  • HUAWEI TECHNOLOGIES CO., LTD.

    www.huawei.com

    Huawei Confidential

    Security Level: Internal

    47pt

    30pt

    :

    FrutigerNext LT Medium

    : Arial

    47pt

    28pt

    Huawei LTE eNodeB Site Solution &

    Installation Key Point

    V1.0

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 2

    LTE Network Topology

    Chapter2: Installation Key Point and Mistake

    CONTENTS

    Chapter1: Site Solution

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 3 Page 3

    RRU Power Cable Solution

    DCDU-11B RRU3938

    < 100m

    0~100m

    Notes:

    If the power cable length(between RRU and DCDU) >100m,

    please contact Huawei Site Engineer for special solution

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 4

    BBU and DCDU install on the Transmission Cabinet

    1) FDD LTE BBU should install under the TDD LTE BBU which already existed on the site.

    2) Power cable of RRU from Sector A/B/C connected Load 3/4/5; Power cable of BBU

    connected to Load 7.

    3) CPRI Fiber of RRU from Sector A/B/C connected to CPRI 0/1/2 on LBBP board.

    4) Transmission Fiber connected to SFP 0; Transmission Ethernet Cable connected to GE/FE 0

    5) CPRI Fiber should be tied with Hook & Loop Mechanical Fastener. 6) 1 U space should be reserved between 2 BBUs.

    5

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 5

    RRU installed on Tower

    Sector A Sector B

    RRU and antenna can be installed as

    back to back.

    RRU can be installed on a pole near the

    pole for antenna.

    RRU should be grounded on tower.

    Sector C

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 6

    Cable connection for RRU

    ANT0 ANT1

    -45 +45

    1) ANT0 of RRU should connected to port +45 of the Antenna. .

    2) ANT1 of RRU should connected to port -45 of the Antenna.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 7

    1

    2

    1) CPRI fiber is connected to CPRI 0;

    2) The metal shield of RRU power cable should

    be cut and grounding on clip inside RRU

    cabling cavity;

    3) The water plugs should be filled in the vacant

    troughs of the RRU cabling cavity.

    Cable connection inside RRU cabling cavity.

    3

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 8

    Antennas Labeling

    Sector A Sector B Sector C

    ANT_1A

    ANT_0A

    ANT_1B

    ANT_0B

    ANT_1C

    ANT_0C

    1) Label of ANT_0A, ANT_0B, ANT_0C is connected to +45

    2) Label of ANT_1A, ANT_1B, ANT_1C is connected to -45

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 9

    RRU Feeder Label and Color Feeder Mark Rules

    RRU Label Rules Sector: A BC RRU Path: 01 Color Feeder Mark: A(Red)B(yellow)C(Blue); all with two while ring code to separate with TDD

    RRU 0

    1 0

    AN

    T_1A

    AN

    T_0A

    Color Feeder Mark

    Feeder Label

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 10

    Antenna Feeder Label and mark rules

    RRU Label Rules Sector: A BC Path: 0123 Color Ring: A(Red)B(yellow)C(Blue); all with two while ring code to separate with TDD

    X X X

    X X X

    X X X Antenna A

    A

    RCU +45 -45 -45 +45 RCU

    AN

    T_

    1A

    AN

    T_

    0A

    X X X

    X X X

    X X X Antenna B

    B

    RCU +45 -45 -45 +45 RCU

    AN

    T_

    1B

    AN

    T_

    0B

    X X X

    X X X

    X X X Antenna C

    C

    RCU +45 -45 -45 +45 RCU

    AN

    T_

    1C

    AN

    T_

    0C

    Make mark with color ring

    Feeder Label

    Make mark use alphabet

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 11

    LTE Network Topology

    Chapter2: Installation Key Point and Mistake

    CONTENTS

    Chapter1: Site Solution

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 12

    Safety belt and cap is extremely needed.

    Wrong Right

    Notes Safety cap is needed for the working on the site. And the safety belt is needed for working on the tower or poles.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 13

    Connect the power cable to the right port Wrong Right

    Notes 1. Power cable of RRU for sector A/B/C should be connected to LOAD3/4/5, label with LTE PWR

    RRU0/1/2 2. BBU should be connected to LOAD7, label with PWR BBU

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 14

    Remove the shield of the power cable near connector

    Wrong Right

    Notes The black shield of the power cable near the power connector of DCDU should be cut and tied up.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 15

    The CPRI fiber should be tied. Wrong Right

    Notes The CPRI fiber should be tied with Hook & Loop Mechanical Fastener. Dont use cable tie.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 16

    Put the redundant fiber on the Transmission Rack bottom

    Wrong Right

    Notes The redundant fiber should be circled and put on the bottom of the transmission rack. Dont put it outside the tower or on the cable tray.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 17

    The heat-shrink tube is used and shrink well. Wrong Right

    Notes The power cable should use the heat-shrink tube. And it should be done well.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 18

    Ground the DCDU on the Transmission Cabin Wrong Right

    Notes Ground the DCDU on the Transmission cabin. ( Use 6mm grounding cable. )

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 19

    Installed the bracket assembly on the right direction

    Wrong Right

    Notes: Follow the label on the bracket assembly carefully. And make sure the bracket assembly of the RRU is installed on the right direction.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 20

    The metal shield of RRU power cable is wrongly cut.

    Wrong Right

    Notes The metal shield of RRU power cable should be cut and grounding on clip inside RRU cabling cavity. The metal shield can not be cut too long and it go outside the cabling cavity.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 21

    The waterproof plugs are filled in the vacant troughs

    Wrong Right

    Notes The water plugs should be filled in the vacant troughs of the RRU cabling cavity.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 22

    Labeling the Jumpers of the RRU with the correct Label

    Wrong Right

    Notes Use Label ANT_0A and ANT_1A for Sector A; Use Label ANT_0B and ANT_1B for Sector B; Use Label ANT_0C and ANT_1C for Sector C.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 23

    Remove the oil paint of the tower for grounding point

    Wrong Right

    Notes Oil paint of tower is not removed on earth grounding point. electric ability surge protection will be decreased.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 24

    The power cable are grounded beside the Roxtec

    Wrong Right

    Notes The power cables of the RRU should be grounded by the grounding clip on the grounding bat before routed into the Roxtec.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 25

    BBU and DCDU should be fixed with screws. Wrong Right

    Notes BBU and DCDU should be fixed with screws. Cable ties is forbidden to use for fixing equipment.

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    35pt

    32pt

    ) :18pt

    Page 26

    Keep the environment of the site neat and clean Wrong Right

    Notes Keep the environment of the site neat and clean. Dont leave any boxes, cables, bottles inside and outside the shelter. Take all the garbage away the site.