Page 1: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

Work Breakdown Structure

Page 2: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

Planning Processes

Work Breakdown Structure with RAM

Estimate Duration and Resources

Network Analysis

Schedule Development

Project Baseline

Page 3: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

A deliverable-oriented grouping of project elements that organizes and defines the total work scope of the project. Each descending level represents an increasingly detailed definition of the project work.

PMBOK® Guide Definition

WBS Definition

Page 4: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

The tool for breaking down a project into its component parts.

It is the foundation of project planning and one of the most important techniques used in project management.

Work Breakdown Structure

Page 5: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

Project X

Work Breakdown Structure

Page 6: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

Software Development

PrepareFunc.Specs.

Approve Requirements

PrepareTest plan

PrepareTest data

ConductTesting

Code Programs

CustomerRequirements

AcceptanceTesting

Testing Training

WBS in Graphical Form

Page 7: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

1. Software Development

1.1 Customer Requirements

1.1.1 Approve Requirements

1.1.2 Prepare Functional Specifications

1.2 Code Programs

1.3 Testing

1.3.1 Prepare Test Plan

1.3.2 Prepare Test Data

1.3.3 Conduct Testing

1.4 Training

1.5 Acceptance Testing

WBS in Outline Form

Page 8: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

1.2.2.1Dig

trenches

1.2.2.1Dig

trenches

1.2.2.2Installpipe &

hardware

1.2.2.2Installpipe &

hardware

1.2.2.3Cover

sprinklersystem

1.2.2.3Cover

sprinklersystem

1.2.3.1Removedebris

1.2.3.1Removedebris

1.2.3.2Prepare

soil

1.2.3.2Prepare

soil

1.2.3.3Plantlawnseed

1.2.3.3Plantlawnseed

1.3.2.1Mark

fence line& post

1.3.2.1Mark

fence line& post

1.3.2.2Installpost

1.3.2.2Installpost

1.3.2.3Install

fencing& gates

1.3.2.3Install

fencing& gates

1.3.2.4Paintfence

1.3.2.4Paintfence

1.3.1Acquirefence

material

1.3.1Acquirefence

material

1.3.2Construct

fence

1.3.2Construct

fence

1.2.1Acquire

lawnmaterial

1.2.1Acquire

lawnmaterial

1.2.2Install

sprinklersystem

1.2.2Install

sprinklersystem

1.2.3Plantgrass

1.2.3Plantgrass

1.2.4Plant

shrubs

1.2.4Plant

shrubs

1.1Designhome

landscape

1.1Designhome

landscape

1.2Put inlawn

1.2Put inlawn

1.3Buildfence

1.3Buildfence

1.0Home

Landscapeproject

1.0Home

Landscapeproject

WBS in Graphical Form

Page 9: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

1.0 Home Landscaping Project 1.1 Design home landscape 1.2 Put in lawn 1.2.1 Acquire lawn material 1.2.2 Install sprinkler system 1.2.2.1 Dig trenches 1.2.2.2 Install pipe and hardware 1.2.2.3 Cover sprinkler system 1.2.3 Plant grass 1.2.3.1 Remove debris 1.2.3.2 Prepare soil 1.2.3.3 Plant lawn seed 1.2.4 Plant shrubs 1.3 Build fence 1.3.1 Acquire fence material 1.3.2 Construct fence 1.3.2.1 Mark fence line and post 1.3.2.2 Install post 1.3.2.3 Install fencing and gates 1.3.2.4 Paint fence

WBS in Outline Form

Page 10: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

Provides a detailed illustration of the project scopeCreate accurate cost and schedule estimatesMonitor progress easilyBasis for building project teams

Advantages of WBS

Page 11: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

WBS Decomposition

Page 12: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

WBS Organized by Product

Page 13: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

WBS Organized by Phase

Page 14: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

WBS must be broken down starting at the topWork packages must add up to the summary taskEach summary task and work package must be named an activity that produces a product (use SMART Technique)

Criteria for a Successful WBS

Page 15: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

specific

measurable

agreed upon

realistic

time-bound

Criteria for a Successful WBS

Page 16: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

Create your Project’s WBS

Workshop Time

Page 17: Http:// Work Breakdown Structure

http://www.mekonginstitute.org/

Tasks Duration Responsible Persons/ Team

Remark

Simple Work plan