Bravo 802

Dong Hae El Bravo 802

Dong Hae El Bravo 802

Dong Hae El Bravo 802

Dae Yeun Hoheweg 804

Dae Yeun Hoheweg 804

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

DN Steel VINASHIN RUBY

Dong Yeun El Bravo 802

Dong Yeun El Bravo 802

Dong Yeun El Bravo 802

Yoobong Ho heweg 803S

Yoobong Ho heweg 803S

Yoobong Ho heweg 803S

Young gwang El Bravo 801

Page 148: Hvc PlatePipe Update)

HVC-PUR 148 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Young gwang El Bravo 801

Young gwang El Bravo 801

Wecan steel VINASHIN RUBY

Wecan steel VINASHIN RUBY

Wecan steel VINASHIN RUBY

Wecan steel VINASHIN RUBY

Corus Noble River

Corus Noble River

Corus Noble River

Ssangyong VINASHIN RUBY

Ssangyong VINASHIN RUBY

Ssangyong VINASHIN RUBY

Ssangyong VINASHIN RUBY

Ssangyong VINASHIN RUBY

Dae Yeun El Bravo 709

Midway

Midway

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

Namvang

Midway

Midway

Thyssenkrupp

Yoobong Hoheweg 717S

Yoobong Hoheweg 717S

Yoobong Hoheweg 717S

Yoobong Hoheweg 717S

Yoobong

Yoobong

Yoobong

Yoobong

Yoobong Orchid Pia

Yoobong Orchid Pia

Yoobong Orchid Pia

Dae Yeun Hoheweg 717S

No.190 Steel

No.190 Steel

No.190 Steel

DN Steel AMRTA VII

DN Steel AMRTA VII

DN Steel AMRTA VII

DN Steel AMRTA VII

DN Steel AMRTA VII

DN Steel AMRTA VII

DN Steel AMRTA VII

DN Steel AMRTA VII

DN Steel AMRTA VII

DN Steel AMRTA VII

DN Steel AMRTA VII

DN Steel AMRTA VII

DN Steel AMRTA VII

DN Steel AMRTA VII

Page 149: Hvc PlatePipe Update)

HVC-PUR 149 STATUS

MV/Voy No Remarks To AcctSupplier

Name

DN Steel AMRTA VII

Namvang

Yoobong AMRTA VII

Yoobong AMRTA VII

Yoobong Bangkok V.0719S

Dae Yeun HOHEWEG V713S

Dae Yeun HOHEWEG V713S

Dae Yeun HOHEWEG V713S

Dae Yeun HOHEWEG V713S

Dae Yeun HOHEWEG V713S

Hangzhou Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Daico Maritime Ace

Daico Maritime Ace

Daico Maritime Ace

Hanchang Maritime Ace

Hanchang Maritime Ace

Hanchang Maritime Ace

Young Gwang EL LOBO 707

Young Gwang EL LOBO 707

Young Gwang EL LOBO 707

Young Gwang EL LOBO 707

Young Gwang Bangkok V.713S

Young Gwang Bangkok V.713S

Young Gwang Bangkok V.713S

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Dae Yeun Hoheweg 708S

Dae Yeun Hoheweg 708S

Young Gwang EL LOBO 701

Young Gwang EL LOBO 701

Young Gwang EL LOBO 701

Young Gwang EL LOBO 701

Young Gwang EL LOBO 701

Young Gwang EL LOBO 701

Young Gwang EL LOBO 701

Young Gwang EL LOBO 701

Page 150: Hvc PlatePipe Update)

HVC-PUR 150 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Young Gwang EL LOBO 701

Haesung Lever Star

DN Steel Ocean Pioneer

Yoobong Hoheweg 717S

Yoobong Hoheweg 717S

Yoobong Hoheweg 717S

Yoobong Hoheweg 717S

Daico Hoheweg V714W

Daico Hoheweg V714W

Daico Hoheweg V714W

Daico Hoheweg V714W

Daico Hoheweg V714W

Daico Hoheweg V714W

Daico Hoheweg V714W

Dong Hae Hoheweg 717S

Dong Hae Hoheweg 717S

Yoobong Orchid Pia

Yoobong Orchid Pia

Yoobong Orchid Pia

Yoobong Orchid Pia

Yoobong Orchid Pia

Yoobong Orchid Pia

Yoobong Orchid Pia

No.190 Steel

DN Steel Hoheweg V714W

DN Steel EL LOBO 710

DN Steel AMRTA VII

DN Steel EL LOBO 710

DN Steel Hoheweg V714W

DN Steel Hoheweg V714W

DN Steel AMRTA VII

DN Steel AMRTA VII

No.190 Steel

No.190 Steel

DN Steel AMRTA VII

DN Steel AMRTA VII

Dong Yeun EL LOBO 709

Dong Yeun EL LOBO 709

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

Dae Yeun Hoheweg V714W

No.190 Steel

No.190 Steel

Page 151: Hvc PlatePipe Update)

HVC-PUR 151 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Namvang

Namvang

Namvang

Namvang

Namvang

Yoobong AMRTA VII

Yoobong AMRTA VII

Yoobong AMRTA VII

Yoobong AMRTA VII

Yoobong AMRTA VII

Yoobong AMRTA VII

Yoobong AMRTA VII

Yoobong AMRTA VII

Yoobong AMRTA VII

Yoobong Bangkok V.0719S

Weigang DONG TAI V-DT0717

Weigang DONG TAI V-DT0717

Weigang DONG TAI V-DT0717

Weigang DONG TAI V-DT0717

Yoobong Hoheweg V714W

Hangzhou Qingyun V0707

Hangzhou Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Hanchang Maritime Ace

Young Gwang Bangkok V.713S

Young Gwang EL LOBO 701

Young Gwang EL LOBO 701

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Wecan Steel Blue ribbon

Namvang

Namvang

Yoobong Lever Star

Dong Yeun Hoheweg 805

Dae Yeun Hoheweg 806

Dae Yeun Hoheweg 805

Page 152: Hvc PlatePipe Update)

HVC-PUR 152 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Dae Yeun Hoheweg 805

Dae Yeun Hoheweg 805

Dae Yeun Hoheweg 805

Dae Yeun Hoheweg 805

Dae Yeun Hoheweg 805

Yoobong El Bravo 802

Yoobong El Bravo 802

Yoobong El Bravo 802

No.190 Steel

No.190 Steel

No.190 Steel

Cong Minh

Wecan steel Ocean pioneer

Wecan steel Ocean pioneer

Wecan steel Ocean pioneer

Wecan steel Ocean pioneer

Wecan steel Ocean pioneer

Wecan steel Ocean pioneer

Wecan steel Ocean pioneer

Wecan steel Ocean pioneer

Wecan steel Ocean pioneer

DN Steel VINASHIN RUBY

Wecan Steel Ocean pioneer

Wecan Steel Ocean pioneer

Dong Hae El Bravo 802

Dong Hae El Bravo 802

Dong Hae El Bravo 802

Dong Hae El Bravo 802

Dong Hae El Bravo 802

Dong Hae El Bravo 802

Dong Hae El Bravo 802

Dong Hae El Bravo 802

Yoobong VINASHIN RUBY

Yoobong VINASHIN RUBY

Yoobong VINASHIN RUBY

Young gwang VINASHIN RUBY

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

PT.Gunung Hoang Phuong

Yoobong HoHEWEG V-0801W

Yoobong HoHEWEG V-0801W

Yoobong HoHEWEG V-0801W

Weigang Cheng Lu 10-V801

Weigang Cheng Lu 10-V801

Weigang Cheng Lu 10-V801

Weigang Cheng Lu 10-V801

Weigang Cheng Lu 10-V801

Weigang Tai Xiang 733

Weigang Tai Xiang 733

Page 153: Hvc PlatePipe Update)

HVC-PUR 153 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Weigang Tai Xiang 733

DN Steel Ocean Pioneer

Yoobong Bangkok V.0719S

Hangzhou Qingyun V0707

Daico Maritime Ace

Wecan Steel Blue ribbon

Yoobong Blue Ribbon

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Baosteel Qingyun V0707

Dae Yeun Hoheweg 717S

Daico AMRTA VII

Dae Yeun El Bravo 707

Dae Yeun El Bravo 707

Dae Yeun El Bravo 707

Chosun Lantau Breeze 008

Komco H-A Sin 818

Hyundai welding Hoheweg 814

PT.Gunung Huong Phuong Star

Wecan steel Ocean pioneer

Wecan steel Ocean pioneer

JFE Shoji Hai Hua

JFE Shoji Hai Hua

JFE Shoji Hai Hua

JFE Shoji Hai Hua

JFE Shoji Hai Hua

JFE Shoji Hai Hua

JFE Shoji Hai Hua

JFE Shoji Hai Hua

JFE Shoji Hai Hua

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Dae Yeun HEUNG-A SINGAPORE 811S

Hyundai BROTHER SKY

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Page 154: Hvc PlatePipe Update)

HVC-PUR 154 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Kolon WAN SHENG V.052

Young Gwang

Young Gwang

Young Gwang

Kumwoo

Kumwoo

Kumwoo

Kumwoo Lantau Bay 821S

Kumwoo Lantau Bay 821S

Igawara

Igawara

Igawara

Yoobong Lantau Breeze 11s

Yoobong Lantau Breeze 11s

Yoobong Lantau Breeze 11s

Yoobong LANTAU BAY 820S

Sin Hwa Steel H-A HK 815

Sin Hwa Steel H-A HK 815

Sin Hwa Steel H-A HK 815

Sin Hwa Steel H-A HK 815

Sin Hwa Steel H-A HK 815

Sin Hwa Steel H-A HK 815

Sin Hwa Steel H-A HK 815

Sin Hwa Steel H-A HK 815

Weigang JUN SHUN

Weigang JUN SHUN

Weigang JUN SHUN

Weigang JUN SHUN

HSS Enterprise JUN SHUN

HSS Enterprise JUN SHUN

HSS Enterprise JUN SHUN

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

Ptramesco

Ptramesco

PT.Gunung TS SHENZHEN 814N

PT.Gunung TS SHENZHEN 814N

Young Gwang

Young Gwang

Daico LANTAU BAY 819S

Dae Yeun H-A MANILA 0826W

Dae Yeun H-A MANILA 0826W

LANTAU BREEZE V-010S

LANTAU BREEZE V-010S

LANTAU BREEZE V-010S

NYK Argus V.032W

NYK Argus V.032W

NYK Argus V.032W

Page 155: Hvc PlatePipe Update)

HVC-PUR 155 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Daico Tian Xing

Daico GOLDEN HIGH

Daico Lan Tau Breeze 005

Daico GOLDEN HIGH

Daico GOLDEN HIGH

Daico GOLDEN HIGH

Haesung Tian Xing

Haesung Tian Xing

Daico BLUE RIBBON

Daico BLUE RIBBON

Yoobong Ice Moon

Yoobong Ice Moon

Yoobong Ice Moon

Dong Yeun LANTAU BAY 819S

Dong Yeun LANTAU BAY 819S

Dong Yeun LANTAU BAY 819S

Dong Yeun LANTAU BAY 819SDong Yeun LANTAU BAY 819SDong Yeun LANTAU BAY 819S

HSS Enterprise

HSS Enterprise

HSS Enterprise

HSS Enterprise

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

Yoobong H-A BK 814

Yoobong H-A BK 814

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Dong Yeun H-A Sin 816

Dong Yeun H-A Sin 816

Dong Yeun H-A Sin 816

Dong Yeun H-A Sin 816

Dong Yeun H-A Sin 816

Dong Yeun H-A Sin 816

Dong Yeun H-A Sin 816

Dong Yeun H-A Sin 816

Dong Yeun H-A Sin 816

Dong Yeun H-A Sin 816

Dong Yeun H-A Sin 816

Yoobong Lantau Bay 817

Young Gwang H-A Sin 816

Yoobong Heung-A Singapore 816

Yoobong GOLDEN HIGH

Yoobong IceMoon

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

Page 156: Hvc PlatePipe Update)

HVC-PUR 156 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Yoobong IceMoon

YGS

Hyundai BROTHER SKY

Yoobong Heung-A Singapore 814

YGS

YGS

Ptramesco

Ptramesco

Ptramesco

Yoobong Lantau Breeze 11s

Yoobong LANTAU BAY 820S

Yoobong LANTAU BAY 820S

Dong Hae Steel Lantau Breeze 11s

Dong Hae Steel Lantau Breeze 11s

Dong Hae Steel Lantau Breeze 11s

Dong Hae Steel Lantau Breeze 11s

Dong Hae Steel Lantau Breeze 11s

Sin Hwa Steel H-A HK 815

Weigang JUN SHUN

HSS Enterprise JUN SHUN

HSS Enterprise JUN SHUN

HSS Enterprise JUN SHUN

HSS Enterprise JUN SHUN

HSS Enterprise JUN SHUN

HSS Enterprise JUN SHUN

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

Dae Yeun H-A MANILA 0826W

Daico GOLDEN HIGH

Daico GOLDEN HIGH

Daico GOLDEN HIGH

Namvang

Namvang

Namvang

Daico BLUE RIBBON

Daico BLUE RIBBON

Yoobong Ice Moon

Page 157: Hvc PlatePipe Update)

HVC-PUR 157 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Yoobong Ice Moon

Daico BLUE RIBBON

Dae Yeun LANTAU BAY 819S

PT.Gunung Sinokor Seoul v. 811 N & Van Ly v. 072 W

PT.Gunung Sinokor Seoul v. 811 N & Van Ly v. 072 W

Young Gwang H-A BK 815

Samsun LANTAU BAY 819S

Samsun LANTAU BAY 819S

Samsun LANTAU BAY 819S

Samsun LANTAU BAY 819S

Samsun LANTAU BAY 819S

Samsun LANTAU BAY 819S

HSS Enterprise

HSS Enterprise

HSS Enterprise

HSS Enterprise

HSS Enterprise

HSS Enterprise

HSS Enterprise

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

Cong Minh

Dae Yeun H-A BK 814

Dae Yeun H-A BK 814

Dae Yeun H-A BK 814

Dae Yeun H-A BK 814

Dae Yeun H-A BK 814

Dae Yeun H-A BK 814

Dae Yeun H-A BK 814

Dae Yeun H-A BK 814

Yoobong H-A BK 814

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

Page 158: Hvc PlatePipe Update)

HVC-PUR 158 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Yoobong Lantau Bay 817

Yoobong Lantau Bay 817

Young Gwang H-A Sin 816

Yoobong Heung-A Singapore 816

Ptramesco

Ptramesco

Yoobong GOLDEN HIGH

Yoobong GOLDEN HIGH

Yoobong IceMoon

YGS

YGS

Dae Yeun Heung-A Bangkok 811S

YGS

Hyundai BROTHER SKY

Hyundai BROTHER SKY

Yoobong Heung-A Singapore 814

Yoobong Heung-A Singapore 814

Yoobong Heung-A Singapore 814

Kumwoo

Kumwoo

Kumwoo

Kumwoo LANTAU BREEZE 012S

Kumwoo

Kumwoo LANTAU BREEZE 012S

Kumwoo Lantau Bay 821S

Igawara

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

PT.Gunung haiphong27

Young Gwang

Young Gwang

Dong Yeun LANTAU BAY 820S

Yoobong LANTAU BAY 820S

Igawara

Kiswel Malaysia VINASHIN NAVIGATOR 038N

Daico GOLDEN HIGH

Daico GOLDEN HIGH

Daico GOLDEN HIGH

Yoobong Ice Moon

Daico BLUE RIBBON

Yoobong Ice Moon

Yoobong Ice Moon

Yoobong Ice Moon

PT.Gunung Sinokor Seoul v. 811 N & Van Ly v. 072 W

PT.Gunung Sinokor Seoul v. 811 N & Van Ly v. 072 W

PT.Gunung Sinokor Seoul v. 811 N & Van Ly v. 072 W

Young Gwang H-A BK 815

HSS Enterprise

LANTAU BREEZE V-010S

LANTAU BREEZE V-010S

LANTAU BREEZE V-010S

LANTAU BREEZE V-010S

APL General V.012W

NKY Pheonix

CHENG GONG 30

Page 159: Hvc PlatePipe Update)

HVC-PUR 159 STATUS

MV/Voy No Remarks To AcctSupplier

Name

HSS Enterprise

HSS Enterprise

HSS Enterprise

HSS Enterprise

HSS Enterprise

HSS Enterprise

HSS Enterprise

HSS Enterprise

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

PT.Gunung Hoang Anh 36 & Thanh An 27

Dae Yeun H-A BK 814

Dae Yeun H-A BK 814

Dae Yeun H-A BK 814

Dae Yeun H-A BK 814

Dae Yeun H-A BK 814

Igawara Vinalines Pioneer 16

Igawara Vinalines Pioneer 16

Igawara Vinalines Pioneer 16

Igawara Vinalines Pioneer 16

Yoobong H-A BK 814

Weigang YU Long 810

Weigang YU Long 810

Weigang YU Long 810

Weigang YU Long 810

Weigang YU Long 810

Weigang YU Long 810

Weigang YU Long 810

Weigang YU Long 810

Weigang YU Long 810

Inox Saoviet

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Young Gwang H-A Sin 817

Yoobong Lantau Bay 817

Yoobong Heung-A Singapore 816

Ptramesco

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

CHENG GONG 30

Page 160: Hvc PlatePipe Update)

HVC-PUR 160 STATUS

MV/Voy No Remarks To AcctSupplier

Name

Yoobong Heung-A Singapore 814

YGS

YGS

YGS -$ 280 NCR

YGS

YGS

Yoobong GOLDEN HIGH

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Dong Yeun H-A Sin 814

Ptramesco