  • 7/25/2019 HUDA Drawing Protocol Document

    1/3

    HUDA: Submission drawing protocol

    Haryana Urban Development Authority has planned to automate the building plan approval process by

    introducing AutoDCR system. AutoDCR software reads the CAD drawings submitted by architects and

    automatically produce the deviation report based on the control regulations prescribed by HUDA.

    The purpose of this document is to establish a set of guidelines to Architects for preparation of drawings to be

    submitted for taking Building Permission from HUDA, Uniformity in the process of drafting of the drawings to

    be submitted for approval is required for automation of building approval system by introducing AutoDCRsystem.

    The consultants/Architects should prepare the drawings keeping specific objects in specific layers with specific

    colors and text. The layers required to be generated with explanation of what is required to be drawn on

    which layer is described in this document. This document serves as a source of information on obtaining level

    of consistency in drafting and approval process focuses on both the theoretical and practical description of

    process flow and protocol to be used while preparing drawings for submission at HUDA for Building

    Permission.

    Refer the following table for Layer names and their details.

    Sr.No.

    Layer Name Color Name

    & numbers

    Text Name Where to draw Remark

    1 _Amenity_GrpHsg Cyan Text should be kept onsame layer and color.

    Inside Plot Polyline

    2 _ArchProj 21 Text should be kept onsame layer and color.

    Inside Floor

    PolylineFloor Bed, Cobbord,chajj

    cornice, Loft,

    Canopy, Porch, Verandah

    Otta, Steps, Bay Window

    Parabola. Should be draw

    on this layer.

    3 _Balcony 25 Text should be kept onsame layer and color.

    Inside Floor & PlotPolyline

    4 _Barsati 141 Text should be kept onsame layer and color.

    Inside Floor

    Polyline

    5 _BoundaryWall 252 Text should be kept onsame layer and color.

    Inside Plot Polyline

    6 _Building 52 Text should be kept onsame layer and color.

    Out Side Plot

    Polyline

    7 _CarpetArea 191 Text should be kept onsame layer and color.

    Inside Floor

    Polyline

    8 _Column 29 Not need text of thislayer.

    Inside Floor

    Polyline

    9 _CommFAR 150 Not need text of thislayer.

    Inside Floor

    Polyline

    10 _Connecting

    Slab

    200 Text should be kept onsame layer and color.

    Inside Plot Polyline

    11 _Courtyard 180 Text should be kept onsame layer and color.

    Inside Floor

    Polyline

    12 _Door 114 Text should be kept onsame layer and color.

    Inside Floor

    Polyline

  • 7/25/2019 HUDA Drawing Protocol Document

    2/3

    13 _Elevation 44 Not need text of thislayer.

    Inside With in

    building

    14 _ExStructure Blue Text should be kept onsame layer and color.

    Inside Plot Polyline

    15 _Floor 153 Text should be kept onsame layer and color.

    Inside building

    Polyline

    16 _FloorInSectio

    n

    132 Text should be kept onsame layer and color.

    Inside building

    Polyline

    17 _Gate 37 Text should be kept onsame layer and color.

    Inside Plot Polyline Main Gate, Wicket gate, gate

    (default) should be drawn on

    this layer.

    18 _GroundLevel 63 Text should be kept onsame layer and color.

    Inside Floor

    Polyline

    19 _Handrail 155 Text should be kept onsame layer and color.

    Inside Floor

    Polyline

    20 _IndFAR 163 Not need text of thislayer.

    Inside Floor

    Polyline

    21 _InternalRoad_

    GrpHsg

    Green Text should be kept onsame layer and color.

    Inside Plot Polyline

    22 _LiftWell 171 Text should be kept onsame layer and color.

    Inside Floor

    PolylineNormal (Default), Hydraulic,

    Lift, Lift for Handicapped, Op

    Lift, Should be drawn on this

    layer.

    23 _Location Plan 211 Text should be kept onsame layer and color.

    Inside Building

    Polyline

    24 _MainRoad 20 Text should be kept onsame layer and color.

    Should be Overlap

    on Plot layer

    25 _MarginLine 253 Not need text of thislayer.

    Should be Overlap

    on Plot layer

    26 _NETPLOT 145Not need text of this

    layer.Should be Overlap

    on Plot layer

    27 _Parking 60 Text should be kept onsame layer and color.

    Inside Floor & Plot

    PolylineCar L. (2.5x5.0), Scooter, Cycl

    Loading/Unloading, Transpo

    Vehicle, Should be drawn on t

    layer.

    28 _Passage 243 Text should be kept onsame layer and color.

    Inside Floor

    Polyline

    29 _Plot White Text should be kept onsame layer and color.

    Out Side from the

    building polyline

    30 _Podium 50 Text should be kept onsame layer and color.

    Inside Plot Polyline

    31 _PrintAdditionalDetail

    223 Not need text of thislayer. Inside FloorPolyline

    32 _PropWork Red Text should be kept onsame layer and color.

    Inside Plot Polyline.

    33 _PublicHealthD

    etails

    24 Text should be kept onsame layer and color.

    Inside Floor & Plot

    Polyline

    34 _Ramp 135 Text should be kept onsame layer and color.

    Inside Floor & Plot

    Polyline

    35 _RecreationalG

    nd_GrpHsg

    Yellow Text should be kept onsame layer and color.

    Inside Plot Polyline

  • 7/25/2019 HUDA Drawing Protocol Document

    3/3

    36 _RefugeArea 79 Text should be kept onsame layer and color.

    Inside Floor

    Polyline

    37 _ResiFAR 190 Not need text of thislayer.

    Inside Floor

    Polyline

    38 _Room 72 Text should be kept onsame layer and color.

    Inside Floor

    Polyline

    39 _Sanitation 119 Text should be kept onsame layer and color.

    Inside Floor

    PolylineUrinal, washbasin, Drinking

    water, Washing Tab, Ablution

    Tab, Cleaner Sink, Kitchen SinWashing Sink, Should be draw

    on this layer,

    40 _Section 75 Text should be kept onsame layer and color.

    Inside Floor

    Polyline

    41 _SewageLine 10 Text should be kept onsame layer and color.

    Inside Plot Polyline

    42 _SitePlan 50 Text should be kept onsame layer and color.

    Inside building

    Polyline

    43 _SpecialUseFA

    R

    213 Not need text of thislayer.

    Inside Floor

    Polyline

    44 _StairCase 120 Text should be kept onsame layer and color.

    Inside Floor

    PolylineIntermediate landing, Flight

    Width, Floor Landing.

    Should be drawn on this laye

    45 _SubStructure 32 Text should be kept onsame layer and color.

    Inside Floor & Plot

    PolylineElectric Room,Transformer,

    Society office, Servent Quarte

    Sanatary block, Covered gara

    Rain water harvesting, A.C. pl

    room, AHU,Swimming

    pool,Septic tank,Punp

    room,Effiuent treatment

    plant/STD,Dish antenna room

    Teliphone Installlation

    room,Control room, Teliphon

    booth,Entrance foyer, Sport

    Structure, Cycle/Scooter

    Shelters. Solar Water heater

    should be drawn on this layer

    47 _Tank 133 Text should be kept onsame layer and color.

    Inside Floor & Plot

    PolylineOverhead water tank

    Underground water tank

    48 _Terrace 30 Text should be kept onsame layer and color.

    Inside Floor

    Polyline

    49 _VentilationSh

    aft

    83 Text should be kept onsame layer and color.

    Inside Floor

    Polyline

    50 _Void 111 Text should be kept on

    same layer and color.

    Inside Floor

    Polyline51 _WaterLine 131 Text should be kept on

    same layer and color.Inside Plot Polyline

    52 _Window 115 Text should be kept onsame layer and color.

    Inside Floor

    Polyline