![Page 2: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/2.jpg)
1 | Study Overview
2 | Existing Conditions
3 | Community Input
4 | Recommendations
5 | Q&A
AGENDA
2
![Page 3: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/3.jpg)
STUDY OVERVIEW
• Joint planning effort by City of Huntsville Public Transit Division and MPO
• Detailed evaluation of Shuttle and Handi-Ride
• Extensive community outreach and input
• Five-Year Service and Capital Plan with supporting recommendations
3
![Page 4: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/4.jpg)
EXISTING CONDITIONS
• Route design
4
![Page 5: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/5.jpg)
EXISTING CONDITIONS
• Route design
• Service levels
5
![Page 6: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/6.jpg)
EXISTING CONDITIONS
• Route design
• Service levels
• Population density
6
![Page 7: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/7.jpg)
EXISTING CONDITIONS
• Route design
• Service levels
• Population density
• Areas of high transit need
7
![Page 8: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/8.jpg)
EXISTING CONDITIONS
• Route design
• Service levels
• Population density
• Areas of high transit need
• Destinations
8
![Page 9: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/9.jpg)
EXISTING CONDITIONS
• Route design
• Service levels
• Population density
• Areas of high transit need
• Destinations
• Ridership
9
![Page 10: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/10.jpg)
EXISTING CONDITIONS
• Route design
• Service levels
• Population density
• Areas of high transit need
• Destinations
• Ridership
• Bus stop access and amenities
10
![Page 11: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/11.jpg)
EXISTING CONDITIONS
• Route design
• Service levels
• Population density
• Areas of high transit need
• Destinations
• Ridership
• Bus stop access and amenities
11
![Page 12: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/12.jpg)
EXISTING CONDITIONS
• Route design
• Service levels
• Population density
• Areas of high transit need
• Destinations
• Ridership
• Bus stop access and amenities
12
![Page 13: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/13.jpg)
KEY FINDINGS
• Ridership has increased while service has not
13
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
2011 2012 2013 2014 2015 2016
Ridership
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
2011 2012 2013 2014 2015 2016
Service Hours
![Page 14: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/14.jpg)
KEY FINDINGS
• Ridership has increased while service has not
• Route design varies across the system
14
![Page 15: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/15.jpg)
KEY FINDINGS
• Ridership has increased while service has not
• Route design varies across the system
• Ridership is high along University Drive
15
![Page 16: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/16.jpg)
KEY FINDINGS
• Ridership has increased while service has not
• Route design varies across the system
• Ridership is high along University Dr
• Ridership is low in South Huntsville
16
![Page 17: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/17.jpg)
COMMUNITY INPUT
• Rider survey
• Online survey
• Transfer Station outreach
• Public meetingso Dr. Richard Showers Center
o Huntsville Senior Center
o Huntsville Library
• Community stakeholder discussions
17
![Page 18: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/18.jpg)
PREFERRED TRANSIT INVESTMENTS
0% 20% 40% 60% 80% 100%
Improved bike amenities
Real-time arrival information
Buses coming more often
Improved pedestrian access
Improved bus stop amenities
Service to new places
Later evening service
Saturday service
18
Percent of Attendees (Attendees were able to vote twice)
![Page 19: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/19.jpg)
RECOMMENDATIONS
19
![Page 20: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/20.jpg)
FIVE-YEAR SERVICE PLAN
• Phase 1 – August 2019
o Restructure route network
o Add Saturday service (7:00 a.m. – 7:00 p.m.)
o Extend weekday service to from 7:00 p.m. to 9:00 p.m.
• Phases 2-5
o Upgrade Route 4 (University Dr) to 15-minute service
o Upgrade four other routes to 30-minute service
o Extend weekday service to 10:00 p.m. on all routes
o Extend Saturday service to 8:00 p.m. on all routes
20
![Page 21: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/21.jpg)
SYSTEM RESTRUCTURE
• Provides more direct service to major destinations
• Increases service to employment centers
• Creates new transit hub at Showers Center
• Reallocates service to areas with greater ridership potential
• Increases frequency on several corridors
• Service increases are included in FY19
budget
21
![Page 22: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/22.jpg)
SERVICE PLAN ADDRESSES COMMUNITY NEEDS
• Saturday service is existing riders’ most desired service improvement
• Later weekday service is the second-most desired improvement
• Improves access to employment, shopping, and recreation
• More direct service reduces rider travel time
22
![Page 23: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/23.jpg)
PARATRANSIT SERVICE
• Rebrand as Huntsville Access
• Extend service to City limits
• Apply for Federal Transit Administration (FTA) Section 5310 Grant to fund expansion
23
![Page 24: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/24.jpg)
FUTURE SERVICE CONSIDERATIONS
• General purpose dial-a-ride service
• South Huntsville reverse commute service
• Shuttle service to new major employers
• Sunday service
24
![Page 25: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/25.jpg)
FIVE-YEAR CAPITAL PLAN
• Vehicle acquisition
o Cycle out smaller buses as ridership increases beyond seated capacity
o Install new on-board technology
25
![Page 26: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/26.jpg)
FIVE-YEAR CAPITAL PLAN
• Vehicle acquisition
o Cycle out smaller buses as ridership increases beyond seated capacity
o Install new on-board technology
• Showers Center Transit Hub
26
![Page 27: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/27.jpg)
FIVE-YEAR CAPITAL PLAN
• Vehicle acquisition
o Cycle out smaller buses as ridership increases beyond seated capacity
o Install new on-board technology
• Showers Center Transit Hub
• Bus stop improvements
27
![Page 28: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/28.jpg)
FIVE-YEAR CAPITAL PLAN
• Vehicle acquisition
o Cycle out smaller buses
o Install new on-board technology
• Showers Center Transit Hub
• Bus stop improvements
• Pedestrian infrastructure improvements
o Crosswalks
o Sidewalk extensions
28
![Page 29: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/29.jpg)
SUPPORTING RECOMMENDATIONS
• Performance metrics
• Scheduled service changes
• Fare products and pricing
29
![Page 30: Huntsville Transit Study](https://reader030.vdocuments.mx/reader030/viewer/2022012722/61b410c193d52e37fb6de159/html5/thumbnails/30.jpg)
SUPPORTING RECOMMENDATIONS
• Rider information and website
• Expanded regional ridesharing
• Monitor subsidized taxi/ride-hailing services in other cities