Page 1: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

Security Level: Internal Open

Slide title :40-47pt

Slide subtitle :26-30pt

Color::white

Corporate Font :

FrutigerNext LT Medium

Font to be used by customers and

partners :

Arial

www.huawei.comLiu Jiang 60307

Mobitel Stage4 Huawei BTS3900A Installation Guide V1.0

2008.9

Page 2: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 2Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

2G BTS3900A(outdoor)

APM30 for power

and BBU

RF cabinet for 6 DRFU

Battery cabinet:

184Ah*2

The layout of the BTS3900A is as shown in the picture.The APM30 and RF cabinet should be near to the cable ladder.Two battery cabinet should stack.

Page 3: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 3Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Outlook of BTS3900A

BTS3900A cabinet Stacked Battery cabinet

Page 4: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 4Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

The plinth

The BTS should be installed on the steel rack or concrete plinth• For the steel rack, use the bolt and nut to fix the base frame of

cabinet.• For the concrete plinth, use the expansion blot to fix the base frame.

Page 5: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 5Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Install the base

• Fix the base to the plinth and check the levelness with level bar, if the level bar is not in the middle, use the adjusting pad to adjust the levelness

• 2 base need to be installed, one is for BTS3900A, one is for battery cabinet

Page 6: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 6Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Install the cabinet

• Push the cabinet so that the cabinet can be in full contact with the installation block

• Use two bolts to fix the cabinet to the base

Page 7: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 7Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Install the component

BBU

DRFU

Install the BBU, DRFU, PMU and PSU to the cabinet as shown in the picture.

The BBU should be close to the PDU panel, without space between PDU and BBU

Special handle is needed to remove the

DRFU

PSU

PMU

Page 8: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 8Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Connect the DC cable for BBU and DRFU

• Connect the DC cable to the “Load5” of the PDU with OT terminal. Blue cable as – 48v, and black as 0 V. Connect the power terminal to the UPEU card on BBU.

• Connect the power cable to the corresponding DRFU, 6 cables to 6 DRFU. The other end is already connected.

Load5 Connector to

UPEU on BBU DC power cable for DRFU

Page 9: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 9Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Install the CPRI cable for DRFU

Connect the CPRI cable between the GTMU and DRFU, the 6 ports on GTMU should be connected to the corresponding DRFU. The port on DRFU should be port0

The CPRI cable route should be at left side of the cabinet, as show in the picture

GTMU

DRFU CPRI

cable

Page 10: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 10Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Install E1 cable

GTMU UELP MW

There are two E1 cable, one is between GTMU and UELP, the other is from UELP to MW

The cable between GTMU and UELP is already made.

GTMU

UELP

Page 11: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 11Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

RF cable

• Usually, one cabinet has 6 jumpers, please refer to the picture for the jumper and RF cable connection.

• One end of the jumper is straight DIN connector, the other end (BTS side) is right angle DIN connector. The connectors need to be made on site.

• The configuration of the cell is as showing in the picture:S2, S2 PBT, S3, S4

Upper 6 jumper to be installed

Usually, the lower 6 jumper is not needed

• S2 • S2 PBT

• S3

• S4

Page 12: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 12Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Stack two battery cabinet

Step1:Install the lower cabinet and remove the cover

Step2:Install the wiring cover to the lower cabinet

Step3:Seal the wiring cover with mud.

Step4:Install the upper cabinet on top of the lower cabinet, fasten the upper cabinet with 4 bolts.

cover

Step 2

Step 3

Step 4

Step 1

Wiring

cover

Page 13: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 13Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Install the battery

• K

Install the DC

cable to APM30

Install the DC

cable between

upper and lower battery

Use the black DC cable as – 48V, and red DC cable as 0V.

2 battery banks to be installed in each cabinet.

Attention! Switch off the battery breaker in battery cabinet and APM30 when installing the battery!

Battery breaker

Upper battery cabinet

Lower battery cabinet

Battery terminal

Page 14: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 14Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Install the grounding cable

• Install the PGND cable from APM30 to ECB

• Install another 2 pcs of equipotential cable from APM30 to upper battery cabinet and lower battery cabinet

ECB inside the cabinet

Page 15: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 15Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Connect the AC input cable

• Install the 4 x 4mm^2 armored cable to the terminal of PDU, L1,L2,L3,N: brown, black, grey, blue. When 3 phase power is used, the short circuit bar should be removed; when single phase power is used, install the short circuit bar.

• AC power cable should be protected in the GI pipe , and the armor of the cable should be grounded with the hose clip

short circuit bar

PDU

Page 16: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 16Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Lay the AC power cable• Dig a channel between meter cubicle and plinth.

• Lay the AC power cable with the protection of GI pipe. Flexible GI pipe should be used as

bend. The armor of the AC cable need to be grounded.

• Ground the GI pipe with M8 x 25mm bolt & nut, using 25mm^2 grounding cable

• Bury the pipe

Dig the channel and lay the AC cable

Make the bend with the Gi flex pipe

Ground the AC cable armor with the hose clip

Page 17: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 17Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Install the SPD for BTS

• Install the SPD box on the meter cubicle, the SPD should be grounded.

Page 18: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 18Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Alarm Cable FMUA(COM)------BBU(MON0)

Connect the BBU(MON0) and FMUA(COM IN) with the cable(04070023)

BBU(MON0)

FMUA(COM IN)

Page 19: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 19Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Alarm Cable DPMU(COM)------APMI(J1)

One end of the cable is already connected to J1 port of APMI, the other end need to be connected to “COM” port of DPMU

Page 20: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 20Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Alarm Cable DPMU(RS422)------APMI(RS422)

One end of the cable is already connected to RS422 port of APMI, the other end need to be connected to “RS422” port of DPMU

Page 21: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 21Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Alarm Cable BBU(MON1)------APMI(TX- TX+,RX- RX+)

One end of the cable(04080029) is to MON1 port of BBU, another end need to be cut and connect the wire to the panel of APMI (TX- TX+,RX- RX+), The connection is as shown in the table.

Wire Port on APMI

White One pair TX+

Orange TX-

Blue One pair RX+

White RX-

Page 22: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 22Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Install battery sensor cable

One end of the battery sensor cable is already connected to the

APMI card BAT_TEM1 port, so connect the other end to one cell of

the battery.

Page 23: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 23Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Connect the door sensor cable

• Connect the door sensors of the two battery cabinets and the APM30 as red line shown in the picture

• Connect the sensor cable to the socket of the prior door sensor, so the connection of the 3 door sensors are serial

Socket to connect the 2 sensor

Page 24: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 24Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Antenna system installation

Page 25: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 25Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Antenna system installation• Ground the feeder cable according to the standard in the picture• Antenna azimuth and down tilt should follow the design file strictly.• All the jumper connectors are waterproofed well.• The feeders are arranged neatly, the feeder and jumper labels are

attached neatly and oriented in the same direction.• Use feeder clamp to fix the feeder each meter.

Page 26: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 26Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Installation check key point

• Check the grounding cable of cabinets, SPD, Gi pipe, AC power cable, feeder.

• Check the water proof of the feeder and antenna connector.• Check AC and DC power cable color code, complied with the standard.• The cable should be tied neatly. Keep redundancy when cutting the

cable tie.• Antenna height, azimuth and down tilt should follow the design file

strictly.• The signal cable and battery cable outside the cabinet should be

protected with PVC flexible pipe.• All the cables should be labeled with the label provided.• Bring back the rest of the materials and clean the sites after installation.

Page 27: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 27Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Power on the cabinet

Step1:Switch off all the AC and DC breakerStep2:Power on the AC input breaker, check the indicator of the PMU and PSU, For PMU, if RUN is 1s on and 1s off, and ALARM is off, it mean the module is

working normally For PSU, if the is on, and is off, it means the module is working normally

AC inputBreaker

DC outputBreaker

Step3:Use the multimeter to measure the DC output voltage, the normal range should be -38.4V to -57V.

Step4:Switch on the DC output breaker for the related module, switch on the DC output breaker on the DCDU

Page 28: Huawei BTS3900A Installation Guide V1.0

HUAWEI TECHNOLOGIES CO., LTD. Page 28Huawei Confidential

Slide title :32-35pt Color: R153 G0 B0

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Slide text :20-22ptBullets level 2-5:

18pt Color:Black

Corporate Font :FrutigerNext LT Medium

Font to be used by customers and

partners : Arial

Commission the BTS

Connect the E1 cable to MW, check the indicator “LIU1” on the GTMU, if it’s always off, it means the E1 is normal.

After the BTS is on air, make some test call, check the cell broadcast service and GPRS service.

LIU1

The following alarm need to be checked on site:• Door alarm of all the 4 cabinets• Water sensor of the cabinet• Temperature and Humidity• Battery sensor • Mains failure and PSU failure

Page 29: Huawei BTS3900A Installation Guide V1.0

Thank youwww.huawei.com