HUBBALLI- DHARWAD
SMART CITY Ltd.
Vision: Hubballi Dharwad aspires to be the gateway to southern Deccan region, for trade, business and commerce. It intends toachieve this, with the spirit of inclusion and citizen empowerment, by synergizing the locational advantage, technology,infrastructure, manpower resource and smart governance. This will also make the city high on livability and sustainability,preserving its rich cultural heritage.
Projects Progress Status
23 May 2018
Are
a B
ased
D
evel
op
men
tRenovation of Core city Market MG Market & Janta Bazar
Industrial Development-Skill development Considered in New Projects
Upgradation of SME Not under consideration
Transport Terminal Hub Taken up by BRTS
MLCP Currently in PPP mode
IPT Connectivity Project termed as Public Bicycle sharing
Street Scape Redesign
Junction Improvement
NMT Zones
Storm water Drains
Underground Ducting
Open Space Upgradation
Tolankere
Nehru Stadium
MG Park
Nala upgradationGreen Corridor
24x7 Water Supply Taken up by ILFS
Underground Drainage
Rainwater Harvesting
Solid Waste Management
Public Toilets Termed as Smart Toilet (e toilet)
Affordable Housing Termed as Basic services to urban poor
LED street Lighting Taken up in PPP mode
Roof top Solar Taken up in PPP mode
Railway Station Redevelopment Taken up in PPP mode
PAN
C
ity
ICT Package-1 (ICCC & Smart SWM)ICCC
Smart Poles (taken in PPP mode)ICT Package-2 (E-Governance) Project dropped
Hubballi Dharwad
Smart City
Projectivised as Smart Road and split into 3 packages
1
PPP1
2
3, 4, 5
67
89
10
11
1213
14
15
PPP2PPP3
PPP4
16PPP5
Additional Projects taken up
Electric Crematorium
Dharwad Super market (PPP mode)
PPP6
17
Project Count–SCP vs Current
17 17 17 17 17
9
7 76
Feasibility Report Draft DPR Final DPR RFP Tender Notification
Total Count Completed
Project Status–Non PPP ProjectsHubballi Dharwad
Smart City
63
1.7
Cr
64
.52
7 C
r
81
.52
7 C
r
81
.52
7 C
r
16
2.5
27
Cr
6 6 6 6
5 5
4
Feasibility Report REIA & SIA RFP Tender Notification
Total Count Completed
Project Status–PPP ProjectsHubballi Dharwad
Smart City
30
8.4
5 C
r
28
3.3
7 C
r
13
7.3
7 C
r
28
3.3
7 C
r
a) Project Status – Tendered Projects
5
Hubballi Dharwad
Smart City Ltd.
Sr.
No.Project Name
Cost
(Cr.)Funding Status
Last date for
tender
submission
Technical
Opening
Implementation
Duration
1
Solid Waste
Management –
Litter Free Zones
3.20 SCM
Due to no participation in
1st round.
Project is Retendered.
SWM_LFZ Technical Bid is
being opened on 23 May
2018.
02 Mar 2018 04 Mar 2018 3 months
2Electric
Crematorium1.80 SCM 20 Mar 2018 22 Mar 2018 6 months
3Rain water
Harvesting0.37 SCM
Technical Bid is being
opened on 23 May 201816 Mar 2018 17 Mar 2018 3 months
4 Smart Toilets 1.55 SCM
LoA is given. Installation of
units will start from 24 May
2018.
23 Jan 2018 25 Jan 2018 6 months
5 Roof Top Solar 2.31 PPP
Tender invited on 6th Jan
2018. No participation. To be
retendered. Requested KERC
to change the tariff rate.
09 March 2018 12 March 2018 4 months
a) Project Status – Tendered Projects
6
Hubballi Dharwad
Smart City Ltd.
Sr.
No.Project Name
Cost
(Cr.)Funding Status
Last date for
tender
submission
Technical
Opening
Implementation
Duration
**Desilting of Raj Nala
(North)0.937 SCM
Tender notified on 30 Jan
2018. LoA is given.16 Feb 2018 17 Feb 2018 1 month
**Desilting of Raj Nala
(South)0.80 SCM
Tender notified on 27 Feb
2018. LoA is given.12 March 2018 13 March 2018 1 month
6
Smart Parking Tower
(Multi Level Car
Parking)
50
PPP
(INR 10
Cr SCM)Tendered Notified on 04
March 2018
20 June 2018 23 June 2018 24 months
7 Smart Poles 48 PPP 30 May 2018 01 June 2018 12 months
8 ICCC 39.57 SCMTender notified on 07 March
201828 April 2018 01 May 2018 9 months
9 LED Street Lighting 37 PPP Tender Notified on 23 May
2018
20 July 2018 23 July 2018 4 months
10 Tolankere Lake 16.3 SCM 20 July 2018 23 July 2018 24 months
# Total 201.837 Cr.
** Desilting of Nala is part of Nala Rehabilitation Project
c) Project Status -RFP under Progress
7
Hubballi Dharwad
Smart City Ltd.
Sr.
No.Project Name Cost (Cr.) Category Funding Status
11Public Bike
Sharing8.09
ABD + Non
ABDPPP
Citizen survey is completed. Industry consultation is also
completed at KUIDFC. RFP is under review at HDMC.
12Super Market at
Dharwad146 Non ABD PPP
Citizen & vendors interaction meeting done. The subject is placed before
the HDMC council after detailed note, council has given authority to
Commissioner for seeking Govt. relaxation on allotment of stallage to the
existing vendors and fixation of rent at ULB level. Hence, the proposal is
under various stages of implementation.
1. – Rehabilitation of vendors & stall holders.
2. – Relaxation on allotment of stalls to the existing vendors.
3. – Phase wise implementation.
13Railway Station
Redevelopment25.08 ABD PPP
Feasibility Report prepared & submitted to Railway Authority on 4 Nov
2017. 4 meetings held with Senior Officers of railway authority for
discussion on proposal. Project is proposed under PPP model.
Concurrence is awaited from Railways.
# Total 179.17 Cr.
d) Project Status - DPR under Progress
8
Hubballi Dharwad
Smart City Ltd.– Impactful Projects
Sr.
No.Project Name
Cost
(Cr.)Category Funding Status
14 Nehru Stadium 14.3 ABD SCM
Draft DPR submitted & reviewed by Technical Committee
at KUIDFC.
As per the suggestions of TC, Corrections on design &
drawings Final DPR is under preparation.
15 M.G. Park 10 ABD SCM
Revised FR reviewed by Technical Committee at KUIDFC.
Draft DPR is under review at KUIDFC.
# Total 40.6 Cr.
Major Smart City Project Diagrams
Hubballi Dharwad
Smart City Ltd.
TolankereMG Park
Nehru Stadium
Integrated
Command &
Control Centre
Smart Parking
Tower
e) Project Status - DPR under progress
10
Hubballi Dharwad
Smart City Ltd.
Sr.
No.Project Name Cost (Cr.) Category Funding Status
16
Street Scape Redesign,
footpath improvement,
underground ducting
260 ABD SCM
Project will be implemented Phase Wise as Smart
Roads.
Stakeholders’ consultation is convened under the
Chairmanship of DC for consent on the project.
BoD provided administrative approval for newly
identified road worth 150 Crs. HPSC approval
obtained on 06 March 2018
DPR reviewed at HDMC for Gokul Road (5 Km- SCP)
17 Junction Improvement
18
Underground Ducting of
electrical /data with Electrical
Smart Metering
19 NMT Zones
20 Underground Drainage 6.5ABD + Non
ABDSCM DPR is under preparation.
21 Core Markets 108 ABD SCM
2 rounds of Consultation with the vendors done.
Finalization of Rehabilitation site under discussion.
e) Project Status - DPR under progress
11
Hubballi Dharwad
Smart City Ltd.
Sr.
No.Project Name Cost (Cr.) Category Funding Status
22 Nala Renovation 29ABD + Non
ABDSCM
Financial approval is obtained during 4th BoD
meeting. Tender invited for Preparatory process of
Nala Renovation - North: 01 Feb 2018 & South: To be
floated within a week. However, Technical approval
obtained from HDMC at the cost INR 1.73 Cr.
Survey, FR & DPR is under preparation.
23
Affordable Housing / Basic
Services to the Urban Poor
(Infrastructure)
41.3 ABD SCMSurvey is completed. Project is under preparation of
revised FR.
24 Storm Water Drains 2.5 Non ABD SCM
The project comes outside ABD area. Obtained BoD’s
approval for new scope of the project. Revised
Feasibility Report under process.
25 Ropeway to Hillock -- Non ABD SCMImplementation of the project during Second Phase
after detailed survey with NOC from various dept.
# Total 487.9 Cr.
Thank you
Hubballi Dharwad
Smart City
http://www.facebook.com/hubballidharwa
dsmartcityltd
http://twitter.com/hdsmartcity
http://www.Instagram.com/hubballidharw
adsmartcity/
http://hubballidharwadsmartcity.com/
Follow us on