WOR NO
1 LINE LIST
2 LEGEND
3 HYDRO TESTING MATERIAL TAKE-OFF
4 PIPING AND INSTRUMENT DIAGRAM (P&ID)
5 ISOMETRIC DRAWING
6 VALVE ISOLATION CHECKLIST
7 INSTRUMENT ISOLATION CHECKLIST
8 WELD SUMMARY REPORT - PIPING
9 PUNCH LIST
10 WATER CERTIFICATE ANALYSIS
11 VALVE LEAK TEST RECORD - MCC 08
12 PIPEWORK CHECK SHEET - MCC 06
13 FLUSHING CERTIFICATES - MCC 15
14 HYDROSTATIC PRESSURE TESTING RECORD - MCC 14
15 PRESSURE GAUGE CERTIFICATE
16 PRESSURE RECORDER CERTIFICATE
17 CHART RECORDER
18 FLANGE MANAGEMENT BROKEN/WITNESS JOINT REGISTER
TABLE OF CONTENT
HYDROSTATIC TEST PACKAGE
CDWA PLATFORM
PML/2014/CP2-029(A)
CHENDOR PHASE 2 DEVELOPMENT PROJECT, BLOCK PM304
PM/PR/C/12-001
-
7/25/2019 Htp Cdwb Ab111 Ph s2
3/21
LEGEND:
TLP : TEST LIMIT POINT
PG : PRESSURE GAUGE
PR : PRESSURE RECORDER
BLD : BLIND FLANGE
VO : VALVE OPEN
VC : VALVE CLOSE
F : FILLING POINT
V : VENT
SPADE : SPADE BLIND
-
7/25/2019 Htp Cdwb Ab111 Ph s2
4/21
LINE LIST
AB111 0100 PH 4 4''-PH-01501-6SS0-PP-OFF-BRD-S2_HU TP-20133 TP-20033 319 60-80 1189 105 - TREATED
WATER 1783.9 3
AB111 0100 PH 4 4''-PH-01502-6SS0-PP-OFF-BRD-S2_HU TP-20134 TP-20034 319 60-80 1189 105 - TREATED
WATER 1783.9 3
AB111 0100 PH 4 4''-PH-01503-6SS0-PP-OFF-BRD-S2_HU TP-20135 TP-20035 319 60-80 1189 105 - TREATED
WATER 1783.9 3
AB111 0100 PH 4 4''-PH-01504-6SS0-PP-OFF-BRD-S2_HU TP-20136 TP-20036 319 60-80 1189 105 - TREATED
WATER 1783.9 3
AB111 0100 PH 4 4''-PH-01505-6SS0-PP-OFF-BRD-S2_HU TP-20137 TP-20037 319 60-80 1189 105 - TREATED
WATER 1783.9 3
AB111 0100 PH 4 4''-PH-01506-6SS0-PP-OFF-BRD-S2_HU TP-20138 TP-20038 319 60-80 1189 105 - TREATED
WATER 1783.9 3
AB111 0100 PH 4 4''-PH-01507-6SS0-PP-OFF-BRD-S2_HU TP-20139 TP-20039 319 60-80 1189 105 - TREATED
WATER 1783.9 3
AB111 0100 PH 4 4''-PH-01508-6SS0-PP-OFF-BRD-S2_HU TP-20140 TP-20040 319 60-80 1189 105 - TREATED
WATER 1783.9 3
SUB SUB
SYSTEMSTATE P&ID TEST MEDIUMTO
INSULATION
THICKNESS
(inch)
MEDIASIZE
(inch)LINE NO. FROM STRESS CATEGORY REMARKS
OPERATION
PRESSURE (psi g)
OPERATING
TEMP. (C)
DESIGN CONDITION
PRESSURE (psi g)
DESIGN CON.
MAX. TEMP. (C)
TEST PRESSURE
(psi g)
-
7/25/2019 Htp Cdwb Ab111 Ph s2
5/21
PIPING &
INSTRUMENTDIAGRAM
-
7/25/2019 Htp Cdwb Ab111 Ph s2
6/21
-
7/25/2019 Htp Cdwb Ab111 Ph s2
7/21
-
7/25/2019 Htp Cdwb Ab111 Ph s2
8/21
-
7/25/2019 Htp Cdwb Ab111 Ph s2
9/21
-
7/25/2019 Htp Cdwb Ab111 Ph s2
10/21
-
7/25/2019 Htp Cdwb Ab111 Ph s2
11/21
-
7/25/2019 Htp Cdwb Ab111 Ph s2
12/21
-
7/25/2019 Htp Cdwb Ab111 Ph s2
13/21
-
7/25/2019 Htp Cdwb Ab111 Ph s2
14/21
-
7/25/2019 Htp Cdwb Ab111 Ph s2
15/21
PRESSURE GAUGE
CERTIFICATE
-
7/25/2019 Htp Cdwb Ab111 Ph s2
16/21
CHART RECORDER
-
7/25/2019 Htp Cdwb Ab111 Ph s2
17/21
NO P&ID NO LINE NO DESCRIPTION STATUS PBJV REP. PML REP. REMARKS
VALVE ISOLATION CHECKLIST
TEST PACK NO:
RLT-CDWA-AB111-PH-S2
TEST PACK NAME:
LIQUID RECEIVING AND COLLECTION
PLATFORM / INSTALLATION / VESSEL: CDW-ACLIENT:PETROFAC
-
7/25/2019 Htp Cdwb Ab111 Ph s2
18/21
FIELD INSTRUMENT
ISOLATIONCHECKSHEET
-
7/25/2019 Htp Cdwb Ab111 Ph s2
19/21
NO P&ID NO LINE NO DESCRIPTION STATUS PBJV REP. PML REP. REMARKS
FIELD INSTRUMENT ISOLATION CHECKLIST
TEST PACK NO:
RLT-CDWA-AB111-PH-S2
TEST PACK NAME:
LIQUID RECEIVING AND COLLECTION
CLIENT:PETROFAC PLATFORM / INSTALLATION / VESSEL: CDW-A
-
7/25/2019 Htp Cdwb Ab111 Ph s2
20/21
Project: CENDOR PHASE 2 DEVELOPMENT PROJECT, BLOCK PM 304
Work Pack
No.
System /
Sub-system P&ID Flange No.
Flange
Size
Flange
Rating
Flange
Type
Bolt
Material
Gasket
Type
Required
Torque
Value
Required
Hydraulic
Torque
Pressure
Required
Tension
Pressure
Tensioning
Coverage
Required
Joint
Broken
Date
Achieved
Torque
Value
Achieved
Hydraulic
Torque
Pressure
Achieved
Tension
Pressure
Achieved
Tensioning
Coverage
Joint
Assembled
Date
Joint
Checked
By
Joint
Completed
Date
FLANGE MANAGEMENT BROKEN/WITNESS JOINTS REGISTER
-
7/25/2019 Htp Cdwb Ab111 Ph s2
21/21
NO CODE QTY REMARKS
1 BLD 1 For blind end point
2 18
3 224
4 BLD 1
5 1
6 1
7 1
1
1 18
2 224
PM/PR/C/12-001
CHENDOR PHASE 2 DEVELOPMENT PROJECT, BLOCK PM304
CDWA PLATFORM
PML/2014/CP2-029(A)
HTP-CDWA-AB111-PH-S2
HYDROSTATIC TEST
MATERIAL
DESCRIPTION
1783.9 PSI / TREATED WATERTEST PRESSURE / MEDIA
CONTRACT
PROJECT
PLATFORM
WOR NO
TEST PACKAGE NO
BLIND FLANGE 4'' X 600# RF
Gasket Spiral Wound 4" x 600# SS316 Graphite Filled SS316 Inner
Ring & CS Outer Ring150 X 7 8 Studbolt & 2 Hexagonal Nuts ASME b1.1 B18.2.2
Flourocarbon Coated ASTM A320-L7/ASTM A194-4
DUAL PEN CHART RECORDER
END FLANGE 4'' X 600# RF WITH NPT CONNECTION
PRESSURE GAUGE
CHECK VALVE
HYDROTEST
HYDROTEST PUMP
INSTALLATION
Gasket Spiral Wound 4" x 600# SS316 Graphite Filled SS316 Inner
Ring & CS Outer Ring
150 X 7/8 Studbolt & 2 Hexagonal Nuts ASME b1.1/B18.2.2
Flourocarbon Coated ASTM A320-L7/ASTM A194-4